HomeMy WebLinkAboutContract 61894CSC No. 61894
THE CITY OF FORT WORTH, TEXAS
PSB MUNICIPAL BUILDING ROOF
REPLACEMENT
PROJECT NO. PMD2024-02
PROJECT NO. 104428
FORTWORTH.
MATTIE PARKER DAVID COOKE
MAYOR CITY MANAGER
Marilyn Marvin
Interim Director, Property Management Department
William F. Rumuly
Director, Municipal Court Services Director
BEAM Professionals
Cowboys Roofing, LLC
OFFICIAL RECORD
March 2024 CITY SECRETARY
FT. WORTH, TX
Instruction to Offerors Page 1 of 37
PSB Municipal Building Roof Replacement (March 2024)
M&C Review
Page 1 of 3
Official site of the City of Fort Worth, Texas
A CITY COUNCIL AGEND F�R�w
Create New From This M&C
DATE: 6/25/2024 REFERENCE **M&C 24- LOG NAME:
NO.: 0584
CODE: C TYPE: CONSENT PUBLIC
HEARING:
21MUNICIPAL COURT ROOF
REPLACEMENT GENERAL
CONTRACTOR
NO
SUBJECT: (CD 9) Authorize Execution of a Contract for Construction Services with Cowboys Roofing,
LLC dba DSA Contractors in an Amount of $685,717.00, for the Municipal Court
Building Roof Replacement Project
IC7XdS]LT, ILyi14►117_1% 111101►F
It is recommended that the City Council authorize execution of a contract for construction services with
Cowboys Roofing, LLC dba DSA Contractors in an amount of $685,717.00, for the Municipal Court
Building Roof Replacement project (City Project No. 104428).
DISCUSSION:
The Municipal Court Building (Public Safety Building - PSB) was built in 1938. There are three roofs
that are all low slope Bitumen Roof Membrane systems that have exceeded the 20-year life
expectancy. The upper and lower roofs on the building are in poor condition, exhibiting leakage to the
interior spaces in several areas. Given the presence of numerous soft spots, it is likely that substantial
moisture is present below the roof membrane. A Facilities Conditions Assessment was done on this
facility on October 3, 2023 by Komatsu Architecture. The report confirmed that the roof was in poor
condition and recommended a complete replacement.
On March 14 and March 21, 2024 in the Fort Worth Star -Telegram, the City published notice of a
Request for Competitive Sealed Proposals and on April 11, 2024 received three (3) proposals.
All three respondents provided the required Post Proposal -Pre -Award Submittals and were evaluated
for consideration.
The proposals were reviewed by members of the Facilities Maintenance, Office of Business Diversity
and the Architectural Services Department and were evaluated for completeness, compliance with
the MWBE requirements and references were checked. CS Advantage did not meet the MWBE
compliance section and was disqualified. Based on its ranking, the selection team met with Cowboys
Roofing and verified scope and schedule. Based on this review and interview, the selection team
recommends award of the construction contract to Cowboys Roofing, LLC dba DSA Contractors.
Past
Proposed
References/
Project
work
MWBE Total
Price
Experience
Schedule
the
Compliance Score
City
(Cowboys
60
14
9
9
Responsive 92
Roofing
Trumble
Construction
LLC. DBA
51
19
7
9
Responsive 86
RBT
Roofing
http://apps.cfwnet.org/council_packet/mc_review.asp?ID=32290&councildate=6/25/2024 6/26/2024
M&C Review Page 2 of 3
The overall project costs are expected to be as described in the table below:
PROJECT COST TOTALS
Architectural & Engineering Design $99,000.00
Construction Contract (Including Owner's Construction Allowance) 11 $685,717.001
(Project Administration Cost: Project Management, Contingency, $215,283.00
etc.
PROJECT TOTAL $1,000,000.00
Permit Fees: In accordance with the City Code of Ordinances, Part II, Chapter 7-1 Fort Worth
Building Administrative Code, Section 109.2.1, Exception 2; "Work by non -City personnel on property
under the control of the City of Fort Worth shall be exempt from the permit fees only if the work is for
action under a contract that will be or has been approved by City Council with notes in the contract
packages stating the fee is waived."
Funding: Funding is budgeted in the General Capital Projects Fund for the Property Management
Department for the purpose of funding the FY23 Roof Replace/Coatings project, as appropriated.
Business Equity Division: Cowboys Roofing, LLC dba DSA Contractors is in compliance with the
City's Business Equity Ordinance by committing to 50.79\% MWBE participation on this project. The
City's MWBE goal on this project is 5\%.
The Municipal Courts Building is located in COUNCIL DISTRICT 9.
FISCAL INFORMATION/CERTIFICATION:
The Director of Finance certifies that funds are available in the current capital budget, as previously
appropriated, in the General Capital Projects Fund for the FY23 Roof Replace/Coatings project to
support the approval of the above recommendation and execution of the contract. Prior to any
expenditure being incurred, the Property Management Department has the responsibility to validate
the availability of funds.
K01
Fund Department Account Project
ID ID
FROM
Fund Department Account Project
ID ID
Submitted for Citv Manager's Office bv:
Oriainatina Department Head:
Additional Information Contact:
ATTACHMENTS
Program Activity Budget Reference #
Year (Chartfield 2)
Program Activity Budget Reference #
Year (Chartfield 2)
Dana Burghdoff (8018)
Marilyn Marvin (7708)
Brian Glass (8088)
Nikita Watts (2028)
21 MUNICIPAL COURT ROOF REPLACEMENT GENERAL CONTRACTOR funds
Amount
Amount
http://apps.cfwnet.org/council_packet/mc review.asp?ID=32290&councildate=6/25/2024 6/26/2024
M&C Review
Page 3 of 3
availabilitv.pdf (CFW Internal)
21 MUNICIPAL COURT ROOF REPLACEMENT GENERAL CONTRACTOR.docx (CFW Internal)
21 PSB ROOF REPLACEMENT FID TABLE.xlsx (CFW Internal)
Compliance Memo 2024-02 Cowbovs 5062024.NS.pdf (CFW Internal)
Form 1295 Certificate 101191430.pdf (CFW Internal)
SAM Cowbovs Roofinq LLC dba DSA Contracts.pdf (CFW Internal)
http://apps.cfwnet.org/council_packet/mc_review.asp?ID=32290&councildate=6/25/2024 6/26/2024
PROJECT:
OWNER:
CONSULTANT:
BID LOCATION:
BID DATE & TIME:
BID TABULATION
NO BIDDER
1 Cowboys Roofing, LLC
2 Patuxent Roofing and Contracting LLC
3 Trumble Construction LLC. Dba RBT Roofing
4
5
6
7
8
9
PSB MUNICIPAL BUILDING ROOF REPLACEMENT Project No. 2024
CFW Municipal Courts
BEAM Professionals
Fort Worth City Hall
Thursday, April 11, 2024 at 2:00 p.m.
OWNER'S
BASE PROPOSAL
CONTINGENCY
PLUS OWNERS
BASE BID
DAYS
7.5%
ADDENDUM #1
CONTINGENCY
$637,875.72
120
$47,840.68
YES
$685,716.40
$763,506.00
30-45
$571263.00
YES
$820,769.00
$755,946.00
56
$56,696.00
YES
$812,642.00
X \Facilities ManagementlAmih_Saina \38 Municipal Court\PSB Assessment\300 Construction\301 Contracts\Procurement\Bid Tabu Municipal Roof Replacement_ Bid Tab_04 1124
NOTICE TO OFFERORS
Proposals for the PSB Municipal Building Roof Replacement located at 200 Texas Street Fort Worth,
TX 76102 in Fort Worth Texas will be received thru the Bonfire Website
httiDs://fortworthtexas.bonfirehub.com/login until 2:00 P.M on Thursday, April 11, 2024, and will be opened
and publicly read aloud approximately thirty minutes later in the Council Chambers.
A Pre -Proposal Conference will be held at 10:00 A.M., Thursday March 21, 2024 at Property Management
Offices.
The last day for questions from prospective Offerors is at 5:00 PM on Friday, March 29, 2024.
After evaluating the Proposals submitted, the City shall select the Offeror that offers the Best Value to the
City and enter into negotiations with that Offeror. The City may discuss with the selected Offeror options for
a scope or time modification and any price change associated with such modification.
The offers will be valid for ONE HUNDRED TWENTY (120) calendar days.
The Offeror will add a 7.5% Owner's Contingency Allowance on a separate line item on the Proposal
form and only the Owner will approve the use of this allowance during construction. Any Allowance
remaining at the end of construction will be retained by the City of Fort Worth. This Allowance is not to be
included in the Base Proposal and will not be used in the Best Value selection process.
