Standard Community Facilities Agreement
Rev. 9/21
Received Date: _______________
Received Time: _______________
Developer and Project Information Cover Sheet:
Developer Company Name: Fort Worth Independent School District
Address, State, Zip Code: 7060 Camp Bowie Blvd. Fort Worth, Texas 76116
Phone & Email: 817-814-2000 | kellie.spencer@fwisd.org
Authorized Signatory, Title: Kellie Spencer, Deputy Superintendent of District Operations
Project Name: FWISD Forest Oak Middle School Portable Village
Brief Description: Water & Sewer
Project Location: 3221 Pecos St, Fort Worth, TX 76119
Plat Case Number: None Given Plat Name: None Given
Mapsco: 92F Council District: 11
CFA Number: 23-0179 City Project Number: 105593 | IPRC24-0104
City of Fort Worth, Texas Page 2 of 15
Standard Community Facilities Agreement
Rev. 9/21
City Contract Number: _______________________
STANDARD COMMUNITY FACILITIES AGREEMENT
This COMMUNITY FACILITIES AGREEMENT (“Agreement”) is made and entered into by
and between the City of Fort Worth (“City”), a home-rule municipal corporation of the State of Texas,
acting by and through its duly authorized Assistant City Manager, and the Fort Worth Independent School
District, a political subdivision of the state of Texas and a legally constituted independent school district
located in Tarrant County, Texas (“Developer”), acting by and through its duly authorized representative.
City and Developer are referred to herein individually as a “party” and collectively as the “parties.”
WHEREAS, Developer is constructing private improvements or subdividing land within the
corporate limits of Fort Worth, Texas or its extraterritorial jurisdiction, for a project known as FWISD
Forest Oak Middle School Portable Village (“Project”); and
WHEREAS, the City desires to ensure that all developments are adequately served by public
infrastructure and that the public infrastructure is constructed according to City standards; and
WHEREAS, as a condition of approval of the Project, Developer is required to bear a portion of
the costs of municipal infrastructure by constructing the public infrastructure necessary for the Project as
described in this Agreement (“Community Facilities” or “Improvements”); and
WHEREAS, as a condition of approval of the Project, Developer is required to meet the additional
obligations contained in this Agreement, and Developer may be required to make dedications of land, pay
fees or construction costs, or meet other obligations that are not a part of this Agreement; and
WHEREAS, the City is not participating in the cost of the Improvements or Project; and
WHEREAS, the Developer and the City desire to enter into this Agreement in connection with
the collective Improvements for the Project;
NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein,
the City and the Developer do hereby agree as follows:
1.
CFA Ordinance
The Community Facilities Agreements Ordinance (“CFA Ordinance”), as amended, is
incorporated into this Agreement by reference, as if it was fully set out herein. Developer agrees to comply
with all provisions of the CFA Ordinance in the performance of Developer’s duties and obligations pursuant
to this Agreement and to cause all contractors hired by Developer to comply with the CFA Ordinance in
connection with the work performed by the contractors. If a conflict exists between the terms and conditions
of this Agreement and the CFA Ordinance, the CFA Ordinance shall control.
2.
Incorporation of Engineering Plans
City of Fort Worth, Texas Page 3 of 15
Standard Community Facilities Agreement
Rev. 9/21
The engineering plans for the Improvements that have been approved by the City (“Engineering
Plans”) are incorporated into this Agreement by reference as if fully set out herein. Developer shall provide
at its expense, unless otherwise agreed to by City, all engineering drawings, and documents necessary to
construct the Improvements required by this Agreement.
3.
Description of Improvements; Exhibits and Attachments
The following exhibits describe the general location, nature, and extent of the Improvements that
are the subject of this Agreement and are attached hereto and incorporated herein by reference:
Exhibit A: Water
Exhibit A-1: Sewer
Exhibit B: Paving and Signage and Striping
Exhibit B-1: Storm Drain
Exhibit C: Street Lights & Signs
The Location Map and Cost Estimates are also attached hereto and incorporated herein by
reference. To the extent that Exhibits A, A-1, B, B-1, C, the Location Map, or the Cost Estimates are
applicable and conflict with the Engineering Plans, the Engineering Plans shall control. If applicable,
Attachment 1 – Changes to Standard Community Facilities Agreement, Attachment 2 – Phased CFA
Provisions, and Attachment 3 – Concurrent CFA Provisions, are attached hereto and incorporated herein
for all purposes.
4.
Construction of Improvements
Developer agrees to cause the construction of the Improvements contemplated by this Agreement
and that said construction shall be completed in a good and workmanlike manner and in accordance with
all City standards and specifications, the Engineering Plans, the Cost Estimates provided for the
Improvements, and this Agreement. Developer acknowledges that City will not accept the Improvements
until the City receives affidavits and lien releases signed by Developer’s contractors verifying that the
contractors, and all subcontractors and material suppliers, have been paid in full for constructing the
Improvements, and consent of the surety on payment and performance bonds provided for the
Improvements.
