Loading...
HomeMy WebLinkAboutContract 61639CSCO NO. ____________________ Transportation Impact Fee Credit Agreement-CA-24-002 Page 1 of 17 Quarry Falls Multifamily Ph. 1B 06/24/2024 TRANSPORTATION IMPACT FEE CREDIT AGREEMENT THIS TRANSPORTATION IMPACT FEE CREDIT AGREEMENT (the “Agreement”) is made and entered into effective as of the Effective Date (as defined below), by and among THE CITY OF FORT WORTH, TEXAS (the “City”), a Texas home rule municipal corporation, and GS Quarry Falls Phase I Owner, L.P., a Delaware Limited Partnership, GS Quarry Falls Phase II Owner, L.P. a Delaware Limited Partnership, GS Quarry Falls Excess Land, LLC a Delaware Limited Liability Company authorized to do business in Texas (the “Owner”) (the City and the Owner a ”Party“, and collectively, the ”Parties”). RECITALS WHEREAS, the Owner is the owner of approximately 87.385 acres in Tarrant County, Texas, as described by metes and bounds in Exhibit “A” (the “Property”) located within the corporate boundaries of the City. A map of the Property showing its location is attached hereto as Exhibit “B”; and WHEREAS, the Owner desires to proceed with development of the Property as described or illustrated on the Development Plan, attached hereto as Exhibit “C”, which identifies the on- site and/or off-site transportation facilities necessary for serving full development of the Property; and WHEREAS, the City has adopted a Transportation Impact Fee program pursuant to Texas Local Government Code Chapter 395, codified in City Code Chapter 30, Article VIII, as amended, under which transportation impact fees are imposed on new development for impacts to the City’s transportation facilities as a result of said development; and WHEREAS, transportation impact fees are collected and must be spent by the City on impact fee eligible transportation facilities identified within the City’s adopted Transportation Improvements Plan (“TIP”), as amended, within the service area(s) in which the new development is located; and WHEREAS,the Transportation Impact Fee Program provides for credits against impact fees for dedication of right-of-way and/or construction of transportation improvements identified as impact fee eligible on the adopted TIP; and WHEREAS, the Property is located within service area G; and WHEREAS,certain transportation facilities depicted on Exhibit “D” are identified as impact fee eligible within the City’s adopted TIP and therefore eligible for impact fee credit; and WHEREAS, Owner has agreed to dedicate the right-of-way and/or construct the transportation improvements shown on Exhibit “D” for which credits against transportation impact fees shall be granted; and WHEREAS, the Owner has received final plat approval for Quarry Falls, FS-23-239, on Transportation Impact Fee Credit Agreement-CA-24-002 Page 2 of 18 Quarry Falls Multifamily Ph. 1B 06/24/2024 5/17/2024; and WHEREAS, the Owner has dedicated 15,811 square feet of right-of-way for Old Decatur Road with FS-23-239, recorded as Instrument D224086716 on 5/17/2024; and WHEREAS, the Owner has received approval for construction plans (IPRC23-0162), on 3/7/2024, on 05/31/2024 and executed a Community Facilities Agreement (CFA 23-0173, CSCO 61207, City Project Number 105209), on 4/1/2024 with a (development bond) financial guarantee. NOW, THEREFORE, for and in consideration of the mutual agreements, covenants, and conditions contained herein, and other good and valuable consideration, the City and the Owner hereby covenant and agree as follows: 1. Recitals. The recitals contained in this Agreement are true and correct as of the Effective Date and form the basis upon which the Parties negotiated and entered into this Agreement. 2. Transportation Improvements. Owner agrees to dedicate the rights-of-way for and/or construct the system facilities identified in Exhibit “D”. For any transportation improvement which has been previously dedicated or constructed by Owner on the Property and accepted by the City prior to execution of this Agreement, the improvement shall be identified as completed on Exhibit “D”. 