HomeMy WebLinkAboutContract 59305-FP1FORTWORTH. -FP1 City Secretary 59305 Contract No. Date Received 08/16/2024 AT NOTICE OF PROJECT COMPLETION (Developer Projects) The Transportation and Public Works Department upon the recommendation of the Project Manager has accepted the following project as complete: Project Name: Northpointe, Phase 10 City Project No.: 103922 Improvement Type(s): Water ❑x Sewer ❑x Original Contract Price: $998,951.50 (Amount of Approved Change Order(s): $13,480.00 (Revised Contract Amount: $1,012,431.50 (Total Cost of Work Complete: $1,012,431.50 Arturo 5ancen (Aug 7, 202416:16 CDT) Aug 7, 2024 Contractor Date Superintendent Title Conaster Construction Company Name jacs- �gers.(Aug 8, 202409:42 CDT) Aug 8, 2024 Project Inspector Date Ram Tiwat l Aug6, 2024 g Ram Tiwari (Aug 16, 202410:10 CDT) Project Manager Date Rebecca Owen (Aug 16, 202410:22 CDT) Aug 16 ,2024 CFA Manager Date Lauren Prieur (Aug 16, 202410:24 CDT) Aug 16, 2024 TPW Director Date Aug 20, 2024 Asst. City Manager Date OFFICIAL RECORD CITY SECRETARY Page 1 of 2 FT. WORTH, TX Notice of Project Completion Project Name: Northpointe, Phase 10 City Project No.: 103654 City's Attachments Final Pay Estimate ❑x Change Order(s): ❑x Yes ❑ N/A Pipe Report: ❑x Yes ❑ N/A Contractor's Attachments Affidavit of Bills Paid Consent of Surety 0 Statement of Contract Time Contract Time: 180 WD Days Charged: 227 Work Start Date: 8/1/2023 Work Complete Date: 7/2/2024 Completed number of Soil Lab Test: 506 Completed number of Water Test: 13 Page 2 of 2 FORT WORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name NORTHPOINTE, PHASE 10 Contract Limits Project Type WATER & SEWER City Project Numbers 103922 DOE Number 3922 Estimate Number 1 Payment Number 1 For Period Ending City Secretary Contract Number Contract Date Project Manager NA Contractor CONATSER CONSTRUCTION TxLP 5327 WICHITA ST FORT WORTH, TX 76119 Inspectors D. WATSON / D. RODGERS Contract Time Days Charged to Date Contract is 100.00 7/2/2024 AID 18WD 227 Complete Friday, July 26, 2024 Page 1 of 5 City Project Numbers 103922 Contract Name NORTHPOINTE, PHASE 10 Contract Limits Project Type WATER & SEWER Project Funding UNIT I: WATER IMPROVEMENTS DOE Number 3922 Estimate Number 1 Payment Number 1 For Period Ending 7/2/2024 Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 8" WATER PIPE 4155 LF $60.00 $249,300.00 4155 $249,300.00 2 8" DIP WATER 465 LF $75.00 $34,875.00 465 $34,875.00 3 FIRE HYDRANT ASSEMBLY W/ 6" GATE 10 EA $4,800.00 $48,000.00 10 $48,000.00 VALVE & BOX 4 4"-12" WATER ABANDONMENT PLUG 4 EA $1,500.00 $6,000.00 4 $6,000.00 5 DUCTILE IRON WATER FITTINGS W/ 2 TN $8,500.00 $17,000.00 2 $17,000.00 RESTRAINT 6 8" GATE VALVE 14 EA $1,450.00 $20,300.00 14 $20,300.00 7 1"WATER SERVICE III EA $1,200.00 $133,200.00 111 $133,200.00 8 TRENCH SAFETY 4620 LF $2.00 $9,240.00 4620 $9,240.00 9 CONNECTION TO EXISTING 4"-12" WATER 4 EA $1,500.00 $6,000.00 4 $6,000.00 MAIN 17 1.5 IRRIGATION SERVICE ON EX WATELINE 2 EA $4,500.00 $9,000.00 2 $9,000.00 (CO#2) 18 -------------------------------------- 4" PVC SLEEVES (CO#2) 140 LF $32.00 $4,480.00 140 $4,480.00 Sub-Total of Previous Unit $537,395.00 $537,395.00 UNIT IL SANITARY SEWER IMPROVEMENTS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total --------------------------------------- 1 8" SEWER PIPE (SDR 26 PVC) 3157 LF $70.00 $220,990.00 3157 $220,990.00 2 8" SEWER PIPE, CLSMBACKFILL 140 EA $90.00 $12,600.00 140 $12,600.00 3 8" SEWER PIPE, CSS BACKFILL 40 EA $100.00 $4,000.00 40 $4,000.00 4 EPDXY MANHOLE LINER 12.8 VF $455.00 $5,824.00 12.8 $5,824.00 5 4" MANHOLE 20 EA $4,500.00 $90,000.00 20 $90,000.00 6 EXTRA DEPTH MANHOLE 41.5 VF $225.00 $9,337.50 41.5 $9,337.50 7 MANHOLE ADJUSTMENT, MINOR 2 EA $1,000.00 $2,000.00 2 $2,000.00 8 MANHOLE VACUUM TESTING 19 EA $200.00 $3,800.00 19 $3,800.00 9 CONNECT TO EXISTING MH W/ EXTERAL 3 EA $3,500.00 $10,500.00 3 $10,500.00 DROP 10 REMOVE PLUG AND CONNECT TO EXISTING 2 EA $1,500.00 $3,000.00 2 $3,000.00 8" SEWER LINE 11 4" SEWER SERVICE 112 EA $850.00 $95,200.00 112 $95,200.00 Friday, July 26, 2024 Page 2 of 5 City Project Numbers 103922 DOE Number 3922 Contract Name NORTHPOINTE, PHASE 10 Estimate Number 1 Contract Limits Payment Number 1 Project Type WATER & SEWER For Period Ending 7/2/2024 Project Funding 12 8" SEWER ABADONMENT PLUG 2 EA $1,000.00 $2,000.00 2 $2,000.00 13 TRENCH SAFETY 3157 LF $2.00 $6,314.00 3157 $6,314.00 13 POST -CCTV INSPECTION 3157 LF $3.00 $9,471.00 3157 $9,471.00 -------------------------------------- Sub-Total of Previous Unit $475,036.50 $475,036.50 -------------------------------------- Friday, July 26, 2024 Page 3 of 5 City Project Numbers 103922 Contract Name NORTHPOINTE, PHASE 10 Contract Limits Project Type WATER & SEWER Project Funding Contract Information Summary Original Contract Amount Change Orders Change Order Number 2 DOE Number 3922 Estimate Number 1 Payment Number 1 For Period Ending 7/2/2024 $998,951.50 $13,480.00 Total Contract Price $1,012,431.50 Total Cost of Work Completed $1,012,431.50 Less % Retained $0.00 Net Earned $1,012,431.50 Earned This Period $1,012,431.50 Retainage This Period $0.00 Less Liquidated Damages Days @ / Day LessPavement Deficiency Less Penalty Less Previous Payment Plus Material on Hand Less 15% Balance Due This Payment $0.00 $0.00 $0.00 $0.00 $0.00 $1,012,431.50 Friday, July 26, 2024 Page 4 of 5 City Project Numbers 103922 Contract Name NORTHPOINTE, PHASE 10 Contract Limits Project Type WATER & SEWER Project Funding Project Manager NA Inspectors D. WATSON / D. RODGERS Contractor CONATSER CONSTRUCTION TxLP 5327 WICHTTA ST FORT WORTH, TX 76119 DOE Number 3922 Estimate Number 1 Payment Number 1 For Period Ending 7/2/2024 City Secretary Contract Number Contract Date Contract Time 180 WD Days Charged to Date 227 WD Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $1,012,431.50 Less % Retained $0.00 Net Earned $1,012,431.50 Earned This Period $1,012,431.50 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 / Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $1,012,431.50 Friday, July 26, 2024 Page 5 of 5 PROJECT NAME: CONTRACT: I CFA # ICITY PROJECT # I IPRC# IX -NUMBER