Loading...
HomeMy WebLinkAboutContract 52517-A5CSC No. 52517-A5 AMENDMENT No . 5 TO CITY SECRETARY CONTRACT No. 52517 WHEREAS, the City of Fort Worth (CITY) and CDM Smith Inc., (ENGINEER) made and entered into City Secretary Contract No. 52517, (the CONTRACT) which was authorized M&C C-29181 on the 25 day of June, 2019, in the amount of $192,600.00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment No.1 in the amount of $97,448.00 authorized administratively on May 29, 2020, Amendment No.2 in the amount of $141,740.00 authorized by M&C 21-0540 on August 3, 2021, Amendment No.3 in the amount of $99,500.00 administratively authorized on November 2, 2022, and Amendment No.4 in the amount of $904,827.00 authorized by M&C 24-0077 on January 23, 2024; and WHEREAS, the CONTRACT involves engineering services for the following project: Westside Water Treatment Plant Plate Settler Expansion, CPN 102052; and WHEREAS, it has become necessary to execute Amendment No. 5 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $99,420.00. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $1,535,535.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. City of Fort Worth, Texas OFFICIAL RECORD Westside WTP Plate Settler Exp Prof Services Agreement Amendment Template CITY SECRETARY CPN 102052 Revision Date: 12/08/2023 Page 1 of 2 FT. WORTH, TX EXECUTED and EFFECTIVE as of the date subscribed by the City's designated Assistant City Manager. APPROVED: City of Fort Worth Fernando Costa Assistant City Manager DATE: Aug 8, 2024 ATTEST: Jannette Goodall City Secretary APPROVAL RECOMMENDED: 4,d-p4URp� o� FORro p''011' P~° odd Pvo o=G P�Q * aoo oo o *9 a44 nEa 44gaa Christopher Hauler (Aug 7, 2024 12:43 CDT) Christopher Harder, P. E. Director, Water Department Contract Compliance Manager: ENGINEER CDM Smith Inc. Jessica L. Veach, P.E. Client Services Leader DATE: 08-06-2024 By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. zl& Tony,�§holola, P.E. Assistant Director M&C No.#: N/A APPROVED AS TO FORM AND LEGALITY: M&C Date: N/A Douglas Black (Aug 8, 202415:13 CDT) Douglas W. Black Form 1295: N/A Sr. Assistant City Attorney OFFICIAL RECORD City of Fort Worth, Texas CITY SECRETARY Westside WTP Plate Settler Exp. Prof Services Agreement Amendment Template CPN 102052 Revision Date: 12/08/2023 FT. WORTH, TX Page 2 of 2 Smith August 5, 2024 Mr. Scott Taylor Fort Worth Water Department 1000 Throckmorton Fort Worth, Texas 76102 Subject: Westside Water Treatment Plant Plate Settler Expansion Project (City Project 102052) City Secretary Contract No. 52517 Request for Amendment #5 Dear Mr. Taylor: CDM Smith was requested to evaluate, design, and provide bidding services for extending the existing 30-inch pipeline ("WS-IV pipeline") to convey finished water from the Westside Water Treatment Plant (WSWTP) high -service pump station (HSPS) to the WS-IV pressure plane at the southwest corner of the WSWTP property. From that point, others will extend the WS-IV pipeline westward to distribution system within the Old Weatherford Road future right of way. We request an amendment to our current contract for performing these additional services. The attached scope of work provides a more detailed explanation for these additional services. Also attached is our fee proposal table developed for the additional scope of work. The requested fee for the above work is $ 99,420. This fee is broken down as follows: Base Services Special Services $ 79,420 $ 20,000 A summary of the total contract amount is provided below: Original Agreement Amount $ 192,600 Amendment 1 $ 97,448 Amendment 2 $ 141,740 Amendment 3 $ 99,500 Amendment 4 $ 904,827 Proposed Amendment 5 $ 99,420 Revised Agreement Amount $ 1,535,535 801 Cherry Street, Unit 33, Suite 1820, Fort Worth, TX 76102 1 tel: 817 332-8727 Smith Mr. Scott Taylor August 5, 2024 Page 2 Please review and if acceptable prepare an amendment for this work. Please contact me if you have any questions or comments. Sincerely, David F. Vallejo Senior Project Manager CDM Smith Inc. cc: Tony Sholola, FWWD Jessica Veach, CDM Smith 801 Cherry Street, Unit 33, Suite 1820, Fort Worth, TX 76102 1 tel: 817 332-8727 SCOPE OF SERVICES FOR WESTSIDE WATER TREATMENT PLANT PLATE SETTLER EXPANSION PROJECT 102052 