HomeMy WebLinkAboutIR 7088 INFORMAL REPORT TO CITY COUNCIL MEMBERS No. 7088 a1q1e(' To the Mayor and Members of the City Council Subject: IWROVEWNTS TO WILL ROGERS MEMORIAL CENTER AUDITORIUM During the City Council workshop January 7, 1986, the architect for the WRMC Auditorium presented the schematic design for the proposed improvements. The estimated cost of construction to complete the entire project is $4,310,000. However, in response to earlier instructions and the limitation of funds, a Phase I plan was submitted for $2,103,000 (See Attachment A). The City Council decided to defer action on the plans until its Cultural District Committee could meet with the other agencies and institutions in the area and brief them on the proposed improvements. A meeting was held on January 15, 1986 at WRMC with Councilman Richard Newkirk presiding. Councilman Jim Bagsby was also in attendance. After the project was explained, everyone agreed that all of the work identified in Phase I of Attachment A needed to be done in order to ensure the safety of the Auditorium patrons. Since the proposed work would not improve the facility to the point that major entertainment events1could be accomodated, the architect was instructed to determine the cost of adding the dressing rooms, OP, scene shop, renovating the existing stage area, existing lobby and other areas. Based on the information in Attachment B , Scheme B, the cost for this additional work would be about $1 ,170,000. If this work is completed, the only major work remaining would be the east lobby, the hydraulic lift for the pit, and some acoustical modifications in the auditorium. The additional professional fees for this work would be about $79,400. FINANCING Outlined below is the estimated construction cost and professional fees for the three phases: Const. Cost Prof. Fees Total $2,103,000 $246,750 $2,349,750 Scheme B 1 ,170,000 79,400 1 ,249,400 Sub-total $3,273,000 $326,150 $3,599,150 Scheme C 1 ,037,000 67,975 1 ,104,975 Total $4,310,000 $394,125 $4,704,125 0011 —ISSUED BY THE CITY MANAGER FORT WORTH, TEXAS INFORMAL REPORT TO CITY COUNCIL MEMBERS No. 7088 X21 To the Mayor and Members of the City Council �flf a O-""en V mrp�� Subject: IMPROVEMENTS TO WILL ROGERS MEMORIAL CENTER AUDITORIUM it? Based on the latest financial reports, the following funds are potentially available for this project: Auditorium Bond Funds $1 ,500,000 Funds from Exhibits Building 1 ,242,000 Total $2,742,000* *The $246,750 encumbered for professional fees for Scheme A has been included in this total . The estimate for completing the north half of the west parking lot is $450,000. After deducting this amount, about $2,292,000 will be left for construction. Therefore, if Schemes A and 8 are completed as proposed, there will be a shortfall of about $1 ,307,150. The architect cannot proceed beyond the schematic design phase until authorized to do so by the City Council . Therefore, staff is seeking Council guidance on what portion of the project should be completed at this time. This item has been scheduled for discussion at the City Council workshop on February 4, 1986. The architect and staff will be available to answer any questions. If you are in need of additional information prior to the meeting, please feel free to contact me. Doug s Haman City Manager As a result of the present conditions and lack of adequate backstage dressing rooms, the professional road shows will not perform at Will Rogers Auditorium. If the improvements include corrections of these deficiences, Will Rogers will once again be used for major travelling shows. ISSUED BY THE CITY MANAGER FORT WORTH, TEXAS