HomeMy WebLinkAboutContract 57480-CO3DEVELOPER-AWARDED-PROJECT CHANGE ORDER
PROJECT NAME:
CONTRACT:
CFA #
CITY PROJECT #
CITY SECRETARY CONTRACT #
FID #
FILE #
INSPECTOR:Phone No:
PROJECT MANAGER:Phone No:
Developer
Cost City Cost Developer Cost City Cost
Developer
Cost City Cost
Developer
Cost City Cost
Developer
Cost City Cost
ORIGINAL CONTRACT $134,159.65 $33,035.70 $139,951.39 $20,066.01 $0.00 $0.00 $264,911.70 $7,866.80 $123,159.00 $0.00 250
EXTRAS TO DATE $26,916.40 $0.00 $0.00 $0.00 $0.00 $0.00 $6,282.50 $0.00 $0.00 $0.00 0
CREDITS TO DATE $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0
CONTRACT TO DATE $161,076.05 $33,035.70 $139,951.39 $20,066.01 $0.00 $0.00 $271,194.20 $7,866.80 $123,159.00 $0.00 250
AMOUNT OF PROP. CHANGE ORDER $0.00 $0.00 $95,297.00 $0.00 $0.00 $0.00 $27,288.06 $0.00 $11,241.36 $0.00 0
REVISED CONTRACT AMOUNT $161,076.05 $33,035.70 $235,248.39 $20,066.01 $0.00 $0.00 $298,482.26 $7,866.80 $134,400.36 $0.00 250
TOTAL REVISED CONTRACT AMOUNT PER
UNIT
REVISED COST SHARE Dev. Cost:City Cost:
TOTAL REVISED CONTRACT
CONTRACT
DAYS
$0.00
PAVING
$194,111.75
CFA22-0004
James Ruiz 817-675-1574
57480
W-2807; X-27120
$255,314.40
CONTRACT UNIT
STREET LIGHTS
817-392-7872Khal Jaafari, P.E.
$306,349.06
YES
30114-0200431-103752-E07685
DRAINAGE
$60,968.51 $829,207.06
SEWER
$134,400.36
WATER
$890,175.57
CITY PARTICIPATION:
CHANGE
ORDER No:
3
Broadway Multifamily
Water, Sanitary Sewer, Paving and Street Light Improvements
103752
Revised: 12-17-2018 Page 2
You are directed to make the following changes in the contract documents:
4 3301.0002 105 LF $0.00 $10.00 $1,050.00 $1,050.00
5 3301.0101 1 EA $0.00 $150.00 $150.00 $150.00
6 3305.0107 1 EA $0.00 $1,000.00 $1,000.00 $0.00 $1,000.00
7 3305.0109 105 LF $0.00 $5.00 $525.00 $525.00
10 3331.4115 71 LF $0.00 $120.00 $8,520.00 $0.00 $8,520.00
12 3339.1001 3 EA $0.00 $26000.00 $78,000.00 $0.00 $78,000.00
14*3331.4108 34 LF $0.00 $178.00 $6,052.00 $0.00 $6,052.00
$95,297.00 $0.00 $95,297.00
22*3211.0112 1581 SY $0.00 $17.26 $27,288.06 $0.00 $27,288.06
$27,288.06 $0.00 $27,288.06
3 3441.1408 351 LF $1.50 $526.50 $526.50
10*2605.3016 117 LF $91.58 $10,714.86 $10,714.86
$11,241.36 $0.00 $11,241.36
$133,826.42
Asterisk (*) indicates New Pay Item
REASONS FOR CHANGE ORDER
2) Water line lowering required on existing 8" water line in Galveston Ave as said water line is in direct path of proposed WW Line 'A' at their crossing. Changes
correspond to Revision No. 3 as shown on sheets 4, 5, and 8 of the construction plans.
3) Revised paving, grading due to required accessibility (ADA) conformance. Changes correspond to Revision No. 3 as shown on sheets 11 and 19 of the
construction plans.
1) Revised proposed 6" sanitary sewer lines WW LAT 'A2", WW LAT 'B1', and WW LAT 'B2' in order to connect to the private MEP connections which were
constructed at locations that differed from approved construction plans. Changes correspond to Revision No. 3 as shown on sheets 4 and 5 of the construction
plans.
No. 6 Insulated Elec Condr
2" CONDT PVC SCH 80 (B)
GRAND TOTAL
TOTAL UNIT V: STREET LIGHT IMPROVEMENTS
UNIT IV: PAVING IMPROVEMENTS
Trench Safety
UNIT PRICE
Developer
Cost
8" Sewer Pipe
Manhole Adjustment, Minor
TOTAL
UNIT II: SANITARY SEWER IMPROVEMENTS
CFW Unit
Price City Cost
TOTAL UNIT IV: PAVING IMPROVEMENTS
4' Manhole
6" Sewer Pipe
TOTAL UNIT II: SANITARY SEWER IMPROVEMENTS
Manhole Vacuum Testing
ITEM DESCRIPTION
Post-CCTV Inspection
6" Flexible Base, Type A, GR-1
UNIT V: STREET LIGHT IMPROVEMENTS
PAY ITEM #QUANTITY UNIT
CITY BID ITEM
#
Revised: 12-17-2018 Page 3
RECOMMENDED:APPROVED:APPROVED:
Stantec Consulting Services Inc.Broadway Acquisition LP Rampart Multifamily, LLC
By: By: By:
Name: Paul Hames, PE Name: Brian Crowell Name: Doug Sorey
Title:Project Manager Title: Manager Title: VP
APPROVAL RECOMMENDED:APPROVED:APPROVED AS TO FORM AND LEGALITY:
CFW - Sponsoring Department CFW - Sponsoring Department CFW - Senior Assistant City Attorney
By: By: N/A By:
Name: Suby Varughese, PE Name: N/A Name: Richard A. McCracken
Title:Engineer Manager - DSWS Title: N/A Title: Senior Assistant City Attorney
RECOMMENDED:APPROVED:ATTEST:
CFW - *Contract Compliance Manager CFW - Assistant City Manager CFW - City Secretary
By: By: By:
Name: Khal Jaafari, PE Name: Dana Burghdoff, AICP Name: Jannette S. Goodall
Title:Professional Engineer Title: Assistant City Manager Title: City Secretary
* Contract Compliance Manager (Project Manager):
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, include
ensuring all performance and reporting requirements.
