HomeMy WebLinkAboutContract 61667KONE Internal
�
CSC No. 61667
CITY OF FORT WORTH
COOPERATIVE PURCHASE
This Cooperative Purchase ("Coop Purchase") reflects the agreement between the City of
Fort Worth, ("City"), a Texas home rule municipal corporation and KONE Inc., a Delaware
Corporation ("Vendor") to purchase Escalator Modernization under a cooperative agreement.
The Coop Purchase includes the following documents (collectively, Cooperative
Documents") which shall be construed in the order of precedence in which they are listed:
1.Schedule A-Fort Worth Terms and Conditions ("Fort Worth Agreement");
2.Schedule B-Omnia EV2516 ("Cooperative Contract"); and
3.Schedule C-KONE Proposal Exhibit 4 Dated: 1-8/2024 ("Quote").
4.Schedule D-KONE Contract Rider #1
All the Schedules which are attached hereto and incorporated herein are made a part of this
Coop Purchase for all purposes. In the event of a conflict between the Schedules the Fort Worth
Agreement shall control, but only to the extent allowable under the Cooperative Contract.
The maximum amount to be paid to the Vendor for all services performed and goods
purchased hereunder shall not exceed Two Million, One Hundred Thirteen Thousand, Two
Hundred Four Dollars and 00/100 ($2,113,204.00).
The Coop Purchase shall become effective upon the signing of the Coop Purchase by an
Assistant City Manager of the City (the "Effective Date") and shall expire two years after the
Effective Date (Expiration Date"), unless terminated earlier in accordance with the provisions of
the Agreement or otherwise extended by the parties. The Coop Purchase may be renewed for a
term of two years at the City's option, ("Renewal Term."). City shall provide Vendor with written
notice of its intent to renew at least thirty (30) days prior to the end of the initial term.
The undersigned represents and warrants that he or she has the power and authority to
execute this Coop Purchase and the Cooperative Documents and bind the Vendor.
(signature page follows)
Cooperative Purchase Page 1 of51
Executed effective as of the date signed by the Assistant City Manager below.
FORT WORTH:
City of Fort Worth
By: Da�=��T)
Name: Dana Burghdoff, AICP Title: Assistant City Manager
Date: Jul 9, 2024
Approval Recommended:
By: Name: Marilyn Marvin Title: Interim Director, PMD
Attest:
By: Name: Jannette Goodall Title: City Secretary
CONTRACTOR: Kone, Inc
By �1D81� Name: Jeff� Yum Title: Executive Vice President
Date: June 25, 2024
Cooperative Purchase and Terms and Conditions
WRMC Escalator Replacement (March 2024)
Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements.
By: Name: Nikita N. Watts Title: Sr. Capital Projects Officer
Approved as to Form and Legality:
By: ;r S-ae"?' Name: John B. Strong Title: Assistant City Attorney
Contract Authorization:
M&C: 24-0128
Page 2 of 51
KONE Internal
KONE Internal
THE CITY OF FORT WORTH, TEXAS
WRMC AMON CARTER EXHIBIT HALL
ESCALATOR REPLACEMENT
PMD2023-04
PROJECT NO. 104044
��RT` �'i���TH�,
MATTIE PARKER DAVID COOKE
MAYOR CITY MANAGER
Marilyn Marvin
Interim Director, Property Management Department
Michael Crumb
Director, Public Events Department
H H Angus & Associates
Kone Inc.
March 2024
Cooperative Purchase and Terms and Conditions Page 3 of 51
WRMC Escalator Replacement (March 2024)
KONE Internal
TABLE OF CONTENTS
• PROJECT COVER PAGE
• TABLE OF CONTENTS
• INSTRUCTIONS
• PROPOSALFORM
• CONFLICT OF INTEREST AFFIDAVIT
• CONFLICT OF INTEREST QUESTIONAIRE (CIQ)
• CONFLICT DISCLOSURE STATEMENT (CIS)
• TEXAS SALES AND USE TAX EXEMPTION CERTIFICATE
• CONSTRUCTION CONTRACT
• PAYMENT BOND
• PERFORMANCE BOND
• CERTIFICATE OF INSURANCE
• CONTRACTOR COMPLIANCE WITH WORKERS' COMPENSATION LAW
• GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION
• PROJECT SIGN
Cooperative Purchase and Terms and Conditions Page 4 of 51
WRMC Escalator Replacement (March 2024)
KONE Internal
INSTRUCTIONS
PAYMENT BOND AND PERFORMANCE BOND: For projects in excess of $25,000, the Contractor
entering into a contract for the work will be required to give the City surety in a sum equal to the
amount of the contract awarded. The form of the bond shall be as herein provided and the surety
shall be acceptable to the City. All bonds furnished hereunder shall meet the requirements of
Texas Government Code Section 2253, as amended.
In order for a surety to be acceptable to the City, the surety must (1) hold a certificate of authority
from the United States Secretary of the Treasury to qualify as a surety on obligations permitted or
required under federal law; or (2) have obtained reinsurance for any liability in excess of $100,000
from a reinsurer that is authorized and admitted as a reinsurer in the State of Texas and is the
holder of a certificate of authority from the United States Secretary of the Treasury to qualify as a
surety on obligations permitted or required under federal law. Satisfactory proof of any such
reinsurance shall be provided to the City upon request. The City, in its sole discretion, will
determine the adequacy of the proof required herein.
No sureties will be accepted by the City that are at the time in default or delinquent on any bonds
or which are interested in any litigation against the City. Should any surety on the contract be
determined unsatisfactory at any time by the City, notice will be given to the contractor to that effect
and the contractor shall immediately provide a new surety satisfactory to the City.
If the total contract price is $25,000 or less, payment to the contractor shall be made in one lump
sum. Payment shall not be made for a period of 45 calendar days from the date the work has been
completed and accepted by the City.
If the contract is in excess of $25,000, a Payment Bond shall be executed, in the amount of the
contract, solely for the protection of all claimants supplying labor and materials in the prosecution
of the work.
If the contract amount is in excess of $100,000, a Performance Bond shall also be provided, in the
amount of the contract, conditioned on the faithful performance of the work in accordance with the
plans, specification, and contract documents. Said bond shall be solely for the protection of the
City of Fort Worth.
2. SITE INVESTIGATION: The Contractor shall examine the site(s) of the work and the details of the
requirements set out in these specifications to satisfy itself as to the conditions which will be
encountered relating to the character, quality, and quantity of the work to be performed and
materials and equipment required.
3. PROPOSED SUBCONTRACTORS: The Contractor must provide and use subcontractors listed
unless the City agrees to allow a substitute.
5. WORKERS COMPENSATION INSURANCE: The Contractor is required to demonstrate that
coverage is in effect at time of Award of Contract. Sample Certificate of Insurance, or other proof
that Workers Compensation Insurance will be obtained, must be submitted within five working days
of bid opening.
6. TAXES: Equipment and materials not consumed by or incorporated into the work are subject to
State sales taxes under House Bill 11, enacted August 15, 1991.
7. PERMITS: Contractor shall apply for all City of Fort Worth Permits and for any other permits
required by this project. City of Fort Worth Building and Trade Permit fees are waived. Separate
permits may be required for each work location.
Cooperative Purchase and Terms and Conditions Page 5 of 51
WRMC Escalator Replacement (March 2024)
KONE Internal
8. PROJECT SCHEDULE: The Project Schedule to be submitted with the Qualification Statement
will, at the minimum, include the following: quality control submittals and approvals, mobilization,
site preparation, under slab utilities, foundation work, structural erection, interior finish,
commissioning, and closeout. The Schedule may be submitted as a table or PERT diagram.
9. STATE FORM 1295 "CERTIFICATE OF INTERESTED PARTIES": Texas Ethics Commission
regulations require that the business entity must fill out the Form 1295 on an electronic filing
application on the Texas Ethics Commission website (www.ethics.state.tx.us). The business entity
that wishes to enter into the contract must supply the completed, signed and notarized Form 1295
to the City.
10. Any oral communications are considered unofficial and non-binding with regard to this Contract.
Cooperative Purchase and Terms and Conditions Page 6 of 51
WRMC Escalator Replacement (March 2024)
KONE Internal
' '� �-�
. ��- ■. ■ ��
r �,., .
. .
.. .
r � �- � �- .
�- � -„ ..
... ■
�
���■ . ..
�. �..
�
■
� �
... ..
� �
■ ., .
� ��_ .�� ■ � _
■_
. ' -
. . . �.
� . .. .
�
Q Q��., n.....,..��i n�.�� n. � r
W oa�� , � opo�a� , �p�,.,.�ner s,�en�ingensTAllewanse
Be14a�� ���
Cooperative Purchase and Terms and Conditions Page 7 of 51
WRMC Escalator Replacement (March 2024)
KONE Internal
._ ■ �
ni TGo�inT�e
oi+o�n�+�"o ni„ �
i� � ,�e c n � n�� n f,,. +hi„ f• ii-�,r� iQ �
�32�S�1'�'vc�G�C. &S S�@61�12��'r^rv@6 � �G -I�^v�rcrrr�SHrn-c��ro��
v.,+�l,.,e.J r. �,Ie+�r.., rJ�+e
�I+or.,�+i��o AI., 7
� ,
��-c�ii�i�cr' LYV�--I�v
��o ��� �
�I+crr�n�i�ie AI.�. il
�� +ho f• ��c /Q \
�}ii=ra v�m�.�iiri-r-^v� v��
fr.�,w, +ha .J�+e .�,f +he hirJ .�,
�.,f.�,rw,�l�+�� �., +he h�rJ.J�.,.-�
��� , ,
I INIIT DGIf`CC AI/A
��
Cooperative Purchase and Terms and Conditions Page 8 of 51
WRMC Escalator Replacement (March 2024)
KONE Internal
.. .- .
.
hirJ.Je.� w, ��+ ..he..L +he h.�,.. i., Ce..+i.�,., Q
�I�FC�cSS��2--Yc�r� +n hc �e�ce� �e��- +h�c�2K�}rvrc a@C���S��2
i�V1�
� .,.Ja.h�.J . ��.Je.,+ h�.JrJe.�
��
� �
■_ ■
■� �
� � ! � � .
TM�, Q.��C..e��. Cr..�C4.. !_`.,.,1 F..r 4MC�. .�. e..4 M.,� Mee.. .. .e.J
De��-.e..+f� �II�� �� �hw,i++e.J
r„",r�.,,, ni��„e
Q„•
r,. �+� �
. , .
��@SS:
c+,-ee+
�� � �*�
..
��:
��' � :
., .- . ..
Cooperative Purchase and Terms and Conditions Page 9 of 51
WRMC Escalator Replacement (March 2024)
KONE Internal
.
fimo r�f nr�ri}rnl nr�oro#ir�n o#n \ r �
�
� .
�
■-
�
�
�
■-
�
� .
�
� . �
■-
0�"' �_ _ _
�
__ _ '�..0��� ' _�' ' "��' � '_ ' ' ' '
� � � � -
��.
� .
_ _ ' iii'+�� � _� � � _ _ .-1"_ _ _ � �'.�-•' _ _
�1:C�1LT_7 ��� G1f:L!_T.LT.�7 ��i'T,.
�
�i
�i
�i�
�. ��.
Cooperative Purchase and Terms and Conditions Page 10 of 51
WRMC Escalator Replacement (March 2024)
KONE Intemal
CONFLICT OF INTERESTAFFIDAVIT
Each Contractor (hereinaft�r also referred ta as "you") to a City of Fort Worth (also referred to as
"City"} procurement are required to complete Confiict of Interest Questionnaire {the af#ached CIQ
Form) an8 Local Government Offcer Conflicts Disclosure Statement (the attached CIS FoRn) below
pursuant to state law. This affiidavii will certify that the Contractor has on frfe with the City Secretary
the required documentation and is efigible ta bid on Ci#y Work. The referenced forms may be
downloaded fram the website links pro�ided below.
htto:lhv�vw,eihics.stAle.t�c.uslforms/C IO. n d f
http://wt��v.eth icsstate.tx.us/formslClS.ad f
Q CIQ Form is on file with City Secretary
� C[Q Form is being pravided to the City Secretary
� C15 Form is on �'ile with City Secretary
Q CIS Form is being provided to the City Secretary
coNT�►croR:
,�
�
By: �
Company (Please Print)
���aJYI'ri1C'3�� �3T . �, � C7�5ignature�
Address
��,.�, i x �-�a iq T;t��:
City/State/Zip (Please Print)
Coaperative Purchase and 7erms and Conditions � Page d! af 51
WRMC Escalator Replacement (March 2024)
KONE Internal
CONFLICT OF INTEREST QUESTIONNAIRE FORM CIQ
For vendor doing business with local governmental entity
This questionnaire reflects changes made to the law by H.B. 23, 84th Leg., Regular Session. OFFICEUSEONLY
This questionnaire is being filed in accordance with Chapter 176, Local Government Code, by a vendor who Date Received
has a business relationship as defined by Section 176.001(1-a) with a local governmental entity and the
vendor meets requirements under Section 176.006(a).
By law this questionnaire must be filed with the records administrator of the local governmental entity not later
than the 7th business day after the date the vendor becomes aware of facts that require the statement to be
filed. See Section 176.006(a-1), Local Government Code.
A vendor commits an offense if the vendor knowingly violates Section 176.006, Local Government Code. An
offense under this section is a misdemeanor.
� Name of vendor who has a business relationship with local governmental entity.
KONE Inc.
2
� Checkthisboxifyouarefilinganupdatetoapreviouslyfiledquestionnaire.(Thelawrequiresthatyoufileanupdated
completed questionnaire with the appropriate filing authority not later than the 7th business day after the date on which
you became aware that the originally filed questionnaire was incomplete or inaccurate.)
3 Name of local government officer about whom the information is being disclosed.
Keith Chisholm
Name of Officer
Describe each employment or other business relationship with the local government officer, or a family member of the
officer, as described by Section 176.003(a)(2)(A). Also describe any family relationship with the local government officer.
CompletesubpartsAandBforeachemploymentorbusinessrelationshipdescribed. AttachadditionalpagestothisForm
CIQ as necessary.
A. Is the local government officer or a family member of the officer receiving or likely to receive taxable income,
other than investment income, from the vendor?
� Yes � No
B. Is the vendor receiving or likely to receive taxable income, other than investment income, from or at the direction
of the local government officer or a family member of the officer AND the taxable income is not received from the
local governmental entity?
� Yes a No
5 Describe each employment or business relationship that the vendor named in Section 1 maintains with a corporation or
other business entity with respect to which the local government officer serves as an officer or director, or holds an
ownership interest of one percent ormore.
NONE
s
❑ Check this box ifthe vendor has given the local government officer or a family member of the officer one or more gifts
as described in Section 176.003(a)(2)(B), excluding gifts described in Section 176.003(a-1).
7
ooperative Purchase and Terms and Conditions ��^ D�w Page 12 of 51
RMC Escalator �� siness with the governmental entity Date
Form provided by Texas Ethics Commission www.ethics.state.tx.us Revised 11/30/2015
KONE Internal
CONFLICT OF INTEREST QUESTIONNAIRE
For vendor doing business with local governmental entity
A complete copy of Chapter 176 of the Local Government Code may be found at
http://www.statutes.legis.state.tx.us/ Docs/LG/htm/LG.176.htm. For easy reference, below are some of
the sections cited on this form.
Local Government Code & 176.00111-a): "Business relationship" means a connection between two or more
parties based on commercial activity of one of the parties. The term does not include a connection based on:
(A) a transaction that is subject to rate or fee regulation by a federal, state, or local governmental entity or an
agency of a federal, state, or local governmental entity;
(B) a transaction conducted at a price and subject to terms available to the public; or
(C) a purchase or lease of goods or services from a person that is chartered by a state or federal agency and
that is subject to regular examination by, and reporting to, that agency.
1.1 LOCAL GOVERNMENT CODE § 176.0031A11211A1 AND (Bl:
(a) A local government officer shall file a conflicts disclosure statement with respect to a vendor if:
���
(2) the vendor:
(A) has an employment or other business relationship with the local government officer or a
family member of the officer that results in the officer or family member receiving taxable
income, other than investment income, that exceeds $2,500 during the 12-month period
preceding the date that the officer becomes aware that
(i) a contract between the local governmental entity and vendor has been
executed;or
(ii) the local governmental entity is considering entering into a contract with
the vendor;
(B) hasgiventothelocalgovernmentofficerorafamilymemberoftheofficeroneormoregifts
that have an aggregate value of more than $100 in the 12-month period preceding the date the
officer becomes aware that:
(i) a contract between the local governmental entity and vendor has been executed;
or
(ii) the local governmental entity is considering entering into a contract with the
vendor.
1.2 LOCAL GOVERNMENT CODE � 176.006(A1 AND (A-11
(a) Avendor shall file a completed conflict of interest questionnaire if the vendor has a business relationship
with a local governmental entity and:
(1) has an employment or other business relationship with a local government officer of that local
governmental entity, or a family member of the officer, described by Section 176.003(a)(2)(A);
(2) has given a local government officer of that local governmental entity, or a family member of the
officer, one or more giftswith the aggregate value specified by Section 176.003(a)(2)(B), excluding any
gift described by Section 176.003(a-1); or
(3) has a family relationship with a local government officer of that local governmental entity.
(a-1) The completed conflict of interest questionnaire must be filed with the appropriate records administrator not later
than the seventh business day after thc later of:
(1) the date that the vendor:
(A) begins discussions or negotiations to enter into a contract with the local governmental
entity; or
(B) submits to the local governmental entity an application, response to a requestfor proposals
or bids, correspondence, or another writing related to a potential contract with the local
governmental entity; or
(2) the date the vendor becomes aware:
(A) of an employment or other business relationship with a local government officer, or a
family member of the officer, described by Subsection (a);
(B) that the vendor has given one or more gifts described by Subsection (a); or
(C) of a family relationship with a local government officer.
Cooperative Purchase and Terms and Conditions Page 13 of 51
WRMC Escalator Replacement (March 2024)
KONE Internal
LOCAL GOVERNMENT OFFICER
CONFLICTS DISCLOSURE STATEMENT
(Instructions for completing and filing this form are provided on the next page.)
This questionnaire reflects changes made to the law by H.B. 23, 84th Leg., Regular Session.
This is the notice to the appropriate local governmental entity that the following local
government officer has become aware of facts that require the officer to file this statement
inaccordancewithChapter176, LocalGovernmentCode.
Name of Local Government Officer
Office Held
FORMCIS
OFFICE USEONLY
Date Received
Name of vendor described by Sections 176.001(7) and 176.003(a), Local Government Code
Description of the nature and extent of each employment or other business relationship and each family relationship
with vendor named in item 3.
List gifts accepted by the local government officer and any family member, if aggregate value of the gifts accepted
from vendor named in item 3 exceeds $100 during the 12-month period described by Section 176.003(a)(2)(B).
Date Gift Accepted
Date Gift Accepte
Date Gift Accepte
AFFIDAVIT
I swear under penalty of perjury that the above statement is true and correct. I acknowledge
that the disclosure applies to each family member (as defined by Section 176.001(2), Local
Government Code) of this local government officer. I also acknowledge that this statement
covers the 12-month period described by Section 176.003(a)(2)(B), Local Government Code.
Signature of Local Government Officer
AFFIX NOTARY STAMP / SEAL ABOVE
Sworn to and subscribed before me, by the said , this the day
20 , to certify which, witness my hand and seal of office.
�r�yyc Piirrh�ec �nrl Tcrme �nrJ Cnnrli4inne �n�c id nf 5i
C�IatolP�ef7ifftieHT�tti�l}al�t�r�.'��th Printed name of officer administering oath Title of officer administering oath
Description of Gift
Description of Gift
escription of Gift
(attach additional forms as necessary)
Form provided by Texas Ethics Commission www.ethics.state.tx.us Revised 11/30/2015
KONE Internal
LOCAL GOVERNMENT OFFICER CONFLICTS DISCLOSURE STATEMENT
Section 176.003 of the Local Government Code requires certain local government officers to file this form. A"local
government officer" is defined as a member of the governing body of a local governmental entity; a director, superintendent,
administrator, president, or other person designated as the executive officer of a local governmental entity; or an agent of a
local governmental entity who exercises discretion in the planning, recommending, selecting, or contracting of a vendor. This
form is required to be filed with the records administrator ofthe local governmental entity not laterthan 5 p.m. on the seventh
business day afterthe date on which the officer becomes aware ofthe factsthat requirethefiling ofthis statement.
A local government officer commits an offense if the officer knowingly violates Section 176.003, Local Government Code. An
offense under this section is a misdemeanor.
Refer to chapter 176 of the Local Government Code for detailed information regarding the requirement to file this form.
PART 2- INSTRUCTIONS FOR COMPLETING THIS FORM
The following numbers correspond to the numbered boxes on the otherside.
1. Name of Local Government Officer. Enter the name of the local government officer filing this statement.
2. Office Held. Enter the name of the office held by the local government officer filing this statement.
3. Name of vendor described by Sections 176.001(7) and 176.003(a), Local Government Code. Enter the
name of the vendor described by Section 176.001(7), Local Government Code, if the vendor: a) has an employment or
other business relationship with the local government officer or a family member of the officer as described by Section
176.003(a)(2)(A), Local Government Code; b) has given to the local government officer or a family member of the officer one
or more gifts as described by Section 176.003(a)(2)(B), Local Government Code; or c) has a family relationship with the local
government officer as defined by Section 176.001(2-a), Local Government Code.
4. Description of the nature and extent of each employment or other business relationship and each
family relationship with vendor named in item 3. Describe the nature and extent of the employment or other
business relationship the vendor has with the local government officer or a family member of the officer as described by
Section 176.003(a)(2)(A), Local Government Code, and each family relationship the vendor has with the local government
officer as defined by Section 176.001(2-a), Local Government Code.
5. List gifts accepted, if the aggregate value of the gifts accepted from vendor named in item 3 exceeds
$100. List gifts accepted during the 12-month period (described by Section 176.003(a)(2)(B), Local Government Code) by
the local government officer orfamily member ofthe officerfrom the vendor named in item 3 that in the aggregate exceed $100
in value.
6. Affidavit. Signature of local governmentofficer.
Local Government Code � 176.001(2-a): "Family relationship" means a relationship between a person and
another person within the third degree by consanguinity or the second degree by affinity, as those terms are defined by
Subchapter B, Chapter 573, Government Code.
PART 3- LOCAL GOVERNMENT CODE § 176.0031A11211A1:
(a) A local government officer shall file a conflicts disclosure statement with respect to a vendor if:
***
(2) the vendor:
(A) has an employment or other business relationship with the local government
officer or a family member of the officer that results in the officer or family member
receiving taxable income, other than investment income, that exceeds $2,500 during
the 12-month period preceding the date that the officer becomes aware that:
(i) a contract between the local governmental entity and vendor has been executed; or
(ii) the local governmental entity is considering entering into a contractwith the vendor.
Cooperative Purchase and Terms and Conditions Page 15 of 51
WRMC Escalator Replacement (March 2024)
KONE Internal
�;'�� 01-339 (BackJ
' xK ` (Rer4-1378J
f, tf�e purchaser named above, claim an exemption from payment of sales a�d use taxes (for #he purchase of taxable
iiems described below or on tF�e attached orderor invoice) frnm:
Seller: Afl Vendors
Street address: City, State, ZIP code:
Description of items to be purchased or on the attached order or invoice:
All items. Purchaser acknowledges that this Certificate cannot be used for #he purchase, lease or renta! of a rrsotor
vehicle.
Purchaser claims this exemptEon for the foflowing reason:
Go�ernmental
I understand that I will he liable for paymeni of all state and local sales or use taxes which may become due #or failure to comply with
Ihe provisions of the Tax Code andlor all applicable law.
1 understand thaf it isa crimrna! offense fo give an exempSon ce�tificafe to fhe sellerfortaxable items thatl know, atthe 8me ofpurchase,
virillbeusedinamanneroiherthanfhafexpressedinthiscsrtificate, anddependingontheamountoftaxevaded, theoffensemayrange
from a Class C misdemeanor fo a felony of the sscond degree.
Purchaser TStle Date
he e f ��i Finance DFrectorlCFO �pplV�j �� �i�
NOTE: This certificate cannot be issued for the p�rchase, lease, or reMal of a motor vehicle.
THlS CERTIFICATE DOFB NOT REQLIIRE A NUMBER TO BE VALID.
Sales and Use Tax "Exemption Numbers" or "Tax Exempl" Numbers do not exist.
This certificate should be furnished to the supplier.
Do not send the completed certificate to the Comptroller of Public Accounts.
General Conditions of the Contract for Construction Lump Sum Contract Page 16 of 51
CFW PMD — WRMC Escalator Replacement (March 2024)
Texas Sales and Use Tax Exemption Ceriification
This certificate does not require a number to be valid.
KONE Internal
CITY OF FORT WORTH, TEXAS
CONSTRUCTION CONTRACT (LUMP SUM)
THE STATE OF TEXAS
COUNTY OF TARRANT
KNOW ALL BY THESE PRESENTS:
This Agreement is made effective as of the date signed by the Assistant City Manager below between the
CITY OF FORT WORTH, a municipal corporation of Tarrant County, Texas, organized and existing under
and by virtue of a special charter adopted by the qualified voters within said City on the 11 th day of
December, A.D. 1924, under the authority (vested in said voters by the "Home Rule" provision) of the
Constitution of Texas, and in accordance with a resolution duly passed at a regular, meeting of the City
Council of said City, hereinafter called OWNER, and Kone.
Inc. of the City of Moline County of Rock Island, State of Illinois, hereinafter called CONTRACTOR.
WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned to
be made and performed by the Owner, and under the conditions expressed in the bond bearing even
date herewith, the said Contractor hereby agrees with the said Owner to commence and complete the
construction of certain improvements described as follows:
City of Fort Worth
WRMC Amon Carter Exhibit Hall Escalator Replacement
3400 Burnett-Tandy Drive
Fort Worth, Texas
PMD2023-04
Project Number - 104044
That the work herein contemplated shall consist of furnishing as an independent contractor all labor, tools,
appliances and materials necessary for the construction and completion of said project in accordance with
the Plans and Specifications and Contract Documents adopted by the City Council of the City of Fort Worth,
which Plans and Specifications and Contract Documents are hereto attached and made a part of this
contract the same as if written herein.
The Contractor hereby agrees and binds himself to commence the construction of said work within ten (10)
days after being notified in writing to do so by the Owner.
The agreed upon total contract amount shall be $2,113,204.00
including the Base Proposal ($1,9983,204), Owner's Contingency Allowance ($0.00), and Alternate Nos.
One (ADD / DEDUCT $130,000.00). Payment will be made in monthly installments upon actual work
completed by contractor and accepted by the Owner and receipt of invoice from the Contractor.
Insurance Requirements:
The Contractor shall not commence work under this contract until it has obtained all insurance
required under the Contract Documents, and the Owner has approved such insurance. The
Contractor shall be responsible for delivering to the Owner the sub-contractors' certificates of
insurance for approval. The Contractor shall indicate on its certificate of insurance included in the
documents for execution whether or not its insurance covers subcontractors. It is the intention of
the Owner that the insurance coverage required herein shall include the coverage of all
subcontractors.
WORKER'S COMPENSATION INSURANCE:
• Statutory limits.
• Employer's liability:
General Conditions of the Contract for Construction Lump Sum Contract Page 17 of 51
CFW PMD — WRMC Escalator Replacement (March 2024)
KONE Internal
• $100,000 disease each employee.
• $500,000 disease policy limit.
• $100,000 each accident.
b. COMMERCIAL GENERAL LIABILITY INSURANCE:
The Contractor shall procure and shall maintain during the life of this contract public liability
insurance coverage in the form of a Commercial General Liability insurance policy to cover
bodily injury, including death, and property damage at the following limits: $1,000,000 each
occurrence and $2,000,000 aggregate limit.
The insurance shall be provided on a project specific basis and shall be endorsed
accordingly.
• The insurance shall include, but not be limited to, contingent liability for independent
contractors, XCU coverage, and contractual liability.
c. BUSINESS AUTOMOBILE LIABILITY:
• $1,000,000 each accident.
• The policy shall cover any auto used in the course of the project.
d. BUILDER'S RISK OR INSTALLATION FLOATER:
This insurance shall be applicable according to the property risks associated with the
project and commensurate with the contractual obligations specified in the contract
documents.
e. EXCESS LIABILITY UMBRELLA:
$1,000,000 each occurrence; $2,000,000 aggregate limit.
This insurance shall provide excess coverage over each line of liability insurance
required herein. The policy shall follow the form(s) of the underlying policies.
f. SCOPE OF INSURANCE AND SPECIAL HAZARD:
The insurance required under the above paragraphs shall provide adequate protection for
the Contractor and its subcontractors, respectively, against damage claims which may
arise from operations under this contract, whether such operations be by the insured or by
anyone directly or indirectly employed by it, against any insurable hazards which may be
encountered in the performance of the Contract.
PROOF OF CARRIAGE OF INSURANCE:
The Contractor shall furnish the owner with satisfactory proof of coverage by insurance
required in these Contract Documents in the amounts and by insurance carriers
satisfactory to the Owner. The form to be used shall be the current Accord certificate of
insurance form or such other form as the Owner may in its sole discretion deem acceptable.
All insurance requirements made upon the Contractor shall apply to the sub-contractors,
should the Contractor's insurance not cover the subcontractor's work operations performed
in the course of this contracted project.
ADDITIONAL INSURANCE REQUIREMENTS:
The Owner, its officers, employees and servants shall be endorsed as an additional
insured on Contractor's insurance policies excepting employer's liability insurance
General Conditions of the Contract for Construction Lump Sum Contract Page 18 of 51
CFW PMD — WRMC Escalator Replacement (March 2024)
KONE Internal
coverage under Contractor's workers' compensation insurance policy.
b. Certificates of insurance shall be delivered to the City of Fort Worth, contract
administrator in the respective department as specified in the bid documents, 200
Texas Street, Fort Worth, TX 76102, prior to commencement of work on the
contracted project.
c. Any failure on part of the Owner to request required insurance documentation shall
not constitute a waiver of the insurance requirements specified herein.
Each insurance policy shall be endorsed to provide the Owner a minimum thirty days'
notice of cancellation, non-renewal, and/or material change in policy terms or coverage.
A ten days' notice shall be acceptable in the event of non-payment of premium.
e. Insurers must be authorized to do business in the State of Texas and have a current
A.M. Best rating of A:VII or equivalent measure of financial strength and solvency.
Deductible limits, or self-funded retention limits, on each policy must not exceed
$10,000.00 per occurrence unless otherwise approved by the Owner.
In lieu of traditional insurance, Owner may consider alternative coverage or risk
treatment measures through insurance pools or risk retention groups. The Owner
must approve in writing any alternative coverage.
Workers' compensation insurance policy(s) covering employees employed on the
project shall be endorsed with a waiver of subrogation providing rights of recovery in
favor of the Owner.
Owner shall not be responsible for the direct payment of insurance premium costs for
contractor's insurance.
Contractor's insurance policies shall each be endorsed to provide that such
insurance is primary protection and any self-funded or commercial coverage
maintained by Owner shall not be called upon to contribute to loss recovery.
k. In the course of the project, Contractor shall report, in a timely manner, to Owner's
officially designated contract administrator any known loss occurrence which could
give rise to a liability claim or lawsuit or which could result in a property loss.
Contractor's liability shall not be limited to the specified amounts of insurance
required herein.
m. Upon the request of Owner, Contractor shall provide complete copies of all insurance
policies required by these contract documents.
If this Contract is in excess of $25,000, the Contractor shall provide a Payment Bond in the full amount of
the contract. If the contract is in excess of $100,000 Contractor shall provide both Payment and
Performance Bonds for the full amount of the contract.
Construction shall not start without a"Notice to Proceed". The Notice to Proceed shall not be issued without
bonds in place.
Contractor shall apply for all City of Fort Worth Permits and for any other permits required by this project.
City of Fort Worth Permit fees are waived. Separate permits will be required for each facility.