Refer to the evaluation matrix for the selection of the Best Value Offeror in the Instructions to Offerors.
Refer to the Request for Proposal documents for the Business Equity Provision Information. The Business
Equity participation will be evaluated in awarding this Contract. The Business Equity goal is 5%. The
applicable documents must be submitted by all offerors wishing to continue in the bid evaluation process
on the third City business day after bid opening, exclusive of bid opening date, to the City location
specified in the bid. Offerors shall obtain a receipt from the appropriate department as evidence that the
City received the documentation. Failure to submit the required business equity documentation will
result in the bid being considered Non -Responsive.
Also, Refer to Section 2. BUSINESS EQUITY PROVISIONS FOR BEST VALUE PROPOSAL in the
Instructions to Offerors.
Offerors must submit a bid bond with their proposal. Offeror(s) to whom an award of contract(s) is made
will be required to provide Payment and Performance Bonds and provide Contractors General Liability and
Statutory Workers Compensation Coverage.
If you intend to submit a Proposal, it is requested you inform the Project Manager or
Architect/Engineer who can then inform the interested subcontractors.
General Contractors and Suppliers may make copies of the Instructions to Offerors, General Conditions,
Drawings, and Specifications through their printer. The construction documents are not available at the City but
may be viewed and printed on-line by cutting and pasting the following link into your browser:
htti3s://fortworthtexas.bonfirehub.com/loqin
Contact the Project Manager, Juan Serrano, at (817) 392-7836 or email ivan.serrano(a-)fortworthtexas.gov for
assistance. For additional information contact the Vice President at Beam Professionals, Harold Stephens at
(713) 805-2652 or email harold.stei)hens(a�beamprof.com
Advertisement: March 14, 2024
March 21, 2024
Instruction to Offerors Page 2 of 37
PSB Municipal Building Roof Replacement (March 2024)
TABLE OF CONTENTS
• PROJECT COVER PAGE
• M&C
• BID TAB
• NOTICE TO OFFERORS
• TABLE OF CONTENTS
• INSTRUCTIONS TO OFFERORS
• PROPOSALFORM
• M/WBE — DVIN FORMS (Separate Attachments)
• CONFLICT OF INTEREST AFFIDAVIT
• CONFLICT OF INTEREST QUESTIONAIRE (CIQ)
• CONFLICT DISCLOSURE STATEMENT (CIS)
• TEXAS SALES AND USE TAX EXEMPTION CERTIFICATE
• 2013 PREVAILING WAGE RATES
• WEATHER TABLE
• GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION (Separate Attachment)
• CONSTRUCTION CONTRACT
• PAYMENT BOND
• PERFORMANCE BOND
• CERTIFICATE OF INSURANCE
• CONTRACTOR COMPLIANCE WITH WORKERS' COMPENSATION LAW
• PROJECT SIGN
• GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION
Instruction to Offerors Page 3 of 37
PSB Municipal Building Roof Replacement (March 2024)
INSTRUCTIONS TO OFFERORS
PROPOSAL REQUIREMENTS: The following requirements shall be used in the preparation of the
response to this Request for Sealed Proposals:
• Use the Proposal Form provided below.
• Entries on the Proposal Form may be handwritten or typed.
• Write in contract duration if not specified.
• Acknowledge all addenda on the Proposal Form.
• Have a Principal sign the Proposal. If the Offeror is a corporation, the president or a vice-
president must sign the Proposal. If the Offeror is a partnership, then the person/entity who is
the managing/general partner must sign the proposal.
• Complete and submit the Conflict of Interest Affidavit form. (Also submit associated Form CIQ
and Form CIS if required.)
• Include cashier's check or an acceptable bidder's bond written by a corporate surety payable
to the City of Fort Worth, in an amount of not less than five (5%) per cent of the total of the bid
submitted.
• In order for a surety to be acceptable to the City, the surety must (1) hold a certificate of
authority from the United States Secretary of the Treasury to qualify as a surety on obligations
permitted or required under federal law; or (2) have obtained reinsurance for any liability in
excess of $100,000 from a reinsurer that is authorized and admitted as a reinsurer in the state
of Texas and is the holder of a certificate of authority from the United States Secretary of the
Treasury to qualify as a surety on obligations permitted or required under federal law.
Satisfactory proof of any such reinsurance shall be provided to the City upon request. The
City, in its sole discretion, will determine the adequacy of the proof required herein.
1A. SELECTION OF CONTRACTOR:
The City shall select the Offeror that offers the best value based upon the following criteria and on
its ranking evaluation.
In determining the Best Value Offeror, the City will consider:
1. Proposed Price (60 points) — The lowest priced responsive Proposal will receive 60 points
for this rating criterion. Higher priced proposals will receive proportionally lower scores.
When compared to the lowest price, the higher priced proposal will have its score reduced
by one percent of the available points for every percent it is higher than the lowest price.
The score will be rounded to the nearest whole number.
2. References/Experience (20 points) - References and experience of the Offeror as
demonstrated by listing past and current projects including references with names and
current telephone numbers; and, list of subcontractors if applicable.
Proposed project schedule (10 points) — Proposals should include a general schedule
showing the amount of time necessary to complete the project, critical path, major phases
of the work, and major impacts on the project. This is to demonstrate an understanding of
the project and the most efficient justifiable time. The best schedule demonstrating the
Instruction to Offerors Page 4 of 37
PSB Municipal Building Roof Replacement (March 2024)
most complete understanding of the project will receive 10 points. All others will be graded
accordingly.
4 Past Work in the City of Fort Worth (10 points) — Points shall be awarded for experience
working on similar projects within the city limits of the City of Fort Worth. Contractors with
no experience in the City of Fort Worth will receive 5 points. Contractors demonstrating
strong experience will receive more than 5 points. Contractors with poor examples may
receive less than 5 points.
5 If the score for any individual rating criteria is rated as zero, this will result in the overall
score being zero regardless of how many points could have been earned in the other
categories.
6 Compliance with the Business Equity (M/WBE) participation and ordinance is Responsive
or Non -Responsive. Offeror shall acknowledge and commit to meeting the Business
Equity goal and present the applicable documents on the third City business day after bid
opening, exclusive of bid opening date, to the City location specified in the bid. Offerors
shall obtain a receipt from the appropriate department as evidence that the City received
the documentation. Failure to submit the applicable documents may render an Offeror
non -responsive and cause the Proposal to be rejected.
After ranking the responses to the Request for Proposal (RFP), the City shall first attempt to
negotiate a contract with the selected Offeror. The City and its architect may discuss with the
selected Offeror options for a scope or time modification and any price change associated with
the modification.
If the City is unable to negotiate a contract with the selected Offeror, the City shall, formally and in
writing, end negotiations with that Offeror and proceed to the next Offeror in the order of the
selection ranking until a contract is reached or all proposals are rejected.
2. BUSINESS EQUITY PROVISIONS
A. All proposers shall note that the Business Equity Ordinance No. 25165-10-2021 (codified in
Chapter 20, Article X of the Fort Worth Code of Ordinances, as amended), and any relevant policy
or guidance documents, was adopted to ensure the full and equitable participation of certified
Minority — and Women -owned business enterprises (M/WBEs), (collectively, "Business Equity
Firms") in City contracts for the procurement of goods and services where a contract's total dollar
value is greater than $100,000.00 as detailed below.
The Business Equity Goal is 5%0.
B. If a Proposer is certified as a Business Equity Firm, such Proposer can count its self -performance
services towards meeting the Business Equity Goal(s) for the assigned NAICS commodity codes
on their MBE or WBE certification. If a Proposer will not self -perform all of the work, it will be
required to provide subcontracting opportunities with certified Business Equity Firms to meet the
stated goal(s).
C. Proposers must obtain a listing of certified Business Equity Firms from the City of Fort Worth's
Department of Diversity and Inclusion (DVIN). The request for listings form can be found on the
City's website at httiDs://www.fortworthtexas.aov/departments/diversity-inclusion/business-equity,
or email DVIN BEOffice(a)fortworthtexas.aov. The selected offeror acknowledges it will present
Business Equity Firms currently certified by the North Central Texas Regional Certification Agency
(NCTRCA) or Dallas/Fort Worth Minority Supplier Development Council (D/FW MSDC) and the
Women's Business Council Southwest (WBCS) and accepted by the City of Fort Worth in order for
the participation to be counted towards the established goal(s).
