HomeMy WebLinkAboutContract 55969-A3CSC No. 55969-A3
AMENDMENT No.3
TO CITY SECRETARY CONTRACT No. 55969
WHEREAS, the City of Fort Worth (CITY) and Neel -Shaffer, Inc.,
(ENGINEER) made and entered into City Secretary Contract No. 55969, (the
CONTRACT) which was authorized by M&C 21-0406 on the 22nd day of Tune,
2021 in the amount of $ 285,711.00; and
WHEREAS, the CONTRACT was subsequently revised by: Amendment Number
1 in the amount of $12,110.59 which was administratively authorized on
July 8th, 2022; and
WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 2
in the amount of $38,252.41 which was administratively authorized on May
15, 2023; and
WHEREAS, the CONTRACT involves engineering services for the
following project:
2022 Bond Year 1, Conract 2, CPN 102927; and
WHEREAS, it has become necessary to execute Amendment No. 3 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement,
which amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and
incorporated herein. The cost to City for the additional design services
to be performed by Engineer totals $15,000.00. (See Attached Funding
Breakdown Sheet, Page -4-)
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $351,074.00.
OFFICIAL RECORD
3. CITY SECRETARY
FT. WORTH, TX
All other provisions of the Contract, which are not expressly
City of Fort Worth, Texas 2022 Bond Year 1, Contract 2
Prof Services Agreement Amendment Template CPN 102927
Revision Date: November 23, 2021
Page 1 of 4
amended herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as
designated Assistant City Manager.
APPROVED:
City of Fort Worth
C>91�v
Jesica McEachern
Assistant City Manager
DATE: Aug 25, 2024
APPROVAL RECOMMENDED:
of the date subscribed by the City's
ENGINEER
Neel -Schaffer, in .
r
im Amick
Senior Engineering Manager
DATE: � 14
Laure,Lau,e, P, , 202420:19 CDT)
Lauren Prieur
Director, Transportation and Public Works Department
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
Greg Robbins
Program Manager
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas 2022 Bond Year 1, Contract 2
Prof Services Agreement Amendment Template CPN 10 M7
Revision Date: November 23, 2021
Page 2 of 4
APPROVED AS TO FORM AND LEGALITY: M&C: N/A
fj� Date :
Douglas Black (Aug 14, 202414:00 CDT)
Douglas W. Black
Sr. Assistant City Attorney
pFORT*
� jN�
ATTEST: �e
P� %
oo
aannq' CxA54b4
Jannette Goodall
City Secretary
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas 2022 Bond Year 1, Contract 2
Prof Services Agreement Amendment Template CPN 102927
Revision Date: November 23, 2021
Page 3 of 4
FUNDING BREAKDOWN SHEET
City Secretary No. 55969
Amendment No. 3
Department Fund -Account -Center Amount
Stormwater 52002 0200431 5330500 102927 002830 $15,000.00
Total: $15,000.00
City of Fort Worth, Texas 2022 Bond Year 1, Contract 2
Prof Services Agreement Amendment Template CPN 102927
Revision Date: November 23, 2021
Page 4 of 4
June 6, 2024
Mr. Greg Robbins, PE, PMP
Senior Project Manager
City of Fort Worth — TPW1Capitai Delivery Division
200 Texas Street
Fort Worth, Texas 76102
Ln
Reference: Third Additional Services for 2022 Bond Year 1 Contract 2, CPN 102927 s
U
L
Dear Greg: a
J
Neel -Schaffer, Inc. offers additional Professional Engineering Services for this project. These
additional services include adding a storm drain plan/profile sheet and calculations for the Thrall
Street at Avenue B intersection for the three new storm drain laterals from the school uncovered M
by the contractor.
cu
These services occurred in several distinct steps. First, the contractor uncovered the two inlet
lead lines coming east to Thrall from the school parking lot. A plan/profile sheet with
calculations for three storm drain segments was created to address the two inlet lead lines. E
Second, the sheet was revised to add a junction box and realign the storm drains. Next, the
contractor uncovered a roof drain pipe. The third step included revising the plan/profile sheet to
connect the roof drain by creating horizontal and vertical geometry for it along with calculations.
