WHEREAS, the City of Fort Worth (CITY) and Shield Engineering Group,
PLLC, (CONSULTANT) made and entered into City Secretary Contract No.
52582, as renewed and amended, (the CONTRACT) which was authorized by M&C
C-29150 on the 18 th day of June, 2019 in the amount of $1,100,000; and
WHEREAS, the CONTRACT was renewed in the amount of $1,100,000 which
was administratively authorized under Ordinance Number 24161-04-2020 and
ratified by M&C 20-0530 (8/11/2020); and
WHEREAS, the original agreement, as renewed, was amended to provide
for additional funds in the amount of $1,300,000.00 for a revised
contract amount of $2,400,000 authorized under Ordinance 24161-04-2020
and ratified by M&C 20-0530 (8/11/2020); and
WHEREAS, the CONTRACT was renewed in the amount of $2,400,000 which
was authorized by M&C 22-0160 (3/8/2022); and
WHEREAS, the original agreement, as renewed, was amended to provide
for additional funds in the amount of $2,000,000.00 for a revised
contract amount of $7,900,000 authorized by M&C 22-0160 (3/8/2022); and
WHEREAS, the CONTRACT involves engineering services for the
following project:
Staff Extension Services in Managing Transportation and Public Works
Stormwater Capital Projects; and
WHEREAS, it has become necessary to execute Amendment No. 2 to the
CONTRACT's second renewal to revise the fee.
NOW THEREFORE, CITY and CONSULTANT, acting herein by and through
their duly authorized representatives, enter into the following agreement,
which amends the CONTRACT:
Article I of the
engineering services
incorporated herein.
City of Fort Worth
CONTRACT
specified
Professional Services Agreement Amendment Template
Revised: March 9, 2020
Page 1 of 4
1.
is
in
2.
amended to
proposal
include the
attached
additional
hereto and
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as previously renewed and amended herein. The cost to City
for the additional services to be performed by Engineer totals $1,352,000
(See Attached Funding Breakdown Sheet) so that the total fee paid by the
City for all work and services shall be an amount of $9,252,000.
3.
All other provisions of the Contract, which are not amended herein,
shall remain in full force and effect.
EXECUTED and EFFECTIVE as of the date last written by a signatory,
below.
APPROVED:
City of Fort Worth
Jesica McEachern
Assistant City Manager
DATE: Jul8,2024
APPROVED AS TO FORM AND LEGALITY:
Douglas Black (Jul 3, 202415:20 CDT)
Douglas W. Black
Sr. Assistant City Attorney
City of Fort Worth
Professional Services Agreement Amendment Template
Revised: March 9, 2020
Page2 of 4
Consultant
Shield Engineering Group, PLLC
:;;a,ie Alexand.?r (Jun 18, 202412:26 CDT)
Jean Marie Alexander coo
DATE: Jun 18, 2024
Form 1295 No. 2024-1155397
M&C: 24-0490--------Date: 6/11/2024
ATTEST:
Jannette S. Goodall
City Secretary
City of Fort Worth
Professional Services Agreement Amendment Template
Revised: March 9, 2020
Page 3 of 4
FUNDING BREAKDOWN SHEET
City Secretary No. 52582
Amendment No. R2-A2
Department Fund-Account-Center Amount
TPW 52002 0200431 5330500 1,352,000.00
Total: 1,352,000.00
City of Fort Worth
Professional Services Agreement Amendment Template
Revised: March 9, 2020
Page 4 of 4
DATE: 6/11/2024 REFERENCE NO.: **M&C 24-0490 LOG NAME: 20SWM SHIELD 19 RENEW 2
AMEND 2
CODE: C TYPE: CONSENT PUBLIC HEARING: NO
SUB7ECT: (ALL) Authorize Amendment No. 2, in the Amount of $1,352,000.00, to the Professional Services
Agreement with Shield Engineering Group, PLLC, as Renewed, for Continuation of Stormwater Capital
Project Management Services
RECOMMENDATION:
It is recommended that the City Council authorize Amendment No. 2, in the amount of $1,352,000.00, to the
Professional Services Agreement with Shield Engineering Group, PLLC, as renewed (City Secretary Contract No.
52582), for the continuation of Stormwater Capital Project Management Services.
DISCUSSION:
Approval of this Mayor and Council Communication (M&C) will authorize Amendment No. 2 to the second renewal
of City Secretary Contract No. (CSC) 52582, a Professional Services Agreement with Shield Engineering Group PLLC
(Shield) in the amount of $1,352,000.00, for staff extension services for managing Stormwater Capital Projects.
In May 2018, the Transportation and Public Works Department (TPW), Stormwater Management Division (SWMD),
published a Request for Qualifications (RFQ) for various engineering consulting services. Seven consultants
responded to the RFQ for the capital project management service area with Statements of Qualifications (SOQ). An
evaluation team of three City staff subject matter experts from the SWMD scored the SOQ's based on team
capability and experience and firm's past performance. The City's Business Equity team also evaluated and scored
the SOQ's. Based on this scoring, Shield was selected as the most qualified consultant to perForm capital project
management services (M&C G29150).
