Loading...
HomeMy WebLinkAboutContract 61071-CO1Contract Time (CD) 210 210 20 230 Date Date Date Date Date ATTEST: ____________________________________________ Jannette Goodall, City Secretary Original Contract Amount M&C Date Approved Contractor's Company Name Peachtree Construction, Ltd. Contractor (Name) J. Barry Clark Contract Signature Senior Capital Project Officer Director, Contracting Department (Dept) DateProgram Manager DateAssistant Director (Dept) Assistant City Manager $2,741,253.55 0.00% $3,426,566.94 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT Additional Funding (if necessary) JUSTIFICATION (REASONS) FOR CHANGE ORDER DateAssistant City Attorney This Change Order is issued to add new bid items for the contractor to: Remove and repair the existing brick sidewalk adjacent to the curb and gutter at Stadium Drive and N Bellaire Drive. Trim and treat tree roots at Stadium Drive, S Bellaire Drive, and N Bellaire Drive during construction. The brick sidewalk within a 2-foot width will need to be removed and repaired to allow for the construction forms for the concrete curb and gutter. Some tree roots were also exposed during construction, necessitating a tree treatment plan carried out by a certified arborist, based on recommendations from the City For ster. The pricing for the brick bid item has been compared with rates from similar contracts and is considered reasonable. The tree root treatment proposal was reviewed by the City For ster and is also considered reasonable. This change order will add 20 calendar days to the contract for the contractor to complete the additional work, which involves removing, preserving, and repairing the brick sidewalk and the tree root treatment work. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Council Action (if required) M&C Number Inspector/Inspection Supervisor Date Project and Contract Compliance Manager $2,741,253.55 Original Funds Available for Change Orders $2,741,253.55 Extras to Date $2,741,253.55 Credits to Date City Sec #2024 Asphalt Resurfacing Contract 5 TPWDept.Totals Project Description Milling 2 inches of existing pavement and applying a 2-inch HMA overlay in addition to replacing damaged curb and gutter, driveways, and non-compliant ADA ramps. Change Order #Peachtree Construction, Ltd. Marwan Hafez Carlos GraciaCity Inspector Remaining Funds Available for this CO Pending Change Orders (in M&C Process) MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) $137,063.00$137,063.00 Contract Cost to Date $137,063.00 Amount of Proposed Change Order $2,741,253.55 Revised Contract Amount $2,741,253.55 $137,063.00 $0.00 City of Fort Worth Contractor 61071 Client Project #(s)104937 Date 6/11/2024 City Project Mgr. Change Order Request 1 Project Name $18,310.00 $18,310.00 Sub Total Additions Date TPW ADDITIONS Remove and Repair Brick Sidewalk (City supplied Brick)61 Client Project # 104937 1 6/11/2024 Marwan Hafez InspectorContractor Change Order Submittal # Peachtree Construction, Ltd.PM Carlos Gracia City of Fort Worth Change Order Additions Project Name 2024 Asphalt Resurfacing Contract 5 City Sec # 61071 SY 62 $6,210.00 TotalUnit Cost $31.05 Unit TPWTree Protection and Repair Qty 200.00000000 DEPTITEM DESCRIPTION TPW 1.00000000 LS $12,100.00$12,100.00 Change Order Additions Page 2 of 4 Peachtree Construction, Ltd. PM Marwan Hafez Inspector Carlos Gracia $18,310.00 Total LS Qty 0.18310000 DEPTITEMDESCRIPTION TPW9999.0096 Paving Construction Allowance60 Unit Cost $100,000.00 Unit City of Fort Worth Change Order Deletions Project Name 2024 Asphalt Resurfacing Contract 5 City Sec # 61071 DELETIONS Client Project # 104937 1 6/11/2024Change Order Submittal # Contractor Sub Total Deletions Date TPW $18,310.00 $18,310.00 Change Order Deletions Page 3 of 4 CO #DATE AMOUNT M/SBE for this Change Order Previous Change Orders $0.00Total Type of Service Amount for this COM/SBE Sub $0.00 $0.00Total Routing and Transmittal Slip Transportation & Public Works Department DOCUMENT TITLE:2024 Asphalt Resurfacing Contract 5 M&C: 24-0032 CPN: 104937 CSO: 61071 DOC#: CO1 Date: 6/11/2024 To: Name Department Initials Date Out 1 Sophia Flores (BSP) TPW 2 J Barry Clark/Peachtree Construc.Vendor 3 Carlos Ga cia (Inspector) TPW 4 Marwan Hafez (PM) TPW 5 Zelalem Arega (PGM) TPW 6 Mary Hanna (SCPO) TPW 7 Patricia Wadsack (AD) TPW 8 Lauren Prieur (Director) TPW 9 Doug Black (ACA) Legal 10 Jesica McEachern (ACM) CMO 11 Jannette Goodall (CS) CSO 12 TPW Contracts TPW CC: Program Manager, Sr. CPO, TPW BSPAP Recon Team, TPW Records Room, TPW Contracts ALSO List: - Bus Sppt: Sophia Flores; Prg Mgr: Zelalem Arega; Sr CPO: Mary Hanna ATURE: All documents received from any and all City THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review and take the next steps. NEEDS TO BE NOTARIZED:YES No RUSH:YES No SAME DAY:YES No NEXT DAY:YES No ROUTING TO CSO:YES No Action Required:Attach Signature, Initial and Notary Tabs As Requested For Your Information Signature/Routing and or Recording Comment File Return To: Please notify TPWContracts@fortworthtexas.gov for pickup when complete. Call ext. 7233 or ext. 8363 with questions. Thank you!