Loading...
HomeMy WebLinkAboutContract 58375-FP2-FP2 City Secretary 58375 Contract No. FORT WORTH. Date Received 7/11/2024 AT NOTICE OF PROJECT COMPLETION (Developer Projects) The Transportation and Public Works Department upon the recommendation of the Project Manager has accepted the following project as complete: Project Name: Synergy 500 City Project No.: 104057 Improvement Type(s): Water M Sewer 0 Original Contract Price: 1$263,774.00 Amount of Approved Change Order(s): Revised Contract Amount: Total Cost of Work Complete: $263,774.00 ,7arm ObemiCCeY Jul 8, 2024 Jason Obermlller (Jul 8, 202409:35 CDT) Contractor Date Owner's Representative Title TCRG Properties LLC Company Name Jul 8, 2024 Richard a den (Jul B, 20241340 CDT) Project Inspector Date 00S&1 �i�(ae Mohammdeevr,P.E. A Jul 11, 2024 Mosadage Mohamrrlil ecn,RE(Jul 11, 202409:46 CDT) Project Manager Date Rebecca Owen (Jul 11, 202411:45 CDT) Jul 11, 2024 CFA Manager Date 10 Jul 11, 2024 TPW Director Date C-)�� J u 112, 2024 Asst. City Manager Date OFFICIAL RECORD CITY SECRETARY Page 1 of 2 FT. WORTH, TX Notice of Project Completion Project Name: Synergy 500 City Project No.: 104057 City's Attachments Final Pay Estimate x❑ Change Order(s): ❑ Yes ❑x N/A Pipe Report: x❑ Yes ❑ N/A Contractor's Attachments Affidavit of Bills Paid Consent of Surety Statement of Contract Time Contract Time: 21 WD Work Start Date: 11/7/2023 Completed number of Soil Lab Test: 89 Completed number of Water Test: 4 Days Charged: 75 Work Complete Date: 3/14/2024 Page 2of2 FoRTWORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name SYNDERGY 500, ( LOT 1, BLOCK 2 SYNERGY WEST) Contract Limits Project Type WATER & SEWER City Project Numbers 104057 DOE Number 4057 Estimate Number 1 Payment Number 1 For Period Ending 3/14/2024 WD City Secretary Contract Number Contract Date Project Manager NA Contractor TCRG 5201 CAMP BOWIE BLVD #200 FORT WORTH, TX 76107 Inspectors G. DEYON / R. WALDEN Contract Time 2WD Days Charged to Date 75 Contract is 100.00 Complete Friday, April 5, 2024 Page 1 of 5 City Project Numbers 104057 Contract Name SYNDERGY 500, ( LOT 1, BLOCK 2 SYNERGY WEST) Contract Limits Project Type WATER & SEWER Project Funding UNIT I: WATER IMPROVEMENTS Item Description of Items Estimated Unit No. Quanity 1 6" WATER PIPE 10 LF 2 10" WATER PIPE 8 LF 3 12" WATER PIPE 705 LF 4 12" WATER PIPE, SELECT BACKFILL 266 LF 5 12" WATER PIPE, CSS BACKFILL 20 LF 6 2" WATER SERVICE 3 EA 7 TRENCH SAFETY 1009 LF 8 6" GATE VALVE 1 EA 9 10" GATE VALVE 1 EA 10 12" GATE VALVE 3 EA 11 DUCTILE IRON WATER FITTINGS W/ 0.5 TN RESTRAINT 12 CONNECTION TO EXISTING 4" -12" WATER 1 EA MAIN 13 4" -12" WATER ABANDONMENT PLUG 1 EA 14 FIRE HYDRANT I EA 15 AUTOMATIC FLUSHING DEVICE 1 EA Sub -Total of Previous Unit - - - - - - - - - - - - - - - - - - - UNIT 11: SANITARY SEWER IMPROVEMENTS Item Description of Items Estimated Unit No. Quanity 1 8" SEWER PIPE 60 LF 2 8" SEWER PIPE, SELECT BACKFILL 170 LF 3 8" SEWER PIPE, CSS BACKFILL 40 LF 4 TRENCH SAFETY 270 LF 5 4' MANHOLE 1 EA 6 EPDXY MANHOLE LINER 14 VF 8 POST -CCTV INSPECTION 270 LF 9 MANHOLE VACUUM TESTING 1 EA 10 MANHOLE ADJUSTED, MINOR 1 EA 11 CONCRETE COLLAR FOR MANHOLE 2 EA DOE Number 4057 Estimate Number 1 Payment Number 1 For Period Ending 3/14/2024 Unit Cost Estimated Completed Completed Total Quanity Total $85.00 $850.00 10 $850.00 $172.00 $1,376.00 8 $1,376.00 $128.00 $90,240.00 705 $90,240.00 $157.42 $41,873.72 266 $41,873.72 $175.00 $3,500.00 20 $3,500.00 $9,204.00 $27,612.00 3 $27,612.00 $1.00 $1,009.00 1009 $1,009.00 $2,200.00 $2,200.00 1 $2,200.00 $3,945.28 $3,945.28 1 $3,945.28 $5,475.00 $16,425.00 