Change Order Request
Project Name Westdiff Drainage Improvements, Ph. 1 and Sanitary Sewer Rehabilitation Contract 91, Pt. 2
Client Project #(s)I C01669 and C01957
CSC No. 57280-CO2
City Sec# 57280
Project Description TPW and Water Department partnership project constructing storm drain, water pipe, and sanitary sewer improvements in the Westdiff neighborhood.
Cirde C Construction Company Change Order#._l ___ 2 ___ _, Datel 6/4/2024Contractor! �========City Project M gr . ._l ____ M_ik_e _B _en_n _ett_,_P _E,_P _M _P ___ _. City lnspectorl.__ ____ B_ri _an_M_c_G_ill ____ _.
Dept
Original Contract Amount Extras to Date Credits to Date Pending Change Orders Qn M&C Process) Contract Cost to Date IGo to ADD & DEL Tabs to Enter CO Bac k up Revised Contract Amount Original Funds Avaiable for Change Orders Remaining Funds Available for this CO Additional Funding Qf necessary)
TPW Water Sewer
$7,520,168.70 $3,119,428.70 $4,023,655.20 $5,250.00 $24,875.00 $29,375.00
$7,525,418.70 $3,144,303.70 $4,053,030.20
$2142 00.00 $1 006192.00 $437 348.00 :57,739,618.70 :54, 150,495.70 :54,490,378.20 $376,000.00 $93,583.00 $120,710.00 $370,750.00 $68,708.00 $91,335.00 $937,484.00 $346,013.00
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS¾ OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Totals $14,663,252.60 $59,500.00
$14,722,752.60
$1,657,740.00 $16,380,492.60 $590,293.00 $530,793.00 $1,283,497.00
I 11.11% II $18,329,065.75 I
Contract Time
(CD) 730 10
740 190 930
Additional storm drain outfall items are needed due to a change in design. A Stone Strong wall was added to keep the City infrastructure within drainage easements and existing City-owned property. A temporary road and additional street signs are being added to the project scope on Mander1y Pl. to allow residents easier access to their driveways during construction and mark the parking lot entrance for a church. Temporary fencing is also being added to be placed along easement boundaries on site. Other line items have quantity increases due to over runs in the contract caused by changes due to field conditions. Some additional survey was also necessary to aid the City with easement negotiations. These easement were necessary to build the outfall for the storm drain system. Additional water pipe and paving items are necessary due to a change in project scope. Additional water pipe replacement was added along Trail Lake Dr. from W. Seminary Dr. to South Dr., Wyndale Ct., and Sierra Cl to replace cast iron water pipes. This also required additional paving for each street There are other paving items being added for streets with only water and sewer pipe replacement due to a change in paving scope. The original scope included permanent trench repair on these streets, that has been changed to pulverize and overlay to provide a better end product for residents. Other line items have quantity increases due to over runs in the contract caused by changes due to field conditions. 150 days are being added to the contract to account for the additional scope. 40 days are being added as part of this change order to account for days the contractor had to pull crews off site to respond to emergency water line breaks in the City. This contractor has an on-call contract for emergency repairs with the Water Department to respond in such situations. Contract item additions have been evaluated by City staff as necessary and the unit prices were determined to be reasonable when compared to City standard prices.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract, induding ensuring all performance and reporting requirements.