5.
Financial Guarantee
Developer has provided the City with a financial guarantee in the form and amounts set forth in
this Agreement which guarantees the construction of the Improvements and payment by Developer of
all contractors, subcontractors, and material suppliers for the Improvements (“Financial Guarantee”).
Developer shall keep the Financial Guarantee in full force and effect until released by the City and shall
not reduce the amount of the Financial Guarantee unless authorized by the City in accordance with the
CFA Ordinance.
6.
Completion Deadline; Extension Periods
City of Fort Worth, Texas Page 4 of 15
Standard Community Facilities Agreement
Rev. 9/21
This Agreement shall be effective on the date that this Agreement is executed by the City’s
Assistant City Manager (“Effective Date”). Developer shall complete construction of the Improvements
and obtain the City’s acceptance of the Improvements within two (2) years of the Effective Date
(“Term”). If construction of the Improvements has started during the Term, the Developer may request that
this Agreement be extended for an additional period of time (“Extension Period”). All Extension Periods
shall be agreed to in writing by the City and the Developer as set forth in a written amendment to this
Agreement. In no event shall the Term of this Agreement plus any Extension Periods be for more than three
(3) years.
7.
Failure to Construct the Improvements
(a) The City may utilize the Developer’s Financial Guarantee to cause the completion of the
construction of the Improvements if at the end of the Term, and any Extension Periods, the
Improvements have not been completed and accepted by the City.
(b) The City may utilize the Developer’s Financial Guarantee to cause the completion of the
construction of the Improvements or to cause the payment of costs for construction of the
Improvements before the expiration of the Term, and any Extension Period, if the Developer
breaches this Agreement, becomes insolvent, or fails to pay costs of construction.
(c) [Reserved]
(d) Nothing contained herein is intended to limit the Developer’s obligations under the CFA
Ordinance, this Agreement, the Financial Guarantee, Developer’s agreements with Developer’s
contractors, or other related agreements.
8.
Termination
If Developer desires to terminate this Agreement before Developer’s contractors begin
constructing the Improvements, Developer agrees to the following:
(a)that Developer and City must execute a termination of this Agreement in writing;
(b)that Developer will vacate any final plats that have been filed with the county where the Project
is located; and
(c)to pay to the City all costs incurred by the City in connection with this Agreement, including
time spent by the City’s inspectors at preconstruction meetings. City will provide Developer
with a detailed invoice accounting for any such costs.
9.
Award of Construction Contracts
(a) Developer will award all contracts for the construction of the Improvements and cause the
Improvements to be constructed in accordance with the CFA Ordinance.
City of Fort Worth, Texas Page 5 of 15
Standard Community Facilities Agreement
Rev. 9/21
(b) Developer will employ construction contractors who meet the requirements of the City to construct
the Improvements including, but not limited, to being prequalified, insured, licensed and bonded to
construct the Improvements in the City.
(c) Developer will require Developer’s contractors to provide the City with payment and performance
bonds naming the City and the Developer as dual obligees, in the amount of one hundred percent
(100%) of the cost of the Improvements as required by the CFA Ordinance. The payment and
performance bonds shall guarantee construction of the Improvements and payment of all
subcontractors and material suppliers. Developer agrees to require Developer’s contractors to
provide the City with a maintenance bond naming the City as an obligee, in the amount of one
hundred percent (100%) of the cost of the Improvements, that guarantees correction of defects in
materials and workmanship for the Improvements by the contractor and surety for a period of two
(2) years after completion and final acceptance of the Improvements by the City. All bonds must
be provided to the City before construction begins and must meet the requirements of the City’s
Standard Conditions, Chapter 2253 of the Texas Government Code, and the Texas Insurance Code.
(d) Developer will require Developer’s contractors to provide the City with insurance equal to or in
excess of the amounts required by the City's standard specifications and contract documents for
developer-awarded infrastructure construction contracts. The City must be named as an additional
insured on all insurance policies. The Developer must provide the City with a Certificate of
Insurance (ACORD or form approved by the State of Texas), supplied by each contractor’s
insurance provider, which shall be made a part of the Project Manual.
(e) Developer will require the Developer’s contractors to give forty-eight (48) hours’ advance notice
of their intent to commence construction of the Improvements to the City’s Construction Services
Division so that City inspection personnel will be available. Developer will require Developer’s
contractors to allow construction of the Improvements to be subject to inspection at any and all
times by the City’s inspectors. Developer will require Developer’s contractors to not install or
relocate any sanitary sewer, storm drain, or water pipe unless a City inspector is present and gives
consent to proceed, and to allow such laboratory tests as may be required by the City.
