HomeMy WebLinkAboutContract 60442-FP2-FP2
City Secretary 60442 Contract No. _____ _
FORT WORTH® Date Received 8/2/2024
NOTICE OF PROJECT COMPLETION
(Developer Projects)
8/6/24
The Transportation and Public Works Department upon the recommendation of the Project
Manager has accepted the following project as complete:
Project Name: lntermodal Parkway
City Project No.: 104996
Improvement Type(s): Water� Sewer�
Original Contract Price: $451,067.00
Amount of Approved Change Order(s): $82,456.00
Revised Contract Amount:
Total Cost of Work Complete:
Arturo Sancen (Jul 31, 2024 07:50 CDT)
Contractor
Superintendent
Title
Conaster Construction (Arturo Sancen)
Company Name
He-rw/,��S:� Hershel Stanley Sutterfield(Ju3J., 2024 11:34 CDT)
Project Inspector
Project Manager a�tk@;J
CFA Manager
X-,Z. Lauren Prieur (Aug 21 2024 13:56 CDT)
TPW Director
Asst. City Manager
$533,523.00
$533,523.00
Jul31,2024
Date
Jul31,2024
Date
Aug 2, 2024
Date
Aug 2, 2024
Date
Aug 2, 2024
Date
Aug 6, 2024
Date
Page 1 of 2
Notice of Project Completion
Project Name: Intermodal Parkway
City Project No.: 104996
City's Attachments
Final Pay Estimate 0
Change Order(s): 0 Yes ❑ N/A
Pipe Report: 0 Yes ❑ N/A
Contractor's Attachments
Affidavit of Bills Paid �
Consent of Surety �
Statement of Contract Time
Contract Time: 60 WD Days Charged: 54
Work Start Date: 4/15/2024 Work Complete Date: 7/5/2024
Completed number of Soil Lab Test: 62
Completed number of Water Test: 2
Page 2 of 2
FORTWORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name INTERMODAL PARKWAY
Contract Limits
Project Type ��ATER R SEWER
City Project Numbers ioa996
DO� Number 4996
�stimate Number I Payment Number � For Period �ndiug 7/5/202d
City Secretary Contract Number
Contract Date
ProjectAtanager NA
Contractor CONATSER CONSTRUCTION T�LP
5327 WICHITA ST
FORT WORTH � TX 76119
Inspectors C. H02TON � SUTTERFIELD
Conh•act Time 60 WD
Days Charged to Date 54
Contract is 100.00
Complete
Tuesday, luly 30, 2024 Page I of 4
City Project Numbers 104996
Conh�act Namc
Contract Limits
Projcct Type
Project P'undiug
INTGRMODAL PAI2KWAY
WATER & SEWER
UNT[ I: WATCR I\4PROV�A4I�,NT5
DO� Number 4996
�stimate Number �
Yayment Number �
I'or Period �nding 7/5/2024
Item Gsti�uated �stimated Completed Completed
Description of Items Unit U�iit Cost
No. Quanity Total Quanity Total
— — — — — — — — — — — — — — — — — — — — — — — — — — — — — — -
I 16" DIP WATER(CO#I) 301 LF $270.00 $81,270.00 301 $81,270.00
2 16" DIP WATER PIPE WITH 30' S'CEEL 20 LF $940.00 $13,800.00 20 $18,800.00
ENCASEMENT
3 16" WATER PIPE, CLSM BACKFILL 20 LF $320.00 $6,d00.00 20 $6,400.00
4 16" CU'I'-IN GATE VALVE W/ VAULY 1 EA $38 SOU.00 $38 500.00 1 $38 500.00
5
6
7
8
9
l0
W
16" GATE VALVE W/ VAULT
16" PRESSURE PLUG
TRENCH SAFETY (CO# I )
DUCTILE I20N WATER FITT[NG W/ RESTRAIN'I'
CONNECTION TO EXISTING 16" WATER MAIN
REMOVAL AND REPLACEMENT OF ASPHALT
PAVEMENT FOR UTILITY LINE (CO# 1)
TRAFFIC CONT20L
2 EA
l EA
341 LF
L55 TN
1 EA
1066 SY
$32,500.00 $65,000.00
$2,�00.00 $2,500.00
$10.00 $3,410.00
$12,500.00 $19,375.00
$28,500.00 $28,500.00
$95.00 $101,270.00
2 $65,000.00
1 $2,500.00
341 $3,410.00
I.S� $19,375.00
1 $28,�00.00
1066 $101,270.00
I MO $6,�00.00 $6,500.00
1 $6,500.00
12 CONCRETE BLOCK[NG, TYPE B 3 CY $1,000.00 $3,000.00 3 $3,000.00
l3 REMOVAL & SALVAGE OF CONCRETE PAVER 4l CY $210.00 $8,610.00 4l $8,610.00
FOR UTII.ITY LINE INSTALLA'I'ION