Contractor's Company Name I Contractor (Name) I Contract Sklnature Date
Cirde C Construction Comoanv I Teresa Skellv I = "<'LN. Jun 8,2024 T--��l\'/lun• ,ean
lnlllllldrlrlln!llllldlM Su� Date Proiecl and Contract Comoliance Manaaer Date
c?"',/,,.-fy;,J_ Jun 10, 2024 7'(,;&t,-at; Jun 6, 2024 Pmoram Manaaer Date Senior Caollal Pmled Officer Date
L,..,(,,_f--,. Jun 12,2024 ;&(L,., Jun 12, 2024 - J.,,.i, IIM1 '".lll:nn Assistant Director IIJ8Dt) Date Direclol: Contraclina Department 11Jem1 Date
'JJnf-1ritin L IAvulrnrv Jun 13,2024 ... a.Jun 13, 2024 atrldaLWlds&ck Junll 202409:l8C0TI l.al!l!"Prlellr(Junl3.l02409:31COT) Assistant l,;lty Attorney Date Assistant 1,;1tv Manaaer Date � Jun 25, 2024 rmq,-Jl ___, Jun 27, 2024 mn Councl Action frf 1911Uil8d)
M&CNumber 24-0393 M&C Date Approved 05-14-2024
Jannette Goodall, City Secretary
FoFr wo►zrH City of Fort Worth
��`� Change Order Additions
Project Name Westcliff Drainage Improvements, Ph. 1 and Sanitary Sewer Rehabilitation Contract 91, Pt. 2 City Sec # 57280
Client Project # C01669 and C01957
Contractor Circle C Construction Company PM Mike Bennett, PE, PMP Inspector Brian McGill
Change Order Submittal# O2 Date 6/412024
ADDITIONS
Change Order Additions Page 2 of S
Change Order Additions Page 3 of S
Foe_ T��TH City of Fort Worth
Change Order Deletions
Project Name Westcliff Draina e Im rovemenis, Ph.1 and Sanita Sewer Rehabilitation Coniract 91, Pt. 2 City Sec # 57280
Client Project # C01669 and C01957
Contractor Circle C Construction Company PM Mike Bennett, PE, PMP Inspector Brian McGill
Change Order Submittal #� Date 61412024
� •
�IL�1�1� � . . � � �' ' ���� ��'' i ��
� ' ' - ��. - �����
� � � � ���������� �, �� �,: � ��
� � � � � ..� ��������� �� �� �� � ��
� ' �����
� � � � •: � �� � � � � � �� �� � ���cr�:�:vuxnn
� i i i �.• � :��������� ', ii �.. iii
� --�� �
� �-���
� --�� �
� --�� �
� �-���
� --�� �
� --�� �
� �-���
� --�� �
� �-���
� --�� �
� �-���
� --�� �
� �-���
� --�� �
� �-���
� --�� �
� --�� �
� �-���
� --�� �
� �-���
� --�� �
� --�� �
� �-���
� �-���
� �-���
� --�� �
� �-���
� �-���
� �-���
� --�� �
� �-���
� --�� �
� --�� �
� �-���
� --�� �
� --�� �
� �-���
� --�� �
� �-���
� --�� �
� �-���
� --�� �
� �-���
� --�� �
� �-���
� --�� �
� --�� �
� �-���
� --�� �
� --�� �
� --�� �
� --�� �
� �-���
� --�� �
� �-���
� --�� �
� �-���
� --�� �
� �-���
� --�� �
� --�� �
� �-���
� --�� �
� �����
�.� ��
�� -�� ��
�� � � �
�
. .• • � �. .� i ii
Change Order Deletions Page 4 of 5
Previous Change Orders
Co# DATE AMOUNT
Total $0.00
MISBE for this Change Order
6/14/24, 3:45 PM
CITY COUNCIL AGENDA
Create New From This M8�C
DATE:
CODE:
5/14/2024 REFERENCE
N O..
C TYPE:
M&C Review
**M&C 24- LOG NAME:
0393
��RT�'�'ORTII
_�v
20SWM WESTCLIFF PH 1
AND CONTRACT 91 PT 2
CHANGE ORDER 2
PUBLIC
CONSENT HEARING: NO
SUBJECT: (CD 3 and CD 9) Authorize Execution of Change Order No. 2, with a Net Total Amount of
$1,657,740.00 after Deducts and the Addition of 190 Calendar Days, to the Contract with
William J. Schultz, Inc. dba Circle C Construction Company for the Construction of
Westcliff Drainage Improvements, Phase 1, and Sanitary Sewer Rehabilitation Contract
91, Part 2 and Adopt Appropriation Ordinance to Effect a Portion of Water's Contribution
to the Fiscal Years 2024-2028 Capital Improvements Program
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize the execution of Change Order No. 2 in the amount of $1,657,740.00 and the
addition of 190 calendar days to City Secretary Contract No. 57280 a contract with William J.
Schultz, Inc. dba Circle C Construction Company, for the Westcliff Drainage Improvements,
Phase 1, and Sanitary Sewer Rehabilitation Contract 91 Project, Part 2, for a revised contract
amount of $16,380,492.60; and
2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations
in the Water and Sewer Capital Projects Fund in the amount of $1,443,540.00, from available
PayGo residuals within the Water and Sewer Capital Projects Fund, for the purpose of funding
the Sanitary Sewer Rehabilitation Contract 91 project (City Project No. C01957) Part 2 and to
effect a portion of Water's Contribution to the Fiscal Years 2024-2028 Capital Improvement
Program.