(f) Developer will not allow Developer’s contractors to begin construction of the Improvements until
a notice to proceed to construction is issued by the City.
(g) Developer will not allow Developer’s contractors to connect buildings to service lines of sewer and
water mains constructed pursuant to this Agreement, if any, until said sewer, water mains, and
service lines have been completed to the satisfaction of the City.
10.
Utilities
Developer shall cause the installation or adjustment of utilities required to: (1) serve the Project;
and (2) to construct the Improvements required herein. City shall not be responsible for payment of any
costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with
any of the Improvements to be constructed pursuant to this Agreement.
11.
Easements and Rights-of-Way
City of Fort Worth, Texas Page 6 of 15
Standard Community Facilities Agreement
Rev. 9/21
Developer agrees to provide, at its expense, all necessary rights-of-way and easements required for
the construction and dedication to the City of the Improvements provided for by this Agreement.
12.
Liability and Indemnification
(a) [RESERVED]
(b) [RESERVED]
(c) DEVELOPER WILL REQUIRE ITS CONTRACTORS TO INDEMNIFY, DEFEND AND
HOLD HARMLESS THE CITY, ITS OFFICERS, AGENTS AND EMPLOYEES FROM
AND AGAINST ANY AND ALL CLAIMS, SUITS OR CAUSES OF ACTION OF ANY
NATURE WHATSOEVER, WHETHER REAL OR ASSERTED, BROUGHT FOR OR ON
ACCOUNT OF ANY INJURIES OR DAMAGES TO PERSONS OR PROPERTY,
INCLUDING DEATH, RESULTING FROM, OR IN ANY WAY CONNECTED WITH, THE
CONSTRUCTION OF THE IMPROVEMENTS CONTEMPLATED HEREIN, WHETHER
OR NOT SUCH INJURIES, DEATH OR DAMAGES ARE CAUSED, IN WHOLE OR IN
PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS
OFFICERS, SERVANTS, OR EMPLOYEES. FURTHER, DEVELOPER WILL REQUIRE
ITS CONTRACTORS TO INDEMNIFY, DEFEND, AND HOLD HARMLESS THE CITY
FOR ANY LOSSES, DAMAGES, COSTS OR EXPENSES SUFFERED BY THE CITY OR
CAUSED AS A RESULT OF SAID CONTRACTORS’ FAILURE TO COMPLETE THE
WORK AND CONSTRUCT THE IMPROVEMENTS IN A GOOD AND WORKMANLIKE
MANNER, FREE FROM DEFECTS, IN CONFORMANCE WITH THE CFA ORDINANCE,
AND IN ACCORDANCE WITH ALL PLANS AND SPECIFICATIONS.
13.
Right to Enforce Contracts
Upon completion of all work associated with the construction of the Improvements, Developer will
assign to the City a non-exclusive right to enforce the contracts entered into by Developer with its
contractors, along with an assignment of all warranties given by the contractors, whether express or implied.
Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City
the right to enforce such contracts as an express intended third party beneficiary of such contracts.
14.
Estimated Fees Paid by Developer; Reconciliation
Prior to execution of this Agreement, Developer has paid to the City the estimated cost of
administrative material testing service fees, construction inspection service fees, and water testing lab fees
in the amounts set forth in the Cost Summary section of this Agreement. Upon completion of the
construction of the Improvements, the City will reconcile the actual cost of administrative material testing
service fees, construction inspection service fees, and water testing lab fees with the estimated fees paid
by Developer. If the actual costs of the fees are more than the estimated payments made by the Developer,
the Developer must pay the difference to the City before the Improvements will be accepted by the City. If
the actual costs of the fees are less than the estimated payments made by the Developer, the City will refund
the difference to the Developer. If the difference between the actual costs and the estimated payments made
by the Developer is less than fifty dollars ($50.00), the City will not issue a refund and the Developer will
not be responsible for paying the difference. The financial guarantee will not be released by the City or
City of Fort Worth, Texas Page 7 of 15
Standard Community Facilities Agreement
Rev. 9/21
returned to the Developer until reconciliation has been completed by the City and any fees owed to the City
have been paid by the Developer.
15.
Material Testing
The City maintains a list of pre-approved material testing laboratories. The Developer must
contract with material testing laboratories on the City’s list. Material testing laboratories will provide copies
of all test results directly to the City and the Developer. If the Improvements being constructed fail a test,
the Developer must correct or replace the Improvements until the Improvements pass all retests. The
Developer must pay the material testing laboratories directly for all material testing and retesting. The City
will obtain proof from the material testing laboratories that the material testing laboratories have been
paid in full by the Developer before the City will accept the Improvements.
16.
