Loading...
HomeMy WebLinkAboutContract 61640CSCO NO. ____________________ Transportation Impact Fee Credit Agreement- CA-20-021 Page 1 of 19 Citadel at Presidio 06/24/2024 TRANSPORTATION IMPACT FEE CREDIT AGREEMENT THIS TRANSPORTATION IMPACT FEE CREDIT AGREEMENT (the “Agreement”) is made and entered into effective as of the Effective Date (as defined below), by and among THE CITY OF FORT WORTH, TEXAS (the “City”), a Texas home rule municipal corporation, and North Presidio LLC, a State of Texas company authorized to do business in Texas (the “Owner”) (the City and the Owner a ”Party“, and collectively, the ”Parties”). RECITALS WHEREAS, the Owner is the owner of approximately 89.2599 acres in Tarrant County, Texas, as described by metes and bounds in Exhibit “A” (the “Property”) located within the corporate boundaries of the City. A map of the Property showing its location is attached hereto as Exhibit “B”; and WHEREAS, the Owner desires to proceed with development of the Property as described or illustrated on the Development Plan, attached hereto as Exhibit “C”, which identifies the on- site and/or off-site transportation facilities necessary for serving full development of the Property; and WHEREAS, the City has adopted a Transportation Impact Fee program pursuant to Texas Local Government Code Chapter 395, codified in City Code Chapter 30, Article VIII, as amended, under which transportation impact fees are imposed on new development for impacts to the City’s transportation facilities as a result of said development; and WHEREAS, transportation impact fees are collected and must be spent by the City on impact fee eligible transportation facilities identified within the City’s adopted Transportation Improvements Plan (“TIP”), as amended, within the service area(s) in which the new development is located; and WHEREAS,the Transportation Impact Fee Program provides for credits against impact fees for dedication of right-of-way and/or construction of transportation improvements identified as impact fee eligible on the adopted TIP; and WHEREAS, the Property is located within service area C; and WHEREAS,certain transportation facilities depicted on Exhibit “D” are identified as impact fee eligible within the City’s adopted TIP and therefore eligible for impact fee credit; and WHEREAS, Owner has agreed to dedicate the right-of-way and/or construct the transportation improvements shown on Exhibit “D” for which credits against transportation impact fees shall be granted; and WHEREAS, the Owner has received preliminary plat approval for Citadel at Presidio, PP- 17-047, on 01/23/2018; and Transportation Impact Fee Credit Agreement- CA-20-021 Page 2 of 19 Citadel at Presidio 06/24/2024 WHEREAS, the Owner has dedicated 23,400 square feet of right-of-way for Heritage Trace Parkway with FP-18-012, recorded as Instrument D219009096, on 12/28/2018; and WHEREAS, the Owner has received approval for construction plans (IPRC19-0053) on 06/12/2019, and executed a Community Facilities Agreement (CFA18-0060, CSCO 51422), on 10/20/2018, and obtained final acceptance by the City for Heritage Trace Parkway, City Project Number 101586, on 05/27/2020. NOW, THEREFORE, for and in consideration of the mutual agreements, covenants, and conditions contained herein, and other good and valuable consideration, the City and the Owner hereby covenant and agree as follows: 1. Recitals. The recitals contained in this Agreement are true and correct as of the Effective Date and form the basis upon which the Parties negotiated and entered into this Agreement. 2. Transportation Improvements. Owner agrees to dedicate the rights-of-way for and/or construct the system facilities identified in Exhibit “D”. For any transportation improvement which has been previously dedicated or constructed by Owner on the Property and accepted by the City prior to execution of this Agreement, the improvement shall be identified as completed on Exhibit “D”. 