These alignments and calculations were then adjusted some more to try to better provide a
demarcation for publicly maintained storm drains and privately (school) maintained storm drains. 0
L
The fees for these tasks were approximately:
• Initial two inlets and three pipe segments - $5,200
• Revisions to realign storm drains and add junction box - $2,700
• Addition of roof drain - $4,200 Q
• Demarcation revisions - $2,900 —
L
v
Neel -Schaffer, Inc. proposes to provide the additional drainage services for $15,000. See
attached Level of Effort for backup. A contract amendment will be required to fund this. The°
table on the following page summarizes the contract and amendments. All additional services
will be performed in accordance with the original contract dated July 7, 2021.
P:817.870.2422 I F: 817.870.2489
O:Vobs\16474 - FW 2022 Year 1 Contract 2\Admin\Contract\Am #3 - Drainage\Amendment 3 Letter rev Ldoc 515 Houston Street, Suite 651 O
Fort Worth, TX 76102
www.neel-schaffer.com
Mr. Greg Robbins, PE, PMP
June 6, 2024
Page 2
Summary Table
Water
Sewer
T/PW
Total
Original Contract Amount
$108,593
$16,314
$160,804
$285,711
Amendment No. 1
$3,678
$8,432.59
$12,110.59
Amendment No. 2
$8,386
$384
$29,482.41
$38,252.41
Amendment No. 3
$15.000
$15,000
Contract Total Amount
$120,657
$16,698
$213,719
$351,074
If you have any questions or we may be of further service, please call me at 817/909-2807.
Sincerely,
NEEL-SCHAFFER, INC.
James P. Amick, P.E.
Engineer Manager
TBPE Firm Reg. No. F-2697
Level of Effort Spreadsheet
TASK/HOUR BREAKDOWN
Transportation & Public Works Department Design Services for
2022 BOND YEAR 1 CONTRACT 2 - Amendment #3
City Project No. 102927
Labor
(hours) Expense
Task No.
Task Description
Principal
Project
CADD Administrative Total Labor Subconsultant
Total Expense %Complete
Manager
Cost Travel
Reproduction
Cost
Rate
$290
$230
$175 $100 MWBE I Non-MWBE
Pro'ect Management
0.5
2
0
2
$805
$0
$0
$0
$9
$9
2
$460
$5
$5
1 QAIQC
2
Invoice
0.5
2
$4
$345
$4
Design
12
9.5
48.5 0
$14,153
$0
$0
$0
$33
$33
3
Drainage Calculations for two inlets and
associated tVee storm dram,'pepments
Drainage Calculations I revise the three
2
0.5
1
$870
$2
$2
4
storm drain segments for the two inlets by
adding a junction box and realigning the
storm drains
1
0.5
1
$580
$2
$2
5
Drainage Calculations to add the roof drain
storm drain
1
0.5
1
$580
$2
$2
Drainage Calculations revisions to provide
6
better demarcation between publicly and
privately maintained storm drains
1
0.5
1
$580
$2
$2
7
Drainage Plan/Profile for two inlets and
associated three storm drain segments
3
0.5
17.5
$4,048
$5
$5
Drainage Plan/Profile to revise the three
8
storm drain segments for the two inlets by
adding a junction box and realigning the
storm drains
1
2
7
$1,975
$5
$5
9
Drainage Plan/Profile revisions to add the
roof drain storm drain
2
3
12
$3,370
$5
Drainage Plan/Profile revisions to provide
10
better demarcation between publicly and
J$42
privately maintained storm drains
1
2
8
$2,150
$10
Totalsi
12.51
11.51
48.51 2
0%
$14,958 $0 $0 $0 $42
Project Summary
Total Hours
74.5
Total Labor
$14,958
Total Expense
$42
MBE/SBE Subconsultant
$0
Non-MBE/SBE Subconsultant
$0
5% Sub Markup
$0
MBE/SBE Participation
0.0%
Total Project Cost
$15,000
City of Fort Worth, Texas
Attachment B - Level of Effort Supplement
PMO Official Release Date: 8.09.2012
1of1
102927-EPAM-2022 Bond Year 1 Contract 2 —
Design Amendment #3
Final Audit Report 2024-08-05
Created: 2024-07-30
By: Andrea Munoz (Andrea. M unoz@fortworthtexas.gov)
Status: Signed
Transaction ID: CBJCHBCAABAA_dHWSIMOOTCmNTZjeUxHcBRtbkN2c3lG
"102927-EPAM-2022 Bond Year 1 Contract 2 — Design Amendm
ent #3" History
Document created by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov)
2024-07-30 - 3:11:26 AM GMT- IP address: 204.10.90.100
Document emailed to Filogonio Munoz (Filogonio.Munoz@fortworthtexas.gov) for filling
2024-07-30 - 1:55:19 PM GMT
Document emailed to Gregory Robbins (Gregory.Robbins@fortworthtexas.gov) for signature
2024-07-30 - 1:55:19 PM GMT
Andrea Munoz (Andrea.Munoz@fortworthtexas.gov) added alternate form filler Jaylyn
Harrelson (Jaylyn.Harrelson@fortworthtexas.gov). The original form filler Filogonio Munoz
(Filogonio.Munoz@fortworthtexas.gov) can still fill the form.