3. Credits. The Parties agree that the estimated value of the credits for each transportation improvement, expressed in current dollars, shall be as set forth in Exhibit “E”. The value of credits associated with the improvements first shall be reduced by the Schedule 2 impact fee associated with any lot for which a building permit has previously been issued, and the net value of credits shown on Exhibit “E” shall be considered as exact. 4. Phasing. The Parties acknowledge that, where it is anticipated that the project will be developed in phases, the anticipated construction of improvements by phase shall be as depicted in Exhibit “D”, which is attached hereto and incorporated herein by reference. 5. Allocation of Credits by Phase. The general allocation of credits to each phase of the development shall be as shown on Exhibit “F”, which is attached hereto and incorporated herein by reference. The Parties agree that the credits identified in this Agreement shall not be deemed to have been created until the system facility for which credit is to be granted has been dedicated and accepted (in the case of right-of-way) or constructed through an executed Community Facilities Agreement and final acceptance by the City has been obtained. The Parties further agree that, prior to the application of a credit against transportation impact fees otherwise due for any unit of development; the following events shall take place: (a) The number of credits resulting from such improvement has been valued; and Transportation Impact Fee Credit Agreement-CA-24-002 Page 3 of 18 Quarry Falls Multifamily Ph. 1B 06/24/2024 (b) Concurrent with final plat approval, a credit allocation shall be provided by the developer for the phase of development to which the credit is to be applied, which allocation may either assign the credit, expressed in dollars, to each finally platted lot or may create a credit- pool to be utilized by that phase of development. 6. Term and Effective Date. The term of this Agreement shall be ten (10) years from its Effective Date. 7. Assignment. Owner shall have the right to assign this Agreement to any person or entity (“Owner’s Assignee”) with the written consent of the City, provided: (a) the assignment is in writing executed by the Owner and its assignee; and (b) the assignment incorporates this Agreement by reference and binds the Owner’s Assignee to perform (to the extent of the obligations assigned) in accordance with this Agreement. Each Owner’s Assignee shall become a Party to this Agreement upon the execution of such assignment. In no event may this Agreement be construed to authorize assignment of any credits attributable to a system facility to be dedicated or constructed hereunder for use outside the boundaries of the Property. 8. Amendment. This Agreement shall not be modified or amended except as follows: (a) Any amendment or modification to this Agreement or any Exhibit or schedule hereto shall be in writing and signed by the Parties. (b) Any revision, amendment, or modification to this Agreement, the Development Plan, or any Exhibit or schedule thereto, shall become effective on the date executed by the Parties or, as applicable, upon the date of approval by the City Council or designated city official. 9. Exhibits. The exhibits attached to this Agreement are incorporated as part of this Agreement for all purposes as if set forth in full in the body of this Agreement. (Remainder of Page Intentionally Left Blank) Transportation Impact Fee Credit Agreement-CA-24-002 Page 4 of 18 Quarry Falls Multifamily Ph. 1B 06/24/2024 IN WITNESS WHEREOF, the undersigned parties have executed this Agreement to be effective as of the date subscribed by the City’s Assistant City Manager. CITY OF FORT WORTH, TEXAS _______________________________ Dana Burghdoff Assistant City Manager Date: __________________________ Recommended By: _____________________________ DJ Harrell Director, Development Services Approved as to Form and Legality: _____________________________ Douglas Black Assistant City Attorney M&C: None required