Contract actions are shown in the table below:
Date M&C Action Amount
June 18 2019 C-29150 Ori inal CSC 52582 $1,100,000.00
August 11, 2020 20-0530 Renewal 1/Amendment 1 $2,400,000.00
March 8, 2022 22-0160 Renewal 2/Amendment 1 $4,400,000.00
his M&C Renewal 2/Amendment 2 $1,352,000.0
otal $9,252,000.0
Under this amendment, Shield will provide project management services for approximately 60 projects over
approximately 6 months. Project management services will cover stormwater project development, design
management, construction management, and project closeout. This amended amount is based upon the estimated
number of projects for this timeframe, and the expected cost is in proportion to the project management costs
experienced for this program. The contract will remain in effect until funds are expended or the work is completed.
Due to the fluctuation of funding for capital improvements, the Stormwater Program uses consultant staff
augmentation to assist with project delivery as opposed to having the number of full-time City staff adequate to
manage the peak workload. The staff augmentation contract also provides flexibility for different levels of project
managers such as Senior Professional Engineers, Professional Engineers, and Engineers in Training to perform
project management, helping to manage costs.
The Stormwater Utility fee increase approved by the City Council in October 2019 made revenue bond sales
possible. The revenue bond issuances in 2020 and 2023 more than doubled the Stormwater capital delivery
capacity compared to the strictly PayGo-funded program of the preceding years, requiring more project
management resources.?
Projects to be constructed and managed through this contract include hazardous roadway overtopping mitigation
projects, storm drain pipe rehabilitation projects, flood mitigation improvements, and channel restoration
improvements. Anticipated spending for these projects is reflected in the Fiscal Years 2024-2028 Stormwater
Management Capital Improvement Program.
Funding is budgeted in the Stormwater Capital Projects and Drainage Rev Bonds Series 2023 Funds for the purpose
of funding the various projects for the Transportation & Public Works Department.
DVIN Office - Shield Engineering Group, PLLC is in compliance with the City's Business Equity Ordinance by
committing to 11\% Business Equity participation on this project. The City's Business Equity goal on this project is
11\%.
This work is located in ALL COUNCIL DISTRICTS.
FISCAL INFORMATION/CERTIFICATION:
The Director of Finance certifies that funds are available in the current?capital budget, as previously appropriated,
in the?Stormwater Capital Projects and Drainage Rev Bonds Series 2023 Funds for various projects to support the
approval of the above recommendation and amendment to the contract.? Prior to any expenditure being incurred,
the Transportation & Public Works Department has the responsibility to validate the availability of funds.
TO
FundDepartmentAccountProjectProgramActivityBudget Reference # Amount
ID ID Year (ChartField 2)
FROM
FundDepartmentAccountProjectProgramActivityBudget Reference # Amount
ID ID Year (Chartfield 2)
Submitted for Citv Manager's Office bv: Jesica McEachern (5804)
Ori4inatina Department Head: Lauren Prieur (6035)
Additional Information Contact: Monty Hall (8662)
ATTACHMENTS
20SWM SHIELD 19 RENEW 2 AMEND 2 FID Tdble.XISX (CFW Internal)
20SWM SHIELD 19 RENEW 2 AMEND 2.dOCX (CFW Internal)
52582 Stormwater Capital Delivery Project Management Staff Augmentation (APCF)
Revised Amendment#3 Final RL.pdf (CFW Internal)
Form 1295 Certificate 101198189.pdf (CFW Internal)
SAM search.dOCX (CFw �nternap
SHIELD
ENGINEERING GROUP
May 30, 2024
Linda S. Young, PE, PMP
Program Manager, TPW Capital Delivery
City of Fort Worth
200 Texas Street
Fort Worth, TX 76102
RE: City of Fort Worth Stormwater Capital Project Management — Renewal 2
Amendment 2
CSN 52582-R2A2
Dear Ms. Young,
Shield Engineering Group, PLLC is pleased to submit the following services to amend the
contract shown above per the attached Level of Effort Spreadsheet. The new contract will be
amended in the amount of $1,352,000 for a revised contract amount of $9,252,000. Shield plans
to provide Senior Project Managers, Project Managers, EIT 2, and EIT 1 services.
Original contract $1,100,000
Renewal 1 $1,100,000
Amendment 1 $1,300,000
Renewal 2 $2,400,000
Amendment 2 $2,000,000
Amendment 3 $1,352,000
Revised contract $9,252,000
Please see the attached Level of Effort spreadsheet which includes the assumptions and
estimations for the hourly efforts.
Please feel free to contact me with any questions or comments.
