Loading...
HomeMy WebLinkAboutContract 60038-FP1FORTWORTH. -FP1 City Secretary 60038 Contract No. Date Received 7/31/2024 AT NOTICE OF PROJECT COMPLETION (Developer Projects) The Transportation and Public Works Department upon the recommendation of the Project Manager has accepted the following project as complete: Project Name: Stonegate Town Homes City Project No.: 104308 Improvement Type(s): Water ❑x Sewer ❑x (Original Contract Price: $579,344.00 (Amount of Approved Change Order(s): $2,460.00 (Revised Contract Amount: $581,804.00 Total Cost of Work Complete: $581,804.00 7 Jul 29, 2024 Contractor Date Project Manager Title Moss Utilities LLC Company Name Ju129 2024 Jesse Cervantes (Jul 29, 202408:34 CDT) Project Inspector Date ",,t�aJun�-d. P.E. Jul31 2024 Izeldeen Ahmed. P.E. (Jul 31, 202408:48 CDT) Project Manager Date )1]04w.W,& Jul 31, 2024 CFA Manager Date 4°-.�'P� Jul 31, 2024 Lauren Prieur (Jul 31, 202408:59 CDT) TPW Director Date np v Aug 21 2024 Asst. City Manager Date OFFICIAL RECORD CITY SECRETARY Page 1 of 2 FT. WORTH, TX Notice of Project Completion Project Name: Stonegate Town Homes City Project No.: 104308 City's Attachments Final Pay Estimate ❑x Change Order(s): ❑x Yes ❑ N/A Pipe Report: ❑x Yes ❑ N/A Contractor's Attachments Affidavit of Bills Paid Consent of Surety Statement of Contract Time Contract Time: 140 WD Days Charged: 140 Work Start Date: 11/20/2023 Work Complete Date: 7/17/2024 Completed number of Soil Lab Test: 56 Completed number of Water Test: 19 Page 2 of 2 FORT WORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name STONEGATE TOWNHOMES Contract Limits Project Type WATER & SEWER City Project Numbers 104308 DOE Number 4308 Estimate Number 1 Payment Number 1 For Period Ending 1/17/2024 AID City Secretary Contract Number Contract Time 11WD Contract Date Days Charged to Date 140 Project Manager NA Contract is 100.00 Complete Contractor MOSS UTILITIES, LLC 18631 REMBRANDT TERRACE DALLAS , TX 75287 Inspectors T. GARDNER / J. CERANTES Wednesday, July 24, 2024 Page 1 of 5 City Project Numbers 104308 Contract Name STONEGATE TOWNHOMES Contract Limits Project Type WATER & SEWER Project Funding UNIT I: WATER IMPROVEMENTS Item Description of Items No. 1 TRENCH SAFETY 2 CONCRETE ENCASEMENT FOR UTILITY PIPES 3 IMPORTED EMBEDMENT/BACKFILL, CRUSHED ROCK 4 DUCTILE IRON WATER FITTINGS W/ RESTRAINT (CO#1) 5 4" PVC WATER PIPE (C0#1) 6 6" PVC WATER PIPE 7 8" PVC WATER PIPE 8 FIRE HYDRANT 9 CONNECTION TO EXISTING 4"-12" WATER MAIN 10 1" WATER SERVICE (CO#1) 11 4" GATE VALVE 12 6" GATE VALVE 13 8" GATE VALVE 14 NON-STANDARD ITEM: 4" BACKFLOW 15 NON-STANDARD ITEM: AUTOMATIC FLUSH POINT IN VAULT 16 NON-STANDARD ITEM: FLUSH POINT IN VAULT 17 UTILITY SERVICE SURFACE RESTORATION SODDING DOE Number 4308 Estimate Number 1 Payment Number 1 For Period Ending 1/17/2024 Estimated Unit Unit Cost Estimated Completed Completed Quanity Total Quanity Total 1340 LF $2.00 $2,680.00 5 CY $7,275.00 $36,375.00 108 CY $37.25 $4,023.00 1.04 $20,125.00 $20,930.00 875 LF $29.00 $25,375.00 10 LF $75.00 $750.00 160 LF $61.00 $9,760.00 1 EA $6,720.00 $6,720.00 1 EA $3,200.00 $3,200.00 29 EA $1,800.00 $52,200.00 5 EA $1,951.00 $9,755.00 1 EA $2,498.00 $2,498.00 3 EA $2,770.00 $8,310.00 1 EA $22,290.00 $22,290.00 1 EA $15,446.00 $15,446.00 1 EA $10,454.00 $10,454.00 25 SY $10.00 $250.00 -------------------------------------- - - Sub-Total of Previous Unit - - - - - - - - - - - - - - - - - $231,016.00 UNIT U: SANITARY SEWER IMPROVEMENTS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 TRENCH SAFETY 1470 LF $2.00 $2,940.00 2 IMPORTED EMBEDMENT/BCAKFILL, CCS 