AMENDMENT NO.5 - WS-IV FINISHED WATER PIPELINE EXTENSION BACKGROUND CDM Smith (ENGINEER) contracted with the City of Fort Worth (CITY) for the Westside Water Treatment Plant (WSWTP) Plate Settler Expansion Project. The initial scope of work included development of design for adding additional plate settlers to the three sedimentation basins and the WSWTP to expand their capacity from the existing 15 MGD capacity to 18 MGD. Amendment No.1 to the contract was executed to provide additional design for the addition of Filter No. 5 and any coordination of changes related to the membrane addition procured by the CITY directly. Amendment No. 1 also included design services for the following items: Replace the existing raw water transit time meter and flow control valve with magnetic flow meter for better accuracy, • Provide an additional membrane feed pump with variable frequency drive, and • Relocate the potable water sample point following the clear well storage tank. Amendment No. 2 provided for an on -site resident project representative, supported as needed by senior technical staff, for the original 56 week (13 month) contractual construction period. Amendment No. 3 provided for additional engineering services during construction, project management, and on -site RPR for an additional 48 weeks through the projected construction completion date of November 2023. Amendment No. 4 provided for additional scope of work and engineering fee to perform design and construction phase services for expanding the WSWTP capacity from its current capacity to 24 MGD in two stages: first by re -rating the plant capacity of 20 MGD and second by completing construction of improvements to increase the overall plant production capacity to 24 MGD. This proposal for Amendment No. 5 requests authorization for additional scope of work and engineering fee to evaluate, design, and provide bidding services for extending the 30-inch pipeline ("WS-IV pipeline') to convey finished water from the WSWTP high -service pump station (HSPS) to the WS-IV pressure plane at the southwest corner of the WSWTP property. From that point, others will extend the WS-IV pipeline westward to the west areas of the distribution system within the Old Weatherford Road future right of way. The additional scope of work and engineering fee proposed herein will cover the following work: 1. Complete a conceptual evaluation up to three (3) options for routing the WS-IV pipeline extension from the HSPS discharge to southwest corner of the WSWTP site and provide a recommendation of the route that provides best value to the CITY. Options to be Westside WTP Plate Settler Expansion Project (102052) 1 Scope of Services — Amendment No. 5 08/05/2024 evaluated are generally as follows: a. Option #1: Extend the proposed 36-inch WS-IV pipeline from the existing blind flange located near the northeast area of the plant to the point of termination near the southwest corner of the plant around the south perimeter of the plant. This route would approximately involve an 1,800 linear foot (L.F.) extension. b. Option #2: Extend the proposed 36-inch WS-IV pipeline from the existing HSPS discharge header and proceed to the west between the HSPS electrical building and the power utility (Oncor) meter to the point of termination near the southwest corner of the plant. This route would approximately involve an 800 L.F. extension and a new meter vault. c. Option #3: Extend the proposed 36-inch WS-IV pipeline from a new tee downstream of the existing WS-IV pipeline meter vault to the point of termination near the southwest corner of the plant. This will involve an approximate extension length of up to 800 L.F. extension if the line needs to go around the existing stormwater pond located on the southwest area of the site. 2. Perform design/contract document preparation and bidding services for implementation of a project for extending the WS-IV pipeline based on the routing selected in conceptual evaluation. SCOPE OF WORK - BASE SERVICES The scope of work presented below describes the additional base services included in this Amendment No. 5. Task P1- WS-IV Extension Evaluation ENGINEER will complete a conceptual level evaluation of the three routing options described above. The