Loading...
HomeMy WebLinkAboutContract 61189-A1CSC No. 61189-A1 AMENDMENT No . 1 TO CITY SECRETARY CONTRACT No. 61189 WHEREAS, the City of Fort Worth (CITY) and CDM Smith Inc., (ENGINEER) made and entered into City Secretary Contract No. 61189, (the CONTRACT) which was authorized by M&C No. 24-0172 on the 27th day of February, 2024 in the amount of $3,695,990.00; and WHEREAS, the CONTRACT involves engineering services for the following project: Eagle Mountain Water Treatment Plant Expansion, CPN 105176; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work at no additional fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $0.00, (This amendment provides for substitution of work task at no additional cost). 2. There is no fee increase to Article II of the CONTRACT. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas Eagle Mountain Water Treatment Plant Expansion Prof Services Agreement Amendment Template CPN 105176 Revision Date: 12/08/2023 Page 1 of 2 EXECUTED and EFFECTIVE as of the date subscribed by the City's designated Assistant City Manager. APPROVED: City of Fort Worth Fernando Costa Assistant City Manager DATE: Jul 16, 2024 oa,� p O� F4 Rt �IIp�d O ATTEST: °a�a o=o . �a�4 aEXA?o4� Jannette Goodall City Secretary APPROVAL RECOMMENDED: CGcnkoehe;- tfal4el- Christopher Harder (Jul 16, 202411:20 CDT) Christopher Harder, P.E. Director, Water Department Contract Compliance Manager: ENGINEER CDM Smith Inc. Jessica L. Veach, P.E. Associate DATE: 07-16-2024 By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Toni Sholola, P.E. Assistant Director APPROVED AS TO FORM AND LEGALITY: Douglas Black (Jul 16, 2024 15:20 CDT) Douglas W. Black Sr. Assistant City Attorney City of Fort Worth, Texas Prof Services Agreement Amendment Template Revision Date: 12/08/2023 Page 2 of 2 M&C No.V N/A M&C Date: N/A Form 1295: N/A OFFICIAL RECORD Fagle Mountain Water Treatment Plant Expansion CITY SECRETARY CPN 105176 FT. WORTH, TX Smith July 3, 2024 Mr. James McDonald, P.E. Project Manager City of Fort Worth Water Department 1000 Throckmorton Street Fort Worth, TX 76102 Subject: Eagle Mountain Water Treatment Plant Amendment No. 1 CDM Smith Project No.: 0515-294565 City Secretary No. 61189 - City Project No. 105176 Dear Mr. McDonald: This letter is in reference to a contract between Consultant (CDM Smith Inc.) and the City of Fort Worth (the City) dated February 27, 2024 referred to herein as the "Contract." CDM Smith is pleased to submit our Amendment No. 1 for the City's Eagle Mountain Water Treatment Plant Phase IV Expansion — Project No. 105176. CDM Smith is eliminating the following services and as directed by the City: Task 3.1— Unit Process Evaluations The following processes were eliminated at the City's direction after the completion of Task 2. Do not include 30% design services associated with the Raw Water Pump Station, Clearwell and High Services Pump Station. CDM Smith is also adding the following services as directed by the City: Task 8.7 Environmental Permitting and TWDB Report Documents Engineer will perform environmental services typically required for TWDB funded project such as preparing an Environmental Information Document (EID) in compliance with National Environmental Policy Act (NEPA) and consistent with Texas Water Development Board (TWDB) guidance. Develop a desktop -based environmental constraints map. Perform desktop and field analysis for biological resources and water resources. Provide a draft and final Archaeological Background Review and review Federal, local, and State regulatory records to determine history of hazardous materials on the property. Prepare and Environmental Assessment (EA) following TWDB guidelines for SWIFT funding. Assist the City to conduct a public meeting following TWDB funding requirements. Delineate wetlands and other water of the US in accordance with USACE requirements. Prepare a Pre - Construction Notification (PCN) or Letter of Permission (LOP) for USACE approval. (If an individual permit or mitigation is required, this is not included in the current budget.) 7 tate Street, Suite 701, Boston, Massachusetts 02109 1 tel: 617 452-6000 Smith Mr. McDonald July 3, 2024 Page 2 DELIVERABLES A. Transmittal Letter to TCEQ with Final Design Documents and response to TCEQ Comments. Two hard copies to TCEQ for review of the Final Design Submittal B. Response Letter to address TCEQ comments C. Exception Request Letters to TCEQ for approval of design criteria exceptions. D. Environmental Constraints Maps and Agency Coordination Letters E. Draft and Final EA document. Budget Modifications The elimination of scope and budget from Task 3.1 is being moved to the new Task 8.7 to be used to expedite the Environmental Permitting and TWDB Report Documents to aid the City in maintaining the project schedule. See budget modification details in Table 1 below: Table 1— Task Budget Revision Summary Table: Original Amendment Budget Task Amount No.1 Revision Task 3.1— Unit Process Evaluations $1,294,540.00 ($94,000.00) $1,200,540.00 Task 8.7 — Env. Permitting and TWDB Report Docs. $ -- $94,000.00 $94,000.00 Total $1,294,540.00 $0.00 $1,294,540.00 Table 2 below summarizes our revisions to the total contract. Table 2 — Total Contract: Description Amount Original Contract $3,695,990.00 Amendment No. 1 $0.00 Modified Contract $3,695,990.00 This change does not impact the MWBE percentages for this project. A Modified Level of Effort Table is attached reflecting the summarized change above changes for the project. 75 State Street, Suite 701, Boston, Massachusetts 02109 1 tel: 617 452-6000 Smith Mr. McDonald July 3, 2024 Page 3 We appreciate the opportunity to be of continued service to the City. Please contact us if we need to provide any further information. Sincerely, Sarah A. Stewart, P.E. Vice President / Project Manager CDM Smith Inc. Copy to: Jessi Veach, P.E., CDM Smith Tony Sholola, P.E. City of Fort Worth Attachments: Amendment No. 1 Modified Level of Effort Spreadsheet 75 State Street, Suite 701, Boston, Massachusetts 02109 1 tel: 617 452-6000 Eagle Mountain Phase IV Expansion - Amendment No. 1 July 1, 2024 Amendment No. 1- Modified Level of Effort CDM Smith Modified Contract WBS Code 1 WBS/Activity Design Mngt Name Hours 698 Labor Bill Amount $170,030.00 ODC Billable $50,000.00 Sub Billable $42,790.00 Total Billable $262,820.00 1.1 Team Mngt 398 $96,450.00 $50,000.00 $42,790.00 $189,240.00 1.2 Communications 300 $73,580.00 $73,580.00 2 Concept Design 1548 $315,000.00 $81,950.00 $396,950.00 2.1 Prep 844 $170,720.00 $81,950.00 $252,670.00 2.2 QAQC and Report 704 $144,280.00 $144,280.00 3 1 Prel. Design Report 9693 $1,741,230.001 i $794,510.00 $2,561,670.00 3.1 Unit Process Eval 4072 $704,130.00 $496,410.00 $1,200,540.00 3.2 Plant Hydraulics 380 $75,700.00 $75,700.00 3.3 Disciplines 3901 $689,035.00 $298,100.00 $987,135.00 3.4 OPCC 133 $24,960.00 $24,960.00 3.5 Schedule 29 $8,595.00 $8, 595.00 3.6 Prel. Desien Report 1178 $264,740.00 $264,740.00 4 Equip Pre -Selection 778 $149,210.00 $26,840.00 $176,050.00 4.1 4.2 Membrane PreSelect Ozone PreSelect 402 376 $76,280.00 $72,930.00 $26,840.00 $103,120.00 $72,930.00 8 Permitting 264 $61,000.00 $94,000.00 $155,000.00 8.1 Stakholder Coord. 54 $15,050.00 $15,050.00 8.2 PDR Submittal 60 $16,100.00 $16,100.00 8.3 CT Study 150 $29,850.00 $29,850.00 8.7 Env. Permittine and TWDB Report Docs. 594.000.00 S94.000.00 9 Field Services 386 $65,400.00 $78,100.00 $143,500.20 9.1 Geotech Report 378 $62,800.00 $45,100.00 $107,900.00 9.2 Survey & SUE 8 $2,600.00 $33,000.00 $35,600.00 Totals 13367 $ 2,501,870.00 $ 50,000.00 $1,118,190.00 $3,695,990.00 With