HomeMy WebLinkAboutContract 20283-CO6 ISTRIBUTION: ME-FILE kNARY-CONSTRUCTION FUZ CITY OF FORT WORTH CITY SECROARY NK-PROJE&MANAGER CHANGE ORDER REQUEST DLDENROD-CON TRAC'TOR O NT&6=NOx D.01.NO. HAN�GE ORDER NO. DATE- PROJECT NO. PE46-0'70460'300020 6 April 5,200 NONE FundJCeriter/Acc 5/70 50108/539'120, �QJECT DESCRIPTION: CITY SECRETARY CONTRACT'NO., LONG TERM SOLIDS DEWATERINGPROCESSING AND DISPOSAL CONTRACT 3101908 ........... ....... B ollids Turbines Landfill Gas TOTAL RJGD�AL CONTRACT'AMOUNT (19194-2000) CS#20283 $24)857)000 NA NA $ 241,85710,010.00 Amendment I (Grit,addition) (1997) C S#22657 $ 5fi781532 NA NA $ 5167813,5312.00 Axnendment#2 (Contract Renewal# 1) (2000—2004) C S#25763 $29,893086 NA NA $ 29;893fl86.00 Amendment#3 (Contract Renewal#2) (2004----2010) C S,#30908 $32,4,107,306 $4,448,585 $�9,800,10,88 $ 46),655,9179.00: Amendment#4(Turbine Re-Buiid) (20018), C S#36404 NA $ 955,0001 NA 95'1151' 0100 00 040.0 .......... TOTAL $1108,0139,1597.00 EXTRAS TO DATE (Change Order#I thru Change Order#4-NO COST Change Orders) $ 1 0.001 (Change Order#5 -(October 2007-$23,963)and travel,(2 005-$1,816.97)) $ 251,779.97 CREDITSTO ATE................................... ..................................... $ 0.00 ONTRACT AMOUNT. ............. ........ .......... $108,0651,376.917 ONTRACT COST TO DATE(tom March 31,20 9(pay­estimate#168) .......*##,.$ 84,0331,267.06 MOUNT OFPROPOSED CHANGE ORDER........... .. .... ..*** A $ 11911790.00 EVISED CONTRACT AMOUNT.....,....... ....... ....... ....... $1108#k.r RIGINAL FUNDS AVAELABLE FOR,CHANGE ........w....... ........... 0.00 ,EMAINING FUNDS AVAILABLE FOR CHANGE,ORDER........ ..................... ......w..................... 0.00 .N ACCORDANCE WITH THIS CHANGE ORDER,THE CONTRACTOR SHALL., 011%,onstruct Biosolids De ater'ng Facflity Modcations—to fac ate TCEQ Biosolids Regulation interpretation of hold" g all I w I I it I M )Iosolids for 24 hours before land,application,,to meet Vector Attraction Reduction(ALT 6).The CONTRACTOR shall construct idditl'onal concrete storage pad area to the existmig,storage pad,raise the concrete r a=` g wall around the exiistmig storage pad area i ipproxim ate ly 2'-0"', and construct meter r`dividers to separate the pad area'unto cells. Cost: $49,707.27 21ean out Equalization Basin— The filtration process used'in wastewater treatment and the Elters performance is uiripacted y,the 0 iccumulation of solids m equalization basin over several years. Clean out of the squab Zatin basi will,facilitate improvement ofthe 1-o lids,treatment process. Cost-, $70,08 1.00 he completion date.f rthi,s contract will remai atMarch-031,2010'. (NO ADDITIONAL TIME 'in Change Order#6). OTAL COST FOR CHANGE ORDER - $11911790.00 s undcrsI tood and 3j,rced that the accapta=of this C' g. Order by the Contractor towssitutes anzecord and satisfaction rcpircients payment in,full(both in,time and money)for all costs arising,out of,or iincidwal to.the Change Order. IGINAL.CON7RACT TIME ADDITIONAL APP FLOVEDnM'E TO DATE APPROVED CONTRACTTIME TO DATE ADD OVAL TIME FOR n-flS CH, GE ORDFA 1825 calendar days, 36,50 calendar days 5475 calendar days 0 Days DATE FIELD ENGrNEER NTRACTOR 4 .