evaluation will include: • A summary description and figure plan of the existing WS-IV pipeline extension route options. Comparison of the three options based on estimated construction cost, ease of installation/constructability challenges, and potential plant disruptions during construction. The conclusions of the evaluation and ENGINEER's recommendation for routing of the WS-IV extension will be summarized in a Draft Technical Memorandum (TM) for CITY review. ENGINEER will conduct a one -hour virtual conference call meeting to present and review the findings and recommendations and obtain CITY comments. Following the review, ENGINEER will revise and finalize the TM to address CITY comments as appropriate. Task P1 Assumptions: • No water distribution system hydraulic analysis of the WS-IV pressure plane will be completed under this amendment's work. It is assumed that the WS-IV pipeline extension pipe will be of the same pressure class of the existing pipeline. If the design criteria of the extended pipeline need to change, it is assumed that updated Westside WTP Plate Settler Expansion Project (102052) 2 Scope of Services — Amendment No. 5 08/05/2024 working and surge pressure information will be provided by the CITY for pipe specification. • Opinions of probable construction costs presented in the TM will be a Class 5 estimate as defined by the Association for the Advancement of Cost Engineering International (AACEI) standards. Task P1 Work Products: • Draft Technical Memorandum (electronic .pdf format) • Review Meeting Summary (electronic .pdf format) • Final Technical Memorandum (electronic .pdf format) Task P2 - Final Design and Final Construction Documents Upon finalization of the Task 1 TM and confirmation of pipeline routing, ENGINEER will develop the WS-IV pipeline extension design documents (plans and specifications) for submittal to TCEQ for approval and for bidding of the work to general construction contractors. ENGINEER will prepare construction documents as follows: • Draft final (90% level) plans and specifications will be submitted to CITY. • The ENGINEER will submit a final design estimate of probable construction cost with the 90% design package. This estimate will be Class 2. • Following a 90% construction document review meeting with the CITY, the ENGINEER will capture comments and prepare and submit 100% level construction documents to the CITY. • ENGINEER will submit the 100% set of construction documents to TCEQ for review and approval to construct. Task P2 Assumptions: • It is assumed that a 30% and 60% design level set of plans and specifications will not be necessary due to the limited project scope and to expedite completion schedule. Once the CITY approves the pipeline alignment provided in the TM, proceeding to completing 90% design is adequate. • Site plan drawings will be developed through use of the existing WSWTP site CADD drawings. These drawings are of 2 dimension -type (21)). It is assumed that development of new Civil 3D models and drawings will not be necessary. • The existing site plan drawings will be updated through topographic survey of the corridor within which the WS-IV pipeline extension will be routed. Survey work is described below under Special Services. • The existing site plan drawings will be updated through a subsurface utility evaluation (SUE) of the corridor within which the WS-IV pipeline extension will be routed. SUE work is described below under Special Services. • No geotechnical borings or field investigations are expected for this work. ENGINEER will use previous geotechnical information developed for previous plant Westside WTP Plate Settler Expansion Project (102052) 3 Scope of Services — Am ndment No. 5 08/05/2024 design. The improvements will include a pipeline extension and fittings for interconnection to the existing piping at the point of connection and termination. No additional facilities or improvements are included in the Base Services scope. • The anticipated list of drawings includes the below sheets. This may vary depending on the routing option selected. o Cover Sheet, including project location map and list of drawings o Legends/Abbreviation/General Notes o Key Map o Pipeline Plan and Profiles (up to three total) o Pipe Installation and Site Restoration Details (up to three total) Task P2 Work Products: 0 Updated opinion of probable construction cost (OPCC) at 90%, and 100%. Submittals (electronic .pdf format). • 90% review meeting summary (electronic .pdf format) Task P2 Deliverables • 90% construction plans and specifications (electronic .pdf format). 