Notices
All notices required or permitted under this Agreement may be given to a party by hand-
delivery or by mail, addressed to such party at the address stated below. Any notice so given shall be
deemed to have been received when deposited in the United States mail so addressed with postage
prepaid:
CITY: DEVELOPER:
Development Coordination Office Fort Worth Independent School District
City of Fort Worth 7060 Camp Bowie
200 Texas Street Fort Worth, TX 76116
Fort Worth, Texas 76102
With copies to: With Copies to:
City Attorney's Office Fort Worth Independent School District
City of Fort Worth Office of Legal Services
200 Texas Street 7060 Camp Bowie
Fort Worth, Texas 76102 Fort Worth, TX 76116
and
City Manager’s Office
City of Fort Worth
200 Texas Street
Fort Worth, Texas 76102
Or to such other address one party may hereafter designate by notice in writing addressed and
mailed or delivered to the other party hereto.
17.
Right to Audit
City of Fort Worth, Texas Page 8 of 15
Standard Community Facilities Agreement
Rev. 9/21
Developer agrees that, until the expiration of three (3) years after acceptance by the City of the
Improvements constructed pursuant to this Agreement, that the City shall have access to and the right to
examine any directly pertinent books, documents, papers, and records of the Developer involving
transactions relating to this Agreement. Developer agrees that the City shall have access during normal
working hours to all necessary Developer facilities and shall be provided adequate and appropriate
workspace in order to conduct audits in compliance with the provisions of this section. The City shall give
Developer reasonable advance notice of intended audits.
Developer further agrees to include in all contracts with Developer’s contractors for the
Improvements a provision to the effect that the contractor agrees that the City shall, until the expiration of
three (3) years after final payment under the contract, have access to and the right to examine any directly
pertinent books, documents, papers and records of such contractor, involving transactions to the contract,
and further, that City shall have access during normal working hours to all of the contractor’s facilities, and
shall be provided adequate and appropriate work space in order to conduct audits in compliance with the
provisions of this section. City shall give Developer’s contractors reasonable advance notice of intended
audits.
18.
Independent Contractor
It is expressly understood and agreed that Developer and its employees, representative, agents,
servants, officers, contractors, subcontractors, and volunteers shall operate as independent contractors as to
all rights and privileges and work performed under this Agreement, and not as agents, representatives, or
employees of the City. Subject to and in accordance with the conditions and provisions of this Agreement,
Developer shall have the exclusive right to control the details of its operations and activities and be solely
responsible for the acts and omissions of its employees, representatives, agents, servants, officers,
contractors, subcontractors, and volunteers. Developer acknowledges that the doctrine of respondeat
superior shall not apply as between the City and its officers, representatives, agents, servants and
employees, and Developer and its employees, representatives, agents, servants, officers, contractors,
subcontractors, and volunteers. Developer further agrees that nothing herein shall be construed as the
creation of a partnership or joint enterprise between City and Developer. It is further understood that the
City shall in no way be considered a co-employer or a joint employer of Developer or any employees,
representatives, agents, servants, officers, contractors, subcontractors, and volunteers of Developer.
Neither Developer, nor any officers, agents, servants, employees, or subcontractors of Developer shall be
entitled to any employment benefits from the City. Developer shall be responsible and liable for any and
all payment and reporting of applicable taxes on behalf of itself, and any of employees, representatives,
agents, servants, officers, contractors, subcontractors, and volunteers. The City, through its authorized
representatives and employees, shall have the sole and exclusive right to exercise jurisdiction and
control over City employees.
19.
Applicable Law; Venue
This Agreement shall be construed under and in accordance with Texas law. Venue shall be in the
state courts located in Tarrant County, Texas or the United States District Court for the Northern
District of Texas, Fort Worth Division.
20.
Non-Waiver
City of Fort Worth, Texas Page 9 of 15
Standard Community Facilities Agreement
Rev. 9/21
The failure of the City to insist upon the performance of any term or provision of this Agreement
or to exercise any right herein conferred shall not be construed as a waiver or relinquishment to any extent
of City’s right to assert or rely on any such term or right on any future occasion.
21.
Governmental Powers and Immunities.
It is understood that by execution of this Agreement, the City and the Developer do not
waive or surrender any of their governmental powers or immunities.
22.
Headings
The paragraph headings contained herein are for the convenience in reference and are not intended
to define or limit the scope of any provision of this Agreement.
23.
Severability
In the event that any clause or provision of this Agreement shall be held to be invalid by any
court of competent jurisdiction, the invalidity of such clause or provision shall not affect any of the
remaining provisions hereof.
24.
Review of Counsel
City and Developer, and if they so choose, their attorneys, have had the opportunity to review
and comment on this document; therefore any rule of contract construction or interpretation that would
normally call for the document to be interpreted as against the drafting party shall not apply in
interpretation of this Agreement, and each section, portion, and provision of this Agreement shall be
construed solely on the basis of the language contained therein, regardless of who authored such
language.