-,nda Environmental Inc,., H'alff&As rates Inc. NAGER/CONST.SEFL DAITE DIRE A 0 DEP D Ft i< F r C ater Director F,Rockers,Water De Villag�Creek �, W ary U_ c:t /4'tECrOWCONTRA P CITY AT'rORNEY ATE I I .Ss6e,,Ie 64A— I I us:Z Krast. Water Director 1,bastian(Bus ray S Ir ;70 'Y MANAGER DATE CO GN CIL ACTION-(IF REQUI RED): I DATE Q APPROVED 0 DISAPPROWD 10(YMFR M&C Review Pagel of2 10 Offidal site of'due City of Fort Worth,Texas I Sol a , bRT 11 CITY COUNCIL AGENDA Fo PA COUNCIL ACTION: Approved on 5/19,/2009 W0N"*M"%ft*~ RIMMON1 DATE: 5/19/2009 REFERENCE C-23539 LOG NAME: 60RENDA ENVIRONMENT C06 ,CODE: C, TYPE: NON- PUBLIC NO CONSENT HEARING.: SUBJECT I: Authorize Change Order No,. 61 in the Amount of$1119,7910.,00 with Renda Environmental, Inc.,, for the Long-Term Solids Dewatering, Processing and Disposal RECOMMENDATION: It is recommended that the city Council authorize the City Manager to execute Change Order No. 6 to, City Secretary Contract No. 30908 with Renda Environrnen�tal, Inc., to include constructing additional concrete storage padl retaining walls and concrete dividers at the Biosolids, De staring Facility and clean-out of grit and inorganic, material from the Equalization Basin located at the Village Creek Wastewater Treatment Plant thereby increasing the contract by$1191790.00. 0 DISCUSSIONS On April 5, 19941, (MI&C C-1 42558) the City Council aut,hoirized execution of a, Long-Term Solids Dewatering Processing and Disposal, contract(City Secretary Contract (CSC) No. 2o2 3) with Oscar Renda Contracting, Inc./Agronomic Management Group, Inc., now known as Renda Environmental, Inc., at Village Creek Wastewater Treatment Plant, On January 25, 2000, (MI&C C-1 7834) the City Council authorized the first five year renewal, of the contract (CSC No. 25763)with two additional five year renewal options. On June 29, 2004, (M&C C-20131) the City Council authorized the second five year renewal of the contract (CSC No. 30908)with one additional five year option. Throughout the duration of the c,on�t'ract, the contractor,has operated without interruption and in full regulatory compliance. Modifications to the Dewate�ring Facility, to increase and improve the biosolids, concrete storage pad area is required to facilitate Texas Commission on Environmental Quality biosolids regulation initerpre,taltilon,, that all biosolids be held 24 hours before land application to meet vector attraction reduction Alternative 6 (lime addition to blosolids). Clean out of the Equalization Basin will facilitate the improvement of the solids treatment process,. It is recommended that the modifications to the Biosolids Dewatering Facility concrete storage pad area and basin clean out be performed by Renda Environmental, Inc. Benda Environmental, Inc., is in compliance with the City'is M/WBE Ordinance by committing to an additional seven percent M/WBE, plarticiplati�o,n on this Change Order No. 6. for a total committmeint of 26 percent. This project is located in COUNCIL DISTRICT 5. FISCAL INF'ORMIAT'10,N 'CE,RTIFICATlON,,-, The Financial Management Services Director,certifies, that funds are available in the current operating budget of the Water and Sewer Fund. TO Fund/Account/Centers FROM Fund/Account/Centers http!://apps.cfwniet.org/counci l iew.asp?1D=I 1507&councilidatc=5/19/2009 9/3/2013 _packet/me—rev" M&C Review Page 2 of 2 PE45 539120 0705008 90.00 ............. ...... S�ub�mitte,d fo�r Cif y �Langger's Off Fernando Costa (6122,) a OUlginatinq Dqpartment Hea-d., S. Frank Crumb (8207) Additional Information Contact.. Gary Rockers (4965) .......... .......-1-1-....'-..... .......��l,,..,,.��,r�,,�,.,.,r�r�....-,��,,,�,,,�7.!.�.".�...... ........... ATTACHMENTS 60RENDA ENVIRONMENT C061 M.api.pldf http://apps.,cfwnet.org/counc"l lew.asp?ID=I 1507&councildate=5/19/20019 9/3/2013 1 _packet/mc—rev'