If the Contractor should fail to complete the work as set forth in the Plans and Specifications and Contract
Documents within the time so stipulated, plus any additional time allowed as provided in the General Condi-
tions, there shall be deducted from any monies due or which may thereafter become due him, the liquidated
General Conditions of the Contract for Construction Lump Sum Contract Page 19 of 51
CFW PMD — WRMC Escalator Replacement (March 2024)
KONE Internal
damages outlined in the General Conditions, not as a penalty but as liquidated damages, the Contractor
and their Surety shall be liable to the Owner for such deficiency.
IMMIGRATION NATIONALITY ACT: City actively supports the Immigration & Nationality Act (INA) which
includes provisions addressing employment eligibility, employment verification, and nondiscrimination. Vendor
shall verify the identity and employment eligibility of all employees who perForm work under this Agreement.
Vendor shall complete the Employment Eligibility Verification Form (I-9), maintain photocopies of all supporting
employment eligibility and identity documentation for all employees, and upon request, provide City with copies
of all I-9 forms and supporting eligibility documentation for each employee who performs work under this
Agreement. Vendor shall establish appropriate procedures and controls so that no services will be performed
by any employee who is not legally eligible to perform such services. Vendor shall provide City with a
certification letter that it has complied with the verification requirements required by this Agreement. Vendor
shall indemnify City from any penalties or liabilities due to violations of this provision. City shall have the right
to immediately terminate this Agreement for violations of this provision by Vendor.
No Bovcott of Israel. If Contractor has fewer than 10 employees or the Agreement is for less than
$100,000, this section does not apply. Contractor acknowledges that in accordance with Chapter 2270 of
the Texas Government Code, City is prohibited from entering into a contract with a company for goods or
services unless the contract contains a written verification from the company that it: (1) does not boycott
Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and
"company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government
Code. By signing this Agreement, Contractor certifies that Contractor's signature provides written
verification to City that Contractor: (1) does not boycott Israel; and (2) will not boycott Israel during the
term of the Agreement.
Prohibition on Bovcottinq Enerqv Companies. Vendor acknowledges that in accordance with Chapter 2274
of the Texas Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2), the City is prohibited
from entering into a contract for goods or services that has a value of $100,000 or more, which will be paid
wholly or partly from public funds of the City, with a company (with 10 or more full-time employees) unless
the contract contains a written verification from the company that it: (1) does not boycott energy companies;
and (2) will not boycott energy companies during the term of the contract. The terms "boycott energy
company" and "company" have the meaning ascribed to those terms by Chapter 2274 of the Texas
Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2). To the extent that Chapter
2274 of the Government Code is applicable to this Agreement, by signing this Agreement, Vendor
certifies that Vendor's signature provides written verification to the City that Vendor: (1) does not
boycott energy companies; and (2) will not boycott energy companies during the term of this
Agreement.
Prohibition on Discrimination Aqainst Firearm and Ammunition Industries. Vendor acknowledges that
except as otherwise provided by Chapter 2274 of the Texas Government Code (as added by Acts 2021,
87th Leg., R.S., S.B. 19, § 1), the City is prohibited from entering into a contract for goods or services that
has a value of $100,000 or more which will be paid wholly or partly from public funds of the City, with a
company (with 10 or more full-time employees) unless the contract contains a written verification from the
company that it: (1) does not have a practice, policy, guidance, or directive that discriminates against a
firearm entity or firearm trade association; and (2) will not discriminate during the term of the contract against
a firearm entity or firearm trade association. The terms "discriminate," "firearm entity" and "firearm trade
association" have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code
(as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1). To the extent that Chapter 2274 of the
Government Code is applicable to this Agreement, by signing this Agreement, Vendor certifies that
Vendor's signature provides written verification to the City that Vendor: (1) does not have a practice,
policy, guidance, or directive that discriminates against a firearm entity or firearm trade association;
and (2) will not discriminate against a firearm entity or firearm trade association during the term of
this Agreement.
This Agreement is made effective as of the date signed by the Assistant City Manager below.
General Conditions of the Contract for Construction Lump Sum Contract Page 20 of 51
CFW PMD — WRMC Escalator Replacement (March 2024)
KONE Internal
Bond #
THE STATE OF TEXAS
COUNTY OF TARRANT
PAYMENT BOND
.
KNOW ALL BY THESE PRESENTS:
That we, , known as "Principal" herein, and
a corporate
surety (sureties), duly authorized to do business in the State of Texas, known as "Surety" herein (whether
one or more), are held and �rmly bound unto the City of Fort Worth, a municipal corporation created
pursuant to the laws of the State of Texas, known as "City" herein, in the penal sum of, Two Million, One
Hundred Thirteen, Two Hundred Four pollars and No Cents ($2,113,204.00), lawful money of the United
States, to be paid in Fort Worth, Tarrant County, Texas, for the payment of which sum well and truly be
made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally,
firmly by these presents:
WHEREAS, Principal has entered into a certain written Contract with City, awarded the day
of , 2024, which Contract is hereby referred to and made a part hereof for all purposes as
if fully set forth herein, to furnish all materials, equipment, labor and other accessories as defined by law,
in the prosecution of the Work as provided for in said Contract and designated as WRMC Amon Carter
Exhibit Hall Escalator Replacement, located at 3400 Burnett-Tandv Drive, Fort Worth, Texas
(PMD2023-04, Proiect Number 1040441.
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if Principal shall
pay all monies owing to any (and all) payment bond beneficiary (as defined in Chapter 2253 of the Texas
Government Code, as amended) in the prosecution of the Work under the Contract, then this obligation
shall be and become null and void; otherwise to remain in full force and effect.
This bond is made and executed in compliance with the provisions of Chapter 2253 of the Texas
Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the
provisions of said statute.
General Conditions of the Contract for Construction Lump Sum Contract Page 21 of 51
CFW PMD — WRMC Escalator Replacement (March 2024)
KONE Internal
IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED this
instrument by duly authorized agents and officers on this the day of , 2024.
ATTEST:
(Principal) Secretary
Witness as to Principal
ATTEST:
PRINCIPAL:
BY:
Signature
Name and Title
Address:
SURETY:
:
Signature
(Surety) Secretary
Witness as to Surety
Name and Title
Address:
Telephone Number:
*Note: If signed by an officer of the Surety, there must be on �ile a certified extract from the bylaws showing that
this person has authority to sign such obligation. If Surety's physical address is different from its mailing address,
both must be provided. The date of the bond shall not be prior to the date the Contract is awarded.
General Conditions of the Contract for Construction Lump Sum Contract Page 22 of 51
CFW PMD — WRMC Escalator Replacement (March 2024)
KONE Internal
Bond #
PERFORMANCE BOND
THE STATE OF TEXAS
COUNTY OF TARRANT
KNOW ALL BY THESE PRESENTS:
That we, , known as "Principal" herein and
a corporate surety
(sureties, if more than one) duly authorized to do business in the State of Texas, known as "Surety" herein
(whether one or more), are held and firmly bound unto the City of Fort Worth, a municipal corporation
created pursuant to the laws of Texas, known as "City" herein, in the penal sum of, Two Million, One
Hundred Thirteen, Two Hundred Four pollars and No Cents ($2,113,204.00), lawful money of the
United States, to be paid in Fort Worth, Tarrant County, Texas for the payment of which sum well and
truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly
and severally, firmly by these presents.
WHEREAS, the Principal has entered into a certain written contract with the City awarded the
_ day of , 2024, which Contract is hereby referred to and made a part hereof for all
purposes as if fully set forth herein, to furnish all materials, equipment labor and other accessories defined
by law, in the prosecution of the Work, including any Change Orders, as provided for in said Contract
designated as WRMC Amon Carter Exhibit Hall Escalator Replacement, located at 3400 Burnett-
Tandv Drive, Fort Worth, Texas (Proiect PMD2023-04 Proiect Number 104044).
NOW, THEREFORE, the condition of this obligation is such that if the said Principal shall
faithfully perform it obligations under the Contract and shall in all respects duly and faithfully perform
the Work, including Change Orders, under the Contract, according to the plans, specifications, and
contract documents therein referred to, and as well during any period of extension of the Contract that
may be granted on the part of the City, then this obligation shall be and become null and void, otherwise
to remain in full force and effect.
PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in Tarrant
County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division.
This bond is made and executed in compliance with the provisions of Chapter 2253 of the Texas
Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the
provisions of said statue.
General Conditions of the Contract for Construction Lump Sum Contract Page 23 of 51
CFW PMD — WRMC Escalator Replacement (March 2024)
KONE Internal
IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED this instrument by
duly authorized agents and officers on this the _ day of , 2024.
ATTEST:
(Principal) Secretary
Witness as to Principal
Witness as to Surety
PRINCIPAL:
BY:
Signature
Name and Title
Address:
SURETY:
BY:
Signature
Name and Title
Address:
Telephone Number:
*Note: If signed by an officer of the Surety Company, there must be on fle a certi�ied extract from the by-laws
showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing
address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded.
General Conditions of the Contract for Construction Lump Sum Contract Page 24 of 51
CFW PMD — WRMC Escalator Replacement (March 2024)
KONE Internal
CERTIFICATE OF INSURANCE
[Assembler: For Contract Document execution, remove this page and replace with standard ACORD
Certificate oflnsurance form.J
General Conditions of the Contract for Construction Lump Sum Contract Page 25 of 51
CFW PMD — WRMC Escalator Replacement (March 2024)
KONE Intemal
CONTRACTOR COMPLiANCE WITH WORKER'S COMPENSATION LAW
Pursuant to Texas Labor Code Section 406.096{a), as amended, Contractor certifies that it provides
worker's compensaiton insurance coverage for ail of its empla}�ees emplayed on City Project, WRMC
Amon Carter Exhibit Hall Escalator Replacement. located at 34dD Burnett-Tandy Drive. Fart
Worth Texas Pro'ect PMD2023-0� Pro'ect Number 1D4b44 . Contractor further certifes that, pursuant
to Texas Labor Code, Section 406.096(b), as amended, it will provide to City its subconkractar's certificates
of compliance with worker's compensation coverage.
CONTRACTOR:
� BY� ��a�.� 1 ` �-1�
Company (Please Print}
L�W Signatur .
Address
Title: �
City/State/Zip (Please Print)
THE STATE OF TEXAS
COUNTY OF TARRANT
§
§ KNOW ALL BY THESE PRESENTS:
§
BEFORE ME, the undersigned authority, on this day personally appeared
��n�� �� , known to me to
be the person whose name is subscribed to the faregoing instrument, and acknowledged to me that he/she
executed the same as the act anci deed of 3�[ �� D���� Y r•��1 for the
purposes and consideration therein expressed and in the capacity therein stated.
GIVEN ClNDER MY HAND AND SEAL OF OFFICE thi�J "day of ���� , 2024.
`"�""' AI.£SHlA J. KUHLMANN
•�` �? '�i,
i°4��`n�Notery Publlc, Stete of Texas
�";•. }�; Comm. Explres 05-15-2628
''�0;,�`' Notery ID 133782383
General Conddlons of the Contract ror Ganstructian Lump 5um Contract
CFW PMD — WRMC Escalalar Replacemeni (March 202b)
Notary Public i d ie 3tate of Texas
i Page 26 of 51
KONE Internal
City of Fort Worth, Texas
Property Management Department
Facilities Management Group/Architectural Services Division
GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION
LUMP SUM CONTRACT
SECTION A
DEFINITIONS, PROCEDURES AND INTERPRETATIONS
A-1 CONTRACT DOCUMENTS: By the term Contract Documents is meant all of the written and drawn documents setting forth
or affecting the rights of the parties, including but not necessarily limited to, the Cooperative Agreement, General Conditions, Special
Conditions, Specifications, Plans, Bonds and all Addenda, Amendments signed by all parties, Change Orders, written Interpretations
and any written Field Order for a minor change in the Work.
A-2 ENTIRE AGREEMENT: The Contract Documents represent the entire agreement between the Parties, and no prior or
contemporaneous, oral or written agreements, instruments or negotiations shall be construed as altering the terms and effects of the
Contract Documents. After being executed, the Contract Documents can be changed only by a written Amendment signed by the
Contractor and the Owner, or Change Order, or by a written Field Order for a minor change.
A-3 WORK: By the term Work is meant all labor, supervision, materials and equipment necessary to be used or incorporated
in order to produce the construction required by Contract Documents.
A-4 EXECUTION OF THE CONTRACT DOCUMENTS: The Contract Documents shall be executed in four originals, with all
required attachments, including required bonds and insurance certificates, by the Contractor and the Owner in such form as may be
prescribed by law and returned to the Owner within ten business days of notification to Contractor.
A-5 FAMILIARITY WITH PROPOSED WORK: The Contractor shall examine carefully the, plans, specifications, special
provisions, and the form of contract to be entered into for the work contemplated. They shall examine the site of work and satisfy
themselves as to the conditions that will be encountered relating to the character, quality and quantity of work to be performed and
materials to be furnished.
Claims for additional compensation due to variations between conditions actually encountered in construction and as indicated by the
plans will not be allowed.
A-6 ONE UNIFIED CONTRACT: Insofar as possible, the Contract Documents will be bound together and executed as a single
unified Contract. The intention of the Contract Documents being to provide for all labor, supervision, materials, equipment and other
items necessary for the proper execution and completion of the Work. Words that have well-recognized technical or trade meanings
are used herein in accordance with such recognized meanings.
A-7 DIVISION OF WORK: The arrangement of Drawings and/or Specifications into Divisions, Sections, Articles, or other
Subdivisions shall not be binding upon the Contractor in dividing the work among Subcontractors or Trades.
A-8 INTERPRETATIONS: The Architect will furnish such Interpretations of the Plans and Specifications as may be necessary
for the proper execution or progress of the work. Such Interpretations shall be furnished at the instance of the Architect or at the
request of the CONTRACTOR, or Owner, and will be issued with reasonable promptness and at such times and in accordance with
such schedule as may be agreed upon. Such Interpretations shall be consistent with the purposes and intent of the Plans and
Specifications and may be affected by Field Order. In the event of any dispute between any of the parties to the Contract and the
Architect or each other involving the interpretation of the Contract Documents, the evaluation of work or materials pertormed or
furnished by the Architect, Contractor, or any subcontractor or materialman, or involving any question of fault or liability of any party,
the decision of the Owner shall be final and binding.
In the event of inconsistency in the contract documents, the following sequence for interpretation shall be used in order of precedence:
Change Orders and/or Field Orders (by date of issuance); Addenda (by date of issuance); Drawings; Notes and dimensions on
Drawings; Technical Specifications; Special Provisions; Supplementary General Conditions; General Conditions; and, Construction
Contract.
A-9 CORRELATION AND INTENT: In general, the drawings indicate dimension, locations, positions, quantities, and kinds of
construction; the specifications indicate the quality and construction procedures required. Work indicated on the drawings and not
specified of vice-versa, shall be furnished as though set forth in both. Work not detailed, marked or specified shall be the same as
similar parts that are detailed, marked or specified. If the drawings are in conflict or conflict with the specifications the better quality
or greater quantity or work or materials shall be estimated and shall be furnished or included. Dimensions on drawings shall take
precedence over small-scale drawings. Drawings showing locations of equipment, piping, ductwork, electrical apparatus, etc., are
diagrammatic and job conditions may not allow installation in the exact location shown. Relocation shall not occur without the
Architects approval.
A-10 COPIES OF REVIEW DRAWINGS AND SPECIFICATIONS: The Contractor will furnish to City review Drawings and
Specifications in electronic format prior to starting work. Contractor shall pay the cost of reproduction for all other copies of Drawings
and Specifications furnished be him.
General Conditions of the Contract for Construction Lump Sum Contract Page 27 of 51
CFW PMD — WRMC Escalator Replacement (March 2024)
KONE Internal
A-11 AGE: In accordance with the policy ("Policy") of the Executive Branch of the federal government, Contractor covenants that
neither themselves nor any of their officers, members, agents, employees, program participants or subcontractors, while engaged in
pertorming this contract, shall, in connection with the employment, advancement or discharge of employees or in connection with the
terms, conditions or privileges of their employment, discriminate against persons because of their age except on the basis of a bona
fide occupational qualification, retirement plan or statutory requirement.
Contractor further covenants that neither themselves nor their officers, members, agents, employees, subcontractors, program
participants, or persons acting on their behalf, shall specify, in solicitations or advertisements for employees to work on this contract,
a maximum age limit for such employment unless the specified maximum age limit is based upon a bona fide occupational qualification,
retirement plan or statutory equipment.
Contractor warrants it will fully comply with the Policy and will defend, indemnify and hold City harmless against any claims or allega-
tions asserted by third parties or subcontractor against City arising out of Contractor's and/or their subcontractors' alleged failure to
comply with the above referenced Policy concerning age discrimination in the pertormance of this agreement.
A-12 DISABILITY: In accordance with the provisions of the Americans With Disabilities Act of 1990 ("ADA"), Contractor warrants
that themselves and any and all of their subcontractors will not unlawfully discriminate on the basis of disability in the provision of
services to the general public, nor in the availability, terms and/or conditions of employment for applicants for employment with, or
employees of Contractor or any of their subcontractors. Contractor warrants it will fully comply with ADA provisions and any other
applicable federal, state and local laws concerning disability and will defend, indemnify and hold City harmless against any claims or
allegations asserted by third parties or subcontractors against City arising out of Contractor's and/or their subcontractors' alleged
failure to comply with the above-referenced laws concerning disability discrimination in the performance of this agreement.
SECTION B
IDENTITY OF ARCHITECT
B-1 CONTRACT ADMINISTRATION: The Architect is the person or person lawfully licensed to practice architecture identified
as such in the Agreement. The Architect is retained by the Owner to prepare the construction documents and represent the Owner
during the construction phase as directed by the Owner.
B-2 DUTIES OF THE ARCHITECT: As used herein, the term Architect means the Architect or their authorized representative.
Nothing contained in these Contract Documents shall create any privity of Contract between the Architect and the Contractor.
B-3 ARCHITECT AS REPRESENTATIVE OF THE OWNER: The Architect will provide general administration of the Contract
on behalf of the Owner and will have authority to act as the representative of the Owner to the extent provided in the Contract
Documents unless changed in writing by the Owner. The Architect will be available for conferences and consultations with the Owner
or the Contractor at all reasonable times.
B-4 ACCESS TO JOB SITES: The Architect shall at all times have access to the Work whenever it is in preparation and
progress. The Contractor shall provide facilities for such access so the Architect may pertorm their assigned functions under the
Contract Documents.
The Architect will make periodic visits to the Site to familiarize themselves with the progress and quality of the work and to determine
if the work is proceeding in accordance with the Contract documents. On the basis of on-site observations, the Architect will keep the
Owner informed of the progress of the Work and will endeavor to guard the Owner against defects and deficiencies in the Work of the
Contractor. Based upon such observations and the Contractor's applications for payments, the Architect will make determinations and
recommendations concerning the amounts owing to the Contractor and will issue certificates for payment amounts.
B-5 INTERPRETATIONS: The Architect will be, in the first instance, the interpreter of the requirements of the Plans and
Specifications and the judge of the pertormance thereunder by the Contractor, subject to the final decision of the Owner.
The ArchitecYs decisions in matters relating to artistic effect will be final if consistent with the intent of the Contract Documents.
B-6 AUTHORITY TO STOP WORK: The Architect will have authority to reject work that does not conform to the Plans and
Specifications. In addition, whenever, in their reasonable opinion, the Architect considers it necessary or advisable in order to insure
the proper realization of the intent of the Plans and Specifications, the Architect will have authority to require the Contractor to stop
the Work or any portion thereof, or to require special inspection or testing of the Work whether or not such Work be then fabricated,
installed or completed.
B-7 MISCELLANEOUS
Shop Drawinqs. Submittals and Samples: The Architect will review Shop Drawings, Submittals and Samples.
Chanae Orders: Change Orders, Owners Contingence Allowance forms, and Field Orders for Minor Changes in the work will be
issued by the Owner through the Architect in accordance with the provisions of Section L.
Guarantees: The Architect will receive all written guarantees and related documents required of the Contractor. Upon completion of
the project the Contractor shall provide the Owner of each guarantee.
Inspections: The Architect will conduct inspections for the purpose of determining and making their recommendations concerning the
dates of substantial completion and final completion. The Architect will conduct the final acceptance inspection and issue the
Certificate of Substantial Completion.
General Conditions of the Contract for Construction Lump Sum Contract Page 28 of 51
CFW PMD — WRMC Escalator Replacement (March 2024)
KONE Internal
Operation and Maintenance Manuals: The Architect will receive on behalf of the Owner one hard copy and two digital copies of all
applicable equipment installation, operation, and maintenance brochures and manuals required of the Contractor.
B-8 TERMINATION OF THE ARCHITECT: In case of the termination of the employment of the Architect by the Owner, the
Owner shall either assume the duties of the Architect through the Director of the Property Management Department, or shall appoint
a successor Architect against whom the Contractor makes no reasonable objection.
SECTION C
OWNER
C-1 IDENTIFICATION: By the term Owner is meant the City of Fort Worth acting herein by their duly authorized representatives
in the manner provided by law. Authorized representatives include the City Manager, Assistant City Manager, and Director of the
Property Management Department and members of the Facilities Management Division. A designated representative will be identified
from within the Facilities Management Division to act as a point of contact for day-to-day contract administration.
C-2 DUTIES OF THE OWNER: The Owner shall furnish surveys describing the physical characteristics, legal limits and utility
locations for the site of the Work; provided, however, that the Contractor hereby covenants that they have inspected the premises and
familiarized themselves therewith and that the locations of utilities and other obstacles to the prosecution of the Work as shown on
the Owner's survey are for information only, are not binding upon the Owner, and the Owner shall not incur any liability for loss or
damage by virtue of any inaccuracies or deficiencies in such surveys. The Owner shall secure and pay for title to the site and all
necessary permanent or construction easements. The Owner will cooperate with the Contractor in the prosecution of the Work in
such manner and to such extent as may be reasonable and shall furnish information under their control with reasonable promptness
at the request of the Contractor.
C-3 INSTRUCTIONS: The Owner shall issue all instructions to the Contractor through the Architect.
C-4 ACCESS TO JOB SITE: The Owner shall at all times have access to the Work whenever it is in preparation and progress.
The Contractor shall provide facilities for such access so the Owner may perform their assigned functions under the Contract
Documents.
C-5 PROGRESS INSPECTIONS: The Owner and Architect will make visits to the Site to familiarize themselves with the
progress and quality of the Work and to determine if the work is proceeding in accordance with the Contract Documents. On the basis
of on-site observations and reports concerning the progress and quality of the work, the Owner and Architect will approve and authorize
the Contractor's applications for payments.
C-6 AUTHORITY TO STOP WORK: The City will have authority to reject work that does not conform to the Plans and
Specifications. Whenever, in their reasonable opinion, the City considers it necessary or advisable in order to insure the proper
realization of the intent of the Plans and Specifications, the City will have authority to require the Contractor to stop the work or any
portion thereof, or to require special inspection or testing of the Work whether or not such Work be then fabricated, installed or
completed. The Contractor shall be responsible for the cost of investigations, special inspections and testing for work that is found not
to comply with the plans and specifications.
C-7 SUBSTANTIAL COMPLETION INSPECTION: Upon agreement of the Contractor and Architect that the Work is
substantially complete, the Owner will schedule a Substantial Completion Inspection to be conducted by the Architect and attended
by representatives of the Architect, Owner and Contractor. Items identified during this inspection as being incomplete, defective or
deficient shall be incorporated into a punch list and attached to the AIA document G704, which is to be prepared by the Architect and
signed by the Contractor, and accepted, approved and signed by the Owner.
C-8 RIGHT TO AUDIT: Contractor agrees that the City shall, until the expiration of three years after final payment under this
contract, have access to and the right to examine any directly pertinent books, documents, papers and records of the Contractor
involving transactions relating to this contract.
Contractor further agrees to include in all their subcontracts hereunder a provision to the effect that the subcontractor agrees that the
City shall, until the expiration of three years after final payment under the subcontract, have access to and the right to examine any
directly pertinent books, documents, papers and records of such subcontractor, involving transactions to the subcontract. The term
"subcontract" as used herein includes purchase orders.
Contractor agrees to photocopy such documents as may be requested by the city. The city agrees to reimburse Contractor for the
costs of copies at the rate published in the Texas Administrative Code.
C-9 TERMINATION AND SUSPENSION OF WORK: The Owner has the right to terminate the Project for any reason. If the
project is terminated, the Contractor shall:
a) Stop work under the Contract on the date and to the extent specified on the notice of termination.
b) Place no further orders or subcontracts except as may be necessary for the completion of the work not terminated.
c) Terminate all orders and subcontracts to the extent that they relate to the performance of the work terminated by the notice
of termination.
After termination as above, the City will pay the Contractor a proportionate part of the contract price based on the work completed;
provided, however, that the amount of payment on termination shall not exceed the total contract price as reduced by the portion
thereof allocable to the work not completed and further reduced by the amount of payments, if, any otherwise made. Contractor shall
submit their claim for amounts due after termination as provided in this paragraph within 30 days after receipt of such claim. In the
General Conditions of the Contract for Construction Lump Sum Contract Page 29 of 51
CFW PMD — WRMC Escalator Replacement (March 2024)
KONE Internal
event of any dispute or controversy as to the propriety or allowability of all or any portion of such claim under this paragraph, such
dispute or controversy shall be resolved and be decided by the City Council of the City of Fort Worth, and the decision by the City
Council of the City of Fort Worth shall be final and binding upon all parties to this contract.
SECTION D
CONTRACTOR
D-1 IDENTIFICATION: The Contractor is the person or organization identified as such in the Contract. The term Contractor
means the Contractor or their authorized representative.
D-2 INDEPENDENT CONTRACTOR: Contractor shall pertorm all work and services hereunder as an independent contractor,
not as agent, or employee of the City. Contractor shall have exclusive control of and the exclusive right to control the details of the
Work and services perFormed hereunder, and all persons performing same, and Contractor shall be solely responsible for the acts of
their officers, agents, and employees. Nothing herein shall be construed as creating a partnership or joint enterprise between City
and the Contractor, their officers, agents and employees, and the doctrine of respondent superior shall not apply.
D-3 SUBLETTING: It is further agreed that the pertormance of this Contract, either in whole or in part, shall not be sublet or
assigned to anyone else by said Contractor without the prior written consent of the Director of the Property Management Department
of the City of Fort Worth.
D-4 REVIEW OF CONTRACT DOCUMENTS: The Contractor shall carefully study and compare the Agreement, Conditions of
the Contract, Drawings, Specifications, Addenda and modifications and shall at once report to the Owner and to the Architect any
error, inconsistency or omission they may discover. The Contractor shall do no work without approved Submittals, Drawings,
Specifications and Interpretations.
D-5 SUPERVISION: The Contractor shall supervise and direct the Work, using reasonable skill and attention. They shall be
solely responsible for all construction means, methods, safety, techniques, sequences and procedures and for coordinating all portions
of the Work under the Contract Documents.
D-6 LABOR AND MATERIALS: Unless otherwise specifically noted, the Contractor shall provide and pay for all labor,
materials, equipment, tools, construction equipment and machinery, water, heat, utilities, transportation and other facilities and
services necessary for the proper execution and completion of the Work.
The Contractor will use its reasonable best efforts to hire or contract with local laborers, workmen and materialmen. This general
condition is not to be construed as limiting the right of the Contractor to employ laborers, workmen or materialmen from outside local
area.
The Contractor shall at all times enforce strict discipline and good order among their employees, and shall not employ on the Work
any unfit person or anyone not skilled in the task assigned to them.
D-7 COMPLIANCE WITH AND ENFORCEMENT OF PREVAILING WAGE RATE
Dutv to pav Prevailina Waae Rates. The Contractor shall comply with all requirements of Chapter 2258, Texas Government Code
(Chapter 2258), including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the
prevailing wage rates in accordance with Chapter 2258. Such prevailing wage rates are included in these contract documents.
Penaltv for Violation. A contractor or any subcontractor who does not pay the prevailing wage shall, upon demand made by the City,
pay to the City $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the prevailing
wage rates stipulated in these contract documents. This penalty shall be retained by the City to offset their administrative costs,
pursuant to Texas Government Code 2258.023.
Complaints of Violations and Citv Determination of Good Cause. On receipt of information, including a complaint by a worker,
concerning an alleged violation of 2258.023, Texas Government Code, by a contractor or subcontractor, the City shall make an initial
determination, before the 315� day after the date the City receives the information, as to whether good cause exists to believe that the
violation occurred. The City shall notify in writing the contractor or subcontractor and any affected worker of their initial determination.
Upon the City's determination that there is good cause to believe the contractor or subcontractor has violated Chapter 2258, the City
shall retain the full amounts claimed by the claimant or claimants as the difference between wages paid and wages due under the
prevailing wage rates, such amounts being subtracted from successive progress payments pending a final determination of the
violation.
Arbitration Reauired if Violation Not Resolved. An issue relating to an alleged violation of Section 2258.023, Texas Government Code,
including a penalty owed to the City or an affected worker, shall be submitted to binding arbitration in accordance with the Texas
General Arbitration Act (Article 224 et seq., Revised Statutes) if the contractor or subcontractor and any affected worker do not resolve
the issue by agreement before the 15th day after the date the City makes their initial determination pursuant to paragraph (c) above.
If the persons required to arbitrate under this section do not agree on an arbitrator before the 11th day after the date that arbitration
is required, a district court shall appoint an arbitrator on the petition of any of the persons. The City is not a party in the arbitration.
The decision and award of the arbitrator is final and binding on all parties and may be enforced in any court of competent jurisdiction.
Records to be Maintained. The Contractor and each subcontractor shall, for a period of three (3) years following the date of
acceptance of the Work, maintain records that show (i) the name and occupation of each worker employed by the Contractor in the
construction of the Work provided for in this contract; and (ii) the actual per diem wages paid to each worker. The records shall be
open at all reasonable hours for inspection by the City. The provisions of the Audit section of these contract documents shall pertain
to this inspection.
General Conditions of the Contract for Construction Lump Sum Contract Page 30 of 51
CFW PMD — WRMC Escalator Replacement (March 2024)
KONE Internal
Pav Estimates. With each partial payment estimate or payroll period, whichever is less, the Contractor shall submit a notarized
affidavit stating that the Contractor has complied with the requirements of Chapter 2258, Texas Government Code.
Postina of Waae Rates. The Contractor shall post the prevailing wage rates in a conspicuous place at the site of the project at all
times.
Subcontractor Compliance. The Contractor shall include in their subcontracts and/or shall otherwise require all of their subcontractors
to comply with paragraphs (a) through (g) above.
On projects where special wage rates apply (e.g. Davis-Bacon) the Contractor agrees to meet all requirements of such programs.
D-8 WARRANTY: The Contractor warrants to the Owner and the Architect that all materials and equipment furnished under
this Contract will be new unless otherwise specified, and that all work will be of good quality, free from faults and defects, and in
conformance with the Contract Documents. All work not so conforming to these standards may be considered defective. If required
by the Architect or the Owner, the Contractor shall furnish satisfactory evidence as to the kind and quality of materials and equipment.
Prior to occupancy of the Project by the Owner, the Contractor warranties and obligations to correct defective Work exclude remedy
for damage or defect caused by (i) abuse by the Owner's separate contractors, or (ii) modifications made by the Owner or the Owner's
separate contractors. After occupancy of the Project by the Owner, the Contractor warranties and obligations to correct defective Work
exclude remedy for damage or defect caused by (i) abuse, (ii) modifications not executed by the Contractor, (iii) improper or insufficient
maintenance, (iv) improper operation, (v) normal wear and tear, or (vi) normal usage.
The warranty provided in this Section shall be in addition to and not in limitation of any other warranty or remedy provided by law or
the Contract Documents.
D-9 TAXES: The Contractor is exempt from State Sales Tax on material incorporated into the finished construction, Excise and
Use Tax. Equipment and materials not consumed by or incorporated into the work are subject to State sales taxes under House Bill
11, enacted August 15, 1991.
D-10 LICENSES. NOTICES AND FEES: Contractor shall obtain all Permits, Licenses, Certificates, and Inspections, whether
permanent or temporary, required by law or these Contract Documents. City of Fort Worth Building and Trade Permit fees are waived.
