HomeMy WebLinkAboutContract 57591-A1FP1FPl City Secretary
Contract No. 57591-Al -------
FORT WORTH® Date Received 6/26/202 4
6/28/24
NOTICE OF PROJECT COMPLETION
(Developer Projects)
The Transportation and Public Works Department upon the recommendation of the Project Manager has accepted the following project as complete:
Project Name: Vista West II Phase 2
City Project No.: 103524
Improvement Type(s): � Paving □Drainage □Street Lights □Traffic Signals
Original Contract Price:
Amount of Approved Change Order(s):
Revised Contract Amount:
Total Cost of Work Complete:
BrittanJ,au:iuf124 i2409:28CDT)
Contractor
Title
RPMX Construction
Company Name
Jesse Cervantes (Jun 24, 2024 09:29 COT) Project Inspector
Kb•'G=l�tfof2□Tl Project Manager
�/1\ Bebeccia Owen (Jun 26 2024 13·12 CDT) CFA Manager ;e...&,. I j)\/[fQ Prieur ( Itta 26 292413"3] CPD
TPW Director
Asst. City Manager
$2,447,956.85
$0.00
$0.00
$2,447,956.85
Jun 24, 2024
Date
Jun 24, 2024
Date
Jun 26, 2024
Date
Jun 26, 2024
Date
Jun 26, 2024
Date
Jun 27, 2024
Date
Page 1 of 2
Notice of Project Completion
Project Name: Vista West II Phase 2
City Project No.: 103524
City's Attachments
Final Pay Estimate �
Change Order(s): ❑ Yes ❑x N/A
Contractor's Attachments
Affidavit of Bills Paid�
Consent of Surety �
Statement of Contract Time
Contract Time 205 WD Days Charged: 329
Work Start Date: 7/18/2022 Work Complete Date: 6/18/2024
Completed number of Soil Lab Test: 1242
Completed number of Water Test: 20
Page 2 of 2
FORTWORTH
CITY OF FORT WORTH
F1NAL PAYMENT REQUEST
Contract Name VISTA WEST II PHASE 2
Contract Limits
Project Type PAVING IMPROVEMENTS
City Project Numbers 103524
DOE Number 3524
Estimate Number 1 Payment Number 1
City Secretary Contract Number
Contract Date
For Period Ending 6/18/2024
WD
Project Manager NA
Contractor RPMX CONSTRUCTION
5208 TENNYSON PARKWAY SUITE 130
PLANO , TX 75024
Inspectors T. GARDNER / J. CERVANTES
Contract Time S�JD
Days Charged to Date 329
Contract is 100.00 Complete
Thursday, June 20, 2024 Page 1 of 4
City Project Numbers 103524
Contract Name VISTA WEST II PHASE 2
Contract Limits
Project Type PAVING IMPROVEMENTS
Project F+unding
UNIT IV: PAVING IMPROVEMENTS
Item Description of Items
No.
1 REMOVE RIP RAP
2 8" FLEXIBLE BASE, TYPE A, GR-1
3 HYDRATED LIME
4 8" LIME TREATMENT
5 6" CONC PVMT
6 7" CONC PVMT
7 3" ASPHALT PVMT TYPE D
8 4" CONC SIDEWALK
9 BARRIER FREE RAMP, TYPE R-1
10 BARRIER FREE RAMP, TYPE P-1
11 BLOCK SOD PLACEMENT
12 FURNISH/INSTALL ALUM SIGN GROUND
MOLTNT CITY STD D3-1
13 FURNISH/INSTALL ALUM SIGN GROUND
MOLTNT CITY STD Rl-1
14 FURNISH/INSTALL ALUM SIGN GROUND
MOLTNT CITY STD Rl-1
15 FURNISH/INSTALL ALUM SIGN GROUND
MOLTNT CITY STF Rl-1
DOE Number 3524
Estimate Number 1
Payment Number 1
For Period Ending 6/18/2024
Estimated Unit Unit Cost Estimated Completed Completed
Quanity Total Quanity Total
832 SF $2.75 $2,288.00 832 $2,288.00
746 SY $18.00 $13,428.00 746 $13,428.00
907 TN $260.00 $235,820.00 907 $235,820.00
355�9 SY $3.50 $124,4�6.50 35559 $124,4�6.50
23121 SY $52.30 ,209,228.30 23121 1,209,228.30
10406 SY $55.40 $576,492.40 10406 $576,492.40
629 SY $48.00 $30,192.00 629 $30,192.00
20832 SF $7.00 �145,824.00 20832 $145,824.00
2 EA $2,300.00 $4,600.00 2 $4,600.00