3 CY $2,150.00 $6,450.00 3 12" CASING BY OPEN CUT 40 LF $402.00 $16,080.00 4 4" SEWER SERVICE 28 EA $2,274.00 $63,672.00 5 8" SEWER PIPE 1060 LF $87.80 $93,068.00 Wednesday, July 24, 2024 Page 2 of 5 City Project Numbers 104308 DOE Number 4308 Contract Name STONEGATE TOWNHOMES Estimate Number 1 Contract Limits Payment Number 1 Project Type WATER & SEWER For Period Ending 7/17/2024 Project Funding 6 4' MANHOLE 10 EA $8,524.00 $85,240.00 7 4'EXTRA DEPTH MANHOLE 1 VF $1,336.00 $1,336.00 8 4' SHALLOW MANHOLE 1 EA $8,524.00 $8,524.00 9 5' DROP MANHOLE I EA $25,398.00 $25,398.00 10 5'EXTRA DEPTH MANHOLE 8 VF $1,000.00 $8,000.00 11 EPDXY MANHOLE LINER 16 VF $1,000.00 $16,000.00 12 TRENCH WATER STOPS 5 EA $3,220.00 $16,100.00 13 UTILITY SERVICE SURFACE RESTORATION 30 SY $10.00 $300.00 SODDING 14 POST - CCTV INSPECTION 1470 LF $4.00 $5,880.00 15 MANHOLE VACUUM TESTING 12 EA $150.00 $1,800.00 -------------------------------------- Sub -Total of Previous Unit $350,788.00 Wednesday, July 24, 2024 Page 3 of 5 City Project Numbers 104308 Contract Name STONEGATE TOWNHOMES Contract Limits Project Type WATER & SEWER Project Funding Contract Information Summary Original Contract Amount Change Orders Change Order Number 1 Total Contract Price DOE Number 4308 Estimate Number 1 Payment Number 1 For Period Ending 7/17/2024 $579,344.00 $2,460.00 $581,804.00 Total Cost of Work Completed #Error Less % Retained $0.00 Net Earned $581,804.00 Earned This Period $581,804.00 Retainage This Period $0.00 Less Liquidated Damages Days @ / Day LessPavement Deficiency Less Penalty Less Previous Payment Plus Material on Hand Less 15% Balance Due This Payment $0.00 $0.00 $0.00 $0.00 $0.00 $581,804.00 Wednesday, July 24, 2024 Page 4 of 5 City Project Numbers 104308 Contract Name STONEGATE TOWNHOMES Contract Limits Project Type WATER & SEWER Project Funding Project Manager NA Inspectors T. GARDNER / J. CERANTES Contractor MOSS UTILITIES, LLC 18631 REMBRANDT TERRACE DALLAS , TX 75287 DOE Number 4308 Estimate Number 1 Payment Number 1 For Period Ending 7/17/2024 City Secretary Contract Number Contract Date Contract Time 110 WD Days Charged to Date 140 WD Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed #Error Less % Retained $0.00 Net Earned $581,804.00 Earned This Period $581,804.00 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 / Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $581,804.00 Wednesday, July 24, 2024 Page 5 of 5 PROJECT NAME: CONTRACT: CFA # CITY PROJECT # DOE# WATER PROJECT # SEWER PROJECT # FILE # INSPECTOR: PROJECT MANAGER: [ORIGINAL CONTRACT EXTRAS TO DATE (CREDITS TO DATE ICONTRACT TO DATE (AMMOUN`TT OF PROP..; CHANGE ORDER T AMOUNT I ,KTl EL FiEVIS CbNTRACT AMOUNT PER UNIT REVISED COST SHARE TOTAL REVISED CONTRACT DEVELOPER -AWARDED -PROJECT CHANGE ORDER Stonepate Townhomes CFA23-0082 CPN 104308 WA Developer Cost $0.00 $0.00 as Dev. Cost: I CITY PARTICIPATION:1 Phone No: Phone No: CONTRACT UNIT CHANGE ORDER NO: 2 I CONTRACT DAYS 'ER SEWER PAVING DRAINAGE STREETLIGHTS City Cost Developer Cost City Cost Developer Cost City Cost Developer Cost City Cost Developer Cost City Cost SO.