3. Credits. The Parties agree that the estimated value of the credits for each transportation improvement, expressed in current dollars, shall be as set forth in Exhibit “E”. The value of credits associated with the improvements first shall be reduced by the Schedule 2 impact fee associated with any lot for which a building permit has previously been issued, and the net value of credits shown on Exhibit “E” shall be considered as exact. 4. Phasing. The Parties acknowledge that, where it is anticipated that the project will be developed in phases, the anticipated construction of improvements by phase shall be as depicted in Exhibit “D”, which is attached hereto and incorporated herein by reference. 5. Allocation of Credits by Phase. The general allocation of credits to each phase of the development shall be as shown on Exhibit “F”, which is attached hereto and incorporated herein by reference. The Parties agree that the credits identified in this Agreement shall not be deemed to have been created until the system facility for which credit is to be granted has been dedicated and accepted (in the case of right-of-way) or constructed through an executed Community Facilities Agreement and final acceptance by the City has been obtained. The Parties further agree that, prior to the application of a credit against transportation impact fees otherwise due for any unit of development; the following events shall take place: (a) The number of credits resulting from such improvement has been valued; and (b) Concurrent with final plat approval, a credit allocation shall be provided by the developer for the phase of development to which the credit is to be applied, which allocation Transportation Impact Fee Credit Agreement- CA-20-021 Page 3 of 19 Citadel at Presidio 06/24/2024 may either assign the credit, expressed in dollars, to each finally platted lot or may create a credit- pool to be utilized by that phase of development. 6. Term and Effective Date. The term of this Agreement shall be ten (10) years from its Effective Date. 7. Assignment. Owner shall have the right to assign this Agreement to any person or entity (“Owner’s Assignee”) with the written consent of the City, provided: (a) the assignment is in writing executed by the Owner and its assignee; and (b) the assignment incorporates this Agreement by reference and binds the Owner’s Assignee to perform (to the extent of the obligations assigned) in accordance with this Agreement. Each Owner’s Assignee shall become a Party to this Agreement upon the execution of such assignment. In no event may this Agreement be construed to authorize assignment of any credits attributable to a system facility to be dedicated or constructed hereunder for use outside the boundaries of the Property. 8. Amendment. This Agreement shall not be modified or amended except as follows: (a) Any amendment or modification to this Agreement or any Exhibit or schedule hereto shall be in writing and signed by the Parties. (b) Any revision, amendment, or modification to this Agreement, the Development Plan, or any Exhibit or schedule thereto, shall become effective on the date executed by the Parties or, as applicable, upon the date of approval by the City Council or designated city official. 