26 EA $2,200.00 $57,200.00 26 $57,200.00
1720 SY $8.50 $14,620.00 1720 $14,620.00
36 EA $175.00 $6,300.00 36 $6,300.00
15 EA $85.00 $1,275.00 15 $1,275.00
1 EA $350.00 $350.00 1 $350.00
1 EA $50.00 $50.00 1 $50.00
16 MAILBOX CLUSTER CONCRETE FOUNDATION 224 SF
17 TYPE III BARRICADE 2 EA
18 CONCRETE HEADER 2 EA
19 SWPPP MAINTENANCE 4 MO
20 REMOVE TYPE III BARRICADE 2 EA
21 4" SLD PVMT MARKING HAS (Y) 241 LF
22 TOPSOIL 180 CY
Sub-Total of Previous Unit
$13.00 $2,912.00 224 $2,912.00
$1,000.00 $2,000.00 2 $2,000.00
$1,100.00 $2,200.00 2 $2,200.00
$500.00 $2,000.00 4 $2,000.00
$600.00 $1,200.00 2 $1,200.00
$4.65 $1,120.65 241 $1,120.65
$80.00 $14,400.00 180 $14,400.00
$2,447,956.85 $2,447,956.8�
Thursday, June 20, 2024 Page 2 of 4
City Project Numbers 103524
Contract Name VISTA WEST II PHASE 2
Contract Limits
Project Type PAVING IMPROVEMENTS
Project F+unding
Contract Information Summary
Original Contract Amount
Change Orders
DOE Number 3524
Estimate Number 1
Payment Number 1
For Period Ending 6/18/2024
$2,447,956.85
Total Contract Price $2,447,956.85
Total Cost of Work Completed g2,447,956.85
Less % Retained $0.00
Net Earned $2>447,956.85
Earned This Period $2,447,956.85
Retainage This Period $0.00
Less Liquidated Damages
Days @ / Day
LessPavement Deficiency
Less Penalty
Less Previous Payment
Plus Material on Hand Less 15%
Balance Due This Payment
$0.00
$0.00
$0.00
$0.00
$0.00
$2,447,9�6.85
Thursday, June 20, 2024 Page 3 of 4
City Project Numbers 103524
Contract Name VISTA WEST II PHASE 2
Contract Limits
Project Type PAVING IMPROVEMENTS
Project F+unding
Project Manager NA
Inspectors T. GARDNER / J. CERVANTES
Contractor RPMX CONSTRUCTION
5208 TENNYSON PARKWAY SUITE 130
PLANO , TX 75024
DOE Number 3524
Estimate Number 1
Payment Number 1
For Period Ending 6/18/2024
City Secretary Contract Number
Contract Date
Contract Time 55 WD
Days Charged to Date 329 WD
Contract is 000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center
Amount Gross Retainage Net
Funded
Total Cost of Work Completed
Less % Retained
Net Earned
Earned This Period $2,447,956.85
Retainage This Period $0.00
Less Liquidated Damages
� Days @ $0.00 / Day
LessPavement Deficiency
Less Penalty
Less Previous Payment
Plus Material on Hand Less 15%
Balance Due This Payment
$2,447,956.85
$0.00
$2,447,956.85
$0.00
$0.00
$0.00
$0.00
$0.00
$2,447,956.85
Thursday, June 20, 2024 Page 4 of 4
�'�������rH�
TRANSPORTATION AND PUBLIC WORKS
June 18, 2024
RPM xconstruction, LLC
6500 Meyer Way
McKinney, Texas 75070
RE: Acceptance Letter
Project Name: Vista West II Ph2
Project Type: Paving
City Project No.: 103524
To Whom It May Concern:
On June 14, 2024 a final inspection was made on the subject project. There were punch list items
identified at that time. The punch list items were completed on June 18, 2024. The final inspection
and the corrected punch list items indicate that the work meets the City of Fort Worth specifications
and is therefore accepted by the City. The warranty period will start on June 18, 2024, which is the date
of the punch list completion and will extend of two (2) years in accordance with the Contract
Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at (817)
392-7872.
Sincerely,
K�G 9a�i�cty'v P. E.