25.
Prohibition on Boycotting Israel
[Reserved]
26.
Prohibition on Boycotting Energy Companies
[Reserved]
27 .
Prohibition on Discrimination Against Firearm and Ammunition Industries
[Reserved]
City of Fort Worth, Texas Page 10 of 15
Standard Community Facilities Agreement
Rev. 9/21
28.
Immigration and Nationality Act
Developer shall verify the identity and employment eligibility of its employees who perform work
under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon
request by City, Developer shall provide City with copies of all I-9 forms and supporting eligibility
documentation for each employee who performs work under this Agreement. Developer shall adhere to all
Federal and State laws as well as establish appropriate procedures and controls so that no services will be
performed by any Developer employee who is not legally eligible to perform such services. City, upon
written notice to Developer, shall have the right to immediately terminate this Agreement for violations of
this provision by Developer.
29.
Amendment
No amendment, modification, or alteration of the terms of this Agreement shall be binding unless
the same is in writing, dated subsequent to the date hereof, and duly executed by the City and Developer.
30.
Assignment and Successors
Developer shall not assign or subcontract all or any part of its rights, privileges, or duties under this
Agreement without the prior written consent of City. Any attempted assignment or subcontract without the
City’s prior written approval shall be void and constitute a breach of this Agreement.
31.
No Third-Party Beneficiaries
The provisions and conditions of this Agreement are solely for the benefit of the City and
Developer, and any lawful assign or successor of Developer, and are not intended to create any rights,
contractual or otherwise, to any other person or entity.
32.
Compliance with Laws, Ordinances, Rules and Regulations
Developer, its officers, agents, servants, employees, and contractors, shall abide by and comply
with all laws, federal, state, and local, including all ordinances, rules and regulations of City. It is agreed
and understood that, if City calls to the attention of Developer any such violation on the part of Developer
or any of its officers, agents, servants, employees, or subcontractors, then Developer shall immediately
desist from and correct such violation.
33.
Signature Authority
The person signing this Agreement on behalf of Developer warrants that he or she has the legal
authority to execute this Agreement on behalf of the Developer, and that such binding authority has been
granted by proper order, resolution, ordinance, or other authorization of the entity. The City is fully entitled
to rely on this warranty and representation in entering into this Agreement.
City of Fort Worth, Texas Page 11 of 15
Standard Community Facilities Agreement
Rev. 9/21
34.
Counterparts
This Agreement may be executed in multiple counterparts, each of which will be deemed an
original, but which together will constitute one instrument.
35.
Entire Agreement
This written instrument, together with any attachments, exhibits, and appendices, constitutes the
entire understanding between the City and Developer concerning the work to be performed hereunder, and
any prior or contemporaneous, oral, or written agreement that purports to vary from the terms hereof shall
be void.
[REMAINDER OF PAGE INTENTIONALLY BLANK]
City of Fort Worth, Texas Page 12 of 15
Standard Community Facilities Agreement
Rev. 9/21
36.
Cost Summary Sheet
Project Name: FWISD Forest Oak Middle School Portable Village
CFA No.: 24-0072 City Project No.: 105593 IPRC No.: 24-0104
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction 70,300.49$
2. Sewer Construction 43,392.00$
Water and Sewer Construction Total 113,692.49$
B. TPW Construction
1. Street -$
2. Storm Drain -$
3. Street Lights Installed by Developer -$
4. Signals -$
TPW Construction Cost Total -$
Total Construction Cost (excluding the fees): 113,692.49$
Estimated Construction Fees:
C. Construction Inspection Service Fee $9,000.00
D. Administrative Material Testing Service Fee $490.00
E. Water Testing Lab Fee $150.00
Total Estimated Construction Fees: 9,640.00$
Financial Guarantee Amount Choice
Statement of Appropriated Funding = 100% 113,692.49$ X
City of Fort Worth, Texas Page 13 of 15
Standard Community Facilities Agreement
Rev. 9/21
IN WITNESS WHEREOF, the City and Developer have each executed this Agreement by their
duly authorized signatories to be effective on the date executed by the City’s Assistant City Manager.
CITY OF FORT WORTH
Dana Burghdoff
Assistant City Manager
Date: __________________
Recommended by:
Dwayne Hollars
Contract Compliance Specialist
Development Services
Approved as to Form & Legality:
Richard A. McCracken
Senior City Attorney
M&C No. N/A
Date:
Form 1295: N/A
ATTEST:
Jannette S. Goodall
City Secretary
DEVELOPER
Fort Worth Independent School District
Kellie Spencer
Deputy Superintendent
Date:
Contract Compliance Manager:
By signing, I acknowledge that I am the person
responsible for the monitoring and
administration of this contract, including
ensuring all performance and reporting
requirements.