Instruction to Offerors Page 5 of 37
PSB Municipal Building Roof Replacement (March 2024)
D. The firms must be located in the Marketplace, or meet the requirements of the City's Significant
Business Presence which means a Person (1) which has its principal place of business located
inside the Marketplace; (2) which has its principal place of business located outside the
Marketplace but has been verified to be in existence for a minimum of 24 months and from which
at least 20% of the business's workforce is based in the Marketplace; or (3) which has cumulative
business receipts greater than $1,000,000 for work done in the Marketplace since January 1, 2013.
E. Proposers shall submit with their proposals a preliminary Business Equity Utilization Plan ("Plan")
to address how it will comply with the Business Equity Goal(s). At a minimum, the preliminary Plan
must certify that the Proposer will comply with the requirements and present evidence of the
Proposer's past business diversity procurement practices.
Failure to submit a preliminary Plan may render a Proposer non -responsive and the
Proposal may be rejected.
F. Business Equity Firms must be certified at the time the proposal is submitted, in order for the
participation to be counted towards the established goal.
G. Short-listed firms are required to submit the final Utilization Plan detailing efforts to comply with the
Business Equity Goal(s).
For additional information contact the DVIN at (817) 392-2674 or send email to
DVIN BEOffice(d)fortworthtexas.gov.
INSTRUCTIONS TO BIDDERS ABOUT THE BUSINESS EQUITY GOAL
It is the policy of the City of Fort Worth to ensure the full and equitable utilization of Business Equity
Firms when appropriate, in the procurement of all goods and services. When a Business Equity Goal
is established for a bid, it means that the City of Fort Worth believes that there are Business Equity
Firms available that can provide goods or services requested by the bid.
The Business Equity Goal for Project number 2024-02 is 5%0. This means that the City
believes that there are available Business Equity Firms that can provide goods or services
required by this bid and therefore, 5% of the Bidder's awarded amount must be spent with a
Business Equity Firm. All requirements and regulations stated in the City's current Business
Eauitv Ordinance #25165-10-2021 apply to this bid.
Because a Business Equity Goal has been established for this bid, in order for your bid to be
considered, a Bidder must satisfv one (1) of the conditions below.
A. Commit to Meet or Exceed the Business Equity Goal
Hire Business Equity Firm(s) to provide goods or services and spend at least the goal amount
with the Business Equity Firm(s).
Step 1: Obtain a listing of Business Equity Firms by completing the "Request for Listing
of Certified Firms Form" located at the City of Fort Worth's Business Equity
Division website.
Step 2: Request bids from Business Equity Firms to provide goods or services at least 10
calendar days before bid opening.
Step 3: Submit the following two (2) forms:
a. Utilization Plan
b. Letter(s) of Intent
B. Prove a Good Faith Effort
Show attempt to hire Business Equity Firms to meet or exceed the goal, but was unsuccessful.
This can occur in two (2) ways:
Instruction to Offerors Page 6 of 37
PSB Municipal Building Roof Replacement (March 2024)
1) Bidder proposes a smaller Goal
Step 1: Obtain a listing of Business Equity Firms by completing the "Request for Listing of
Certified Firms Form" located at the City of Fort Worth's Business Equity Division
website.
Step 2: Request bids from Business Equity Firms to provide goods or services at least 10
calendar days before bid opening.
Step 3: Submit the following three (3) forms:
a. Utilization Plan
b. Letter(s) of Intent
c. Good Faith Effort
2) Bidder proposes a 0% Goal
Step 1: Obtain a listing of Business Equity Firms by completing the "Request for Listing of
Certified Firms Form" located at the City of Fort Worth's Business Equity Division
website.
Step 2: Request bids from Business Equity Firms to provide goods or services at least 10
calendar days before bid opening.
Step 3: If unsuccessful, submit Good Faith Effort Form. Please see Ordinance U0-370 (q)
page for requirements of an acceptable Good Faith Effort.
C. Prove that the Bidder Can Perform the Service and Provide all Materials on the Project as
the Prime Contractor
Bidder must show that the Bidder is providing all of the goods and services through their own
company and that there are no goods or services provided by a third party or an affiliate. Bidder
will not purchase any supplies or inventory from a third party.
Step 1: Must submit a Prime Contract Waiver Form
D. Create a Joint Venture with a Business Equity Firm
At least one or both of the firms must be a Business Equity Firm
Step 1: Must submit a Joint Venture Form
Forms can be obtained on the Proiect Resources website under section 60 - MWBE.
VIOLATIONS AND SANCTIONS
1. Failure to comply with the City's Business Equity Ordinance will result in the bid being
considered "Non -Responsive."
2. Failure to submit the required Business Equity forms and documentation will result in the bid being
considered non -responsive and a "written warning" letter that may impact the Offeror's evaluation
scoring on future City bid opportunities for up to 12 months, refer to Ordinance �_20-373 on
VIOLATIONS AND SANCTIONS for continued offenses or failures to comply.
If you have any questions, contact Department of Diversity & Inclusion, Business Equity
Division
Email: DVIN BE(abfortworthtexas.ciov I Phone: 817-392-2674
DEFINITIONS
Business Equity Firm means an Independent Firm that is a Certified minority -and/or
women -owned business enterprise (M/WBE) with a Significant Business Presence in the
City's Marketplace.
Business Equity Goal means a calculation prepared by the DVIN-BE that includes all the
following factors: the detailed cost estimate of the work to be performed, or goods
purchased; the 6-county Marketplace; the availability of Business Equity Firms and non -
Business Equity Firms in the Marketplace determined on a Contract -by -Contract basis;
and the subcontracting/supplier opportunities of each project.
Instruction to Offerors Page 7 of 37
PSB Municipal Building Roof Replacement (March 2024)
Certified means those firms identified by the North American Industry Classification
System (NAICS) that have been determined to be a bona fide MBE or WBE by the North
Central Texas Regional Certification Agency (NCTRCA), the Dallas/Fort Worth Minority
Supplier Development Council (DFW /MSDC), Women's Business Council -SW (WBCS),
Texas Department of Transportation (TxDOT) or another certifying agency that the DVIN-
BE may deem appropriate and accepted by the City of Fort Worth.
DVIN-BE means the City's Department of Diversity and Inclusion — Business Equity
Division
Good Faith Efforts means the actions undertaken by a Contractor and approved by DVIN-
BE as described in the Business Equity Ordinance W0-370 (q).
Joint Venture means a business entity formed by two or more independent Persons for
the purpose of pursuing a common objective, such as a prime contract. The resulting
business entity has additional resources and capacity, enhancing its ability to compete for
larger awards. A joint venture is generally characterized by shared ownership, shared
returns and risks, and shared governance. In a joint venture, the prime managing partner
holds 51 % or more interest in the business. Partner(s) hold less than 51 % interest but in
most cases, not less than 20%.
Marketplace means the geographic area as defined by the City's most current Disparity
Study (i.e., Tarrant, Dallas, Denton, Johnson, Parker and Wise counties).
Responsive means that a Person is compliant with the requirements of the Business
Equity Ordinance.
Significant Business Presence means a Person (1) which has its principal place of
business located inside the Marketplace; (2) which has its principal place of business
located outside the Marketplace but has been verified to be in existence for a minimum of
24 months and from which at least 20% of the business's workforce is based in the
Marketplace; or (3) which has cumulative business receipts greater than $1,000,000 for
work done in the Marketplace since January 1, 2013.
Utilization Plan means the list of Business Equity Firms that a Contractor commits will be
utilized to meet the Business Equity Goal for a specific project, the scopes of the work and
the dollar values or the percentages of the work to be performed.
3. PROPOSAL SECURITY: Cashier's check or an acceptable Offeror's bond payable to the City of
Fort Worth, in an amount of five (5) per cent of the Proposal submitted (See paragraph 1 above).
The Proposal Security must accompany the Proposal and is subject to forfeit in the event the
successful Offeror fails to execute the contract documents within ten (10) days after the contract
has been awarded. The Proposal Security shall be included in the envelope containing the
Proposal. Failure to submit the Proposal Security will result in the Proposal not being considered
for this project. Offeror's bond will be returned if the City fails to award the contract within 90
calendar days of receipt of proposals, unless the Offeror agrees to an extension. The surety must
be licensed to do business in the state of Texas.
4. PAYMENT BOND AND PERFORMANCE BOND: For projects in excess of $25,000, the
successful Offeror entering into a contract for the work will be required to give the City surety in a
sum equal to the amount of the contract awarded. The form of the bond shall be as herein provided
and the surety shall be acceptable to the City. All bonds furnished hereunder shall meet the
requirements of Texas Government Code Section 2253, as amended.