9. Exhibits. The exhibits attached to this Agreement are incorporated as part of this Agreement for all purposes as if set forth in full in the body of this Agreement. (Remainder of Page Intentionally Left Blank) Transportation Impact Fee Credit Agreement- CA-20-021 Page 4 of 19 Citadel at Presidio 06/24/2024 IN WITNESS WHEREOF, the undersigned parties have executed this Agreement to be effective as of the date subscribed by the City’s Assistant City Manager. CITY OF FORT WORTH, TEXAS _______________________________ Dana Burghdoff Assistant City Manager Date: Recommended By: DJ Harrell Director, Development Services Approved as to Form and Legality: Douglas Black Assistant City Attorney M&C: None required Form 1295: None required ATTEST: Jannette Goodall City Secretary OWNER North Presidio LLC a State of Texas Company By: Artemio De La Vega Manager Artemio De La Vega Manager City Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Jennifer H. Roberts Assistant Director, Development Services Department Transportation Impact Fee Credit Agreement- CA-20-021 Page 5 of 19 Citadel at Presidio 06/24/2024 EXHIBIT LIST “A” Description of the Property “B” Map of Property “C” Development Plan “D” Eligible Transportation Improvements “E” Credits Against Transportation Impact Fees “F” Allocation of Credits Transportation Impact Fee Credit Agreement- CA-20-021 Page 6 of 19 Citadel at Presidio 06/24/2024 EXHIBIT A Description of Property: Citadel at Presidio FP-18-012 WHEREAS Add Northtowne, LLC and North Presidio, LLC are the owners of an 89.2599 acre tract of land situated in the William Mccowen Survey, Abstract No. 999. City of Fort Worth. Tarrant County. Texas; said tract being part of Tract I and all of Tract II and Tract Ill described in Special Warranty Deed to North Presidio, LLC recorded in Instrument No. D216079375 and corrected in Instrument No. D216177083 of the Official Public Records of Tarrant County Texas, said tract also being all of those tracts of land described in Warranty Deed to Add Northtowne, LLC recorded in Instrument No. D218258315 of said Official Public Records, said tract being more particularly described as follows: BEGINNING at a capped 5/8" iron rod found marked "CATER AND BURGESS" found in the west right-of-way line of North Freeway (Interstate Highway No. 35-W) (a variable width right- of-way); said point being the southeast corner of said Tract I and the northeast corner of Lot 2R1, Block C, The Presidio, an addition to the City of Fort Worth according to the plat recorded in Cabinet A, Slide 12792 of the Plat Records of Tarrant County. Texas; THENCE, South 89°00'11" West, along the south line of said Tract I, a distance of 1,323.36 feet to a 5/8-inch iron rod with "CARTER & BURGESS" cap found for corner; THENCE, along the west line of said Tract I, the following eight (8) calls: North 60°44'19" West. a distance of 74.00 feet to a 5/8-inch iron rod with "KHA" cap set for corner; North 24°13'16" West, a distance of 430.67 feet to a 5/8-inch iron rod with "KHA" cap set for corner; North 13°05'27" West, a distance of 405.62 feet to a 5/8-inch iron rod with "KHA" cap set for corner; North 9°59'04" West, a distance of 211.92 feet to a 5/8-inch iron rod found for corner; South 72°58'49" East, a distance of 90.06 feet to a capped 5/8" iron rod found marked "CATER AND BURGESS" for corner; North 0°34'15" West, a distance of 1013.86 feet to a capped 5/8" iron rod found marked "CATER AND BURGESS" for corner; North 34°06'06" East, a distance of 425.44 feet to a capped 5/8" iron rod found marked "CATER AND BURGESS" for corner; North 0°37'28" West, a distance of 238.46 feet to a point for corner in the south right-of-way line of Heritage Trace Parkway (a 120-foot wide right-of-way) THENCE, North 89°34'51" East, along the said south line of Heritage Trace Parkway, a distance of 1,065.70 feet to a 1/2-inch iron rod with "HALFF ASSOC" cap found for corner in the said west line of the North Freeway; THENCE, along the said west line of North Freeway, the following ten (10) calls: South 0°23'21" East, a distance of 36.45 feet to a 1/2-inch iron rod with "HALFF ASSOC" cap found for corner; South 