3 $16,425.00 $31,900.00 $15,950.00 0.5 $15,950.00 $4,807.00 $4,807.00 1 $4,807.00 $2,500.00 $2,500.00 1 $2,500.00 $6,913.00 $6,913.00 1 $6,913.00 $2,000.00 $2,000.00 1 $2,000.00 $221,201.00 $221,201.00 Unit Cost Estimated Completed Completed Total Quanity Total $75.00 $4,500.00 60 $4,500.00 $95.00 $16,150.00 170 $16,150.00 $105.00 $4,200.00 40 $4,200.00 $1.00 $270.00 270 $270.00 $4,551.00 $4,551.00 1 $4,551.00 $250.00 $3,500.00 14 $3,500.00 $1.00 $270.00 270 $270.00 $132.00 $132.00 1 $132.00 $2,000.00 $2,000.00 1 $2,000.00 $2,000.00 $4,000.00 2 $4,000.00 Friday, April 5, 2024 Page 2 of 5 City Project Numbers 104057 DOE Number 4057 Contract Name SYNDERGY 500, ( LOT 1, BLOCK 2 SYNERGY WEST) Estimate Number 1 Contract Limits Payment Number 1 Project Type WATER & SEWER For Period Ending 3/14/2024 Project Funding 12 TRENCH WATER STOPS 1 EA $3,000.00 $3,000.00 1 $3,000.00 Sub -Total of Previous Unit $42,573.00 $42,573.00 Friday, April 5, 2024 Page 3 of 5 City Project Numbers 104057 Contract Name SYNDERGY 500, ( LOT 1, BLOCK 2 SYNERGY WEST) Contract Limits Project Type WATER & SEWER Project Funding Contract Information Summary Original Contract Amount Chanhe Orders Total Contract Price DOE Number 4057 Estimate Number 1 Payment Number 1 For Period Ending 3/14/2024 $263,774.00 $263,774.00 Total Cost of Work Completed $263,774.00 Less % Retained $0.00 Net Earned $263,774.00 Earned This Period $263,774.00 Retainage This Period $0.00 Less Liquidated Damages Days @ / Day LessPavement Deficiency Less Penalty Less Previous Payment Plus Material on Hand Less 15% Balance Due This Payment $0.00 $0.00 $0.00 $0.00 $0.00 $263,774.00 Friday, April 5, 2024 Page 4 of 5 City Project Numbers 104057 DOE Number 4057 Contract Name SYNDERGY 500, ( LOT 1, BLOCK 2 SYNERGY WEST) Estimate Number 1 Contract Limits Payment Number 1 Project Type WATER & SEWER For Period Ending 3/14/2024 Project Funding Project Manager NA City Secretary Contract Number Inspectors G. DEYON / R. WALDEN Contract Date Contractor TCRG Contract Time 21 WD 5201 CAMP BOWIE BLVD #200 Days Charged to Date 75 WD FORT WORTH, TX 76107 Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $263,774.00 Less % Retained $0.00 Net Earned $263,774.00 Earned This Period $263,774.00 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 / Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $263,774.00 Friday, April 5, 2024 Page 5 of 5 FORTWORTH TRANSPORTATION AND PUBLIC WORKS PIPE REPORT FOR: PROJECT NAME: Synergy 500 CITY PROJECT NUMBER: 104057 WATER PIPE LAID SIZE TYPE OF PIPE c900 6" pvc c900 10" pvc c900 12" pvc c900 (Select Backfill) 12" pvc c900 (CSS Backfill) 12" pvc FIRE HYDRANTS: 1 PIPE ABANDONED N/A DENSITIES: NEW SERVICES: I PIPE LAID sdr26 sdr26 (Select Backfill) sdr26 (CSS Backfill) PIPE ABANDONED N/A DENSITIES: NEW SERVICES: VALVES (16" OR LARGER) SIZE TYPE OF PIPE N/A N/A Performed and Passed 2" COPPER SEWER SIZE TYPE OF PIPE 8" pvc 8" pvc 8" pvc SIZE TYPE OF PIPE N/A N/A Performed and Passed TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth • 1000 Throckmorton Street • Fort Worth, TX 76012-6311 LF 10 8 705 266 20 n/a LF N/A 3ea LF 60 170 40 LF N/A FORTWORTH. TRANSPORTATION AND PUBLIC WORKS March 15, 2024 TCRG Properties LLC 5201 Camp Bowie Blvd Ste #200 Fort Worth, TX 76107 RE: Acceptance Letter Project Name: Synergy 500 Project Type: Developer City Project No.: 104057 To Whom It May Concern: On March 14, 2024 a final inspection was made on the subject project. There were no punch list items identified at that time. The final inspection indicates that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on March 14, 2024, which is the date of the final inspection and will extend of two (2) years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at (817) 392-2443. Sincerely, Mosadgae Mohammdeev, P. E. Mosadage Moham een,P.E.