IFILE # IFID # DEVELOPER -AWARDED -PROJECT CHANGE ORDER Northpointe Phase 10 Water, Sewer, Paving/Street Signs, Storm Drain and Street Lights 22-0131 CITY PARTICIPATION: 103922 22-0081 X-27333 W-2868 FID# 30114-0200431-103922-EO7685 NO CHANGE ORDER No: 2 INSPECTOR: Dennis Rodgers Phone No: 817-471-9351 PROJECT MANAGER: Ram Tiwari Phone No: 817-392-2237 CONTRACT UNIT WATER SEWER I PAVING I DRAINAGE STREET LIGHTS Developer P evelo er Post Cost City Cost Developer Cos[ City Cos[ Developer Cost City Cost Developer Cost City Cost C City Cost ORIGINAL CONTRACT $523,915.00 I $475,036.50 $1,445,882.50 I I $554,325.00 $104,795.00 EXTRAS TO DATE CREDITS TO DATE CONTRACT TO DATE $523,915.00 I $0.00 $475,036.50 I $0.00 I $1,445,882.50 I $0.00 I $554,325.00 $0.00 $104,795.00 $0.00 (AMOUNT OF PROP. CHANGE ORDER $ 13,480.001 I I I I I REVISED CONTRACT AMOUNT $537,395.00 I $0.00 $475,036.50 I $0.00 I $1,445,882.50 I $0.00 I $554,325.00 $0.00 $104,795.00 $0.00 TOTAL REVISED AMOUNT PER ER UNIT $537,395.00 $475,036.50 $1,445,882.50 $554,325.00 $104,795.00 REVISED COST SHARE Dev. Cost: $3,117,434.00 City Cost: $0.00 TOTAL REVISED CONTRACT $3,117,434.00 CONTRACT DAYS 180 180 0 180 Revised: 10-12-2011 Page 1 DocuSign Envelope ID: 7CE5BFBC-A54E-498E-A180-3C7E628F2A25 You are directed to make the followlno anoes in the �ntract docu nts: CITY BID ITEM f j PAY ITEM # # QUANTITY UNIT ITEM DESCRIPTION UNIT PRICE I I TOTAL I I 17' NIT I: WATER IMPROVEMigs Ilmoation I 3312.2103 I 2 I EA 1 18` 9999.0026 140 LF I 1.51 Service on Ex Waterline I $ 4,500.001 S 4" PVC Sleeves $ 32.00 $ 9r000.001 a,\4��80.001 I TOTAL CHANGE ORDER NO. 11 $ 13.4s0.00 I REASONS FOR CHANGE ORDER Add water services for irrigation meters. NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100 % OF THE CHANGE ORDER COST AND NO REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER. RECOMMENDED: APPROVED: APPROVED: Do��slyaea by: Sign�dConstruction Klmley-Horn LennarHome of�Te Conatser Construction TX, LP (� By: (�+�/Q�g/ �uii� 4-4-4 By.--jj-..,,-- gy: Name: Bryce Eckeberner Name: Jennifer Eller Name: Ada Rum. Title: Protect Manaaer Title: Authorized Aaent Title: Manaoer REVIEWED By TiwariR at 1:06 pm, Jul 09, 2024 Revised: 10-12-2011 Page 2 ALL uxE-n - a vuvE n a oETni� ° xmm. o.v a..c. °' ° WATER GENERAL NOTES es naE F F s.,u ° s xxE` i R. ,,,5ITA°aE o E.°aaaa°Paoa.o,aarvxrva� �ax�� 1 �• a az aa.Prv.nrva°.==ca i.°P_ a ") :�Es�Qe:rvc, RII o�;��m�o=�E�oEa e a = °° xE n� °xTMPo P A% k, -- _ ;=EE aPaTMP° wP sEry ac ALL—`o E o°x—I—THE—II—El° ° _r° x. PaaE� ° zz..-z PP,E 0o°3,z°. a° z , �x F ,° x x° Exn l q —ATHaxox,xN� II1ER—REPurva L — oF_REa.aeeau>s uaeauceoc� a e a�� 1 _ — i------- ----' - _ --� m De wnTEauxE \ , \\\ cU, c?5�, i nn TaErvcn caxainsoa xarvsu,onao PwcEnErvT- ^ =g x=W as�a. °a a EEaErvE °rvo. s. zSTsa REnFaE rorv. Ea oauw , :o°ANU z� _.xxn`: o m IaL x LINE w e a e as 3' 3e fmn scue�r EpE I - x�" c LINE `\ TYPICAL UTILITY LOCATION ao 3s 2 192E/liarz x orru� --� - - I T _ _ �-I _ —RCP ETREET Tic. t__ . unE x•- �.a— o �wE w.