Separate permits may be required for each work location. It is the responsibility of the contractor to ensure all permits are kept active
and do not expire. The contractor will be responsible for any reinstatement fees due to expired permits.
The Contractor shall give all Notices and comply with all Laws, Ordinances, Rules, Regulations and Orders of any public authority
bearing on the pertormance of the Work. If the Contractor observes or becomes aware that any of the Contract Documents are at
variance therewith in any respect, he shall promptly notify the Architect and Owner in writing and any necessary changes will be made.
If the Contractor pertorms any Work knowing that it is in violation of, or contrary to, any of such Laws, Statutes, Charter, Ordinances,
Orders or Directives, or Regulations without furnishing Notice to the Architect and Owner, the Contractor will assume full responsibility
therefore and bear all costs attributable thereto.
D-11 ALLOWANCES: The Contractor shall include in the Contract Sum all allowances stated in the Contract Documents. These
allowances shall cover the net cost of the materials and equipment delivered and unloaded at the site, and all applicable taxes. The
Contractor's handling costs on the site, labor, installation costs, overhead, profit and other expenses contemplated for the original
allowance shall be included in the Contractor Sum and not in the allowance. The Contractor shall cause the Work covered by these
allowances to be performed for such amounts and by such persons as the Owner may direct, but they will not be required to employ
persons against whom they make a reasonable objection. If the cost, when determined, is more than or less than the allowance, the
Contract Sum shall be adjusted accordingly by Change Orderwhich will include additional handling costs on the site, labor, installation
costs, field overhead, profit and other direct expenses resulting to the Contractor from any increase over the original allowance.
D-12 SUPERINTENDENT: The Contractor shall employ a competent superintendent and necessary assistants who shall be in
attendance at the Project site during the progress of the Work. The superintendent shall be satisfactory to the Owner. The
superintendent shall represent the Contractor and all communications given to the superintendent shall be binding as if given to the
Contractor. Important communications will be confirmed in writing. Other communications will be so confirmed on written request in
each case.
D-13 RESPONSIBILITIES FOR EMPLOYEES AND SUB-CONTRACTORS: The Contractor shall be responsible to the Owner
for the acts and omissions of all employees and all Sub-contractors, their agents and employees, and all other persons performing
any of the Work under a contract with the Contractor.
D-14 FAILURE TO COMMENCE WORK: Should the Contractor fail to begin the Work herein provided for within the time herein
fixed or to carry on and complete the same according to the true meaning of the intent and terms of said Plans, Specifications and
Contract Documents, then the Owner shall have the right to either demand the surety to take over the Work and complete same in
accordance with the Contract Documents or to take charge of and complete the Work in such a manner as it may deem proper, and
if, in the completion thereof, the cost to the said City shall exceed the contract price or prices set forth in the said plans and specifica-
tions made a part hereof, the Contractor and/or their Surety shall pay said City on demand in writing, setting forth and specifying an
itemized statement of the total cost thereof, said excess cost.
D-15 PROGRESS SCHEDULE: Contractor, immediately after execution of the contract, shall prepare and submit for the
ArchitecYs approval, an estimated progress schedule for the Work. The progress schedule shall be related to the entire Project. This
schedule shall indicate the dates for the starting and completion of the various states of construction and shall be revised as required
by the conditions of the Work, subject to the ArchitecYs approval. It shall also indicate the dates for submission and approval of shop
drawings and submittals as well as the delivery schedule for major pieces of equipment and/or materials.
General Conditions of the Contract for Construction Lump Sum Contract Page 31 of 51
CFW PMD — WRMC Escalator Replacement (March 2024)
KONE Internal
Progress Schedule shall be GANT style and include:
Base Line: Planned Start/Finish
Progress Schedule: Actual Start/Finish
Variance: Ahead+/Behind-
% of Completion
Total Float and Weather Days
Critical, Milestones and Commissioning
Inspections
Owner Activities and Owner Furnished/Contractor Installed
Contractor shall update the progress schedule monthly and submit to the Architect for approval with the Contractor's monthly progress
payment requests.
Contractor shall provide a two-week look-ahead schedule detailing actual work taking place during that period at all OAC meetings.
D-16 DRAWINGS AND SPECIFICATIONS AT THE SITE: The Contractor shall maintain at the site for the Owner one copy of
all Drawings, Specifications, Addenda, approved Shop Drawings, Change Orders, and other Changes and Amendments in good order
and marked to record all changes made during construction. These shall also be available to the Architect. The Drawings, clearly
marked to record all changes made during construction, shall be delivered to the Architect upon completion of the Work. The Architect
will prepare, and provide to the Owner, one complete set of reproducible record drawings of the Work.
D-17 SHOP DRAWINGS AND SAMPLES: Shop Drawings are drawings, diagrams, illustrations, schedules, perFormance charts,
brochures and other data which are prepared by the Contractor or any Subcontractor, manufacturer, supplier or distributor, and which
illustrate some portion of the Work. These may be provided in an electronic format if acceptable to the Architect.
Samples are physical examples furnished by the Contractor to illustrate materials, equipment or workmanship, and to establish
standards by which the Work will be judged. Three copies of all physical examples shall be provided.
The Contractor shall review, approve, and submit, with reasonable promptness and in orderly sequence so as to cause no delay in
the Work or in the work of any other contractor, normally within the first 90 days of the work, three copies of all shop Drawings and
Samples required by the Contract Documents or subsequently by the Architect as covered by changes or amendments. Shop
Drawings and Samples shall be properly identified as specified, or as the Architect may require. At the time of submission, the
Contractor shall inform the Architect in writing of any deviation in the Shop Drawings or Samples from the requirements of the Contract
Documents.
By approving and submitting Shop Drawings and Samples, the Contractor thereby represents that they have determined and verified
all field measurements, field construction criteria, materials, catalog numbers and similar data, and that they have checked and
coordinated each shop drawing given in the Contract Documents. The ArchitecYs approval of a separate item shall not indicate
approval of an assembly in which the item functions.
The Architect will review and approve Shop Drawings and Samples with reasonable promptness so as to cause no delay, but only for
conformance with the design concept of the Project and with the information given in the Contract Documents. The ArchitecYs approval
of a separate item shall not indicate approval of an assembly in which the item functions. The Contractor shall make any corrections
required by the Architect and shall resubmit the required number of corrected copies of Shop Drawings or new Samples until approved.
The Contractor shall direct specific attention in writing or on resubmitted Shop Drawings to revisions other than the corrections
requested by the Architect on previous submissions.
The ArchitecYs approval of Shop Drawings or Samples shall not relieve the Contractor of responsibility for any deviation from the
requirements of the Contract Documents unless the Contractor has informed the Architect in writing of such deviation at the time of
submission and the Architect has given written approval to the specific deviation. ArchitecYs approval shall not relieve the Contractor
from responsibility for errors or omissions in the Shop Drawings or Samples.
No portion of the Work requiring a Shop Drawing or Sample submission shall be commenced until the Architect has approved the
submittal. All such portions of the Work shall be in accordance with approved Shop Drawings and Samples. Payment for Shop
Drawings will not be made until they are approved by the Architect or City.
D-18 SITE USE: The Contractor shall confine operations at the site to areas permitted by law, ordinances, permits and the
Contract Documents and shall not unreasonably encumber the site with any materials or equipment. Until acceptance of the Work by
the City, the entire site of the Work shall be under the exclusive control, care and responsibility of the Contractor. Contractor shall take
every precaution against injury or damage to persons or property by the action of the elements or from any other cause whatsoever.
The Contractor shall rebuild, repair, restore and make good at their own expenses all injuries or damages to any portions of the Work
occasioned by any of the above, caused before acceptance.
D-19 CUTTING AND PATCHING OF WORK: The Contractor shall do all cutting, fitting or patching of their Work that may require
making several parts fit together properly, and shall not endanger any Work by cutting, excavating or otherwise altering the Work or
any part of it.
D-20 CLEAN UP: The Contractor at all times shall keep the premises free from accumulation of waste materials or rubbish. At
the completion of the Work the contractor shall remove all their waste materials and rubbish from and about the Project as well as all
their tools, construction equipment, machinery and surplus materials, and shall clean all glass surfaces and leave the Work "Broom-
clean" or equivalent, except at otherwise specified. In addition to removal of rubbish and leaving the buildings "broom-clean",
Contractor shall clean all glass, replace any broken glass, remove stains, spots, marks and dirt from decorated work, clean hardware,
remove paint spots and smears from all surfaces, clean fixtures and wash all concrete, tile and terrazzo floors.
General Conditions of the Contract for Construction Lump Sum Contract Page 32 of 51
CFW PMD — WRMC Escalator Replacement (March 2024)
KONE Internal
If the Contractor fails to clean up, the Owner may do so, and the cost thereof shall be charged to the Contractor.
D-21 COMMUNICATIONS: The Contractor shall copy the Owner on all communications to the Architect and copy Architect an
all communications to Owner.
D-22 CONTRACTOR REQUIREMENTS ON FEDERALLY FUNDED PROJECTS: Contractor shall observe and comply with the
requirements of the City of Fort Worth Fiscal Department, Intergovernmental Affairs and Grants Management as outlined in the
Supplemental Conditions contained in the Project Manual.
SECTION E
SUBCONTRACTORS
E-1 DEFINITION: A Subcontractor is a person or organization that has a direct contract with the Contractor to perform any of
the Work at the site. The term Subcontractor is referred to throughout the Contract Documents as if singular in number and masculine
in gender and means a Subcontractor or their authorized representative.
Nothing contained in the Contract, Documents shall create any contractual relation between the Owner and the Architect and any
subcontractor or any of their sub-subcontractors or materialmen.
E-2 AWARD OF SUBCONTRACTS: The Contractor shall furnish a list of the names of the subcontractors or other persons or
organizations (including those who are to furnish materials or equipment fabricated to a special design) proposed for such portions of
the Work as may be designated in the bidding requirements, or if none is so designated in the bidding requirements, the names of the
Subcontractors proposed for the principal portions of the Work. Prior to the award of the Contract, the Architect shall notify the
Contractor in writing if either the Owner or Architect, after due investigation, has reasonable objection to any person or organization
on such list. Failure of the Owner and Architect to make an objection to any person or organization on the list prior to the award of this
Contract shall not constitute acceptance of such person or organization.
The Contractor shall not make any substitution for any Subcontractor or person or organization that has been accepted by the Owner
and the Architect, unless the substitution is also acceptable to the Owner and the Architect.
E-3 TERMS OF SUBCONTRACTS: All work performed for the Contractor by a Subcontractor shall be pursuant to an
appropriate agreement between the Contractor and the Subcontractor (and where appropriate between Subcontractors and Sub-
subcontractors) which shall contain provisions that:
Preserve and protect the rights of the Owner and the Architect under the Contract with respect to the Work to be pertormed under the
subcontract so that the subcontracting thereof will not prejudice such rights;
Require that such Work be performed in accordance with the requirements of the Contract Documents;
Require submission to the Contractor of applications for payment under each subcontract to which the Contractor is a party, in
reasonable time to enable the Contractor to apply for payment;
Require that all claims for additional costs, extensions of time, damages for delays or otherwise with respect to subcontracted portions
of the Work shall be submitted to the Contractor (via any Subcontractor or Sub-subcontractor where appropriate) in the manner
provided in the Contract Documents for like claims by the Contractor upon the Owner;
Waive all rights the contracting parties may have against one another for damages caused by fire or other perils covered by the
property insurance, except such rights, if any, as they may have to proceeds of such insurance held by the Owner, and,
Obligate each Subcontractor specifically to consent to the provisions of this Section
All of the provisions set out in this section shall be deemed to have been included in every subcontract, and every subcontract shall
be so construed and applied as to the Owner and the Architect, whether or not such provisions are physically included in the sub-
contract.
E-4 PAYMENTS TO SUBCONTRACTORS: The Contractor shall pay each Subcontractor, upon receipt of payment from the
Owner, an amount equal to the percentage of completion allowed to the Contractor on account of such Subcontractor's Work. The
Contractor shall also require each Subcontractor to make similar payments to their subcontractors.
If the Owner refuses to issue a Certificate for Payment for any cause which is the fault of the Contractor and not the fault of a particular
subcontractor, the Contractor shall pay that Subcontractor on demand, made at any time after the Certificate for Payment would
otherwise have been issued, for their Work to the extent completed, less the retained percentage.
The Contractor shall pay each Subcontractor a just share of any insurance monies received by the Contractor, and they shall require
each Subcontractor to make similar payments to their Subcontractors.
The Owner may, on request and at their discretion, furnish to any Subcontractor, if practicable, information regarding percentages of
completion certified to the Contractor on account of Work done by such Subcontractors.
Neither the Owner nor the Architect shall have any obligation to pay or to see to the payment of any monies to any Subcontractor.
SECTION F
SEPARATE CONTRACTS
F-1 OWNER'S RIGHT: The Owner reserves the right to award separate contracts in connection with other portions of the Work.
When separate contracts are awarded for other portions of the Work, "the Contractor" in the Contract Documents in each case shall
be the contractor who signs each separate contract.
General Conditions of the Contract for Construction Lump Sum Contract Page 33 of 51
CFW PMD — WRMC Escalator Replacement (March 2024)
KONE Internal
F-2 MUTUAL RESPONSIBILITY OF CONTRACTORS: The Contractor shall afford other contractors reasonable opportunity
for the introduction and storage of their materials and equipment and the execution of their work, and shall properly connect and
coordinate work with theirs.
If any part of the Contractor's Work depends for proper execution or results upon the work of any other separate contractor, the
Contractor shall inspect and promptly report to the Owner any apparent discrepancies or defects in such work that render it unsuitable
for such proper execution and results. Failure of the Contractor to inspect and report shall constitute an acceptance of the other
contractor's work as fit and proper to receive their Work, except as to defects which may develop in the other separate contractor's
work after the execution of the Contractor's Work.
Should the Contractor cause damage to the work or property of any separate contractor on the site, the Contractor shall, upon due
notice, settle with such other contractor by agreement, if he will so settle. If such separate contractor sues the Owner on account of
any damage alleged to have been so sustained, the Owner shall notify the Contractor who shall defend against such suit at the
Contractor's expense, and if any judgment against the Owner arises therefrom, the Contractor shall pay or satisfy such judgment and
shall reimburse the Owner for all attorney's fees, court costs and expenses which the Owner has incurred in connection with such
suit.
F-3 CUTTING AND PATCHING UNDER SEPARATE CONTRACTS: The Contractor shall do all cutting, fitting or patching of
work that may be required to fit it to receive or be received by the work of other contractors shown in the Contract Documents. The
Contractor shall not endanger any work or any other contractors by cutting, excavating or otherwise altering any work and shall not
cut or alter the work of any other contractor except with the written consent of the Architect.
Any costs caused by defective or ill-timed work shall be borne by the party responsible therefor.
F-4 OWNER'S RIGHT TO CLEAN UP: If a dispute arises between the separate contractors as to their responsibility for cleaning
up, the Owner may clean up and charge the cost thereof to the several contractors as the Director of the Project Management
Department shall determine to be just.
SECTION G
MISCELLANEOUS PROVISIONS
G-1 CONFLICT OF LAWS: The Contractor and strictly comply with all Federal, State, County and City Laws, Statutes, Charter,
Ordinances, Regulations, or Directives controlling the action or operation of those engaged upon the work affecting the materials
used. He shall indemnify and save harmless the City and all of its officers and agents against any claim or liability arising from or
based on the violation of any such Laws, Statutes, Charter, Ordinances, Regulations, or Directives, whether by himself, his employees,
agents or subcontractors.
G-2 GOVERNING LAWS AND VENUE: It is mutually agreed and understood that this agreement is made and entered into by
the parties hereto with reference to the existing Charter and Ordinances of the City of Fort Worth and the laws of the State of Texas
with reference to and governing all matters affecting this Contract, and the Contractor agrees to fully comply with all the provisions of
the same. Venue for any cause of action arising out of this Contract shall lie exclusively in the state courts of Tarrant County, Texas
and contracts consents to such jurisdiction.
G-3 PERSONAL LIABILITY OF PUBLIC OFFICIALS: In performing their duties under the Statutes of the State of Texas and
the Charter and Ordinances of the City of Fort Worth in connection with this Contract, or in exercising any of the powers granted the
Owner herein, the officers, agents and employees of the City of Fort Worth are engaged in the performance of a governmental function
and shall not incur any personal liability by virtue of such performance hereunder, except for gross negligence or willful wrong.
G-4 COMPLIANCE WITH LAWS: Contractor agrees to comply with all laws, Federal, state and local, including all ordinances,
rules and regulations of the City of Fort Worth, Texas. Materials incorporated into the finished Project are not subject to State Sales
Tax.
The Architect is responsible for obtaining the Building Permit. The Contractor and the appropriate subcontractor are responsible for
obtaining all other construction permits from the governing agencies. Contractor shall schedule all code inspections with the Code
Inspection Division in accordance with the permit requirements. Building, plumbing, electrical and mechanical building permits are
issued without charge. Water and sewer tap, impact & access fees will be paid by the City. Any other permit fees are the responsibility
of the Contractor.
G-5 INDEMNIFICATION: Contractor covenants and agrees to indemnify City's engineer and architect, and their
personnel at the project site for Contractor's sole negligence. In addition, Contractor covenants and agrees to indemnify,
hold harmless and defend, at their own expense, the Owner, their officers, servants and employees, from and against any
and all claims or suits for property loss, property damage, personal injury, including death, arising out of, or alleged to arise
out of, the work and services to be performed hereunder by Contractor, their officers, agents, employees, subcontractors,
licensees or invitees, whether or not anv such iniurv. damaqe or death is caused. in whole or in part. bv the nealiaence or
alleqed nealiaence of Owner. their officers. servants. or emplovees. Contractor likewise covenants and agrees to indemnify
and hold harmless the Owner from and against any and all injuries to Owner's officers, servants and employees and any
damage, loss or destruction to property of the Owner arising from the performance of any of the terms and conditions of
th is Contract, whether or not anv such iniury or damaqe is caused in whole or in part bv the neqliqence or alleqed nepliqence
of Owner. their o�cers. servants or emplovees.
In the event Owner receives a written claim for damages against the Contractor or their subcontractors prior to final payment,
final payment shall not be made until Contractor either (a) submits to Owner satisfactory evidence that the claim has been
settled and/or a release from the claimant involved, or (b) provides Owner with a letter from Contractor's liability insurance
carrier that the claim has been referred to the insurance carrier.
General Conditions of the Contract for Construction Lump Sum Contract Page 34 of 51
CFW PMD — WRMC Escalator Replacement (March 2024)
KONE Internal
The Director may, if deemed appropriate, refuse to whom a claim for damages is outstanding as a result of work pertormed
under a City Contract.
G-6 SUCCESSORS AND ASSIGNS: Except as provided in Paragraph E-2, this contract shall be binding upon and insure to
the benefit of the parties hereto, their Successors or Assigns. Contractor shall not assign or sublet all or any part of this Contract or
their rights or duties hereunder without the prior written consent of the Owner. Any such purported assignment or subletting without
the prior written consent of Owner shall be void.
G-7 WRITTEN NOTICE: Written Notice shall be deemed to have been duly served if delivered in person to the individual or
member of the firm or to an officer of the corporation for whom it was intended, or if delivered at or sent by registered or certified mail
to the last business address known to them who gives the notice.
G-8 SURETY BONDS: Surety Bonds are required on all Owner contracts in excess of $25,000. Contractor agrees, on the
execution of the contract to make, execute and deliver to said City of Fort Worth good and sufficient surety bonds for the faithful
performance of the terms and stipulations of the Contract and for the payment to all claimants for labor and/or materials furnished in
the prosecution of the work, such bonds being as provided and required in Chapter 2253, Texas Government Code.
Bonds shall be made on the forms furnished by or otherwise acceptable to the Owner. Both the Contractor and the Surety Company
shall properly execute each bond.
If the total contract price is $25,000 or less, payment to the contractor shall be made in one lump sum. Payment shall not be made for
a period of 45 calendar days from the date the work has been completed and accepted by the Owner.
If the contract amount is in excess of $25,000, a Payment Bond shall be executed, in the amount of the contract, solely for the
protection of all claimants supplying labor and material in the prosecution of the work.
If the contract amount is in excess of $100,000, a Pertormance Bond shall be executed, in the amount of the contract conditioned on
the faithful performance of the work in accordance with the plans, specifications, and contract documents. Said bond shall solely be
for the protection of the City of Fort Worth.
In order for a surety to be acceptable to the Owner, the surety must (1) hold a certificate of authority from the United States secretary
of the treasury to qualify as a surety on obligations permitted or required under federal law; or (2) have obtained reinsurance for any
liability in excess of $100,000 from a reinsurer that is authorized and admitted as a reinsurer in the state of Texas and is the holder of
a certificate of authority from the United States secretary of the treasury to qualify as a surety on obligations permitted or required
under federal law. Satisfactory proof of any such reinsurance shall be provided to the Owner upon request. The Owner, in its sole
discretion, will determine the adequacy of the proof required herein.
No sureties will be accepted by the Owner that are at the time in default or delinquent on any bonds or which are interested in any
litigation against the Owner. Should any surety on the contract be determined unsatisfactory at any time by the Owner, notice will be
given to the Contractor to that effect and the Contractor shall immediately provide a new surety satisfactory to the Owner.
Until bonds are sent to the city and verified no Notice to Proceed will be issued.
G-9 OWNER'S RIGHT TO CARRY OUT THE WORK: If the Contractor defaults or neglects to carry out the Work in accordance
with the Contract Documents or fails to perform any provision of the Contract, the Owner may, without prejudice to any other remedy
they may have, enter the site and make good such deficiencies. In such case an appropriate Change Order shall be issued deducting
from the payments then or thereafter due the Contractor the cost of correcting such deficiencies, including the cost of the ArchitecYs
additional services made necessary by such default, neglect or failure. If the payments then or thereafter due the Contractor are not
sufficient to cover such amount, the Contract shall pay the difference to the Owner.
G-10 ROYALTIES AND PATENTS: The Contractor shall pay all royalties and license fees. they shall defend all suits or claims
for infringement of any patent rights and shall save the Owner harmless from loss on account thereof and shall be responsible for all
such loss when a particular design, process or the product of a particular manufacturer or manufacturers is specified; however, if the
Contractor has reason to believe that the design, process or product specified is an infringement of a patent, they shall be responsible
for such loss unless they promptly give such information to Owner.
G-11 TESTS: If the Contract Documents, Laws, Ordinances, Rules, Regulations or Orders of any public authority having
jurisdiction require any Work to be inspected, tested or approved, the Contractor shall give the Owner timely notice of their readiness
and the date arranged so the Architect may observe such inspection, testing or approval. The Owner shall bear all costs of such
inspection, tests and approvals unless otherwise provided.
If after the commencement of the Work, the Owner determines that any work requires special inspection, testing or approval not
included above, the Architect, upon written authorization from the Owner, will instruct the Contractor to order such special inspection,
testing or approval, and the Contractor shall give notice as required in the preceding paragraph. If such special inspection or testing
reveals a failure of the Work to comply (1) with the requirements of the Contract Documents or (2) with respect to the performance of
the Work, with Laws, Statutes, Charter, Ordinances, Regulations or Orders of any public authority having jurisdiction, the Contractor
shall bear all costs thereof, including the ArchitecYs additional services made necessary by such costs; otherwise the Owner shall
bear such costs, and an appropriate Change Order shall be issued.
The Contractor shall secure certificate of inspection, testing or approval, and three copies will be promptly delivered by them to the
Architect. The Architect will review the certificates and forward one copy of each with their recommendation(s) to the Owner and one
copy will be kept onsite for review by the Owner, Architect and AHJ. Contractor shall provide a graphic log documenting all testing
and inspection locations and dates.
General Conditions of the Contract for Construction Lump Sum Contract Page 35 of 51
CFW PMD — WRMC Escalator Replacement (March 2024)
KONE Internal
If the Owner wishes to observe the inspections, tests or approvals required by this Section, they will do so promptly and, where
practicable, at the source of supply.
Neither the observations of the Architect or the Owner in their administration of the Construction Contract, nor inspections, tests or
approvals by persons other than the Contractor shall relieve the Contractor from their obligations to pertorm the Work in accordance
with the Contract Documents.
G-12 INTERRUPTION OF EXISTING UTILITIES SERVICES: The Contractor shall pertorm the Work under this Contract with a
minimum of outage time for all utilities. Interruption shall be by approved sections of the utility. In some cases, the Contractor may be
required to pertorm the Work while the existing utility is in service. The existing utility service may be interrupted only when approved
by the Owner. When it is necessary to interrupt the existing utilities, the Contractor shall notify the Owner in writing at least ten days
in advance of the time that they desire the existing service to be interrupted. The interruption time shall be kept to a minimum.
Depending upon the activities at an existing facility that requires continuous service from the existing utility, an interruption may not
be subject to schedule at the time desired by the Contractor. In such cases, the interruption may have to be scheduled at a time of
minimum requirements of demand for the utility. The amount of time requested by the Contractor of existing utility services shall be
as approved by the Owner.
G-13 LAYING OUT WORK: The Contractor shall verify dimensions and elevations indicated in layout of existing work.
Discrepancies between Drawings, Specifications, and existing conditions shall be referred to the Architect for adjustment before work
affected is pertormed. Failure to make such notification shall place responsibility upon Contractor to carry out work in satisfactory
workmanlike manner at the Contractor's sole expense.
The Contractor shall be held responsible for the location and elevation of all the construction contemplated by the Construction
Documents. The contractor shall video document all under-slab work and provide such documentation to the City prior to slab
placement.
Prior to commencing work, the Contractor shall carefully compare and check all Architectural, Structural, Mechanical an Electrical
drawings; each with the other that in any affects the locations or elevation of the work to be executed, and should any discrepancy be
found, they shall immediately report the same to the Architect for verification and adjustment. Any duplication of work made necessary
by failure or neglect on their part to comply with this function shall be done at the Contractor's sole expense.
G-14 MEASUREMENTS: Before ordering any material or doing any work, the Contractor shall verify all measurements at the
site or at the building and shall be wholly responsible for the correctness of same. No extra charge or compensation will be allowed
on account of any difference between actual dimensions and dimensions indicated on the drawings. Any difference that may be found
shall be submitted to the Architect for consideration and adjustment before proceeding with the project.
G-15 EXISTING OVERHEAD OR UNDERGROUND WORK: The Contractor shall carefully check the site where the project is
to be erected and observe any existing overhead wires and equipment. Any such work shall be moved, replaced or protected, as
required, whether or not shown or specified at the Contractor's sole expense.
Attention is directed to the possible existence of pipe and other underground improvements that may or may not be shown on the
Drawings. All reasonable precautions shall be taken to preserve and protect any such improvements whether or not shown on the
Drawings.
Location of existing underground lines, shown on the Drawings are based on the best available sources, but are to be regarded as
approximate only. Exercise extreme care in locating and identifying these lines before excavation in adjacent areas.
G-16 ALIGNMENT OF JOINTS IN FINISH MATERIALS: It shall be the responsibility of the Contractor to make certain in the
installation of jointed floor, wall and ceiling materials that:
Preserve and protect the rights of the Owner and the Architect under the Contract with respect to the Work to be performed under the
subcontract so that the subcontracting thereof will not prejudice such rights;
Place joints to relate to all opening and breaks in the structure and be symmetrically placed wherever possible. This includes heating
registers, light fixtures, equipment, etc.
If because of the non-related sizes of the various materials and locations of openings, etc., it is not possible to accomplish the above,
the Contractor shall request the Architect to determine the most satisfactory arrangement. The Contractor shall establish centerlines
for all trades.
G-17 INTEGRATING EXISTING WORK: The Contractor shall protect all existing street and other improvements from damages.
Contractor's operations shall be confined to the immediate vicinity of the new work and shall not in any interfere with or obstruct the
ingress or egress to and from existing adjacent facilities.
Where new site work is to be connected to existing work, special care shall be exercised by the Contractor not to disturb or damage
the existing work more than necessary. All damaged work shall be replaced, repaired and restored to original condition at no cost to
the Owner.
G-18 HAZARDOUS MATERIAL CERTIFICATION: It is the intent of the contract documents, whether expressly stated or not,
that nothing containing hazardous materials, such as asbestos, shall be incorporated in to the project. The Contractor shall exercise
every reasonable precaution to ensure that asbestos-containing materials are not incorporated into any portion of the project, including
advising all materials suppliers and subcontractors of this requirement. The Contractor shall verify that components containing lead
do not contact the potable water supply.
G-19 LOCATION OF EQUIPMENT AND PIPING: Drawing showing location of equipment, piping, ductwork, etc. are
diagrammatic and job conditions may not always permit their installation in the location shown. When this situation occurs, it shall be
General Conditions of the Contract for Construction Lump Sum Contract Page 36 of 51
CFW PMD — WRMC Escalator Replacement (March 2024)
KONE Internal
brought to the ArchitecYs attention immediately and the relocation determined in a joint conference. The Contractor will be held
responsible for the relocating of any items without first obtaining the ArchitecYs approval. They shall remove and relocate such items
at their own expense if so directed by the Architect. Where possible; uniform margins shall be maintained between parallel lines and/or
adjacent wall, floor or ceiling surfaces.
G-20 OVERLOADING: The Contractor shall be responsible for loading of any part or parts of structures beyond their safe carrying
capacities by placing of materials, equipment, tools, machinery or any other item thereon. No loads shall be placed on floors or roofs
before they have attained their permanent and safe strength.
G-21 MANUFACTURER'S INSTRUCTIONS: Where it is required in the Specifications that materials, products, processes,
equipment, or the like be installed or applied in accordance with manufacturer's instructions, direction or specifications, or words to
this effect, it shall be construed to mean that said application or installation shall be in strict accordance with printed instructions
furnished by the manufacturer of the material concerned for use under conditions similar or those at the job site. Six copies of such
instructions shall be furnished to the Architect and their approval thereof obtained before work is begun.
G-22 CLEANING UP: The Contractor shall keep the premises free from accumulation of waste material or rubbish caused by
employees or as a result of the Work.
At completion of work, the General Contractor shall, immediately prior to final inspection of complete building, execute the following
final cleaning work with trained janitorial personnel and with material methods recommended by the manufactures of installed
materials.
1. Sweep and buff resilient floors and base, and vacuum carpeting.
2. Dust all metal and wood trim and similar finished materials.
3. Clean all cabinets and casework.
4. Dust all ceilings and walls.
5. Dust, and if necessary wash, all plumbing and electrical fixtures.
6. Wash all glass and similar non-resilient materials.
7. All hardware and other unpainted metals shall be cleaned and polished and all equipment and paint or decorated work shall be
cleaned and touched-up if necessary, and all temporary labels, tags, and paper coverings removed throughout the buildings.
Surtaces that are waxed shall be polished.
8. The exterior of the building, the grounds, approaches, equipment, sidewalks, streets, etc. shall be cleaned similar to interior of
buildings and left in good order at the time of final acceptance. All paint surtaces shall be clean and unbroken, hardware shall
be clean and polished, all required repair work shall be completed and dirt areas shall be scraped and cleared of weed growth.
9. Clean all glass surfaces and mirrors of putty, paint materials, etc., without scratching or injuring the glass and leave the work
bright, clean and polished. Cost of this cleaning work shall be borne by Contractor.
10. Cleaning, polishing, scaling, waxing and all other finish operations indicated on the Drawings or required in the Specifications
shall be taken to indicate the required condition at the time of acceptance of all work under the Contract.
11. Burning: Burning of rubbish on the premises will not be permitted.
G-23 DUST CONTROL: Precaution shall be exercised at all times to control dust created as a result of any operations during
the construction period. If serious problems or complaints arise due to air-borne dust, or when directed by the Architect, operations
causing such problems shall be temporarily discontinued and necessary steps taken to control the dust.
G-24 FIRE PROTECTION: The Contractor shall at all times maintain good housekeeping practices to reduce the risk of fire
damage or injury to workmen. All scrap materials, rubbish and trash shall be removed daily from in and about the building and shall
not be permitted to be scattered on adjacent property.
Suitable storage space shall be provided outside the immediate building area for storing flammable materials and paints; no storage
will be permitted in the building. Excess flammable liquids being used inside the building shall be kept in closed metal container and
removed from the building during unused periods.