Form 1295: None required ATTEST: ______________________ Jannette Goodall City Secretary OWNER GS Quarry Falls Phase I Owner, L.P. a Delaware Limited Partnership JR Thulin Vice President GS Quarry Falls Phase II Owner, L.P. a Delaware Limited Partnership JR Thulin Vice President GS Quarry Falls Excess Land, LLC a Delaware Limited Liability Company JR Thulin Vice President City Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Jennifer H. Roberts Assistant Director, Development Services Department Transportation Impact Fee Credit Agreement-CA-24-002 Page 5 of 18 Quarry Falls Multifamily Ph. 1B 06/24/2024 EXHIBIT LIST “A” Description of the Property “B” Map of Property “C” Development Plan “D” Eligible Transportation Improvements “E” Credits Against Transportation Impact Fees “F” Allocation of Credits Transportation Impact Fee Credit Agreement-CA-24-002 Page 6 of 18 Quarry Falls Multifamily Ph. 1B 06/24/2024 EXHIBIT A Description of Property: Quarry Falls Final Plat, FS-23-239 BEING an 87.385 acre tract of land situated in the J.T. Hobbs Survey, Abstract No. 806, the J. Boman Survey, Abstract No. 80, the R. Mussellman Survey, Abstract No. 1102, and the A.F. Albright Survey, Abstract No. 1849, City of Fort Worth, Tarrant County, Texas, being all of the land described in the deed to Fort Worth Quarry Company, LLC, as recorded in Instrument No. D222030435, Official Public Records, Tarrant County, Texas (OPRTCT), and being more particularly described by metes and bounds as follows: BEGINNING at a point for the southwest corner of said Fort Worth Quarry Company, LLC tract, in the northerly right-of-way line of Interstate Highway 820, a variable width right-of-way, as described in the Judgment to the State of Texas (No. 153-16320-72), recorded in Volume 6923, Page 1434, Deed Records, Tarrant County, Texas (DRTCT), and in the east right-of-way line of Old Decatur Road, a variable width right-of-way, from said point, a TxDOT monument with brass disk found bears North 51°21'12" East, a distance of 0.40 feet; THENCE departing the northerly right-of-way line of said Interstate Highway 820, with the west line of said Forth Worth Quarry Company, LLC tract and the east right-of-way line of said Old Decatur Road the following courses and distances: North 49°55'35" West, a distance of 112.78 feet to a point for corner from which a 5/8 inch capped iron rod stamped “PATE SURVEYORS” found (disturbed) bears North 64°11'35" East, a distance of 0.45 feet; North 0°29'28" West, a distance of 393.98 feet to a 5/8” iron rod found for corner; North 8°52'58" West, a distance of 453.40 feet to a 5/8” iron rod found; North 10°52'13" West, a distance of 364.13 feet to a 5/8” capped iron rod stamped “PATE SURVEYORS” found for the southwest corner of Lot 19 (common area), Block 6, The Quarry, an addition to the City of Fort Worth, Tarrant County, Texas, according to the plat recorded in Cabinet A, Slide 8696, OPRTCT; THENCE departing the east right-of-way line of said Old Decatur Road and with the common line of said Fort Worth Quarry, LLC tract and said The Quarry addition the following courses and distances: North 79°08'01" East, a distance of 259.74 feet to a 1/2” capped iron rod stamped "JPH LAND SURVEYING" found (disturbed) for the beginning of a curve to the left, having a radius of 999.95 feet and a chord which bears North 59°47'54" East, a distance of 662.16 feet; In a northeasterly direction with said curve to the left, through a central angle of 38°40'14", an arc length of 674.89 feet to a point for the end of said curve to the left, from which a 1/2” capped iron rod stamped "JPH LAND SURVEYING" found (disturbed) bears South 78°44'49" East, a distance of 0.50 feet; North 40°27'44" East, a distance of 87.30 feet to a 5/8” iron rod found for corner; Transportation Impact Fee Credit Agreement-CA-24-002 Page 7 of 18 Quarry Falls Multifamily Ph. 1B 06/24/2024 North 0°28'44" West, a distance of 197.38 feet to a 5/8” capped iron rod stamped "PATE SURVEYORS" found for corner; North 39°01'15" East, a distance of 109.08 feet to a 5/8” capped iron rod