In order for a surety to be acceptable to the City, the surety must (1) hold a certificate of authority
from the United States Secretary of the Treasury to qualify as a surety on obligations permitted or
required under federal law; or (2) have obtained reinsurance for any liability in excess of $100,000
from a reinsurer that is authorized and admitted as a reinsurer in the State of Texas and is the
holder of a certificate of authority from the United States Secretary of the Treasury to qualify as a
Instruction to Offerors Page 8 of 37
PSB Municipal Building Roof Replacement (March 2024)
surety on obligations permitted or required under federal law. Satisfactory proof of any such
reinsurance shall be provided to the City upon request. The City, in its sole discretion, will
determine the adequacy of the proof required herein.
No sureties will be accepted by the City that are at the time in default or delinquent on any bonds
or which are interested in any litigation against the City. Should any surety on the contract be
determined unsatisfactory at any time by the City, notice will be given to the contractor to that effect
and the contractor shall immediately provide a new surety satisfactory to the City.
If the total contract price is $25,000 or less, payment to the contractor shall be made in one lump
sum. Payment shall not be made for a period of 45 calendar days from the date the work has been
completed and accepted by the City.
If the contract is in excess of $25,000, a Payment Bond shall be executed, in the amount of the
contract, solely for the protection of all claimants supplying labor and materials in the prosecution
of the work.
If the contract amount is in excess of $100,000, a Performance Bond shall also be provided, in the
amount of the contract, conditioned on the faithful performance of the work in accordance with the
plans, specification, and contract documents. Said bond shall be solely for the protection of the
City of Fort Worth.
5. PRE -PROPOSAL SITE INVESTIGATION: Prior to filing a response, the Offeror shall examine the
site(s) of the work and the details of the requirements set out in these specifications to satisfy itself
as to the conditions which will be encountered relating to the character, quality, and quantity of
the work to be performed and materials and equipment required. The filing of a response by the
Offeror shall be considered evidence that it has complied with these requirements.
6. AMBIGUITY: In case of ambiguity or lack of clearness in stating prices in the proposal, the City
reserves the right to adopt the most advantageous construction thereof to the City or to reject the
proposal.
7. WAGE RATES: Not less than the prevailing wage rates set forth in the Contract Documents must
be paid on this project.
8. POST PROPOSAL - PREAWARD SUBMITTALS: Offerors are required to submit an electronic
copy of the following information to the Bonfire Site https://fortworthtexas.bonfirehub.com/login,
within three business days subsequent to bid opening (normally by 2:00 PM the next Tuesday
following a Thursday bid opening) and in order to assist City staff in determining the Contractor's
capability of performing the work and in meeting City contract requirements:
• Contractors Qualification Statement (AIA Form A305), including client references
• List of current projects & past projects built within the last 10 years, including
owners' and architects' names with contact information for both current & past
projects.
• Proposed Subcontractors and Suppliers
• Project Schedule
• Schedule of Values (Breakout by CSI Divisions)
• Proof of insurability for Statutory Workers Compensation Insurance
Note: Business Equity Documentation must be submitted on the third City business day
after bid openinq,, exclusive of bid opening date, to the City location specified in the bid.
Offerors shall obtain a receipt from the appropriate department as evidence that the City
received the documentation.
9. PROPOSED SUBCONTRACTORS: Acceptance of the Proposal in no way requires the City to
accept the qualifications of the subcontractors. The Subcontractor lists are for use by the City in
Instruction to Offerors Page 9 of 37
PSB Municipal Building Roof Replacement (March 2024)
preparing recommendations for award of the contract. The Contractor must provide and use
subcontractors listed unless the City agrees to allow a substitute.
10. DISCREPANCIES AND ADDENDA:
Should an Offeror find any discrepancies in the drawings and specifications, or should it be in doubt
as to their meaning, it shall notify the City at once. If required, the City will then prepare a written
addendum that will be available to all Offerors at the place designated for distribution of the Request
for Proposal Documents by the Notice to Offerors. The Contractor is responsible for determining if
addenda are available and for securing copies prior to submitting a response to this request for
sealed proposals. Oral instructions or decisions unless confirmed by written addenda will not be
considered valid, legal or binding. No extras will be authorized because of failure of the contractor
to include work called for in the addenda.
Offeror must acknowledge addenda in the Proposal. Failure to acknowledge addenda may cause
the Proposal to be ruled non -responsive. It is the Contractor's responsibility to obtain Addenda and
include its information in the Proposal.
11. WORKERS COMPENSATION INSURANCE: Offerors will be required to demonstrate that
coverage is in effect at time of Award of Contract. Sample Certificate of Insurance, or other proof
that Workers Compensation Insurance will be obtained, must be submitted within five working
days of bid opening.
12. TAXES: Equipment and materials not consumed by or incorporated into the work are subject to
State sales taxes under House Bill 11, enacted August 15, 1991.
13. PERMITS: Contractor shall apply for all City of Fort Worth Permits and for any other permits
required by this project. City of Fort Worth Building and Trade Permit fees are waived. Separate
permits may be required for each work location.
14. UTILITIES AND IMPACT FEES: The City will pay water and sewer utilities tap fees and impact
fees. Unless shown otherwise, the City will coordinate and pay for water and sewer taps and
meters to the property line. The Contractor will include all remaining fees from the electrical and
gas companies in the Base Proposal. The Contractor will be responsible for coordinating with City
and utility companies for installation of utilities. The Contractor will be responsible for all fees for
electrical, gas, and other utilities within the property line of the project. Unless indicated otherwise
on the plans, the contractor will be responsible for costs and installations from the building side of
the water meter and sewer tap.
15. BID DOCUMENTS: Hard copies of bidding documents may be downloaded and printed by the
Offeror.
16. MANUFACTURER'S REFERENCE: Catalog, brand names, and manufacturer's references are
descriptive, not restrictive. Use of brands of like nature and quality will be considered. Upon
request of the architect or contractor, the contractor will submit a full sized sample and/or detailed
information as required to allow the architect to determine the acceptability of proposed
substitutions. Where equipment has been listed as "no substitute accepted", the City will accept
no alternates to the specified equipment. Also, refer to specification's product requirements.
17. TESTING SERVICES: The City shall provide for, independently of the contractor, the inspection
services, the testing of construction materials engineering, and the verification testing services
necessary for the acceptance of the construction work.
18. PROJECT SCHEDULE: The Project Schedule to be submitted with the Qualification Statement
will, at the minimum, include the following: quality control submittals and approvals, mobilization,
site preparation, under slab utilities, foundation work, structural erection, interior finish,
commissioning, and closeout. The Schedule may be submitted as a table or PERT diagram.
Instruction to Offerors Page 10 of 37
PSB Municipal Building Roof Replacement (March 2024)
19. STATE FORM 1295 "CERTIFICATE OF INTERESTED PARTIES": Texas Ethics Commission
regulations require that the business entity must fill out the Form 1295 on an electronic filing
application on the Texas Ethics Commission website (www.ethics. state. tx.us). The business
entity that wishes to enter into the contract must supply the completed, signed and notarized Form
1295 to the City.
20. IMMIGRATION NATIONALITY ACT: City actively supports the Immigration & Nationality Act (INA)
which includes provisions addressing employment eligibility, employment verification, and
nondiscrimination. Vendor shall verify the identity and employment eligibility of all employees who
perform work under this Agreement. Vendor shall complete the Employment Eligibility Verification
Form (1-9), maintain photocopies of all supporting employment eligibility and identity documentation
for all employees, and upon request, provide City with copies of all 1-9 forms and supporting eligibility
documentation for each employee who performs work under this Agreement. Vendor shall establish
appropriate procedures and controls so that no services will be performed by any employee who is
not legally eligible to perform such services. Vendor shall provide City with a certification letter that it
has complied with the verification requirements required by this Agreement. Vendor shall indemnify
City from any penalties or liabilities due to violations of this provision. City shall have the right to
immediately terminate this Agreement for violations of this provision by Vendor.
21. No Bovcott of Israel: If Contractor has fewer than 10 employees or the Agreement is for less
than $100,000, this section does not apply. Contractor acknowledges that in accordance with
Chapter 2270 of the Texas Government Code, City is prohibited from entering into a contract with
a company for goods or services unless the contract contains a written verification from the
company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the
contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those
terms in Section 808.001 of the Texas Government Code. By signing this Agreement, Contractor
certifies that Contractor's signature provides written verification to City that Contractor: (1) does
not boycott Israel; and (2) will not boycott Israel during the term of the Agreement.
