HomeMy WebLinkAboutContract 20283-CO6 ISTRIBUTION:
ME-FILE
kNARY-CONSTRUCTION FUZ CITY OF FORT WORTH CITY SECROARY
NK-PROJE&MANAGER CHANGE ORDER REQUEST
DLDENROD-CON TRAC'TOR
O NT&6=NOx
D.01.NO.
HAN�GE ORDER NO. DATE- PROJECT NO. PE46-0'70460'300020
6 April 5,200 NONE FundJCeriter/Acc 5/70 50108/539'120,
�QJECT DESCRIPTION: CITY SECRETARY CONTRACT'NO.,
LONG TERM SOLIDS DEWATERINGPROCESSING AND DISPOSAL CONTRACT 3101908
........... ....... B ollids Turbines Landfill Gas TOTAL
RJGD�AL CONTRACT'AMOUNT (19194-2000) CS#20283 $24)857)000 NA NA $ 241,85710,010.00
Amendment I (Grit,addition) (1997) C S#22657 $ 5fi781532 NA NA $ 5167813,5312.00
Axnendment#2 (Contract Renewal# 1) (2000—2004) C S#25763 $29,893086 NA NA $ 29;893fl86.00
Amendment#3 (Contract Renewal#2) (2004----2010) C S,#30908 $32,4,107,306 $4,448,585 $�9,800,10,88 $ 46),655,9179.00:
Amendment#4(Turbine Re-Buiid) (20018), C S#36404 NA $ 955,0001 NA 95'1151' 0100 00
040.0 .......... TOTAL $1108,0139,1597.00
EXTRAS TO DATE (Change Order#I thru Change Order#4-NO COST Change Orders) $ 1 0.001
(Change Order#5 -(October 2007-$23,963)and travel,(2 005-$1,816.97)) $ 251,779.97
CREDITSTO ATE................................... ..................................... $ 0.00
ONTRACT AMOUNT. ............. ........ .......... $108,0651,376.917
ONTRACT COST TO DATE(tom March 31,20 9(payestimate#168) .......*##,.$ 84,0331,267.06
MOUNT OFPROPOSED CHANGE ORDER........... .. .... ..*** A $ 11911790.00
EVISED CONTRACT AMOUNT.....,....... ....... ....... ....... $1108#k.r
RIGINAL FUNDS AVAELABLE FOR,CHANGE ........w....... ........... 0.00
,EMAINING FUNDS AVAILABLE FOR CHANGE,ORDER........ ..................... ......w..................... 0.00
.N ACCORDANCE WITH THIS CHANGE ORDER,THE CONTRACTOR SHALL.,
011%,onstruct Biosolids De ater'ng Facflity Modcations—to fac ate TCEQ Biosolids Regulation interpretation of hold" g all
I w I I it I M
)Iosolids for 24 hours before land,application,,to meet Vector Attraction Reduction(ALT 6).The CONTRACTOR shall construct
idditl'onal concrete storage pad area to the existmig,storage pad,raise the concrete r a=` g wall around the exiistmig storage pad area
i
ipproxim ate ly 2'-0"', and construct meter r`dividers to separate the pad area'unto cells. Cost: $49,707.27
21ean out Equalization Basin— The filtration process used'in wastewater treatment and the Elters performance is uiripacted y,the
0
iccumulation of solids m equalization basin over several years. Clean out of the squab Zatin basi will,facilitate improvement ofthe
1-o lids,treatment process. Cost-, $70,08 1.00
he completion date.f rthi,s contract will remai atMarch-031,2010'. (NO ADDITIONAL TIME 'in Change Order#6).
OTAL COST FOR CHANGE ORDER - $11911790.00
s undcrsI tood and 3j,rced that the accapta=of this C' g. Order by the Contractor towssitutes anzecord and satisfaction
rcpircients payment in,full(both in,time and money)for all costs arising,out of,or iincidwal to.the Change Order.
IGINAL.CON7RACT TIME ADDITIONAL APP FLOVEDnM'E TO DATE APPROVED CONTRACTTIME TO DATE ADD OVAL TIME FOR n-flS CH, GE ORDFA
1825 calendar days, 36,50 calendar days 5475 calendar days 0 Days
DATE
FIELD ENGrNEER
NTRACTOR
4
.-,nda Environmental Inc,., H'alff&As rates Inc.