stamped "PATE SURVEYORS" found for corner; North 56°44'59" East, a distance of 170.56 feet to a 5/8” capped iron rod stamped "PATE SURVEYORS" found for corner; South 61°30'17" East, a distance of 111.15 feet to a 5/8” capped iron rod stamped "PATE ENGR RPLS 5647" found for corner; North 75°14'14" East, a distance of 274.63 feet to a 5/8” capped iron rod stamped "PATE ENGR RPLS 5647" found for corner; North 40°45'07" East, a distance of 193.20 feet to a 5/8” capped iron rod stamped "PATE ENGR RPLS 5647" found for corner; North 47°27'03" East, a distance of 464.30 feet to an “X” cut in in rock found for corner; North 25°34'09" East, a distance of 121.45 feet to an “X” cut in in rock found for corner; North 55°50'19" East, a distance of 205.01 feet to a “Y” cut in in rock found for corner; South 72°23'45" East, a distance of 186.68 feet to a 1/2” capped iron rod stamped "JPH LAND SURVEYING" found for corner; North 75°27'20" East, a distance of 45.54 feet to a 5/8" capped iron rod stamped "MMA" set for corner; North 39°33'20" East, a distance of 189.19 feet to a 5/8” capped iron rod stamped "PATE ENGR RPLS 5647" found for corner; North 84°33'20" East, a distance of 56.57 feet to a 5/8” capped iron rod stamped "PATE ENGR RPLS 5647" found for corner; South 50°27'30" East, a distance of 300.83 feet to a 5/8” capped iron rod stamped "PATE SURVEYORS" found for corner; North 13°46'11" East, a distance of 435.84 feet to a point for corner from which a 1/2” capped iron rod stamped "JPH LAND SURVEYING" found bears South 56°48'56" East, a distance of 0.25 feet and from which a 1/2” capped iron rod (illegible) found bears South 07°08'12" East a distance of 0.32 feet; North 11°20'11" East, a distance of 417.66 feet to a 5/8” iron rod found (leaning) for corner; South 89°16'04" West, a distance of 238.72 feet to a 5/8” capped iron rod stamped "PATE RPLS 5647" found for corner; South 89°35'20" West, a distance of 1,279.19 feet to a point for the most northerly southwest corner of said Fort Worth Quarry, LLC tract, from which a 5/8” capped iron rod stamped "PATE ENGR RPLS 5647" found bears South 69°02'51" West, a Transportation Impact Fee Credit Agreement-CA-24-002 Page 8 of 18 Quarry Falls Multifamily Ph. 1B 06/24/2024 distance of 0.62 feet; THENCE North 23°00'51" West, departing the north line of said The Quarry addition, a distance of 54.14 feet to a 1/2” capped iron rod stamped "JPH LAND SURVEYING" found for the most northerly northwest corner of said Fort Worth Quarry, LLC tract and in the south line of a tract of land described in the deed to Texas Electric Service Company (Tract No. 2), as recorded in Volume 2037, Page 277, DRTCT, and in the Affidavit of Name Change to TXU Electric Company, as recorded in Volume 14403, Page 441, DRTCT; THENCE North 89°35'08" East, with the common line of said Fort Worth Quarry, LLC tract and said TXU Electric Company tract (Tract 2), a distance of 1,300.03 feet to a 5/8” capped iron rod stamped "PATE RPLS 5647" found for the southeast corner of said TXU Electric Company tract (Tract 2) and the southwest corner of a tract of land described as Tract 1 in said deed to Texas Electric Service Company; THENCE North 89°15'32" East, with the common line of said Fort Worth Quarry, LLC tract and said TXU Electric Company tract (Tract 1), a distance of 300.25 feet to a point for the most northerly northeast corner of said Fort Worth Quarry, LLC tract and the northwest corner of a tract of land described in the deed to Tarrant County Water Control and Improvement District No. 1, as recorded in Volume 2866, Page 188, DRTCT, from which a broken concrete monument found bears South 59°58'35" East, a distance of 0.45 feet; THENCE in a southerly direction, with the common line of said Fort Worth Quarry, LLC tract and said Tarrant County Water Control and Improvement District No. 1 tract the following courses and distance: South 11°20'45" West, a distance of 480.47 feet to a 5/8” capped iron rod stamped "PATE SURVEYORS" found for corner, from which a 3/4” iron rod found (smooth) bears South 43°23'52" East, a distance