Loading...
HomeMy WebLinkAboutContract 60590-A2AMENDMENT No . Two TO CITY SECRETARY CONTRACT No. 60590-A2 WHEREAS, the City of Fort Worth (CITY) and Quorum Architects, Inc, (ARCHITECT) made and entered into City Secretary Contract No. 60590, (the CONTRACT) which was authorized by M&C 23-0872 on the 11th day of December, 2023 in the amount of $ 504,000.00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $3,300.00 which was administratively authorized on May 21, 2024, WHEREAS, the CONTRACT involves architectural services for the following project: Holly WTP Fueling Facility, CPN 104085; and WHEREAS, it has become necessary to execute Amendment No. Two to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ARCHITECT, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional architectural services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by the Architect totals $22,000.00. (See Attached Funding Breakdown Sheet, Page -4-) 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to the Architect for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $529,300.00. OFFICIAL RECORD CITY SECRETARY 3. FT. WORTH, TX City of Fort Worth, Texas Holly WTP Fueling Station Prof Services Agreement Amendment Template 104085 Revision Date: 12/08/2023 Page 1 of 4 All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as designated Assistant City Manager. APPROVED: City of Fort Worth d�lallt� Dana Burghdoff (Au 2024 CDT) Dana Burghdoff, AICP Assistant City Manager DATE: Aug 8, 2024 A4 FORr°°Ba ATTEST: ;>°%!ao9PP Pvo=4 Qd o Jannette Goodall City Secretary of the date subscribed by the City's ARCHITECT Quorum Architects, Inc. 'Davy( G. D"Wan David G. Duman (Jul 25,202415:41 CDT) David G. Duman, AIA Principal DATE: Jul 25, 2024 APPROVAL RECOMMENDED: �a�a�— Marilyn Marvin Interim Director, Property Management Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. � \� OFFICIAL RECORD Nikita N. Watts CITY SECRETARY Senior Capital Projects Officer FT. WORTH, Tx City of Fort Worth, Texas Holly WTP Fueling Station Prof Services Agreement Amendment Template 104085 Revision Date: 12/08/2023 Page 2 of 4 APPROVED AS TO FORM AND LEGALITY: Douglas Black (Aug B, 202415:07 CDT) Douglas W. Black Sr. Assistant City Attorney City of Fort Worth, Texas Prof Services Agreement Amendment Template Revision Date: 12/08/2023 Page 3 of 4 M&C No.#: n/a M&C Date: n/a Holly WTP Fueling Station 104085 FUNDING BREAKDOWN SHEET City Secretary No. 60590 Fund Dept ID Account 53004 0600430 5330500 53004 0600430 5330500 53004 0600430 5330500 Total: City of Fort Worth, Texas Prof Services Agreement Amendment Template Revision Date: 12/08/2023 Page 4 of 4 Amendment No. Two Project CF1- CF2 - Bond ID Activity Reference 104085 005330 9999 104085 005330 9999 104085 005300 9999 Amount 504,000 3,300 22,000 $529,300 Holly WTP Fueling Station 104085 ouorum ARCHITECTURE - INTERIOR DESIGN July 3, 2024 Nikita (Niki) Watts Senior Capitol Projects Officer Property Management City of Fort Worth 401 W 13th Street Fort Worth, TX 76102 RE: Holly WTP Fueling Facility Amendment 02 Proposal, Quorum No: 23066 Niki, We respectfully submit this request for Amendment 02 for adding back a small building to house the equipment as requested by the City. You might remember our original proposal included an equipment building until the City directed us to remove it, along with a generator, reducing the proposal from $553,000 to EQUIPMENT BUILDING $504,000. That structure was „OP—GH O NEW e� CHAINLINK intended to be slightly larger and FENCE , r'—'—'—'—'-'—�1 FENCE EXISTING I POWER POLE I incorporated into the island. This I I I ! I EXISTING I CHAINLINK I one recently requested is slightly I _ I I FENCE smaller and simpler and is intended L•-----J to be located near the above ground L ' NEW CONCRETE I I fuel tanks. We will, however, need H PA RE CIVIL VING ' HIGH PAINTED , 4'DIA. X3W additional M P and structural I SBOLLARD o I SPPAA CED 48' z O.C. PER a •_ NFPA•30A. TYP. I services in addition to architectural. N= r , a I ////''' T'U S SEISON I We will also need additional Za f-p/ RERIES MOTEFILL I UNLEADED , BOMO EF 12,00D GAL specifications and will need to I b (I.I.L.2DBB) Q' complete and submit IECC forms for MGRRISDN ISTING I it since it will be conditioned. VING �•� REMOT�EIE$ UNLEADED REMOTFILL I TW 12.ODO GAL. I SOX -TYP. (U.L. 2085) I 4 I Compensation for Amendment 02 as w EL TANK described herein is proposed to be a NT STACK DIESEL m t2.000 GAL. lump sum fee of $22,000. As a WCONCRETE (U L. 2085 x reminder, Amendment 01 was for additional surveying services and was approved at $3300: Sincerely, Q.aorum Architects, Inc. 4>r•1� David G. Duman, AIA Texas registration #14305 Quorum Architects, Inc 825 W Vickery Blvd • Su)te 100 • Fort Worth, TX 76104 • 817.738 8095 • wrrw.garch co—