NOTICE OF PROJECT COMPLETION
(Developer Projects)
The Transportation and Public Works Department upon the recommendation of the Project
Manager has accepted the following project as complete:
Project Name: 2601 Avenue J Avenue at Sycamore Park
City Project No.: 103804
Improvement Type(s): ❑x Paving ❑x Drainage ❑ Street Lights ❑x Traffic Signals
Original Contract Price:
Amount of Approved Change Order(s):
Revised Contract Amount:
Total Cost of Work Complete:
1411
Pro; aJun 15, 20 12:39 CST Jun 15, 2024
Contractor Date
Proiec[4 anaeer lJ un 15. 202 14 2:3_
Title
North Texas Contractors
Company Name
J u n 17, 2024
Project Inspector
Date
J u n 18, 2024
Project Manager
Date
Jun 18 2024
Rebecca Owen (Jun 18, 202410:08 CDT)
CFA Manager
Date
A.
Jun 18, 2024
Lauren Prieur (Jun 18, 202410:25 CDT)
TPW Director
Date
��
Jun 18, 2024
Asst. City Manager
Date
$244,203.00
$0.00
$0.00
$244,203.00
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Page 1 of 2
Notice of Project Completion
Project Name: 2601 Avenue J Avenue at Sycamore Park
City Project No.: 103804
City's Attachments
Final Pay Estimate ❑x
Change Order(s): ❑x Yes ❑ N/A
Contractor's Attachments
Affidavit of Bills Paid -
Consent of Surety
Statement of Contract Time
Contract Time 65 WD
Days Charged: 349
Work Start Date: 8/25/2022 Work Complete Date: 6/07/2024
Completed number of Soil Lab Test: 110
Completed number of Water Test: 8
Page 2 of 2
FORT WORTH
,%golf *00
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name AVENUE AT SYCAMORE PARK
Contract Limits
Project Type DRAINAGE, PAVING AND STREETSIGN
City Project Numbers 103804
DOE Number 8040
Estimate Number I Payment Number i For Period Ending
City Secretary Contract Number Contract Time
Contract Date 6/2/2022 Days Charged to Date
Project Manager NA Contract is 100.00
Contractor NORTH TEXAS CONTRACTING, INC.
P.O. BOX 468
Inspectors
KELLER , TX 76244
A. DUARTE / P. HERNANDEZ
6/7/2024
WD
13WD
65
Complete
Tuesday, June 11, 2024 Page 1 of 5
City Project Numbers 103804 DOE Number 8040
Contract Name AVENUE AT SYCAMORE PARK Estimate Number 1
Contract Limits Payment Number I
Project Type DRAINAGE, PAVING AND STREETSIGN For Period Ending 6/7/2024
Project Funding
UNIT III DRAINAGE IMPROVEMENTS
Item
Description of Items
Estimated Unit
Unit Cost
Estimated
Completed
Completed
No.
Quanity
Total
Quanity
Total
1
24" RCP, CLASS III
106 LF
$55.00
$5,830.00
106
$5,830.00
2
48" RCP, CLASS III
208 LF
$105.00
$21,840.00
208
$21,840.00
3
6' X 6' STORM JUNCTION BOX
2 EA
$5,600.00
$11,200.00
2
$11,200.00
4
20' CURB INLET
2 EA
$6,500.00
$13,000.00
2
$13,000.00
5
5'X5' DROP INLET
1 EA
$3,750.00
$3,750.00
1
$3,750.00
6
TRENCH SAFETY
294 LF
$1.00
$294.00
294
$294.00
7
18" LATERAL LINE IN BEACH STREET
1 LS
$1,500.00
$1,500.00
1
$1,500.00
8
TRAFFIC CONTROL
1 MO
$1,750.00
$1,750.00
1
$1,750.00
9
REMOVE CONCRETE PAVEMENT
214 SY
$12.00
$2,568.00
214
$2,568.00
10
--------------------------------------
6" CONCRETE PAVEMENT REPAIR
214 SY
$56.00
$11,984.00
214
$11,984.00
Sub-Total of Previous Unit
$73,716.00
$73,716.00
UNIT IV PAVING IMROVMENTS
Item Description of Items
No.
----------------
1 HYDRATE LIME (CO#1)
2 6" LIME TREATMENT (CO#1)
3 6" CONC PAVMT(CO#1)
4 CONCRETE CURB & MEDIAN CURB
5 BARRIER FREE RAMO, TYPE P-1
6 MANHOLE ADJUSTMENT, MINOR CONNER
STREET
7 CONCRETE SIDEWALK (CO#2)
8 REMOVE EXISTING SIDEWALK AVENUE I
9 REMOVE EXISTTING ASPHALT CONNER
STREET
10 6" SOLID BLACK PAVEMENT MARKING
@CROSS WALK
11 24" SOLID WHITE PAVEMENT MARKING@
CROSSWALK
12 REMOVE CONCRETE CURB AND GUTTER@
MEDIAN
13 REMOVE CONCRETE PAVEMENT@ MEDIAN
Estimated
Unit
Unit Cost
Estimated
Completed
Completed
Quanity
Total
Quanity
Total
-----------------------
20.86
TN
$200.00
$4,172.00
20.86
$4,172.00
1295
SY
$5.00
$6,475.00
1295
$6,475.00
1246
SY
$56.00
$69,776.00
1246
$69,776.00
1040
LF
$3.00
$3,120.00
1040
$3,120.00
4
EA
$750.00
$3,000.00
4
$3,000.00
1
EA
$750.00
$750.00
1
$750.00
12644
SF
$5.00
$63,220.00
12644
$63,220.00
2495
SF
$1.00
$2,495.00
2495
$2,495.00
780
SY
$9.00
$7,020.00
780
$7,020.00
60
LF
$2.25
$135.00
60
$135.00
30
LF
$7.50
$225.00
30
$225.00
20
LF
$20.00
$400.00
20
$400.00
5
SY
$50.00
$250.00
5
$250.00
Tuesday, June 11, 2024 Page 2 of 5
City Project Numbers 103804
Contract Name AVENUE AT SYCAMORE PARK
Contract Limits
Project Type DRAINAGE, PAVING AND STREETSIGN
Project Funding
DOE Number 8040
Estimate Number 1
Payment Number 1
For Period Ending 6/7/2024
14
EROSION CONTROL
1 LS
$750.00
$750.00
1
$750.00
15
TRAFFIC CONTROL
1 MO
$1,750.00
$1,750.00
1
$1,750.00
Xl
DEMO, FOAMING, & STEEL PLACEMENT
1 LS
$5,000.00
$5,000.00
1
$5,000.00
WITHIN AREA WHERE PARKING TO BE
DELETED
X2
REPLACE CURB & RESTORE PARKWAY AREA
1 LS
$1,249.00
$1,249.00
1
$1,249.00
---------------------------------------
(CO#l)
Sub-Total of Previous Unit
$169,787.00
$169,787.00
UNIT
VI STREET SIGN IDIPROVENIENTS
Item
Description of Items
Estimated Unit
Unit Cost
Estimated
Completed
Completed
No.
Quanity
Total
Quanity
Total
1
---------------------------------------
STOP SIGNS (Rl-1)
2 EA
$350.00
$700.00
2
$700.00
---------------------------------------
Sub-Total of Previous Unit
$700.00
$700.00
Tuesday, June 11, 2024 Page 3 of 5
City Project Numbers 103804
Contract Name AVENUE AT SYCAMORE PARK
Contract Limits
Project Type DRAINAGE, PAVING AND STREETSIGN
Project Funding
Contract Information Summary
Original Contract Amount
Change Orders
Change Order Number 1
Change Order Number 2
Total Contract Price
DOE Number 8040
Estimate Number I
Payment Number I
For Period Ending 6/7/2024
$244,203.00
$0.00
$0.00
$244,203.00
Total Cost of Work Completed $244,203.00
Less % Retained $0.00
Net Earned $244,203.00
Earned This Period $244,203.00
Retainage This Period $0.00
Less Liquidated Damages
Days @ / Day
LessPavement Deficiency
Less Penalty
Less Previous Payment
Plus Material on Hand Less 15%
Balance Due This Payment
$0.00
$0.00
$0.00
$0.00
$0.00
$244,203.00
Tuesday, June 11, 2024 Page 4 of 5
City Project Numbers 103804 DOE Number 8040
Contract Name AVENUE AT SYCAMORE PARK Estimate Number I
Contract Limits Payment Number I
Project Type DRAINAGE, PAVING AND STREETSIGN For Period Ending 6/7/2024
Project Funding
Project Manager NA City Secretary Contract Number
Inspectors A. DUARTE / P. HERNANDEZ Contract Date 6/2/2022
Contractor NORTH TEXAS CONTRACTING, INC. Contract Time 130 WD
P.O. BOX 468 Days Charged to Date 65 WD
KELLER, TX 76244 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
--------------------
Total Cost of Work Completed $244,203.00
Less % Retained
$0.00
Net Earned
$244,203.00
Earned This Period $244,203.00
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 / Day
$0.00
LessPavement Deficiency
$0.00
Less Penalty
$0.00
Less Previous Payment
$0.00
Plus Material on Hand Less 15%
$0.00
Balance Due This Payment
$244,203.00
Tuesday, June 11, 2024 Page 5 of 5
PROJECT NAME:
CONTRACT:
+CFA #
ICITY PROJECT #
IDOE #
WATER PROJECT #
[SEWER PROJECT #
[FILE #
INSPECTOR:
PROJECT MANAGER:
DEVELOPER -AWARDED -PROJECT CHANGE ORDER
Avenue at Sycamore Park
57560 CITY PARTICIPATION: 0.00
103804
30114-0200431-103804-EO7685
WATER
Developer
Cost
574,607.00
ORIGINAL CONTRACT
EXTRAS TO DATE
$0.00
CREDITS TO DATE
$0.00
.
CONTRACT TO DATE
$74,637.00
AMOUNT OF PROP. CHANGE ORDER
$0.00REVISSED
CQNTRAJT AMOUNT
TOTAL RE ISED ONTRACT AMOUNT
$74,607.00
.
PER UNIT
$74,607.00
REVISED COST SNARE
Dew. Cost:
TOTAL REVISED CONTRACT
Phone No:
Phone No:
1
CONTRACT UNIT
SEWER
PAVING
DRAINAGE
STREETLIGHTS
eveloper
ost
Developer
Cost
Developer
Cost
Developer
Cost
$27,214.00
$169,787.00
$73,716.00
$245,517.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$27,210.00
$169,787.00
573,716.00.
$245,517.00
$0.00
$0.00
$0.00
E0.00
$27,214.00
$169,787.00
$73,716.00
E245,517.00
527,214.00
$169.787.00
$73.716.00
$248.517.00
$590,841.00
City Cos .
$690,841.00
VCONTRACT
f DAYS
0
0
Revised: 10-12-2011 Page 1
You are directed to make the following changes in the cmtract documents:
CITY BID ITEM
PAY ITEM N
N QUANTITY UNIT ITEM DESCRIPTION UNIT PRICE
TOTAL
11. Hydrated Lime
3211.0400 (1.64) TN Delete Bulk Lime for Concrete Paving 200
$ t328.00+ I
12 6' Lime Treatment
3211.0501 (109.00) SY Delete Labor for Lime Stabilizing Subgrade 5
$ J545 00 I
13. 6" Concrete Pavement
3213.0101 (96.00) SY Delete Paving from Concrete 56
$ ( 376.00)1
Demo, Forming, & Steel
$ 5,000.00
IX1.
Placement within area where parking
Area where parking being deleted has already been cleared, excavated, forms set,
to be deleted
NIA 1 LS and rebar placed prior to decision to delete this pavement. 5000
X2 Replace Curb & Restore Parkway
$ 1,249.001
Area
N/A 1 LS 6" Curb must be replaced on Avenue I, curb back filled and stabilized. 1249
I
TOTAL
0.00
REASONS FOR CHANGE ORDER
Existing Water facifities exist within area proposed as parallel parking, specifically a water service vault and an air release valve riser. This change
order is
necessary to delete a portion of the parallel parking (4 spaces total) to avoid removal or relocation of the existing water facilities. the parking to be
removed is
not a part of the required parking for the site.
NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100% OF THE CHANGE ORDER COST AND NO
REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER.
RECOMMENDED:
Barron -stark !ngi ers, LP
By:
Name. Charles Stark, PE
Title: Proiect Engineer
APPROVED:
CSHAveenue at Sycamore Park, LTD.
By: Dj ak✓ Ri ,�.�Di1'U U Y1Qi
Name: Eleanor M C Fanning
Title: Executive Director
APPROVED,
North Texas
Contracting, Inc.
By:
Name: Zach Fusilier
Title: Vice President
Revised: 10-12-2011 Page 2
REVIEWED
By George Marqeuez, P.E. at 4:56 pm, Dec 05, 2023
DEVELOPER -AWARDED -PROJECT CHANGE ORDER
I PROJECT NAME:
Avenue at Svcarnore Park
(CONTRACT:
2
ICFA#
57560
CITY PARTICIPATION:
0.00
CITY PROJECT #
103804
DOE #
WATER PROJECT #
SEWER PROJECT #
(FILE #
30114-0200431-103804-EO7685
INSPECTOR: William
Rodgers
Phone No:
682-693-2418
PROJECT MANAGER: George Marquez
Phone No:
817-392-6826
CONTRACT UNIT
WATER
SEWER
PAVING
t DRAINAGE
I STREETLIGHTS
CONTRACT
Developer
Developer
Developer
I
DAYS
Cost i City Cost
Cost City Cost
Developer Cost City Cost
Cost City Cost
1 Developer Cost City Cost
ORIGINAL CONTRACT
$74,607.00
$27,214.00
$169,787.00
$73,716.00
$245,517.00__
II.
_
EXTRAS TO DATE
$0.00 F
$0.00
$0.00
$0.00
$0.00
CREDITS TO DATE
$0.00
$0.00
$0.00
$0.00
_
$0.00
CONTRACT TO DATE
$74,607.00 ! $0.00
$27,214.00 $0.00
$169,787.00 $0.00
$73,716.00 $0.00
$245,517.00 $0.
