Loading...
HomeMy WebLinkAboutContract 59851-CO3Contract Time (CD) 400 3 403 42 445 Date Date Date Date Date ATTEST: ____________________________________________ Jannette Goodall, City Secretary City of Fort Worth Contractor 59851 Client Project #(s) Date 4/16/2024 City Project Mgr. Change Order Request 3 Project Name Remaining Funds Available for this CO Pending Change Orders (in M&C Process) MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) $397,822.00 $54,065.00 $140,071.00 Contract Cost to Date $1,081,300.00 $140,671.00 Amount of Proposed Change Order $2,800,812.50 Revised Contract Amount $281,755.00 $7,739,612.50 $175,510.00 $65,550.00$0.00 $398,422.00 $65,550.00 City Sec #102927 - 2022 Bond Year 1 Contract 2 Unit 1: WaterDept.TotalsUnit 3: Storm Unit 4: PavingUnit 2: Sewer Project Description Combined Street Paving Improvements, Stormwater Improvements, and Water and Sanitary Sewer Main Replacements for 2022 Bond Year 1 - Contract 2 Change Order #McClendon Construction Company Greg Robbins Ignacio AndradeCity Inspector $7,674,662.50 Original Funds Available for Change Orders $2,866,362.50 $1,081,300.00 $0.00 $3,510,195.00 $175,510.00 $54,065.00 $1,081,300.00 Extras to Date $2,801,412.50 Credits to Date $600.00 $3,510,195.00 $0.00 $281,755.00 $28,176.00 $281,755.00 0.85% $9,593,328.13 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT Additional Funding (if necessary) JUSTIFICATION (REASONS) FOR CHANGE ORDER DateAssistant City Attorney IN ACCORDANCE WITH THIS CHANGE ORDER REQUEST, THE CONTRACTOR SHALL: Furnish all labor and material as per the proposed Change Order Request #3. This change order is required to add new bid items to cut and plug an existing 6" cast iron water line in order to safely shore and construct a proposed 5'x5' stormwater junction box in Vickery Boulevard. This request will increase the quantities for 8" PVC water line and related items to replace the length of 6" cast iron water pipe within the limits of the stormwater construction on Vickery Boulevard between Thrall Street and Ravine Road. This change order also adds bid items for the increased depth of the storm pipe located at Vickery and Ravine, as the strm pipe needed to be lowered by 2.5' due to site conditions. Finally, an addition to the bid quantity of 4" underdrain is included for groundwater encountered on Avenue G. Cost - The City of Fort Worth has compared the unit price that the contractor is proposing to similar items in recently bid construction contracts. The contractor also provided calculations for the extra-depth storm pipe and junction box. The City finds that the prices the contractor is proposing for the new items are fair and reasonable. All other items are already included in the project's existing bid items. Time - This change order will add 42 calendar days to the project contract time. This is broken down as 7 days to install extra depth storm pipe and junction box, 21 calendar days for the cutting and plugging, demolition, and reinstallation of the new 8" water line in Vickery Boulevard, 7 days for installation of underdrain and 7 days for negotiating and routing the change order. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Council Action (if required) M&C Number Inspector/Inspection Supervisor Date Project and Contract Compliance Manager $7,674,062.50 $600.00 $28,176.00 Original Contract Amount $3,510,195.00 M&C Date Approved Contractor's Company Name McClendon Construction Company Contractor (Name) Justin Blair Contract Signature Senior Capital Project Officer Director, Contracting Department (Dept) DateProgram Manager DateAssistant Director (Dept) Assistant City Manager Change Order Additions Page 2 of 4 LF $6,300.00 $1,460.00 $3,150.00 $730.00 $2,600.00 $13,500.00 $160.00 $136.00 $5,500.00 Unit 4: Paving EA EA EA TN SY EA LS EA EA LF LS LF Qty 220.00000000 DEPTITEMDESCRIPTION Unit 1: Water 2.00000000 2.00000000 150.00000000 1.00000000 600.00000000 38 48 53 8" Gate Valve 1" Water Service Meter Reconnection Temporary Water Service Connection to Existing 4"-12" Water Main Asphalt Pvmt Repair Beyond Defined Width, Arterial 4' Wide Asphalt Pavement Repair (Arterials) Ductile Iron Fittings w/Restraint 1" Water Service 4" Pipe Underdrain Type 8 Extra Depth 5x5 Junction Box Extra Depth Storm Drain Installation Plug Service At Existing Main 8" Pressure Plug $27,720.00 TotalUnit Cost $126.00 Unit Unit 1: Water Unit 1: Water $11,000.00 $8,850.00 $6,000.00 $2,200.00 $9,750.00 $4,000.00 $30,600.00 $5,200.00 $2,700.00 $48,000.00 $6,120.00 Unit 1: Water Unit 1: Water Unit 1: Water LF 9 13 39 51 66 67 14 18 20 22 City of Fort Worth Change Order Additions Project Name 102927 - 2022 Bond Year 1 Contract 2 City Sec # 59851 Client Project # 3 4/16/2024 Greg Robbins InspectorContractor Change Order Submittal # McClendon Construction Company PM Ignacio Andrade Sub Total Additions Date Unit 1: Water Unit 2: Sewer Unit 4: Paving ADDITIONS 8" PVC Water Line3 $169,900.00 $125,550.00 $0.00 $30,600.00 2.00000000 0.20000000 300.00000000 45.00000000 2.00000000 0.03000000 2.00000000 2.00000000 Unit 1: Water Unit 1: Water Unit 1: Water Unit 1: Water Unit 1: Water Unit 3: Storm Unit 3: Storm $295,000.00 $3,000.00 $1,100.00 $65.00 $4,000.00 $51.00 Unit 3: Storm $13,750.00 Change Order Deletions Page 3 of 4 $104,350.00 $60,000.00 $0.00 $30,600.00 Sub Total Deletions Date Unit 1: Water Unit 2: Sewer Unit 4: Paving Client Project # 3 4/16/2024Change Order Submittal # Contractor City of Fort Worth Change Order Deletions Project Name 102927 - 2022 Bond Year 1 Contract 2 City Sec # 59851 DELETIONS Unit Cost $80,000.00 Unit Construction Allowance Construction Allowance $60,000.00 Total LS Qty 0.75000000 DEPTITEMDESCRIPTION Unit 1: WaterConstruction Allowance61 36 63 Unit 3: Storm Unit 4: Paving LS LS 0.19642857 0.30600000 $100,000.00 $13,750.00 $30,600.00 $70,000.00 Unit 3: Storm $13,750.00 McClendon Construction Company PM Greg Robbins Inspector Ignacio Andrade -$600.00Total M/SBE for this Change Order Previous Change Orders $0.00Total Type of Service Amount for this COM/SBE Sub Not Applicable Not Applicable $0.00 2 2/15/2024 -$600.00 1 1/4/2024 CO #DATE AMOUNT $0.00 Routing and Transmittal Slip Transportation & Public Works Department DOCUMENT TITLE:2022 Bond Year 1 Contract 2 – Change Order #3 M&C:CPN:102927 CSO: 59851 DOC#: Date: To: Name Department Initials Date Out 1. Filogonio Munoz TPW - initial 2. Justin Blair Contractor - signature 3. Ignacio Andrade TPW - signature 4. Aaron Nivone Water - initial 5. Greg Robbins TPW - signature 6. Mary Hanna TPW - signature 7 Patricia Wadsack TPW - signature 8 Lauren Prieur TPW - signature 9 Doug Black Legal - signature 10. Jesica McEachern CMO - signature 11. Jannette Goodall CSO - signature 12. TPW Contracts TPW DOCUMENTS FOR CITY MANAGER’S SIGNATURE: All documents received from any and all City Departments requesting City Manager’s signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review and take the next steps. NEEDS TO BE NOTARIZED: YES No RUSH:YES No SAME DAY:YES No NEXT DAY:YES No ROUTING TO CSO: YES No Action Required: Attach Signature, Initial and Notary Tabs As Requested For Your Information Signature/Routing and or Recording Comment File Return To:TPWContracts @FortWorthTexas.gov at ext. 7233 for pick up when completed. Thank you!