DISCUSSION:
On February 22, 2022, by Mayor and Council Communication (M&C) 22-0120, the City Council
authorized a contract with William J. Schultz, Inc. dba Circle C Construction Company in the amount
of $14,663,252.60 for the construction of Westcliff Drainage Improvements, Phase 1, and Sanitary
Sewer Rehabilitation Contract 91, Part 2. The contract was subsequently revised by Change Order
No. 1 in the net amount of $59,500.00 administratively authorized January 19, 2023, that primarily
provided pay item quantity for temporary pavement repair, additional traffic control on the project and
additional street cleaning. This is a combined project between the Water Department and the
Transportation and Public Works (TPV� Department Stormwater Division (Stormwater).
Change Order No. 2 will provide for three main changes to the scoped project. The first change
includes the construction of new water pipes on Trail Lake Drive, Wyndale Court, and Sierra Court, as
requested by the Water Department as part of its cast iron replacement initiative. The change order
also provides for mill and overlay paving for all streets impacted by water and sewer pipe construction
in lieu of permanent pavement repair. The second change is that the Stormwater scope will add a
retaining wall at the downstream pipe outfall into the channel to prevent stormwater facilities from
encroaching onto adjacent properties. This change was identified after additional survey was
perFormed during the construction phase which better defined right-of-way constraints due to slope
stability issues. Lastly, the change order includes adjustments for quantity overruns such as concrete
paving repair, gate valves, and block sod placement. These are due to changes brought on by
existing field conditions that were encountered during construction. TPW's share of the change order
is $214,200.00, while the Water Department's share is $1,443,540.00 (Water: $1,006,192.00; Sewer:
$437,348.00).
apps.cfwnet.org/council_packeUmc_review.asp?ID=32099&councildate=5/14/2024 1 /3
6/14/24, 3:45 PM
M&C Review
The sanitary sewer component of this change order is part of the Water Department's Sanitary Sewer
Overflow Initiative Program. Approximately 1,107 linear feet of cast iron water pipe will be removed
and replaced as part of this change order.
Staff recommends that the contract time be extended by 190 calendar days due to the changes in
scope discussed above and for the time the contractor expended assisting the Water Department
with emergency water line repairs due to the February 2023 winter weather event which impacted
their work schedule on the Westcliff Project.
Contract item additions have been evaluated by City staff as necessary, and the unit prices were
determined to be fair and reasonable when compared to City standard prices and recently bid
projects.
The following table summarizes previous contract action and change orders:
Construction
Contract
Original Contract
(M&C 22-0120)
Date Scope
2/22/2022
Change Order No. Bid item changes such as type of water
� 1/19/2023 pipe installed and new bid items, such as
temporary paving and trash pick up.
Change Order No. Additional water pipe, mill and overlay
2 Pending paving, retaining wall, and quantity
adjustments.
Revised Contract
Amount
Additional
Appropriations
It is the practice of the Water Department to appropriate its CIP plan throughout the Fiscal Year (FY),
instead of within the annual budget ordinance, as projects commence, additional funding needs are
identified, and to comply with bond covenants. The actions in the M&C will appropriate funds in
support of the Water's portion of the City of Fort Worth's Fiscal Years 2024-2028 Capital Improvement
Program, as follows:
Sanitary Sewer Rehabilitation Contract 91 project:
Capital project FY2024 CIP Budget Change Revised
Fund Name Appropriations Authority �Increase/Decrease) FY2024 Budget
Name
W&S C01957
Capital — SS
Projects— Rehab $11,064,561.00 This M&C $1,443,540.00 $12,508,101.00
Fund Contract
56002 91
Appropriations for Sanitary Sewer Rehab Contract 91 project:
Fund
30100 General Capital Projects
(C01957)
56002 Water & Sewer Capital
Projects Fund (C01957)
59601 W&S Capital Projects
Existing
Appropriations
$1,050,034.00
$11,064,561.00
$4, 000.00
apps.cfwnet. org/council_packeUmc_review.asp?ID=32099&councildate=5/14/2024
$0.00
Amount
$14,663,252.60
$59,500.00
$1,657,740.00
$16,380,492.60
Project Total
$1,050,034.00
$1,443,540.00 $12,508,101.00
2/3
6/14/24, 3:45 PM
59607 Sewer Capital Legacy
Project Total
$498,439.00
$12,617,034.00
M&C Review
$0.00 $4,000.00
�
$0.00 $498,439.00
$1,443,540.00 $14,060,574.00
Funding is available for appropriation from available funds within the W&S Capital Projects Fund for
the purpose of funding the SS REHAB CONTRACT 91 project and funding is available within the
Stormwater Capital Projects Fund for the Westcliff Drainage project.