Sub-Total of Pi•evious Unit $383,135.00 $383,135.00
UNTI II: SANITARY I�IPROVE\4�NTS
Item �stimated �stin�ated Completed Completed
Descriptioi� of Items Unit Unit Cost
No. Quanity Total Quanity Total
I POST-CCTVINSPECTION(CO#1) 343 LF $8.00 $2,744.00 343 $2,744.00
2 l2" SEWER PIPE (CO#1) 8 LF $300.00 $2,400.00 3 $2,400.00
3 8" SEWER PIPE, CSS BACKF[LL 50 LF $260.00 $13,000.00 50 $13,000.00
4 8" SEWER PIPE (CO#1) 270 LF $200.00 $�4,000.00 270 $54,000.00
5 MANHOLE VACUUM TESTING (CO# I) 3 EA $500.00 $1,500.00 3 $1,500.00
6 TRENCH SAFTEY (CO# I) 3d3 LF $8.00 $2,744.00 343 $2,744.00
7 4' MANHOLE W/ HYDRAULIC SLIDE (CO# 1) 3 EA $12,500.00 $37,500.00 3 $37,�00.00
8 4' EXTREA DEPTH MANHOLE(CO# I) 3 VF $300.00 $900.00 3 $900.00
9 EPOYY N[ANHOLE LINER (COtI l) 48 VF $600.00 $23,800.00 48 $28,800.00
10 l2" SEWER PIPE, CSS BACKPILL (CO#1) 20 LF $340.00 $6,300.00 20 $6,800.00
Sub-Total of Previo�s Unit $150,388.00 $150,383.00
Tuesday, luly 3Q 2024 Page 2 of 4
City Project Numbers 104996
CmitractNante INTERMODALPARKWAY
Contract Limits
Project Type WATER & SEWER
Project P'unding
Contt•act Infoi•mation Summary
Original Cantract Amaunt
Change Orders
Cliange Order Number I
Change Order Number 1
Total Contract Price
DO� Numbcr 4996
�stimate Nuinber �
Yayntcnt Nwnber 1
Fm• Period �ndiiig 7/5/2024
$451,067.00
$63,920.00
$18,�36.00
$533,523.00
Total Cost of Wortc Completcd $533,523.00
Less °/o Retained $0.00
Net Earned $533,523.00
�arned This Period $�33,523.00
Retainage This Period $0.00
Less Liquidated Daivages
Days @ / Day
LessPavement Deficiency
Less Penalty
Less Previous Payment
Plus A4aterial on Hand Less 15%
Balance Due This Payment
$0.00
$0.00
$0.00
$0.00
$0.00
$533,523.00
Tuesday, Jul}� 30, 2024 Vage 3 of d
City P�•oject Numbers 104996
Contract lVamc INTERMODAL PARKWAY
Contract Limits
Project Typc WATER & SGWER
DOL Nmnber 4996
�stimate Numher �
Payment Number I
F'or Period Ending 7/5/2024
Project I+uuding
Project A�Ianagcr NA
Inspectors C. HORTON / SUTTERFIELD
Conh•actor CONATSER CONSTRUCTION TxLP
5327 WICHITA ST
FORT WORTH � TX 761 19
City Secreta�y Contract Number
Contract Date
ConU•act Timc 60 WD
Days Charged to Date 54 WD
Cm�h•act is 000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line rund Account Center ��»om�t Gross Retainage Net
rw�ded
Total Cost of Work Completed
Less % Retained
Net �arned
Earned This Period $�33,523.00
Retainage This Period $0.00
Less Liquidated Damages
� Days @ $0.00 / Day
LessPavement Deficiency
Less Penalty
Less Previous Payment
Plus �Iaterial on EIand Less 15%
Balance Due This Payment
$533,523.00
$0.00
$533,523,00
$0.00
$0.00
$0.00
$0.00
$0.00
$533,523.00
Tuesday, July 30, 2024 Page 4 of 4
�EVELOPER-AWARDED-PROJEGTfHANC 0 E
— - CONiRAGTUNIT --
WA'fER BEWER , P0.VING oRNNA6E STREETLqIRB CONTRFCT
` , � I i. lomiowr � iow.mo:: ---"-- DAV8
AAia.)NT OF PROP. CHANGE
OROER
1 Slw.aes.o0 I YM 50.00 N/C � fp,pp L {ppp
TOTALPEVI9EDCDNTR0.CT -- � -
AMOUNTPERUNR f]S]f20.ao S15o ea.00 f0.aa �ooa
NEVI9E0008TSHnnE OBv.Caat s53�.629.D0 �. "
TOTPL REY0E0 CONTNACT se�� y� �
REVIEWED
By Sandip Adhikari at 2:11 pm, Jun 20, 2024
Ra�eo: io-iz-zo>>
Page 1
INSPECTDR: To Ba betermtnad PMne Nv:
PROJECT MANAGER: Sa�dip Adhikarl Plnne No: 817-392-8424
NOCRYFl1NOSINVOLVE01NTH19CONTRACT. �EVEIOPERISRESPONSiBLEFOR100°l.OFTNECHANGEOR�E2CD9TANOND
REIM9UF$EMeNT FqOM THE CfiY WILL 6E SOUpHT BY THE DEVELOPER.