A fire extinguisher shall be available at each location where cutting or welding is being performed. Where electric or gas welding or
cutting work is done, interposed shields of incombustible material shall be used to protect against fire damage due to sparks and hot
metal. When temporary heating devices are used, a watchman shall be present to cover periods when other workmen are not on the
premises.
The Contractor shall provide fire extinguishers in accordance with the recommendations and NFPA Bulletins Nos. 10 and 241.
However, in all cases a minimum of two fire extinguishers shall be available for each floor of construction.
G-25 CUTTING AND PATCHING: Wherever cutting and removal of portions of the existing work is indicated, such work shall be
neatly sawed or cut by Contractor in a manner that will produce a neat straight line, parallel to adjacent surfaces or plumb for vertical
surfaces. Care should be exercised not to damage any work that is to remain.
At no time shall any structural members be cut without written consent from the Architect.
General Conditions of the Contract for Construction Lump Sum Contract Page 37 of 51
CFW PMD — WRMC Escalator Replacement (March 2024)
KONE Internal
G-26 PROJECT CLOSEOUT: Electronic submission of Close Out documentation must be submitted 30 days prior to substantial
completion for review and approval of Architect and Owner.
Final Inspection, Record Drawinqs: Attention is called to General Conditions Section entitled, "Substantial Completion and Final
PaymenY'.
Maintenance Manual: Sheets shall be 8'/z' x 11", except pull out sheets may be neatly folded to 8 Yz "x 11". Manuals shall be bound
in plastic covered, 3 ring, loose leaf binder with title of project lettered on front and shall contain:
1) Name, address and trade of all sub-contractors.
2) Complete maintenance instructions; name, address, and telephone number of installing Contractor, manufacturer's local
representative, for each piece of operative equipment.
3) Catalog data on plumbing fixtures, valves, water heaters, heating and cooling equipment, temperature control, fan, electrical
panels, service entrance equipment and light fixtures.
4) Manufacturer's name, type, color designation for resilient floors, windows, doors, concrete block, paint, roofing, and other
materials.
5) Provide complete copies of ALL APPROVED product and material submittals.
Submit two digital electronic copies and one hard copy of Maintenance Manuals, prior to request for final payment including any video
documentation of work recorded over the duration of the project.
Commissioning and Test and Balance Reports (Final)
Operational Inspection and Maintenance Instruction: The Contractor shall provide at their expense, competent manufacturer's
representatives to completely check out all mechanical and electrical systems and items covered by the Drawings and Specifications.
This requirement shall be scheduled just prior to and during the initial start-up. After all systems are functioning properly the
representatives shall instruct maintenance personnel of the Owner in the proper operation and maintenance of each item.
G-27 GUARANTEE AND EXTENDED GUARANTEE: Upon completion of the Project, prior to final payment, guarantees
required by technical divisions of Specifications shall be properly executed in quadruplicate by subcontractors and submitted through
the Contractor to Architect. Delivery of guarantees shall not relieve Contractor from any obligation assumed under Contract.
The Contractor shall guarantee the entire Project for one year. In addition, where separate guarantees, for certain portions of work,
are for longer periods, General Contractor's guarantee shall be extended to cover such longer periods. Manufacturer's extended
warrantees shall be included in this contract.
Guarantees shall become valid and operative and commence upon issuance of Certificate of Inspection and Acceptance by Owner.
Guarantees shall not apply to work where damage is result of abuse, neglect by Owner or their successor(s) in interest.
The Contractor agrees to warrant their work and materials provided in accordance with this contract and the terms of the Technical
Specifications contained herein. Unless supplemented by the Technical Specifications or the manufacturer's normal extended
warrantees, the Contractor shall warrant all work materials, and equipment against defects for a period of one year from the date of
final acceptance. The Contractor further agrees to bear all costs of making good all work that is found to be defective or not provided
in accordance with the Contract Documents. Additionally, if the facility or contents are damaged due to defective materials or
workmanship of the Contractor, the Contractor further agrees to bear all cost of repairing and/or replacing damaged items and
components to bring such items back to at least their original condition.
G-28 RECORD DRAWINGS: Upon completion of the Work and prior to application for final payment, one print of each of the
drawings accompanying this specification shall be neatly and clearly marked in red by the Contractor to show variations between the
construction actually provided and that indicated or specified in the Contract Documents. The annotated documents shall be delivered
to Architect. Where a choice of materials and/or methods is permitted herein and where variations in the scope or character of the
work from the entire work indicated or specified are permitted either by award of bidding items specified for that purpose, or by
subsequent change to the drawings, the record drawings shall define the construction actually provided. The representation of such
variations shall conform to standard drafting practice and shall include supplementary notes, legends and details which may be
necessary for legibility and clear portrayal of the actual construction. The record drawings shall indicate, in addition, the actual location
of all sub-surface utility lines, average depth below the surface and other appurtenances. All diagrammatic designs shall be indicated
with the actual locations on the plans.
G-29 CONSTRUCTION FENCE: The Contractor shall provide a substantial chain-link construction fence around all or a part of
the site. The fences and gates must be maintained throughout the construction period. Remove the fences and gates upon completion
of the Project and restore the site to the required original or contract condition.
G-30 PRODUCT DELIVERY, STORAGE, HANDLING: The Contractor shall handle, store and protect materials and products,
including fabricated components, by methods and means which will prevent damage, deterioration and loss, including theft (and
resulting delays), thereby ensuring highest quality results as the work progresses. Control delivery schedules so as to minimize
unnecessary long-term storage at project site prior to installation.
G-31 REMOVAL OF SALVAGED MATERIAL: The Contractor shall remove salvaged material and equipment from the Project
site and dispose of it in accordance with the law. Equipment or material identified in the Specifications or Plans for Owner salvage
shall be carefully removed and delivered to the Owner at any location in within the City limits as directed by the City.
G-32 MANUFACTURER'S REFERENCE: Catalog, brand names, and manufacturer's references are descriptive, not restrictive.
Bids on brands of like nature and quality will be considered. Contractor shall inform the City of any substitutions intended for the
project within 5 business days of bid opening. Failure to inform the City of substitute projects will obligate the Contractor to provide
the specified material if awarded the contract. Within 14 days after bid opening and upon request of the Contractor, the Contractor
General Conditions of the Contract for Construction Lump Sum Contract Page 38 of 51
CFW PMD — WRMC Escalator Replacement (March 2024)
KONE Internal
will submit a full-sized sample and/or detailed information as required to allow the architect to determine the acceptability of proposed
substitutions. Where equipment has been listed as "no substitute accepted"; the City will accept no alternates to the specified
equipment.
SECTION H
CONTRACT TIME
H-1 DEFINITIONS
The Contract Time is the period of time allotted in the Contract Documents for completion of the Work and is the number of calendar
days elapsing between the date of commencement and the date of Substantial Completion plus additional days assessed for failure
to complete punch list items from the Final Inspection in a timely manner and additional weather days beyond what is allotted in the
contract.
The Date of Commencement of the Work is the date established in the Notice to Proceed. If there is no notice to proceed, it shall be
the date of the Agreement or such other date as may be established therein.
The Date of Substantial Completion of the Work or designated portion thereof is the Date certified by the Architect with the approval
of the Owner that construction is sufficiently complete, in accordance with the Contract Documents, so the Owner may occupy the
Work or designated portion thereof for the use for which it is intended. Final acceptance of the completed work or any portion thereof
can be made only by the Owner, and no other form of acceptance will be binding upon the Owner.
A Calendar Dav constitutes 24 hours of time and is any one of the seven days of a week, including Sunday, regardless of whether a
"Working Day" or not, and regardless of weather conditions or any situation which might delay construction. An extension of contract
time shall be in accordance with this Section. Extensions of time will be as recommended by the Architect with final approval by City
of Fort Worth.
A Workina Dav is defined as a calendar day, not including Saturdays, Sundays, and legal holidays, in which weather or other conditions
not under the control of the Contractor permit the pertormance of work for a continuous period of not less than seven hours between
7:00 a.m. and 6:00 p.m. However, nothing in these Contract Documents shall be construed as prohibiting the Contractor from working
on Saturdays if he so desires. Should the Contractor choose to work on Saturdays, one day will be charged as contract-working time
when weather or other conditions permit seven hours of work as delineated above. Legal holidays are defined as being New Year's
Day, Martin Luther King Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Thanksgiving Day, the day after
Thanksgiving, and Christmas Day. If Juneteenth, Independence Day, Christmas Day or New Year's Day falls on a Saturday, the
preceding Friday is a legal holiday. If Juneteenth, Independence Day, Christmas Day or New Year's Day falls on a Sunday, the
following Monday will be a legal holiday.
H-2 PROGRESS AND COMPLETION: All the time limits stated in the Contract Documents are of essence to the Contract. The
Contractor shall begin the Work on the date of commencement as defined in this Section. He shall carry the Work forward expeditiously
with adequate forces and shall complete it within the Contract Time.
H-3 CONSTRUCTION WORK: Noise created by construction work within three hundred (300) feet of an occupied residential
structure involving the erection, excavation, demolition, alteration, or repair of any building, structure, or flatwork is prohibited as
fol lows:
Before 7:00 a.m. or after 8:00 p.m. Monday-Friday
Before 9:00 a.m. or after 8:00 p.m. Saturday-Sunday
H-4 DELAYS AND EXTENSIONS OF TIME: If the Contractor is delayed at any time in the progress of the Work by any act or
neglect of the Owner or the Architect, or by any employee of the Owner, or by any separate contractor employed by the Owner, or by
changes ordered in the Work, or by labor disputes, fire, unusual delay in transportation, unavoidable casualties or any causes beyond
the Contractor's control, or by any cause which the Architect determines may justify the delay, then the contract time may be extended
by Change Order for such reasonable time as recommended by the Architect and approved by the Owner. When the Contractor is
delayed due to abnormal weather conditions, the Fort Worth Weather Table provided in these Contract Documents shall be used as
the basis for providing a fair and equitable adjustment of the contract time.
All claims for extension of time shall be made in writing to the Architect no more than fifteen days after the occurrence of the delay;
otherwise they shall be waived.
If no schedule or agreement is made stating the dates upon which written interpretations shall be furnished, then no claim for delay
shall be allowed on account of failure to furnish such interpretation until fifteen days after demand is made for them, and not then
unless such a claim is reasonable.
H-5 WEATHER: The Fort Worth Weather Table is to be used as a basis for calculation of excess rain or weather days for
projects with duration in calendar days. If the site records indicate that the Contractor was unable to carry out operations due to
weather, it is counted as a weather day. If the number of weather days exceeds the number of average rain days plus the snow/ice-
pellet days for the contract duration, the contract period will be adjusted by Change Order.
H-6 NO DAMAGE FOR DELAY: Notwithstanding anything to the contrary contained herein, the Contractor shall never be
entitled to any compensation or damages for delay of any nature. In that regard, the Contractor shall receive no compensation for
delays or hindrances to the work, as a result of price escalation in the marketplace, labor, material shortages or to increases in the
GMP. When such extra compensation is claimed a written statement thereof shall be presented by the Contractor to the Architect
and if found to be correct shall be approved and referred by him to the Council for final approval or disapproval; and the action thereon
by the Council shall be final and binding. If delay is caused by specific orders given by the Architect or Owner to stop work, or by the
General Conditions of the Contract for Construction Lump Sum Contract Page 39 of 51
CFW PMD — WRMC Escalator Replacement (March 2024)
KONE Internal
performance of extra work, or by the failure of the Owner to provide material or necessary instructions for carrying on the work, then
such delay will entitle the Contractor to an equivalent extension of time, his application for which shall, however, be subject to the
approval of the Owner and no such extension of time shall release the Contractor or the surety on its pertormance bond from all his
obligations here under which shall remain in full force until the discharge of the contract.
SECTION I
PAYMENTS AND COMPLETION
I-1 CONTRACT SUM: The Contract Sum is stated in the contract and is the total amount payable by the Owner to the
Contractor for the performance of the Work under the Contract Documents.
I-2 SCHEDULE OF VALUES: Before the first Application for Payment, the Contractor shall submit to the Architect and owner
a Schedule of Values of the various portions of the Work broken out by labor and materials, including quantities if required by the
Architect, aggregating the total Contract Sum, divided so as to facilitate payments to Sub-contractors, prepared in such form as
specified or as the Architect and the Contractor may agree upon, and supported by such data to substantiate correctness as the
Architect may require. Each item in the Schedule of Values shall include proper share of overhead and profit. This Schedule, when
approved by the Architect and the Owner, shall be used as a basis for the Contractor's Applications for Payment.
I-3 PROGRESS PAYMENTS: On the first day of each month after the first month's work has been completed, the Contractor
will make current estimates in writing for review by the Architect and Owner of materials in place complete and the amount of work
pertormed during the preceding month or period and the value thereof at the prices contracted for as shown on the approved Schedule
of Values and Progress Schedule.
If payments are to be made on account of materials or equipment not incorporated in the Work but delivered and suitably stored at
the site such payments shall be conditioned upon submission by the Contractor of bills of sale or such other procedures satisfactory
to the Owner to establish the Owner's title to such materials or equipment or otherwise protect the Owner's interest including applicable
insurance and transportation to the site.
Contractor warrants and guarantees that title to all Work, materials and equipment covered by an Application for Payment, whether
incorporated into the Project or not, will pass to the Owner upon the receipt of such payment by the Contractor, free and clear of all
liens, claims, security interests or encumbrances hereinafter referred to as "liens"; and that no Work, materials or equipment covered
by an Application for Payment will have been acquired by the Contractor, or by any other persons pertorming the Work at the site or
furnishing materials and equipment for the Work, subject to an agreement under which an interest therein or an encumbrance thereon
is retained by the seller or otherwise imposed by the Contractor or such other person. Contractor shall provide access to the red-lined
drawings for that period for approval by Owner.
The Contractor shall prepare each application for payment on AIA Document G702, "Application and Certificate for PaymenY', and
attached thereto AIA Document G703, "Continuation SheeY', to indicate the progress made to date and the period or month for which
payment is requested for each Item listed in the Schedule of Values. A copy of the revised monthly work progress schedule must be
attached before the pay request can be accepted.
I-4 CERTIFICATES FOR PAYMENT: If the Contractor has made Application for Payment as above, the Architect will, with
reasonable promptness but not more than seven days after the receipt of the Application, prepare a Certificate of Payment, with a
copy to the Contractor, for such amount determined to be properly due, or state in writing reasons for withholding a Certificate.
The issuance of a Certificate for Payment will constitute a representation by the Owner, based on the ArchitecYs observations at the
site and the data comprising the Application for Payment, that the Work has progressed to the point indicated; that the quality of the
Work is in accordance with the Contract Documents (subject to an evaluation of the Work as a functioning whole upon Substantial
Completion, to the results of any subsequent tests required by the Contract Documents, to minor deviations from the Contract
Documents correctable prior to completion, and to any specific qualifications stated in the Certificate); and recommendations to the
Owner that the Contractor be paid in the amount certified. In addition, the ArchitecYs approval of final payment assures the Owner
that the conditions precedent to the Contractor's being entitled to final payment as set forth in this Section have been fulfilled.
After the Architect has issued a Certificate for Payment, the Owner shall approve or disapprove same within ten days after it has been
delivered to the Owner. For contracts less than $400,000, Owner shall pay 90% of the approved estimate to the Contractor within
seven days after approval, and the remaining 10% of each such estimate will be retained by the Owner until Substantial Completion.
For contracts in excess of $400,000, the Owner will retain only 5% of each estimate until Substantial Completion.
No Certificate for a progress payment, nor any progress payment, nor any partial or entire use or occupancy of the Project by the
Owner, shall constitute an acceptance of any Work not in accordance with the Contract Documents, or relieve the Contractor of liability
in respect to any warranties or responsibility for faulty materials or workmanship. The Contractor shall promptly remedy any defects
in the Work and pay for any damage to other work resulting therefrom that shall appear within a period of one year from the date of
final acceptance of the Work unless a longer period is specified.
I-5 PAYMENTS WITHHELD: The Architect may decline to approve an Application for Payment and may withhold the
Certificate in whole or in part if in their opinion they are unable to make the representations to the Owner as provided in this Section.
The Architect may also decline to approve any Applications for Payment or, because of subsequently discovered evidence or
subsequent inspections, may nullify the whole or any part of any Certificate for Payment previously issued to such extent as may be
necessary in their opinion to protect the Owner from loss because of:
1) Defective work not remedied;
2) Claims filed or reasonable evidence indicating probable filing of claims;
3) Failure of the Contractor to make payments properly to Subcontractors, or for labor, materials or equipment;
General Conditions of the Contract for Construction Lump Sum Contract Page 40 of 51
CFW PMD — WRMC Escalator Replacement (March 2024)
KONE Internal
4) Reasonable doubt that the Work can be completed for the unpaid balance of the Contract Sum;
5) Damage to another contractor;
6) Reasonable indication that the Work will not be completed within the Contract Time; or
7) Unsatisfactory prosecution of the Work by the Contractor.
When such grounds for the refusal of payment are removed, payment shall be made for amounts withheld because of them, without
payment of interest. The Owner reserves the right to withhold the payment of any monthly estimate, without payment of interest, if the
Contractor fails to pertorm the Work in accordance with the specifications or instructions of the Architect.
I-6 LIQUIDATED DAMAGES: The parties agree and acknowledge that actual damages are uncertain and difficult to ascertain
because the Project relates to construction for a municipality. Normal damages of lost rent or profit are not applicable in this
circumstance because the City is a municipality and the Project will not receive rent and the City will not have lost profits. Therefore,
the parties agree that because City's actual damages are too difficult to ascertain that the liquidated damages stated below are
reasonable and a correct representation of actual damages to the City. The parties also agree that the liquidated damages called for
in this contract are not a penalty but an agreed upon damages calculation by two sophisticated parties. The deduction for liquidated
damages shall be as follows:
Amount of Contract Liquidated Damages per Day
$15,000 or less $45
$15,001 to $25,000 $63
$25,001 to $50,000 $105
$50,001 to $100,000 $154
$100,000 to $500,000 $210
$500,001to $1,000,000 $315
$1,000,001 to $2,000,000 $420
$2,000,001 to $5,000,000 $630
$5,000,001 to $10,000,000 $840
Over $10,000,000 $980
I-7 FAILURE OF PAYMENT: If, without fault on the part of the Contractor, the Architect should fail to issue any Certificate for
Payment within seven days after receipt of the Contractor's Application for Payment, if the Contractor's Application for Payment, or if,
without fault on the part of the Contractor, the Owner should fail to approve such estimate or to pay to the Contractor 90% or 95% (as
applicable) of the amount thereof within the period of time specified, then the Contractor may, upon seven (7) days additional written
notice to the Owner and to the Architect, stop the Work until payment of the amount owing has been received.
I-8 SUBSTANTIAL COMPLETION AND FINAL PAYMENT: Prior to the request for final payment, the Contractor must meet
all provisions for Project Closeout.
When the Contractor determines that the Work is substantially complete, the Contractor will prepare a"Preliminary Punch LisY' and
then the City shall inspect the project with the Contractor. The Contractor will provide an updated punch list weekly, to be sent to the
Owner. The punch list will include the Contractor's initials by each item that is closed. This process will continue at all subsequent
OAC meetings until 100% completion of the punch list items are confirmed by the A/E and Contractor in writing, along with the project
specific Attic Stock List. Final PMD's Construction Inspector's written confirmation is mandatory.
When the Architect, on the basis of a subsequent inspection, determines that the Work is substantially complete, they then will prepare
a Certificate of Substantial Completion (G704) which, when approved by the Owner, shall allow the Contractor to request and obtain
a Certificate of Occupancy which will establish the Date of Substantial Completion. The Certificate of Substantial Completion shall
state the responsibilities of the Owner and the Contractor for maintenance, heat, utilities, and insurance, shall set forth the remaining
work as a"final punch IisY'. The Contractor shall complete the remaining work listed therein within 30 calendar days. When the
Certificate of Occupancy has been issued, the retainage may be reduced to 4%.
Upon completion of the work listed on the final punch list to the satisfaction of the City of Fort Worth, the retainage may be reduced to
2.5%.
Should the Contractor fail to complete all contractual requirements of the contract, including submittals and final pay request within
the fixed time, the contract time will again commence. Should the Contractor fail to complete the work within the contract duration,
liquidated damages will be assessed
Upon receipt of written notice that the Work is ready for final inspection, the City will conduct a joint inspection and certify completion
of the final punch list by cosigning it with the Contractor.
The Contractor shall submit the following items to the City prior to requesting final payment:
1) Contractor's Affidavit of Payment of Debts and Claims (G706) stating that all payrolls, bills for materials and equipment, and
other indebtedness connected with the Work for which the Owner or their property might in any way be responsible, have been
paid or otherwise satisfied,
2) Consent of Surety to Final Payment (G707), if any, to final payment,
3) Contractor's Affidavit of Release of Liens (G706A), and,
4) Other data establishing payment or satisfaction of all such obligations, such as receipts, releases, and waivers of liens arising
out of the Contract, to the extent and in such form as may be designated by the Owner.
5) Contractor's Warranty
General Conditions of the Contract for Construction Lump Sum Contract Page 41 of 51
CFW PMD — WRMC Escalator Replacement (March 2024)
KONE Internal
6) Statement that all outstanding work has been completed
7) Issuance of the Final Certificate of Substantial Completion
8) Final acceptance by the City of Fort Worth.
If any Subcontractor, materialman or laborer refuses to furnish a Contractor's Affidavit of Release of Liens, the Contractor may, at the
election of the Owner, furnish a bond satisfactory to the Owner to indemnify them against any right, claim or lien which might be
asserted by such Subcontractor, materialman or laborer. If any such right, claim or lien remains unsatisfied after all payments are
made. The Contractor shall refund to the Owner all monies that the latter may be compelled to pay to discharging such right, claim or
lien, including all costs and reasonable attorney's fees.
The Contractor may then request final payment. The acceptance of final payment shall constitute a waiver of all claims by the
Contractor except those previously made in writing and still unsettled.
The Contractor's one-year warranty will commence upon Substantial Completion of the Project. Trees will be warranted for a period
of two-years per City ordinance. All landscaping and irrigation shall be cared for and maintained by the contractor for 1 year from the
date of substantial completion. This includes but not limited to grass/turt, trees, shrubs, and plant beds. Prior to the expiration of the
one-year warranty there will be a walk through attended by the Owner, Architect, and Contractor to identify any items that need to be
addressed. These items will be agreed upon by all parties and the contractor will complete the work within 30 days.
The designated representative of the City of Fort Worth will make final acceptance and no other form of acceptance will be binding
upon the Owner.
I-9 FINAL PAYMENT FOR UN-BONDED PROJECTS: Final payment will not be made for a period of 30 calendar days and
until all requirements have been met, with the exception of Consent of Surety for Final Payment.
SECTION J
PROTECTION OF PERSONS AND PROPERTY
J-1 SAFETY PRECAUTIONS AND PROGRAMS: The Contractor shall be responsible for initiating, maintaining and
supervising all safety precautions and programs in connection with the Work. The Contractor shall designate a responsible member
of their organization at the site whose duty shall be the prevention of accidents. This person shall be the Contractor's superintendent
unless otherwise designated in writing by the Contractor to the Architect.
J-2 SAFETY OF PERSONS AND PROPERTY: The Contractor shall take all reasonable precautions for the safety of, and shall
provide all reasonable protection to prevent damage, injury or loss to:
(1) All employees on the Work and all other persons who may be affected thereby;
(2) All the Work and all materials and equipment to be incorporated therein, whether in storage on or-off the site, under the care,
custody or control of the Contractor or any of their Subcontractors or Sub-contractors; and
(3) Other property at the site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures and utilities
not designated for removal, relocation or replacement in the course of construction.
Until acceptance of the Work, it shall be under the charge and care of the Contractor, and they shall take every precaution against
injury or damage to the Work by the action of the elements or from any other cause whatsoever, whether arising from the execution
or from the non-execution of the Work. The Contractor shall rebuild, repair, restore and make good, at his own expense, all injuries or
damages to any portion of the Work occasioned by any of the above, caused before completion and acceptance.
The Contractor shall comply with all applicable Laws, Ordinances, Rules, Regulations and Orders of any public authority having
jurisdiction for the safety of persons or property or to protect them from damage, injury or loss. They shall erect and maintain, as
required by existing conditions and progress of the Work, all reasonable safeguards for safety and protection, including posting danger
signs and other warnings against hazards, promulgating safety regulations and notifying owners and users of adjacent utilities.
When the use or storage of explosives or other hazardous materials or equipment is necessary for the execution of the Work, the
Contractor shall exercise the utmost care and shall carry on such activities under the supervision of properly qualified personnel.
All damage or loss to any property referred to in the preceding paragraphs caused in whole or in part by the Contractor, any
Subcontractor, or anyone directly or indirectly employed by any of them, or by anyone for whose acts any of them may be liable, shall
be remedied by the Contractor, including damage or loss attributable to faulty Drawings or Specifications and acts or omissions of the
Architect or anyone employed by them or for whose acts they may be liable, and not attributable to the fault or negligence of the
Contractor or anyone claiming through the Contractor for such damage or loss.
The Contractor shall not load or permit any part of the Work to be loaded so as to endanger safety.
J-3 HARD HATS: Hard Hats will be required at all construction sites included in this Contract from start to completion of work.
Each Contractor, employee and visitor at any construction site included in the Contract will be required to wear a hard hat. The
Contractor shall enforce the wearing of hard hats by Contractor, employees and visitors. Contractor shall provide hard hats for use by
the consulting Architects and Engineers and visitors.
J-4 EMERGENCIES: In any emergency affecting the safety of persons or property, the Contractor shall act at their discretion
to prevent threatened damage, injury or loss. Any additional compensation or extension of time claimed by the Contractor on account
of emergency work shall be determined as provided in Changes in the Work.
General Conditions of the Contract for Construction Lump Sum Contract Page 42 of 51
CFW PMD — WRMC Escalator Replacement (March 2024)
KONE Internal
J-5 SAFE WORK PRACTICES: The Contractor shall employ safe practices in handling materials and equipment used in
pertorming required work so as to insure the safety of their workmen, City employees and the public. The Contractor shall keep the
premise free at all times from accumulation of waste materials or rubbish. At the completion of the work, the Contractor shall remove
all their wastes and rubbish from and about the work area, as well as their tools, equipment and surplus materials and shall leave the
area as clean and free of spot, stains, etc., as before the work was undertaken.
J-6 TRENCH SAFETY: The Contractor shall be responsible for all design and implementation of trench shoring and
stabilization to meet regulatory requirements. If the Cooperative Agreement requires, the Contractor shall include a per-unit cost for
trench safety measures in their bid. If not included in the Cooperative Agreement, the Contractor shall include a cost for trench safety
measures for all trenches over 5 feet in depth in their Schedule of Values.
SECTION K - INSURANCE
K-1 INSURANCE REQUIRED: The Contractor shall not commence work under this Contract until they have obtained all
insurance required under this Section and such insurance has been approved by the City of Fort Worth, nor shall the Contractor allow
any Subcontractor to commence work to be pertormed under this Contract until all similar insurance of the Subcontractor has been
so obtained and approved. The City of Fort Worth will be listed as an "additional insured" on all policies except Worker's
Compensation.
K-2 WORKERS' COMPENSATION INSURANCE
1) General:
a) Contractor's Worker's Compensation Insurance. Contractor agrees to provide to the Owner (City) a certificate showing that
it has obtained a policy of workers compensation insurance covering each of their employees employed on the project in
compliance with state law. No Notice to Proceed will be issued until the Contractor has complied with this section.
b) Subcontractor's Worker's Compensation Insurance. Contractor agrees to require each and every subcontractor who will
pertorm work on the project to provide to it a certificate from such subcontractor stating that the subcontractor has a policy
of workers compensation insurance covering each employee employed on the project. Contractor will not permit any
subcontractor to perform work on the project until such certificate has been acquired. Contractor shall provide a copy of all
such certificates to the Owner (City).
c) By signing this Contract or providing or causing to be provided a certificate of coverage, the Contractor is representing to
the City that all employees of the Contractor who will provide services on the project will be covered by worker's
compensation coverage for the duration of the project, that the coverage will be based on proper reporting of classification
codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the
case of a self-insured, with the Texas Worker's Compensation Commission's Division of Self-Insurance Regulation.
Providing false or misleading information may subject the Contractor to administrative penalties, criminal penalties, civil
penalties or other civil actions.
d) The Contractor's failure to comply with any of these provisions is a breach of contract by the Contractor which entitles the
City to declare the contract void if the Contractor does not remedy the breach within ten days after receipt of notice of breach
from the City.
2) Definitions:
a) Certificate of Coverage ("certificate"). A copy of a certificate of insurance, a certificate of authority to self-insure issued by
the Texas Workers' Compensation Commission, or a coverage agreement (TWCC-81, TWCC-82, TWCC-83, or TWCC-
84), showing statutory workers' compensation insurance coverage for the person's or entity's employees providing services
on a project, for the duration of the project.
b) Duration of the Project. Includes the time from the beginning of the work on the project until the Contractor's/person's work
on the project has been completed and accepted by the City.
c) Persons providing services on the project ("subcontractor" in section 406.096)-includes all persons or entities pertorming
all or part of the services the Contractor has undertaken to pertorm on the project, regardless of whether that person
contracted directly with the Contractor and regardless of whether that person has employees. This includes, without
limitation, independent contractors, subcontractors, leasing companies, motor carriers, owner-operators, employees of any
such entity, or employees of any entity which furnishes persons to provide services on the project. "Services" include,
without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other
services related to a project. "Services" does not include activities unrelated to the project, such as food/beverage vendors,
office supply deliveries, and delivery of portable toilets.
3) Requirements:
a) The Contractor shall provide coverage, based on proper reporting of classification codes and payroll amounts and filing of
any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all
employees of the Contractor providing services of the project, for the duration of the project.
b) The Contractor must provide a certificate of coverage to the governmental entity prior to being awarded the contract.
c) If the coverage period shown on the Contractor's current certificate of coverage ends during the duration of the project, the
Contractor must, prior to the end of the coverage period, file a new certificate of coverage with the City showing that
coverage has been extended.
d) The Contractor shall obtain from each person providing services on a project, and provide to the City:
i) a certificate of coverage, prior to that person beginning work on the project, so the governmental entity will have on file
certificates of coverage showing coverage for all persons providing services on the project; and
General Conditions of the Contract for Construction Lump Sum Contract Page 43 of 51
CFW PMD — WRMC Escalator Replacement (March 2024)
KONE Internal
ii) no later than seven days after receipt by the Contractor, a new certificate of coverage showing extension of coverage,
if the coverage period shown on the current certificate of coverage ends during the duration of the project.
e) The Contractor shall retain all required certificates of coverage for the duration of the project and for one year thereafter.
� The Contractor shall notify the City in writing by certified mail or personal delivery, within ten (10) days after the Contractor
knew or should have known, of any change that materially affects the provision of coverage of any person providing services
on the project.
g) The Contractor shall post on each project site a notice, in the text, form and manner prescribed by the Texas Worker's
Compensation Commission, informing all persons providing services on the project that they are required to be covered,
and stating how a person may verify coverage and report lack of coverage.
h) The Contractor shall contractually require each person with whom it contracts to provide services on a project, to:
i) provide coverage, based on proper reporting on the classification codes and payroll amounts and filing of any coverage
agreements, which meets the statutory requirements of Texas labor Code, Section 401.011(44) for all of its employees
providing services on the project, for the duration of the project;
ii) provide to the Contractor, prior to that person beginning work on the project, a certificate of coverage showing that
coverage is being provided for all employees of the person providing services on the project, for the duration of the
project;
iii) provide the Contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of
coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project;
iv) obtain from each other person with whom it contracts, and provide to the Contractor:
(1) a certificate of coverage, prior to the other person beginning work on the project; and
(2) a new certificate of coverage showing extension of coverage, prior to the end of the coverage period, if the
coverage period shown on the current certificate of coverage ends during the duration of the project;
v) retain all required certificates of coverage on file for the duration of the project and for one year thereafter.
vi) notify the City in writing by certified mail or personal delivery, within ten (10) days after the person knew or should have
known, of any change that materially affects the provision of coverage of any person providing services on the project;
and
vii) contractually require each person with whom it contracts, to pertorm as required by paragraphs h-i) - vii), with the
certificates of coverage to be provided to the person for whom they are providing services.
4) Posting of Required Worker's Compensation Coverage.
a) The Contractor shall post a notice on each project site informing all persons providing services on the project that they are
required to be covered, and stating how a person may verify current coverage and report failure to provide coverage. This
notice does not satisfy other posting requirements imposed by the Texas Worker's Compensation Act or other Texas
Worker's Compensation Commission rules. This notice must be printed with a title in at least 30-point bold type and text in
at least 19-point normal type, and shall be in both English and Spanish and any other language common to the worker
population. The text for the notices shall be the following text, without any additional words or changes:
"REQUIRED WORKER'S COMPENSATION COVERAGE"
The law requires that each person working on this site or providing services related to this construction project
must be covered by worker's compensation insurance. This includes persons providing, hauling, or delivering
equipment or materials, or providing labor or transportation or other service related to the project, regardless of
the identity of their employer or status as an employee".
Call the Texas Worker's Compensation Commission at 512-440-3789 to receive information on the legal
requirement for coverage, to verify whether your employer has provided the required coverage, or to report an
employer's failure to provide coverage."
K-3 LIABILITY INSURANCE: The Contractor shall procure and maintain during the term of this Contract such Liability
Insurance as shall protect them, the City of Fort Worth and any Subcontractor performing work covered by this Contract, from claims
of damage which may arise from operations under this Contract, including blasting, when blasting is done on, or in connection with
the Work of the Project, whether such operations be by themselves or by any Subcontractor or by anyone directly or indirectly
employed by either of them and the limits of such insurance shall be not less than the following:
1) Automobile Liability: $1,000,000 each accident or reasonably equivalent split limits for bodily injury and property damage.
Coverage shall be on "any auto" including leased, hired, owned, non-owned and borrowed vehicles used in connection with this
Contract.
2) Commercial General Liability: $1,000,000 each occurrence. Coverage under the policy shall be as comprehensive as that
provided in a current Insurance Services Office (ISO) policy form approved for use in Texas and the policy shall have no
exclusions by endorsement unless such are approved by the City.
3) Asbestos Abatement Liability Insurance: When the Project specifically requires the removal of Asbestos Containing Materials,
the Contractor, or subcontractor performing the removal, shall be required to maintain Asbestos Abatement Liability Insurance
as follows: $1,000,000 per occurrence; $2,000,000 aggregate limit. The coverage shall include any pollution exposure, including
environmental impairment liability, associated with the services and operations pertormed under this contract in addition to
sudden and accidental contamination or pollution liability for gradual emissions and clean-up costs.
General Conditions of the Contract for Construction Lump Sum Contract Page 44 of 51
CFW PMD — WRMC Escalator Replacement (March 2024)
KONE Internal
K-4 BUILDER'S RISK INSURANCE: The Contractor shall procure, pay for and maintain at all times during the term of this
Contract, Builder's Risk Insurance against the perils of fire, lightning, windstorm, hurricane, hail, riot, explosion, civic commotion,
smoke, aircraft, land vehicles, vandalism, and malicious mischief, at a limit equal to 100% of the Contract Sum.
The policy shall include coverage for materials and supplies while in transit and while being stored on or off site. Different sub-limits
for these coverages must be approved by the City.
Consequential damage due to faulty workmanship and/or design pertormed by the Contractor or their agents shall be covered.
Upon completion of the Work, the Contractor shall notify the City of Fort Worth in writing before terminating this insurance.
K-5 PROOF OF CARRIAGE OF INSURANCE: The Contractor shall provide a certificate of insurance documenting the Property
Management Department, City of Fort Worth as a"Certificate Holder", and noting the specific project(s) covered by the Contractor's
insurance as documented on the certificate of insurance. More than one certificate may be required of the Contractor depending upon
the agents and/or insurers for the Contractor's insurance coverages specified for the project(s).
K-6 OTHER INSURANCE RELATED REQUIREMENTS
1) The City of Fort Worth shall be added as an additional insured, by endorsement, on all applicable insurance policies.
2) Applicable insurance policies shall each be endorsed with a waiver of subrogation in favor of the City of Fort Worth.
3) Insurers of policies maintained by Contractor and its subcontractor(s), if applicable, shall be authorized to do business in the
State of Texas, or otherwise approved by the City of Fort Worth, and such shall be acceptable to the City of Fort Worth insofar
as their financial strength and solvency are concerned. Any company through which the insurance is placed must have a rating
of at least A:VII, as stated in current edition of A. M. BesYs Key Rating Guide. At the City's sole discretion, the City may accept
a less favorable rate.
4) Deductible limits on insurance policies and/or self-insured retentions exceeding $10,000 require prior written approval of the City
of Fort Worth as respects this Contract.
5) The City of Fort Worth shall be notified in writing a minimum of thirty days prior to an insurer's action in the event of cancellation,
non-renewal or material change in coverage regarding any policy providing insurance coverage required in this Contract. A 10-
day notice for failure to pay premium is acceptable.
6) Full limits of insurance shall be available for claims arising out of this Contract with the City of Fort Worth.
7) The Contractor shall provide certificates of insurance to the City prior to commencement of operations pursuant to this Contract.
Any failure on part of the City of Fort Worth to request such documentation shall not be construed as a waiver of insurance
requirements specified herein.
8) The City of Fort Worth shall be entitled, upon request and without incurring expense, to review the insurance policies including
endorsements thereto and, at its discretion, to require proof of payment for policy premiums.
9) The City of Fort Worth shall not be responsible for paying the cost of insurance coverages required herein.
10) Notice of any actual or potential claim and/or litigation that would affect insurance coverages required herein shall be provided
to the City in a timely manner.
11) "Other insurance" as referenced in any policy of insurance providing coverages required herein shall not apply to any insurance
policy or program maintained by the City of Fort Worth.
12) Contractor agrees to either require its subcontractors to maintain the same insurance coverages and limits thereof as specified
herein or the Contractor shall provide such coverage on the Contractor's subcontractors.
SECTION L
CHANGES IN THE WORK
L-1 CHANGE ORDER: The Owner, without invalidating the Contract, may order Changes in the Work within the general scope
of the Contract consisting of additions, deletions or other revisions, the Contract Sum and the Contract Time being adjusted
accordingly. All Such Changes in the Work shall be authorized by Change Order, and shall be executed under the applicable
conditions of the Contract Documents.
A Change Order is a written order to the Contractor signed by the Contractor, Owner and the Architect, issued after the execution of
the Contract, authorizing a Change in the Work or adjustment in the Contract Sum or the Contract Time. The Contract Sum and the
Contract Time may be changed only by Change Order.
Any changes in work required due to changed or unforeseen conditions, or by request of either the Contractor or the City, shall be
coordinated with the Director, Property Management Department. A change order must be written and duly negotiated and executed
prior to pertorming changed work.
The cost or credit to the Owner resulting from a Change in the work shall be determined in one or more of the following ways:
1) by mutual acceptance of a lump sum property itemized, including the allowance to Contractor for overhead and profit stipulated
in the original contract proposal;
General Conditions of the Contract for Construction Lump Sum Contract Page 45 of 51
CFW PMD — WRMC Escalator Replacement (March 2024)
KONE Internal
2) by unit prices stated in the Contract Documents or subsequently agreed upon; or
3) by cost and a mutually acceptable fixed or percentage fee.
If none of the methods set forth herein above is agreed upon, the Contractor, provided they receive a Change Order, shall promptly
proceed with the Work involved. The cost of such work shall then be determined on the basis of the Contractor's reasonable
expenditures and savings, including a reasonable allowance for overhead and profit as indicted in the original contract proposal. In
such cases, the Contractor shall keep and present, in such form as the Architect shall prescribe, an itemized accounting together with
appropriate supporting data. Pending final determination of cost to the Owner, payments on account shall be made on the ArchitecYs
Certificate of Payment as approved by the Owner.
If after the Contract has been executed, the Architect, requests a price proposal from the Contractor for a proposed change in scope
of the work, Contractor shall process such proposal within seven days of receipt and return the price quote to the Architect in writing.
The Architect shall review the price quotation and if approval is recommended, forward the proposed change order request and price
proposal to the Owner for approval. If approval is not recommended, the Architect will attempt to negotiate with Contractor to revise
the proposal to a figure which is fair and reasonable and forward it on to the Owner for approval. If the negotiations do not result in an
equitable solution, the Architect shall prepare a cost-plus type Change Order with a price-not-to-exceed figure for approval by the City
and require specific documentation to be provided by Contractor in accordance with the paragraph above.
If after the contract has been executed, the Architect, requests a price proposal from the Contractor for a proposed change in scope
of the work, Contractor shall process such proposal within seven days of receipt and return the price quote to the Architect in writing.
Contractor is advised that when the cumulative effect of Change Orders results in an increase in contract valuation by over $100,000,
the City Council must approve all such Change Orders that will exceed this limit, once the recommended change order has been
approved by Council the normal processing time is approximately thirty (30) days. Owner, Architect and Contractor shall endeavor to
identify Change Order items as early in the Construction process as possible to minimize their impact on the construction schedule.
If the Contractor claims that additional cost or time is involved because of (1) any written interpretation issued pursuant to Section A,
(2) any order by the Architect or Owner to stop the Work pursuant to Section B, where the Contract was not at fault, or (3) any written
order for a minor change in the Work, the Contractor shall make such claim.
L-2 CLAIMS FOR ADDITIONAL COST OR TIME: If the Contractor wishes to make a claim for an increase in the Contract
Sum or an extension in the Contract Time, they shall give the Architect written notice thereof within a reasonable time after the
occurrence of the event that gave rise to such claim. This notice shall be given by the Contractor before proceeding to execute the
Work, except in an emergency endangering life or property in which case the Contractor shall proceed in accordance with Section J.
No such claim shall be valid unless so made. Any change in the Contract Sum or Contract Time resulting from such claim, if approved
by the Owner, shall be authorized by Change Order. Any claims submitted for additional cost or time shall be accompanied by a
recovery schedule.
L-3 OVERHEAD ALLOWANCES FOR CHANGES: Should any change in the work or extra work be ordered, the following
applicable percentage shall be added to Material and Labor costs to cover overhead and profit:
1. Allowance to the Contractor for overhead and profit for extra work performed by the Contractor's own forces shall not exceed
fifteen percent 15% .
2. Allowance to the Contractor for overhead and profit for extra work performed by a Subcontractor and supervised by the Contractor
shall not exceed ten percent 10% .
L-4 MINOR CHANGES IN THE WORK: The Architect shall have authority to order minor changes in the Work not involving an
adjustment in the Contract Sum or an extension of the Contract Time and not inconsistent with the intent of the Contract Documents.
Such changes may be effected by Field Order or by other written order. Such changes shall be confirmed in writing by the Architect
and shall be binding on the Owner and the Contractor.
L-5 FIELD ORDERS: The Architect may issue written Field Orders which interpret the Contract Documents, or which order
minor changes in the Work without change in Contract Sum or Contract Time. The Contractor shall carry out such Field Orders
promptly.
SECTION M
UNCOVERING AND CORRECTION OF WORK
M-1 UNCOVERING OF WORK: If any Work should be covered contrary to the request of the Owner, it must be uncovered for
observation and replaced, at the Contractor's expense.
If any other work has been covered which the Owner has not specifically requested to observe prior to being covered, the Architect
or the Owner may request to see such work and it shall be uncovered by the Contractor. If such Work be found in accordance with
the Plans and Specifications, the cost of uncovering and replacement shall, by appropriate Change Order, be charged to the Owner.
If such work be found not in accordance with the Plans and Specifications, the Contractor shall pay such costs unless it is found that
this condition was caused by a separate contractor employed by the Owner.
M-2 CORRECTION OF WORK: The Contractor shall promptly correct all work rejected by the Architect or Owner as defective
or as failing to conform to the Plans and Specifications whether observed before or after Substantial Completion and whether or not
fabricated, installed or completed. The Contractor shall bear all costs of correcting such rejected Work, including the cost of the
ArchitecYs additional service thereby made necessary.
General Conditions of the Contract for Construction Lump Sum Contract Page 46 of 51
CFW PMD — WRMC Escalator Replacement (March 2024)
KONE Internal
If, within one year after the Date of Substantial Completion or within such longer period of time as may be prescribed by law or by the
terms of any applicable special guarantee required by the Contract Documents, any of the work is found to be defective or not in
accordance with the Contract Documents, the Contractor shall correct it promptly after receipt of a written notice from the Owner to
do so, unless the Owner has previously given the Contractor a written acceptance of such condition, describing same specifically and
not generally. The Owner shall give such notice promptly after discovery of the condition.
All such defective or non-conforming work under the preceding paragraphs shall be removed from the site where necessary and the
work shall be corrected to comply with the Contract Documents without cost to the Owner.
Defective or non-conforming work shall be completed in a timely manner. The Contractor shall respond and/or repair any work that is
deemed an emergency by the City within 24 hours. The Contractor shall respond and/or repair any other defective or non-conforming
work within three working days.
The Contractor shall bear the cost of making good all work of separate contractors destroyed or damaged by such removal or
correction.
If the Contractor does not remove such defective or non-conforming work within a reasonable time fixed by written notice from the
Owner, the Owner may remove it and may store the materials or equipment at the expense of the Contractor. If the Contractor does
not pay the cost of such removal and storage within ten days thereafter, the Owner may upon ten additional days' written notice sell
such work at auction or at private sale and shall account for the net proceeds thereof, after deducting all the costs that should have
been borne by the Contractor including compensation for additional architectural services. If such proceeds of sale do not cover all
costs that the Contractor should have borne, the difference shall be charged to the Contractor and an appropriate Change Order shall
be issued. If the payments then or thereafter due the Contractor are not sufficient to cover such amount, the Contractor shall pay the
difference to the Owner.
If the Contractor fails to correct such defective or non-conforming work, the Owner may correct it in accordance with Section G.
The obligation of the Contractor under this Section shall be in addition to and not in limitation of any obligations imposed upon them
by special guarantees required by the Contract Documents or otherwise prescribed by law.
M-3 ACCEPTANCE OF DEFECTIVE OR NON-CONFORMING WORK: If the Owner prefers to accept defective or non-
conforming work, he may do so instead of requiring its removal and correction, in which case an extended warranty or Change Order
will be issued to reflect an appropriate reduction in the final payment to the Contractor or if the amount is determined after final
payment, the Contractor shall pay Owner the amount of the appropriate reduction.
SECTION N
TERMINATION OF THE CONTRACT
N-1 TERMINATION BY THE CONTRACTOR: If the work is stopped for a period of 30 days under an order or any court or
other public authority having jurisdiction, through no act or fault of the Contractor or a Subcontractor or their agents or employees or
any other persons performing any of the work under a contract with the Contractor, or if the work should be stopped for a period of 30
days by the Contractor for the Owner's failure to make payment thereon as provided in Section I, then the Contractor may after the
end of such period of 30 days and upon seven additional days' written notice to the Owner , terminate the Contract.
N-2 TERMINATION BY THE OWNER: If the Contractor is adjudged as bankrupt, or if they make a general assignment for the
benefit of their creditors, or if a receiver is appointed on account of their insolvency, or if the Contractor refuses, except in cases for
which extension of time is provided, to supply enough properly skilled workmen or proper materials, or if they fail to make prompt
payment to Subcontractors or for materials or labor, or fails to comply with all Laws, Statutes, Charter, Ordinances, Regulations or
Orders of any public authority having jurisdiction, or otherwise is guilty of a substantial violation of a provision of the Contract
Documents, then the Owner, on their own initiative that sufficient cause exists to justify such action, may, without prejudice to any
rights or remedy and after giving the Contractor and their surety, if any, seven (7) days' written notice, terminate the employment of
the Contractor and take possession of the site and of all materials, equipment, tools, construction equipment and machinery thereon
owned by the Contractor and may finish the work by whatever method they may deem expedient. In such case the Contractor shall
not be entitled to receive any further payment until the Work is finished.
If the costs of finishing the Work, including compensation for the ArchitecYs additional services exceed the unpaid balance of the
Contract, the Contractor shall pay the difference to the Owner.
The City of Fort Worth may terminate this contract in whole, or from time to time, in part, whenever such termination is in the best
interest of the City. Termination will be affected by delivering to the Contractor a notice of termination specifying to what extent
pertormance of the work of the contract is being terminated and the effective date of termination. After receipt of termination the
Contractor shall:
a) Stop work under the Contract on the date and to the extent specified on the notice of termination.
b) Place no further orders or subcontracts except as may be necessary for the completion of the work not terminated.
c) Terminate all orders and subcontracts to the extent that they relate to the perFormance of the work terminated by the notice of
termination.
After termination as above, the City will pay the Contractor a proportionate part of the contract price based on the work completed;
provided, however, that the amount of payment on termination shall not exceed the total contract price as reduced by the portion
thereof allocable to the work not completed and further reduced by the amount of payments, if, any otherwise made. Contractor shall
submit a claim for amounts due after termination as provided in this paragraph within 30 days after receipt of such claim. In the event
of any dispute or controversy as to the propriety or allowability of all or any portion of such claim under this paragraph, such dispute
General Conditions of the Contract for Construction Lump Sum Contract Page 47 of 51
CFW PMD — WRMC Escalator Replacement (March 2024)
KONE Internal
or controversy shall be resolved and be decided by the City Council of the City of Fort Worth, and the decision by the City Council of
the City of Fort Worth shall be final and binding upon all parties to this contract.
SECTION O
SIGNS
The Contractor shall construct and install the project designation sign as required in the Contract Documents and in strict accordance
with the Specifications for "Project Designation Signs." This sign shall be a part of this Contract and shall be included in the Contractor's
Base Bid for the Project.
The Contractor may install their company sign and shall allow the Architect to install their company sign. No other signs will be allowed.
SECTION P
TEMPORARY FACILITIES
P-1 SCOPE: The Contractor shall furnish, erect, and maintain facilities and perForm temporary work required in the performance
of this Contract, including those shown and specified.
P-2 USE OF TEMPORARY FACILITIES: All temporary facilities shall be made available for use by all workmen and
subcontractors employed on the project, subject to reasonable directions by the Contractor as to their proper and most efficient
utilization.
P-3 MAINTENANCE AND REMOVAL: The Contractor shall maintain temporary facilities in a proper, safe operating and
sanitary condition for the duration of the Contract. Upon completion of the Contract, all such temporary work and facilities shall be
removed from the premises and disposed of unless otherwise directed or specified hereunder.
P-4 FIELD OFFICES AND SHED: The Contractor is not required to provide a temporary field office or telephone for projects
under $1,000,000. Contractor shall equip the Project Superintendent with a pager and provide 24-hour contacts to the City.
The Contractor shall provide a temporary field office building for themselves, their subcontractors and use by the Architect and Owner.
For construction contracts with a bid price in excess of $1,000,000.00, the Contractor shall provide a separate field office for the City's
field representative (but the separate office may be in the same structure). The buildings shall afford protection against the weather,
and each office shall have a lockable door, at least one window, adequate electrical outlets and lighting, and a shelf large enough to
accommodate perusal of the project drawings. Openings shall have suitable locks. Field offices shall be maintained for the full time
during the operation of the work of the Contract. During cold weather months, the field offices shall be suitably insulated and equipped
with a heating device to maintain 70-degree Fahrenheit temperature during the workday. During warm weather the offices shall be
equipped with an air conditioning device to maintain temperature below 75 degrees F. Upon completion of the work of the Contract,
the Contractor shall remove the building from the premises. In addition to the drawing shelf, provide for the City field representatives
office: one desk, four chairs, plan rack and a four-drawer filing cabinet (with lock). Each office shall contain not less than 120 square
feet of floor space.
The Contractor shall provide and maintain storage sheds and other temporary buildings or trailers on the project site as required for
their use. Location of sheds and trailers shall be as approved by the Owner. Remove sheds when work is completed, or as directed.
P-5 WIRELESS CONNECTION: The Contractor shall provide and pay for wireless internet connection (WIFI) for the City and
Architect.
P-6 TOILET FACILITIES: The Contractor shall provide proper, sanitary and adequate toilet facilities for the use of all workmen
and subcontractors employed on the project.
P-7 UTILITIES: Contractor shall make all necessary arrangements and provide for temporary water and electricity required
during the construction. Contractor shall provide and install temporary utility meters during the contract construction period. These
meters will be read and the Contractor will be billed on this actual use. The Contractor shall provide all labor and materials required
to tap into the utilities. The Contractor shall make the connections and extend the service lines to the construction area for use of all
trades. Upon completion of the work all utility lines shall be removed and repairs made to the existing lines. Only utilities at existing
voltages, pressures, frequencies, etc. will be available to the Contractor.
Water. Provide an ample supply of potable water for all purposes of construction at a point convenient to the project or as shown on
the Drawings. Pipe water from the source of supply to all points where water will be required. Provide sufficient hose to carry water
to every required part of the construction and allow the use of water facilities to subcontractors engaged on the work. Provide pumps,
tanks and compressors as may be required to produce required pressures.
Electric Service. Provide adequate electric service for power and lighting to all points where required. Temporary, electric service
shall be of sufficient capacity and characteristics to supply proper current for various types of construction tools, motors, welding
machines, lights, heating plant, air conditioning system, pumps, and other work required. Provide sufficient number of electric outlets
so that 50-foot-long extension cords will reach all work requiring light or power.
Liahtina. Supply and maintain temporary lighting so that work of all trades may be properly and safely performed, in such areas and
at such time that day-lighting is inadequate. Provide at least 0.75 watts of incandescent lighting per squqr4e foot and maintain a
socket voltage of at least 110 volts. Use at least 100-watt lamps. In any event, the lighting intensity shall not be less than 5-foot
candles in the vicinity of work and traffic areas.
P-8 CONDITIONED SPACE: The Contractor shall provide HVAC services as required to protect all work and materials and to
keep the humidity down to the extent required to prevent corrosion of any metal and to prevent dampness or mildew which is potentially
General Conditions of the Contract for Construction Lump Sum Contract Page 48 of 51
CFW PMD — WRMC Escalator Replacement (March 2024)
KONE Internal
damaging to materials and finishes. All such heating, ventilation and services shall be provided and maintained until final acceptance
of all work. In addition, the Contractor shall provide HVAC prior and during the following work operations as follows:
At all times during the placing, setting and curing of concrete provide sufficient heat to insure the heating of the spaces involved to not
less than 40 F.
From the beginning of the application of drywall and during the setting and curing period, provide sufficient heat to produce a
temperature in the spaces involved of not less than 50 F and above 95 F.
For a period of seven (7) days previous to the placing of interior finish materials and throughout the placing of finish painting, decorating
and laying of resilient flooring materials, provide sufficient heat to produce a temperature of not less than 50 F and above 85 F.
P-9 TEMPORARY CONSTRUCTION. EQUIPMENT AND PROTECTION:
The Contractor shall provide, maintain, and remove upon completion of the work all temporary rigging, scaffolding, hoisting equipment,
rubbish chutes, ladders to roof, barricades around openings, and all other temporary work as required to complete all work of the
Contract. Contractor shall coordinate the use and furnishing of scaffolds with their sub-contractors.
The Contractor shall provide, maintain, and remove upon completion of the work, or sooner, if authorized by the Owner, all fences,
barricades, lights, shoring, pedestrian walkways, temporary fire escapes, and other protective structures or devices necessary for the
safety of workmen, City employees, equipment, the public and property.
All temporary construction and equipment shall conform to all regulations, ordinances, laws and other requirements of the authorities
having jurisdiction, including insurance companies, with regards to safety precautions, operation and fire hazard.
The Contractor shall provide and maintain pumping facilities, including power, for keeping the site, all times, whether from underground
seepage, rainfall, drainage of broken lines.
The Contractor shall maintain provision for closing and locking the building at such time as possible to do so. If this is not feasible,
maintain a night
The Contractor shall provide and maintain all barricades or enclosures, required to protect the work in progress from outside elements,
dusts, and other disturbances as a result of work under this Contract. Such protection shall be positive, shall meet the approval of
the Owner and shall be maintained for the duration of the construction period or as required to provide for the protection as specified.
P-10 PROJECT BULLETIN BOARD: The Contractor shall furnish, install and maintain during the life of the project a weather-
tight bulletin board approximately 3 feet high by 5 feet wide having not less than two hinged or sliding glass doors with provisions for
locking. The bulletin board shall be mounted where and as approved by the Owner, in a prominent place accessible to employees of
the Contractor and sub-contractors, and to applicants for employment. The bulletin board shall remain the property of the Contractor
and shall be removed by them upon completion of the Contract work. The following information which will be furnished by the City to
the Contractor shall be posted on the bulletin board and shall be maintained by the Contractor in easily readable condition at all times
for the duration of the Contract.
A. The Equal Opportunity Poster and Notice Nondiscrimination of Employment (Standard Form 38).
B. Wage Rate Information Poster (Form SOL 155), with the Contract Schedule of minimum wage rates as required by the
Davis-Bacon Act.
C. Safety Posters.
D.
SECTION Q
VENUE
Should any action arise out of the terms and conditions of this contract, venue for said action shall lie in Tarrant County, Texas.
END OF GENERAL CONDITIONS
General Conditions of the Contract for Construction Lump Sum Contract Page 49 of 51
CFW PMD — WRMC Escalator Replacement (March 2024)
��� �����
2024
SUBJECT: Notice to Proceed
Notice to Proceed Date: -------------, 2024
Project Duration: 000 Days
Substantial Completion Date: --------------, 2024
City Council Contract Date: -------------, 2024
Dear Sir or Madam,
--------------- located at ----------------- was awarded to ----------------, -------------, VP of Construction, in the amount of (Contract
Amount, on (Date). This letter shall serve to substantiate a Notice to Proceed with the below scope of work for the Project.
You are hereby directed to proceed on the following work, in accordance with provisions of City Secretary Contract Number CSC# --
All work is to be done in accordance with plans, specifications and conditions provided in the contract.
Please acknowledge receipt of this Notice by signing the space below and returning a copy to the Property Management Office.
Please contact Jackson Jones, Construction Superintendent at (817) 269-6578 if there are any questions and prior to commencing
work.
Sincerely,
Dana Burghdoff, AICP
Assistant City Manager
Acceptance of Notice Receipt of the above Notice to Proceed is hereby acknowledged this day -----------------------, 2024.
BY:
TITLE:
CC:
City Project Manager
Nikita Watts
Brian Glass
City Construction Super
City Sr. Construction
PROPERTY MANAGEMENT DEPARTMENT
FACILITIES DIVISION / ARCHITECTURAL
SERVICES
THE CITY OF FORT WORTH * 200 TEXAS STREET *
FORT WORTH, TEXAS 76102 (817) 392-2586 * FAX
(817)392-8488
KONE Internal
General Conditions of the Contract for Construction Lump Sum Contract Page 50 of 51
CFW PMD — WRMC Escalator Replacement (March 2024)
KONE Internal
4,_�»
� � ¢ =�
.
�
�, � � _ _
��
CENTERLINE 0�
51GN, LOGO &
TEXT [NFQR�ATIaN
�RT � �RTH�
a�
�
�
�
�
�
Project Title
Architect:
Architect's Name
Contractvr:
�ontractar's Name
FUNDEQ BY
{List Sond Fund, etc.)
SCHEDULE� COMPLETION DATE
YEAR
ah
SIGN C�L�R & FONT:
0
�
�-
BACKGRQUND - VIIHITE
B�RDER - 5116"WIDE, 3"RADlUS C�RNERS, PMS 288 (BLUE}
TEXT - HELVETICA or ARIAL, PM5 288 (BLUE)
F�RT WORTH L�G� C�LflRS & F�NT:
FORT II1I�RTH - PMS 288 (BLUE), CHE�TENHAM BQLD
LONGH4RN LQG4 - PMS 725 (BRQWN}
PR�JECT DESI�NATI�N SIGN
General Conditions of the Contract for Construction Lump Sum Contract Page 51 of 51
CFW PMD — WRMC Escalator Replacement (March 2024)
FACILITY REPAIR AND MAINTENANCE CONTRACT
EV2516 ELEVATOR AND ESCALATOR
MAINTENANCE AND REPAIR SERVICES
GEIVERAI. SERVICES DEPARTMENT
THI3 CONTR.ACT is between KANSAS CTTY, MISSOURI, a constitutionally chartered municipal
corporation ("City"), and KONE, INC. ("Contractor"). City and Contractor agree as follows:
PART I
SPECIAL TERMS AND CONfDITIONS
Sec. l. Work To Be Performed. The Specification/Scope of Work and any addenda are attached
hereto and incorporated into this Contract.
Sec. 2. Term of Contract and Additional Periods
A. Initial Term. The initial term of tlus Contract shall begin on llecember 1, 20�8 and shall
end on November 30, 2024 far a six {6) year term. The Mana.ger of Procurement Services
is authorized to enter into an amendment of tlus Contract with CONTRACTOR to extend
the term of this Contract and time of performance for this Contract.
B. Renewal Terms. At any time prior to the expiration of ihe initial term or any subsequent
teim, the CTTY, in its sole discretion, may renew this Contract for up to five (5) ad.d7it�onal
one (1) year terms.
C. Transition Term. Notwithstanding the expiration of th� initial term or any subsequent
ter�m or a11 options to zenew, CONTRACTOR and CITY shall continue performance
under this Contract until the CITY has a new contract in place with either
CONTR.ACTOR ar another provider or until the CITY terminates the Cantract.
D. The products and services which are subject to this Contract may be covered by a separate
maintenance agreement {see Exhibit 4}. The term of the maintenance agreement shall be
governed by that document and may extend beyond the expiration date of this Contract.
Sec. 3. P�rchase Orders
A. City shall order all services to be provided by Contractor under this Contract by rneans of a
Purchase Order issued by the City's Mana.ger of Procurement Services for which funds
have been certified and encumbered by the City's Director of Finance.
Facility Repair & Maintenance Contract Part I 1Q2014
Contract Central
Page 1 of 10
B. Contrac�or shall not provide any services in excess of the dollar amount conta.ined in any
Purchase Order and Contxactor shall not be entitled to any payment iri excess of the dollar
arnount of the Purchase Orders from City.
Sec. 4. Compensation.
A. The maximum amount that City shall pay Contractor under this Contract is set forth in
the Contract -- Contractor's proposal shall provide all work at the prices contained in
Con�actar's Proposal that is incorparated herein by reference.
B. Co�tractor will bill the City, in a form accepta.ble to the City, on the following basis:
C. It sha11 be a condition precedent to payment af any invoice from Contractor that
Contractor is in compliance with, and not in breach or default of, all terms, covenants
and conditions of this Contract. If damages are susta.ined by City as a result of breach or
default by Contractor, City may withhold payment{s) to Contractor for the purpose of set
off until such time as the exac� amaunt of darnages due City from Contractor may be
determined.
D. It shall be a condition precedent to payment af any invoice from Contractor that
Con�ractor is in compliance with, and not in breach or defauit of, all terms, covenants
and condirions of this Contract. Tf damages are sustained by City as a result of breach or
default by Contractor, City may withhold payment(s} to Contractor for the purpose of set
off until such time as the exact amount of dalnages due City from Contractor may be
determined.
E. No request far payment will be pmcessed unless the request is in proper form, correctly
computed, and is approved as payable under the teYms of this Contract.
Sec. 5. Notices. All nofices required by this agreement shall be in writing sent to the following:
City:
General 5ervices Department
Procurement Services Division
Cedric Rowan; Ma�ager of Pracurement Services
City Hall, lst F1aor, Roam 102W
414 E. 12� Street
Kansas City,'1iI0 6410b
Phone: 8�}-513-0814 Facsimile: 816 -513-1066
E-mail address: cedric,rowan@lkcmo.or�
Contractor: Kone. Inc.
Contact: Ashley Brauer, Seniar Sales Consultant
Address: 2700 BiState Drive, Suite 100
Kansas City, MO 64108
Phone: (816)-531-2140 Ext. 1d514) Facsimile: (816)-531- 5523
E-mail address: ashlev.brauer(cL„kone.com
All notices are effecti�e a) when delivered in person, b) upon confirmation of receipt when
transmitted by facsimile transmission or by electronic mail, c) upon receipt after dispatch by
registered or certified mail, postage prepaid, d) on the next business day if transmitted by overnight
Facility Repair & Maintenance Contract Part I 102014
Contract Central
Page2of10
courier{with confirmation of delivery), or e}three business days after the date of mailing, whichever
is earlier.
Sec. 6. Merger. This Contract consists o€ Part I, Special Terms and Conditions and any
Attachments and any documents incorparated by reference; and Part TT, Standard Terms and
Condi�ions. This Contract, including any Attachments and incorporated documents, constitu�es the
entire agreement between City and Contractor with respect to this subject matter.
Sec. 7. Conflict Between Contract Parts. In the event of any conflict or ambiguity between the
Special Contract Terms and Conditions of Part I and the Standard Terms and Conditions of Part II
of thia Contract, Part I will be controlling. For any participating public agency, Exhibit �4 will be the
contrallutg document and prevail over Part I and Part II of this Contract.
Sec. 8. Minority and Women's Business Enterprises. Sae Exhibit 1: City of Kansas City Special
Requirements
Sec. 9. Workforce. If Contractor is required to pay prevailing wages for the work pexformed
pursuant to this Contract, Contractor agrees to comply with all requirements of City's Construction
Employment Pragrazn as ena�cted in City's Code, Sections 3-501 through 3-525 and as hereinafter
amended. Contractor shall meet or exceed the construction employment goals unless the saxne shall
have been waived in the manner provided by law. Contractor's compliance with this provision is a
material part of this Contract.
Contractor shall comply with City's Workforce Program Reporting System requirements.
Contractor sha11 use City's Internet web based Workforce Program Reporting System provided by
City and protocols included in that software during the term of this Contract. Contractor shall
maintain user applications to City's provided system for a11 applicable personnel and shall require
subcantractors to maintain applications.
Sec.10. Bonds and Surety. See Exhibit 1: City of Kansas City Special Requirements
Sec.11. Subcontracting.
A. Contractor shall not employ or retain any Subcontractor, Supplier or other person or
organization, whether initially or as a substitute, against whom City has a reasonable
objection, including but not limited to debarment by City or another govenuriental entity
or decertifica�ion of the Subcontractor from the City's Minor�ty and Women's Business
Entezprise Program as a result of the Subcontractor's fai�ure to comply with any of the
requirements of the provisions of Chapter 3 of the City's Code as determined by the
Directar of the Human Relations Department. Contractor shall insert this provision in
any subcontractor agreement associatad with this Coniract. Contractor sha11 not be
required to employ any Subcontractor, Supplier or other person or organization to
furnish or perform any af the Wark against whom Coni�actor has reasonable obj ection.
B. Contractor shall submit required information for all Subcontractors on Form 01290.09 -
Subcontractors and Major Material Suppliers List, provi�ded in these Contract
Documen�s, prior to Subcontractor beginning Work at the Site.
C. Contractor shall be fully responsible ta City for all acts and omissions of the
Subcontractors, Suppliers and other persons and organizations performing or furnishing
any of the Work under a direct or indirect contract with Contractor just as Contractor is
responsible �or Contractor's own acts and amissions.
Facility Repair 8t Maintenance Coniract Part I 102014
Contract Central
Page 3 of 10
D. Contractor shall be solely responsible far scheduling and coordinating the Work of
Subcontractars, Suppliers and other persons and organizatians per�orming ar furnishing
any of the Work under a direct or indirect contract with Contractor.
Sec. 12. Prevailing �i�'age.
A. Prevailing Wage.
1. Co�tractor shall comply and require its Subcontractors to comply with;
a. Sec�ions 290.210 to 290.340, RSMo the Sta.te of Missouri Prevailing Wage Law
(the "Law"); and
b. 8 CSR 30-3.010 to 8 CSR 30-3.060, the Prevailing Wage Law Rules (the
"R�xles"); and
c. the Annuai V4Tage Order {Wage Order} issued b}- the State of Missouri's
De�artment of Labor and Industrial Relations; and
d. any applicable Anz�ual IncrementaJ. Wage In.cz�ease (Wage Increase} to the
Annual Wage Or�er.
2. The Law, Rules, Wage Order and any Wage Increase are incorporated into and macle
part hereof this Contract and sha11 be collectively referred to in this Section as the
"Prevailing Wage Requirements." In the event this Contraci is renewed for an
additional term, the Wage Order in ei'fect as o£ the commencement date of the
additional terrri, as amended by any applicable Wage Increase, sha11 be deemed
incorporated herein and sha11 apply to and remain in effect for the duration of the
additional terrn. The new Wage Order and any applicable Wage Increase sha11
goverr� notv��ithstanding the fact that the Wage Order being replaced might be
physically attached to this Contract.
3. Contractor sha11 pay and require its Subcontractors to pay to all worke�rs pez�£ornung
work under this Contract not less than the preva.iling haurly rate of wages for the
class or type of work performed by the ��oxker in accardance with the La�v; Rules,
Wage Order and any applicable Wage Increase. Contractar sha11 take u-hatever steps
are necessary to insure that the prevailing hourly wage rates are paid and that all
workers for Contractor and each of its Subcontractors are paid for the class or type of
work perforined by the worker in accordance with the Prevailing W age
Requirements.
4. Prior to each of its Subcontractors beginning Work on the Site, Contractor shail
require each Subcontractor to complete City's Form 04490 entit�ed "Pre-cantract
Certification" that sets forth the Subcontiactor's pre�•ai�ing wage and tax compliance
history for the two (2) years prior to the bid. Contractor shall retain one { I) year arid
make the Pr�-contract Certifica.rions available to City within five {5} days after
written request.
5. Contractor sha11 keep and require each of its Subcontractors engaged in the
construction of public ivorks in performance of the Contract to keep fiz11 and accurate
records on City's:
a. Keep and require each of its Subcontraciors engagad in the constxuction of public
works in performance af the Contract to keep full and accurate records on Cit�•'s
Fac�lity Repair �?vIaintenance Canuact Part I 102014 Contracc Cen�ral
Page 4 of 10
"Daily Labor Force Report" Form indicating the worker's name, occupational
title or classification group and skill and the workers' hours. City sha11 furnish
blank copies of the Daily Labor Force Report Form to Contractor for its use and
for distribution ta Subcontractors. Contractor shall submit its and its.
Subcontractars Daily La.bor Force Reports to City each day; and
b. Submit, and require each of its Subcontractors engaged in the construction of
public works in performance of the Contract to submii, electronically, in a forn�at
prescribed by the City, Certified Payroll Report Information indicating the
worker's name, address, social security number, occupation(s), craft(s) of every
worker employed in connaction with the public work together with the number of
hours worked by ea,ch warker and the act� wages paid in connection with the
Project and other pertinent information as requested by the City; and
c. Submit, and require each af its Subcantractors engaged in the construction of
public works in performance of the Contract to submit, electronically, in format
prescribed by the City, a Payroll Certification. The Payroll Certification must be
signed by the employee or agent who pays or supervises the payment of the
workers employed under the Contract for the Contractor and each Subcontractor.
d. The Dai1y Labor Force Report, docwnents used to com�ile infarmation for the
Certified Payroll Report, and Payroll Certification are col�ectavely referred to in
this Section as the "Recards."
6. Contractor shall xnake all of Contractor's and Subcontractors' Records open to
inspection by any authorized representatives of City and th� Missouri Departtnent of
Labor and Industrial Relations at any reasonable time and as often as they may be
necessary and such Records shall not be destroyed or removed. from the State of
Missouri for a period of one {1) year followi.ng the completion of the public work in
connection with which the Records are rr�ade. Cont;ractor shall have its and its
Subcontractors Certified Payroll Reports and Payroll Certifications available at the
Contractor's office and shall pravide the Records to the City electronically at City's
sole discretion. In addition, all Records shall be considered a public record and
Contractor shall provide the Records to the City in the farmat required by the City
within three (3) working days af any req�est by City at the Contractor's cost. City,
in its sale discretion, may require Con�actor to send any of the Records directly to
the person who requested the Record at Contractor's expense.
7. Conh'actor shall post and keep posted a clearly legible state�nent of all prevailing
hourly wage rates ta be paid to a11 workers emp�ayed by Contractor and each of its
Subcontractors in the performance of this Contract in a prominent and easily
accessible p�ace at the Site of the VVork by a11 workers.
8. If the Contract Price exceeds $250,000.00, Contractor sha11 and shall require each
Subcontractor engaged in any cons�ction of public works to have its name,
acceptable abbreviation or recognizable loga and the name of the city and state of the
mailing address of the principal office of the company, on each motor vehicle and
motorized self-propelled piece of equipment which is used in connectian with the
Project during the ti.me the Contractar or Subcontr�ctor is engaged on the project.
The sign shall be legible from a distance of twenty {20'} feet, but the size of the
lettering need not be larger than two {2"} inches. In cases where equipment is leased
Facility Repair & Maintenance Contract Part I 102014
Contract Central
Page 5 of 10
ar where aff�ing a legible sign to the equiprnent is impractical, the Contractor may
place a temporary sta�ionary sign, with the information required pursuant to this
section, at the main entrance of the Project in place o� a�fixing the required
information on the equipment so long as such sign is not in violation of any state ar
federal statute, rule or regulation. iVIotor vehicles which are required �o have similar
information affixed thereto pursuant to requirements of a regulatory agency of the
state or federal government are exempt irom the provisions of this subsection.
9. Contractor must correct any errors in Contractor's or any Subcontractors' Records,
or Contractor's or any Subcontractors' �iolations of the Law, Rules, Annual Wage
Ozder and any Wage Increase within fourteen (14) calendar days after natice from
City.
1Q. Contractor shall and shall require its Subcontractors to cooperate with the City and
the Department of Labor and Indus�.-ial Relations in the enforcement of this Section,
the Law, Rules, Annual Wage Order and any Wage Increase. Con�actor shall and
shall require its Subcontractars to permit City and the Department of Labor and
Indus�ial Relations to inter«ew any and all workers during working hours on the
Project at Contractor's sole cast and expense.
11. Contractor shall file with City, upon completion of the Project and prior to final
payment therefore, affidavits from Contractor and each of its Subcontractors, stating
that each has fully complied with the provisions and requ�rements of �he Missouri
Prevaaling Wage Law. City shal� not make final payment until the affidavits, in
proper form and order, from Contractor and each of its Subcon�actors, are fiied by
Contractor.
12. Contractor shall forfeit as a sta.tutory penalty to the City one hundred dollars
{� 100.00} for each worker em}�loyed, for each calendar day, or portion thereof, such
worker is paid less than the prevailing hourly rates for any work done under this
Contract, by Contractor or by any of Contxactor's Subcontxactors. If Contractor or
any af its Subcontractors have vialated any section(s} of 290.210 to 290.340, RSMo,
in tlie course of the execution of the Cantract, City shall when making payments to
the Con�actor becoming due under this Contract, withhold and retain therefrom all
sums and amounts due and owing as a result of any violation of sections 290.210 to
290.340, RSMo.
B. Prevailing Wage Damages. Contrac�or acknov��ledges and agrees that, based on the
experience of City, violations of the ��Viissouri Prevailing Wage Act, whether by
Contractor ar its Subcontractors, commonly result in additional costs to City, Contractor
agrees tha� addi#ional costs to City for any particular vialation a�re difficult to establish
and include but are not limited to: costs of construction delays, additional work for City,
additional interest expense�, investigations, and the cost of establishing and maintauung
a special division working under the City Manager to monitor prevailing wage
compliance.
1. In the event of the failure by Contractor or any o£ its Subcontractors to pay wages as
pravided in the Missouri Prevailing Wage Act, City sha11 be entit�ed to deduct from
the Contract Price, and shall retain as liquidated damages, one hundred dollars
{$100.00} per day, per �vorker who is paid less than the prevailing hourly rate of
wages, to approximate the additional costs. The sugn shall be deducted, paid or ot�red
Facility Repair & VIaintenance Contract Part � 102014 Contract Central
Page 6 of 10
whether or not the Contract Times have expired.
2. City shall give written notice to Contractor setting forth the workers who have been
underpaid, the amaunt of the statutory penalty and the amount of the liquidated
damages as provided for in this Subparagraph. Contractor shall have fourteen (14)
calendar days to respond, which iime may be extended by City upon written request.
If Contractor fails to respond within the spec�fied time, the City's original natice
sha11 be deemed final. If Contractor responds to City's notice, City will furnish
Contractor a final decision in writing within five {5) d�.ys of completing any
investigation.
C. Excessive Unemployment.
1. Resident Laborers" means laborers who have been residents of the State of Missouri
for at Ieast thirty days and who intend to remain Missouri residents, and residents of
Nonrestrictive States.
2. "Nonrestrictive States" means states identified by the Missouri Department of Labor
and Industrial Relations Division of Labor Standards that have not enacted state laws
restricting Missouri laborers from working on public works projects. A list of
Nonrestrictive States can be found on the Division web site
at http://www.dolir.mo. gov/ls/index.hhn.
3. A period of Excessive Unemployment is declared when the Missouri Department of
Labor and Industrial Relations Division of La.bor Standazds provides notice of such
declaration. When in effect, notice will be provided on the Division web site
at http:llwww.dolir.mo.gov/ls/index.hi�n. It is Contractor's obligation to determine
whether a period of Excessive Unemplayment is in effect when this Con�act is let.
�4. Contractar agrees to follow the provisians of Section 290.560 - 290.575 RSMo and
agrees that if a period of Excessive Unemployment has been declared at any point
during the term of this Contract, it will employ and require all Subcontractors of
whatever tier to employ only Resident Laborers for the Work to be performed under
this Contract. Provided, however, Contractor may use laborers who are not Resident
Laborers when Resident Laborers are not available or are incapable of performing
the particular type of work involved if Contractor so certifies in writing to City and
City issues a written approval. This provision does not apply to regularly employed
nonresident executive, supervisory or technical employees.
Sec. 13. Attachments to Part I. The following documents are Attachments to Part I of this
Contract and aze attached hereto and incorporated herein by tlus reference:
Attachment A — RFP EV2516
Attachment B— Proposer Response dated June 8, 2018
Attachment C- Clarification Questions and Answers
Attachment D- Scope of Services revised per Clarification Questions
Attachment E- Facility Repair and Maintenance Contract Part II
i. Exhibit 1: City of Kansas City Special Requirements
ii,. Exhibit 2: City of Kansas City Pricing 5chedule
iii. Exhibit 3: National Pricing Schedule
iv. Exhibit 4: Partic;ipating Public Agency Service Level Agreement
Attachment F— OOb20 Insurance Certificate
Facility Repair 8c Maintenance Contract Part I 10201�
Contract Central
Page7af10
THE BELOW FORMS ARE SPECIFIC TO THE CITY OF KANSAS CITY, MO
Attachment G— HRD Forms & Ynstructions
00440 HRD 5: Const�uc�ion Contract HRD Instructions
00450 HRD 8: Contractor Utilization P1ar�IRequesfi for Waiver
00450.01 Letter of Intent to Subcantract
00460 HRD 10: Timeta.ble for MBE,`WBE Utilization
00470 HRD 11: Request for Modification or Substatution
00485 HRD Monthly Reporting Forms
Attachment H - Bonds
00610 Performance and Maintenance Bond
00615 Payment Bond
Attachment I— 00830 W�ge Rate Requirements
Annual Wage Order #25
County — Cass, Clay, Jackson, Platte or Ray
Work Type: State — Heavy
�tate — Building
Division of Labor Standards Rules & Regulations
01290.08 Wage Rate Verification Questionnaire
01290.09 Subcontractors and �ajor Material Suppliers List
01290.1 � Daaly Labor Fozce Report
01290.14 Contra.c�or Affidavit for Fina1 Payment
01290.15 Subcontractor Affidavit for Fina1 Payment
Attachment J— 0056Q Missouri Projecf Exemp'on Certificate
OOSb0.01 Kansas City Missouri Tax Exempt Certificate
Att�chment K— 00630 Re�enue Cle�rance Release Authorization
Attachment L— 40515.01 Employee EligibiliL� Veritication Aif davit
Sec. 14. Missouri Sa1es Tax Exemption. Pursuant to Section 144.062, RSMo, City is a
:Vlissouri exempt entity and tangible personal praperty to be incorporated or consumed in the
construction of this Project may be purcha�ed w�ithout sales tax. City shall furnish Contractor a
�issouri Project Exemption Certificate for Sales Tax at the t�me of issuance of the Notice to
Proceed.
Sec.15. Emergencies.
{a) Disaster means any large scale event such as an act of ferrorism, fire, wind, flood,
earthquake or other natural or man-made ca�amity which results in, or has the patential
to result in a significarit loss of life or property.
(b) During and after a disaster, C�'�TTRACTOR shall provide special services to the CITY
incZuding CONTRACT�R shall open COIvTTRACTOR°s facilities even on nights and
weekends as necessary to meet the needs of the City during a disaster.
(c) CONTRACTOR shall not charge CITY any fee for opening facilities during an
emergenc�- or for extending COTTRACTOR's hours of operation during a disaster.
CITY shall pay CONTRACTOR the agreed upon contract prices for all purchases
Facility Repair &:VIaintenance Contract Part I 102014 Cantract Central
Page $ of 1Q
made by CITY during the disaster and CONTRACTOR shalI not charge CITY any
additionai mark-up, fee or cost for any purchases made by CITY during a disaster.
(d} CONTR.ACTOR shall quickly mobilize CONTR.A�TOR's intemal and external
resources to assist CITY when a disaster unfo�ds.
(e} Extended hours and personnel. During disasters, CONTRACTOR's facilities shall stay
open 24 hours if requested by the CITY. CONTRACTOR shall utilize additional
CONTRA,CT4R personnel to take CITY orders if necessary. CONTRACTOR's Ca11
Center shall accept phone orders 24 hours a day.
(� CONTRACTOR shall have contingency plans with CONTRACTOR's suppliers to
provide additional supplies and equipment quickly to CITY as needed.
(g) CONTRACTOR shall cooperate with CITY to pmperly document any and al� expenses
incurred by CITY with CONTRACT�R and C�NTRACT4R shall assist C1TY in
meeting any and a11 documentation requirements of the Federal Emergency
Management Agency (FEMA).
Facility Repair & Maintenance Contract Part I 102014
Contract Central
Page9of10
-� •--
THIS CU1V'TRACT CO\'TAINS L�TDE11�'�IFICATIOiV' PROVISIU�TS
Date:
lV�ov ( a � ao I�
Date: /� t�L z � l8
Appro� ed as �cr''� :
:i�— �
�
ty ttoxney
Facility Rcpair 8c Maintenance Conrract Part I 102014
COv"'TRACTOR
I hereby certify that I have autharity to execute
this document on behalf Contractor
By:
Tit�e:
Sent ��r ( Stc,l� �
KA_'�IS S Cl'TY, h SSOG'RI
By: i�G ll1.t/�',
Title: Manager of Procurement Services
Contract Cena-a1
�
Pagel0of10
tr
�'
¥
� , x, �:.
a. :.. � , ` # 9� a ''1 ti.. , i ,,'.. , � �
! y,
i• 1 ' 1 � t �
�ec.l. Ge�aer�IIndem�aificatioa�.
A. For purposes of this Section 1
only, the following terms shall have the
meanings listed:
1. Clai�ns means all claims,
damages, liability, losses, costs and expenses,
court costs and reasonable attorneys' fees,
including attorneys' fees incurred by the City in
the enforcement of this indemnity obligation.
2. Contr�ctor's Agents means
Contractor's offcers, employees, subconsultants,
subcontractors, successors, assigns, invitees and
other agents.
3. City means City and its agents,
officials, officers and employees.
B. Contractor's obligations under this
Section with respect to indemnification shall be
limited to the coverage and limits of General
Liability insurance that Contractor is required to
procure and maintain under this Contract.
Contractor affirms that it has had the opportunity
to recover the costs of the liability insurance
required in this Contract in its contract price.
C. Contractor shall defend, indemnify and
hold harmless City from and against all claims
arising out of or resulting from all negligent acts
or omissions in connection with this Contract
but only to the extent caused by Contractor or
Contractor's Agents, regardless of whether or
not caused in part by any act or omission,
including negligence, of City. Contractor is not
obligated under this Section to indemnify City
for the negligence of City.
D. In no event shall the language in this
Section constitute or be construed as a waiver or
limitation of the City's rights or defenses with
regard to sovereign immunity, governmental
immunity, or other official imrnunities and
protections as provided by the federal and state
constitutions or by law.
Sec. 2. Indepemdent Contr�ctor. Contractar is
an independent contractor and is not City's
Facility Repair & Maintenance
Contract Part II 050113
agent. Contractor has no authority to take any
action or execute any documents on behalf of
City.
Sec. 3. I�asur�nce.
A. Contractor shall procure and maintain
in effect throughout the duration of this Contract
insurance coverage of the types and amounts
specified in this section. In the event that
additional insurance, not specified herein, is
required during the term of this Contract,
Contractor shall supply such insurance at City's
cost. Policies containing a Self-Insured
Retention are unacceptable to City unless City
approves in writing the Contractor's Self-
Insured Retention.
1. Commercial General Liability
Insurance: with limits of $1,000,000 per
occurrence and $2,000,000 aggregate, written on
an "occurrence" basis. The policy shall be
written or endorsed to include the following
provisions:
a. Severability of Interests
Coverage applying to Additional Insureds
b. Contractual Liability
c. Per Project Aggregate
Liability Limit
d. No Contractual Liability
Limitation Endorsement
e. An Owners and Contractors
Protective Liability Policy (OCPL).
2. Workers' Compensation
Insurance: as required by statute, including
Employers Liability with limits of:
Workers' Compensation Statutory
Employers Liability $100,000 accident
with limits of:
$500,000 disease-policy limit
$100,000 disease-each employee
3. Commercial Automobile Liability
Insurance: with a limit of $1,000,000 , covering
owned, hired, and non-owned automobiles.
Coverage provided shall be on an "any auto"
basis and written on an " each accident" basis.
This insurance will be written on a Commercial
Automobile Liability form, or acceptable
equivalent, and will protect against claims
arising out of the operation of motor vehicles, as
Page 1 of b
Contract Central
to acts done in connection with the Contract, by
Contractor.
4. If applicable, Professional
Liability Insurance with limits per claim and
annual aggregate of $2,000,000.
B. The Commercial General Liability
Insurance specified above shall provide that City
and its agencies, officials, officers, and
employees, while acting within the scope of
their authority, will be named as Named
Insureds on the OCPL for the services
performed under this Contract and maintain
products and completed operations coverage for
the duration of this Agreement. Contractor shall
provide to City at execution of this Contract a
certificate of insurance showing all required
coverage and additional insureds. The
certificates of insurance will contain a provision
stating that should any of the policies described
in the certificate be cancelled before the
expiration date thereof, notice will be delivered
in accordance with the policy provisions.
C. All insurance coverage must be written
by companies that have an A.M. Best's rating of
"A-V" or better, and are licensed or authorized
by the State of Missouri to do business in
Missouri.
D. Contractor's failure to maintain the
required insurance coverage will not relieve
Contractor of its contractual obligation to
indemnify the City pursuant to Section 1. If the
coverage afforded is cancelled or changed or its
renewal is refused, Contractor shall give at least
thirty (30) days prior written notice to City. In
the event of Contractor's failure to maintain the
required insurance in effect, City may order
Contractor to immediately stop work, and upon
ten (10) days notice and an opportunity to cure,
may pursue its remedies for breach of this
Contract as provided for herein and by law.
E. In no event shall the language in this
Section constitute or be construed as a waiver or
limitation of the City's rights or defenses with
regard to sovereign immunity, governmental
immunity, or other official immunities and
protections as provided by the federal and state
constitutions or by law.
F. Contractor shall obtain evidence that all
Subcontractors have in force general,
automobile, and employer's and workers'
compensation liability insurance in the amounts
required by these Contract Documents, and
evidence that each is current on its
unemployment insurance payments before
Subcontractors begin Work at the Site.
Contractor shall retain snch evidence in its files
and make available to City within ten (10) days
after written request.
Sec. 4. Governing Law. This Contract shall be
construed and governed in accordance with the
laws of the State of Missouri without giving
effect to Missouri's choice of law provisions.
The City and Contractor: (1) submit to the
jurisdiction of the state and federal courts
located in Jackson County, Missouri; (2) waive
any and all objections to jurisdiction and venue;
and (3) will not raise forum non conveniens as
an objection to the location of any litigation.
Sec. 5. Compliance with Laws. Contractor
shall comply with all federal, state and local
laws, ordinances and regulations applicable to
the work and this contract.
Sec. 6. Termination for Convenience.
A. City may, at any time upon thirty (30)
days notice to Contractor specifying the
effective date of termination, terminate this
Contract, in whole or in part. If this Contract is
terminated by City, City shall be liable only for
payment for services rendered before the
effective date of ternunation. Contractor shall
prepare an accounting of the services performed
and money spent by Contracior up to the
effective date of termination and shall return to
City any remaining sums within thirty (30) days
of such date.
B. If this Contract is temunated prior to
Contractor's completion of services, all work or
materials prepared or obtained by Contractor
pursuant to this contract shall become City's
property.
C. If this Contract is terminated prior to
Contractor's completion of the services to be
performed hereunder, Contractor shall return to
City any sums paid in advance by City for
services that would otherwise have had to be
rendered between the effective date of
termination and the original ending date of the
Contract. Contractor shall prepare an accounting
of the services performed and money spent by
Contractor up to the effective date oftermination
�.
Facility Repair & Maintenance Page 2 of 6 Contract Central
Contract Part II 050113
and shall return to City any remaining sums
within tl�irty {30) days of such date.
Sec. 7. Resolution oi Claims
A. For purposes of this Section 7 only, the
fallowing terms shall have the meanings listed:
1. A Claim is a demand or assertion
by fhe Contractor seeking, as a matter of right,
the adjustment of Contract price andior times
wiih respect to the terms of the Cont�•aet.
2. City's Representative--Person or
agency designaied to act for the Director.
B. The Contractor must give written notice
io the City's Representative within fourteen (14)
calendar days after the occurrence af the event
giving rise to the Claim or wiihin fourteen (14)
calendar days after the first recognition of ihe
conditions givin.g rise to the Claim. After the
fourteen (14} day period for filing claims has
expired, the Claim shall be considered waived
unless the Director grants an extension based an
good cause shown by the Contractor that such
additional time is warranted. The responsibility
to substantiate Claims shall rest with th�
Contractor.
C. If the claim cannot be resolved by
direct negotiation between the City's
Representative and the Contractor, the parties
mnst submit the Claim to the Director wiihin
five {5) days after the parties agree that they
cannot resolve the Claim.
D. The submittal af the Claim pasitian
statem.ents shall: 1} be in writing; 2} state the
issues; 3) and state the respeetive positions of
ihe parties.
E. The Directar shall review the written
statements and reply in writing to both parties
within ten (10) working days. The Director may
extend this period if necessary by notifyimg the
parties.
F. Absent fraud, gross mistake or bad
faiih, tha Director's decision shall be final and
binding on City and Cantractor within fourteen
(]4) calendar days after issnar�ce.
G. All administrative procedures set fortll
in this contraci rnust firsi be e�austed before
suit is iiled.
H. The iime frame for the DirectoY•'s
decisian may be tolled if the parties mutually
agree to participate in mediation. Mediator
selection and the procedures to be employed in
the mediation shall be mutually acceptable to
botli parties. Cast of the mediation, including ihe
mediator's fees, shall be shared equally among
the parties.
I. If the Claim is not resolved during
medi.ation, the Contractor agrees that it will �le
no suit based on facts ar evidentiary materials
that were not presented for consideration to the
City during the mediation process or of which
the Contractor had knowledge and failed to
present during the administrativepracedures.
Sec. 8. Default and Remedies. I£ Contractor
shalJ. be in default or breaeh af auy provision of
this Contraet, City may ierminate tlus cantract,
suspend City's performanee, withhold payment
or invake any other legal or eqc�itable remedy
after giving Contractor natice and apporlunity to
correct such default or breach.
Sec. 9. Waiver. Waiver by City of any term,
covenant, or condition hereof shall noi operate
as a waiver af any subsequent breach of the
sa�me or of any other ierin, covenant or
C4Il(�1�1022. No term, covenant, or condition of
this Contraet can be waived except by written
consent of City, and forbearance or indulgence
by City in a�y regard whatsoever shall not
constitute a waiver of same to be performed by
Contractor ta which the same may apply and,
until complete performance by Cantractar of the
term, cavenant ar condiiion, City shall be
entitled to invoke any remedy available to it
under this Contract or by law despite any such
farbearance or indulgence.
Sec. 10.Modificaiiou. Unless stated othercvise
in this Canfiract, no provision of this Cantr•act
may be waived, modified or amended except in
writing signed by City and Contractor.
Sec. 11.Headiugs; Cons�ructron af Contract.
The headings of each section of this Contract are
for reference only. Unless the context of' this
Contract clearly requires otherwise, all terms
aud wards used he�ein, regardless of the nuxnber
and gender in which used, shall be canstrued to
include any ather number, singular or plural, or
any other gender, masculine, feminine ar neuter,
the sazne as if such words kad been fully and
properly written in that number or gender.
Facility Repair & Mairitenance Page 3 af 6 Cantract Central
Contract Part II 050113
Sec. 12.Severability af Provisians. Except as
specifically provided in t.his Contract, all of the
provisions af this Contract shall be severable. In
the event that any provision of this Contract is
found Uy a cauxi af eompetent jurisdiction to be
unconstitutional or unlawful, ihe remaining
provisians of this Contract shall be valid unless
the court iinds that the valid pzovisions of this
Contract are sa essentially and inseparably
cor�x�.ected with and so dependent upon the
invalid provision(s) that it cannoi be presumed
that the parties to this Contract could have
included the valid provisions without the invalid
provision{s}; or unless the caurt finds that ihe
valid provisions, standing alone, are incapable of
bei�g performed in accordance with the
intentions of the parties.
Sec. 13.Recards.
A. For purposes of this section:
1. "Ci#y" sha11 �nean the City
Auditor, the City's Irxternal Auditor, the City's
Director of Human Relations, the City Manager,
the Ciiy department aclzninistering Chis Contract
and their delegaies and agents.
2. "Record" shall mean any
docubaent, book, paper, phoiagraph, map, sound
recordings ar other maierial, regardless of
physieal form or characterisiics, made or
received in eonnection with this Contract and all
Co�tract amendments and renewals.
B. Contractor shall maintain and retain alI
Records for a ternn af five (5) years that shall
begin after the expiration or termination of this
Contract and aIl Contract amendments. Cit�
shall have a right to examine ar audit all Reeords
and Contraciar shall provi.de access to City of aIl
Records upon ten (10) days written notice from
the City.
Sec. 14.Afiirmative Action. Not Used.
Sec. 15.Tax Compliance. Contractor shall
provide proof of compliance with the City's taac
�..
�
�
Facility Repair & Maintenance Page 4 af 6 Contract Central
Cantract Part II 050113
ordinances administered by the City's
couunissioner of revenue as a precondition to
the City rnaking the first paymeni under this
contract ar any contraci renewal when the total
cantract amount exceeds $150,OOd.00.
Sec. 16.Assignability or Subcontracting.
A. Assignability. Contractor shall not
asszgn ar transfer any pat�t ar all af Cantractar's
obligation or interest in this Contract withaut
prior written appraval af City. If Contractor
shall assign or transfer any of its obligations or
interests under this Cant�•aet without the City's
prior written appraval, it shall constitute a
matenial breaeh of this Cantract. This provision
shall not prohibit contractor from subcantracting
as atherwise provided far herein.
B. Subcontraciing. Contractor shall not
subcontract any part or all of Co;�tractar's
obligations or interests in this Contract unless
the subcantractar has been identified. in a format
required by City. If Contraetor shall
subcontract any part o£ Contracior's obligations
or interests under this Contract without having
identiiied the subcontractor, it shall consiitute a
material breach of thrs Contract. The utilizatiol�
of subcontractors sha11 not relieve Contractor of
any of its responsibilities under the Contract,
and Contractor shall remain responsible to City
for the negligent aets, errors, omissions or
neglect of any subcontractor and of such
subcont�ractor's a€ficers, agents and employees.
