Project Name Keller Hicks - Lauren Way to US 377 I City Sec # I 60585
Client Project #(s)I 100146
Project Keller Hicks - Lauren Way to US 377 - Roadway, Drainage, Illumination and Traffic Improvements
Description
Contractorl McMahon Contracting, LP I CA#I 4 Date 6/26/2024
City Project Mgr.I Mitch Alton I City Inspectorl Curtis Hollingsworth
UNIT or DEPT
Original Contract Amount
Extras to Date
Credits to Date
Current Contract Amount
lAmount of Proposed Allocation
Original Allowance Available to Allocation
Allowance Funds Previously Allocated
Revised Allowance Balance
Unit I - CFW
$5,685,582.88
Unit II - Keller
$1,041,186.09
Unit III - Signal
$477,855.28
I Totals
$7,204,624.25
5,685,582.88
$1,041,186.09
4
7,204,624.25
13,429.22
0.00
0.00
0.00
13,429.22
200,000.00
62,515.04
$200,000.00
$62,515.04
124,055.74
$0.00
$0.00
$0.00
124,055.74
JUSTIFICATION (REASONS) FOR CONSTRUCTION ALLOWANCE
IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST, THE CONTRACT SHALL:
The project requires 3 new electrical services to be installed by TriCounty Electric to power the new Roadway Illumination along Keller Hicks and
new Traffic Signal at Keller Hicks and Katy Road. City Illumination and Traffic Inspection approved the Power service locations. The City normally
pays other utility companies for service connections through Discretionary Service Agreements (DSA). However, Tri-County Electric does not do
DSA. In Tri-County Electric service area projects, TPW customarily has the contractor pay for the service work, and the contractor is reimbursed
via a change order or Construction Allowance Request. This is the pass -through cost.
It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and
satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Construction
Allowance Request. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and
administration of this contract, including ensuring all performance and reporting requirements.
McMahon Contracting, LP I Andrew Marquez
Jun 28, 2024
Inspector/Inspection Supervisor
Date
Project and Contract Compliance Manager
Date
Jun 28, 2024�j
Jun 28, 2024
Program Manager
Date
1111111111 ject Officer
Date
,/#,-
Jul 1, 2024
�e��a
Jul 1, 2024
Assistant Director (Dept)
Date
Director, Contracting Department (Dept)
Date
„L, wad
Jul 1,2024
A--2--
Jul 3,2024
t City Attorney
Date
Assistant City Manager
Date
ss
Jul 9,2024
�,,p,r -
Jul 12,2024
0
Jannette Goodall, City Secretary
�e
ore old
Qann nEoaSOQo
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Construction Allowance SUMMARY
Page 1 of 1
FORT WORTH City of Fort Worth
Construction Allowance Additions
Project Name I Keller Hicks - Lauren Way to US 377 Ity Sec # 1 60585 1
Client Project # 1 100146 1
Contractor I McMahon Contracting, LP I PMJ Mitch Alton I Inspector) Curtis Hollingsworth
Construction Allowance Submittal # to 1 6/26/2024 1
ADDITIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
1-49A 2605.1010 Electrical Facilities - 3 New TriCounty Services Unit I - CFW 1.0000 LS $13,429.22 $13,429.22 1
1
1
Unit I - CFW $13,429.221
Unit 11- Keller $0.001
Unit III - Signal $0.001
$0.001
Total Additions $13,429.221
Construction Allowance Additions
Page 2 of 4
FORT WORTH City of Fort Worth
Construction Allowance Value
Project Name I Keller Hicks - Lauren Wav to US 377 I City Sec # 1 60585 1
Client Project # I 100146 1
Contractorl McMahon Contracting, LP I PMI Mitch Aiton I Inspectorl Curtis Hollingsworth l
Construction Allowance Submittal # ® Date 1 6/26/2024
CONSTRUCTION ALLOWANCE VALUE BEING USED
ITEM DESCRIPTION Qty Unit Unit Cost Total
Unit 1
Item 85 9999.0000 Construction Allowance 0.067146 EA $200,000.00 $13,429.22
Construction Allowance Value
3of4
M/SBE for this Construction Allowance Request
M/SBE Sub I Type of Service I Amount for this CAR
Total $0.00 I
Previous Construction Allowance Requests
CAR # DATE AMOUNT
CA #1 2/20/2024 $1,252.90
CA #2 3/25/2024
CA #3 5/9/2024
$11,747.71
$49,514.43
Total 1 $62,515.04
Construction Allowance MSBE Data
Page 4 of 4
REQUEST FOR INFORMATION REPORT (RFI)
Keller Hicks - Lauren Way to US 377
Andrew Marquez Project Manager
TriCounty Electric Illumination and Signal Power Service
POTENTIAL•
NO CHANGE
INCREASE IN COST $ 13,429.22
DECREASE IN COST
RFI NO. PAGE NO.
