Loading...
HomeMy WebLinkAboutIR 7243 , INFORMAL REPORT TO CITY COUNCIL MEMBERS No. 7243 OPP 0 . To the Mayor and Members of the City Council January 5, 1988 x C'* Subject: PROCEDURE FOR PROCESSING AND ACCEPTING FACILITY GIFTS Attached is a draft of the proposed policy for the City accepting facility gifts from different entities. The proposed policy includes the items which the City Council has identified in the past as being important items to be considered before gifts are accepted by the City. A copy of this proposed policy has been sent to the major foundations and other organizations within the City which have donated facilities in the Should you have any questions, additional information on the proposed policy will be provided. "'W4 ity Manager ISSUED BY THE CITY MANAGER FORT WORTH, TEXAS City of Fort Worth Procedure for the Processing and Accepting Facility Gifts 1.0 Purpose of Policy: To outline a procedure to be followed by the City of Fort Worth when accepting gifts of facilities, improvements to be constructed on City owned land or when authorizing a study involving City property. 2.0 Entities affected by this policy: Private, non-profit, or private for profit organizations, foundations or individuals which desire to donate a facility or the construction of a facility to the City of Fort Worth. 3.0 Approval of Project Conce2t: 3.1 The donating entity will present a written description of the concept of the proposed project to the City Manager. The description shall include, but not limited to the following information: 3.1.1 The location of the project. 3. 1.2 The scope of the project - indicating whether this is one phase of a larger project. 3.1.3 The estimated construction cost of the project. 3.1.4 The estimated annual maintenance and operation cost of the project. 3.1.5 The schedule for the construction and completion of the project. 3.2 The City Manager shall provide a copy of the project description to the City Council and provide a copy to the appropriate department OpIk head for analysis. 3.3 The proposed project will be reviewed by designated staff based on the following criteria: 3.3.1 The proposed project's relationship to specific departmental and/or City-wide goals and objectives. 3.3.2 The immediate and long-range financial impact of the project on the City's operating budget. 3.4 Staff will prepare a recommendation on the proposed project based on the above referenced information and forward same to the appropriate board or commission, and the City Manager. 3.5 The City Manager will submit a report on the project concept with the recommendation from the appropriate board or commission to the City Council for action. 4.0 Authorization to Construct Projects: 4.1 Following approval of the project concept by the City Council the donating entity should complete detailed plans, and specifications for the proposed project. 4.2 The detailed plans of the proposed project will be submitted to the City Manager. 4.3 The City Manager will provide a copy of the project plans to the appropriate staff and board or commission for review. 4.4 The City Manager will submit a recommendation on the proposed project plans with that of the appropriate board or commission to the City Council for action. 4.5 The City Council may authorize the construction of the proposed project. 4.6 The contract documents of the authorized project will contain the required bonding, insurance, and indemnification provisions satisfactory to the City. 5.0 Funding of Construction Costs: The funding entity must document that the necessary funds to pay for the proposed construction costs of the donated project are available at the time the City Council is requested to authorize the construction of the project. 6.0 Method of Awarding Construction Contracts City Council will determine how the construction contract will be awarded which may include one of the following options: 6.1 Require the funding entity to deposit the necessary funds with the City. 6.1.1 The City may then use City staff to construct the project. 6. 1.2 The donated funds may be used by the City to award a construction contract following City procedures. OP011 6.2 Allow the funding entity to award contracts for the construction of the project. 7.0 Construction of Projects: 7.1 Unless otherwise authorized, all costs, fees, permits, and other requirements of the project will be borne by the funding entity. 7.2 Construction Inspections. 7.2.1 The City will be allowed to inspect any phase of the construction which may be beyond normal inspections of construction projects. 7.2.2 The funding entity will provide to the City regular progress reports and other information as requested. 7.3 Change Orders. 7.3.1 Requests for change orders will follow the same procedure used to authorize the construction of the project. (See Section 4.0) 0 7.3.2 Change orders which increase the contract cost may be authorized by the City Manager if the increase does not exceed Poll 10% of the original contract or cause an original contract of less than $5,000 to exceed $5,000 in value. 7.3.3 All change orders which increase the original contract by more than 10% or cause an original contact of less than $5,000 to exceed $5,000 in value must be approved by the City Council . 8.0, Acceptance of Project: The Directors of the Department of Transportation and Public Works and the appropriate Department or their designees will inspect the project after construction is completed, but before the construction contractor is given its final payment to determine the acceptability of the project. 9.0 Authorization of Studies: An entity desiring to conduct a study affecting City property, at their expense, shall follow the steps outlined in Section 3.0 Approval of Project Conceot of this procedure to receive authorization from the City Council to conduct the study.