0 100 % Regulatory Approval/Issued for Bid Documents (electronic .pdf format). Task P3 - Bid Phase Services ENGINEER will support the bid phase of the project by providing the following services: During the Bidding Phase of the Project, ENGINEER will provide the following engineering services: • ENGINEER will attend a pre -bid meeting at the WSWTP site with potential bidders 0 ENGINEER will provide necessary interpretations and clarifications of contract documents from bidders during the bidding phase. If necessary, such clarifications will be included in Addenda. Up to one addendum is assumed. • Engineer will attend Bid Opening, and review and tabulate bids received and provide a summary of tabulation and any informalities noted for CITY's consideration in for recommendation of award of construction contract. • ENGINEER will prepare conformed documents for the construction project, incorporating addenda items into the drawings and specifications. Task 2.3 Work Products Pre -bid meeting minutes (electronic .pdf file) Addenda (electronic .pdf file) Westside WTP Plate Settler Expansion Project (102052) 4 Scope of Services — Am ndment No. 5 08/05/2024 • Bid Tab and Review Summary (electronic .pdf file) • Conformed documents (one electronic .pdf file, five hard copies of paper -size plans and specifications and two paper copies of full-size drawing sets) Task P4 - Construction Phase Services (Not included) SCOPE OF WORK - SPECIAL SERVICES Task P2.A - Land Surveying A topographic land survey of the corridor within which the WS-IV pipeline extension will be routed will be performed to locate visible site features (e.g., fences, structures, roads, parking areas, signs), aboveground utilities, overhead power lines, and drainage structures, and to identify existing ground elevations and key elevations of structures. The survey work will also locate horizontally, and vertically underground utilities identified by SUE work. The survey will include a 50 L.F. wide corridor along the conceptual pipeline alignment. An allowance of $5,000 is proposed for land surveying work is assumed to the proposed compensation for this task. Task P2.A Assumptions: Special Services for Land Surveying do not include development of survey plats and/or meets -and -bounds documents to obtain easements or any construction permits. It is assumed that construction within the WSWTP site, which belongs to the CITY, will not require such plat. Task P2.A Work Products: • The topographic survey will be issued in an electronic CADD file compatible with Autodesk/AutoCAD products and will be used to develop the pipeline plan and profile sheets. For the site grading plan drawing, the topographic survey will be integrated into the exiting grading plan available from the existing WSWTP site CADD drawings. Task P2.B - SUE The scope of subsurface utility evaluation (SUE) services that are performed will be completed at Quality Level A, as defined by Standard Cl /ASCE 38-02. The limits where SUE services will be provided will coincide with the limits of topographic land surveying along the corridor of the WS-IV pipeline extension. The located utilities will be surveyed to the project control. This approach is useful to address the challenges caused by inaccurate record drawings, abandoned and unrecorded subsurface facilities, and lost references. The information gained from the SUE will help facilitate decisions regarding the location of new facilities to help avoid conflicts with existing subsurface utilities and structures during future construction efforts. An allowance of $5,000 is proposed for SUR work is assumed to the proposed compensation for Westside WTP Plate Settler Expansion Project (102052) 5 Scope of Services — Amendment No. 5 08/05/2024 this task based on assumptions of up to five pot holes locations of existing utilities. Task P2B Assumptions: • It is assumed that at least one location