(Jul 11, 202409:46 CDT) Mohammdeen, Mosadage, Project Manager Cc: Walden,Richard, Inspector Deyon, Gary, Inspection Supervisor Davila, Edward, Senior Inspector Goodman, Andrew, Program Manager Bartley, Preston, Consultant TCRG Properties LLC, Contractor TCRG Properties LLC, Developer File Rev.08/20/19 AFFIDAVIT STATE OF Texas COUNTY OF Tarrant Before me, the undersigned authority, a notary public in the state and county aforesaid, on this day personally appeared Jason Obermiller, Owner's Representative Of TCRG Construction LLC., known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said; That all persons, firms, associations, corporations, or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fork Worth has been paid in full; That there are no claims pending for personal injury and/or property damages; On Contract described as; City Project No: 104057- Synergy 500- CFA# A22-0119 BY f' ��— G _ Jason Obermiller Subscribed and sworn before me on this date 26th of June, 2024. , Texas Public _•'�Y JADE K. SIMONS •: *: My Notary ID # 134372034 *:E••••;�* ' Expires May 22, 2027 MERCHANTS BONDING COMPANY. MERCHANTS BONDING COMPANY (MUTUAL) • MERCHANTS NATIONAL BONDING, INC. 2100 FLEUR DRIVE - DES MOINES, IOWA 50321-1158 - (800) 678-8171 - (515) 243-3854 FAX CONSENT OF SURETY TO FINAL PAYMENT TO OWNER: TCRG Construction, LLC 5201 Camp Bowie Blvd. Fort Worth, TX 76107 PROJECT: Synergy 500 (Lot 1, Block 2 Synergy West) OWNER ARCHITECT CONTRACTOR SURETY OTHER Bond No. TXC616070 ARCHITECT'S PROJECT NO.: 104057 CONTRACT FOR: Unit I Water Improvements Unit II Sanitary Sewer Improvements CONTRACT DATED: 10/26/2023 In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the (Insert name and address of Surety) Merchants Bonding Company (Mutual) P.O. Box 14498 Des Moines, IA 50306 , SURETY, on bond of (Insert name and address of Contractor) City of Fort Worth, Texas 100 Throckmorton Street Fort Worth, TX 76102 X ,CONTRACTOR, hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surety of any of its obligations to (Insert name and address of Owner) TCRG Construction, LLC 5201 Camp Bowie Blvd. Fort Worth, TX 76107 , OWNER, as set forth in said Surety's bond. IN WITNESS WHEREOF, the Surety has hereunto set its hand on this date: July 1, 2024 (Insert in writing the month followed by the numeric date and year.) Merchants Bondim Company (Mutual) Attest: yil (Seal): (Signs of auth ized representative) Payton Blanchard Attornev-In-Fact CON 0405 (2/12) (Printed name and title) MERCHANTS BONDING COMPANY-. POWER OF ATTORNEY Know All Persons By These Presents, that MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., both being corporations of the State of Iowa, d/b/a Merchants National Indemnity Company (in California only) (herein collectively called the "Companies") do hereby make, constitute and appoint, individually, Allison C Lueck; Bryan Simpson; Cadda E Eary; Caitlin Kelley; Donna Martinez; H E Wilkins; Haley Crocker; James R Reid; Jessica Turner; Julie Lindsey; Kay Blair; Lindsay Senior; Malachi Smith; Marie Reyna; Markham Paukune; Michelle Blizzard; Payton Blanchard; Ralph E French; Sandra Fuller; Shane Smith; Shawn Blacklock; Teresa C Smith; Tina LaValley; William Blanchard; William Mitchell Jennings their true and lawful Attorney(s)-in-Fact, to sign its name as surety(ies) and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. This Power -of -Attorney is granted and is