45°35'47" East, a distance of 141.33 feet to a TxDOT Monument found Transportation Impact Fee Credit Agreement- CA-20-021 Page 7 of 19 Citadel at Presidio 06/24/2024 for corner; South 6°11'59" East, a distance of 100.39 feet to a TxDOT Monument found for corner; South 13°15'28" East, a distance of 615.14 feet to a TxDOT Monument found for corner; South 6°05'52" East, a distance of 59.05 feet to a 5/8-inch iron rod with yellow cap found for corner; South 6°15'20" East, a distance of 192.41 feet to a TxDOT Monument found for corner; South 3°54'39" East, a distance of 344.72 feet to a TxDOT Monument found for corner; South 0°34'50" East, a distance of 197.81 feet to a•+• cut in concrete found for corner; South 0°31'25" East, a distance of 486.97 feet to a 5/8-inch iron rod found for corner; South 0°36'02" East, a distance of 483.16 feet to the POINT OF BEGINNING and containing 89.2599 acres or 3,888,161 square feet of land, more or less. Transportation Impact Fee Credit Agreement- CA-20-021 Page 8 of 19 Citadel at Presidio 06/24/2024 EXHIBIT B Map of Property: Citadel at Presidio FP-18-012 Transportation Impact Fee Credit Agreement- CA-20-021 Page 9 of 19 Citadel at Presidio 06/24/2024 EXHIBIT C Development Plan: Final Plat FP-18-012 Transportation Impact Fee Credit Agreement- CA-20-021 Page 10 of 19 Citadel at Presidio 06/24/2024 Transportation Impact Fee Credit Agreement- CA-20-021 Page 11 of 19 Citadel at Presidio 06/24/2024 Transportation Impact Fee Credit Agreement- CA-20-021 Page 12 of 19 Citadel at Presidio 06/24/2024 Transportation Impact Fee Credit Agreement- CA-20-021 Page 13 of 19 Citadel at Presidio 06/24/2024 Transportation Impact Fee Credit Agreement- CA-20-021 Page 14 of 19 Citadel at Presidio 06/24/2024 EXHIBIT D Eligible Transportation Improvements Transportation Impact Fee Credit Agreement- CA-20-021 Page 15 of 19 Citadel at Presidio 06/24/2024 EXHIBIT E Credits Against Transportation Impact Fees Heritage Trace Parkway Transportation Impact Fee Credit Overview Value of ROW Dedication Instrument # Final Plat # Eligible Arterial Value D219009096 FP-18-012 Heritage Trace Parkway $51,012.00 Total ROW Transportation Impact Fee Credit $51,012.00 Value of Community Facilities Agreement Construction City Secretary # City Project # CFA # Eligible Arterial Value 51422 101586 CFA18-060 Heritage Trace Parkway $844,200.25 Engineering, Surveying, and Material Testing = 20% of eligible construction costs $168,840.05 Total Transportation Impact Fee Credit $1,064,052.30 Transportation Impact Fee Credit Agreement- CA-20-021 Page 16 of 19 Citadel at Presidio 06/24/2024 Right-of-Way Valuation for Heritage Trace Parkway Valuation Method 1 - Percentage of TIP Project Cost Eligible Arterial Heritage Trace Parkway 2013 Transportation Improvements Plan Project Number C-18 Estimated Construction Costs from 2013 Transportation Improvements Plan $1,249,000.00 Value of Total Project Right-of-Way (20% of Construction Cost) $249,800 Total Project Length (LF) 5,240 Arterial Cross-Section Width (LF)110 Additional ROW needed for Roundabout (SF)0 Total Project Right-of-Way (SF) 576400 Right-of-Way Value Per Square Foot $0.44 Valuation Method 2 - Percentage of Construction Project Cost Eligible Arterial Heritage Trace Parkway City Project Number 101586 Final Construction Costs from Notice of Completion (Green Sheet) $254,890.97 Value of Total Project Right-of-Way (20% of Construction Cost) $50,978 Total Project Length (LF) 5240 Arterial Cross-Section Width (LF)110 Additional ROW needed for Roundabout (SF)0 Total Project Right-of-Way (SF) 23,400 Right-of-Way Value Per Square Foot $2.18 Valuation Method 3 - TAD appraised value TAD Value as of 08/9/2023 Heritage Trace Parkway TAD Account 41228820 Total Area (SF) 28,209 Appraised Value $100.00 Value per Square