HomeMy WebLinkAboutContract 53181-CO7FoK-r WoK-rH City of Fort Worth CSC No. 53181-007
Change Order Request
Project Name; Waiercress Low Pressure Sewer Extension Ciry Sec No.: 53181
PfOj2Ct N0.(S�: 56016-0700430-001783 DOE No. N/A City Proj. No.: 101002
Project Descripiion:� Extend low pressure sewer in Watercress Drive and connecfing s(reets. Install grinder pumps at each home.
Contractor: William J. Schultr, Inc. dba Circle C Construclion Co. Change Order #� Date: 7118l2024
City Project Mgr. Walter Norwood City Inspector: Carmen Drake
Phone Number: 817-392-5026 Phone Number: (817)392-8347
Dept,
Original Coniract Amount
Extras to Date
Credils to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Amount of Proposed Change Order
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
Unit 1 Sewer Unit 2 Paving Unit 3 Water
y4,905,476.50 $510,107.50 0.00
$93,596.50 $0.00 $547.945.00
510,528,00
87,810.00
422,718.00
47,164.00
i3.567.50
10,107.50 �u547,94
$0,00 587,811
10,107.50 �635,75
'.5.505.00
Totals I Contract Time
,568,580.50
172.669.00
�79.072.50
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 2.83%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) 6,769,480.00
JU
FOR
4
This Change Order No. 7 provides for the following;
• Installation of 2 inch dia. service lines and 2" dia. pressure reducing valves to serve businesses currently
provided water by the Town of Lakeside but must be converted to Fort Worth water per terms of the CCN
Transfer Agreement with the Town of Lakeside.
� The relocation a fire hydrant, air release valve vent and cathodic protection test station to allow space for
construction of a service road by TxDOT.
Staff reccommends the addition of 418 calendar days for securing all permits from property owners to access
their properties to install/connect residents to Fort Worth Water. In addition, all property owners had to open
accounts with the Water Department.
It is understood and agreed that (he acceptance of this Change Order by the contraclor constitutes an
in fuil (both time and money) for all costs arising out of, or incidental to, the above Change Order.
Gonlractors Company Name Conlractor Name �o+
Wlliam J, Schuilz, Inc. dba Circle C ConsWctlon Co. TOf�I SI(CIIy � ��
Director
S2nfoF Ass�s?anl
M&C Number
� I Date
e� 0 9 2��
Date
� .r►, Ju122, 2024
ie�� Date
Ju123 2024
Caunctl AcUan
NIA
and satisfaction and represents
latar
M&C Date Approved
Oete
7-18-24
Dale
7/19/2024
Dale
u123.2024
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT' WORTH City of Fprt Worth
Change Order Additions
Project Name Watercress Low Pressure Sewer Extension City Sec No.: 53181
Project No.(s): 56016-0700430-001783 DOE Na. N A City Proj. No.: 101002
Project
Description
E�end low pressure sewer in Watercress Drive and connecting streets. Install grintler pumps at each home.
Coniractor William J, Schultz, Inc. dba Circle C Construction Co. Change Order:�7 Date; 7118I2024
City Project Mgr. Walter Norwood City Inspector John Kula
ADDITIONS
DEPT Q Unit Unit Cost Total
7 Fire ydrant Unit 3 Water EA $6,500,00 $6,500.00
10 1" Private Water Service Unif 3 Water 185.00 EA $100.00 $18,500.00
12 Temporary Asphalt Paving Repair (with asphall and Flex base) Unit 3 Water 18 LF $40.00 $720.00
19 1" Water Service Unit 3 Water 2 EA $725.00 $1,450.00
22 6" PVC Water Line(Tyler Place and Sommerville PI. Road) Unit 3 Water 39.00 LF $115.00 $4,485.00
24 6" Gate Valve Unit 3 Water 2.00 EA $1,600.00 $3,200.00
25 2" Water Service, Meter Reconneclion Unit 3 Water 3 EA $650.00 $1,950.00
26 2" Water Service Unif 3 Water 3 EA $825.00 $2,475,00
27 2" Private Water Service (7601 Jacksboro Hwy, 4305 Surfside Dr,) Unit 3 Water 300.00 LF $100,00 $30,000.00
28 2" PRV Unit 3 Water 2.00 EA $2,175.00 $4,350.00
29 Asphalt Parking/Driveway Replacement Unif 3 Water 10.00 LF $48.00 480.00
30 Relocaie Fire Hydrant Unit 3 Water 1.0� EA �1,200,00 $1,200.00
31 Relocaie Air Vent on Air Release Valve Vault Unit 3 Water 1.00 LS �3,500.00 $3,500.00
32 Relocate Cathodic Protection Test Station Unit 3 Water 1.00 LS �3,500.00 $3,500.00
33 Block Sod Placement Unit 3 Water 125,00 SY $12,00 $1,500.00
34 Mobilization for FH, ARV Adjustment, Cath. Protection Test Sta. Unit 3 Water 1.OD EA $2,000.00 $2,000.00
35 Mobilization and Repair - 2" Service Line(7601 Jacksboro Hwy) Unit 3 Water 1.00 E,4 $2,000.00 �2,000.00
Unit 1 Sewer
Unif 2 Paving
Unit 3 Waier $87,810.00
Page 1 of 1 Addifions Sub Total $87,810.00
FoRT W(�R'rH City of Fort Worth
Change Order Deletions
Project Name Watercress Low Pressure Sewer Extension City Sec No.: 53181
Project No,(s); 56016-0700430-001783 DOE No. N/A City Proj. No.: 101002
Project bescription
Extend low pressure sewer in Watercress Drive and connecting streeis. Install grinder pumps at each home.
Confractor William J. Schultr, Inc. dba Circle C Consfruction Co. Change Order: � Date 711812024
Ciry Project Mgr. Walter Norwood City Inspector: John Kula
DELETIONS
Previous Change Orders
Co# DATE AMOUNT
Total $0.00
Page 1 of 1
MNVBE Breakdawn for this Change Order
7/18/2024
Watercress Low Pressure Sewer Extension
CSC: 53181
CPN: 101002
Change Order 7 Notes
Staff has reviewed the requested prices and addition to calendar days and considers
them to be fair and reasonable.
.Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Mbh�
Signature
Walter Norwood
Name of Employee
Project Manager
Title
ATTEST:
Jannette Goodall
City Sec re ta ry