signed and sealed by facsimile under and by authority of the following By -Laws adopted by the Board of Directors of Merchants Bonding Company (Mutual) on April 23, 2011 and amended August 14, 2015 and adopted by the Board of Directors of Merchants National Bonding, Inc., on October 16, 2015. "The President, Secretary, Treasurer, or any Assistant Treasurer or any Assistant Secretary or any Vice President shall have power and authority to appoint Attorneys -in -Fact, and to authorize them to execute on behalf of the Company, and attach the seal of the Company thereto, bonds and undertakings, recognizances, contracts of indemnity and other writings obligatory in the nature thereof." "The signature of any authorized officer and the seal of the Company may be affixed by facsimile or electronic transmission to any Power of Attorney or Certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligations of the Company, and such signature and seal when so used shall have the same force and effect as though manually fixed." In connection with obligations in favor of the Florida Department of Transportation only, it is agreed that the power and aut hority hereby given to the Attorney -in -Fact includes any and all consents for the release of retained percentages and/or final estimates on engineering and construction contracts required by the State of Florida Department of Transportation. It is fully understood that consenting to the State of Florida Department of Transportation making payment of the final estimate to the Contractor and/or its assignee, shall not relieve this surety company of any of its obligations under its bond. In connection with obligations in favor of the Kentucky Department of Highways only, it is agreed that the power and authority hereby given to the Attorney -in -Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner - Department of Highways of the Commonwealth of Kentucky at least thirty (30) days prior to the modification or revocation. In Witness Whereof, the Companies have caused this instrument to be signed and sealed this 3rd day of February 2024 . •...... ...... MERCHANTS MERCHANTS BONDING COMPANY (MUTUAL) �•••�P�,P�A<•e.•o�Q�Nr'.��iJ�A.• MERCHANTS NATIONAL BONDING, INC. C y r pR Rq O � . . Q, . oRpo c-. -f ; d/b/a MERCHANTS NATIONAL INDEMNITY COMPANY Z'ZG -O- v : Z003 1933 c: By d. `� ; : mod. ;�o:• %.• �' •......•:;��• •..`�'ly 67 ••.••• �A••• President STATE OF IOWA '•.••����••••.•' •. • • • • • • .• COUNTY OF DALLAS ss. On this 3rd day of February 2024 before me appeared Larry Taylor, to me personally known, who being by me duly sworn did say that he is President of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.; and that the seals affixed to the foregoing instrument are the Corporate Seals of the Companies; and that the said instrument was signed and sealed in behalf of the Companies by authority of their respective Boards of Directors. A,Q'FUA( S Penni Miller z o Commission Number 787952 • 4= • My Commission Expires 1001111 January 20, 2027 (Expiration of notary's commission does not invalidate this instrument) t - Notar3 f�bl I, William Warner, Jr., Secretary of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., do hereby certify that the above and foregoing is a true and correct copy of the POWER -OF -ATTORNEY executed by said Companies, which is still in full force and effect and has not been amended or revoked. In Witness Whereof, I have hereunto set my hand and affixed the seal of the Companies on this 1st day of July 2024 •60........... •.•.....• •.••P110 Nq4 . •;A Cp y�•. •�. �. .�� P .o• -0- 2003 ; y 1933 c • Secretary is