HomeMy WebLinkAboutContract 59165-CO1FORT WORTH.: City of Fort Worth
IF**,-- Change Order Request CSC No. 59165-COI
Project Name Greenfield Acres Phase 4 Drainage Improvements City Sec # I 59165
Client Project #(s)
Project Storm Drain and Paving Improvements to the Greenfield Acres Subdivision (North Ridge Rd, Cindy Ln, Greenfield Rd, and Tee Head Dr.)
Description
Contractorl Fort Worth Civil Constructors, LLC Change Order #1 1 I Date 5/29/2024
City Project Mgr.l Michael Wellbaum, PE City Inspectorl Charles Hayes
Dept.
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Amount of Proposed Change Order
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
TPW - SW Contract Time
Totals (CD)
$5,051,919.63 $5,051,919.63 365
$0.00
$0.00
$0.00
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 0.00%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) $6,314,899.54
JUSTIFICATION (REASONS) FOR CHANGE ORDER
This change order does not increase or decrease the contract value. The items added to the contract on the Additions page are offset by reductions to bid items including the
construction allowance as reflected on the Deletions page. The line items added to the contract provide for additional storm drain improvements needed to make field
adjustments as directed. This change order also provides additional items for the repair of trench failures on Cindy Lane from a prior project that is no longer under warranty.
The days included in this change order provide additional time needed to make the Cindy Lane repairs. To check the validity of the change order request, the information
provided by the contractor was compared to available bid tabulation data for similar work and the labor and material charges were checked against the contract provisions.
The request for additional days was compared to the time required to complete similar work through discussions with inspection. This change order request appears
consistent with available information.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below
acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and
reporting requirements.
ontractor's Company Name Contractor Name
Contract Signature Date
Fort Worth Civil Constructors, LLC Brad Caldwell
Jul 10, 2024
Inspector/Inspection
Date
Project and Contract Compliance Manager
Date
07 CD ITHYCwdner
Jul 13, 2024
Jul 15, 2024
Program Manager
Date
Senior Capital Project Officer
Date
Jw,w+, N'g("
J u 115, 2024
SI& ILL--
J u 115, 2024
Assistant Director Dept
Date
Director, Contracting Department Dept
Date
�aA_
Jul 15 2024
Jul 15, 2024
Assistant City Attorney
Date
Assistant CitX Manager
Date
Jul 23, 2024
_
Jul 29, 2024
Council Action (if required)
boron M&C Number I N/A M&C Date Approved N/A
been: Un.
°!yo�oAo
i0
aV° g P
oo^+'
Jannette Goodall, City Secretary °a, ano�p6g44q
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FoKr WORTH City of Fort Worth
Change Order Additions
Project Name I Greenfield Acres Phase 4 Drainage Improvements
City Sec # 59165
Client Project #
Contractorl Fort Worth Civil Constructors, LLC I
PMI Michael Wellbaum, PE
Inspectorl Charles Hayes
Change Order Submittal # 0
Date I 5/29/2024
ADDITIONS
I I EM
ULbUKIN I IUIV
UEN I
Uty
Unit
Unit lost
I otal
CU1- U1
Add fittings to clear existing water line In lieu of a lowering
I I- W - SW
3.000UUUUU
EA
$6U2.96
$1,8U8.94
C01-02
Additional fittings for Lateral C2 to avoid Fire Hydrant relocation
TPW - SW
2.00000000
EA
$650.00
$1,300.00
C01-03
Additional Fittings for Lateral C6 to avoid Fire Hydrant relocation
TPW - SW
3.00000000
EA
$650.00
$1,950.00
C01-04
Core and Install drop connection in Existing Manhole
TPW - SW