Sincerely,
Jean-Marie Alexander, P.E.
COO
Shield Engineering Group, PLLC
Attachments: Attachment B LOE for CPM amendment2
1600 West 7th Street, Suite 200, Fort Worth, TX 76102 � 817.810.0696
info@segpllc.com - www.SHIELDENGINEERINGGROUP.com
TBPE FIRM #F-1 1039 - TBPLS FIRM #10193890
�
d
E
d
�
�
c
R
i
�
d
d
Z 'o
s� a�
�,o�r�
� Y y � ti
� Q d V o
m� � �Z
.. m a�i > R
`o�rn_
� � c d �
W p s0 u
o= d �om
y�0'QT
J F �j U
r
0
�
0
LL
O
T
U
°' E �
o nE�
� �
t n«
���
� w �
E '� _ 3 m
o�mri-
� , � �
Y r � -
N �i m N �
- �i E�¢
-r
a ii¢�ri
Shield Renewal 2nd Renewal Amend 2
Final Audit Report 2024-06-18
Created: 2024-06-17
By: Sadie Ishmael (Sadie.lshmael@fortworthtexas.gov)
Status: Signed
Transaction ID: CBJCHBCAABAA9vVmSk5N-icfRmgrDHslwdfPUomRL333
"Shield_Renewal_2nd_Renewal_Amend_2" History
Document created by Sadie Ishmael (Sadie.lshmael@fortworthtexas.gov)
2024-06-17 - 11:51:01 PM GMT- IP address: 204.10.90.100
�',� Document approved by Sadie Ishmael (Sadie.lshmael@fortworthtexas.gov)
Approval Date: 2024-06-17 - 11:53:26 PM GMT - Time Source: server- IP address: 204.10.90.100
Document emailed to jeanmarie.alexander@shield-engineering.com for signature
2024-06-17 - 11:53:27 PM GMT
Email viewed by jeanmarie.alexander@shield-engineering.com
2024-06-18 - 5:01:55 AM GMT- IP address: 104.28.110.102
�`�,� Signer jeanmarie.alexander@shield-engineering.com entered name at signing as Jean-Marie Alexander
2024-06-18 - 5:26:57 PM GMT- IP address: 172.59.197.250
-� � Document e-signed by Jean-Marie Alexander (jeanmarie.alexander@shield-engineering.com)
Signature Date: 2024-06-18 - 5:26:59 PM GMT - Time Source: server- IP address: 172.59.197.250
Document emailed to tpw_sw_contracts@fortworthtexas.gov for approval
2024-06-18 - 5:27:02 PM GMT
Email viewed by tpw_sw_contracts@fortworthtexas.gov
2024-06-18 - 6:41:16 PM GMT- IP address: 204.10.90.100
Document approval delegated to Sadie Ishmael (Sadie.lshmael@fortworthtexas.gov) by
tpw_sw_contracts@fortworthtexas.g ov
2024-06-18 - 6:41:19 PM GMT- IP address: 204.10.90.100
�"�,� Document approved by Sadie Ishmael (Sadie.lshmael@fortworthtexas.gov)
Approval Date: 2024-06-18 - 6:41:25 PM GMT - Time Source: server- IP address: 204.10.90.100
�`! Agreement completed.
2024-06-18 - 6:41:25 PM GMT
��R7' W�RTHS Powered by
� Adobe
Acrobat Sign
F�RT�V�RTH�
Routing and Transmittal Slip
Transportation & Public Works Department
DOCUMENT TITLE: CS52582 R2 AMENDMENT 2
M&C: 24-0490 CPN: VARIOUS
Date:
To: Name
1. Jean-Marie Alexander
2.
�
�
�
�
�
:
�
�
Linda Young
Lauern Prieur
Doug Black
Jesica McEachern
Jannette Goodall
Allison Tidwell
TPW/Contracts
CSO: 52582-R2
Department
Contractor
TPW/Approver/Agiloft
TP W/Approver/Agiloft
ACM
CSO
CSO
TPW
DOC#:
Initials I Date Out
J u n 18, 2024
J u l 3, 2024
J u l 8, 2024
J u l 8, 2024
J u l 8, 2024
CC: Program Manager, Sr. CPO, TPW BSPAP Recon Team, TPW Records Room, TPW
Contracts
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and takc thc ncxt stcps.
NEEDS TO BE NOTARIZED: ❑YES �No
RUSH: ❑YES �No SAME DAY: ❑YES ❑No
ROUTING TO CSO: �YES ❑No
NEXT DAY: ❑YES ❑No
Action Required: ❑ Attach Signature, Initial and Notary Tabs
❑ As Requested
❑ For Your Information
� Signature/Routing and or Recording
❑ Comment
❑ File
Return To: Please notify tpw sw contracts(c�fortworthtexas.�ov when complete. Call ext. 817 228
3283 or ext. 6254 with questions. Thank you!