HomeMy WebLinkAboutContract 58111-CO3CSC No. 58111-CO3
FORT WORTH,., City of Fort Worth
Change Order Request
Project Namel 103396 Comanche Trail Hazardous Road Overtopping Mitigation Project
Client Project #(s)l 103396
I City Sec # l 58111
Project Description) Roadway and culvert improvements to improve drainage at crossing, associated water & sewer realignments
Contractorl Klutz Contractors, LLC Change Order #1 3 1 Date) 414/2024
City Project Mgr.l Bert Guidry City Inspectorl Stan Sutterfield
Dept.
TPW
Contract Time
Totals
(CD)
Original Contract Amount
$1,894,090.00
$1,894,090.00
365
Extras to Date
$88,290.75
$88,290.75
90
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
$1,982,380.75
$1,982,380.75
455
Amount of Proposed Change Order
$73,535.70
�73,535.70
Revised Contract Amount
$2,055,916.45
$2, 55,916.45
455
Original Funds Available for Change Orders
$94,704.50
$94,704.50
Remaining Funds Available for this CO
$6,413.75
$6,413.75
Additional Funding (if necessary) $67,121.95 $67,121.95
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 8.54%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) $2,367,612.50
JUSTIFICATION (REASONS) FOR CHANGE ORDER
A combination rail with a narrower width is being proposed to allow a full 5' unencumbered concrete walk section adjacent to the roadway since the railing that was bid was
wider and encroached into the 5' width. Additional railing length has been added due to a bid quantity that did not include the complete length of rail to be installed. The
handrail portion of this combination rail is more expensive than that of the rail that was bid since it contains more handrailing. Roadway markings were added to eliminate on -
street parking at the culvert. Quantity adjustments were made to hydromulching, rip -rap, flex base, curb, Class A concrete and guardrail to reflect actual plan quantities and field
adjustments. Costs for new items were compared to past bid tabs and other resources and found to be reasonable.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that
he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements.
Contractor's Compan Name Contractor (Name) Contract Signatur
Klutz Contractors, LLC Charlie Klutz I C. -I Jun 27, 202
on Supervis
Project and Contract Compliance Manager
Date
Jun 27, 2024
Pro ram Mana er
M277,2024
Senior Capital Project Officer
Date
��j.l-
Jun 27, 2024
Assistant Director De t
Director, Contracting Department Dept
Date
Jun28,202
,�,
Jun27,2024
Assistant City Attorney
Date
Assistant ON Manaaer
Date
Jul 16, 2024 C_111t JuI 16, 2024
Council Action i requir
ATTEST: =oF� °ARA4 a
U g d
pdpM48* d
Jannette Goodall, City Secretary aQaynne o
M&C Number l 24-0485 l M&C Date Approved l 6/11/2024
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORTWORTH City of Fort Worth
*1�-- Change Order Additions
Project Name 1 103396 Comanche Trail Hazardous Road Overtopping Mitigation Project City Sec # 58111
Client Project # 1 103396 1
Contractorl Klutz Contractors, LLC I PMI Bert Guidry I Inspectorl Stan Butterfield I
Change Order Submittal # 0 Date 1 4/4/2024 1
ADDITIONS
HEM
UESCRIP I ION
UEP I
uty
Unit
Unit Cost
I otal
t
3292.0400
Seeding, Hydromulch
I PW
/50.000000U 91
SY
$/.2U
$5,400.00
17
3137.0101
Concrete Riprap
TPW
137.8000000
SY
$95.00
$13,091.00
18
3211.0123
8" Flexible Base, Type A, GR-2
TPW
129.0000000
SY
$20.00
$2,580.00
22
3216.0101
6" Cone Curb and Gutter
TPW
83.2000000
LF
$26.00
$2,163.20
24
9999.0070
Class A Concrete
TPW
229.0000000
SF
$16.00
$3,664.00
25
9999.0020
Metal Beam Guard Fence
TPW
55.3000000
LF
$155.00
$8,571.50
64
9999.0170
Combination Rail C1 W
TPW
295.00000001-
LF
$357.00
$105,315.00
65
3217.0101
6" SLD Pvmt Marking HAS (W)
TPW
550.0000000C
LF
$2.90
$1,595.00
66
3217.0102
6" SLD Pvmt Marking HAS (Y)
TPW
340.00000000
LF
$5.90
$2,006.00
67
3217.0401
18" SLD Pvmt Marking HAE (W)
TPW
150.00000000
LF
$11.60
$1,740.00
68
3217.2103
REFL Raised Marker TY II -A -A
TPW
10.00000000
EA
$6.00
$60.00
69
3217.2104
REFL Raised Marker TY II-C-R