-c . _ _ — "�- � „zs aEx° Exa Pa=rvP.ga x �a 1 z, T ErPER q� . az 3° ,p 3� °ro°/lI.1 nL TYPICAL LOT SERVICE DETAIL — 1 3, L°cx — To 1— ° q 0 1 a a reaas_ET.IRIL u. eo, o.. muRE s -- Ia1.1aILl ga IAT IN A Z a,�33a�5„ al _I.TYEU Al­x n°3A. LE � o. °I A_ I i ear ce,n enaaes ,a � `l. N - I D_ ,e,�a�,a,°° - z —oLU ENI l orai ��' ; a ai'ii�;'3i 65°°11,1E3353 —,-- INI — �� • —� —a ALL OTxEIANLPERRaxUTILITY LEGENDa oic TEss �f _T, 1 ., i — acoaomzwx.wvzt.,ErecxE ' .i�6 �r T �u L-� ow000,mrt� =Aa o �1—T. qN. ' ' LIJ rvE .- Ex c _ - En o L�UZ'E cox Ec. +� r WATER METER TABLE KEV MAP 0 W g z c 12E �q 5, Tl N P o . ' —RUN I METE.A—E —ITI, NTa ° 1 I Prcis nuaocc. x,°mo. paean) l I e ? IPEs BENCHMARKS = Q mnxoxa.Ere�uuE 1 e•„is °o,o J— _ — i 111111 rEa ° H 2 oz Q' d� o IN A axrNo.iA po�.�. _ aOP°sEccn— - I ix °aaic.T. 3 I./,I E�rerzc aEn Aax — - - ;sE xa RE s zNI zT, qxn n }rv'°' R = R� ImTMR�nExw. o m n wr M«no j E°a y EE o s�'„5' --� Rh E ono sn ERA =nC_08Ea UI ILI I LEGEND 'J , A f �i areoaocmzwxvsvzEvsre�xs / UTILNY oMPax IINI s ATAT A ax,xxF„E„sE..a E�rvEIIELG IEIII.NE ATMOS ENERGY ONGOR CHARTER % ° �"•"`�"'""'•`�"°""" ALL OTHER RncI TIES ein e79B85-eze°�� le,ne�,a,00 cam �aae,a L _ s A ,�• lI� Hove vow WATER GENERAL NOTES m ­ �\ is €$a • >aloa To m+srauc�?e ¢ / rlrvauo[s nu FmNas, TIr 0 zo � s ui FlaexroauaTe To selanreDnTaccasoa lnr axes �/ o e naFnxWovrv[Isax[aula[sno[ncx oosi 1. 8 _ 'DI E _ wnaTxsxoamaaeswae>urve z� I 11 w,eTeassxnu seauceD c�ewa AR EA�Ll -- oaE xcoxaER�onPxorvs,H,1.aDewcExErv.= =8 w u,owrEvawrsmusr I aoom xucoxcIRrIIR CATIR. oAl N� ,z lrvsu�mexroa 1TIRA Da— 111111 D,zom,r,rm i Woo�� • TYPICAL UTILITY LOCATION o" l �qv C TYPICAL LOT SERVICE DETAIL Ll— uxe m �a 3 p oa a' . / WATER METER TABLE � scR�cc mm , s xc,Ea ' I 3 " LLI Zo In KEY MAP o g z W a BENCHMARKS = < HIlT ER C-09 FORT WORTH TRANSPORTATION AND PUBLIC WORKS PIPE REPORT FOR: PROJECT NAME: Northpointe Ph. 10 PROJECT NUMBER: 103922 DOE NUMBER: 3922 WATER PIPE LAID SIZE TYPE OF PIPE LF Yes 8" PVC 4155 LF Yes 8" DIP 465 LF FIRE HYDRANTS: 10 VALVES (16" OR LARGER) 0 PIPE ABANDONED SIZE TYPE OF PIPE LF NA DENSITIES: Yes NEW SERVICES: 1" Copper 1950 LF 1.5" Copper 44 LF SEWER PIPE LAID SIZE TYPE OF PIPE LF Yes 8" PVC 3337 LF PIPE ABANDONED SIZE TYPE OF PIPE LF NA NA NA NA DENSITIES: Yes NEW SERVICES: 4" PVC 2,800 LF TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth • 1000 Throckmorton Street • Fort Worth, TX 76012-6311 (817) 392 - 7941 • Fax: (817) 392 - 7845 FORTWORTH. TRANSPORTATION AND PUBLIC WORKS July 18, 2024 Conaster Construction Tx,LP 5327 Wichita Street Fort Worth Tx 76119 RE: Acceptance Letter Project Name: Northpointe, Phase 10 Project Type: Water, Sewer, Paving, Drainage and Street Light City Project No.: 103922 To Whom It May Concern: On July 18, 2024 a final inspection was made on the subject project. There were no punch list items identified at that time. The final inspection indicates that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on July 18, 2024, which is the date of the final inspection and will extend of two (2) years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at 817- 