NAGER/CONST.SEFL DAITE DIRE A 0 DEP D
Ft i<
F
r C ater Director
F,Rockers,Water De Villag�Creek �, W
ary U_ c:t
/4'tECrOWCONTRA P CITY AT'rORNEY ATE
I I .Ss6e,,Ie 64A— I I
us:Z Krast. Water Director 1,bastian(Bus ray S Ir
;70
'Y MANAGER DATE CO GN CIL ACTION-(IF REQUI RED): I DATE
Q APPROVED 0 DISAPPROWD 10(YMFR
M&C Review Pagel of2
10 Offidal site of'due City of Fort Worth,Texas
I Sol
a , bRT 11
CITY COUNCIL AGENDA Fo PA
COUNCIL ACTION: Approved on 5/19,/2009
W0N"*M"%ft*~ RIMMON1
DATE: 5/19/2009 REFERENCE C-23539 LOG NAME: 60RENDA
ENVIRONMENT C06
,CODE: C, TYPE: NON- PUBLIC NO
CONSENT HEARING.:
SUBJECT I: Authorize Change Order No,. 61 in the Amount of$1119,7910.,00 with Renda Environmental,
Inc.,, for the Long-Term Solids Dewatering, Processing and Disposal
RECOMMENDATION:
It is recommended that the city Council authorize the City Manager to execute Change Order No. 6
to, City Secretary Contract No. 30908 with Renda Environrnen�tal, Inc., to include constructing
additional concrete storage padl retaining walls and concrete dividers at the Biosolids, De staring
Facility and clean-out of grit and inorganic, material from the Equalization Basin located at the Village
Creek Wastewater Treatment Plant thereby increasing the contract by$1191790.00.
0
DISCUSSIONS
On April 5, 19941, (MI&C C-1 42558) the City Council aut,hoirized execution of a, Long-Term Solids
Dewatering Processing and Disposal, contract(City Secretary Contract (CSC) No. 2o2 3) with Oscar
Renda Contracting, Inc./Agronomic Management Group, Inc., now known as Renda Environmental,
Inc., at Village Creek Wastewater Treatment Plant, On January 25, 2000, (MI&C C-1 7834) the City
Council authorized the first five year renewal, of the contract (CSC No. 25763)with two additional five
year renewal options. On June 29, 2004, (M&C C-20131) the City Council authorized the second five
year renewal of the contract (CSC No. 30908)with one additional five year option. Throughout the
duration of the c,on�t'ract, the contractor,has operated without interruption and in full regulatory
compliance.
Modifications to the Dewate�ring Facility, to increase and improve the biosolids, concrete storage pad
area is required to facilitate Texas Commission on Environmental Quality biosolids regulation
initerpre,taltilon,, that all biosolids be held 24 hours before land application to meet vector attraction
reduction Alternative 6 (lime addition to blosolids). Clean out of the Equalization Basin will facilitate
the improvement of the solids treatment process,.
It is recommended that the modifications to the Biosolids Dewatering Facility concrete storage pad
area and basin clean out be performed by Renda Environmental, Inc.
Benda Environmental, Inc., is in compliance with the City'is M/WBE Ordinance by committing to an
additional seven percent M/WBE, plarticiplati�o,n on this Change Order No. 6. for a total committmeint of
26 percent.
This project is located in COUNCIL DISTRICT 5.
FISCAL INF'ORMIAT'10,N 'CE,RTIFICATlON,,-,
The Financial Management Services Director,certifies, that funds are available in the current operating
budget of the Water and Sewer Fund.
TO Fund/Account/Centers FROM Fund/Account/Centers
http!://apps.cfwniet.org/counci l iew.asp?1D=I 1507&councilidatc=5/19/2009 9/3/2013
_packet/me—rev"
M&C Review Page 2 of 2
PE45 539120 0705008 90.00
............. ......
S�ub�mitte,d fo�r Cif y �Langger's Off Fernando Costa (6122,)
a
OUlginatinq Dqpartment Hea-d., S. Frank Crumb (8207)
Additional Information Contact.. Gary Rockers (4965)
.......... .......-1-1-....'-..... .......��l,,..,,.��,r�,,�,.,.,r�r�....-,��,,,�,,,�7.!.�.".�...... ...........