0
(AMOUNT OF PROP. CHANGE ORDER
$0.00
$0.00
$0.00
$0.00
$0.00
REVISED CONTRACT AMOUNT
$74,601.00 $0.00
$27,214.00 $0.00
$169.787.00 $0.00
$73,716.00 $0,00
$245,517.00 $0.00
0
TOTAL REVISED CONTRACT AMOUNT
PER UNIT
$74,607.00
$27,214.00
$169,787.00
$73,716.00
I $245,517.00
REVISED COST SHARE
Dev. Cost:
$590,841.00
City Cost:
$0.00
TOTAL REVISED CONTRACT
$590,841.00
Revised: 10-12-2011 Page 1
You are directed to make the followino chanties in the mract documente:
CITY BID ITEM
PAY ITEM A # OUANTRY UNrr ITEM DESCRIPTION UNIT PRICE TOTAL
I 7. CoWPIP Sidewalk 3213.0301 0 SF Adivat alinnment of sidewalk alono Connor Avenue oer Sheet C9.0 $5.00 $D.00 I
TOTAL
REASONS FOR CHANGE ORDER This no -cost change order required to memorialize an adjustment to Bre alignment of the sidewalk along Connor Avenue per Revised Sheet C9.0
NO CITY FUNDS INVOLVED IN Tt3S CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100% OF THE CHANGE ORDER COST AND NO
REIMBURSEMENT FROM THE CITY WILL BESOUGHT By THE DEVELOPER.
RECOMMENDED: APPROVED: APPROVED.
BY: B/ artn �ngin� rs. LP C5H Avenue a re Para, ND. North Texas ContracNing, Inc.
By-
IName: Charles Stark PE Name: Eteanor M C. Fanning ,Name: Zach Fusilier
rNe: Proiect Enoineer Title: Executive director Title: Vice President
Revised: 10-12-2011 Page 2
FORTWORTH
TRANSPORTATION AND PUBLIC WORKS
June 7, 2024
North Texas Contractors
4999 Keller -Haslet Road
Fort Worth, TX 76244
RE: Acceptance Letter
Project Name: 2601 Avenue J Avenue at Sycamore Park
Project Type: Water, Sewer, Paving & Drainage Improvements
City Project No.: 103804
To Whom It May Concern:
On March 28, 2024 a final inspection was made on the subject project. There were punch list items
identified at that time. The punch list items were completed on June 7, 2024. The final inspection and
the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is
therefore accepted by the City. The warranty period will start on June 7, 2024, which is the date of the
punch list completion and will extend of two (2) years in accordance with the Contract Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at George
Marquez — 817-392-6826.
Sincerely,
George Marquez, Project Manager
Cc: Pedro Hernandez, Inspector
Troy Gardner, Inspection Supervisor
Ariel Duarte, Senior Inspector
Andrew Goodman, Program Manager
Barron —Stark Engineers, LP, Consultant
North Texas Contractors, Contractor
CSH Avenue at Sycamore Park, LTD, Developer
File
E-Mail: TPW_Acceptance@fortworthtexas.gov
Rev. 8/20/19
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me, the undersigned authority, a notary public in the state
and county aforesaid, on this day personally appeared COLIN EGAN, PM
Of NORTH TEXAS CONTRACTING, INC, known to me to be a credible
person, who being by me duly sworn, upon his oath deposed and said;
That all persons, firms, associations, corporations, or other
organizations furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury and/or
property damages;
On Contract described as;
Water, Sewer, Paving, Drainage & Street Light Improvements to Avenue
at Sycamore Park - CPN 103804
BY
COLIN EGAN
Subscribed and sworn before me on this date 8 of March, 2024.
....... ,.........
=otPaY P�e�c JOHN M TOMB JF
NOTARY PUBLIC STATE OF TEXAS
* MY COMM. EXP. OB/27/2025
s � NOTARY ID 13330165-7
r
NORTH TEXAS
t •J fg Iit" g 10 Lej
03/08/2024
City of Fort Worth
CFA Administration
200 Texas St.
Fort Worth, TX 76102
RE: AVENUE AT SYCAMORE PARK
CFA# 57560 City Project # 103804 IPRC# 22-0028
COMPONENTS: Water, Sewer, Paving, Drainage, Street Lights
The purpose of this letter is to acknowledge that North Texas Contracting
have been paid in full by CSH Avenue at Sycamore Park, Ltd for the public
improvements constructed to serve Avenue at Sycamore Park in Fort Worth,
Texas. As a result, we hereby waive, release and relinquish all rights to
assert any claim or demand for lien in connection with this project.
Please feel free to contact me with any questions you may have.
Sincerely,
Colin Egan
Project Manager
615-474-8988
4999 Keller -Haslet Road Keller, Texas 76248 Phone (817) 430-9500 Fax (817) 430-9207