TPW
65.00000000
EA
$6.00
$390.00
TPVV $146,575.70
Sub Total Additions $146,575.70
Change Order Additions Page 1 of 1
FOR_ T�RTH City of Fort Worth
Change Order Deletions
Project Name 1 103396 Comanche Trail Hazardous Road Overtopping Mitigation Project City Sec # 1 58111
Client Project # 1 103396 1
Contractorl Klutz Contractors, LLC PMI Bert Guidry I Inspectorl Stan Sutterfield
Change Order Submittal # 0 Date 1 4/4/2024 1
I I tM Ut6UKIN I IUN
Z/ 9999.UU4U Uombinatlon Kail
DELETIONS
ULHI Uty Unit Unit lost total
I F'VV ZZ0.000UUUUU LF $332.1JU $/3,U4U.UUj
TPW $73,040.001
1
1
1
Sub Total Deletions $73,040.001
Change Order Deletions Page 1 of 1
M/SBE for this Change Order
M/SBE Sub Type of Service Amount for this CO
Klutz $67,744.70
Total $67,744.70
Previous Change Orders
co # DATE I AMOUNT
Total I $0.00 1
7/15/24. 10:11 AM M&C Review
CITY COUNCIL AGENDA
Create New From This M&C
DATE: 6/11/2024 REFERENCE **M&C 24- LOG NAME: 20SWM COMANCHE
NO.: 0485 TRAIL HROM CO 3
CODE: C TYPE: CONSENT PUBLIC NO
HEARING.
SUBJECT. (CD 7) Authorize Execution of Change Order No. 3 in the Amount of $73,535.70 to a
Contract with Klutz Construction, LLC for the Construction of the Comanche Trail
Hazardous Road Overtopping Mitigation Project, Adopt an Appropriation Ordinance and
Amend the Fiscal Years 2024 — 2028 Capital Improvement Program
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize execution of Change Order No. 3 to City Secretary Contract No. 58111 with Klutz
Construction, LLC, increasing the contract amount by $73,535.70 for the construction of the
Comanche Trail Hazardous Road Overtopping Project (City Project No. 103396), thereby
increasing the total contract amount to $2,055,916.45;
2. Adopt the attached appropriation ordinance adjusting estimated receipts and appropriations
in the Stormwater Revenue Bonds 2020 Fund by increasing estimated receipts and
appropriations in the Comanche Trail HROM project (City Project No. 103396), in the amount
of $88,000.00 and decreasing estimated receipts and appropriations in SW Hazardous Road
Overtopping Project (City Project No. P00120) by the same amount; and
3. Amend the Fiscal Years 2024-2028 Capital Improvement Program.
DISCUSSION:
On Tuesday, August 23, 2022, by Mayor and Council Communication (M&C 22-0634), the City Council
authorized a contract with Klutz Contractors, LLC in the amount of $1,894,090.00 for the construction
of the Comanche Trail Hazardous Roadway Overtopping Mitigation (HROM) project (City Project No.
103396). The project will better protect drivers from flood waters overtopping Comanche Trail Road
between Malaga Drive and Marina Drive. This M&C will authorize the execution of Change Order No.
3, appropriate funding for Change Order No. 3 and amend the 2024-2028 Capital Improvement Plan.
The following table summarizes previous contract action and change orders:
Construction Contract
Date
Amount
Official site of the City of Fporrt+ Worth, Texas
FVIIJ oR117
apps.cfwnet.org/council_packet/mc_review.asp?ID=32192&councildate=6/11 /2024 1 /3
7/15/24, 10:11 AM
Original Contract (M&C 22-0634)
Change Order No. 1
Change Order No. 2
Change Order No. 3
Revised Contract Amount
M&C Review
8/23/2022 $1,894,090.00
11 /07/2022 $44, 500.00
01 /18/2024 $43,790.75
Pending $73,535.70
$2,055,916.45
Previous change orders 1 and 2 were provided to modify the water and sewer alignments to stay
within easements, and to demolish and reconstruct bridge footings. This change order includes a
revision to the type of traffic rail to be used from the type of traffic rail included in the bid, includes
additions to the length of traffic rail to be used, and includes additional pavement markings and
quantity reconciliations. The additional funds also provide for additional project management and
inspection time due to the extended construction duration needed for demolition and reconstruction of
culvert footings, which was done due to deficiencies in the footing materials and construction
documentation.
Appropriations for this project are shown below:
Fund
52002 -
Stormwater
Capital Projects
(103396)
52007 -
Stormwater Rev
Bonds 2020
(103396)
Table Total
Project Additional Project Total
Appropriations Funding
$2,200,000.00
$717,165.00
$2,917,165.00
$0.00 $2,200,000.00
$88,000.00 $805,165.00
$88,000.00 $3,005,165.00
Funding is budgeted in the Stormwater Rev Bonds 2020 Fund for the TPW Dept Highway & Streets
Department for the purpose of funding the Comanche Trail HROM.
Business Equity: Klutz Contractors, LLC agrees to maintain its initial M/WBE commitment of 16\% that
it made on the original contract and extend and maintain that same M/WBE commitment of 16\% to all
prior change orders up to and inclusive of this Change Order No. 3. Therefore Klutz Contractors, LLC
remains in compliance with the City's M/WBE Ordinance and attests to its commitment by its signature
on the Acceptance of Previous M/WBE Commitment form executed by an authorized representative of
its company.
This project is located in COUNCIL DISTRICT 7.
FISCAL INFORMATION/CERTIFICATION:
apps.cfwnet.org/council_packet/mc_review.asp?ID=32192&counciIdate=6/11 /2024 2/3
7/15/24, 10:11 AM M&C Review
The Director of Finance certifies that funds are currently available in the SW Hazardous Rd
Overtopping project within the Stormwater Rev Bonds 2020 Fund and upon approval of the above
recommendations and adoption of the attached appropriation ordinance, funds will be available in the
Stormwater Rev Bonds 2020 Fund for the Comanche Trail HROM project to support the above
recommendations and execution of the agreement. Prior to an expenditure being incurred, the
Transportation & Public Works has the responsibility of verifying the availability of funds.
TO
Fund Department I Account Project Program Activity Budget Reference # Amount
ID ID I Year (Chartfield 2)
FROM
Fund Department Account Project Program Activity Budget Reference # Amount
ID ID , , Year (Chartfield 2)
Submitted for City Manaaer's Office by_ Jesica McEachern (5804)
Originating Department Head: Lauren Prieur (6035)
Additional Information Contact: Linda Young (2485)
ATTACHMENTS
20SWM COMANCHE TRAIL HROM 103396 Chanae Order 03.xlsm (CFW Internal)
20SWM COMANCHE TRAIL HROM 1295.Ddf (CFW Internal)
20SWM COMANCHE TRAIL HROM APCF FORM. pdf (CFW Internal)
20SWM COMANCHE TRAIL HROM CO 3.docx (CFW Internal)
20SWM COMANCHE TRAIL HROM FID TABLE.xlsx (CFW Internal)
20SWM COMANCHE TRAIL HROM MAP.pdf (Public)
20SWM COMANCHE TRAIL HROM SAM SEARCH.Ddf (CFW Internal)
ORD.APP 20SWM COMANCHE TRAIL HROM CO 3 52007 (r2).docx (Public)
apps.cfwnet.org/council_packet/mc_review.asp?ID=32192&counciIdate=6/11 /2024 3/3
FORT WORTH.
Routing and Transmittal Slip
Transportation & Public Works Department
DOCUMENT TITLE:
24-0485
M &C: 22-0634
Date:
To: Name
Charlie Klutz
1.
2. Stanley Sutterfield
Comanche Trail HROM — Change Order 3
CPN: 103396
3.
Bert Guidry
4.
Justin Naylor
5.
Lissette Acevedo
6.
Patricia Wadsack
7.
Lauren Prieur
8.
Doug Black
9.
Jesica McEachern
10.
Ronald Gonzales
11.
Jannette Goodall
12.
Allison Tidwell
13.
Tpw—SW—Contract
CSO:CS58111
Department
Contractor
TPW -Inspector
TPW - Project Manager
TPW -Interim P Manager
TPW — Sr. CPO
TPW — Assistant Director
TPW - Director
Legal - Assistant City Attorney
CMO —Assistant City Manager
CSO — City Secretary
CSO — City Secretary
CSO — City Secretary
TPW Stormwater
NEEDS TO BE NOTARIZED: DYES ®No
DClC#:
Initials
Gk
��Y V
DB
Date Out
Jun 27, 2024
J u n 27, 2024
Jun 27, 2024
Jun 27, 2024
J u n 27, 2024
Jun 28, 2024
Jun 27, 2024
J u 116,
2024
J u 116, 2024
J u 116, 2024
Ju116,2024
RUSH: OYES ®No SAME DAY: ❑ YES ❑No NEXT DAY: ❑YES []No
ROUTING TO CSO: ®YES ONO
Action Required: ❑ Signature/Routing and or Recording