of 2.02 feet; South 13°45'21" West, a distance of 557.48 feet to a 5/8” capped iron rod stamped "PATE SURVEYORS" found for corner, from which a 3/4” iron rod found bears South 45°00'00" East, a distance of 0.45 feet; South 22°32'41" West, a distance of 791.41 feet to a concrete monument with brass disc stamped “TCWC ID NO1” found for corner; South 19°47'45" West, a distance of 445.36 feet to a 3/4” iron rod found (smooth) for corner; South 44°49'14" West, a distance of 398.63 feet to a concrete monument with disc found (broken) for corner; South 32°30'13" East, a distance of 197.31 feet to a 3/4” iron rod found (leaning) for the southeast corner of said Fort Worth Quarry, LLC tract, the southwest corner of said Tarrant County Water Control and Improvement District No. 1 tract, in the northerly right-of-way line of said Interstate Highway 820 and for the beginning of a non-tangent curve to the left, having a radius of 11,659.00 feet and a chord which bears South 62°25'45" West, a distance of 871.26 feet; THENCE in a southwesterly direction with the southerly line of said Forth Worth Quarry, LLC tract and the northerly right-of-way line of said Interstate Highway 820 the following courses and distances: Transportation Impact Fee Credit Agreement-CA-24-002 Page 9 of 18 Quarry Falls Multifamily Ph. 1B 06/24/2024 With said non-tangent curve to the left through a central angle of 4°16'57", an arc length of 871.46 feet to a 5/8” iron rod found for the end of said non-tangent curve to the left, from which a TxDOT monument with brass disk found bears North 24°41'44" East, a distance of 0.74 feet; South 67°53'45" West, a distance of 462.78 feet to a point for corner from which a 3/4” iron rod found (leaning) bears North 70°22'04" East, a distance of 0.46 feet; South 62°34'45" West, a distance of 551.44 feet to a concrete monument found (broken); South 58°24'45" West, a distance of 293.20 feet to the POINT OF BEGINNING and containing 3,806,490 Square Feet or 87.385 Acres of Land, more or less. Transportation Impact Fee Credit Agreement-CA-24-002 Page 10 of 18 Quarry Falls Multifamily Ph. 1B 06/24/2024 EXHIBIT B Map of Property: Bonds Ranch Commerce Center Final Plat, FS-23-239 Transportation Impact Fee Credit Agreement-CA-24-002 Page 11 of 18 Quarry Falls Multifamily Ph. 1B 06/24/2024 EXHIBIT C Development Plan: Quarry Falls Final Plat, FS-23-239 Transportation Impact Fee Credit Agreement-CA-24-002 Page 12 of 18 Quarry Falls Multifamily Ph. 1B 06/24/2024 Transportation Impact Fee Credit Agreement-CA-24-002 Page 13 of 18 Quarry Falls Multifamily Ph. 1B 06/24/2024 EXHIBIT D Eligible Transportation Improvements Exhibit D Quarry Falls Multifamily Eligible Transportation Improvements for Credit against Transportation Impact Fees Key Development Plan Area Right-of-Way Dedication / Roadway Construction Eligible Improvements Reference #Limits Old Decatur Road FS-23-239 Right-of-way dedication from north of Old Decatur to River Rock Rd Old Decatur Road CPN 105209 Construction of two lanes, street lights, & storm drain. Transportation Impact Fee Credit Agreement-CA-24-002 Page 14 of 18 Quarry Falls Multifamily Ph. 1B 06/24/2024 EXHIBIT E Credits Against Transportation Impact Fees Quarry Falls Multifamily Transportation Impact Fee Credit Overview Value of ROW Dedication Instrument # Final Plat # Eligible Arterial Value D224086716 FS-23-239 Old Decatur Rd $39,685.61 Total ROW Transportation Impact Fee Credit $39,685.61 TrIF Eligible Community Facilities Agreement Construction City Secretary # CFA # Eligible Arterial Value 61207 CFA23-0173 Old Decatur Rd $1,670,991.00 CPN 105209 75% Community Facilities Agreement Credit Prior to Final Acceptance of the Facility $1,253,243.25 Engineering, Surveying, and Material Testing = 20% of eligible construction costs $334,198.20 Total Transportation Impact Fee Credit Applied to Date $1,627,127.06 Transportation Impact Fee Credit Agreement-CA-24-002 Page 15 of 18 Quarry Falls Multifamily Ph. 1B 06/24/2024 Right-of-Way Valuation for Old Decatur Rd Valuation Method 1 - Percentage of TIP Project Cost Eligible