Rebecca Diane Owen
Development Manager
City of Fort Worth, Texas Page 14 of 15
Standard Community Facilities Agreement
Rev. 9/21
The following attachments are incorporated into this Agreement. To the extent a
conflict exists between the main body of this Agreement and the following attachments, the
language in the main body of this Agreement shall be controlling.
Included Attachment
Attachment 1 - Changes to Standard Community Facilities Agreement
Attachment 2 – Phased CFA Provisions
Attachment 3 – Concurrent CFA Provisions
Location Map
Exhibit A: Water Improvements
Exhibit A-1: Sewer Improvements
Exhibit B: Paving, Signage and Striping Improvements
Exhibit B-1: Storm Drain Improvements
Exhibit C: Street Lights and Signs Improvements
Cost Estimates
(Remainder of Page Intentionally Left Blank)
City of Fort Worth, Texas Page 15 of 15
Standard Community Facilities Agreement
Rev. 9/21
ATTACHMENT “1”
Changes to Standard Community Facilities Agreement
City Project No. 105593
Negotiated changes are incorporated into the body of this Agreement.
� i I CONNECT TO EX. 8"
— PVC WATER MAIN EX. FIRE HYDRANT
EX. 8" PVC I' I I CONNECT TO EX.
PROPERTY LINE
WATER MAIN I ii 6" C.I. WATER LMAIN �__
— — — I,�, �� ,.,, �.,.
-- --
`'t X 6" C.I. WATER MAW
q.t E
: � ;, :
I ��� :��� = �
.:: "' __' ___—,�--r` e[ot+a8�✓
. ,
o, �
_ �.. � .� a \
,__i ^� ,.- � �.,, _,_. �,...y.w -
., --� . ... . <.�. ... .. "` �� .
� • ��
� � �
�
�� . �.
�� . � � � 6<. _ !
� � � � \
� � o
. o �
NEW FIRE HYDRANT 10 LF OF NEW 8" PVC °s��
PUBUC WATER SERVICE � � _ _66,—
s., . � �� �� �9 � � �3 � '
,� � �
51 LF OF NEW 8" PVC
,
. a _ � ; PUBLIC WATER SERVICE �`'� — —663—
I7 �
� `, � �� �� �� �� � -
�
�
6.2 LF OF NEW 2 TYPE K
' I �� '� i � � � � � � COPPER PUBLIC WATER '
I'�
SERVICE & 1-2" WATER MEfER �
I �I� ,, _
C � _ _ _ _ ne we
gp • . , ,�—�;;= ' 8N P CIT P BLI�C WA� R — �� _ _ `
!. ° . ,., h � '
� Zy \
o�= , � . _., „ � SERVICE �
� — �
� � — . � .,
I , l� �. � \ \ , ,,� — �
.
I �I �, �� � , �.o� s�E�, �I` , �
.a� � w /� uEiK BLW. / ^�� � / � ' �'. � n.,� i� �
� � ���. unuaoo. � 0 /�A �\ / / .
a ..�
n^••••• As�»."" "` nww[n ,I�n pvr.•�
a
,., ..— _ " ..,,., s — .... , .� .
� y�/ \ ,i,.,a .�
� /
_.. . ""-j R.. m.... �T ^^�x y �I � .�,..v � � _
� 1' Ji �_\ m \ I.%� �""� --- ...a� __
� � . — f„„ � / : —
.�,�Y.�. �.�, is63j /�
� . - .. ..... �' � 1
.
— ���� �� },� �
/
P ,o�. �.
�
0
�
�q ..« .,
-_ � �m� � i . m<.� / �,`. �'�t
� .-� � _.. , ��,�..�... � �i >' �- '-I�, �'a�y, '�
� �
— � �_ l " /' \\: ..o. ,
v. � � �
�
. "
,� �
- -- , �
�, ..
-� �
II .
�
�il ��'��" , W
�
_
=r
�� �
..
. _ a�.
0
� — -- .
_
� � � — � . ��. ra...,e�,o :�s.,r. � .. ,� f .,. _ � � �
�w
I �
� _ .
:� �. . _ . .._ � ,� , e y ���.
., , '_ ' ' — � _ , - ` .
_ .. - � T -, ' s �
_ �
�-� - �_ , ��f^ , .,m�.
.,�� , . .` -__ _ � � I
. . ,v _ .,.,. �
� � �,� �
� � � a,a \� i I
.. ,u.. �EME.
, =.�R �;,
.,. .:.:o � ..sl �a - ,
r
, i �..._
; _� , — � � ' �� ,� � �., �. �. �
a,, . , �
o � �
�� „ � i
-- -- -- --:�,� - -
Legend
PROPOSED WATER LINE
FXISTING WATFR I INE
JQ INFRASTRUCTURE, lLC
100 GLASS STREET, SUITE 201
972.392.7340
PROJECT N0: 4220277
' CPN 105593
I■ ►.��.o OWNER/DEVELOPER POi2T WORTH INDEPENDENT SGHOOL DISTRIGT
�� �������� 100 N. UNIV�RSITY DR.