point will be completed by SUE for each underground utility that is identified and that potentially crosses or is near the WS- IV pipeline extension corridor. At the discretion of the ENGINEER, two points may be identified for certain utilities. Task P2B Work Products: The SUE findings will be issued in an electronic CADD file compatible with Autodesk/AutoCAD products and will be used to develop the pipeline plan and profile drawings. Task P2.0 - Additional Services In the event that additional work is identified as being required to fully implement the WS-IV pipeline extension during execution of tasks P1 and P2, such as the need for an additional flow meter facility, additional piping for interconnection, tunneling, or additional field investigations, a contingency allowance of $10,000 has been assumed for this additional work. This work would be added to the Task P2 work products and deliverables. If this additional work is required, ENGINEER will prepare an estimated level of effort for approval by the CITY prior to utilization of this Additional Services allowance. If the funding provided by this allowance is not sufficient, it is assumed that further Additional Services funds will be required prior to completing that work. COMPENSATION The total requested amount of this proposed Amendment No. 5's work is as follows: • $79,420 for Base Services per attached Fee Development Spreadsheet. • $20,000 for Special Services work. The Labor Rate Schedule shall be the below updated schedule that includes 2024 and 2025 hourly billing rates. Labor Category 2024 Rate ($/hour) 2025 Rate ($/hour) Officer/Principal $310 $320 Senior Technical Specialist $280 $290 Project Manager $260 $270 Senior Engineer (Level 7/8) $260 $270 Project Engineer (Level 5/6) $200 $210 Engineer (Level 3/4) $170 $180 Graduate Engineer (Level 1/2) $160 $160 CADD Designer/Drafter $150 $150 Senior Administration $140 $140 Contract Administration $140 $140 Clerical Administration $110 $110 Westside WTP Plate Settler Expansion Project (102052) 6 Scope of Services — Am ndment No. 5 08/05/2024 SCHEDULE The above services are anticipated to be completed following the below schedule. • Delivery of draft TM that evaluates the WS-IV pipeline extension options: 45 calendar days after receiving notice to proceed (NTP) from CITY. • Delivery of 90% design level package: 100 calendar days after receiving comments from CITY on 30 % deliverable. • Delivery of 100% design level package: 21 calendar days after receiving comments from CITY on 90 % deliverable. END OF SCOPE OF WORK Westside WTP Plate Settler Expansion Project (102052) % Scope of Services — Am ndment No. 5 08/05/2024 Westsiae — Plater Settler E.P—i- Amendment p5 W$-IV Pipeline Extension Fee Breakdown u on LPmoscl Meneg., Labor -Employee Sr Engmssr - QC Labor-Empbyp Mid Engmssr Labor-Empbvce Pr0led Engmesr Labor -Employee Sr. Praress CADO Labor -Job Prgosss CADD Wbm-Employee Cost Estlnlabr La -Emp oye Labor -Employee borAtlmin a Spec Revrewer or PCSpIo La -Em yee Labor -Employee CA OOC PmNlq?rerel SubContmct-OOC Survey SubCOMnM-ODC Atltlitional5ervices SUE PlI.— alleb,DavitlF Madinat, WendyM stl KRIdi,A VmwgM, BdtlanyC Clayton,—gMD OH b r In a Le 6A(Judy He KC Srotl, SbannonL zt,$280.OD 3600 $280.OD 20.00 $260.OD 52.00 $1)0.00 13200 $150.00 ]IS00 $)5.0091m 4000 $1]0.00 800 $110.00 ]8 $14000 BGO $140.00 $140.00 800 0.00 000 0.00 000 TetalcLabur H.— Total Billable Amount $10,08000 $5,60000 $13,520.00 $22,440.00 $1],25000 $3,D0000 51,3600E G0 51,98000 $1,12D 00 1000 51,4000E $1,12000 $550.OD $5,00000 $5,000.00 $10,a00.n0 P10 Task Project Management 800 4 2 $3,08000 Evaluation TM 24� 26 52500 $10,910.00 P.1.2 P3 Quality-TSR Review Pipeline Design 4, s1,120.00 200E buD bCu 11 800E P21 Drawingsej6 s6ee[sjement 16 �� 540E 1050E 400E $32,090.00 4A uR4 40 DD 1806 8.6 514,140001 P.23 P.231 Qualrtv-TSR Review ]0%TPC 40E $3,360.00 $1,12111 6oxTRgRGY 4addd $1,1z0.DDl P.1.33 90%RGY Odd $1,120.001 g D6 $1,1611 me - $S,000 W s5,000.001 vze Sp-.11 serv1— SUE $5,00000 $5,000 MI C ow Design $10,000 DO $1D,000.00 P.3 Bidding Auntance 56,080.0E 31 Bld Advertisement e-e�d Mewing 3d 3�� 51sD R� 51,52E 00 51,50.-1 P 3 432 P-33 Atltlentla Conbrmed Dpa 1.0 1 D 1 31f 5SE z 0 5 0 1 $150 ff s1,69000 $l,3]0 D01 M=