Loading...
HomeMy WebLinkAboutContract 59134-FP1-FP1 City Secretary59134 Contract No. FORTWORTH. Date Received 06/24/2024 AT NOTICE OF PROJECT COMPLETION (Developer Projects) The Transportation and Public Works Department upon the recommendation of the Project Manager has accepted the following project as complete: Project Name: ATCN Proposed Grocery Store City Project No.: 104284 Improvement Type(s): Water 0 Sewer 0 Original Contract Price: $174,040.78 Amount of Approved Change 0rder(s): $54,180.04 Revised Contract Amount: $228,220.82 Total Cost of Work Complete: $228,220.82 Cody e(yJun18,25:21 CDT) Jun 18, 2024 Contractor Date C&r% SlutGze- Cody Shu ze (Jun 18, 2024 15:21 CDT) Title Jeremiah Rader EMJ Corp Company Name ffer'-hol Stanley Sutter field Hershel Stanley Sutterfield(Jun l ,202415:41 CDT) Jun 18, 2024 Inspector PA`� Date Jun 23, 2024 Project Manager Date ,n Rebecca Owen (Jun 24,202408:20 CDT) Jun 24, 2024 CFA Manager Date 4&.., Lauren Prieur (Jun 24, 202408:22 CDT) Jun 24 2024 TPW Dire for Date Jun 25, 2024 Asst. City Manager Date OFFICIAL RECORD Notice of Project Completion CITY SECRETARY FT. WORTH, TX Page 1 of 2 Project Name: ATCN Proposed Grocery Store City Project No.: 104284 City's Attachments Final Pay Estimate ❑x Change Order(s): ❑x Yes ❑ N/A Pipe Report: ❑x Yes ❑ N/A Contractor's Attachments Affidavit of Bills Paid Consent of Surety Statement of Contract Time Contract Time: 280 WD Days Charged: 192 Work Start Date: 5/8/2023 Work Complete Date: 2/16/2024 Completed number of Soil Lab Test: 265 Completed number of Water Test: 8 Page 2 of 2 FORT WORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name PROPOSED GROCERY STORE (LOT 3, BLOCK 1 HERITAGE TRACE GR Contract Limits Project Type WATER IMPROVEMENTS City Project Numbers 104284 DOE Number 4284 Estimate Number 1 Payment Number 1 For Period Ending 2/16/2024 City Secretary Contract Number Contract Time Contract Date Days Charged to Date 192 Project Manager NA Contract is 100.00 Complete Contractor EMJ CONSTRUCTION 5525 N. MACARTHUR BLVD., SUITE 400 IRVING, TX 75038 Inspectors W. MILLER / S. SUTTERFIE Thursday, April 18, 2024 Page 1 of 5 City Project Numbers 104284 DOE Number 4284 Contract Name PROPOSED GROCERY STORE (LOT 3, BLOCK 1 HERITAGE TRACE G Estimate Number 1 Contract Limits Payment Number 1 Project Type WATER IMPROVEMENTS For Period Ending 2/16/2024 Project Funding UNIT I: WATER IMPROVEMENTS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 MOBILIZATION 1 LS $6,197.13 $6,197.13 1 $6,197.13 2 CONSTRUCTION STAKING 1 LS $586.96 $586.96 1 $586.96 3 TRENCH SAFETY 75 LF $7.83 $587.25 75 $587.25 4 20" CASING BY OTHER THAN OPEN CUT 40 LF $984.68 $39,387.20 40 $39,387.20 5 24" CASING BY OTHER THAN OPEN CUT 35 LF $987.27 $34,554.45 35 $34,554.45 6 DUCTILE IRON WATER FITTINGS W/ 1 TN $7,716.18 $7,716.18 1 $7,716.18 RESTRAINT 7 8" DIP WATER 80 LF $118.57 $9,485.60 80 $9,485.60 8 12" DIP WATER 80 LF $140.87 $11,269.60 80 $11,269.60 9 1 1/2" WATER SERVICE (IRRIGATION) 1 EA $6,200.65 $6,200.65 1 $6,200.65 10 2" WATER SERVICE 1 EA $6,673.74 $6,673.74 1 $6,673.74 11 16"x8" TAPPING SLEEVE & VALVE 1 EA $16,134.36 $16,134.36 1 $16,134.36 12 16"xl2" TAPPING SLEEVE & VALVE I EA $18,907.16 $18,907.16 1 $18,907.16 13 UTILITY SERVICE SURFACE RESTORATION 155 SY $12.91 $2,001.05 155 $2,001.05 SODDING 14 8" GATE VALVE 1 EA $3,811.72 $3,811.72 1 $3,811.72 15 12" GATE VALVE 1 EA $6,207.69 $6,207.69 1 $6,207.69 16 6" FLEXIBLE BASE, TYPE A, GR-1 (CO#2) 17.3 SY $53.50 $925.55 17.3 $925.55 17 4" ASPHALT BASE TYPE B (CO#2) 17.3 SY $71.17 $1,231.24 17.3 $1,231.24 18 8" CONC PVMT (CO#2) 17.3 SY $235.39 $4,072.25 17.3 $4,072.25 19 6" CONC CURB AND GUTTER (CO#2) 12 LF $43.90 $526.80 12 $526.80 20 CONCRETE COLLAR FOR VALVE (CO#3) 1 EA $1,750.00 $1,750.00 1 $1,750.00 21 8" CUT - IN GATE VALVE (CO#3) 1 EA $8,125.00 $8,125.00 1 $8,125.00 Sub -Total of Previous Unit $186,351.58 $186,351.58 UNIT M SEWER IMPROVEMENTS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 INSTALL CONCRETE CAP OVER EXISTING 4 CY $1,080.01 $4,320.04 4 $4,320.04 SEWER LINE 2 MANHOLE ADJUSTMENT, MINOR (CO#1) 3 EA $10,700.00 $32,100.00 3 $32,100.00 3 CONCRETE COLLAR (CO#1) 3 EA $376.40 $1,129.20 3 $1,129.20 Thursday, April 18, 2024 Page 2 of 5 City Project Numbers 104284 DOE Number 4284 Contract Name PROPOSED GROCERY STORE (LOT 3, BLOCK 1 HERITAGE TRACE G Estimate Number 1 Contract Limits Payment Number 1 Project Type SEWER IMPROVEMENTS For Period Ending 2/16/2024 Project Funding 4 INSTALL CONCRETE CSP OVER EXISTING 4 CY $1,080.00 $4,320.00 4 $4,320.00 SEWER LINE (CO#1) Sub -Total of Previous Unit $41,869.24 $41,869.24 Thursday, April 18, 2024 Page 3 of 5 City Project Numbers 104284 DOE Number 4284 Contract Name PROPOSED GROCERY STORE (LOT 3, BLOCK 1 HERITAGE TRACE G Estimate Number 1 Contract Limits Payment Number 1 Project Type SEWER IMPROVEMENTS For Period Ending 2/16/2024 Project Funding Contract Information Summary Original Contract Amount $174,040.78 Change Orders Change Order Number 1 $37,549.20 Change Order Number 2 $6,755.84 Change Order Number 3 $9,875.00 Total Contract Price $228,220.82 Total Cost of Work Completed $228,220.82 Less % Retained $0.00 Net Earned $228,220.82 Earned This Period $228,220.82 Retainage This Period $0.00 Less Liquidated Damages Days @ / Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $228,220.82 Thursday, April 18, 2024 Page 4 of 5 City Project Numbers 104284 DOE Number 4284 Contract Name PROPOSED GROCERY STORE (LOT 3, BLOCK 1 HERITAGE TRACE G Estimate Number 1 Contract Limits Payment Number 1 Project Type SEWER IMPROVEMENTS For Period Ending 2/16/2024 Project Funding Project Manager NA Inspectors W. MILLER / S. SUTTERFIE Contractor EMJ CONSTRUCTION 5525 N. MACARTHUR BLVD., SUITE 400 IRVING, TX 75038 City Secretary Contract Number Contract Date Contract Time Days Charged to Date 192 Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $228,220.82 Less % Retained $0.00 Net Earned $228,220.82 Earned This Period $228,220.82 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 / Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $228,220.82 Thursday, April 18, 2024 Page 5 of 5 DocuSign Envelope ID: BD171534-AF9F-41 F4-9D2C-7BC977C22398 REVIEWED DEVELOPER -AWARDED -PROJECT CHANGE ORDER By Sandip Adhikari at 9:10 am, Jul 19, 2023 Water, Sanitary Sewer, Storm, Street Lighting & Paving Improvements to Serve Proposed PROJECT NAME: Grocery Store CHANGE CONTRACT: Water, Sanitary Sewer, Storm, Street Lighting & Paving Improvements ORDER No: ICFA # 22-0187 I CITY PARTICIPATION ICITYPROJECT# 104284 IFILE # W-2864 INSPECTOR: Stan Sutterfield Phone No: PROJECT MANAGER Sandie Adhikan Phone No: CONTRACT UNIT I WATER SEWER PAVING DRAINAGE STREETLIGHTS I CONTRACT Developer Developer Developer Developer DAYS Cost Citycost cost ciTy cost cost ciTy coat Developer Cost ciTy coat