I■ �■►I■�
�� �■�►■� POiZT WORTH, TX 7610�
I■ ►�r ■■►�l
I■ r ���� �
PROJECT FWISD �OR�ST ORK MIDDL� SGHOOL PORTR�L� VILLftG�
EXHIBIT A - WATER
DALLAS, TEXAS 75207
SCALE: REV: SHEET: 2 �� 3
I" = 130' NOiZTH 05/2�/2024
TBPE FIRM 7986
— — — � �i = � STA. 0+00.00
i I'� CONNECT TO EX. SSMH
EX. 8" PVC SAN ITARY II I°-�
�RTY LINE
SEWER MAIN "`' PROPOSED 26.6 LF
I I
— — �.� I NEW PUBLIC -- --
„ OF
i 8" PVC SANITARY SEWER
PROPOSED 15'X15' � p�� ^ 1: � • , —
f' '
�� � � -, ei� � „.,. � ,�,
SEWER EASEMENT ' �- —�:�" �:- � � ss= �—
I - :—�,„, ' �� °E�� —ss. _ ` \ �
,.. � � � — — — -_, .:� �
q ..
......._.. � — 6s��' -,
EX. 8 HD SEWER I MA N �� �� �� �� p �
EX. 8" HDPE SANITARY SEWER MAIN ,_
, =F � — —ssz— —
�
CONSTT NEW SSMH �� �9 �i �9 �� �� �3 \� ,�
END 8" PUBLIC LINE � � � � � � � ;
,
, _ ---
C � nc wc
� �u�vic ...__ _ �r.
C �._ -_ �
� -
� — -
� I w ��_ .__ � � __
_
' � I ? �.. � ;.-,�,.: , . . . , i ..... �. . � - .
, � . � .�-
., ,�.�� ..,
. - +
. . � . ..n,
F.
: r...,-� �� ;: I
��i \ � ��' I I I " �
{ ���.1� -.......� .�n -
lo�� � \
� � � �� � �....,. __ .. _ _
..." �....o.. .
��� � ��
' � • ��/ _ .... � —
.,., .. p„ �� � META�BLOG.EEi � ...� ..�o- 1
// �a� e� � � �
��� � �: o � �,..� , � ♦ � � � � ' . _ � �
I I m�., ,,.... �' I� M e � - '�
& �-;
••y �sioancc� e .�""' ,; " r"' �
�=m � �� ��. - --
� -
— � ..,..
� /
.E g
l .
ti
' �, ' ,,..o.r i6 — w
I _ w�mic sn.m. S - --.
�o .�,... � . '' — I -u�
i � . �
: �k i� rvwn a.
I / � .
— : _ ....� ...«,,, ......
i � ;
.
.. �i� .:..�.-,.. \\\\ / / � ��� ... y.�� ' \ . �
�� _ � ��� � �`
\ / ,_ / \\ .. � c
I
o, �.. . 2
_"\ -..... . ., _ � �I .� S - - � FS- , qc
. ...v% I p " � . I . _ - _
, _ G .x,� �� � ..� �� .�
.: . � . ^�'"' . , � . � � �-
- Ec�—e / ( !' I / 'l I ��
_ _-6y ,. � . w
1 � „
/ � q ,m
� � ��
.�1 1 � — r'=
� �—� . . .�,. T. racos sr. � :i�"1 —
��_�., � , �a
-�, —
.� tlqA — _
.. -. — ,
. .—.. . �
�
..�' �s5e _ _ _ .� . _ .. 6
.�* - _° .� �0/ � .. e \
_ �
— .
. .. � . - . , I` � ....a..m
' �.
� _
� l ! � R
.�� ..., __ ... _ � �
.. .... .� I� ' I ///''' ���
/ 1S� /
,,. - � . 1
A �� .
. -�.- � . � i \ w� � J w. �. �. �.
XX� — / � a� � /
� ,. w r
� / '` q . -.,� � .
s _ Fw.
xK �
' wvek. °" wi�w � wvuv W�.ekz
, _� � ,
�
w wa : ..rc� � � �
. o
, � ., /
-- �- -- ��� - ,
Legend
PROPOSED SEWER LINE
EXISTING SEWER LINE
JQ INFRASTRUCTURE, lLC
100 GLASS STREET, SUITE 201
972.392.7340
PROJECT N0: 4220277
CPN 105593
OWNER/DEVELOPER POi2T WORTH INDEPENDENT SGHOOL DISTRIGT
100 N. UNIV�RSITY DR.
POiZT WORTH, TX 7610�
PROJECT FWISD �OR�ST ORK MIDDL� SGHOOL PORTR�L� VILLftG�
EXHIBIT A1 — WASTEWATER
DALLAS, TEXAS 75207
SCALE: REV: SHEET: 3 �� 3
I" = 130' NOiZTH 05/2�/2024
TBPE FIRM 7986
00 42 43
DAP - BID PROPOSAL
Page 1 of 3
1 3305.2002 8" Water Carrier Pipe 33 05 24 LF 61 $192.00 $11,712.00
2 3305.2001 6" Water Carrier Pipe 34 05 24 LF 5 $174.00 $870.00
3 0241.1013 Remove 8" Water Line 02 41 14 LF 23 $52.00 $1,196.00
4 3312.0117 Connection to Existing 4"-12" Water Main 33 12 25 EA 1 $4,123.00 $4,123.00
5 3312.0117 Connection to Existing 4"-12" Water Main 34 12 25 EA 1 $4,385.00 $4,385.00
6 3312.3003 8" Gate Valve 35 12 20 EA 1 $3,322.00 $3,322.00
7 3312.3002 6" Gate Valve 36 12 20 EA 1 $2,422.00 $2,422.00
8 3312.0001 Fire Hydrant 32 12 40 EA 1 $6,812.00 $6,812.00
9 3312.2201 2" Water Service, Meter Reconnection 33 12 10 EA 1 $3,137.00 $3,137.00
10 3311.0011 Steel Fittings 33 11 14 LS 1 $819.00 $819.00
11 3201.0201 Asphalt Pvmt Repair Beyond Defined Width, Resid32 01 17 SY 57.3 $441.30 $25,286.49
12 3471.0001 Traffic Control 34 71 13 MO 1 $5,250.00 $5,250.00
13 3305.0109 Trench Safety 32 05 10 LF 69 $14.00 $966.00
14
UNIT I: WATER IMPROVEMENTS
Bidder's Application
Specification
Section No.
Unit of
Measure Unit Price
Project Item Information
Bid Value
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Bidder's Proposal
Description
TOTAL UNIT I: WATER IMPROVEMENTS $70,300.49
Bid
Quantity
Bidlist Item
No.
UNIT PRICE BID
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version May 22, 2019 00 42 43_Bid Proposal_DAP_FHPInputR002- (1)
00 42 43
DAP - BID PROPOSAL
Page 2 of 3
Bidder's Application
Specification
Section No.
Unit of
Measure Unit Price
Project Item Information
Bid Value
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Bidder's Proposal
Description Bid
Quantity
Bidlist Item
No.
UNIT PRICE BID
1 3305.3001 8" Sewer Carrier Pipe (6" SDR-25)35 05 24 LF 27 $304.00 $8,208.00
2 3331.3313 8" Sewer Service, Reconnection 33 31 50 EA 1 $4,218.00 $4,218.00
3 3339.1002 4' Drop Manhole 33 39 10, EA 1 $8,787.00 $8,787.00
4 3201.0201 Asphalt Pvmt Repair Beyond Defined Width, Resid32 01 17 LF 195 $49.00 $9,555.00
5 3201.0614 Conc Pvmt Repair, Residential 32 01 29 LF 187 $42.00 $7,854.00
6 3471.0001 TRAFFIC CONTROL 34 71 13 MO 1 $4,500.00 $4,500.00
7 3305.0109 Trench Safety 32 05 10 LF 27 $10.00 $270.00
UNIT II: SANITARY SEWER IMPROVEMENTS
TOTAL UNIT II: SANITARY SEWER IMPROVEMENTS $43,392.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version May 22, 2019 00 42 43_Bid Proposal_DAP_FHPInputR002- (1)
4
5
2
00 42 43
DAP - BID PROPOSAL
Page 3 of 3
Bidder's Application
Specification
Section No.
Unit of
Measure Unit Price
Project Item Information
Bid Value
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Bidder's Proposal
Description Bid
Quantity
Bidlist Item
No.
UNIT PRICE BID
This Bid is submitted by the entity named below:
BIDDER: BY:
F.H. Paschen, S.N. Nielsen & Associates LLC
122 West John Carpenter Freeway
Suite 550 TITLE:
Irving, TX 75039 DATE:
24
END OF SECTION
UNIT I: WATER IMPROVEMENTS
UNIT II: SANITARY SEWER IMPROVEMENTS $43,392.00
Contractor agrees to complete WORK for FINAL ACCEPTANCE within working days after the date when the
CONTRACT commences to run as provided in the General Conditions.
$70,300.49
$113,692.49Total Construction Bid
Bid Summary
Project Manager
6/14/2024
Richard Darrah
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version May 22, 2019 00 42 43_Bid Proposal_DAP_FHPInputR002- (1)