City shall have the righi ta reject, at any paint
during tlie term of this Contraei, any
subeontractar identified by Contractor, and to
require that any subconiractor ceasa warking
under this Contract. City's right shall be
exercisable in its sole and subjective discretion.
City shall nQt be obligated ta pay or be liable �or
payment af any manies which znay be due to any
subcontractor. Contractar shall include in an.y
subcontract a requirement that the subcontractor
camply with aIl requirements of ihis Contract in
performing Contractor's services hezeunder.
Sec. 17.Conflicts of Interest. Cont�actor
eertifies that no off'icer ar employee of City has,
or will have, a direct or indireet financial or
personal interest in this Contract, and tl�at no
afiicer or empioyee of City, ar member of such
officer's or ernployee's immediate iamily, either
has negotiated, or has or will have an
arrangement, concerning employment to
perforxn services on behalf of Contracior in this
Contract.
Sec. 18.Rules of Construction. The judicial
rule of constructian zequiring or allowing an
instrument to be construed to the detrim�nt of or
against the interests of the maker thereof shall
not apply to this Contract.
Sec. 19.Reports. Contractor slaall provide City
detailed reports of actual contract usage by
categary each quarter and annually at no cost.
Sec. 20.Employee Eligibility Veri�catian. If
tYus contract exceeds five thousand
dollars{$5,000.00}, Coniractox shall execute and
submit an affidavii, in a fozm prescribed 1�y the
City, afiirming that Cantractor does not
knowingly emplay any person in eonnectian
with the contracted services wha does not have
the Iegal right or authorizatian under federal law
to work in t3ie United States as defined in 8
U.S.C. § 1324a(h)(3}. Contractor shall atiach to
the affidavit dacumentatian sufficient to
establish Contractar's enrollment and
participatian in an electronic verification of
work program operated by ihe United Siates
Depaxlment of F-Iameland Security io v�rify
information of newly hired employees, under the
Immigration and Reform and Control Act of
19&6. Contractar may obtain additional
infonnation about E-Verify and enroll
at www.dhs.gov/xprevprot/pro�rams/�c 118522
1678150.shtm. For those Contractors enrolled in
E-Veri£y, ihe first and last pages of th� E-Verify
Memorandum of Understanding that Contractor
will obtain upon suecessfully enrolling � in the
program shall constitute sufficient
documentatian for purposes of eomplying with
ihis sectian. Contractor shall subnnit the afiidavit
and attachments io the City prior to execution of
the contraci, or at any point during the term of
the contract if reques�ed by the City.
Sec. 21.Buy American and Missouri
Preference Palicies. It is the policy of ihe City
that any manufaciured goods or commoditiss
used or supplied in. the performance of any City
contract ar any suUcontract thereto shall be
manufactured or produced in the Uniied States
whenever possible. Pursuant to Seetion 71.140
RSMo., preference shall be given to materials,
products, supplies and all other articles
produced, manufaciuzed, made ar grown within
the State of Missouri.
Facility Repair & Maintenance Page 5 of 6 Cantract Central
Contract Part II 0501 i3
Sec. �Z.Missouri Sales T�x Exemtption.
Pursuant to Sectian 144.Ob2, RSMa, City is a
Missouri exempt entity and tangible personal
property to be incorpo�ated or consumed in ihe
construction of this Project may be purchased
withoui sales tax. City s1�a11 fiu�ish Contractor a
Missouri Project Exemption Certificate far Sales
Tax at the time of issuance of the Notice to
Proceed.
Sec. 23,Escalator Technical Survey.
Coniractor is not obligated ta perform tests,
correct outstanding violations or deficiencies
that were not addressed by the priar service
provider and/or the owner, or nzake related
necessary repairs ar component replacements on
the equiprnent. If additional work is necessary,
Contractar will provide a separate proposal or
recommendatian for such work. Contractor's
price and obligations under ihis Agreement are
subject to a technical survey to be performed
wiihin 90-days of the effective date. If a safety
hazard or code violation is identified during
Contractor's technical suivey, City will
immediately remove the unit fram service until
repairs are pe�'ormed. City agrees to indemnify,
defend, and hold Contractor harmless for any
clainis arising aut af City's failure to comply
with Contractor's recommendations and
praposal. If City does not immediately approve
Contractar's proposal or
recammendation, Contractor reserves the rigYft to
terminaie this Agreement without penalty.
Sec. 24.Hazardo�s Materials. Notwithstanding
anything contained ta the cantrary within this
bid or contract, Contracior's work shall not
ii�clude any abatemeni or disturbance of asbestos
containing material �AGM), presumed asbestos
containing materials (PACM) or other hazardous
materials (i.e. lead, PCBs) {callectively
"HazMat"). Contractor shall have the right to
discontinue its wark in any locatian where
suspected HazMat is encauniered ar disturbed.
.Any HazMat removal or abatement, or delays
eaused by such, required in order for Contractor
to perform its vvork shall be the Cityr's sole
respansibility and expense.
Sec. 25.Cousequential Damages. In na event
will either party be liable to the oiher party for
indirect, incidental, consequential, speaial,
exemplary, or punitive damages of aa�y kind ar
nature arising from or related to performance of
the Agreement, including without limitation loss
af profits, Ioss or inaccuxacy of data, or loss of
use damages, even ii the party has been advised
r,,
�_
Facility Repair & Maintenance Page b of 6 Contraci Cenl�al
Contract Part II 050113
of ihe possibility o� such damages and even if
under applicable law such damages would not be
considered for indirect, incidental, puzutive,
special, or consequential damages. Each party
hereby waives its rights io su.ch darr�ages to the
fullest extent permitted by applicable Iaw.
Sec. 26.Force Majuere. A party is not liable for
failure to perfarm its ohligations under the
Agreemeut if such faiiure resul�s from Acts of
God, %re, flood, unusual delay in deliveries,
unavoidable casualties, terrarist
activities, government sanction, blockage,
embargo, Iabor dispute, strike, or
lockout, concealed conditions, shortage or
unavailability of materials, supplies, labar,
equipment or systems, interruption or failure of
electricity or ielephone service or any other
causes beyond Contractar 's control. The non-
performing party must promptly noiify the other
pariy in writing of ihe force majeure event and
resume perfarmance unrnediately upon cessation
of the event.
Sec. 2'I.Iniellectual Property. All proprietary
and intellectual praperty rights ia the equipment,
any drawings, technical documentation and
software shall remain solely with Contractor.
Faciiity Repair & Maintenance Page 7 of 6 Cantract Centra.l
Contract Part II fl50113
Classification: KONE Internal
����
�II T = � �I .
�-- ..�-� ���--.
l� '__�=_'�
�;� � __��
- �,
_ J _T
r�� ° = E�' � � �
� � �
�
�
� I �.
�,�� �I,� ��� ���
Iw � �
. �� �� . _ ►� ,
� �� , -
�,. - - _�L1
� � -� � �
■ ���
,�_ � � o
�
�
� ,,
.,
- `'L1 �
■ ��� tl
� _�
+ � :::;, �
� ,
I � �__
KONE EcoMod Proposal
Specification
• Will Rogers Arena — East & West Units
• Fort Worth, Texas
• January 8, 2024
Exhibit 4
KONE Inc. Proposal to Suppl� Ele�•ator, Escalator, �1oving Walk��a� �taintenance,
Repair, M17odernization and Related, Products, Sen ices and Solutions under the U.S.
Communities Program utilizing the Terms and Conditions of the Cih� of Kansas
Cit� �laster Contract
(Reference GE\RL-E�'2516 dated December 1", 2018)
Thc partics hcreby agrcc to bc bowid to thc Tcrms and Conditions of thc City of Kansas
City MasterContract (Reference GENRL-EV251G dated December I". 2018)
("Contrxt"), togethcr «ith thosc tcrms and conditions containcd in this Exhibit
4(collcctively. "Ser��ice Agreement"). In the event of conflict between terms and
conditions contained in the Contract and this Exhibit 4, the terms in this Exhibit 4 shall
supersede and prevail.
Classification: KONE Internal
����
11 /16/2023
KONE Inc.
Elevators & Escalators
801 Hammond St. Ste. 400
Coppell, TX 75019
Mobile: (469) 933-7105
Email: Ryan.Bok@kone.com
www. kone. us
Dear Keith Chisolm,
We are pleased to enclose, for your review and consideration, KONE's proposal to modernize your
equipment located at the following address for the amount of $ 1,983,204.00 (proiect is exempt from
Texas Sa/es Tax):
Will Rogers Auditorium
3400 Burnett-Tandy Fort Worth, TX, 76107
Our proposal is based on the Traction Elevator Modernization/Replacement Specification dated 10/12/2022 and
meets the general intent of the project.. Pricing is based on the contents specified in this Proposal and the appen-
dices and Bid Attachments, which are incorporated into this Proposal (the "Proposal"). Contract terms shall be in
accordance under the U.S. Communities Program utilizing the Terms and Conditions of the City of Kansas City
Master Contract (Reference GENRL-EV2516 dated December 1 st, 2018)
The parties hereby agree to be bound to the Terms and Conditions of the City of Kansas City Master Contract
(Reference GENRL-EV2516 dated December 1st, 2018) ("ContracY'), together with those terms and conditions
contained in this Exhibit 4(collectively, "Service AgreemenY'). In the event of conflict between terms and conditions
contained in the specification and The Service Agreement this The Service Agreement shall supersede and prevail.
This Exhibit 4 shall be incorporated by reference in the final agreement. The pricing included in this Proposal is
submitted with the understanding that all documents referenced and incorporated will be signed without
modification. This Proposal is valid for 30 days.
Should you have any questions or require additional information, please feel free to contact me directly.
We look forward to hearing from you and working together on this project.
Yours sincerely,
' '.
Ryan Bok
Senior Modernization Sales Consultant
KONE Inc.
Classification: KONE Internal
����
KONE EcoMod Solution Specification
Units in bid
Units in group
Unit names
Existinq Epuipment outline
Make
Model
Rise
Step width
Existing voltage
Balustrade type
Speed
Offered Components
Truss
4 Montgomery Solid Balustrade HR Escalators
Original Contract Numbers 50244-45 / 50246-47
Montgomery
4500
2 @ 10'-11" / 2 @ 10'-4"
40"
480VAC
Solid
100FPM
The existing truss shall be reused. The following work shall be pertormed:
1. Upper and Lower End
a. Removal of track and support brackets.
b. Removal of access cover support plates.
c. Removal of selected truss cross members.
d. Removal of handrail support return brackets.
2. Incline
a. Removal of top and return track
b. Removal of handrail return brackets.
c. Modification to truss cross members.
Clean down of the existing truss removing all remnants of oil, grease, lint, dirt, and debris from
the unit.
Inspection/analysis of the existing welds, rivets, and overall structure.
Isolation Mounting
Existing isolation mounting shall be reused.
Upper, Lower, and Incline Modules
Upper, lower, and incline modules shall be designed and fabricated for installation into the existing
truss.
1. The upper end module shall include the drive machine, track sub-assemblies, and truss intertace
components. The track sub-assemblies shall be welded steel plate construction. The left and right
hand plates shall be connected by structural steel tube cross members. The following components
shall be directly mounted to the upper end module: top and return curve track; step guidance system;
handrail guidance system; skirts and support brackets; access cover and comb plate support angles;
safety devices and associated mounting brackets, including skirt switches, missing step detector,
step out of level detector, and handrail speed sensors.
www. kone. us 3(19)
Classification: KONE Internal
����
A) Drive machine:
A totally enclosed, planetary geared machine specially designed for this service shall be
furnished. It shall include furnished. It shall include a drive motor and electro-magnetic brake.
The machine shall be mounted in the upper end module to truss interface brackets and
integrally attached to the track sub-assembly plates and be connected by direct drive to the
step drive sprocket. An output shaft shall be provided to directly drive the handrail. The drive
machine shall be designed to substantially match speeds of the step band and handrails.
Lubrication of the gears and bearings shall be by synthetic based oil bath.
B Motor:
The escalator(s) shall be equipped with a motor designed for escalator service. The motor
shall be of TEFC design, ball bearing type, integrally and horizontally mounted to the drive
machine. The motor shall be flange mounted to the main drive gear case and torsionally
connected to the gearbox. Driving motor and motor switchgear shall be designed to provide a
smooth start, which shall prevent undue strain on drive components. The motor shall be of
sufficient size to operate the escalator at a minimum of code-rated load, ascending without
exceeding the rated horsepower.
Each escalator shall be provided with a permanent magnet ceramic brake, located on the
high speed shaft which, when activated, shall stop the escalator as required by Code, upon
activation of a stop button, safety device, or loss of power.
C) Permanent maanet ceramic brake:
A load compensating brake system shall be installed. The brake shall be capable of
automatically stopping the escalator quickly but gradually and shall hold the escalator
stationary under full load whenever the power is interrupted. The brake shall be "fail safe"
and electrically released. The system shall continually adjust brake torque to maintain a
relatively constant deceleration independent of the load. The brake shall not cause the
escalator to come to an abrupt stop. It shall be designed to meet ASME A17.1 Code
deceleration requirements without adjustment.
Dl Upper reversina station:
The Upper reversing station and drive shall include a precision-machined step chain sprocket
mounted on the machine output shaft and rotating on bearings.
2. The lower end module shall include the reversing station, track sub-assemblies, and truss
interface components. The track sub-assemblies shall be welded steel plate construction. The left
and right hand plates shall be connected by structural steel tube cross members. The following
components shall be directly mounted to the lower end module: top and return curve track; step
guidance system; handrail guidance system; skirts and support brackets; access cover and comb
plate support angles; safety devices and associated mounting brackets, including skirt switches,
missing step detector, step out of level detector, and step up-thrust device.
A) Lower reversing station
The lower reversing station shall consist of a machined floating track system designed to
maintain proper tension on the step chain by use of springs. It shall be designed to maintain
uniform chain tension and shall detect movement of the carriage through the activation of a
safety switch.
www.kone.us 4(19)
Classification: KONE Internal
����
3. Incline modules. Modular multi-purpose stanchion assemblies shall be installed on the incline of
the existing truss. These incline support stanchions shall be fabricated of steel and mounted to the
existing truss. They shall be designed to support all incline track sections and handrail guide
components as part of the complete step band. These stanchions shall be pre-assembled and
fixtured to set track spacing, as well as step and handrail guidance components, prior to installation
into the existing truss.
Step Bands
1. A step guidance system shall be provided to control the movement of the steps both horizontally
and vertically. Each step shall be provided with horizontal guide pads, which shall guide the steps
throughout their travel, in combination with a continuous guide profile installed in the area of the
escalators open to passengers. A17.1 Code Step/Skirt Performance Index requirements shall be met
without the need for skirt deflector brushes.
2. Step chain: The step band shall consist of consecutively running steps powered and spaced with
a chain designed for long life and quiet operation. The step chain shall properly mesh with the main
drive sprockets and lower reversing station castings. The chain shall be an engineering class roller
chain, manufactured to close tolerances, from high quality material with heat-treated bushings, pins,
and link plates.
The escalators shall be designed using lubrication-free chain. The chain shall be designed to reduce
oil use and life cycle costs.
3. The steps shall be formed from one-piece die cast aluminum with closely spaced tread and riser
cleats. Step rollers shall rotate on sealed ball bearings. The step shall be connected to the chain by a
pin and bushing. Vertical curved step risers shall be furnished with vertical cleats arranged to pass
between the cleats of the tread on the adjacent step to form an inter-meshing unit with minimum
clearances. Step color shall be black painted aluminum.
A) The number of level steps at each end of the escalator shall be 2 upper/2 lower.
B) Step demarcation inserts shall be provided on the sides and rear of each step. The inserts
shall be fabricated from reinforced structural plastic, shall be easily replaced and shall be
approximately 1.5 inches (38mm) wide at the sides and approximately 1.5 inches (38 mm)
wide at the rear. Inserts shall be attached to the step without the use of visible fasteners. The
color of the demarcation inserts shall be yellow.
4. New tracks shall be designed and fabricated to support and retain the steps and running gear at
the rated load and at the highest speed specified. Tracks shall be assembled and secured together
for easy removal and replacement of sections. The system shall be adjustable, with no welding of the
track sections at the joints. Tracks shall be properly supported on stanchions to provide correct
alignment and smooth transition to return stations. The rolling surface of the incline track shall be a
minimum thickness of 3 mm. The transition track shall be a minimum thickness of 10mm. The guiding
surface of the wheels shall be galvanized steel profiles with smooth and even running surfaces.
Joints shall be cut diagonally to the running direction. A second, continuous step guiding profile shall
be provided above the step chain rollers.
www.kone.us 5(19)
Classification: KONE Internal
����
Comb plates and Access Covers
1. Adjustable comb plates shall be located at the top and bottom landings. The comb plates shall
support injection molded, reinforced structural plastic comb segments which shall be designed to be
removable and to mesh with the cleats on the step treads. The skid resistant comb plates shall be
designed to sense both horizontal and vertical movement of the comb segments. Comb segments
shall be yellow plastic.
2. Lightweight aluminum access covers shall be provided. The design of these skid resistant access
covers shall allow for ease of maintenance. These covers shall be provided at both upper and lower
landings and match the pattern of the new comb plates.
The escalators shall be designed with access cover extensions of adequate length to match existing
opening dimensions.
Decks/Balustrades/Front plates/Skirts/Interior Trim
1. The escalator decks shall be constructed such that there shall be an inner deck and an outer
deck. The inner and outer decks shall be fabricated from heavy gauge metal. Deck panels shall be
installed without overlapping joints or requiring trim pieces to cover where two deck panels meet.
Both inner and outer decks shall be finished in stainless steel #4 satin finish 14 gauge material.
A) Both the upper and lower newel ends shall be designed to allow the return of the
handrail without undue stress. The newel ends shall support the handrail around the newel
through the use of a multi-roller bearing system to minimize drag and maximize handrail life.
Escalator units in this specification are required to have deck guards per ASME Code. The
guards can either be provided by the escalator modernization contractor or the owner. The
deck guards are required at the upper and lower end.
2. Solid balustrades shall be provided between the escalator skirts and the handrails. The
balustrades shall be fabricated of sheet metal with stainless steel #4 finish.
3. Front plates shall be provided at upper and lower ends designed to include the handrail inlet
device and key actuated direction-starting switch. The handrail inlet device shall be a four-piece
door/gate assembly. The front plate material shall be stainless steel.
A) At both the upper and lower landings, located near the handrail inlet, a station shall be
provided which shall include a key actuated direction starting switch. The escalator will not
restart automatically. It must be restarted with the key after it has shut down.
4. The skirts shall be constructed from a heavy gauge material reinforced with steel channels. Skirts
shall be fastened to the truss modules with hidden fastenings in the incline and transition areas. Skirt
panels shall be installed without overlapping joints or requiring trim pieces to cover where two skirt
panels meet. The skirt panels will be finished in teflon coated 11 gauge stainless steel #4 satin finish.
5. Interior trim pieces shall be aluminum and designed to connect the skirts and inner panels
together.
www. kone. us 6(19)
Classification: KONE Internal
����
Handrails
V Groove handrails, properly constructed and reinforced, shall be provided. Handrails shall be
endless with a smoothly vulcanized splice and shall operate with the moving steps. The handrails
shall move on specially formed guides and traction sheaves. These sheaves shall be an integral part
of the single drive machine. Close fitting guards shall be provided by the handrail openings in the
newel base. The handrail color shall be black.
Controls and Wiring
1. The controller shall be a Eco501 type. The controller shall monitor the condition of each safety
device, brake, and motor operation, and shall cause the escalator to come to a stop upon activation
of any safety device, brake problem, or motor overload. Should a power failure occur, the controller
shall automatically remove power from the motor, and brake, and bring the escalator to a controlled
stop. The controller shall include phase and overload protection.
The controller shall include smart technology, allowing for 24/7 connectivity and diagnostic capability.
Around the clock monitoring of escalator operation and all safety devices shall be provided. Real time
statistical data shall be transmitted through wireless connection, allowing for prompt reaction to
escalator faults and fast response times to customer service needs. Means to store real time data
and allow 24/7 customer access shall be provided.
2. A pre-assembled wiring harness shall be installed, complete with modular assemblies for the upper
end, incline section, and lower end of the truss. The upper and lower end assemblies shall be
constant and consistent from unit to unit. The incline assembly shall be variable by length only. Both
upper and lower harnesses shall have terminal boxes for easy access and troubleshooting
capabilities. In conjunction with the low voltage/low power circuitry, S.O. cord shall be installed
between terminal boxes and individual safety switches.
Safety Devices
1. Each escalator shall be provided with a reversal stop device or function that is controller sensitive
to stop the escalator automatically should the escalator attempt to reverse its direction while
operating in the ascending direction.
2. A broken step chain device, a part of the lower reversing station assembly, shall be provided for
each chain. When these devices are activated, the escalator will come to a controlled stop.
3. A step up-thrust device shall be located on each side of the lower curve track on the lower end of
each escalator. The escalator will come to a controlled stop should a step be displaced against the up
thrust track.
4. A comb-step impact device shall be provided at the upper and lower comb plates. The escalator
will come to a controlled stop should an impact occur between the comb segments and steps.
5. Skirt obstruction devices shall be provided, at both upper and lower ends, within the skirt panels.
The escalator will come to a controlled stop should an obstruction occur between the step and skirt
panel. Switches shall be of the plunger, self-resetting type, adjustable to maintain the required
position and clearance from the skirts.
6. Missing step devices shall be provided. The missing step devices are designed to detect a
missing step or steps at the upper and lower ends of the escalator. When these devices are
activated, the escalator will come to a controlled stop.
www.kone.us ��� 9�
Classification: KONE Internal
����
7. Step demarcation lights demarcation lights at top and bottom of each escalator shall be provided.
Lights shall be mounted below the track system where the step leaves or enters the combplate and
shall be visible between the steps and the step/comb segment. Two independent green LED lights
shall be provided, capable of lighting the entire width of the step.
8. A handrail entry device shall be provided at the handrail inlet in the newel. The escalator will
come to a controlled stop should an object enter the handrail inlet area.
9. A magnetic sensor shall be provided to sound the alarm when the handrail deviates from the step
speed by 15% or more. If the deviation lasts for more than 2-6 seconds, the escalator will come to a
controlled stop.
10. Emergency stop buttons shall be provided, designed so that the momentary pressure of either
button shall cut off the electrical power supply to the motor and bring the escalator to rest.
A) One emergency stop button shall be located at each landing. Location shall be in the
existing newel upper radius quadrant, 45 degrees above horizontal, in order to provide easy
access. The stop button shall be red in color.
B) The button shall be housed under a clear, high impact resistant plastic cover, which shall
be self-closing. Instructions for operating the stop button shall be imprinted on the cover in
half-inch high letters. When the cover is lifted, an audible alarm shall sound until the cover is
returned to its closed position.
11. A pictorial sign meeting the requirements of the ASME A17.1 Code shall be provided at both the
upper and lower landings. The safety signs will be provided in English.
12. Each escalator shall be provided with stop switches in the upper and lower pits. When these
switches are activated, the escalator will come to a controlled stop.
13. Step level devices shall be provided at the upper and lower ends of the escalator to detect
downward displacement of the step prior to it reaching the comb plates. When these devices are
activated, the escalator will come to a controlled stop.
14. Escalators in this specification are required to have step guards. Step guards will be provided in
the upper and lower pit. The step guard will protect a mechanic from the step band.
www.kone.us $�� 9�
Classification: KONE Internal
����
2 Other Optional Features
Basic Optional Features
- New escalator decking — Yes
- Common center decking — No
- Step sound deadening — No
- Newel extensions — No
- Reuse existing access frame — Yes
- Plastic demarcation step inserts — Yellow
- Step chain covers — No
- Pendant station — Yes
- Drip pan modifications required — No
Optional Controller / Electrical / Environmental Features
- Power control type — Soft start
- Electrical Protection Class — NEMA 1
- Comb lights — No
- Skirt spot lighting — No
- Under handrail lighting — No
- Diagnostic display — No
- Phone jack — Yes
- Controller cooling fan — Yes
- Controller heater — No
- Comb plate heater — No
- Truss heater — No
Optional Safety Devices
- Deck guards — No
- Apex/head guards — No
- Anti-slide knobs — Yes
Special Features Included
- 264 Ib. step loading (Public Transportation Grade)
- Stainless Steel Front Plate
- V Groove Handrail
- 3 mm / 10 mm Step Track
- Lube Free Step Chain
Pre-Assembled Escalator Modules
Escalator modules included in this specification shall be completely pre-assembled by escalator
modernization contractor prior to shipment to the job site. Such modules have specific access re-
quirements. In accordance with information provided by the escalator modernization contractor,
adequate access to the location of final modernization shall be provided by the general contractor
or owner.
www.kone.us 9�� 9�
Classification: KONE Internal
����
3 Maintenance Service
The escalator modernization contractor shall provide a quality maintenance service consisting of
examination, adjustments, and lubrication of the escalator equipment for a period of 12 months after the
escalator has been turned over for customer use. This service shall not be subcontracted but shall be
performed by the escalator modernization contractor. All work shall be performed by qualified employees
during regular working hours of regular working days and shall include regular time call backs.
This service shall not include adjustments, repairs, or replacement of parts due to negligence, misuse,
abuse, vandalism or circumstances caused by persons other than the escalator modernization contractor.
Only genuine parts and supplies as used in the manufacture and installation of the original equipment shall
be used.
4 Delivery, Storage and Handling
A) Should the building or the site not be prepared to receive the escalator equipment on the agreed upon
date, the owner or general contractor shall be responsible for providing a suitable storage area on or off
the premises.
B) Should the storage area be off site and the equipment not yet delivered, the escalator modernization
contractor, upon notification from the owner or general contractor, shall divert the escalator equipment to
the storage area at no additional cost to the escalator modernization contractor. If the escalator equipment
has already been delivered to the site, the owner or general contractor shall be responsible for
transporting the escalator equipment to the storage area. The escalator equipment shall be stored and
removed from storage to the job site in a timely manner at no cost to the escalator modernization
contractor.
5 Escalator Preparatory Work
The following work is the responsibility of the purchaser, and must be performed or furnished by
contractors other than the escalator subcontractor, according to governing codes:
GENERAL: A clear entry and exit safety zone at the top and bottom of the escalator.
ESCALATOR LIGHTING: Adequate lighting for the escalator entry and exit points as well as up and down
the incline is required by the Code. A minimum intensity of five foot candles is required. Correcting any
lighting deficiencies should be contracted, by the owner, with a qualified lighting contractor.
MACHINE SPACE LIGHTING: Adequate lighting for machine spaces as well as a 15 amp, 120-volt
duplex outlet is required. A qualified electrician should be contracted separately, by the owner, to correct
any deficiencies.
POWER SUPPLY: Provision of 110 VAC to upper and lower escalator pits and 60 Hz three (3) phase
electrical power.
GROUNDING: Provision of any necessary electrical grounding to the disconnect switch if not currently
present in the facility.
PROTECTION FROM WEATHER: canopy and/or covering.
FIRE PROTECTION: Provision of code compliant fire protection in and around the escalator truss or work
area, if required.
www. kone. us 10(19)
Classification: KONE Internal
����
PROVISIONS FOR EQUIPMENT PROTECTION: Arrangements must be made to protect the escalator
equipment from damage throughout the entire project.
WORK AND STORAGE AREAS: The working and storage areas must be clean, dry, and protected from
the weather.
6 Modernization Preparatory Work
Barricades
KONE will furnish, install, maintain and remove (at Project completion) necessary barricades. The deter-
mination of need, the description, the location and the quantity of such barricades will be at KONE's sole
discretion. Care of KONE barricades, during times when KONE personnel are not on-site, will be the pur-
chaser's responsibility (not KONE). All signage to be placed on KONE supplied barricades will be the pur-
chaser's responsibility (not KONE).
Special Precautions
Any asbestos removal necessitated by the work described in this proposal will be the purchaser's respon-
sibility (not KONE).
Reports To Purchaser
Where this proposal includes KONE's review of the condition of any item, KONE will report the results to
the purchaser in the event that the results impact the work as proposed.
www.kone.us 11(19)
Classification: KONE Internal
����
7 Project Clarifications
Technical Clarifications:
1. Please reference the attached proposal specifications which define the technical scope of work for this
proposal.
2. Based upon minor dimensional variations between the existing escalators and the newly modernized
ones, some minor cosmetic work may be required to existing escalator cladding, flooring, walls, etc.
This work is to be performed by OTHERS, not KONE.
Job Schedule / Sequencinq / Coordination:
3. This proposal is inclusive of an equitable adjustment in price in accordance with the known impact of
recent U.S. tariffs in effect at the time of this proposal. After the date of this proposal, and KONE's
price or time to perform the work, KONE shall be entitled to an equitable adjustment in contract price
and a time extension to complete its work commensurate with the impact.
4. All pricing assumes arriving at mutually agreeable contract terms between your form and KONE, in-
cluding the reference to this proposal in any subcontract agreement.
5. The agreed delivery and installation times for the project may need to be extended because of delays
caused by measures undertaken to stop the spreading of the Coronavirus (2019-nCoV) epidemic,
such as mandatory holiday extensions and transportation restrictions imposed by authorities in China
and other countries, and the availability of personnel, logistics providers and supply chains, due to
the ongoing pandemic.
6. Labor costs in this proposal have been based upon an award date of no later than 2/15/2024, and
an approximate installation start date of the first 2 units by no later than 9/1 /2024. The second 2
units will be installed following the completion of the 2025 Fort Worth Stock show. No more than 2
units being installed (simultaneously). Final pricing is subject to change based upon actual start date
of the project. Schedule requirements which require additional manpower will require price modifica-
tions.
7. It is assumed that all work will be performed weekdays between the hours of 6:00 AM and 4:00 PM.
NO OVERTIME has been included in this proposal unless stated otherwise.
8. The existing escalator truss is assumed to be in good condition, and a structural engineer review has
NOT been included. If it is determined for any reason this is required, an add to the quoted proposal
amount would apply.
9. If KONE Inc. is require to pull off the work site for any reason beyond our ability to control, a remobili-
zation fee of $3,500.00 will be charged for each occurrence.
10. The pricing proposal is based upon KONE being awarded no less than a 5 year maintenance con-
tract for the equipment including in this proposal. Maintenance contract to be awarded at the sane
time as the contract for the modernization work.
11. KONE anticipates being provided with free on-site parking for our installation crews during the dura-
tion of the modernization work.
www. kone. us 12(19)
Classification: KONE Internal
����
12. All escalators are assumed to be capable of running in a safe condition to allow for engineering
surveys and equipment demo to take place. If this is not possible, a change order may be required
due to the additional labor these activities will require.
13. Deliveries are assumed to occur on regular time at the main floor and allow for all material to be
brought to the work site across the exhibit hall floor.
14. It is anticipated all material will be stored inside the barricaded space for each set of units. Remote
storage is not included.
15. KONE anticipate locating dumpsters for torn out material in close proximity to the delivery location. A
remote location dumpster is not included.
16. GC work included is strictly limited to the scope pf work defined on the attached proposal.
Any other items required would be an add to our contract amount. (Section 9 on page 15 of
this proposal)
www.kone.us 13(19)
Classification: KONE Internal
����
8 Alternates
Alternate #1 :
To DELETE all required "GC Work" (see paragraph (/ page 15 of this proposal) - please DEDUCT the total net
sum of $130,000.00 from our base bid amount.
Accepted Rejected
www.kone.us 14(19)
Classification: KONE Internal
����
9 GC Scope of work
reneraF:
i. 1+1+e will abtain permits for the scape af work fisted in this propos�l as requFred by AHJ_
2. We will provide ansite supen+ision �s required to camplete our listed scope af wark_
3. 1Ne will provide subnzittals far any items required in the specifEcations_
4. We will hau! away aur debris and lea�e the area cfean.
UQoer Esealator E'r}ain En►rance
^ I. 1Ne will Qravide exFerior balustradeltn�ss of il�e esca[ator arith#F4S5. There will be a hairline seern at the
building jaints af each cl�d. Survey for fi�3a1 dirnensions inciuded.