Khal Jaafari P.E (Jun 2G, 202411:51 CDT)
Khal Jaafari, Project Manager
Cc: Jesse Cervantes, Inspector
Troy Gardner, Inspection Supervisor
Ariel Duarte, Senior Inspector
Andrew Goodman, Program Manager
Pape-Dawson Engineers, Consultant
RPM xconstruction,LLC., Contractor
LGI HOMES, Developer
File
E-Mail: TPW_Acceptance@fortworthtexas.gov
Rev. 8/20/19
AFFEDAVIT
STATE OF TEXAS
COUNTY OF COLLIN
Qefore me. tlie unders�`�i1ed autliarity. a�Zotary public in the state and covnty
aforesaid, on this day personally appeared Amy Siavola, Accounting Supervisor Of
RPM xConstruction. LLC, knaw�l to me ta be a credible person, who being by me duly
sworn, �ipan his oat�� deposed a�}d said;
That all peesons, firms, associatiai�s, corporations, or other organizations
furnishing labor andlor ma�erials have been paid in iull except for retainage in the
amount af �244,795.69;
That the wage scale establisE�ed by the City Cou�lcil in tf�e City of Fort Worth
E�as been paid in full except for ��etainage in the amo�nt of' $244,795.69;
Tllat there are no claims pending for p�rsonal injury andlor property damages;
On Contract describeci as: Vista West 11 Phase 2
, ;�
; ;L�.
��'� ' �'� �-i _
s v ��� ,i ��� �.� ���_:
Amy�Stava9a, AccouE�ting Supervisor
Subscribed and sworn before me on tllis date Zath ofJune, 2024.
l� � t C� .tL
Notary Public
Collin. TX
`\ 1�1ti411S11111!!!�
\,�,.� , �, �i Fi �-,y%i��,,
� �� 2� ��Y pL1 n� �/��
=�: .m�
= L; �' � :�_
'% c� Or 3�1 ��gr'1 u`�
�'�', �A p9 -13 _2a� ����\•
/����l11f1111145�ti��`\\
CONSENT OF
�URETY COMPANY
TO FINAI� PAYMENT
AIA DOCUMENT G707
OWNER ❑
�Rcxrr�,c�r ❑
corr�rRnc�roti ❑
SURC"I'Y ❑
07'I-IL'R
Bond No. 2346680
PROJECT:
(name, address)
TO (Owner) [
Vista West II, Phase Z City Project 103524
City of Fort Worth
200 Texas Street
Fort Worth, TX 76102
ARCHITECT'S PROJECT NO:
CONTRACT FOR:
CONTRACT DAT�:
CONTRACTOR:
RPM xConstruction, LLC
6500 Meyer Way, Suite 100
McKinney, TX 75070
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the
(here insert name and address of'Surety Company)
Swiss Re Corporate Solutions America Insurance
Corporation
1200 Main St., Suite 800 , SURETY COMPANY,
oll bOtld Of (here insert name and address of Contractor)
RPM xConstruction, LLC
6500 Meyer Way, Suite 100
McKinney, TX 75070 CONTRACTOR
hereby approves of the final payment to the Contractors, and agrees that final payment to the Contractor shall not relieve
the Surety Company of any of its obligations to (here inscn name and address oi'Owner)
City of Fort Worth
200 Texas Street
Fort Worth, TX 76102
as set forth in the said Surety Company's bond.
IN WITNESS WHEREOF,
the Surety Company has hereunto set its hand this 20th day of June
2Q24
,OWNER,
Swiss Re Corporate Solutions America Insurance
Surety Company
� �
� nature of Authorized Representative
Attest:
(Seal): Andrea Rose Crawford Attornev-In-Fact
Title
NO'I'F:: "l'his form is to be uscd as a companion documcnt to AIn DOCUMCN'1' G706, CON'fRAC1'OR'S APPIDnVPC OP PAYMCNI' OI� DEB"CS nND CLAIMS,
Current Edition
AIA DOCUMENT G707 • CONSCN't OP SURL'TY COMPANY 7'O PINAL PAYM�N"I' • APRIL 1970 L'DI"C[ON • A[AO ONC PAGL
O 1970 •'I'I IE AMCRICAN INS1'[TUTE OP ARCI-[I7'EC'I'S, 1735 New York Ave., NW, WASI IING']'ON, D.C. 20006
S�VISS RE CORPORATE SOLUTIONS
SWISS RG CORPORATfs SOLIJ'I'IONS AM�RICA INSURANCt's CQRPORATION ("SRCSAIC")
SWISS RF, CORPORAT� SOLU1'IONS PRGMII;R INSURANCL CORPORATION ("SRCSPIC")
W L-'STPORT [NSURANCF; CORPORATION ("W IC')
GENERAL POWER OF ATTORNEY
KNOW AI,I. ML'N BY THLSE PRGSENTS, "I'IIA"I' SRCSAIC, a corporation duly organized and existing undcr laws of the State of Missouri, and
having its principal o�ce in the City of Kansas City, Missouri, and SRCSPIC, a corporation organired and existing under the laws oPthc Statc of
Missouri and having its principal oiticc in tl�c City of Kansas City, Missouri, and WIC, organizcd under thc la�vs of the State of l�lissouri, and having its