2024-07-30 - 1:56:27 PM GMT- IP address: 204.10.90.100
Document emailed to Jaylyn Harrelson (Jaylyn.Harrelson@fortworthtexas.gov) for filling
2024-07-30 - 1:56:27 PM GMT
Email viewed by Jaylyn Harrelson (Jaylyn.Harrelson@fortworthtexas.gov)
2024-07-30 - 8:14:10 PM GMT- IP address: 204.10.90.100
%Li Form filled by Jaylyn Harrelson (Jaylyn.Harrelson@fortworthtexas.gov)
Form filling Date: 2024-07-30 - 9:06:22 PM GMT - Time Source: server- IP address: 204.10.90.100
Email viewed by Gregory Robbins (Gregory.Robbins@fortworthtexas.gov)
2024-08-05 - 12:32:10 PM GMT- IP address: 204.10.90.100
=` Document e-signed by Gregory Robbins (Gregory.Robbins@fortworthtexas.gov)
Signature Date: 2024-08-05 - 12:33:01 PM GMT - Time Source: server- IP address: 204.10.90.100
FORTW❑RTHg I P°He1 "y
Adobe
Acrobat Sign
Agreement completed.
2024-08-05 - 12:33:01 PM GMT
FORTW❑RTHg I Paw m"y
Adobe
Acrobat Sign
FORT WORTH
Routing and Transmittal Slip
Transvortation & Public Works
Department
DOCUMENT TITLE: 2022 Bond Year 1 Contract 2 — Design Amendment #3
M&C: 21-0406 CPN: 102927 CSO: 55969 DOC#:
Date:
To:
Name
Department Initials Date Out
1.
Filogonio Munoz
TPW - initial 74' Ju[ 30, 2024
2.
Jim Amick
f�
Consultant - signature '�Lj / / 30r -� 24
3.
Greg Robbins
TPW - signature - Aug 5, 2024
4.
Stephen Nichols
SW - initial AhhA„l via Agile rn• t im
5.
Mary Hanna
TPW - initial
6.
Patricia Wadsack
TPW - initial
7.
Lauren Prieur
TPW - signature W— Aug 13, 2024
8.
Doug Black
Legal - signature 7V8 Aug 14, 2024
9.
Jesica McEachern
CMO - signatureAug 25, 2024
10.
Jannette Goodall
CSO - Signature Aug 26, 2024
11.
TPW Contracts
TPW
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City
Departments requesting City Manager's
signature for approval MUST BE ROUTED TO THE APPROPRIATE
ACM for approval first. Once the ACM
has signed the routing slip, David will review and take the next steps.
NEEDS TO BE NOTARIZED: []YES ®No
RUSH: ❑YES ®No SAME DAY: ❑YES ®No NEXT DAY: ❑YES ®No
ROUTING TO CSO: ®YES []No
Action Required: ❑ Attach Signature, Initial and Notary Tabs
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
Return To: TPWContracts(aFortWorthTexas.cov at ext. 7233 for pick up when completed.
Thank you!