There are NO City Funds associated with this Contract
M&C Number: N/A
There are City Funds associated with this Contract
M&C Date Approved: N/A
Revised: 12-17-2018 Page 4
Instructions for Processing Developer-Awarded-Project Change Orders (for City PM use only)
II. Once the City PM has completed the review, the change order will be sent to the City Inspector to verify the quantities.
The following individuals need to sign the CHANGE ORDER REQUEST:
a.Consultant
b.Contractor
c.Developer
d.City Project Manager
*Note:Project Manager is required to check "There are No City funds associated with this project." under the Contract Compliance Manager field.
e.Assistant City Attorney (ACA)
f.Assistant City Manager (ACM)
g.City Secretary Office (CSO)
V-B. If the change order does impact the City participation the PM will:
1. Send CHANGE ORDER REQUEST to sponsoring department for review. If sponsoring department accepts the CHANGE ORDER REQUEST, the request
will move on to the next step. If it is not accepted, the CHANGE ORDER REQUEST is sent back to the PM for corrections and the process starts over.
2. PM will verify if the CHANGE ORDER REQUEST is greater than or equal to $100K.
a.If yes, then the PM must:
i Coordinate with sponsoring department staff member to begin drafting M&C.
ii Sponsoring dept. staff will prepare and route M&C.
iii Sponsoring dept. staff shall notify the PM when the M&C is approved and return C.O. back to PM to move on to the next step.
Note: If City Council denies the M&C, the change order will be returned back to the PM for revisions and the process starts over.
b.If no, then the sponsoring department returns change order back to PM and moves on to the next step.
3. PM will start routing the change order via Adobe Esign. Follow the Adobe Esign instructions on setting up distribution list.
The following individuals need to sign the CHANGE ORDER REQUEST:
a.Consultant
b.Contractor
c.Developer
d.City Project Manager
*Note:Project Manager is required to check "There are City funds associated with this project." under the Contract Compliance Manager field.
e.Sponsoring Dept.(S)
f.Assistant City Attorney (ACA)
g.Assistant City Manager (ACM)
h.City Secretary Office (CSO)
4. Upon receiving CHANGE ORDER REQUEST completely signed by City staff, copies are to be distributed as follows*:
b- Client Department--see (d) below
TPW Fiscal Staff- Brandi Crane
Water Dept - Dianna Parr (front desk)
c- Construction Services (inspector)
*If anyone else requires the executed CHANGE ORDER REQUEST for records photocopies should be provided.
VI. Upon completion of the project, all change orders which have not been forwarded to the CSO through step III-B must be forwarded to the CFA office, which in turn will forward to the CSO
along with CFA closure records.
I. Consulting Engineer shall complete the electronic change order and submit to the City Project Manager (PM) for review.
III. If the City Inspector determines there is a discrepancy with the quantities, the change order will be sent back to the City PM and the
Consulting Engineer will be required to make the necessary changes.
IV. City PM will convert the electronic change order to a pdf and prepare the change order package. If there are any previous change
orders associated with the project, those executed change orders must be routed with the current change order being processed.
V-A. If there is no City partcipation in the project or the change order does not impact the City participation, the PM will start
routing the change order via Adobe Esign. Follow the Adobe Esign instructions on setting up distribution list.
Instructions for Using the Developer-Awarded-Project Change Order Form (DO NOT PRINT THIS SHEET)
The format of the form may not be altered.
*Text in blue italics is for guidance and should be deleted and/or modified as necessary.
II. Once the City PM has completed the review, the change order will be sent to the City Inspector to verify the quantities.
*Pay items listed in the change order shall match the pay items and sequential numbers in the Bid Proposal Section of the Contract
Documents. For any new pay items added that were not part of the original contract, please assign a new sequential number with an
Asterisk. Use standard CFW pay item descriptions for the change order.
III. If the City Inspector determines there is a discrepancy with the quantities, the change order will be sent back to the City PM
and the Consulting Engineer will be required to make the necessary changes.
I. Consulting Engineer shall complete the electronic change order and submit to the City Project Manager (PM) for review.
(For projects that do not involve City Cost Participation, the consultant is required to place N/A for all City Signature blocks except for
the Contract Compliance Manager. For projects that involve City Cost Participation, the consultant is required to provide a cost
breakdown between developer and City improvements.)