392-7800. Sincerely, Ram Tiwan Ram Tiwari (Aug 16, 202410:10 CDT) Victor Tornero, Project Manager Cc: Dennis Rodgers, Inspector Donald Watson, Inspection Supervisor Oscar Aguillon, Senior Inspector Andrew Goodman, Program Manager Kimley Horn and Associates, Consultant Conaster Construction Tx, LP, Contractor Lennar Homes of Texas Land & Construction, Ltd, Developer File E-Mail: TPW_Acceptance@fortworthtexas.gov Rev. 08/20/19 AFFIDAVIT STATE OF TEXAS COLnVTY OF TARRANT Before me, the undersigned authority, a Notary Public in the state and county aforesaid, on this day personally appeared Brack Huggins, President ofConatser Management Group, Inc., general partner ofConatser Construction TX. known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said: "That all persons, firms, associations, corporations or other organizations fumishing lubor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth, has been paid in full: and That there art no claims pending for personal injury and/or property damagcs; On Contract described as. NOR"T`HPOINTE PH.10 WATER, SANITARY SEWER, DRAINAGE, PAYING, & STREET LIGHT IMPROVEMENTS CPA PR) #: 22-0131 CITY PROJECT #: 103922 CITY OF FORT WORTH STATE OF 'TEXAS CONATSER CONSTRUCTION TX. I ? Brack 1 [uggi�n, Subscribed and sworn to before me this 24TH day of July, 2024. 7 NouryPN"!3aMG#TC. Notary Public in Turrant County, Texas IDM 133H1477 • �X r a�Ya■ Ewa r CONSENT OF SURETY COMPANY TO FINAL PAYMENT Conforms with the American Institute of Archliecxe. AIA Docum m C707 PROJECT: Iname, sddiiesSlNUrlhPa+nlu, Ptlaso 10 OWNER ❑ ARCHITEC-` ❑ CONTRACTOR ❑ SURETY ❑ OTHER Bond No 02519113 Fort Worth TX TO (Owner) CITY OF FORT WORTH AND LENNAR HOMES OF � ARCHtTECT`S PROJECT NO: TEXAS LAND AND CONSTRUCTION, LTD CONTRACT aFOR* ar 1707 Market Mace Olvd., Suite i DO W � i�hei<a T4 DnakwW. wd $traal Ughl Im " s For Lr-ng Tx 75W3 CONTRACT DATE: CONTRACTOR: CON,ATSER CONSTRUCTION TX. L.P, Ire accordance with the provisions of the Cmtract briveert the Ch-mer and the Cont.Il'nctur as indicated above, the OWO kl a name and e416a0 71 1 LPFMY C4myanVl BERKLEY INSURANCE COMPANY 475 Steamboal Road Greenry O CT 06830 , SURETY COMPANY on torld of If1an kr.rt nsnr .r,d addr.aa of Cvnu.axo.} CONATSER CONSTRUCTION TX, L.P. 5327 Wi&49 SI. Fort +North TX 7611"035 .CONTRACTOR, hereby approves of the final paymetlt to the Contractor, and agrces that final payment to the Contractor shall not relieve the Surety Company of any of its obligations to owe rwWn wma errd address Qf QW~1 CITY OF FORT WORTH AND LENNAA HOMES OF TEXAS LAND AND CONSTRUCTION. LTC). 1707 FRat*et Place Blvd , sidle 100 Irvmp TIC 75063 , OWNER, as set forth i0 the said Surety Company's bond. IN WITNESS, W14F.REL7F, the Surety Company has hereunto set its haled this Attest: ti.►,� (5eal); 26th dAy Of February, 2024 BERKLEY INSURANCE CO APANY SumCompany r" r - Sigrsatu of Authorized Representative Robbi Morales Attarrilly-In-Fed Title - - NOTE- 7we form .s 10 " us" as a compen4n document io AIA DOCUMENT W05. CONTRACTOR'S AFflDAVIT OF FAYMENi OF DEBTS ANID CLA&AS, Current Ednlan ONE PAGE