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 i $0.00 $0.00 $0.00 00 $0.00 $0.00 $0.00 $0.00 $0.00 City Cost: $0.00 $0.00 110 0 0 110 30 140 Revised: 10-12-2011 Page 1 You are directed to make the following changes in the contract documents CITY BID ITEM PAY ITEM # # QUANTITY UNIT ITEM DESCRIPTION UNIT PRICE TOTAL � I I !I TOTAL I REASONS FOR CHANGE ORDER City of Fort Worth asked contractor to reduce total working days to 110. However, due to the unique nature of the development, some of the public improvements are contingent on completion of private improvements. Construction of pulic work cannot be continuous and the contractor requires additional working days to cover the construction schedule requirements.. (Delete if there is City Participation) NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100% OF THE CHANGE ORDER COST AND NO REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER. RECOMMENDED: 41W APPROVED: 4*4J I-W APPROVED: (Consulting Engineer) (Developer) (Contractor) By: Westwood Professional Services By: Village Homes, L.P. By, Moss Utilities Name: MatthewZamadpa, PE Name: Michael Dike Name: Shawn Lain Tale: Project Manager Title: President Title: Vice President Revised: 10-12-2011 Page 2 IPROJECT NAME: CONTRACT: ICFA # CITY PROJECT # IFID # FILE # INSPECTOR: PROJECT MANAGER: REVIEWED By Andrew Goodman at 1:06 pm, Jan 03, 2024 DEVELOPER -AWARDED -PROJECT CHANGE ORDER Stoneqate Toownhomes CHANGE ORDER No: CFA23-0082 CITY PARTICIPATION:( No 104308 1 30114-0200431-104308-EO7685 N/A Adam Payan Phone No: 682-225-9106 Andrew Goodman, P.E. Phone No: 817-392-6251 CONTRACT UNIT WATER SEWER PAVING DRAINAGE STREET LIGHTS CONTRACT Developer Developer Developer Developer Developer DAYS Cost CI Cost Cost City Cost Cost Cit Cost Cost City Cost Cost CityCost IORIGINAL CONTRACT $228,556.00 I $350,788.00 I EXTRAS TO DATE ICREDITS TO DATE I CONTRACT TO DATE $228,556.00 $0.00 I $350,788.00 I $0.00 (AMOUNT OF PROP. CHANGE ORDER $ 2,460.00 IREVISED CONTRACT AMOUNT $231,016.00 $0.00 I $350,788.00 I $0.00 TOTAL REVISED CONTRACT AMOUNT PER UNIT $231,016.00 $350,788.00 REVISED COST SHARE Dev. Cost: $581,804.00 TOTAL REVISED CONTRACT $0.00 $0.00 $0.00 $0.00 City Cost: $581,804.00 $0.00 $0.00 L $0.00 $0.00 $0.00 $0.00 $0.00 1 $0.00 1 0 $0.00 $0.00 0 $0.00 Revised: 10-12-2011 Page 1 REVIEWED lBy Andrew Goodman at 1:07 pm, Jan 03, 2024 J You are directed to make the b1c ing changes In the pntrarit d entS: - PAY R4EMS CITY BID fiEA1 au0 pp77�rppffjj��LINIT Elltin4s 20. 5.00 TOTAL 3 ern' TON 3311.p01 DuC ron�r $ $ 6 331.p¢gel S LF 4" PVC Water Fps t zB.no� 10 3312.2603 1 FA 9' Water Servica $ 1,$00.00 '. 1.8C4A0 � 2,1460t — - - -_-_ TOTAL REASONS FOR CHANGE ORDER Added irrigarion matar, upate walWirm alignment, and updated project benchmark list NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100% OF THE CHANGE ORDER COST AND NO REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER. RECOMMENDED: APPROVED: APPROVED: Pach Koch, a Westwood Company VAiege Nome, Mass iRilitles By: �—' � BY: ly By: i- rt LJ Name: Carlo Andreard. PE Nam'4: Michael D'0 ika Name. , K a'. Title: Encireerof Record Title. President a llD manac/`! V amant. GP of Villaos Homes TIft Y' Revised: 10-12"2011 Page 2 FORTWORTH TRANSPORTATION AND PUBLIC WORKS PIPE REPORT FOR: PROJECT NAME: STONEGATE TOWN HOMES CITY PROJECT NUMBER: 104308 WATER PIPE LAID SIZE TYPE OF PIPE LF 4" PVC 875 6" PVC 10 8" PVC 160 FIRE HYDRANTS: 2 VALVES (16" OR LARGER) PIPE ABANDONED SIZE TYPE OF PIPE LF DENSITIES: NEW SERVICES: 1 "(29) COPPER I SEWER PIPE LAID SIZE TYPE OF PIPE LF 8" PVC SDR26 1060 PIPE ABANDONED SIZE TYPE OF PIPE LF DENSITIES: NEW SERVICES: 4"(28) PVC SDR26 TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth • 1000 Throckmorton Street • Fort Worth, TX 76012-6311 (817) 392 - 7941 • Fax: (817) 392 - 7845 FORTWORTH. TRANSPORTATION AND PUBLIC WORKS July 17, 2024 Moss Utilities 11050 Ables Lane Dallas, Texas 75229 RE: Acceptance Letter Project Name: Stonegate Town Homes Project Type: Water & Sewer City Project No.: 104308 