cost City Coat (ORIGINAL CONTRACT $169,720.74 E0.00 E4,320.04 E0.00 $401,513.54 E0.00 $567,394.13 E0.00 E57,249.23 $0,00 I EXTRAS TO DATE I (CREDITS TO DATE ICONTRACT TO DATE $169,720.74 $0.00 $4,320.04 $0.00 $401,513.54 $0.00 $567,394.13 $0.00 $57,249.23 120 I (AMOUNT OF PROP. CHANGE ORDER $ 37,549.20 $ 87,460.10 $ 1,750,216.94 120 I I REVISED CONTRACT AMOUNT $169,720.74 $0.00 $41,869.24 $0.00 $488,973.64 $0.00 _ $2,317,611.07 $0.00 $57,249.23 240 CONTRACT TOTAAMO NIED T PER UNIT $169,720.74 $41,869.24 $488,973.64 $2,317,611.07 $57,249.23 REVISED COST SHARE Dev. Cost: $3,076,423.92 City Cost: TOTAL REVISED CONTRACT $3,075,423.92 You are directed to make the following changes in t e contract do umentsCl I BID I I I PAY ITEM# ITEM QUANTITY UNIT ITEM DESCRIPTION UNITPRICE TOTAL (sewer Improvements I 1 2* 1305.0108 3 EA 3305.0107 Manhole Adjustment, Minor $ 10,700.00 $ 32,100.001 I 3* 3305.0112 3 EA 3305.0 11 2 Concrete Collar $ 376.40 $ 1,129.20 I 1 4* 9999.9999 4 CY 9999.0001 Install concrete cap over existing sewer line $ 1,080.00 $ 4,320.00 I I Change Order Addition $ 37,549.201 Drainage Improverpenta I.i 0241.0800 4,320 CY 0241.0800 Remove Rip Rap $ 4.93 $ 21,297.601 I 8 3123.0101 4,000 CY 3123.0101 Unclassified Excavation by Plan (for storm drain improvements) $ 27.00 $ 108,000.001 1 9 3137,0102 -190 SY 3137.0102 Large Stone Riprap, dry $ 143.22, $ (27,211.80)1 I 11 3305.0109 90 LF 3305.0109 Trench Safety $ 1.17 $ 105.301 1 20* 3305.0108 1 EA 3305.0108 Miscellaneous Structure Adjustment $ 6,200.00 $ 6,200.001 I 13 3341.0103 20 LF 3341.0205 24" RCP, Class III $ 262.96 $ 5,259.201 1 14 3341.0302 70 LF 3341.0302 48" RCP, Class III $ 259.44 $ 18,160.801 I 17 3349.9003 1 EA 3349.9003 4' Grate Inlet (Grate Rim Only) $ 6,219.43 $ 6,219.43 1 1 18 3349.4113 -1 EA 3349.4113 48" SET, 1 pipe $ 9,552.19 $ (9,552.19)1 I 19 3292.0500 -1,260 SY 3292.0500 Seeding, Soil Retention Blanket $ 7.04 $ (8,870.40)1 1 21* 3341.1502 410 LF 3341.1502 8x5 Box Culvert $ 1,515.93 $ 6 1,531.301 1 22* 3341.2001 540 LF 3341.2001 10x4 Box Culvert $ 1,628.18 $ 879,217.201 1 23* 3349.0104 1 EA 3349.0104 4' Stacked Manhole $ 8,305.00 $ 8,305.00 1 I 24* 3349.6002 1 EA 3349.6002 15' Recessed Inlet $ 20,020.00 $ 20,020.001 1 25 9999.9999 1 EA 60'X6' Junction Box $ 101,535.50 $ 101,535.501 1 Chang -Order Addition $ 1,795,851.331 1 Change Order Deduction $ (45,634.39)1 1 Change Order Net Addition $ 1,750,216.941 1 Paving Improvements 9 0241.0100 1,820 SF 0241.0100 Remove Sidewalk $ 5.87 $ 10,683.401 11 I 3213.0301 I 1,690 I SF I 3213.0301 4" Cone Sidewalk I $ 45.43 $ 76,776.701 Change Ober Addition $ 87,460.101 TOTAL I * New pay items added Total Cost Addition $ 1,920,860.63 Total Cost Subtraction $ (45,634.39) Total Change order cast $ 1,875,226.24 REASONS FOR CHANGE ORDER Updates to construction plans per approved FSR-22-0003 to include the proposed fill within the existing floodplain area and subsequent culvert extensions on site. NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100% OF THE CHANGE ORDER COST AND NO REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER. RECOMMENDED Baird, Hampton & Brown, Inc By: Name: Joe LaCroix, PE Title: Civil Engineer APPROVED: H-E-B, LP R.