Loading...
HomeMy WebLinkAboutContract 61069-CO2CSC No. 61069-CO2 Fox_ T� rtM Project Namel 2024 Asphalt Resurfacing Contract 2 Client Project #(s)I 104961 Project Description) Contractorl Texas Materials Group City Project Mgr.I Tariqul Islam Dept Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date Amount of Proposed Change Order Revised Contract Amount Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) TPW $1,908,743.34 City of Fort Worth Change Order Request Resurfacing of Everman Pkwy and W. Risinger Rd I� Change Order #I 2 I City Sec # I 61069 Date 6/12/2024 City Inspector Sergio Garcia $1,908,743.34 $0.00 $1,908,743.34 $190,874.00 $190,874.00 Contract Time Totals (CD) $1,908,743.34 210 $1,908,743.34 210 $0.00 $1,908,743.34 210 $190,874.00 $190,874.00 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 1 0.00% MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) 1 $2,385,929.18 JUSTIFICATION (REASONS) FOR CHANGE ORDE This change order is issued to add a new pay item to remove and replace the existing 20 ft storm drain inlet at Everman Pkwy. This being a maintenance project, the scope of work for the inlet at this location was limited to inlet top replacement. However, during the replacement of the inlet top at this location, severe cracks were discovered inside the inlet that require total replacement. The contractor provided a quote of $12,825.00 for the replacement. Staff verified the price with a recent bid for similar items and found it reasonable. The net change order amount will be zero ($0) as the construction allowance pay item will be used to negate the additional cost. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting reauirements. Contractor's Company Name Contractor (Name) Contract Signature Date Texas Bit Matthew Harper p Jun 26, 2024 Inspector/Inspection Supervisor Date Project and Contract Compliance Manager Date 10R .,1—TI � Jun 26, 2024 Jun 26, 2024 Program manager Date Senior Capital Project Officer Date ZefanfAfmo Ju13, 2024 Jut 3, 2024 Assista or (Dept) k )at Jul3, 2024 tar, Contracting Department (Dept) Date Jul3, 2024 ssistCityant Attorney Date AIM Date Jul 9,2024 Jul 12,2024 Council Ac M&C Number I I M&C Date Approved ATTEST: iF FORi�yoa O°°°° d °° 09Ad Jannette Goodall, City Secretary 0 oaaIln�°Ag6gq OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX FORTWORTH City of Fort Worth Change Order Additions Project Name 2024 Asphalt Resurfacing Contract 2 City Sec # 61069 Client Project # 104961 1 Contractorl Texas Materials Group I PMI Tariqul Islam Inspectorl Sergio Garcia l Change Order Submittal # 0 Date 1 6/12/2024 ADDITIONS I I tM UESCRIP I ION DEP I Oty Unit Unit Cost I otal 1 40-New Replace 20 ft Curb Inlet TPW 1.00000006 EA $12,825.00 $12,826.001 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I I TPW $12,825.001 1 1 1 Sub Total Additions $12,825.001 Change Order Additions Page 2 of 4 FOeH Project Name 1 2024 Asphalt Resurfacing Contract 2 Client Project # 1 104961 Contractorl Texas Materials Group ITEM DESCRIPTION 38 Paving Construciton Allowancew City of Fort Worth Change Order Deletions City Sec # 1 61069 1 PMl Tariqul Islam l Inspectorl Sergio Garcia l Change Order Submittal # 0 Date 1 6/12/2024 1 DELETIONS DEPT Oty Unit Unit Cost Total IPW 0.18321429 LS $/u,uuu.uu $12,825.001 TF W $12,825.001 1 1 1 Sub Total Deletions $12,825.00 1 Change Order Deletions Page 3 of 4 M/SBE for this Change Order M/SBE Sub Type of Service Amount for this CO Not Applicable Not Applicable Not Applicable Total $0.00 Previous Change Orders co # DATE AMOUNT 1 5/10/2024 $0.00 Total 1 $0.00 I FORT WORTH. Routing and Transmittal Slip Transportation and Public Works Department DOCUMENT TITLE: 2024 Asphalt Resurfacinq Contract 2, CO 2 M&C CPN 104961 CSO # 61069 DATE: INITIALS TO: 1. Crystal Greene (Business Support:( 2.Texas Bit — Matthew Harper DOC# DATE OUT Jun 26, 2024 Jun 26, 2024 3. Sergio Garcia (Inspector) 54 Jun 26, 2024 4. Oscar Aguillon (Sr. Inspector) oOA Jun 26, 2024 5.Tariqul Islam (PM) ' a Jun 26, 2024 6 Zelalem Arega (PGM) -Zf- Jul 31 2024 7. Mary Hanna (SCPO) N/' Jul 3, 2024 s. Patricia Wadsack (AD) C' L Y V Jul 3, 2024 g Lauren Prieur (Director) LP Jul 3, 2024 10. Doug Black (ACA) Jul % 2024 p B� Jesica McEachern (ACM) ,�` J u l 12, 2024 12. Jannette Goodall (CS) Jul 155 2024 DOCUMENTS FOR CITY MANAGER'S SIGNTURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review and take the next steps. NEEDS TO BE NOTARIZED: U Yes ❑✓ No RUSH: ❑ ❑✓ SAME DAY: ❑ Yes ❑✓ o NEXT DAY: []Yes ❑✓ No ROUTING TO CSO: OYes ❑No Action Required: ❑ As Requested ❑ Attach Signature, Initial and Notary Ta ■ Signature/Routing and or Recording ❑ Comment ❑ File Return to: Please call at ext. for pick up when completed. Thank you.