Foot $0.01 Right-of-Way Dedication Heritage Trace Parkway Recording Instrument Number D219009096 Final Plat Number FP-18-012 Recording Date 1/15/2019 Total area of ROW dedicated (SF) 23,400 Value per SF $2.18 ROW Credit Available $51,012.00 Transportation Impact Fee Credit Agreement- CA-20-021 Page 17 of 19 Citadel at Presidio 06/24/2024 Value of Community Facilities Agreement Construction Heritage Trace Parkway Paving Item No. Description Unit Eligible Quantity Completed Quantity Unit Price Credit Available 1 REMOVE ADA RAMP EA 0 4 $ 250.00 -$ 2 REMOVE FENCE LF 0 1,052 $ 1.00 -$ 3 REMOVE CONC PVMT SY 0 5,043 $ 10.00 -$ 4 HYDRATED LIME TN 122 122 $ 174.00 21,228.00$ 5 8" LIME TREATMENT SY 8,450 8,450 $ 6.00 50,700.00$ 6 10" CONC PVMT SY 6,494 6,494 $ 68.45 444,514.30$ 7 4" CONC SIDEWALK SF 11,575 11,575 $ 6.55 75,816.25$ 8 BARRIER FREE RAMP EA 0 2 $ 2,160.00 -$ 9 BARRIER FREE RAMP EA 3 3 $ 2,160.00 6,480.00$ 10 BARRIER FREE RAMP EA 0 2 $ 2,160.00 -$ 11 BARRIER FREE RAMP EA 0 6 $ 2,160.00 -$ 12 4" SLD PVMT MARKING HAS LF 0 955 $ 1.80 -$ 13 18" SLD PVMT MARKING HAE LF 0 60 $ 7.20 -$ 14 24" SLD PVMT MARKING HAE LF 0 120 $ 9.60 -$ 15 LANE LEGEND ARROW EA 0 3 $ 180.00 -$ 16 LANE LEGEND DBL ARROW EA 0 8 $ 270.00 -$ 17 REFL RAISED MARKER EA 0 13 $ 5.50 -$ 18 REFL RAISED MARKER EA 0 227 $ 5.50 -$ 19 BLOCK SOD PLACEMENT SY 7,021 7,021 $ 5.70 40,019.70$ 20 FURNISH/INSTALL ALUM SIGN GROUND MOUNT CITY STD EA 41 41 $ 625.00 25,625.00$ 21 TRAFFIC CONTROL MO 3 3 $ 10,000.00 30,000.00$ 22 8" SLD PVMT MARKING HAE (W) LF 0 212 $ 5.00 -$ 23 8" DOT CONTRAST PVMT MARKING HAE (W) LF 0 96 $ 5.00 -$ 24 4" BRK PVMT MARKING HAE (W) LF 0 12 $ 7.00 -$ 25 10" INTEGRAL COLORED CONC PVMT SY 0 819 $ 120.00 -$ 26 4' INTEGRAL COLORED CONC SF 11,165 11,165 $ 11.00 122,815.00$ 27 DECOMPOSED GRANITE SF 0 1,207 $ 6.30 -$ 28 RIVER ROCK SF 0 54 $ 30.00 -$ 29 ROCK BOULDER EA 0 36 $ 225.00 -$ Paving Subtotal 817,198.25$ Transportation Impact Fee Credit Agreement- CA-20-021 Page 18 of 19 Citadel at Presidio 06/24/2024 Storm Drain Item No. Description Unit Eligible Quantity Completed Quantity Unit Price Credit Available 1 REMOVE 21" STORM LINE LF 0 50 $ 27.00 -$ 2 REMOVE 10' RECESSED INLET EA 0 2 $ 600.00 -$ 3 SWPPP LS 1 1 $ 1,602.00 1,602.00$ 4 21" RCP, CLASS III LF 225 225 $ 39.00 8,775.00$ 5 10' RECESSED INLET EA 2 6 $ 4,800.00 9,600.00$ 6 TRENCH SAFETY LF 0 760 $ 2.10 -$ 7 24" RCP CLASS III LF 0 534 $ 47.00 -$ 8 4' STORM JUNCTION BOX EA 0 1 $ 5,000.00 -$ Storm Drain Subtotal 19,977.00$ Street Light Improvements Item No. Description Unit Eligible Quantity Completed Quantity Unit Price Credit Available 1 2" CONDT PVC SCH 80 LF 680 $ 17.25 -$ 2 2" CONDT PVC SCH 80 LF 0 655 $ 23.00 -$ 3 GROUND BOX TYPE B W/APRON EA 1 9 $ 525.00 525.00$ 4 LED LIGHTING FIXTURE EA 2 8 $ 650.00 1,300.00$ 5 RDWY ILLUM FOUNDATION EA 1 7 $ 1,250.00 1,250.00$ 6 RDWY ILLUM TY D-40-9 POLE EA 0 6 $ 3,165.00 -$ 7 RDWY ILLUM TY D-40-9T POLE EA 1 1 $ 3,950.00 3,950.00$ Street Lights Subtotal 7,025.00$ Paving Subtotal 817,198.25$ Storm Drain Subtotal 19,977.00$ Street Lights Subtotal 7,025.00$ CONSTRUCTION SUBTOTAL 844,200.25$ Transportation Impact Fee Credit Agreement- CA-20-021 Page 19 of 19 Citadel at Presidio 06/24/2024 EXHIBIT F Allocation of Credits Allocation of Credits shall be as listed below and then on a first-come/first-served basis within the plat boundary of Citadel at Presidio Final Plat, FP-18-012 and shall run with the land. Credit Allocations Specs Family Corp., a Texas corporation as successor in interest to Spec's Family Partners, LTD. $ 241,985.63 Part of Lot 8, Block 1 PB21-17599 Building 6 Expansion $ 14,419.93 PB21-18862 Building 8 $ 59,664.37 PB21-18745 Specs Retail Shell Building $ 67,877.00 Remaining Balance Allocation to ADD Northtowne, LLC and North Presidio, LLC only $ 680,105.37