principal office in the City of Kansas City,lVtissouri, cach does hereby make, constitute and appoint:
JOHN R. WARD, TF[OMAS DOUGLAS MOORB, FiMILY AI.I,ISON MIKESKA, ALLYSON W. DBAN, MONICA RUBY VGA'LtiY, JOI{N WILLIAM NEWBY,
7'ROY RUSSELL KLY, UL'BRA LL'L' MOON, ANDRBA ROSG CRAWI�ORD. SANDRA 1.liti RONEY, FAffl�t ANN llll:t'Y, ANDREW GARI;t'll ADDISON, PATRICK TIIOMAS COYI.I;,
MICIIAEI. DONALD IIL:NDRICKSON, l3KYAN KBt,LY MOORG, L'LI%ABE'I'li ORTI"!., ANA OWtiNS, BE'1'1'Y J Ri:kill, AND ANDRHW pAl'RICK CLARK 101NI'LY OR SBVGRALLY
Its true and lawful Attorney(s)-in-Fact, to makc, execute, seal and deliver, for and on its bchalf and as its act and deed, bonds or other writings
obligatory in the nature oP a bond on Uehalf of each of said Companics, as surety, on contracts of sureY}�ship as are or may be requircd or permiticd by
law, regulation, contract or othenvise, provided that no bond or undertaking or contract or suretyship execuYed under this authority shall exceed the
amount of:
TWO HUNDRED MILLION ($200,000,000.00) DOLLARS
This Power of Attorney is granted and is signed by facsimile under and by the authority of the following Resolutions adopted by the Boards of
Directors of both SRCSAIC and SRCSPIC at mcctings duly called and hcld on the 18th of Novembcr 2021 and WIC by �vrittcn consent of its
Gxecutive Committee dated July 18, 2011.
"RESOLVED, that any t�vo of the President, airy Managing Director, any Senior Vice Presidcnt, any Vice President, the Secretary or any Assistant
Secretary be, and each or a��y of them hcreby is, authorized to execute a Po�ver of Attorney qualifying the attorncy named in the givcn Powcr of
Attorney to execute on behalf of the Corporation bonds, andertakings and all contracts of surety, and that each or any of them hereby is authorized to
attest to the execution of any such Power of Attorney and to attach therein the seal oFthe Corporation; and it is
FURTI IL'R RESOLVED, that the signature of such officers and the seal of Yhe Corporation may bc affixed to any such Power of Attorney or to
any ccrtiticate relating thereto by facsimile, and any such Power of Attorney or certificate bearing such facsimile signatures or facsimile seal shall be
bindine unon thc Corporation when so ai'fixed and in the future with rceard to anv bond, undertaking or contract of surety to which it is attachcd."
.•'�jxs .v�tE ", ,,,,,,��,,, � �„
,.,g\o � RIC,�"�, ,.' � Z\QNS PR�t.��
o�' oRPO �r ��c,�,,w ,?�O�,J�p,F�R,�TRr��,, :..: . ....,... _ ,�;��8
""�"'' V t�' •• ? = r �`''. � 4 G �' B � �•� P "PtN 6
������- � �� ��� E A L�:Pz _ F.nk Janasens, Senior Vic¢ President of SRCSAIC & Senior Vice President j ti�1
:`� ; . m; : O; j m: of SRCSPIC & Senior Vice President of 1YIC � t ,:,,7"d
`,`'' 1973 :'Qa=' :��'•. .�b�c ;� (��� �t i�
=��'s' �'.'.'ssa�?'�\>�`': : ��y•.,.?a� ��: o ��
si ,, s S s o�. �,.� s'�p"'��
��. '�vs' * ' r:a ,, ,, s,.�,�s , Np�s, � '' gy • � •
�� �� '� Ger�ld Ja�rowski, Vice President ofSRCSAIC & Yice President ofSRCSPIC
,,, & Vice President of WIC
IN WI"('N�3SS WHEREOF, SRCSAIC, SRCSPIC, and WIC have caused their official seals to be hereunto affixcd, and these prescnts to bc signed by Yhcir
authorized officers
this llth day of January
State of Il(inois
County af Cook ss
20 24
Swiss Re Corporate Solutions Amcrica Insurance Corporation
Swiss Re Corporate Solutions Premier Insurance Corporation
Westport Insurancc Corporation
On this � 1 th day of �anuary 20 24� bci'ore me, a Notary 1'ublic personaily appeared Erik Janssens , Scnior Vice President oPSRCSAIC
and Senior Vice President of SRCSPIC and Scnior Vice Presidcnt of WIC and Gerald Ja rowski , Vice Presidcnt ofSRCSAIC and Vice 1'resident of'
SPCSPIC and Vice President of WIC, personally known to me, who bcing by mc duly sworn, acknowledgcd that they signed the above Power of Attorncy
as officers oi'and ackno�vledged said instrmnent to be thc voluntary act and decd oYthcir respectivc companics.
o�av�.. s�ai.