- Wang By: 3a„amm.oasm Name Rebecca Wang Title: Senior Engineer APPROVED: EMJ Construction eeee �,yJ �2GGLWrit, Oa4enl By'. Name William Mosher Title Executive Vice President Revised 10-12-2011 Page 1 DocuSign Envelope ID: 34C9C6C2-6299-4E1C-882B-E69B0147EC50 DEVELOPER -AWARDED -PROJECT CHANGE ORDER Water, Sanitary Sewer, Storm, Street Lighting & Paving Improvements to Serve Proposed PROJECT NAME: Grocery Store CHANGE CONTRACT: Water, Sanitary Sewer, Storm, Street Lighting & Paving Improvements ORDER No: ICFA # 22-0187 CITY PARTICIPATION:( ICITY PROJECT # 104284 2 FILE # W-2864 I INSPECTOR: Stan Sutterfield Phone No: PROJECT MANAGER: Sandip Adhikari Phone No: WATER I SEWER CONTRACT UNIT I PAVING DRAINAGE STREETLIGHTS CONTRACT er IDeveloper DAYS I 120 I 120 I I 240 I 20 260 You are directed to make the following changes in the contract documents I CITY BI#D ITEM( I I I I PAY ITEM # QUANTITY UNIT ITEM DESCRIPTION UNIT PRICE TOTAL I Water Improvements 1 1 16* 3211.0112 17.3 SY 3211.0112 6" Flexible Base, Type A, GR-1 $ 53.50 J $ 925.55 I 17* 32t2.0501 17.3 SY 3212.0501 4" Asphalt Base Type B $ 71.1- $ 1,231.241 18* 3213.0103 17.3 SY 3213.0103 8" Conc Pvmt $ 235.39 1 $ 4,072.25 1 19* 3216.0101 12 LF 3216.0101 6" Conc Curb and Gutter $ 43.90 $ 526.80 1 1 * New pay items added Total Change order cost $ 6,755.84 REASONS FOR CHANGE ORDER Pavement repair withing N. Riverside Drive of concrete street panel to allow for connection of water lime 1 to existing 16" water line near station 17+35 as shown on sheet 5 " Water Plan" of the approved IPRC plans. NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100 % OF THE CHANGE ORDER COST AND NO REIMBURSEMENT FROM THE CITY WILL BESOUGHT BY THE DEVELOPER. RECOMMENDED: Baird, Hampton & Brown, Inc By: Name: Joe LaCroix, PE Tine: Civil Engineer APPROVED: H-E-B, LP ev Rebecca Wang"pz3�'z�,s ems° Name Rebecca Wang Title: Senior Engineer APPROVED: EMJ Construction By: Wi-WtI-1. William Mosher Name: Tine: Executive Vice President REVIEWED 1 By Sandip Adhikari at 4:33 pm, Jul 28, 2023 J ORIGINAL CONTRACT EXTRAS TO DATE CREDITS TO DATE CONTRACT TO DATE (AMOUNT OF PROP. CHANGE ORDER IREVISED CONTRACT AMOUNT TOTAL REVISED CONTRACT AMOUNT PER UNIT REVISED COST SHARE TOTAL REVISED CONTRACT Cost City Cost $169,720.74 $0.00 $169,720.74 $0.00 $ 6,756.84 $176,476.58 i $0.00 $176,476.58 Dev. Cost: Cost City Cost $4,320.04 $0.00 $ 37,649.20 $41,869.24 $0.00 $41,869.24 $0.00 $41,369.24 $3,082,179.76 lCost City Cost Developer Cost City Cost $401,513.54 $0.00 I $567,394.13 I $0.00 $ 87,460.10 I $ 1,750,216.941 I I $483,973.64 $0.00 I $2,317,611.07 I $0.00 I $483,973.64 $0.00 I $2,317,611.07 I $0.00 $488,973.64 $2,317,611.07 City Cost: $3,082,179.76 Cost City Cost $67,249.23 $0.00 $57,249.23 $0.00 $57,249.23 $0.00 I $57,249.23 Revised: 10-12-2011 Page 1 DocuSign Envelope ID: 45CEC1 E4-8E08-4161-85EB-9E3800BE6C42 DEVELOPER -AWARDED -PROJECT CHANGE ORDER Water, Sanitary Sewer, Storm, Street Lighting & Paving Improvements to Serve Proposed PROJECT NAME: Grocery Store CHANGE CONTRACT: Water, Sanitary Sewer, Storm, Street Lighting & Paving Improvements ORDER No: ICFA # 22-0187 I CITY PARTICIPATION:( NO CITY PROJECT # 104284 3 FILE # W-2864 INSPECTOR: Stan Sutterfield Phone No: 817-240-4037 PROJECT MANAGER: Sandip Adhikari Phone No: 817-392-8424 CONTRACT UNIT CONTRACT DAYS I 120 I 160 I I 280 I 280 (ORIGINAL CONTRACT (EXTRAS TO DATE ICREDITS TO DATE ICONTRACT TO DATE (AMOUNT OF PROP. CHANGE ORDER IREVISED CONTRACT AMOUNT (TOTAL REVISED ER UNIT ACT AMOUNT REVISED COST SHARE TOTAL REVISED CONTRACT WATER Developer Cost I City Cost $169,720.74 I $0.00 $ 