22. Prohibition on Bovcottinq Enerqv Companies. Vendor acknowledges that in accordance with
Chapter 2274 of the Texas Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 13,
§ 2), the City is prohibited from entering into a contract for goods or services that has a value of
$100,000 or more, which will be paid wholly or partly from public funds of the City, with a
company (with 10 or more full-time employees) unless the contract contains a written verification
from the company that it: (1) does not boycott energy companies; and (2) will not boycott energy
companies during the term of the contract. The terms "boycott energy company" and "company"
have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code (as
added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2). To the extent that Chapter 2274 of the
Government Code is applicable to this Agreement, by signing this Agreement, Vendor
certifies that Vendor's signature provides written verification to the City that Vendor: (1)
does not boycott energy companies; and (2) will not boycott energy companies during the
term of this Agreement.
23. Prohibition on Discrimination Aqainst Firearm and Ammunition Industries. Vendor
acknowledges that except as otherwise provided by Chapter 2274 of the Texas Government
Code (as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1), the City is prohibited from entering
into a contract for goods or services that has a value of $100,000 or more which will be paid
wholly or partly from public funds of the City, with a company (with 10 or more full-time
employees) unless the contract contains a written verification from the company that it: (1) does
not have a practice, policy, guidance, or directive that discriminates against a firearm entity or
firearm trade association; and (2) will not discriminate during the term of the contract against a
firearm entity or
firearm trade association. The terms "discriminate," "firearm entity" and "firearm trade
association" have the meaning ascribed to those terms by Chapter 2274 of the Texas
Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1). To the extent that
Chapter 2274 of the Government Code is applicable to this Agreement, by signing this
Agreement, Vendor certifies that Vendor's signature provides written verification to the
City that Vendor: (1) does not have a practice, policy, guidance, or directive that
discriminates against a firearm entity or firearm trade association; and (2) will not
Instruction to Offerors Page 11 of 37
PSB Municipal Building Roof Replacement (March 2024)
discriminate against a firearm entity or firearm trade association during the term of this
Agreement.
24. Any oral communications are considered unofficial and non -binding with regard to this proposal.
(The remainder of this page left blank)
Instruction to Offerors Page 12 of 37
PSB Municipal Building Roof Replacement (March 2024)
PROPOSAL
TO: MR. DAVID COOKE
CITY MANAGER
ATTN: PURCHASING OFFICE
200 TEXAS STREET
CITY OF FORT WORTH, TEXAS
FOR: PSB Municipal Building Roof Replacement
200 Texas Street
Fort Worth, Texas 76102
City Project # 2024-02
Pursuant to the foregoing "Instructions to Offerors," the undersigned has thoroughly examined the plans,
specifications and the site, understands the amount of work to be done, and hereby proposes to do all the
work and furnish all labor, equipment and materials necessary to fully complete all the work as provided in
the plans and specifications, and subject to the inspection and approval of the Director of Transportation
and Public Works of the City of Fort Worth.
Upon acceptance of this Proposal by the City Council, the bidder is bound to execute a contract and, if the
contract amount exceeds $25,000.00, furnish acceptable Performance and/or Payment Bonds approved
by the City of Fort Worth for performing and completing the Work within the time stated and for the following
sum, to wit:
DESCRIPTION OF ITEMS
$ 637,875.72 Base Proposal
120 Calendar Days
$ 47,840.68 Owner's Contingency Allowance (7.5%) added to Base Proposal (This
Allowance amount is not included in the Base Proposal but is added to the Base Proposal. Only
the Owner will approve the use of this Allowance during construction. Any Allowance remaining at
the end of construction will be retained by the City of Fort Worth).
$ 685,716.40 Base Proposal Plus Owner's Contingency Allowance
ALTERNATES — There are none.
The undersigned agrees to complete the Work within the calendar days specified above after the date of
Notice to Proceed. A Project Schedule will be submitted as required in the Instructions to Offeror.
The City reserves the right to accept or reject any and all bids or any combination thereof proposed for the
above work.
The undersigned assures that its employees and applicants for employment and those of any labor
organization, subcontractors or employment agency in either furnishing or referring employee applicants to
the undersigned are not discriminated against as prohibited by the terms of City Ordinance 7278 as
amended by City Ordinance 7400 (Fort Worth City Code Section 13A-21 through 13A-29).
Residency of Offerors: The 1985 Session of the Texas Legislature passed house Bill 620 relative to the
award of contracts to non-resident bidders. The law provides that, in order to be awarded a contract as low
bidder, non-resident bidders (out of state contractors whose corporate offices or principal place of business
are outside of the State of Texas) that bid projects for construction, improvements, supplies or services in
Texas at an amount lower than the lowest Texas resident bidder by the same amount that Texas resident
bidder would be required to underbid a non-resident bidder in order to obtain a comparable contract in the
Instruction to Offerors Page 13 of 37
PSB Municipal Building Roof Replacement (March 2024)
state in which the non-resident's principal place of business is located. The appropriate blanks in Section
A must be filled out by all non-resident bidders in order for your bid to meet specifications.
The failure of out of state or non-resident bidders to complete the forms may disqualify that bidder. Resident
bidders must check the box in Section B.
A. 1_1 Non-resident vendors in (give state), our principal place of
business, are required to be percent lower than resident bidders by state
law.
1_I Non-resident vendors in (give state), are not required to
underbid resident bidders.
B. N/ Our principal place of business or corporate offices are in the State of
Texas.
Within ten (10) days of receipt of notice of acceptance of this bid, the successful bidder will execute the
formal contract and will deliver approved Performance and Payment Bonds for the faithful performance of
this contact. The attached deposit check in the sum of 5 %
Dollars ($ 31,493.786 ) is to become the property of the City of Fort Worth, Texas, or
the attached Bidder's Bond is to be forfeited in the event the contract and bonds are not executed within
the time set forth, as liquidated damages for delay and additional work caused thereby.
BUSINESS EQUITY PROVISION for proposals in excess of $100,000.00:
1 am aware that I must submit information to the Director, Property Management Department, concerning
the Business Equity participation on the THIRD BUSINESS DAY after bid opening, exclusive of bid opening
date, to the City location specified in the bid in order to be considered RESPONSIVE. FAILURE TO
SUBMIT THE REQUIRED BUSINESS EQUITY DOCUMENTATION WILL RESULT IN THE BID BEING
CONSIDERED NON -RESPONSIVE.
Respectfully submitted,
DSA Contractors dba Cowboys Roofing LLC
Company Name
By:
Signature
Bilal Shaikh Estimator
Printed Name of Principal Title
Address: 2500 Texas Drive Suite 101
Street
Irving, Texas 75062
City Zip
Phone: 682-391-8857
Fax:
Email: Bilal@DSAContractors.net
Instruction to Offerors Page 14 of 37
PSB Municipal Building Roof Replacement (March 2024)
Receipt is acknowledged of the following addenda:
Addendum No. 1:
Addendum No. 3:
N/A
Addendum No. 5:
N/A
Addendum No. 7:
N/A
Addendum No. 9:
N/A
Addendum No. 2: N/A
Addendum No. 4: N/A
Addendum No. 6: N/A
Addendum No. 8: N/A
Addendum No. 10: N/A
Instruction to Offerors Page 15 of 37
PSB Municipal Building Roof Replacement (March 2024)
CONFLICT OF INTEREST AFFIDAVIT
Each bidder, offeror, or respondent (hereinafter also referred to as "you") to a City of Fort Worth (also
referred to as "City") procurement are required to complete Conflict of Interest Questionnaire (the attached
CIQ Form) and Local Government Officer Conflicts Disclosure Statement (the attached CIS Form) below
pursuant to state law. This affidavit will certify that the Bidder has on file with the City Secretary the required
documentation and is eligible to bid on City Work. The referenced forms may be downloaded from the website
links provided below.
httii://www.ethics.state.tx.us/forins/CIO.Ddf
htto://www.ethics.state.tx.us/forms/CIS.odf
19r CIQ Form is on file with City Secretary
IV CIQ Form is being provided to the City Secretary
SZ CIS Form is on File with City Secretary
CIS Form is being provided to the City Secretary
BIDDER:
DSA Contractors dba Cowboys Roofing LLC By: Bilal Shaikh
Company (Please Print)
2500 Texas Drive Suite 101 Signature:
Address
Irving, Texas 75062
City/State/Zip
Instruction to Offerors
PSB Municipal Building Roof Replacement (March 2024)
Title: Estimator
(Please Print)
Page 16 of 37
POWER OF ATTORNEY
Great Midwest Insurance Company
KNOW ALL MEN BY THESE PRESENTS, that GREAT MIDWEST INSURANCE COMPANY, a Texas Corporation, with its principal office
n Houston, TX, does hereby constitute and appoint:
Zach Matter, Zach Mefferd, Tina Bockholt, Havilah Watson, Jimmy Brown, Shannon Cox
true and lawful Attorney(s)-In-Fact to make, execute, seal and deliver for, and on its behalf as surety, any and all bonds, undertakings or other
tings obligatory in nature of a bond.