CFiRiSitNA'M/WtSCO
UOTARI M1gi„�� 8TAiE OF t� 81018 . fl �
Camrt�a6n Espkq Mert�ti 2021F C�A f ai��Noir.�.��"'GO
ClSr14
[, Jeffrey Goldber,g, the duly clected Senior Vice President and Assistant Sccretary oY SRCSAIC and SRCSPIC and WIC, do hereby certify that thc abovc and
f'orcgoing is a true and correct copy of a Powcr oi'Attorncy given by said SRCSAIC and SRCSPIC and W1C, which is stil( in f'ull force and effect.
IN WI"I'NI:SS WfIL-'REOF, I liave set my hand and affixed thc seals oPthe Companies this 20th day of June , 20 24 .
Jei"frey Goldberg, Senior Vice President &
Assistant Sccrctary of SRCSAIC and
SRCSPIC and WIC
IMPQRTANT NOTICE
In order to obtain information or make a complaint
l'ou may contact Jeffrey Gotdberg, Vice President -
Claims, at 1-800-338-0'753.
You may call Swiss 12e Corporate Solutions
America Insurance Corporation or Swiss Re
Corporate Solutions Premier Insurance
Corporation's toll-free number for information or to
make a complaint at:
1-800-338-0753
You may also write to Swiss Re Corporate Solutions
America Insurance Corporation or Swiss Re
Corporate Solutions Premier Insurance
Corporation at the following address:
1450 American Lane, Suite 1100
Schaumburg, IL 60173
You may contact the Texas Department of Insurance
to obtain information on companies, coverages, rights
or complaints at:
1- 800-252-3439
You may write the Texas Department of Insurance:
P.O. Box 149104
Austin, TX 78714-9104
Fax: (512) 475-1'771
Web: httn://w���tiv.tdi.state.t�.us
E-mail:Consumer.Protection�a�.tdi.st�te.tx us
PREMIUM OR CLAIM DISPUTES:
Should you have a dispute concerning your premium or
about a clai�n you should first contact the Swiss Re
Corporate Solutions America Insurance
Corporation or Swiss Re Corporate Solutions
Premier Insurance Corporation. If the dispute is not
resolved, you may contact the Texas llepartment of
Insurance.
ATTACH THIS NOTICE TO YOUR POLICY: This
notice is for infoimation only and does not become a
part or condition of the attached document.
AVISO IMPORTANTE
Para obtener informacion o para someter un queja:
Puede comunicarse con Jeffrey Goldberg, Vice
President - Claims, al 1-800-338-0'753.
Usted puede llamr al numero de telefono gratis de
Swiss Re Corporate Solutions America Insurance
Corporation o Swiss Re Corporate Solutions
Premier Insurance Corporation's para informacion o
para someter una queja al:
1-800-338-0753
Usted tarnbien puede escribir a Swiss Re Corporate
Solutions America Insurance Corporation o Swiss
Re Corporate Solutions Premier Insurance
Corporation al:
1450 Arnerican Lane, Suite 1100
Schaumburg, IL 60173
Puede escribir al Departmento de Seguros de Texas
para obtener informacion acerca de companias,
coberturas, derechas o quejas al:
1- 800-252-3439
Puede escribir al Departmento de Seguros de Texas:
P.O. Box 149104
Austin, TX 78714-9104
Fax: (512) 475-17�1
Web: http://www.tdi.state.tx.us
E-mail:ConsumerProtection(a�tdi.state.tx. us
DISPUTAS SOBRE PRIMAS O RECLAMOS:
Si tiene una disputa concerniente a su prima o a un
reclamo, debe comunicarse con el Swiss Re Corporate
Solutions America Insurance Corporation o Swiss
Ke Corporate Solutions Premier Insurance
Corporation primero. Si no se resuelve la disputa,
puede entonces comunicarse con el Departmento de
Seguros de Texas.
UNA ESTE AVISO A SU POLIZA:
Este aviso es solo para proposito de infromacion y no se
converte en parte o condicion del documento adjunto.