Arterial Old Decatur Rd 2022 Transportation Improvements Plan Project Number G-19 Estimated Construction Costs from 2022 Transportation Improvements Plan $1,462,000 Value of Total Project Right-of-Way (20% of Construction Cost) $292,400 Total Project Length (LF) $1,565 Arterial Cross-Section Width (LF) $110 Additional ROW needed for Roundabout (SF) $0 Total Project Right-of-Way (SF) 172150 Right-of-Way Value Per Square Foot $1.70 Valuation Method 2 - Percentage of Construction Project Cost Eligible Arterial Old Decatur Rd City Project Number 105209 Final Construction Costs from Notice of Completion (Green Sheet) $1,670,991 Value of Total Project Right-of-Way (20% of Construction Cost) $334,198 Total Project Length (LF) 1211 Arterial Cross-Section Width (LF) 110 Additional ROW needed for Roundabout (SF) 0 Total Project Right-of-Way (SF) 133,210 Right-of-Way Value Per Square Foot $2.51 Valuation Method 3 - TAD appraised value TAD Value as of 08/9/2023 Old Decatur Rd TAD Account 43096363 Total Area (SF) 1,582,753 Appraised Value $256,272.00 Value per Square Foot $0.17 Right-of-Way Dedication Old Decatur Rd Recording Instrument Number D224086716 Final Plat Number FS-23-239 Recording Date 5/17/2024 Total area of ROW dedicated (SF) 15,811 Value per SF $2.51 ROW Credit Available $39,685.61 Transportation Impact Fee Credit Agreement-CA-24-002 Page 16 of 18 Quarry Falls Multifamily Ph. 1B 06/24/2024 Paving Item No. Description Unit Eligible Quantity Completed Quantity Unit Price Credit Available 1 REMOVE CONC PVMT SY 5,454 0 $15.00 $81,810.00 2 9" CONC PVMT SY 8,255 0 $95.00 $784,225.00 3 8" LIME TREATMENT SY 8,546 0 $5.50 $47,003.00 4 HYDRATED LIME TN 154 0 $390.00 $60,060.00 5 6" CONC PVMT SY 167 0 $85.00 $14,195.00 6 4" CONC SIDEWALK SF 11,172 0 $7.25 $80,997.00 7 SEEDING, HYDROMULCH SY 2,834 0 $2.50 $7,085.00 8 TOPSOIL CY 237 0 $30.00 $7,110.00 9 BARRIER FREE RAMP, TYPE P-1 EA 8 0 $3,250.00 $26,000.00 10 BARRIER FREE RAMP, TYPE R- 1 EA 1 0 $3,250.00 $3,250.00 11 BARRIER FREE RAMP, TYPE M- 2 EA 1 0 $3,250.00 $3,250.00 12 6" CONC CURB AND GUTTER LF 5,126 0 $20.00 $102,520.00 13 INSTALL ALUM SIGN GROUND MOUNT EA 11 0 $350.00 $3,850.00 Paving Subtotal $1,221,355.00 Storm Drain Item No. Description Unit Eligible Quantity Completed Quantity Unit Price Credit Available 1 REMOVE 24" STORM LINE LF 258 0 $15.00 $3,870.00 2 REMOVE 30" STORM LINE LF 307 0 $16.00 $4,912.00 3 TRENCH SAFETY LF 899 0 $1.00 $899.00 4 21" RCP, CLASS III LF 344 0 $100.00 $34,400.00 5 30" RCP, CLASS IV LF 252 0 $165.00 $41,580.00 6 36" RCP, CLASS III LF 282 0 $200.00 $56,400.00 7 36" RCP, CLASS IV LF 21 0 $215.00 $4,515.00 8 4' STORM JUNCTION BOX EA 4 0 $8,500.00 $34,000.00 9 10' RECESSED INLET EA 3 0 $6,500.00 $19,500.00 10 15' RECESSED INLET EA 4 0 $8,000.00 $32,000.00 Storm Drain Subtotal $232,076.00 Street Light Improvements Item No. Description Unit Quantity Eligible Quantity Unit Price Credit Available 1 2" CONDT PVC SCH 80 (T) LF 1857 0 $27.00 $50,139.00 2 EXPLORATORY EXCAVATION OF EXISTING UTILITIES EA 10 0 $185.00 $1,850.00 3 FURNISH/INSTALL GROUND BOX TYPE B, W/APRON EA 15 0 $2,162.00 $32,430.00 4 FURNISH/INSTALL TYPE 33A ARM EA 13 0 $851.00 $11,063.00 5 FURNISH/INSTALL 240-480 VOLT SINGLE PHASE TRANSOCKET METERED PEDESTAL EA 1 0 $12,275.00 $12,275.00 6 LED LIGHTING FIXTURE EA 13 0 $903.00 $11,739.00 Transportation Impact Fee Credit Agreement-CA-24-002 Page 17 of 18 Quarry Falls Multifamily Ph. 1B 06/24/2024 7 RDWY ILLUM FOUNDATION TY 3 EA 10 0 $3,891.00 $38,910.00 8 FURNISH/INSTALL RDWAY ILLUM TY 18 POLE EA 10 0 $3,687.00 $36,870.00 9 6-6-6 TRIPLEX ALUM ELEC CONDUCTOR LF 5,571 0 $4.00 $22,284.00 Street Lights Subtotal $217,560.00 Paving Subtotal $1,221,355.00 Storm Drain Subtotal $232,076.00 Street Lights Subtotal $217,560.00 CONSTRUCTION SUBTOTAL $1,670,991.00 Transportation Impact Fee Credit Agreement-CA-24-002 Page 18 of 18 Quarry Falls Multifamily Ph. 1B 06/24/2024 EXHIBIT F Allocation of Credits Credit shall be allocated on a first-come, first-served basis to building permits within the final plat boundary of Quarry Falls Final Plat, FS-23-239.