To Whom It May Concern: On July 17, 2024 a final inspection was made on the subject project. There were no punch list items identified at that time. The final inspection indicates that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on July 17, 2024, which is the date of the final inspection and will extend of two (2) years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at (817) 392-6251. Sincerely, /zWl)e-ems P. . Imideen Ahmed. P.E. (Jul 31, 202408:48 CDT) Andrew Goodman, Project Manager Cc: Jesse Cervantes, Inspector Troy Gardner, Inspection Supervisor Ariel Duarte, Senior Inspector Andrew Goodman, Program Manager Pacheco Koch, Consultant Moss Utilities, Contractor Village Homes, Developer File E-Mail: TPW_Acceptance@fortworthtexas.gov Rev. 08/20/19 AFFIDAVIT STATE OF Texas COUNTY OF Tarrant Before me, the undersigned authority, a notary public in the state and county aforesaid, on this day personally appeared Garrett Moss, President Of Moss Utilities, LLC, known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said; That all persons, firms, associations, corporations, or other organizations furnishing labor and/or materials have been paid in full except for retainage in the amount of $67,774.70; That the wage scale established by the City Council in the City of Fort Worth has been paid in full except for retainage in the amount of $67,774.70; That there are no claims pending for personal injury and/or property damages; On Contract described as; Stone 39Y1 ownliomes CFA23-0082 CPN104308 BY Garrett Moss, President Subscribed and sworn before me on this date 26 of July, 2024. T av�� Not4 Public County, State JESSICA DEANN DAllS Notary Public, State of Texan Comm. Expirea 12-092025 Notary ID 133452603 Bond No: GSH5900090 OWNER ❑ CONSENT OF SURETY ARCHITECT TO FINAL PAYMENT CONTRACTOR Conforms with the American Institute of SURETY ❑X Architects, AIA Document G707 OTHER ❑ TO OWNER: ARCHITECT'S PROJECT NO.: (Name and address) City of Fort Worth 1000 Throckmorton, CONTRACT FOR: OCP: $579,344.00 Fort Worth, TX 76102 FCP: $686,457.25 PROJECT: CONTRACT DATED: September 18, 2023 (Name and address) Stonegate Townhomes - CFA No. CFA23-0082 - Site Utilities In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the (Insert name and address of Surety) The Gray Casualty & Surety Company P.O. Box 6202, Metairie, LA 70009 ,SURETY, on bond of (Insert name and address of Contractor) Moss Utilities, LLC 11050 Ables Ln., Dallas, TX 75229 ,CONTRACTOR, hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surety of any of its obligations to (Insert name and address of Owner) City of Fort Worth 1000 Throckmorton, Fort Worth, TX 76102 OWNER, as set forth in said Surety's bond. IN WITNESS WHEREOF, the Surety has hereunto set its hand on this date: July 26, 2024 (Insert in writing the month followed by the numeric date and year) Attest. Ashly Simchik S-2134/GE 10/01 The Gray Casualty & Surety Company (Surety) (Signatu�f aut orize represent Sean McCauley (Printed name and title) a �.ttorney-m'�- "act — XDP McCauley Bond Agency 07/26/2024 17:39 189509405751 THE GRAY INSURANCE COMPANY THE GRAY CASUALTY & SURETY COMPANY Bond Number: GSH5900090 Project: Stonegate Townhomes GENERAL POWER OF ATTORNEY Principal: City of Fort Woth KNOW ALL BY THESE PRESENTS, THAT The Gray Insurance Company and The Gray Casualty & Surety Company, corporations duly organized and existing under the laws of Louisiana, and having their principal offices in Metairie, Louisiana, do hereby make, constitute, and appoint: Sean McCauley, Alex Rausch, Liam Hackett, Sterling Ward, Sam