Loading...
HomeMy WebLinkAboutContract 20283-CO7 CITY Off"'FORT WORTH 'RUCTIONFILE Crry SECRETARY PINK-PkOJECTMANAM CHANGE ORD�ER REQUEST GOLDENROD-C CTO CONMCT NO 0 wswmwqswm� CHANGE ORDER NO. DATE D.O.E.No. PROJECT NO. PE46-070460300020 October 20,2009 NONE Fund/Center/Account.- PE451/705008/539120 PROJECT DESCRIPIRON: CITY SECRETARY CONTRACT NO,- LONG TERM SOLIDS DEWATERING,PROCESSING AND DISPOSAL COr NT'RACT 30908 -A &a. 9 or.64# a.6 0-0.4 0.9 4*1..4*6 0 6 0..0*4&6.q •0 6 6 0 6.. I%1 0 6 0 Biosollds T.urbines Landfill Gas TOTAL ORIGINAL CONTRACT AMOUNT (1994-2000) C S#20283 $243857,000 NA NA $ 2438573000.00 Amendment# I (Galt addition) (19917) C S#22657 $ 5,678�532 NA NA $ 51678,532.00 Amendment#2(Contract Renewal# 1) (2 00—2004) C S#25763 $293,8931086 NA NA $ 291893,086.00 Amendment A 3 (Contract Renewal#2) (2004—20101) C S 9 3 �08 $32,4017,306 $4,448,585 $9,800,088 $ 467655)979-001 Amendment#4(Turbine Re-Biiiild) (2008) C S#36404 NA $ 9553000 NA $ 955,000.00 ....................................................... .......*.*...... TOT'A-L $108;039:�597.00 EXTRAS TO,DATE (Change Orders#I thru 96 and Travel) 1453569.97 CREDITS TO DATE............................................. 0.00 ""ONTRACT AMOUNT......,....,..A...W'..,........,.,........—...................I................................................ ..................................................$108)i 853166-97 COST TO DATE(thru September 3 0,2009(pay esthinate#174)....... ...... 88,220,782.27 WOUNT OF PROPOSED CHANGE ORDER.................. ........................................•......... .............-......$ 6.1011.01• �-EVISED CONTRACT AMOUNT...................... ............I....................... ........................... .........1108),191J77.98 )RIGINAL FUNDS AVAILABLE FOR CHANGE ORDERS.............................................................................. 0.00, T FUNDS AVAILABLE FOR CHANGE ORDER....... 0.00 -0 IN ACCORDANCE WITH THIS CHANGE ORDER,THE CONTRACTOR SHALL: CMR-1003.-Purchase and'Install a Storm Water Lift Pump to replace an existing storm water Lift pump on the storm water system at the Sludge Only Landfill(SOS.). In 199 8,,the City of Fort Worth Water Depaftment and Renda Environmental Inc,(RED"partnered"and worked together to provide a storm water pumping and piping system at the Sludge Only Landfill(S )to be used to remove excess,storm water from the SOL site and pump the storm water back to the Village Creek Wastewater Treatment Plant,through the existing 12"filtrate return line from the SOS...,. 'Me existing storm water lift pumps, pump station and a 12"storm witer L'booster"pump was provided by the City to assist REI 'in storm water management at the SOL. REI will continue to provide normal wear and tsar replacement parts?maintenance of the pump and maintenance of the piping,and electrical systems at,no additional costs to the City. The Contractor has provided a cost breakdown of$6,011.01.1 for this work. r completion date for thiS the contact will remain at March 31,201+x. (NO ADDITIONAL. TIME in Change Order#7) OT'AL COST FOR CHANGE ORDER - $61011.01 s understood and agreed that tha accoptance of this Change Order bar.the contractor constitutes an accord and satisfactioa i ropmenEs payment in full(both in time and money)for all costs arising out of,or incidental to,tine Change Order. IGTN;AL CONTRACT TIME ADDrTjONAL APPROVED TIME TO DATE APPROVED CONTRACTTIME TO DATE AJ)DITIONAL TIME:FOP,TMS CHANGE ORDER 18,25 calendar days 3650 calendar days 5475 calendar days 0 Days NTRACTOR DATB/�o4 R DAM FIELD ENGTNEE nda n Hal ssociate �nc, Evirorunen taHalf` s,l Inc SER. DATE DJUCT ALNA D NAGEWCONST -7 e7 2c? C(.;& E, titer Director 4 F.Rockers,Waster De t./Vfflagge Creek I ECTORICONTRAC G DEPT. DATE CrTY ATTORNEY OATE bas'tian,LBUS C Aera, sst. Water Director Y MANACER DATE COUNCIL ACTION OF REQVIRED): DATE r1l AVI)CAIrc'm " mft-A"Mn^lfv-