(TRACT NO. PRIME CONTRACTOR
.1McMahon Contracting,
McMahon Contracting 817-908-2704 06/11/24
NO CHANGE '
INCREASE IN TIME
DECREASE IN TIME
# of Days =
# of Days =
The project requires 3 new electrical services to be installed by TriCounty Electric to power the new Roadway Illumination along
Keller Hicks and new Traffic Signal at Keller Hicks and Katy Road. City Illumination and Traffic Inspection approved the Power
service locations.
Please review the attached invoice from TriCounty Electric for the installation price.
Mitch Aiton Sr Professional Engineer 682-715-9424
Planca nrnr-earl With tha Tri(ni inty Ccniira Inctnllntinn
The City normally pays other utility companies for service
connections through Discretionary Service Agreements (DSA).
However, Tri-County Electric does not do DSA. In Tri-County
Electric service area projects, TPW customarily has the contractor
pay for the service work, and the contractor is reimbursed via a
change order or Construction Allowance Request. This is the pass -
through cost
06/11/24 06/25/24
No Schedule Impact
TRI-COUNTY ELECTRIC COOPERATIVE
Taking Care of Our Member -Owners
Field Services: 817-752-8172
TO:
GARRETT HILL
3019 ROY ORR, BLVD
GRAND PRAIRIE, TX 75050
FOR: 4900 KELLER HICKS RD
JOB COSTS
Construction Costs:
Miscellaneous Sales:
JOB CREDITS
Miscellaneous Credits (If Applicable):
Member Credit (If Applicable):
Total Cost:
Total Credit:
Tax:
Expires On: September 19, 2024
TYPE
PRI
Svc
SEC
CONS
INSTALL
OH
41
0
0
0
INSTALL
UG
0
177
0
3
RETIRE
OH
0
0
0
0
RETIRE
UG
0
0
0
0
INVOICE #: STK958126
DATE: 06/21/2024
EXPIRES: 09/19/2024
BY: Amy
$ 15,930.98
$ 0.00
Total Costs: $ 15,930.98
$
0.00
$
-2,501.76
Total Credits: $
-2,501.76
$
15,930.98
$
-2,501.76
$
0.00
Grand Total: $
13,429.22
INVOICE
POLES
TRANSF
LIGHTS
METERS
2
3
0
0
0
0
0
0
ALEDO AZLE GRANBURY KELLER SEYMOUR
200 Bailey Ranch Rd 600 N W Parkway 1623 Weatherford Hwy 4900 Keller Hicks Rd 419 North Main Street
Aledo, TX 76008 Azle, TX 76020 Granbury, TX 76048 Keller, TX 76244 Seymour, TX 76380
THIS COST ESTIMATE IS GOOD FOR 90 DAYS. EXPIRATION: 09/19/2024 3
FORTWORTH.
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: Keller Hicks CA #4
M&C: N/A CPN:
100146
CSO:
60585
DOC#: N/A
Date:
6/26/2024
To:
Name
Department
Initials
Date Out
1.
Jessica Rodriguez
TPW - Review
Jun 28, 2024
2.
Mitch Aiton
TPW
- Signature
Jun 28, 2024
3.
Andrew Marquez
McMahon
- Signature q4"
Jun 28, 2024
4.
Curtis Hollingsworth
TPW
- Signature
A-L
Jun 28, 2024
5.
Raul Lopez
TPW
- Signature
-'67-
Jul 1, 2024
6.
Lissette Acevedo
TPW
- Signature
9�v
Jul 1, 2024
7.
Patricia Wadsack
TPW
- Signature
PLVY
Jul 1, 2024
8.
Lauren Prieur
TPW
- Signature
?P-
Jul 3, 2024
9.
Doug Black
Legal
- Signature
DB 17��
Jul 9, 2024
10.
Jesica McEachern
CMO
- Signature
Jul 12, 2024
11.
Jannette Goodall
CSO
- Signature
J—GW-
Jul 15, 2024
12. TPW Contracts
CC: Program Manager, Sr. CPO, TPW BSPAP Recon Team, TPW Records Room, TPW
Contracts
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: ❑YES ❑No SAME DAY: ❑YES ❑No NEXT DAY: ❑YES ®No
ROUTING TO CSO: ®YES ❑No
Action Required: ❑ Attach Signature, Initial and Notary Tabs
❑ As Requested
® For Your Information
® Signature/Routing and or Recording
® Comment
❑ File
Return To: Please notify TPWContractsnu,fortworthtexas.gov for pickup when complete. Call ext.
7233 or ext. 8363 with questions. Thank you!