6,75&84I I $176,476.58 I $ 9,87&001 $186,351.58 I $0.00 $186,351.53 Dev. Cost: SEWER Developer Cost City Cost $4,320.04 $ 37,549.20 $41,869.24 $0.00 $41,869.24 $0.00 $41,869.24 $3,092,054.76 PAVING Developer Cost City Cost $401,513.54 $ 87,460.10 $488,973.64 $0.00 $488,973.64 $0.00 $488,973.64 City Cost: $3,092,054.76 DRAINAGE Developer Cost City Cost I $567,394.13 I $ 1,750,216.94 I I $2,317,611.07 $0.00 I I $2,317,611.07 $0.00 $2,317,611.07 STREETLIGHTS Developer Cost City Cost $57,249.23 $57,249.23 $0.00 $57,249.23 $0.00 I $57,249.23 You are directed to make the following changes in the contract documents CITY #D ITEM( I I I I PAYITEM# QUANTITY UNIT ITEM DESCRIPTION UNITPRICE TOTAL i Water Improvements i i 20* 3305.0117 EA 3305.0117 r for Valve 21* 133112.3033 I 1 I EA I33112.3103 8" Cut -in Gate Valve I $ 8,125.00 I $ 8,125.00 * Indicates new item Total Change order cost $ 9,875.00 REASONS FOR CHANGE ORDER Addition of 8" Cut In Gate Valve for Blow Off Valve at City's Request NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100% OF THE CHANGE ORDER COST AND NO REIMBURSEMENT FROM THE CITY WILL BESOUGHT BY THE DEVELOPER. RECOMMENDED: APPROVED: APPROVED: Baird, Hampton & Brown, Inc H-E-B, LP EMJ Construction pflysi11 by Rebecca Rebecca Wal z0z3.,z.m 'WlAa'w -MO�rz By: By: ��:wlbb 4706'00' By: ' William Mosher Name: Joe LaCroix, PE Name: Becca Wang, PE Name. Title: Civil Engineer Title: Senior Engineer Title: 11/30/2023 REVIEWED By Sandip Adhikari at 9:40 am, Mar 18, 2024 Revised: 10-12-2011 Page 1 FORTWORTH TRANSPORTATION AND PUBLIC WORKS PIPE REPORT FOR: PROJECT NAME: ATCN Proposed Grocery Store CITY PROJECT NUMBER: 104284 WATER PIPE LAID SIZE TYPE OF PIPE DIP 8" slip joint DIP 12" slip joint FIRE HYDRANTS: N/A VALVES (16" OR LARGER) PIPE ABANDONED SIZE TYPE OF PIPE DENSITIES: yes NEW SERVICES: 1.5 copper 2 copper SEWER PIPE LAID SIZE TYPE OF PIPE PIPE ABANDONED SIZE TYPE OF PIPE DENSITIES: yes NEW SERVICES: TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth • 1000 Throckmorton Street • Fort Worth, TX 76012-6311 (817) 392 - 7941 • Fax: (817) 392 - 7845 LF LF LF LF 80 80 1 ea 1 ea FORTWORTH. TRANSPORTATION AND PUBLIC WORKS April 10, 2024 EMJ Construction 5525 North McArthur Blvd. Suite 400 Irving. Tx 75038 RE: Acceptance Letter Project Name: ATCN Proposed Grocery Store Project Type: drainage,pav,street lights,water,sewer City Project No.: 104284 To Whom It May Concern: On March 27, 2024 a final inspection was made on the subject project. There were punch list items identified at that time. The punch list items were completed on April 15, 2024. The final inspection and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on April 15, 2024, which is the date of the punch list completion and will extend of two (2) years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at 817- 393-8424. Sandip Adhikari, Project Manager Cc: Hershel Stanley Sutterfield, Inspector Troy Gardner, Inspection Supervisor Cody Horton, Senior Inspector Andrew Goodman, Program Manager Baird, Hampton & Brown, Consultant EMJ Construction, Contractor H.E.B. Alliance Corp, Developer File E-Mail: TPW_Acceptance@fortworthtexas.gov Rev. 8/20/19 DocuSign Envelope ID: 3CDEB248-6639-42BD-A6C7-A43B5688D3C2 AFFIDAVIT STATE OF TEXAS COUNTY OF TARRANT Before me, the undersigned authority, a notary public in the state and county aforesaid, on this day personally appeared Cody Shulze, Project