Loading...
HomeMy WebLinkAboutContract 20283-CO5 DISTRIBUTION: WHITE-Fn-di CITY OF FORT WORTH CITY SECMAW"001 CANARY-CONSTRUCTION FM PM-PROJECT MANAGER CHANGE ORDER RE UESST - CONTRACT NO* GOLDENROD-CONTRACTOR, CHANGE ORDER NO. DATE D.O.E.NO. PROJECT NO. PE46-070460300020 5 September 27,2007 , NON Furid/Center/Account: PIFA5/705008/539120 PROJECT D,ESC ION: C.1W SECRETARY CONTRACT NO. r LONG TERM SOLIDS DEWATERING,PROCESSING AND DISPOSAL CONTRACT 30908 ORIGINAL CONTRACTAMOUNT (1994-2000) City Sec.#20283 $2428573000.00 Approved CONTRACT RENEWAL ft.,1 (2000—2004) City Sec.# 5763 $29,8931086.00 Approved CONTRACT RENEWAL#2 (2004-20101) City Sec.#30908 $32)407)306.00 EXTRAS TO DATE (Amendment# I (April 19917)) City See.#226571 $ 5)67 ,532. CREDITS TO DATE....... to .......... ........... ... 0.00 CONTRACT COST TO DATE.,........P 0-40 got a I$,#pop*0 *.*..a 1#0#IF 16 0&14 A 1 0 0,a A a 4 A........#*A­w 0 9218,35,924.00 AMOUNT OF PROPOSED CHANGE .—.... .............. 231'963-00 REVISED CONTRACT do I*o$"1, two 0 too to 927859g887.010 ORIGINAL,FUNDS AVAILABLE F'OR-CHANGE ORDERS....... ............................................ $ 0.00 ADDITIONAL FUNDING(IF NECESSARY) ...... q I a 0 WA 0&I*0 6 a a#6#0 4..........I.4 0..0 o o 0o o q 0 4 4 4 W M a 0 4 A A a.....$ 0.00 REMAINING FUNDS AV, E FOR CHANGE ORDER................. 0.00 IN ACCORDANCE WITH TIES CHANGE ORDER e as o ,THE CONTRACTOR SHALL:proce d f Ilows, 4 CMR-00 1:Purchase and mstall a 12 inch Storm Water Pump(Gorman Rupp#I 12D60-B Basic Pump)to replace an,existing"booster" storm water pump on the storm,water system at the Sludge Only Landfill(SOL). In.19'98,the City of'Fort Worth Water Department and Renda Environmental Inc. (REI)partnered and worked together to provide, . storm water pump and piping system at the Sludge Only Landfill(S )to be used to remove excess storua water from the S site and pump the storm.water back to the Village Creek Wastewater Treatment Plant through the existing 12"filtrate return.line from the SOL. The existing pump was provided:by the City with RE I building the pump skid;providing the piping and electrical hook-ups and maintating the pump and purnpuilg system. REI will cbntm' ue tcf provide normal wear and tear replacement parts,mamiten"nce of'the pump and maintenance of the piping and electrical systems at no ad do l costs to the City. The Contractor has provided a cost of$23, 63.00 for this work. The compIdtion d6te for.this the contact will remalli at March 31,2010. (NO ADDITIONAL TM4E ire Change Order#5) TOTAL COST FOR CHANGE ORDER N ER #5 - S 23,963.00 It Is undcr3tood and agreed that the acceptance of this Change Order by the Contra for consfitutcs an accord and satisfaction and represents payment In full(both in time and,money)for all coos wising out of or incidental to,the Change Order, .......... OPLIGINALCONTRACT T ADDMONAL APPROVED TRvMT0 DATE ArPROVED CONTRACT MIE TO DATE ADDMONAL TIME FORMS CHANGE 0 IWER 1825 cale N'ard 3650 calendar days 5475 calendar days 0 Days 4 0 CONTPLACTOR oATE FLPLDENG1N1iEjF� SN to- OATS Renda Envnmental In "C. t Halff&Associates Inc'.- 1012107 A oloon MANAGE FUCONS,T.SER. DATE DI 0 DB� DATE r No )c z 0 F.Rockers, ater I� t./Villacre Creek W ater Dn"ector I DlF,ECT0R/C0NTRACTTNG DE 4AP_ DATE COY ATT0RNEY,.P'o" DA AV Sebastian(B Fi lera,Asst. Water ir,ector uste E) CTI 7 DAT / CITY MANAGER DATE COUNCIL A ON� 0 AYPROVED ISAY R4 Q UrMR Marc A. Ott ►