HomeMy WebLinkAboutContract 59862-CO2Contract Time
(CD)
210
15
225
7
232
Date
Date
Date
Date
Date
ATTEST:
____________________________________________
Jannette Goodall, City Secretary
City of Fort Worth
Contractor
59862
Client Project #(s)104816
Date 6/12/2024
City Project Mgr.
Change Order Request
2
Project Name
Remaining Funds Available for this CO
Pending Change Orders (in M&C Process)
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%)
$85,000.00$85,000.00
Contract Cost to Date
$85,000.00
Amount of Proposed Change Order
$1,635,118.50
Revised Contract Amount $1,635,118.50
$85,000.00
$0.00
City Sec #2023 Asphalt Resurfacing Contract 3
TPWDept.Totals
Project Description Milling 2 inches of existing pavement and applying a 2-inch HMA overlay in addition to replacing damaged curb and gutter, driveways, and non-
compliant ADA ramps. Reclaiming pavement by pulverizing 11" of existing asphalt pavement and applyin 3-inch HMA overlay.
Change Order #Peachtree Construction, Ltd.
Marwan Hafez Brandon GibsonCity Inspector
$1,635,118.50
Original Funds Available for Change Orders
$1,635,118.50
Extras to Date $0.00
$1,635,118.50
Credits to Date
0.00%
$2,043,898.13
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
Additional Funding (if necessary)
JUSTIFICATION (REASONS) FOR CHANGE ORDER
DateAssistant City Attorney
This Change Order is issued to add 7 days to the contract due to delays experienced because of adverse weather conditions. The adverse weather condition dates were March
7, 2024, March 8, 2024, May 16, 2024, May 28, 2024, May 30, 2024, and June 5, 2024. These weather events impacted the ability to proceed with project tasks including
flatwork excavation, concrete pouring, and pavement striping.
Staff reviewed the progress of the work and recommends an extension of 7 calendar days to the current project schedule. This extension will allow for the recovery of lost time
and ensure the completion of the project to the required standards of safety and quality.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that
he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements.
Council Action (if required)
M&C Number
Inspector/Inspection Supervisor Date Project and Contract Compliance Manager
$1,635,118.50
Original Contract Amount
M&C Date Approved
Contractor's Company Name
Peachtree Construction, Ltd.
Contractor (Name)
J. Barry Clark
Contract Signature
Senior Capital Project Officer
Director, Contracting Department (Dept)
DateProgram Manager
DateAssistant Director (Dept)
Assistant City Manager
QtyDEPTITEM DESCRIPTION
$0.00
TotalUnit CostUnit
City of Fort Worth
Change Order Additions
Project Name 2023 Asphalt Resurfacing Contract 3 City Sec # 59862
Client Project # 104816
2 6/12/2024
Marwan Hafez InspectorContractor
Change Order Submittal #
Peachtree Construction, Ltd.PM Brandon Gibson
Sub Total Additions
Date
TPW
ADDITIONS
$0.00
$0.00
Change Order Additions Page 2 of 4
$0.00
$0.00
Sub Total Deletions
Date
TPW
Client Project # 104816
2 6/12/2024Change Order Submittal #
Contractor
City of Fort Worth
Change Order Deletions
Project Name 2023 Asphalt Resurfacing Contract 3 City Sec # 59862
DELETIONS
Unit CostUnit
$0.00
TotalQtyDEPTITEMDESCRIPTION
Peachtree Construction, Ltd. PM Marwan Hafez Inspector Brandon Gibson
Change Order Deletions Page 3 of 4
$0.00Total
M/SBE for this Change Order
Previous Change Orders
$0.00Total
Type of Service Amount for this COM/SBE Sub
$0.00
CO #1 1/11/2024
CO #DATE AMOUNT
$0.00
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE:2023 ASPHALT RESURFACING CONTRACT 3
M&C: 23-1054 CPN: 104816 CSO: 59862 DOC#: CO2
Date: 6/12/2024
To: Name Department Initials Date Out
1 Sophia Flores (BSP)TPW
2 J. Barry Clark/Peachtree C., Ltd. Vendor
3 Brandon Gibson (Inspector) TPW
4 Marwan Hafez (PM) TPW
5 Zelalem Arega (PGM) TPW
6 Mary Hanna (SCPO) TPW
7 Patricia Wadsack (AD) TPW
8 Lauren Prieur (Director) TPW
9 Doug Black (ACA) Legal
10 Jesica McEachern (ACM)CMO
11 Jannette Goodall (CS) CSO
12 TPW Contracts TPW
CC: Program Manager, Sr. CPO, TPW BSPAP Recon Team, TPW Records Room, TPW
Contracts ALSO List: - Bus Sppt: Sophia Flores; Prg Mgr: Zelalem Arega; Sr CPO: Mary Hanna
ATURE: All documents received from any and all City
ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review and
take the next steps.
NEEDS TO BE NOTARIZED: YES No
RUSH:YES No SAME DAY:YES No NEXT DAY:YES No
ROUTING TO CSO: YES No
Action Required: Attach Signature, Initial and Notary Tabs
As Requested
For Your Information
Signature/Routing and or Recording
Comment
File