This project is located in COUNCIL DISTRICTS 3 AND 9.
DVIN: A waiver of the goal for Business Equity subcontracting requirements was requested, and
approved by the DVIN, in accordance with the applicable Ordinance, because the purchase of goods
or services is from sources where subcontracting or supplier opportunities are negligible;
FISCAL INFORMATION/CERTIFICATION:
The Director of Finance certifies that funds are currently available in the Unspecified-All Funds project
within the W&S Capital Projects Fund, and upon approval of the above recommendations and
adoption of the appropriation ordinance, funds will be available in the W&S Capital Projects Fund for
the SS REHAB CONTRACT 91 project. Prior to any expenditure being incurred, the Transportation &
Public Works and Water Departments have the responsibility of verifying the availability of funds.
TO
CFund Department Account Project Program Activity Budget Reference # Amount
ID ID Year (Chartfield 2) ]
Submitted for City Manager's Office by_
Originating Department Head:
Additional Information Contact:
ATTACHMENTS
Jesica McEachern (5804)
Lauren Prieur (6035)
Linda Young (2485)
20SWM WESTCLIFF PH 1 AND CONTRACT 91 PT 2 CHANGE ORDER 2(2).docx (CFW Internal)
20SWM WESTCLIFF PH 1 AND CONTRACT 91 PT 2 CHANGE ORDER 2.docx (Public)
20WESTCP1ANDSS91 P2CCO2-CIRCLEC FID Table.xlsx (CFW Internal)
20WESTCPIANDSS91 P2.pdf (Public)
CircIeC1295.pdf (CFW Internal)
PBS CPN C01957.pdf (CFW Internal)
SAM search results.pdf (CFW Internal)
Waiver for Westcliff Ph one.pdf (CFW Internal)
apps.cfwnet.org/council_packeUmc_review.asp?ID=32099&councildate=5/14/2024 3/3
FORTWORTH�
Routing and Transmittal Slip
Transportation & Public Works Department
DOCUMENT TITLE: Westcliff Drainage Improvements Ph 1 and Contract
91 Pt 2 Change Order 2
�vrx�r� N/A rpN� C01669 & �cn� S�2Rn nnr�� 2
------ - �— -- - C01957 ---- ----- - - -��- -
Date:
To: Name Department Initials Date Out
1. Mike Bennett TPW M�- J u n 6, 2024
2. Teri Skelly Contractor TS� J u n 8, 2024
t.skell circlecconstruction.com
3. Edward Davila TPW �� Jun 10, 2024
4. Linda Young TPW �� Jun 12, 2024
5. Lissette Acevedo TPW oC� .lun 12, 2024
6. Patricia Wadsack TPW �L�{/� Jun 13, 2024
7. Lauren Prieur TPW ?� Jun 13, 2024
8. Doug Black Legal o� J u n 25, 2024
9. Jesica McEachern CMO „ .lun 27, 2024
10. Ronald Gonzales CSO
11. Jannette Goodall CSO �un za, 2024
12. Allison Tidwell CSO .1un 2s, 2024
13. TPW SW Contracts TPW SW � Jun 13, 202
CC: TPW BSPAP Recon Team — Cindy Sengathith, Assistant PM — Dillon Johns
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES �No
RUSH: ❑YES �No SAME DAY: ❑YES ❑No NEXT DAY: ❑YES ❑No
ROUTING TO CSO: �YES ❑No
Action Reguired:
❑ As Requested
❑ For Your Information
� Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return to: tpw sw contracts(a�fortworthtexas.gov Ca11817-229-3283 with questions. Thank you!