This authority is made under and by the authority of a resolution which was passed by the Board of Directors of GREAT MIDWEST
RANCE COMPANY, on the V day of October, 2018 as follows:
Resolved, that the President, or any officer, be and hereby is, authorized to appoint and empower any representative of the Company or
other person or persons as Attorney -In -Fact to execute on behalf of the Company any bonds, undertakings, policies, contracts of indemnity or other
writings obligatory in nature of a bond not to exceed Twenty -Five Million dollars ($25,000,000.00), which the Company might execute through its
duly elected officers, and affix the seal of the Company thereto. Any said execution of such documents by an Attorney -In -Fact shall be as binding
upon the Company as if they had been duly executed and acknowledged by the regularly elected officers of the Company. Any Attorney -fin -Fact, s❑
appointed, may be removed in the Company's sole discretion and the authority so granted may be revoked as specified in the Power of Attorney.
Resolved, that the signature of the President and the seal of the Company may be affixed by facsimile on any power of attorney granted,
and the signature of the Secretary, and the seal of the Company may be affixed by facsimile to any certificate of any such power and any such
power or certificate bearing such facsimile signature and seal shall be valid and binding on the Company. Any such power so executed and sealed
and certificate so executed and sealed shall, with respect to any bond of undertaking to which it is attached, continue to be valid and binding on the
Company.
IN WITNESS THEREOF, GREAT MIDWEST INSURANCE COMPANY, has caused this instrument to be signed by its President, and its
Corporate Seal to be affixed this 11 th day of February, 2021.
GREAT MIDWEST INSURANCE COMPANY
BY H.�, ")
Mark W. Haushill
President
ACKNOWLEDGEMENT
On this 11th day of February, 2021, before me, personally came Mark W. Haushill to me known, who being duly sworn, did depose and
say that he is the President of GREAT MIDWEST INSURANCE COMPANY, the corporation described in and which executed the above instrument,
that he executed said instrument on behalf of the corporation by authority of his office under the By-laws of said corporation.
Q1llllr
,l
+�r��■F, CHRISTfNA BISHOP
Notary Public, State of Texea BY
~ +� Comm. Expires 04•14.2026 Christina Bishop
vie+'`Notefy ID 131D90488
_ Notary Public
CERTIFICATE
I, the undersigned, Secretary of GREAT MIDWEST INSURANCE COMPANY, A Texas insurance Company, DO HEREBY CERTIFY that
the original Power of Attorney of which the foregoing is a true and correct copy, is in full force and effect and has not been revoked and the resolutions
as set forth are now in force,
Signed and Sealed at Houston, TX this [/X
Day of *.1 _, 203 {�
BY
Leslie K. Shaunty
Secretary
"WARNING: Any person who knowingly and with intent to defraud any insurance company or other person, files and application for insurance of claim
containing any materially false Information, or conceals for the purpose of misleading, information concerning any fact material thereto, commits a
fraudulent insurance act, which is a crime and subjects such person to criminal and civil penalties.
N/A
LOCAL GOVERNMENT OFFICER CONFLICTS FORM CIS
DISCLOSURE STATEMENT
(Instructions for completing and filing this form are provided on the next page.)
This questionnaire reflects changes made to the law by H.B. 23, 84th Leg., Regular Session. OFFICE USE ONLY
This is the notice to the appropriate local governmental entity that the following local Date Received
government officer has become aware of facts that require the officer to file this statement
in accordance with Chapter 176, Local Government Code.
1 Name of Local Government Officer
2 Office Held
3 Name of vendor described by Sections 176.001(7) and 176.003(a), Local Government
Code
4 Description of the nature and extent of each employment or other business relationship and each family relationship
with vendor named in item 3.
5 List gifts accepted by the local government officer and any family member, if aggregate value of the gifts accepted
from vendor named in item 3 exceeds $100 during the 12-month period described by Section 176.003(a)(2)(B).
Date Gift Accepted Description of Gift
Date Gift Accepted Description of Gift
Date Gift Accepted Description of Gift
(attach additional forms as necessary)
6 SIGNATURE I swear under penalty of perjury that the above statement is true and correct. I acknowledge that the disclosure applies
to each family member (as defined by Section 176.001(2), Local Government Code) of this local government officer. I
also acknowledge that this statement covers the 12-month period described by Section 176.003(a)(2)(B), Local
Government Code.
Signature of Local Government Officer
Please complete either option below:
(1) Affidavit
NOTARY STAMP/SEAL
Sworn to and subscribed before me by
20 , to certify which, witness my hand and seal of office.
Signature of officer administering oath
(2) Unsworn Declaration
My name is
My address is
Executed in
Printed name of officer administering oath
(street)
County, State of
this the day of
and my date of birth is
Title of officer administering oath
(city) (state) (zip code) (country)
on the day of 20
(month) (year)
Signature of Local Government Officer (Declarant)
Form provided by Texas Ethics Commission www.ethics.state.tx.us Revised 8/17/2020
CONFLICT OF INTEREST QUESTIONNAIRE FORM CIQ
For vendor doing business with local governmental entity
This questionnaire reflects changes made to the law by H.B. 23, 84th Leg., Regular Session. OFFICE USE ONLY
This questionnaire is being filed in accordance with Chapter 176, Local Government Code, by a vendor who Date Received
has a business relationship as defined by Section 176.001(1-a) with a local governmental entity and the
vendor meets requirements under Section 176.006(a).
By law this questionnaire must be filed with the records administrator of the local governmental entity not later
than the 7th business day after the date the vendor becomes aware of facts that require the statement to be
filed. See Section 176.006(a-1), Local Government Code.
A vendor commits an offense if the vendor knowingly violates Section 176.006, Local Government Code. An
offense under this section is a misdemeanor.
jJ Name of vendor who has a business relationship with local governmental entity.
N/A
J
❑ Check this box if you are filing an update to a previously filed questionnaire. (The law requires that you file an updated
completed questionnaire with the appropriate filing authority not later than the 7th business day after the date on which
you became aware that the originally filed questionnaire was incomplete or inaccurate.)
J Name of local government officer about whom the information is being disclosed.
N/A
Name of Officer
J Describe each employment or other business relationship with the local government officer, or a family member of the
officer, as described by Section 176.003(a)(2)(A). Also describe any family relationship with the local government officer.
Complete subparts A and B for each employment or business relationship described. Attach additional pages to this Form
CIO as necessary.
A. Is the local government officer or a family member of the officer receiving or likely to receive taxable income,
other than investment income, from the vendor?
Yes F-1 No N/A
B. Is the vendor receiving or likely to receive taxable income, other than investment income, from or at the direction
of the local government officer or a family member of the officer AND the taxable income is not received from the
local governmental entity?
71 Yes F1 No N/A
J Describe each employment or business relationship that the vendor named in Section 1 maintains with a corporation or
other business entity with respect to which the local government officer serves as an officer or director, or holds an
ownership interest of one percent or more.
N/A
J
❑Check this box if the vendor has given the local government officer or a family member of the officer one or more gifts
as described in Section 176.003(a)(2)(B), excluding gifts described in Section 176.003(a-1).
J
4/9/24
Signature of vendor doing business with the governmental entity Date
Form provided by Texas Ethics Commission www.ethics.state.tx.us Revised 1/1/2021
(Revs-t M.
Texas Sales and Use Tax Exemption Certification
This certificate does not requke a number to be valid.
Name of purcha ser, firm or agency
C Ity of Fort Worth, Texas
Address f Sfreef E nwZor, P. ❑. Box or Roufe nunboO Ph on a {Ares code a+rd nomheo
200 Texas Street 817-392-BS17
city, Dial a, ZIP code
Fort Worth, TX 76102
I, the purchaser named above, claim an exemption from payment of sales and use taxes (for the purchase of taxable
items described below or on the attached orderor irrvoix) tram:
Seller- All Vendors
Street address: City, State, ZIP Cod -
Description of items to be purchased or on the attached order or invoice:
All items. Purchaser acknowledges that this certificate cannot be used for the purchase, lease, or rental of a motor
Vehicle.