Manager of EMJ Construction, LLC., known to me to be a credible person, who being by ne duly sworn, upon his oath deposed and said; That all persons, firms, associations, corporations, or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Wroth has been paid in full; That there are no claims pending for personal injury and/or property damages; On Contract described as; ACTN Proposed Grocery Store CPN 104284 BY Cody shulze Name or Title Subscribed and sworn before me on this date 10"' of June, 2024 Notary Public Faith Cri ssman County, State Tarrant Texas FAITH CRISSMAN .( �. Notary 130884493 ��+►aR� My Commission Expires 10/17/2024 CONSENT OF SURETY TO FINAL PAYMENT AM Document G707 Bond No. 30168461 TO OWNF - (Nmne tu,d afdrt:�J H-E-B, LP 646 South Flores San Antonio, TX 78204 PROJECT: (rvalnN Arid addrWC�J OWNER ARCHITECT CONTRACTOR SURETY OTHFA ARCHITECT'S PROJECT NO.: CO.NTRACP FOR: CONTRACT DATED: Water, Sanitary Sewer, Storm, Street Lighting & Paving Improvements to Serve Proposed Grocery Store (Heritage Trace Grocer Addition Lt 3, Block 1) In accordance with the provislons of the Contract between die Owner and the Contractor as indicaretl above, the (Insvff marnr and addrtts ojsirrrlyJ Western Surety Company 151 N. Franklin St. Chicago, IL 60606 , SURETY, on bond of (Jrwn narnearrd addrvwq(Cailracrw) EMJ Corporation 5525 N. MacArthur Blvd., Suite 400 Irving, TX 75038 , CONTRACTOR, hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surety of any of its obligations io (hrwn name(4ndWdrw afOwner) H-E-B, LP 646 South Flores San Antonio, TX 78204 as set forth in said Surety's bond. IN WITNESS VMREOF, the Surety Iles hereunto set its hand on this date; Tune 12, 2024 (Jnsnrrl in a9ilhW (be inmvb fdAm ed bp rbr mmark dareand yv ar.) AMT! hannn YLar� y Western Surety Company (Ser►tNl'1 j, qqf—, (SYk,runr,rofurrrGo,r r[re ,3xvulrrriltJ William M. Smith, Attorney -in -Fact (Prri,hr! narrw arrd ikk) , OWNER, 0707--1994 Western Surety Company POWER OF ATTORNEY APPOINTING INDIVIDUAL ATTORNEY -IN -FACT Know All Men By These Presents, That WESTERN SURETY COMPANY, a South Dakota corporation, is a duly organized and existing corporation having its principal office in the City of Sioux Falls, and State of South Dakota, and that it does by virtue of the signature and seal herein affixed hereby make, constitute and appoint Mark W Edwards II, Jeffrey M Wilson, William M Smith, Robert R Freel, Aliss B Ferris, Anna Childress, Richard H Mitchell, Individually, of Birmingham, AL R E Daniels, Individually, of Pensacola, FL Robert M Verdin, Individually, of Covington, LA Robert R Davis, Individually, of Atlanta, GA its true and lawful Attomey(s)-in-Fact with full power and authority hereby conferred to sign, seal and execute for and on its behalf bonds, undertakings and other obligatory instruments of similar nature - In Unlimited Amounts - and to bind it thereby as fully and to the same extent as if such instruments were signed by a duly authorized officer of the corporation and all the acts of said Attorney, pursuant to the authority hereby given, are hereby ratified and confirmed. This Power of Attorney is made and executed pursuant to and by authority of the Authorizing By -Laws and Resolutions printed at the bottom of this page, duly adopted, as indicated, by the shareholders of the corporation. In Witness Whereof, WESTERN SURETY COMPANY has caused these presents to be