HomeMy WebLinkAboutContract 58641-A1CSC No. 58641-A1
AMENDMENT No . 1
TO CITY SECRETARY CONTRACT No. 58641
WHEREAS, the City of Fort Worth (CITY) and GRAHAM ASSOCIATES, INC.,
(ENGINEER) made and entered into City Secretary Contract No. 58641, (the
CONTRACT) which was authorized by M&C 22-1010 on the 29th day of November,
2022 in the amount of $ 300,000.00; and
WHEREAS, the CONTRACT involves engineering services for the following
project:
Citywide Storm Drain Rehabilitation, CPN 102527; and
WHEREAS, it has become necessary to execute Amendment No. 1 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement, which
amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and incorporated
herein. The cost to City for the additional design services to be performed
by Engineer totals $95,000.00. (See Attached Funding Breakdown Sheet, Page
-4-)
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $395,000.00.
OFFICIAL RECORD
CITY SECRETARY
3 • FT. WORTH, TX
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
City of Fort Worth, Texas Citywide Storm Drain Rehabilitation
Prof Services Agreement Amendment Template 102527
Revision Date: 03/08/2024
Page 1 of 3
EXECUTED and EFFECTIVE as of the date subscribed by the City's
designated Assistant City Manager.
APPROVED:
City of Fort Worth
op�---)
Jesica McEachern
Assistant City Manager
DATE: Aug 20, 2024
ATTEST:
a 4 nn�y
YR— ,9a
a°�°
�o
Pv8 �=4
< %
Opp* 4 .^ *d
�aad�oo 54pa
Jannette Goodall
City Secretary
APPROVED AS TO FORM AND LEGALITY:
Douglas Black (Aug 13, 202415:25 CDT)
Douglas W. Black
Sr. Assistant City Attorney
ENGINEER
Graham Associates, Inc.
Mark Burckhard (Jul 24, 202410:19 CDT)
Mark Burckhard
Vice President
DATE: Jul 24, 2024
M&C No.#: N/A
M&C Date: N/A
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas
Prof Services Agreement Amendment Template
Revision Date: 03/08/2024
Page 2 of 3
Citywide Storm Drain Rehabilitation
102527
FUNDING BREAKDOWN SHEET
City Secretary No. 58641
Amendment No. 1
Fund Dept ID Account Project CF1- CF2 - Bond Amount
ID Activity Reference
52002 0200431 5330500 102527 CAPEXP $ 95,000
Total: $95,000
City of Fort Worth, Texas CILyw, do SLcr, -)raln Rcrabl='r_a_Icr
Prof Services Agreement Amendment Template 1C2527
Revision Date: 03/08/2029
Page 3 of 3
GRAHAM
ASSOCIATES
July 02, 2024
Graham Associates, Inc. TBPE Firm F-1191 I TBPLS Firm 101538-00
600 Six Flags Drive, Suite 500
Arlington, TX 76011
817.640.8535 8k7.633.5240 fax
Mr. Mike Bennett, P.E.
City of Fort Worth, Transportation and Public Works
200 Texas Street, 2nd Floor
Fort Worth, Texas 76102
1300 Summit Avenue, Suite 419 Fort
Worth, Texas 76102
817.332.5756
Re: Citywide Storm Drain Improvements Project; Project No: 102527, City Contract #
58641, M&C # 22-1010
Contract Amendment 1 for Additional Services
Dear Mr. Mike Bennett:
Graham Associates, Inc. is pleased to offer additional Professional Engineering Services for this
project. These additional services are required due to needing additional miscellaneous storm
drain design services. The previous design contract was for $300,000 for on -call storm drain design
services and included six (6) Task Orders. This amendment is for a $95,000 increase to the original
contract amount. All the additional services proposed will be performed in accordance with the
original contract dated December 20, 2022.
This Amendment, consisting of three pages, and the attached hourly rates represent the entire
amendment to the original agreement between the City of Fort Worth and Graham Associates, Inc.
If the terms of this Amendment are acceptable, please indicate by acknowledging acceptance of
the terms of this document.
Summery of Contract Fee for Citywide Storm Drain Improvements Project
Original Contract Amount $ 300,000
Amendment No. 1 $ 95,000
Revised Contract Amount $ 395,000
If you should have any questions, please do not hesitate to call at 817-640-8535 or my cell at 817-
929-7934.
�
Sincerely,
/ k' ` �'�
Mark Burckhard, P.E.
Vice President
Graham Associates, Inc. TBPE Firm F-1191 I TBPLS Firm 101538-00
GRAHAM
600 Six Flags Drive, Suite 500 1300 Summit Avenue, Suite 419 Fort
ASSOCIATES Arlington, TX 76011 Worth, Texas 76102
817.640.8535 8k7.633.5240 fax 817.332.5756
GRAHAM ASSOCIATES, INC.