Purchaser claims this exemption for the following reason:
Municipality, Governmental Entdy.
I understand that I will be liable for payment of all state and local sales or use taxes which may become due for failure to comply with
the provisions of the Tax Code and/or all applicable law.
I Inderstandthatihsa chmirWoflense togive anexerWWncerhficate to the seflerfortaxabkeitems that Iknow.atthe firm ofpurchase.
w1lbeusedin a manner otherthan thatexpressedinthis certificate, anddependingon the amountoftaxeva*d. the offensemayranga
from a Gass C misdemeanor to a felony of the second degree.
Purchgsw Title pole
Sign `?
here Chief Finanical Services Officer N uvember 29, 2M2
,a ?A
NOTE: This certificate cannot be issued for the purchase, lease, or rental of a motor vehicle.
THIS CERTIFICATE DOES NOT REgt11REA NUMBER To SE VALID_
Sales and Use Tax "Exemption Numbers' or "Tax Exempt" Numbers do not exis'.
This certificate should befurnished to the supplier.
Do not send the completed certificate to the Comptroller of Public Accounts.
Instruction to Offerors Page 21 of 37
PSB Municipal Building Roof Replacement (March 2024)
2013 PREVAILING WAGE RATES
Commercial Construction Projects
$
AC Mechanic Helper
13.67
Acoustical Ceiling Installer
16.83
Acoustical Ceiling Installer Helper
12$70
$
Bricklayer/Stone Mason
19.45
Bricklayer/Stone Mason Trainee
13$31
$
Bricklayer/Stone Mason Helper
10.91
$
Carpenter
17.75
$
Carpenter Helper
14.32
Concrete Cutter/Sawer
17.00
$
Concrete Cutter/Sawer Helper
11.00
$
Concrete Finisher
15.77
Concrete Finisher Helper
11.00
$
Concrete Form Builder
15.27
Concrete Form Builder Helper
11.00
$
Drywall Mechanic
15.36
$
Drywall Helper
12.54
$
Drywall Taper
15.00
$
Drywall Taper Helper
11.50
$
Electrician (Journeyman)
19.63
$
Electrician Apprentice (Helper)
15.64
$
Electronic Technician
20.00
$
Floor Layer
18.00
$
Floor Layer Helper
10.00
$
Glazier
21.03
Instruction to Offerors Page 22 of 37
PSB Municipal Building Roof Replacement (March 2024)
$
Glazier Helper
12.81
$
Insulator
16.59
$
Insulator Helper
11.21
$
Laborer Common
10.89
$
Laborer Skilled
14.15
$
Lather
12.99
Metal Building Assembler
16.00
Metal Building Assembler Helper
12.00
Metal Installer (Miscellaneous)
13.00
$
Metal Installer Helper (Miscellaneous)
11.00
$
Metal Stud Framer
16.12
$
Metal Stud Framer Helper
12.54
$
Painter
16.44
$
Painter Helper
9.98
$
Pipefitter
21.22
$
Pipefitter Helper
15.39
$
Plasterer
16.17
$
Plasterer Helper
12.85
$
Plumber
21.98
$
Plumber Helper
15.85
$
Reinforcing Steel Setter
12.87
Reinforcing Steel Setter Helper
11.08
$
Roofer
16.90
$
Roofer Helper
11.15
$
Sheet Metal Worker
16.35
$
Sheet Metal Worker Helper
13.11
$
Sprinkler System Installer
19.17
$
Sprinkler System Installer Helper
14.15
Instruction to Offerors Page 23 of 37
PSB Municipal Building Roof Replacement (March 2024)
$
Steel Worker Structural
17.00
Steel Worker Structural Helper
13$74
$
Waterproofer
15.00
Equipment Operators
$
Concrete Pump
18.50
$
Crane, Clamshell, Backhoe, Derrick, D'Line Shovel
19.31
$
Forklift
16.45
Foundation Drill Operator
22$50
$
Front End Loader
16.97
$
Truck Driver
16.77
$
Welder
19.96
$
Welder Helper
13.00
The prevailing wage rates shown for Commercial construction projects were based on a salary survey
conducted and published by the North Texas Construction Industry (Fall 2012) Independently compiled
by the Lane Gorman Trubitt, PLLC Construction Group. The descriptions for the classifications listed are
provided on the TEXO's (The Construction Association) website.
www.texoassociation.org/Chapter/wagerates.asp
Instruction to Offerors Page 24 of 37
PSB Municipal Building Roof Replacement (March 2024)
CITY OF FORT WORTH
WEATHER TABLE
Average Days
Month
of
Inches of Rainfall
Rainfnowllce
January
6
2.51
February
7
2.23
March
9
3.49
April
7
2.97
May
10
4.56
June
8
3.31
July
4
1.83
August
5
1.86
September
5
2.34
October
7
3.65
November
7
2.70
December
6
2.34
Annually
81
33.81
( 1) Mean number of days precipitation of 0.01' or more or 112" sr o fiice
(2) Average normal precipb ion, in inches
This table is based on information reported from Dallas -Fart ~North Intemational Airport,
Texas. Latitude 32 deg 54 min north, longitude 97 deg 02 min west, elevation (ground) 551 ft.
Average number of days of rain, snow, and ice days are based on records covering 21 years.
Precipitation is based on recorded information from 1996through 2016 period.
This table is to be used as a baisis for calculation of excess rain or weather days for projects
with duration in calendar days_ If the site records indicate that the Contractor was unable to
carry out operations due to weather, it is counted as a weather day. If the number of weather
days exceeds the number of average rain days plus the snowfice days for the contract
duration, the contract will be adjusted by Change Order.
Fart Worth Weather iabie
24Aprill 2017
Instruction to Offerors Page 25 of 37
PSB Municipal Building Roof Replacement (March 2024)
City of Fort Worth, Texas
Property Management Department
Facilities Management Group/Architectural Services Division
GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION
LUMP SUM CONTRACT
SECTION A
DEFINITIONS, PROCEDURES AND INTERPRETATIONS
A-1 CONTRACT DOCUMENTS: By the term Contract Documents is meant all of the written and drawn documents setting forth
or affecting the rights of the parties, including but not necessarily limited to, the Contract, Notice to Bidders, Proposal, General
Conditions, Special Conditions, Specifications, Plans, Bonds and all Addenda, Amendments signed by all parties, Change Orders,
written Interpretations and any written Field Order for a minor change in the Work.
A-2 ENTIRE AGREEMENT: The Contract Documents represent the entire agreement between the Parties, and no prior or
contemporaneous, oral or written agreements, instruments or negotiations shall be construed as altering the terms and effects of the
Contract Documents. After being executed, the Contract Documents can be changed only by a written Amendment signed by the
Contractor and the Owner, or Change Order, or by a written Field Order for a minor change.
A-3 WORK: By the term Work is meant all labor, supervision, materials and equipment necessary to be used or incorporated
in order to produce the construction required by Contract Documents.
A-4 EXECUTION OF THE CONTRACT DOCUMENTS: The Contract Documents shall be executed in four originals, with all
required attachments, including required bonds and insurance certificates, by the Contractor and the Owner in such form as may be
prescribed by law and returned to the Owner within ten business days of notification to Contractor. Failure to execute contracts and
provide required enclosures will be grounds for revocation of award and taking of Bid Bond.
A-5 FAMILIARITY WITH PROPOSED WORK: Before filing a Proposal, the Contractor shall examine carefully the, plans,
specifications, special provisions, and the form of contract to be entered into for the work contemplated. They shall examine the site
of work and satisfy themselves as to the conditions that will be encountered relating to the character, quality and quantity of work to
be performed and materials to be furnished. The filing of a bid by the bidder shall be considered evidence that they have complied
with these requirements and has accepted the site as suitable for the work.
Claims for additional compensation due to variations between conditions actually encountered in construction and as indicated by the
plans will not be allowed.
A-6 ONE UNIFIED CONTRACT: Insofar as possible, the Contract Documents will be bound together and executed as a single
unified Contract. The intention of the Contract Documents being to provide for all labor, supervision, materials, equipment and other
items necessary for the proper execution and completion of the Work. Words that have well -recognized technical or trade meanings
are used herein in accordance with such recognized meanings.
A-7 DIVISION OF WORK: The arrangement of Drawings and/or Specifications into Divisions, Sections, Articles, or other
Subdivisions shall not be binding upon the Contractor in dividing the work among Subcontractors or Trades.