signed by its Vice President and its corporate seal to be hereto affixed on this 9th day of November, 2023. `o�r��`� WESTERN SURETY COMPANY x / Lany Kasten, Vice President State of South Dakota ss County of Minnehaha On this 9th day of November, 2023, before me personally came Larry Kasten, to me known, who, being by me duly sworn, did depose and say: that he resides in the City of Sioux Falls, State of South Dakota; that he is a Vice President of WESTERN SURETY COMPANY described in and which executed the above instrument; that he knows the seal of said corporation; that the seal affixed to the said instrument is such corporate seal; that it was so affixed pursuant to authority given by the Board of Directors of said corporation and that he signed his name thereto pursuant to like authority, and acknowledges same to be the act and deed of said corporation. My commission expires i M. BENT e March 2, 2026 NOTARY PUBLIC(Mg. �. f�SOIITH OAKOTA *444444444\\\\4\44\44\\\ M. Bent, Notary Public CERTIFICATE I, L. Nelson, Assistant Secretary of WESTERN SURETY COMPANY do hereby certify that the Power of Attorney hereinabove set forth is still in force, and further certify that the By -Law and Resolutions of the corporation printed below this certificate are still in force. In testimony whereof I have hereunto subscribed my name and affixed the seal of the said corporation this 12th day of June, 2024. Srrc WESTERN SURETY COMPANY QQgORq,6-� ,6 L. Nelson, Assistant Secretary Authorizing By -Laws and Resolutions ADOPTED BY THE SHAREHOLDERS OF WESTERN SURETY COMPANY This Power of Attorney is made and executed pursuant to and by authority of the following By -Law duly adopted by the shareholders of the Company. Section 7. All bonds, policies, undertakings, Powers of Attorney, or other obligations of the corporation shall be executed in the corporate name of the Company by the President, Secretary, and Assistant Secretary, Treasurer, or any Vice President, or by such other officers as the Board of Directors may authorize. The President, any Vice President, Secretary, any Assistant Secretary, or the Treasurer may appoint Attorneys in Fact or agents who shall have authority to issue bonds, policies, or undertakings in the name of the Company. The corporate seal is not necessary for the validity of any bonds, policies, undertakings, Powers of Attorney or other obligations of the corporation. The signature of any such officer and the corporate seal may be printed by facsimile. This Power of Attorney is signed by Larry Kasten, Vice President, who has been authorized pursuant to the above Bylaw to execute power of attorneys on behalf of Western Surety Company. This Power of Attorney may be signed by digital signature and sealed by a digital or otherwise electronic -formatted corporate seal under and by the authority of the following Resolution adopted by the Board of Directors of the Company by unanimous written consent dated the 271 day of April, 2022: "RESOLVED: That it is in the best interest of the Company to periodically ratify and confirm any corporate documents signed by digital signatures and to ratify and confirm the use of a digital or otherwise electronic -formatted corporate seal, each to be considered the act and deed of the Company." Go to www.cuosuretv.com > Owner / Obligee Services > Validate Bond Coverage, if you want to verify bond authenticity. Form F4280-6-2023