Duckett, Jarrod Yost, Sarah Timmons, Ashlyn Simchik, and Bridget Truxillo of Dallas, Texas jointly and severally on behalf of each of the Companies named above its true and lawful Attomey(s)-in-Fact, to make, execute, seal and deliver, for and on its behalf and as its deed, bonds, or other writings obligatory in the nature of a bond, as surety, contracts of suretyship as are or may be required or permitted by law, regulation, contract or otherwise, provided that no bond or undertaking or contract of suretyship executed under this authority shall exceed the amount of $25,000,000.00. This Power of Attorney is granted and is signed by facsimile under and by the authority of the following Resolutions adopted by the Boards of Directors of both The Gray Insurance Company and The Gray Casualty & Surety Company at meetings duly called and held on the 26th day of June, 2003. "RESOLVED, that the President, Executive Vice President, any Vice President, or the Secretary be and each or any of them hereby is authorized to execute a power of Attorney qualifying the attorney named in the given Power of Attorney to execute on behalf of the Company bonds, undertakings, and all contracts of surety, and that each or any of them is hereby authorized to attest to the execution of such Power of Attorney, and to attach the seal of the Company; and it is FURTHER RESOLVED, that the signature of such officers and the seal of the Company may be affixed to any such Power of Attorney or to any certificate relating thereto by facsimile, and any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal shall be binding upon the Company now and in the future when so affixed with regard to any bond, undertaking or contract of surety to which it is attached. IN WITNESS WHEREOF, The Gray Insurance Company and The Gray Casualty & Surety Company have caused their official seals to be hereinto affixed, and these presents to be signed by their authorized officers this 4th day of November, 2022. \�SORA«LCF � Jp�TY a.a :o �s SEAL BY Michael T. Gray Cullen S. Piske <': `b President President SEAL ,e The Gray Insurance Company The Gray Casualty & Surety Company State of Louisiana ss: Parish of Jefferson On this 4' day of November, 2022, before me, a Notary Public, personally appeared Michael T. Gray, President of The Gray Insurance Company, and Cullen S. Piske, President of The Gray Casualty & Surety Company, personally known to me, being duly sworn, acknowledged that they signed the above Power of Attorney and affixed the seals of the companies as officers of, and acknowledged said instrument to be the voluntary act and deed, of their companies. Anne Henican U 4Leigh Notary Public Notary ID No.92653 Leigh Anne Henican Orleans Parish, Louisiana Notary Public, Parish of Orleans State of Louisiana My Commission is for Life I, Mark S. Manguno, Secretary of The Gray Insurance Company, do hereby certify that the above and forgoing is a true and correct copy of a Power of Attorney given by the companies, which is still in full force and effect. IN WITNESS WHEREOF, I have set my hand and affixed the seals of the Company this 26th day of July , 2024 I, Leigh Anne Henican, Secretary of The GrayCgstialty & Surety Company, b hereby certify that the above and forgoing is a true and correct copy of a Power of Attorney given by the companies, whicl: is still. in full farce and effect. IN WITNESS WHEREOF, I have set my hand and affixed the seals of the Company this 26th --day of LI - 2024 - {n• A n ert ii `�VV' �U�-.`-`. -._ \�`,�'•wR ..•'•.Cy caiP•"`�• �8ti9 �J tt elf •C+ 6Cir •: s. SEAL 0 , �,