1.00000000
EA
$4,110.0(F
$4,110.00
C01-05
Add 3x3xl Riser Section to Storm Inlets
TPW - SW
2.00000001)
EA
$375.00
$760.00
C01-06
Add 4x4x1 Riser Section to Storm Inlets
TPW - SW
2.00000000
EA
$450.01JV
$900.00
C01-07
Add 5x5xl Riser Section to Storm Inlets
TPW - SW
2.00000000
EA
$575.00
$1,160.00
C01-08
Remove 18" Storm Drain Line
TPW - SW
40.00000000
LF
$30.0(F
$1,200.00
C01-09
Install 15" RCP
TPW - SW
40.00000000
LF
$198.0cr $T920.00
C01-10
Installation of Hydraulic Slide (L-7758, STA 12+84.63)
TPW - SW
1.0000000U
LS
$2,319.69
$2,319.69
C01-11
Water Line Repair on North Ri ge
TPW - SW
1.00000000
LS
$6,858.95
C01-12
Traffic Control
TPW - SW
0.50000000
MO
$7,500.00
$3,750.00
C01-13
Sawcut & Remove Existing Asphalt
TPW - SW
469.50000000
SY
$23.00 ----10798.50
C01-14
Unclassified Excavation
TPW - SW
157.00000000
CY
$51.00
$8,007.00
C01-15
Scarify and re -compact existing ditchline
TPW - SW
469.50000000
SY
$10.00 $4zg5-
0
C01-16
CLSM Backfill
TPW - SW
118.00000000
CY
$250.00
$29,500.00
C01-17
Cut & Restore Paving
TPW - SW
469.50000000
SY
$155.00 ----$72772:50
C01-18
1-1/2" Overlay on Cindy Lane from Greenfield to North Hill
TPW - SW
1,900.00000000
SY
$27.1 k
$51,585.00
C01-19
Asphalt Drive Approach on Cindy Lane
TPW - SW
60.00000000
SY
$60.85
C01-20
Add'I Cost for Composite in Lieu of Concrete Grade Rings
TPW - SW
1.00000000
LS
$7,082.56
$7,082.56
TPW - SW $222,109.14
Sub Total Additions $222,109.14
Change Order Additions Page 2 of 3
FOR_ T� WORTH
City of Fort Worth
Change Order Deletions
Project Name Greenfield Acres Phase 4 Drainage Improvements
City Sec # 59165
Client Project #
Contractorl Fort Worth Civil Constructors, LLC I PMI Michael Wellbaum, PE
Inspectorl Charles Hayes
Change Order
Submittal # 0
Date 1 5/29/2024
DELETIONS
I I EM
UI:bUKIF' I IUN
UEN I
Uty
Unit Unit lost I otal
2-18
3311.U161 6" PVU Water Pipe
I I'W - SW
15.5000UUUU
LF $143.UU $2,216.5U
2-21
3312.0001 Fire Hydrant
TPW - SW
2.00000000
EA $7,300.0(Y $14,600.06
1-16
3339.1002 4' Drop Manhole
TPW - SW
1.00000001)
EA $14,025.01J $14,025.00
2-31
Construction Allowance
TPW - SW
1.00000000
LS $175,000.0(F $475,000.00
3-09
Construction Allowance
TPW - SW
1.00000000
LS $16,267.64 $16,267.64
TPW - SW $222,109.14
Sub Total Deletions $222,109.14
Change Order Deletions Page 3 of 3
FORTWORTH.
Routing and Transmittal Slip
Transportation & Public Works Department
DOCUMENT TITLE: -Construction Change Order 1
M&C: N/A CPN: 102975
CSO: 59165
DOC#:
Date:
To: Name
Department
Initials
Date Out
1. Brad Caldwell (BradC@fwcivcon.com)
Contractor
BC
Jul 10, 2024
2. Charles Hayes
TPW Inspector
CH
Jul 12, 2024
3. Troy Gardner
TPW Inspector
;Rm-
Jul 13, 2024
4. Michael Wellbaum
TPW Project Mgr.
Mw
Jul 15, 2024
5. Justin Naylor
TPW In -Program Mgr.
Jul 15, 2024
6. Lissette Acevedo
TPW Sr. CPO TPW
o
Jul 15, 2024
7. Patricia Wadsack
Asst. Dir. TPR Dir.
CCv
Jul 15, 2024
8. Lauren Prieur
Dir./TPW
LP Agiloft
Jul 17, 2024
9. Doug Black
Legal
D ; t)s
Jul 23, 2024
10. Jesica McEachern
ACM
`k`
Jul 29, 2024
11. Ronald Gonzales
CSO
12. Jannette Goodall
CSO
Jul 29, 2024
13. Allison Tidwell
CSO
Jul 30, 2024
14. TPW_ SW_ Contracts
TPW
Jul 16, 2024
CC: Program Manager — Linda Young, Sr. CPO — Lissette Acevedo, TPW BSPAP Recon Team —
Cindy Sengathith
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents
received from
any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: ❑YES ®No SAME DAY: ❑YES ❑No NEXT DAY: ❑YES ❑No
ROUTING TO CSO: ®YES ❑No
Action Required: ❑ Attach Signature, Initial and Notary Tabs
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
Return to: ti)w sw contracts&a fortworthtexas.gov Call 817-229-3283 with questions. Thank you!