Loading...
HomeMy WebLinkAboutContract 59068-CO3CSC No. 59068-CO3 F_ Cl I2T wdV RT H City of Fort Worth Change Order Request Project Name: Walnut Creek Sanitary Sewer Interceptor Extension - Phase 1 f City Sec No.: 59068 Project No.(s)] 103414-1 1 DOE No. I N/A City Proj. No.: 103414-1 Project Description: Sanitary Sewer Installation on Aledo Road Contractor: S.J. Louis Construction of Texas, Ltd. J Change Order # 3 1 Date: 5/14/2024 City Project Mgr.I Preeti KC City Inspector: Stephen Martinez Phone Number: (817) 392-5467 I Phone Number: (817 392-6051 Dept. Water Sewer TPW Totals Contract Time (Calender days) Original Contract Amount $10,424,212.97 $10,424,212.97 360 Extras to Date $56,480.37 $56,480.37 7 Credits to Date Pending Change Orders (in M&C Process) j Contract Cost to Date $10,480,693.34 i $10,480,693.34 367 Amount of Proposed Change Order $13,829.06 j $13,829.06 Revised Contract Amount $10,494,522.40 $10,494,522.40 367 Original Funds Available for Change Orders $260,605.00 $260,605.00 Remaining Funds Available for this CO $204,124.63 $204,124.63 Additional Funding (if necessary) CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS X OF ORIGINAL CONTRACT 0.67% MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) 1$13,030,266.21 JUSTIFICATION (REASONS) FOR CHANGE ORDER Change Order No. 3 provides compensation of additional pay item quantities of 4-inch asphalt paving, removal/replacement of curb and gutter, traffic control and portable message sign that were necessary in order to complete the project. The change order also allows for the deletion of pay item quantities tha are no longer needed on the project. Staff concurs with the contractor's request for additional calendar days for the change order. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. Contractor's Company Name Contractor Name ontractg(Si nature Date S.J. Louis Construction of Texas, Ltd. I Adam Lunsford I I 3'117/7-4 Inspector I Date Project Manager Date 34"a rL 106/18/2024 /0-aet ii'� �' 5/23/24 Director (Water Dept) Date Co ruction""Sup/ervis[Lor (Water) Date Chrisfonhe .�Farder T.S. Jul 17, 2024 = n 6/18/2024 of 1SOss s ant City Attomey Date A stant City Manager Date „.l�.2,..z,IoT JUi 18, 2024 ---- �J u 118, 2024 Council Action (If Required) M&C Number N/A I M&C Date Approved N/A F" RT Wc) ay H City of Fort Worth Change Order Additions Project Name Walnut Creek Sanitary Sewer Interceptor Extension - Phase 1 City Sec No.: ( 59068 Project No.(s): 103414-1 DOE No.1 N/A City Proj. No.: 103414-1 Project Sanitary Sewer Installation on Aledo Road Description Contractor S.J. Louis Construction of Texas, Ltd. Change Order: Date:1 511412024 City Project Mgr. Preeti KC ! City Inspector I Stephen Martinez ADDITIONS - 11 LM UtSt;KIF f 1UN 28 Remove and Replace 6" Concrete Drive 33 Traffic Control and Detour 34 Portable Message Sign 57 Unclassified Excavation by Plan 59 8" Flexible base, Type A, GR-2 60 2" Asphalt Pvmt Type D 61 4" Asphalt Pavement Type B 62 4" SLID Pvmt Marking HAS (W) 63 4" SLD Pvmt Marking HAS (Y) DEPT- t Qty Unit .Unit Cost Total Sewer 830.60 LF $19.00 $15,781.40 Sewer 1.50 EA $3,000.00 $4,500.00 Sewer 16.66 EA $300.00 $4,998.00 Sewer 25.00 CY $18.00 $450.00 Sewer 112.33 SY $18,00 $2,021.94 Sewer 447.61 SY $15.00 $6,714.15 Sewer 497.82 SY $29.00 $14,436.78 Sewer 192.00 LF $1.20 $230.40 Sewer 192.00 LF $1.20 $230.40 Water Sewer $49,363.07 TPW Page i of i Additions Sub Total FC-iP T W" P,-F H City of Fort Worth Change Order Deletions Project Name ( Walnut Creek Sanitary Sewer Interceptor Extension - Phase 1 City Sec No.: 59068 Project No.(s): 103414-1 DOE No. I N/A City Proj. No.: 103414-1 Project Description I Sanitary Sewer Installation on Aledo Road Contractor S.J. Louis Construction of Texas, Ltd. Change Order: F3 ] Date 5/14/2024 City Project Mgr. Preeti KC City Inspector: I Stephen Martinez DELETIONS ITEM DESCRIPTION 22 Imported Embedment/Backfill, CLSM 25 Railroad Flagmen 56 Temporary Asphalt Paving Repair 58 Temporary Asphalt Paving Repair (2" HMAC on 6" Flexbase) 68 Construction Allowance DEPT Oty Unit Unit Cost Total Sewer 22.00 CY $150.00 $3,300.00 Sewer 2.00 EA $500.00 $1,000.00 Sewer 40.00 LF $33.00 $1,320.00 Sewer 27.00 SY $43.00 $1,161.00 Sewer ).1916867 LS $150,000.00 $28,753.01 Page 1 of 1 Water Sewer $35,534.01 TPW ;Deletions Sub Total $35,534.01 MWBE Sub Co # MIWBE Breakdown for this Change Order Type of Service Amount for this CO Previous Change Orders DATE Total $0.00 I 2' AMOUNT Total $0.00 Page 1 of 1 Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Signature Preeti KC Name of Employee Sr. Professional Engineer Title 400vvnUb a F FART °�a ATTEST: pia o9.i$ dvo o=a nE00 o?o4cr Jannette Goodall City Secretary OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX