Loading...
HomeMy WebLinkAboutContract 58683-CO3CSC No. 58683-C03 FC>RTWORTH ---. City of Fort Worth Change Order Request Project Name:I Village Creek WRF Digester Mixing, Flare, Dome Improvements Phase 1 I City Sec No.:I � =5=8 =68=3=========: Project No.(s):I 56021/0700430/5740010/001780 M&C: I 22-1046 I City Proj. No.: �I _1_02_6_52 ___ __, Project Description: Digester mixing, flare, and dome improvements, new digeseter gas dryers, and new hydrogen sulfide scrubbers. Contractor:! Eagle Contracting, LLC �-================-.----------' City Project Mgr.I Suzy Abbe Change Order# l.___3 _ _.Date: ::=============: Phone Number:I 817-392-8209 City Inspector: I Kevin Sidebottom Phone Number:! 817-874-9330 Dept. Sewer Original Contract Amount $39,773,000.00 Extras to Date $315,341.00 Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date $40,088,341.00 !Amount of Proposed Change Order $96,293.00 Revised Contract Amount $40,184,634.00 Original Funds Available for Change Orders $318,184.00 Remaining Funds Available for this CO $305,064.00 Additional Funding (if necessary) ' ,, J '" "'-"L.� --.tlli� :ij_�□ •·::;q�.r:: �-;r;; ,;..,�?!,;...,'!:( \ ... - � -r-' � - CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS% OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) JUSTIFICATION (REASONS) FOR CHANGE ORDER Totals $39,773,000.00 $315,341.00 $40,088,341.00 $96,293.00 $40,184,634.00 $318,184.00 $305,064.00 7/1/2024 Contract Time (Calender days) 1,095 !,:Gu'i'.;/1 � � "q '\ -�' 1 095 12.ili:'j;:!!3 1 095 Change Order No. 3 will provide for low pressure digester gas bypass piping that will redirect digester gas to the existing flares while the tie-in to the new flares is performed. The bypass will eliminate the need for an extended full solids shut down at the Village Creek Water Reclamation Facility and will minimize the release of digester gas into the atmosphere, improving safety and reducing the risk of a process upset during the tie-in to the new flares. Staff concurs with the Contractors request to add 35 calendar days to Milestone 1 for the time needed to develop a bypass plan, procure materials, and install the bypass ahead of the tie-in. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. \licklr Ograntes Date 7/2/24 7/2/2024 Date Date ul3,2024 7/2/24 Senior Assistant c· Attome Date Date Jul 9, 2024 Jul 9, 2024 uired M&C Number N/A M&C Date Approved NIA FC� P T WC) RT H City of Fort Worth �`'''' Change Order Additions Project Name Village Creek WRF Digester Mixing, Flare, Dome Improvements Phase 1 City Sec No.: 58683 Project No.(s): 56021/0700430/5740010/001780 DOE No. 22-104 City Proj. No.: 102652 Project Description Digester mixing, flare, and dome improvements, new digeseter gas dryers, and new hydrogen sulfide scrubbers. Contractor Eagle Contracting, LLC Change Order:�3 Date: 711/2024 City Project Mgr. Suzy Abbe City Inspector Kevin Sidebottom ADDITIONS �� ' . ' ' � ������ � • � � � : �. � ����,., . 1� ',�. • �� _ --_-- _ --_-- '_ --_-- _ --�-- _ --_-- _ --_-- _ --_-- _ --_-- � --_-- _ --�-- _ --_-- _ --_-- _ --_-- _ --_-- _ --_-- _ --_-- _ --_-- _ --_-- _ --_-- _ --_-- _ --_-- _ --_-- � --_-- ' �. � �� �- - . , � - ��� • � � . '��. � �� FC� RT WC� RT H City of Fort Worth Change Order Deletions Project Name Village Creek WRF Digester Mixing, Flare, Dome Improvements Phase 1 City Sec No.: 58683 Project No.(s): 5602110700430/5740010/001780 DOE No. 22-10 City Proj. No.: 102652 Project Description Digester mixing, flare, and dome improvements, new digeseter gas dryers, and new hydrogen sulfide scrubbers. Contractor Eagle Contracting, LLC Change Order: �3 Date 7/112024 City Project Mgr. Suzy Abbe City Inspector: Kevin Sidebottom DELETIONS Page 1 of 1 MIWBE Breakdown for this Change Order 6/27/2024 CPN 102652 Digester Mixing, Flare, Dome Improvements Phase 1 Chan�e Order 3 Notes The existing isolation valves on the low-pressure digester gas piping system do not allow tie-ins to the new flares to be performed without releasing large volumes of digester gas into the atmosphere. Options to reduce the release of digester gas were explored, including temporary partial and full solids shut downs to reduce gas production. However, it was determined that the combined risks posed by both the solids shut down (from a process standpoint) and releasing large volumes of digester gas (from a safety standpoint) were unacceptable. The consultant proposed a plan to utilize temporary bypass piping to direct digester gas to the existing flares while allowing the tie-in to the new flares to take place. Installation of the bypass piping can take place with minimal gas release and no solids shut down. Labor hours, material costs, and quantities in the contractors' proposal were reviewed, and the City finds them to be fair and reasonable. The approved CMR (CMR-29) is saved in E-builder. The contractor is asking for 35 days be added to Milestone 1 for the time needed to develop the bypass plan, procure the materials, and install the bypass piping. The City agrees to the additional time. Signature: .Contract Compliance Manager By signing I aclmowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Signature Suzanne Abbe Name of Employee Senior Engineer, Capital Project Delivery Title ATTEST: Jannette Goodall City Secretary Email: tressa.williams@fortworthtexas.gov