PeblonLeM�� HIIlwootlAlllance rvlcc;�,LLGI Cane�erCaatnittlon7%,Lp
By: �' � .- ay' ' ' _�,. �y .E _ sy _�� I �w
Mamg R_0'�..5_�E.� Name: � RtL �LQy57 _ Neme. Atl eums
nue: p� r� M�awe� _ nne , S v p -- nne __rg�xip
REVIEWED
By Sandip Adhikari at 2:11 pm, Jun 20, 2024
ne�� ro-iazo� �
Page 2
REASONBFORCHANGEOPOER: RBW�tlwalaraMmwBl&Il�ymgn(6.ApdBtloneEKygMgNu/a
Matlifietl7reflfeContrM Ran
F4RTWORTH
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
PROJECT NAME: INTERMODAL PARKWAY
CITY PROJECT NUMBER: 104996
WATER
PIPE LAID SIZE TYPE OF PIPE LF
DIP 16" DIP 85
FIRE HYDRANTS: N/A
PIPE ABANDONED
N/A
SIZE
VALVES (16" OR LARGER)
TYPE OF PIPE
LF
3
DENSITIES:
NEW SERVICES:
N/A
YES
SEWER
PIPE LAID SIZE TYPE OF PIPE LF
PVC 12" PVC 20
PVC 8" PVC 322
PIPE ABANDONED
SIZE
TYPE OF PIPE
LF
DENSITIES:
NEW SERVICES:
N/A
1•/ �f.`!
TR,-�NSPORTr1TION �ND PUBLIC WORKS
The City- of Fort ��'orth • 1000 Thxockmoxton Stxeet • Fort ��'orth, TX 76012-6311
(817) 392 - 7941 • Fax: (817) 392 - 7845
��������x�
TRANSPORTATION AND PUBLIC WORKS
July 5, 2024
Conatser Construction TX,L.P.
5327 Wichita St.
Fort Worth, TX 76119
RE: Acceptance Letter
Project Name: Intermodal Parkway
Project Type: water/sewer
City Project No.: 104996
To Whom It May Concern:
On July 5, 2024 a final inspection was made on the subject project. There were no punch list items
identified at that time. The final inspection indicates that the work meets the City of Fort Worth
specifications and is therefore accepted by the City. The warranty period will start on July 5, 2024,
which is the date of the final inspection and will extend of two (2) years in accordance with the Contract
Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at 817-
392-8424.
Sincerely,
�
Sandip Adhikari, Project Manager
Cc: Hershel Stanley Sutterfield, Inspector
Troy Gardner, Inspection Supervisor
Cody Horton, Senior Inspector
Andrew Goodman, Program Manager
Peloton Land Solutions, Consultant
Conatser Construction TX,L.P., Contractor
Hillwood Alliance Services LLC, Developer
File
E-Mail: TPW_Acceptance@fortworthtexas.gov
Rev. 08/20/19
11I� E� [ a�1� ['C
STA'[`F. �]F 'f F��1�
�O[_.�Tl�' C�F TAI�F��1�'i'
i3�torc n1e. t}�� urtdersi�nc�i au�hority, a Noxr�ry Publi� in ih�� s#ace and eaunty a#aresaid,
an �3�is ci�y p�rsc�nally a}��e�rcd �3rc�ck ilug�tins, 1'ms�dent of �:ot�atsor [N�nagemenc Ciroupt II�C.r
�,er�eral paetncr of' �'��..n�ttic�r. .C'c�nstruction -� �C�,L�?, kn�wn tv m� �� be a cr�diblc persor�, who
being by m� duty s�v�rn, upi�n hi� csath dc�se�1 and said:
Th�t �11 persc�n�, firms, assoei�tic�r�s, c:c►rpora�ions ar otlt�r o��anixations furni�hing
la�ar and.lor ma��nc�lti i�av� bccn pard in f�ll,
"Chgt the wa�e sc;�le c;��bli�h�d by �he City Council in [�4 C'i!y �f For� WarCh, httss
bc�n p�ic� in f'ull; and
'�`hat tl�ere ars� nv ��aims pen�lir�g #c�r per.�r�al inj�ry autdlar prup�rt� damag�s;
C7n C:nntr��i d�scrilh�d {rra:
��T�RMOUAL FARKWAY
1�A��Ft 8c S�IVITARY Sf�WCR [11�P�01{EMENTS
cF�► ��J #: 2�-00��
CITY PRO,���'�` #; io����
�ITY OF FOR'I" VV�RTI-�
S'TA'�'E �F'�'EXAS
C�NA'I'S�R C.{)I��'I`RUC"�[7��1 `t"�{, LI'
.