2_ Lar�ding-Discani3ect+ recunneci power in tiie pit landir�g �t ihe base af fhe escalator for (2} tatal _
(Disconneets prav3de by otl3�rs)
3. 120va1t �Damp pawer- Enstal3 id�R a�'.rb �iv1T far 12�-volt power to escalatar A. Ta be fed from Panei
Garage Toll Booth Circuit breaker panel. 12Qvi2ff8_ Install {1) 2flamp Westinghouse Bf2 breaker stab iRs.
4_ Grounding- E�3s#ali graunding electrade in the pit, a{so band ta eitkier f�uilding steei or equipnzeoYt (water}
means_ Keep under 2�ahn�s af resistarace_ Allawar�ce of 3aft banding in equ�pment raom iR sra` EMT.
5. Receptacle- li7stall i GFCI receptacle in the pif_
6. Light-add or repface alfaw�nce af 1 vapor 4ft.
7_ Switches- IRstall 1 illurninated switcf� in pit_
Lower Escalator
�. La�dint�-Disconnect� reeonrTect pawer in the pit landing at the base o� the escalafar for �2� total_
(�is�annee� prauide by athersj
2. I 20volt 20amp powe�- install i D�ft of'.�a ETv1T for 120-volt power to escalatar A. To be fed from Pane3
Garage Tafl Sootn i�ircuit 6reaicer pane4_ 126vl208_ Install {1) 2�amp WestingE�ouse BR breaker sia6 ie�s_
3. Grounding- Insiafl graunding electrode in #he pit, also band to eithee 6uiiding steel ar equi�ment {water)
mea�s_ fSeep under25ohms ofiresistance. Rliaw�nce af 36ft banding in equipment raom in ?%` ENkT_
4. Receptacle- Install 1 GFCI receptacie in the pit_
5. Lighi-add or replace alkawance of 1 vapar 4ft.
fi. Switches- Insfall 1 illumina#ed switch in pit_
Exclusions:
i. We do not include ar�y hazardo�Fs ahateinent in our propasal_
2. We do not include any work nat listed in this propasal_
3. We do not include any additianai sprinkler work.
4. We do not include any painting and waterpraafing of the pit has not been included in our propasal_
5. We do not include the reEocatian and or rerouting of the active buildingimechanicai devices.
7. We do not include ai�y line side electrical feeder wire size cha�7ge, circuit size ir�crease or replacement
[existii3g line side pawer and circuits to be used}_
6. We do not include emergency power Ufark in oue propasal_
7. We dn nnt �nclude rerr�aval af ar�y nan�levator 6uiRdiRg cammunication wiring or piping.tdra�n lirres in our
propasal_
8. We do nat ii�clude creafio� af any new buiiding aechitectural plans ar drawings_ B�ildi�g must supply
existing drawings for perrriitting purpas�s if required byr AFIJ_
:i. LVe do noE include removal of �ny r�an-e4evaEor building cammunicatian wtring ar piping�drain lines in our
propasal_
f s�_ Corrective measures to existir�g caFistruetion, l�uiiding systems_ or finish materials ihat were either
in�peaperly ins#alled or insfalled and did r�at meet the cade requirerrtents af the ii�st�iiation are not iiicluded
in this peoposai �niess speciTically noted in the scope por[ion of the praposal_
! 1_ We do nat include repiacement af any existing fire �larm devices orfire alarrrz control panel_ Only fiee alarm
upgrade wark specifically identified �n our scope is included in oue bid. Any rnain fire �larm control pane[
saftware upgrades required to ailow prograrrimingia�ceptance of newly instal4ed alarm dewFces is not
included in aur proposal.
www. kone. us 15(19)
Classification: KONE Internal
����
10 Tender Approval
Price Overview
Proposal pricing is based on the scope of work as defined herein. Any additional work required will be performed
only upon purchaser's approval of a mutually agreeable change proposal. Any other deficiencies revealed in the
progress of the work will be promptly reported to the purchaser with recommendations and cost for corrective ac-
tion. The pricing in this offer is valid for 30 days.
Total Sales Price (SALES TAX EXCLUDED)
Alternate #1 — ADD / DEDUCT $130,000
Maintenance
$1,983,204.00
Accepted Rejected
Free service for 12 months following the comple-
tion of each unit is included.
We accept the offer constituted by this proposal and agree to the conditions contained therein.
Approved by Purchaser
Signature:
Printed Name:
Title:
Company Name:
Date:
www. kone. us 16(19)
Classification: KONE Internal
����
Appendix 1: Bid Attachment "A" / KONE Inc. General Terms and Conditions
(Modernization)
1. APPLICATION OF THESE TERMS
The parties agree to be bound by the terms and conditions contained
in the Bid Letter, this Bid Attachment A and Bid Attachment B,
including the documents incorporated herein by reference (collectively,
the "Proposal").
2. SPECIAL PURCHASING REQUIREMENTS
This Proposal is made without regard to compliance with any special
sourcing and/or manufacturing requirements including, but not limited
to, Buy America, Buy American, U.S. Steel, FAR clauses, minority /
disadvantaged supplier requirements or similar federal and/or state
procurement laws. Should such requirements be applicable to this
Project, KONE reserves the right to modify and/or withdraw its
Proposal.
3. PROPOSAL CONDITIONS
The Proposal shall be open for acceptance within the period stated in
the Bid Letter or, when no period is stated, for a period of 30 days from
the date of the Bid Letter. Prior to commencing manufacture of the
equipment described in the Bid Letter ("EquipmenY'), KONE must have
(i) a fully executed contract; (ii) a schedule acceptable to KONE
identifying the Equipment installation start date, or alternatively,
KONE's letter specifying the ship date ("Ship Date Letter") signed by
Customer, which, as applicable, is incorporated by reference herein;
(iii) the first payment in Section 4 herein; and (iv) fully approved KONE
layouts.
4. PAYMENT TERMS
Payment of the total Price is due within 30 days from invoice date, as
follows:
• 30% of the Price for engineering, site management, and
overhead, billable and due upon execution of this Proposal or
receipt of the subcontract;
• 50% of the Price for material and shipping, billable and due
upon delivery of material to the jobsite or KONE Distribution
Center;
• 20% of the Price for Equipment installation, billable and due at
the billing cycle following the start of installation.
KONE imposes a surcharge for payments made via credit card that is
not greater than our cost of acceptance. The surcharge that we
impose for this type of transaction is a percentage of the amount paid
via credit card, which will be notified to the Customer at the payment
portal. KONE reserves the right to delay, suspend, or stop the work,
including manufacturing, delivery, installation and/or Equipment
turnover, for non-payment, without liability to KONE or being held in
default. Simple interest at 1.5% per month shall be charged on
amounts not paid when due. Payments to KONE are not contingent on
any third-party payments to Customer. Customer shall reimburse
KONE for all costs of collection, including courts costs and reasonable
attorneys' fees.
Prior to turnover, KONE must be paid in full, less 10% maximum
retention, the Price including all change orders. Retention shall be due
and payable within 30 days of execution of the Uniform Final
Acceptance or Equipment turnover, whichever occurs first. If certified
payroll reporting is required, KONE will submit the requested reporting
in the format of the U.S. Department of Labor form WH 347 & WH 348.
The Price does not include Textura or any other special billing
requirements, which can be added via change order at a rate of 0.3%
of the Price.
5. INSTALLATION
Customer shall be responsible for procurement and cost of all permits,
except permits related to installation of the Equipment. Where KONE's
scope of work or other responsibilities include the obligation to utilize
materials and/or finishes resembling or identical to those pre-existing
in the building, KONE shall use reasonable efforts to procure such
materials and Customer acknowledges and accepts that the materials
and/or finishes reasonably available may not be in all respects
identical to those pre- existing in the building. This Proposal is
conditioned upon KONE using its standard installation method. The
installation of the Equipment shall start after Customer has completed
all work set forth in Bid Attachment B and any other documents
describing site requirements ("Site Requirements"), all of which are
incorporated by reference herein. Within two (2) weeks prior to the
scheduled delivery date for KONE's materials, KONE shall conduct a
standard visual site survey to verify that the Site Requirements are
complete and notify Customer if there are outstanding deficiencies
preventing KONE from beginning installation.
KONE's site survey may include, but is not limited to, inspection of site
access, working and safety conditions on site, wear and tear of any
existing structures or surfaces, and planning of any dismantling or
removal of existing equipment, components and materials, where
applicable. KONE shall not be deemed to have surveyed any hidden
structures, latent defects, subsurface conditions, or other non-visible
matters, including but not limited to searching for hazardous
substances and/or materials, which shall be subject to Section 16. If
KONE's site survey reveals any deficiencies, KONE shall be entitled to
delay the start of installation and Customer shall be responsible for all
additional costs incurred by KONE, including without limitation, costs
associated with: labor reallocation, re- directing materials to and
storage in a KONE Distribution Center, additional labor for double
handling of materials, and additional trucking, freight and insurance.
Once the Site Requirements are completed, the start of installation
shall be subject to the availability of labor and the delivery of material,
if applicable.
KONE's work shall be performed during regular union working hours of
regular working days, Monday to Friday, statutory holidays excluded. If
overtime is mutually agreed upon and performed, the additional costs
for such work shall be added to the Price at KONE's standard overtime
rates. If the installation cannot be performed in an uninterrupted
manner for any reason beyond KONE's control, Customer shall store
the Equipment at Customer's cost and compensate KONE for any
costs caused by such delay including, but not limited to, double
handling of Equipment and demobilization. KONE shall not be required
to perform overtime or any Customer directed change to its work
("Extra Work") without an executed change order. No action by KONE,
including but not limited to, performing Extra Work without an executed
change order, shall be a waiver of KONE's right to seek payment for
Extra Work performed.
KONE shall be entitled to an extension of time and an equitable
adjustment in the Price, including but not limited to, any increased
costs of labor, including overtime, resulting from any change of
schedule, re-direction of KONE personnel to another work area,
acceleration, or out of sequence work.
KONE shall take reasonable methods to protect its work-in-place while
KONE is actively on site and until execution of a KONE Uniform Final
Acceptance, which is incorporated by reference herein. Should
damage occur to KONE property, material or work-in- place by fire,
water, theft or vandalism, Customer shall compensate KONE for said
damages.
www. kone. us 17(19)
Classification: KONE Internal
����
Additionally, the Customer is solely responsible for ensuring that the
equipment maintenance contractor, if not KONE, does not disturb,
delay or interfere with KONE's work. KONE shall abide by Customer's
safety policies and procedures to the extent such policies and
procedures are not in conflict with KONE's Safety Policy. Testing
and/or security features of Equipment must be completed before
Equipment turnover. KONE is not responsible for damages, either to
Equipment or the building, or for any personal injury or death, arising
out of or resulting from any code required safety tests performed on
Equipment or hoistway access granted by Customer to other trades.
6. TEMPORARY USE
Temporary use of certain types of Equipment may be permitted,
provided the use period allows adequate time for Equipment
restoration for final turnover and Customer executes KONE's
Temporary Use Agreement. Temporary use shall be invoiced
separately and subject to payment terms in Section 4 herein. At the
end of temporary use, Customer shall return the Equipment to KONE
in "like new" condition.
7. HAZARDOUS MATERIALS
KONE's work shall not include any abatement or disturbance of
asbestos containing material ("ACM"), presumed asbestos containing
materials ("PACM"), or other hazardous materials (i.e. lead, PCBs)
(collectively "HazMaY'). KONE shall have the right to discontinue its
work in any location where suspected HazMat is encountered or
disturbed. Any HazMat removal or abatement, or delays caused by
such, required in order for KONE to perform its work shall be
Customer's sole responsibility and expense. Should any HazMat
abatement occur within the shaft or machine room, Customer shall
execute KONE's Hoistway or Pit Access Request. If any HazMat is
known to be present on site before the start of work, HazMat removal
or abatement shall be completed prior to KONE scheduling installation
and delivering material.
8. TITLE AND RISK TO EQUIPMENT
Title to and ownership of all Equipment intended for incorporation in
KONE's work, whether installed or stored on or off site, shall remain
with KONE until final payment is made. Risk of loss in KONE's work
and Equipment passes to Customer upon delivery to the site or off-site
storage.
Any tools, devices, or other equipment that KONE uses to perform its
work or monitor the Equipment remains the sole property of KONE. If
this Proposal terminates or expires for any reason, Customer will give
KONE access to the premises to remove such tools, devices or
equipment at KONE's expense.
9.TURNOVER
Prior to turnover, KONE must receive a final punch list. Upon turnover,
KONE requires a signed Uniform Final Acceptance. KONE shall
provide its standard electronic O&M manuals with CD-ROMs in
electronic format, if applicable, upon execution of the Uniform Final
Acceptance. Standard KONE samples shall be provided upon request.
No mock-ups or video training are included in the Price.
10. DELAY
KONE shall not be liable for any loss, damage, claim, or delay due to
any cause beyond KONE's control, including, but not limited to, acts of
domestic or foreign government (including a change in law), strikes,
lockouts, work interruption or other labor disturbance, delays caused
by others, fire, explosion, theft, floods, inclement weather, riot, civil
commotion, war, malicious mischief, infectious diseases, epidemic,
pandemic, quarantine , border or port of entry and exit restrictions or
acts of God.
In the event of such delays, KONE shall be entitled to an extension in
time equal to the length of such delay affecting KONE and an
equitable adjustment in the Price. Customer shall compensate KONE
for labor and material cost escalations resulting from Project delays not
caused by KONE, which e�end completion of KONE's work beyond
the end of the current calendar year. Customer is on notice that IUEC
labor rates increase annually.
11. LIMITED WARRANTY
For one (1) year after the acceptance date set forth in the signed
Uniform Final Acceptance, date of Equipment turnover, or date of
Customer's use of Equipment (unless such use is pursuant to the
Temporary Use Agreement), whichever occurs first, KONE warrants
Equipment against defect in workmanship and material. The warranty
excludes remedy for damage or defect caused by abuse, misuse,
vandalism, neglect; repairs, alteration or modifications not executed by
KONE; improper or insufficient maintenance, improper operation,
characteristics of the building such as electrical power or security
features, natural or other catastrophe such as flood, fire, or storm, or
normal wear and tear and normal usage. The warranty excludes
training or instruction in the proper operation or maintenance of
Equipment. Specific noise ratings and energy efficiencies cannot be
guaranteed due to different building characteristics and ambient noise
levels. Customer's remedy is limited to repair or replacement of a
defective part, in KONE's sole discretion, and excludes labor.
12. INDEMNIFICATION
KONE shall only indemnify and hold Customer harmless for claims,
damages, losses or expenses, but excluding loss of use ("Claims") due
to bodily injury, including death, or tangible property damage (other
than the Project or KONE's work itselfl to the extent caused by
KONE's negligent acts or omissions. KONE shall not indemnify
Customer for any other Claims. Customer agrees to indemnify and
hold KONE harmless from any Claim for bodily injury, including death,
or tangible property damage in connection with the use or operation of
the Equipment. Each party shall defend itself in the event of a Claim.
13. INTELLECTUAL PROPERTY
KONE shall retain title and ownership of all intellectual property rights
relating (directly or indirectly) to the Equipment provided by KONE,
including but not limited to software or firmware (whether in the form of
source code, object code or other), drawings, technical documentation,
or other technical information delivered under the Proposal. KONE
grants Customer a non-exclusive and non-transferable license and
right to use the software and firmware in connection with the use and
maintenance of the Equipment. Customer shall not use any drawings,
technical documentation or other technical information supplied by or
on behalf of KONE for any purposes other than those directly related
to the Proposal or to the use and maintenance of the Equipment.
Customer shall not in any form copy, modify or reverse engineer the
software, or give access to the software for such use to any third party
without KONE's prior written consent.
www. kone. us 18(19)
Classification: KONE Internal
����
14. INSURANCE
In lieu of any Customer insurance requirements, KONE shall provide
its standard certificate of insurance, which shall be deemed to satisfy
all insurance requirements for this Project. KONE shall not provide loss
runs, insurance rate information, copies of its insurance policies or any
other information which KONE considers confidential. KONE shall not
provide coverage for professional (E&O) liability, pollution liability, data
privacy/security, or no-fault medical payments. If the Project is covered
by a Wrap Up Insurance Program, KONE agrees to participate
provided there is no cost to KONE, no reduction in the Price, and
subject to KONE's review of the proposed program. If KONE's primary
limits are sufficient to satisfy insurance coverage requirements,
excess/umbrella liability will not be required or if excess/umbrella is
required, KONE's excess coverage does not follow form although
typically provides broader coverage than KONE's primary policies. The
excess coverage is not AM Best Rated nor licensed to do business
within the jurisdiction although the carrier has strong Standard &
Poor's and Moody's financial ratings that may be evidenced upon
request.
15. LIMITATION OF LIABILITY
In no event shall either party be liable to the other party for any
consequential, special, punitive, exemplary, liquidated, incidental, or
indirect damages (including, but not limited to, loss of profits or
revenue, loss of goodwill, loss of use, increase in financing costs)
(collectively, "Consequential Damages") that arise out of or relate to
this Proposal even if such party has been advised of the possibility of
such Consequential Damages. The limitation set forth in this section
shall apply whether the claim is based on contract, tort or other theory
16. CONCEALED OR UNKNOWN CONDITIONS
If during the course of its work, KONE encounters conditions at the site
that are subsurface, differ materially from what is represented in the
contract documents, or otherwise concealed physical conditions,
KONE shall be entitled to an extension of time and additional costs for
the performance of its work, which shall not be subject to any payment
conditions or contingencies.
17. TECHNICAL SURVEY
KONE's Price and obligations under this Proposal are subject to a
technical survey to be performed on Customer's existing units within
90-days of the effective contract start date. If a safety hazard or code
violation is identified during KONE's technical survey, Customer shall
immediately remove the unit from service until repairs are performed.
KONE is not obligated to perform tests, correct outstanding violations
or deficiencies that were not addressed by the prior service provider
and/or the owner, or make related necessary repairs or component
replacements on the unit. If additional work is necessary, KONE shall
provide a separate proposal or recommendation for such work.
Customer agrees to indemnify, defend, and hold KONE harmless for
any claims arising out of Customer's failure to comply with KONE's
recommendations and proposal, and any obligation on the part of
KONE to indemnify or defend Customer with regard to such claim shall
be null and void. If Customer does not immediately approve KONE's
proposal or recommendation, KONE reserves the right to terminate
this Proposal/contract without penalty.
18. TERMINATION
If a party materially breaches this Proposal, the other party shall
provide written notice of the breach and a reasonable time to cure the
breach, but in no event less than 30 days. If the breaching party fails to
cure the breach within the specified time period, the non-breaching
party may terminate the Proposal upon 15 days written notice to the
other party. If KONE notifies Customer of a material breach pursuant
to this paragraph, KONE may temporarily suspend its work without
liability.
19. GOVERNING LAW AND DISPUTE RESOLUTION
The parties agree that this Proposal shall be governed by the laws of
the state where the Project is located, and venue for disputes shall be
located in that state. KONE does not agree to participate in arbitration
proceedings.
20. PRICE ADJUSTMENT
KONE shall be entitled to an equitable adjustment in the Price,
including but not limited to, any increased costs between the time the
Contract is signed and the date of manufacture for materials, labor, or
shipping, as well as increased costs resulting from any change in law
or tariffs.
21. 24/7 EMERGENCY VIDEO COMMUNICATIONS
Applicable only for projects where KONE 24/7 Emergency Video
Communications is included: The KONE 24/7 Emergency Video
Communications contract addendum and General Terms and
Conditions for KONE Digital Services must be signed by the Building
Owner. This contract addendum requires the Building Owner to pay a
fee for audio, video, and data connectivity. This payment obligation,
among other provisions, survives termination of any maintenance
agreement.
22. MISCELLANEOUS
This Proposal, including the documents incorporated herein by
reference, constitutes the entire agreement of the parties and
supersedes all prior negotiations, understandings, and representations
whether written or oral in relation to the subject matter hereof. Where a
conflict or ambiguity exists between this Proposal and any other
contract document (including but not limited to, Customer's drawings
and specifications), the terms and conditions of this Proposal shall
control. This Proposal may be amended only in writing by the duly
authorized representative of both parties. This Proposal may be
executed in one or more counterparts. Each counterpart shall be
considered an original and all of the counterparts shall constitute a
single agreement binding all the parties as if all had signed a single
document. For purposes of executing this Proposal, a document
signed by electronic means is to be treated as an original document.
The failure of either party to insist upon performance or strict
performance of any of the terms or conditions of this Proposal shall not
be deemed a waiver of any rights or remedies that such party may
have or a waiver of any subsequent breach or default under this
Proposal. Neither party may assign or transfer the benefit or burden of
this Proposal without prior written consent of the other party.
www. kone. us 19(19)
�
RIDER No. 1 (Schedule D)
Will Rogers Memorial Center Escalator Modernization
The parties hereby agree to be bound to the terms contained in the Agreement between KONE Inc. ("Contractor") and City of Fort Worth
("Owner"), to include CFW's agents, officers, directors and employees [City], KONE Exhibit 4 dated January 8, 2024 (the "Agreement"),
together with OMNIA EV2516, those terms contained in this Rider No. 1. Provided, however, that notwithstanding any terms contained in the
Agreement or any Contract Document to the contrary, in the event of conflict between terms containetl in the Agreement or any Contract
Document antl terms contained in this Ritler No. 1, the terms in this Rider No. 1, Exhibit 4& OMNIA EV2516 shall supersetle and prevail.
1. Contractor's Bid Proposal, including Attachments A and B thereto, and Ship Date Letter are included as referenced Contract Documents,
antl shall prevail in the event of conflicts hereunder. Contractor shall not be bound by or obligated to comply in any manner with any
Contract Document which has not been given to Contractor prior to the execution of the Agreement.
2. In no event shall either party be liable to the other party for any consequential, special, punitive, exemplary, incidental, liquidated, or
indirect damages (including, but not limited to, loss of profits or revenue, loss of goodwill, loss of use, increase in financing costs)
(collectively, "Consequential Damages") that arise out of or relate to the Agreement.
3. Any references to "conditions precedenY' to Contractor's right to payment shall be interpreted to merely establish timing of payment.
Contractor reserves the right to delay antl/or suspend its Work, including manufacturing, delivery, installation and/or final turnover of
equipment, for non-payment, without risk of breach of contract if Contractor is not paid within 30 days of submission of Contractors
payment application. Prior to turnover, Contractor requires a signed Final Acceptance Form. At the time of equipment turnover,
Contractor must be paid in full, less 10% maximum retention, the Agreement Price including all unpaid Change Orders or outstanding
change directives. Final payment, inclutling retention, shall be due sixty (60) tlays after Contractor's final invoice.
4. Contractor's intlemnification antl defense obligations shall apply only to the extent caused by the negligence of Contractor (or its
subordinates) and not to the extent caused by others.
5. Delete any and all additional insured and waiver of subrogation requirements contained in the Contract Documents. Contractor will
provide an Owners and Contractors Protective Liability Policy which shall list the Owner as Named Insured. Limits to be $2,000,000.
Delete any requirement for Contractor to provide medical expense, virus, communicable disease or terrorism coverage.
6. Contractor and Owner have mutually agreetl upon a schedule for the performance of Contractor's Work and it is attached to the
Agreement. Any changes or revisions, accelerations, resequencing, suspension, work stoppage or delays of Contractor's Schedule may
only be made upon Contractor's mutual written consent, and are not included in the Agreement Price.
7. Contractor shall not be obligated to continue performance of Extra Work without a fully executed Change Order if the estimatetl value of
unexecuted Change Ortlers exceetls 10% of Contractor's Agreement Price, or if there is a reasonable safety concern, a protluct
limitation, or it is unreasonable to proceed.
8. If Contractor is delayed at any time in the performance of its Work by an act or neglect of the Owner or Architect/Consultant, or of a
subordinate of any of them; or by labor disputes, unusual delay in deliveries, unavoidable casualties, Acts of God, sabotage, vandalism,
theft, concealed conditions, hazardous materials, legal requirements, shortage or unavailability of materials, supplies, labor, equipment
and systems; or by any other causes beyond Contractor's control, then Contractor's Schedule and the Agreement Price shall be adjusted
accordingly.
9. If the materials are manufactured more than twelve months after the Contract date, KONE shall be entitled to an equitable atljustment in
the Price, including but not limitetl to, any increasetl costs between the time the Contract is signed and the date of manufacture for
materials, labor, or shipping. Further, KONE shall be entitled to an equitable adjustment in the Price for any increase in costs resulting
from any change in law or tariffs.
10. Contractor's work shall not include any abatement or disturbance of asbestos containing material, presumed asbestos containing
materials, or other hazartlous materials (i.e. leatl, PCBs) (collectively "HazMaY'). Contractor shall have the right to discontinue its work in
any location where suspected HazMat is encountered or disturbed. Any HazMat removal or abatement, or delays causetl by such, shall
be the Owner's sole responsibility and expense.
11. Scope of Work Clarifications: contained in contract document Exhibit 4 dated 1/8/2024.
ACCEPTED:
City of Fort Worth KONE INC.
BY: BY:
TITLE: TITLE: Jeff Blum, Senior Vice President
DATE: DATE: .lune 25, 2024
KONE INC. CONTRACT #: 6766139
KONE INC. CONTRACT#: Page 1 of 1
2/20/24, 12:30 PM
CITY COUNCIL AGENDA
Create New From This M8�C
DATE:
CODE:
2/13/2024 REFERENCE **M&C 24- LOG
NO.: 0128 NAME:
P TYPE: CONSENT PUBLIC
HEARING:
M&C Review
��RT�'�ORTII
_�L-
25COOP OMNIA EV2516 ESCALATOR
REPLACEMENT/MODERNIZATION
PED
NO
SUBJECT: (ALL) Authorize Execution of a Contract with KONE INC. in an Amount Not to Exceed
$2,113,204.00 for the Will Rogers Memorial Center Escalator Replacement Project, Adopt
Appropriation Ordinance and Amend the Fiscal Years 2024-2028 Capital Improvement
Program
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize execution of a contract with KONE INC. using Omnia Partners Cooperative Contract
No. EV2516 in an amount not to exceed $2,113,204.00 for escalator replacement and
modernization capital improvements in the Amon Carter Building of the Will Rogers Memorial
Center;
2. Adopt the attached appropriation ordinance adjusting estimated receipts and appropriations
in the Public Events Capital Fund by increasing estimated receipts and appropriations in the
WRMC Escalator Replacement project (City Project No.104044) in the amount of
$530,000.00 and decreasing estimated receipts and appropriations in the WRMC Minor
Renovation and Repair programmable project (City Project No. P00054) by the same
amount; and
3. Amend the Fiscal Years 2024-2028 Capital Improvement Program.
DISCUSSION:
The purpose of this Mayor and Council Communication (M&C) is to authorize the execution of a
capital improvement contract with KONE Inc. utilizing OMNIA Partners Cooperative Contract No.
EV2516 in an amount not to exceed $2,113,204.00, including a contingency of $130,000.00 for
potential related mechanical and electrical work if necessary, for the replacement and modernization of
the four (4) escalators in the Amon Carter Building at the Will Rogers Memorial Center (WRMC) and to
appropriate additional capital funding, amending the Fiscal Years (FY) 2024-2028 Public Events
Department (PED) Capital Improvement Program (CIP).
Originally, the PED strategy for addressing the Amon Carter Building escalators at WRMC was to
complete improvements over several years in phases, however it was later determined that
acceleration by appropriating total funding to execute a single project and contract for the complete
replacement of all four (4) existing units would be most beneficial, as they are original to the building,
have exceeded their life cycle and have not received mechanical or electronic upgrades since
installation in the 1990's resulting in the need for safety elements to address future liability concerns.
Overall maintenance to the existing units has become increasingly costly and repair parts are difficult
to procure resulting in increased downtime.
In July of 2022, PED engaged the services of a professional consultant to assess the full scope of
work needed, draft technical specifications and assist in choosing a qualified contractor to complete
the work. With the help of the consultant, the Property Management Department and Financial
Management Services-Purchasing Division, PED seeks to execute a contract with KONE Inc. for these
capital improvements utilizing an existing cooperative agreement through Omnia Partners (Contract
No. EV2561) based on review of their proposal specific to WRMC, work history on other similar
projects and proposed lead and completion time being within grant funding deadlines. Staff's review of
pricing is determined it to be fair and reasonable.
apps.cfwnet.org/council_packeUmc_review.asp?ID=31835&councildate=2/13/2024 1 /3
2/20/24, 12:30 PM
M&C Review
This project will completely remove the original escalators located in the northwest and southeast
corners of the Amon Carter Building at WRMC and replace them with newly manufactured escalators
incorporating the latest vertical transportation technology in order to improve overall performance, and
increase reliability, safety and efficiency. Additionally, the newly installed escalators will result in an
immediate positive customer experience.
Funding for this project was approved in the FY 2022-2026 PED CIP in connection with ordinance
25073-09-2021, amended with M&C 22-0393, May 24, 2022 accelerating the funding and combining
multiple phases into a single project and M&C 23-0646, August 8, 2023 reallocating American Rescue
Plan Act (ARPA) funds, Subtitle M(Coronavirus State and Local Fiscal Recovery Funds) along with
other active projects at WRMC. The additional appropriations from this M&C were not included in the
current CIP proposal because the extent of the material and labor increases occurring in the market
since initiation of the design phase for this project were unforeseen at the time of the CIP
proposal. The actions in this M&C amend the FY 2024-2028 CIP as approved in connection with
ordinance 26453-09-2023 and with approval of the attached appropriation ordinance, funding will be
available in Public Events Capital and Grants Capital Projects Federal Funds for the award of the
contract.
COOPERATIVE PURCHASE: State law provides that a local government purchasing an item under a
cooperative purchasing agreement satisfies state laws requiring that the local government seek
competitive bids for the purchase of the items. Omnia Partners contracts have been competitively bid
to increase and simplify the purchasing power of government entities.
DIVERSITY & INCLUSION -A Business Equity goal is not assigned when purchasing from an
approved purchasing cooperative or public entity.
AGREEMENT TERMS - Upon City Council approval, the agreement will begin with contract execution
and end with completion of the project. Staff anticipates that work will commence in March of 2024
with an estimated 8 to12 months to complete.
ADMINISTRATIVE CHANGE ORDERS -An administrative change order or increase may be made by
the City Manager or his designee up to the amount allowed by relevant Law and the Fort Worth City
Code and does not require specific City Council approval as long as sufficient funds have been
appropriated.
FISCAL INFORMATION/CERTIFICATION:
The Director of Finance certifies that funds are currently available in the WRMC Minor Renovation &
Repair programmable project within the Public Events Capital Fund and in the ARPA WRMC Escalator
RIP Replac project within the Grants Cap Projects Federal Fund upon approval of the
recommendations and adoption of the attached appropriation ordinance, funds will be available in the
Public Events Capital and Grants Cap Projects Federal Funds for the ARPA WRMC Escalator RIP
Replac project to support the above recommendations and execution of the contract. Prior to an
expenditure being incurred, the Public Events Department has the responsibility to validate the
availability of funds. This is a reimbursement grant.
Fund Department I Account I Project Program Activity Budget Reference # I Amount
ID ID Year (Chartfield 2)
FROM
Fund Department Account Project Program Activity Budget Reference # Amount
ID ID Year (Chartfield 2)
Submitted for City Manager's Office by_
Originating Department Head:
Additional Information Contact:
Reginald Zeno (8517)
William Johnson (5806)
Michael Crum (2501)
Jo Ann Gunn (8525)
apps.cfwnet.org/council_packeUmc_review.asp?ID=31835&councildate=2/13/2024 2/3
2/20/24, 12:30 PM
M&C Review
Keith Chisholm (2525)
ATTACHMENTS
1295 Form.pdf (CFW Internal)
25COOP OMNIA EV2516 ESCALATOR REPLACEMENT MODERNIZATION PED funds availabilitv,pdf (CFW Internal)
FID Kone Prj104044.x1sx (CFW Internal)
ORD.APP 25COOP OMNIA EV2516 ESCALATOR REPLACEMENTMODERNIZATION PED 30205 r(2).docx
(Public)
SAMs - KONE INC..pdf (CFW Internal)