HomeMy WebLinkAboutContract 56834-A2City of Fort Worth, Texas W&SS Repl. Contract 2020, WSM-M
Prof Services Agreement Amendment Template CPN 103413
Revision Date: 12/08/2023
Page 1 of 2
AMENDMENT No.2
TO CITY SECRETARY CONTRACT No. 56834
WHEREAS, the City of Fort Worth (CITY) and Gresham Smith, (ENGINEER)
made and entered into City Secretary Contract No. 56834, (the CONTRACT)
which was authorized M&C 21-0925 on the 30th day of November, 2021,in the
amount of $318,160.00; and
WHEREAS, the CONTRACT was subsequently revised by: Amendment No.1 in
the amount of $18,026.00 which was administratively authorized on August
23, 2023; and
WHEREAS, the CONTRACT involves engineering services for the following
project:
Water and Sanitary Sewer Replacement 2020 WSM-M, CPN 103413; and
WHEREAS, it has become necessary to execute Amendment No. 2 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement, which
amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and incorporated
herein. The cost to City for the additional design services to be performed
by Engineer totals $17,797.00 (Water: $3,975.00; Sewer: $13,822.00).
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $353,983.00.
3.
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
City of Fort Worth, Texas W&SS Repl. Contract 2020, WSM-M
Prof Services Agreement Amendment Template CPN 103413
Revision Date: 12/08/2023
Page 2 of 2
EXECUTED and EFFECTIVE as of the date subscribed by the City’s designated
Assistant City Manager.
APPROVED:ENGINEER
City of Fort Worth Gresham Smith
Fernando Costa Timothy O’Brien, P.E.
Assistant City Manager Senior Vice President
DATE: _______________DATE: _________________
ATTEST:
Jannette Goodall
City Secretary
APPROVAL RECOMMENDED:
Christopher Harder, P. E.
Director,Water Department
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
_______________________________
Preeti KC, P.E.
Project Manager
M&C No.#: ______N/A ______
APPROVED AS TO FORM AND LEGALITY:
M&C Date: ___ N/A ____
Douglas W. Black Form 1295: ___ N/A _
Sr. Assistant City Attorney
�
� �.y
� ��I
� C"y
\� VJ
�
_
N 2
N �
C �
�a y
°' a
m¢
� m
o �
� �
w p
o=
- Y
� N
D Q
J r
g
�
N
�
0
N
O
N
U
m
C
p M
U d
c �
v o
v d
V Z
�
a�
v �
� o
va`
�
N V
�
�
C
b
�
�
C
b
W
?N
3
O
N
N
U
.�
N
rn
.�
�
c
a�
E
r
m
�
41
�
�
E
0
U
L
�-+
.�
�
�
�
L
�
�
� � �
� O %� r
Q M ~ p
z � � M
O ._
O � � �
�f> Cn � N