HomeMy WebLinkAboutContract 53181-CO7FoK-r WoK-rH City of Fort Worth CSC No. 53181-007 Change Order Request Project Name; Waiercress Low Pressure Sewer Extension Ciry Sec No.: 53181 PfOj2Ct N0.(S�: 56016-0700430-001783 DOE No. N/A City Proj. No.: 101002 Project Descripiion:� Extend low pressure sewer in Watercress Drive and connecfing s(reets. Install grinder pumps at each home. Contractor: William J. Schultr, Inc. dba Circle C Construclion Co. Change Order #� Date: 7118l2024 City Project Mgr. Walter Norwood City Inspector: Carmen Drake Phone Number: 817-392-5026 Phone Number: (817)392-8347 Dept, Original Coniract Amount Extras to Date Credils to Date Pending Change Orders (in M&C Process) Contract Cost to Date Amount of Proposed Change Order Revised Contract Amount Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) Unit 1 Sewer Unit 2 Paving Unit 3 Water y4,905,476.50 $510,107.50 0.00 $93,596.50 $0.00 $547.945.00 510,528,00 87,810.00 422,718.00 47,164.00 i3.567.50 10,107.50 �u547,94 $0,00 587,811 10,107.50 �635,75 '.5.505.00 Totals I Contract Time ,568,580.50 172.669.00 �79.072.50 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 2.83% MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) 6,769,480.00 JU FOR 4 This Change Order No. 7 provides for the following; • Installation of 2 inch dia. service lines and 2" dia. pressure reducing valves to serve businesses currently provided water by the Town of Lakeside but must be converted to Fort Worth water per terms of the CCN Transfer Agreement with the Town of Lakeside. � The relocation a fire hydrant, air release valve vent and cathodic protection test station to allow space for construction of a service road by TxDOT. Staff reccommends the addition of 418 calendar days for securing all permits from property owners to access their properties to install/connect residents to Fort Worth Water. In addition, all property owners had to open accounts with the Water Department. It is understood and agreed that (he acceptance of this Change Order by the contraclor constitutes an in fuil (both time and money) for all costs arising out of, or incidental to, the above Change Order. Gonlractors Company Name Conlractor Name �o+ Wlliam J, Schuilz, Inc. dba Circle C ConsWctlon Co. TOf�I SI(CIIy � �� Director S2nfoF Ass�s?anl M&C Number � I Date e� 0 9 2�� Date � .r►, Ju122, 2024 ie�� Date Ju123 2024 Caunctl AcUan NIA and satisfaction and represents latar M&C Date Approved Oete 7-18-24 Dale 7/19/2024 Dale u123.2024 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX FORT' WORTH City of Fprt Worth Change Order Additions Project Name Watercress Low Pressure Sewer Extension City Sec No.: 53181 Project No.(s): 56016-0700430-001783 DOE Na. N A City Proj. No.: 101002 Project Description E�end low pressure sewer in Watercress Drive and connecting streets. Install grintler pumps at each home. Coniractor William J, Schultz, Inc. dba Circle C Construction Co. Change Order:�7 Date; 7118I2024 City Project Mgr. Walter Norwood City Inspector John Kula ADDITIONS DEPT Q Unit Unit Cost Total 7 Fire ydrant Unit 3 Water EA $6,500,00 $6,500.00 10 1" Private Water Service Unif 3 Water 185.00 EA $100.00 $18,500.00 12 Temporary Asphalt Paving Repair (with asphall and Flex base) Unit 3 Water 18 LF $40.00 $720.00 19 1" Water Service Unit 3 Water 2 EA $725.00 $1,450.00 22 6" PVC Water Line(Tyler Place and Sommerville PI. Road) Unit 3 Water 39.00 LF $115.00 $4,485.00 24 6" Gate Valve Unit 3 Water 2.00 EA $1,600.00 $3,200.00 25 2" Water Service, Meter Reconneclion Unit 3 Water 3 EA $650.00 $1,950.00 26 2" Water Service Unif 3 Water 3 EA $825.00 $2,475,00 27 2" Private Water Service (7601 Jacksboro Hwy, 4305 Surfside Dr,) Unit 3 Water 300.00 LF $100,00 $30,000.00 28 2" PRV Unit 3 Water 2.00 EA $2,175.00 $4,350.00 29 Asphalt Parking/Driveway Replacement Unif 3 Water 10.00 LF $48.00 480.00 30 Relocaie Fire Hydrant Unit 3 Water 1.0� EA �1,200,00 $1,200.00 31 Relocaie Air Vent on Air Release Valve Vault Unit 3 Water 1.00 LS �3,500.00 $3,500.00 32 Relocate Cathodic Protection Test Station Unit 3 Water 1.00 LS �3,500.00 $3,500.00 33 Block Sod Placement Unit 3 Water 125,00 SY $12,00 $1,500.00 34 Mobilization for FH, ARV Adjustment, Cath. Protection Test Sta. Unit 3 Water 1.OD EA $2,000.00 $2,000.00 35 Mobilization and Repair - 2" Service Line(7601 Jacksboro Hwy) Unit 3 Water 1.00 E,4 $2,000.00 �2,000.00 Unit 1 Sewer Unif 2 Paving Unit 3 Waier $87,810.00 Page 1 of 1 Addifions Sub Total $87,810.00 FoRT W(�R'rH City of Fort Worth Change Order Deletions Project Name Watercress Low Pressure Sewer Extension City Sec No.: 53181 Project No,(s); 56016-0700430-001783 DOE No. N/A City Proj. No.: 101002 Project bescription Extend low pressure sewer in Watercress Drive and connecting streeis. Install grinder pumps at each home. Confractor William J. Schultr, Inc. dba Circle C Consfruction Co. Change Order: � Date 711812024 Ciry Project Mgr. Walter Norwood City Inspector: John Kula DELETIONS Previous Change Orders Co# DATE AMOUNT Total $0.00 Page 1 of 1 MNVBE Breakdawn for this Change Order 7/18/2024 Watercress Low Pressure Sewer Extension CSC: 53181 CPN: 101002 Change Order 7 Notes Staff has reviewed the requested prices and addition to calendar days and considers them to be fair and reasonable. .Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Mbh� Signature Walter Norwood Name of Employee Project Manager Title ATTEST: Jannette Goodall City Sec re ta ry