Hrock ����ir�s
Subscribcd anc! savc�rn t�� bcforc mc thi� �3�[' d�y oE`Jt��y, �(�24.
K .
i Na�'1 �� 9uN el Trru
ILMI � 7��Mrt.15
t � r � W�r1r�+E���
� �. �76
�� � �
Notnry �uhli� in Tarrant Caunty, �'exas
}
��NSEN� DF
S�J�tETII C�MPANY
�� FiNA� P�#YII��N7
Conlorm■ with tfi. A�rrica�n Instituxa of
�#S. �Itfl O�ac�rn�r►t G787
PRO.IECT:
;name, eddress��n� �'�rkrra�r
TO I�wner�
OWNER ❑
ARCH�T�CT �
ca�rr��ac�o� �
su��ry �
OTH�R
fo� wv+�h
Bond i+10 �2�,G222
C1TY �F F�T W�RTH Atd� HIL�WdOd ALLj14FIGE� ARCHIT�CT' S Pl�OJEC'� 1+1�:
S�Fttif1C,�S� L.LG �Q�i���k�T F�R:
f0a0 �'tn�+ 'Y�+ster 3 Sernl,jry 5awer �r,+provemw+t� fta+ IMerrnndel �arkrv�y
� ,,,�,q� rx �ewfl2 � CDNTRACT QAf�:
C�NTRACT�fi: COIVATS�R CQNS7FtUCT10N Ti�. L.P.
In ac�rdana w�tl� �trc provisions vi tfire Co�tract betw�en thc �+n� �nd tho CanCr�ctar sa i�rd�csted �ba�+�, tha
c1w,. w+rs n�nw �+e .aur... a+ sur.rtx �a.nrs
B�FtKLEY IF#SURANC� C�MPANY
A 75 S1��rnbOa� FRO�
��n„� cT �sa�a , SURETY COfN�AHY
an bo�d of uw. Mu.�t nam. ar,a wa�s�. o+ ca�a.�.s
COf+IATSER COt�ISTRL,tG�10N TX. L.P.
53�7 Ylfrct+da St_
�orS woren Tx 761t9-fio3a�
� C�DN�FWCT�R.
hene�y apprmres of tf�e �aa! �rayment ta t�c �o�tracto�. and agr� t�eat tinsl payme�t to the Coetrac�ror shall �ot rc3e�ve
tha Sw`e�ty Carnp�ny of any of its obligaii4ns �a a�. w.�e �..�w+e�..+ � o.M++.�►
cinr oF Fa�� w��t�K �r�o rt��v�r� auu�c� s�vic�s. �c
1�00 Thr�c�kmortOr�
Fare VNorth 1`?C 7�i�
as s�c°t fo�zh in t#�e said Stsrrxy CarF+pnn�s 6ond.
�N Wt"I7�i�55, rvFIEREVF,
th� Sw�r#y Comp�any h�s �rercurtt� sat i� ltand this
���; �j�.rv'4 f �'`'M� r,� x.�
�
day af ��y. 2t��
�
, OWNER,
B�FiIQEY IN3LJR�4NCE C�AA�AhlY
Se�r�ry Co�nge�Y
��� j �- ,� f
�L}� dt f.L')
Signat rc af Authoritxd �tcpresentet�rc
�+�Iva�ie Fsun�er Attorney-�-Fact
�f��
fWTE: T1+ia i4nn r l� b� �u�d q� vo�r�an dotwnanS W AI� P4CU1#i�IT Q�U�, C0lirqhC7W1'S AFFIW►V17 G� �'AYMENT Of G#� Af10 C1J�1S�
C,�nnt �dF�1on
ON� PAGE