ESTABLISHED HOURLY RATES 2024
PRINCIPAL
$375.00
SENIOR ENGINEER $225.00
REGISTERED PUBLIC SURVEYOR $225.00
PROJECT MANAGER $225.00
SENIOR HYDROLOGIST $225.00
SENIOR DESIGN MANAGER $225.00
REGISTERED ENGINEER $180.00
ASSISTANT PROJECT MANAGER $180.00
PROJECT HYDROLOGIST $175.00
PROJECT ENGINEER IV $175.00
PROJECT ENGINEER III $165.00
PROJECT ENGINEER II $155.00
PROJECT ENGINEER I $150.00
SURVEY MANAGER $165.00
PROJECT COORDINATOR $140.00
TECHNICIAN V
$150.00
TECHNICIAN IV
$135.00
TECHNICIAN III
$125.00
TECHNICIAN II
$110.00
TECHNICIAN I
$100.00
3 MAN SURVEY CREW $180.00*
2 MAN SUREY CREW $150.00*
CLERICAL $70.00
*Priority Construction Staking ("Rush")
Requests requiring staking with less than 48 hours notice
Addition to Standard Rates
3-Man Survey Crew $40/hour
2- Man Survey Crew $30/hour
BILLING RATES MAY BE ADJUSTED BY UP TO 5 PERCENT ANNUALLY (AT THE BEGINNING
OF EACH CALENDAR YEAR) DURING THE TERM OF THIS AGREEMENT
102527 CS58641 Al On Call Services
Final Audit Report 2024-07-24
Created: 2024-07-17
By: Sadie Ishmael (Sadie.Ishmael@fortworthtexas.gov)
Status: Signed
Transaction ID: CBJCHBCAABAAsW8ycS2lWyp000D6lgJeau1u_FKgmOdU
"102527 CS58641 Al On Call Services" History
Document created by Sadie Ishmael (Sadie.Ishmael@fortworthtexas.gov)
2024-07-17 - 2:08:53 PM GMT- IP address: 204.10.90.100
Document approved by Sadie Ishmael (Sadie.Ishmael@fortworthtexas.gov)
Approval Date: 2024-07-17 - 2:12:18 PM GMT - Time Source: server- IP address: 204.10.90.100
Document emailed to mburckhard@grahamcivil.com for signature
2024-07-17 - 2:12:20 PM GMT
Email viewed by mburckhard@grahamcivil.com
2024-07-24 - 3:17:51 PM GMT- IP address: 209.65.241.66
Signer mburckhard@grahamcivil.com entered name at signing as Mark Burckhard
2024-07-24 - 3:19:25 PM GMT- IP address: 209.65.241.66
Document e-signed by Mark Burckhard (mburckhard@grahamcivil.com)
Signature Date: 2024-07-24 - 3:19:27 PM GMT - Time Source: server- IP address: 209.65.241.66
Document emailed to tpw_sw_contracts@fortworthtexas.gov for approval
2024-07-24 - 3:19:29 PM GMT
Email viewed by tpw_sw_contracts@fortworthtexas.gov
2024-07-24 - 3:20:56 PM GMT- IP address: 204.10.90.100
Signer tpw_sw_contracts@fortworthtexas.gov entered name at signing as Sadie Ishmael
2024-07-24 - 3:21:20 PM GMT- IP address: 204.10.90.100
Document approved by Sadie Ishmael (tpw_sw_contracts@fortworthtexas.gov)
Approval Date: 2024-07-24 - 3:21:22 PM GMT - Time Source: server- IP address: 204.10.90.100
Agreement completed.
2024-07-24 - 3:21:22 PM GMT
FORTWORTH. I Pp1Nerea by
Adobe
Acrobat Sign
Graham Associates, Inc. - Amendment -
Final Audit Report 2024-08-13
Created: 2024-08-13
By: Sadie Ishmael (Sadie.Ishmael@fortworthtexas.gov)
Status: Canceled / Declined
Transaction ID: CBJCHBCAABAAhQrxlP1i7-16q-xAaLINIJJIfDTIZrEY
"Graham Associates, Inc. - Amendment 2 History
Document created by Sadie Ishmael (Sadie.Ishmael@fortworthtexas.gov)
2024-08-13 - 1:54:46 PM GMT- IP address: 204.10.90.100
Document approved by Sadie Ishmael (Sadie.Ishmael@fortworthtexas.gov)
Approval Date: 2024-08-13 - 1:59:06 PM GMT - Time Source: server- IP address: 204.10.90.100
Document emailed to Douglas Black (Douglas.Black@fortworthtexas.gov) for signature
2024-08-13 - 1:59:07 PM GMT
Document emailed to Jesica McEachern aesica.mceachern@fortworthtexas.gov) for signature
2024-08-13 - 1:59:08 PM GMT
Document declined by Douglas Black (Douglas.Black@fortworthtexas.gov)
Decline reason: Please remove the reference to the 2022 M&C at the signature block.
2024-08-13 - 3:17:31 PM GMT- IP address: 204.10.90.100
FDRTWORTHs I P°`4'y
Adobe
Acrobat Sign
FORT WORTH.
Routing and Transmittal Slip
Transportation & Public Works Department
DOCUMENT TITLE: 102527 On Call Amendment 1— Graham n Associates
M&C: 21-0399 CPN: 102527
Date:
To: Name
1. Sadie Ishmael
Mark Burckhard
2' <mburckhard@grahamcivil.com>
3. Lauren Prieur
4. Doug Black
5. Jesica McEachern
7. Jannette Goodall
8. Allison Tidwell
9. tpw_sw_contracts
10.
11.
CSO: 58641
Department Initials
TPW W
Consultant MPB
TPW/Dir
Legal
ACM
CSO
CSO
TPW
DOC#:
Date Out
J u 117, 2024
Jul 24, 2024
Approval/Agiloft Aug 13, 2024
6 Aug 13, 2024
CO- Aug 20, 2024
IM
Aug 20, 2024
Aug 20, 2024
5Jul 24, 2024
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: DYES ®No SAME DAY: ❑YES ®No NEXT DAY: DYES ®No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return to: tpw sw contracts(a),fortworthtexas.uov Call 817-229-3283 with questions. Thank you!