A-8 INTERPRETATIONS: The Architect will furnish such Interpretations of the Plans and Specifications as may be necessary
for the proper execution or progress of the work. Such Interpretations shall be furnished at the instance of the Architect or at the
request of the CONTRACTOR, or Owner, and will be issued with reasonable promptness and at such times and in accordance with
such schedule as may be agreed upon. Such Interpretations shall be consistent with the purposes and intent of the Plans and
Specifications and may be affected by Field Order. In the event of any dispute between any of the parties to the Contract and the
Architect or each other involving the interpretation of the Contract Documents, the evaluation of work or materials performed or
furnished by the Architect, Contractor, or any subcontractor or materialman, or involving any question of fault or liability of any party,
the decision of the Owner shall be final and binding.
In the event of inconsistency in the contract documents, the following sequence for interpretation shall be used in order of precedence:
Change Orders and/or Field Orders (by date of issuance); Addenda (by date of issuance); Drawings; Notes and dimensions on
Drawings; Technical Specifications; Special Provisions; Supplementary General Conditions; General Conditions; and, Construction
Contract.
A-9 CORRELATION AND INTENT: In general, the drawings indicate dimension, locations, positions, quantities, and kinds of
construction; the specifications indicate the quality and construction procedures required. Work indicated on the drawings and not
specified of vice -versa, shall be furnished as though set forth in both. Work not detailed, marked or specified shall be the same as
similar parts that are detailed, marked or specified. If the drawings are in conflict or conflict with the specifications the better quality
or greater quantity or work or materials shall be estimated and shall be furnished or included. Dimensions on drawings shall take
precedence over small-scale drawings. Drawings showing locations of equipment, piping, ductwork, electrical apparatus, etc., are
diagrammatic and job conditions may not allow installation in the exact location shown. Relocation shall not occur without the
Architects approval.
General Conditions of the Contract for Construction Lump Sum Contract Page 1 of 27
CFW PMD — Project Name March 2024
A-10 COPIES OF REVIEW DRAWINGS AND SPECIFICATIONS: The Contractor will furnish to City review Drawings and
Specifications in electronic format prior to starting work. Contractor shall pay the cost of reproduction for all other copies of Drawings
and Specifications furnished be him.
A-11 BUSINESS EQUITY PROVISIONS: All proposers shall note that the Business Equity Ordinance No. 25165-10-2021 (codified
in Chapter 20, Article X of the Fort Worth Code of Ordinances, as amended), and any relevant policy or guidance documents, was
adopted to ensure the full and equitable participation of certified Minority — and Women -owned business enterprises (M/WBEs),
(collectively, "Business Equity Firms") in City contracts for the procurement of goods and services where a contract's total dollar value
is greater than $100,000.
The City of Fort Worth Business Equity Ordinance will take precedence over other subcontractor utilization programs on Block Grant
and other federally funded Projects.
A-12 AGE: In accordance with the policy ("Policy") of the Executive Branch of the federal government, Contractor covenants that
neither themselves nor any of their officers, members, agents, employees, program participants or subcontractors, while engaged in
performing this contract, shall, in connection with the employment, advancement or discharge of employees or in connection with the
terms, conditions or privileges of their employment, discriminate against persons because of their age except on the basis of a bona
fide occupational qualification, retirement plan or statutory requirement.
Contractor further covenants that neither themselves nor their officers, members, agents, employees, subcontractors, program
participants, or persons acting on their behalf, shall specify, in solicitations or advertisements for employees to work on this contract,
a maximum age limit for such employment unless the specified maximum age limit is based upon a bona fide occupational qualification,
retirement plan or statutory equipment.
Contractor warrants it will fully comply with the Policy and will defend, indemnify and hold City harmless against any claims or allega-
tions asserted by third parties or subcontractor against City arising out of Contractor's and/or their subcontractors' alleged failure to
comply with the above referenced Policy concerning age discrimination in the performance of this agreement.
A-13 DISABILITY: In accordance with the provisions of the Americans With Disabilities Act of 1990 ("ADA"), Contractor warrants
that themselves and any and all of their subcontractors will not unlawfully discriminate on the basis of disability in the provision of
services to the general public, nor in the availability, terms and/or conditions of employment for applicants for employment with, or
employees of Contractor or any of their subcontractors. Contractor warrants it will fully comply with ADA provisions and any other
applicable federal, state and local laws concerning disability and will defend, indemnify and hold City harmless against any claims or
allegations asserted by third parties or subcontractors against City arising out of Contractor's and/or their subcontractors' alleged
failure to comply with the above -referenced laws concerning disability discrimination in the performance of this agreement.
SECTION B
IDENTITY OF ARCHITECT
B-1 CONTRACT ADMINISTRATION: The Architect is the person or person lawfully licensed to practice architecture identified
as such in the Agreement. The Architect is retained by the Owner to prepare the construction documents and represent the Owner
during the construction phase as directed by the Owner.
B-2 DUTIES OF THE ARCHITECT: As used herein, the term Architect means the Architect or their authorized representative.
Nothing contained in these Contract Documents shall create any privity of Contract between the Architect and the Contractor.
B-3 ARCHITECT AS REPRESENTATIVE OF THE OWNER: The Architect will provide general administration of the Contract
on behalf of the Owner and will have authority to act as the representative of the Owner to the extent provided in the Contract
Documents unless changed in writing by the Owner. The Architect will be available for conferences and consultations with the Owner
or the Contractor at all reasonable times.
B-4 ACCESS TO JOB SITES: The Architect shall at all times have access to the Work whenever it is in preparation and
progress. The Contractor shall provide facilities for such access so the Architect may perform their assigned functions under the
Contract Documents.
The Architect will make periodic visits to the Site to familiarize themselves with the progress and quality of the work and to determine
if the work is proceeding in accordance with the Contract documents. On the basis of on -site observations, the Architect will keep the
Owner informed of the progress of the Work and will endeavor to guard the Owner against defects and deficiencies in the Work of the
Contractor. Based upon such observations and the Contractor's applications for payments, the Architect will make determinations and
recommendations concerning the amounts owing to the Contractor and will issue certificates for payment amounts.
B-5 INTERPRETATIONS: The Architect will be, in the first instance, the interpreter of the requirements of the Plans and
Specifications and the judge of the performance thereunder by the Contractor, subject to the final decision of the Owner.
The Architect's decisions in matters relating to artistic effect will be final if consistent with the intent of the Contract Documents.
B-6 AUTHORITY TO STOP WORK: The Architect will have authority to reject work that does not conform to the Plans and
Specifications. In addition, whenever, in their reasonable opinion, the Architect considers it necessary or advisable in order to insure
the proper realization of the intent of the Plans and Specifications, the Architect will have authority to require the Contractor to stop
General Conditions of the Contract for Construction Lump Sum Contract Page 2 of 27
CFW PMD — Project Name March 2024
the Work or any portion thereof, or to require special inspection or testing of the Work whether or not such Work be then fabricated,
installed or completed.
B-7 MISCELLANEOUS
Shop Drawinas. Submittals and SamDles: The Architect will review Shop Drawings, Submittals and Samples.
Chanoe Orders: Change Orders, Owners Contingence Allowance forms, and Field Orders for Minor Changes in the work will be
issued by the Owner through the Architect in accordance with the provisions of Section L.
Guarantees: The Architect will receive all written guarantees and related documents required of the Contractor. Upon completion of
the project the Contractor shall provide the Owner of each guarantee.
Inspections: The Architect will conduct inspections for the purpose of determining and making their recommendations concerning the
dates of substantial completion and final completion. The Architect will conduct the final acceptance inspection and issue the
Certificate of Substantial Completion.
Operation and Maintenance Manuals: The Architect will receive on behalf of the Owner one hard copy and two digital copies of all
applicable equipment installation, operation, and maintenance brochures and manuals required of the Contractor.
B-8 TERMINATION OF THE ARCHITECT: In case of the termination of the employment of the Architect by the Owner, the
Owner shall either assume the duties of the Architect through the Director of the Property Management Department, or shall appoint
a successor Architect against whom the Contractor makes no reasonable objection.
SECTION C
OWNER
C-1 IDENTIFICATION: By the term Owner is meant the City of Fort Worth acting herein by their duly authorized representatives
in the manner provided by law. Authorized representatives include the City Manager, Assistant City Manager, and Director of the
Property Management Department and members of the Facilities Management Division. A designated representative will be identified
from within the Facilities Management Division to act as a point of contact for day-to-day contract administration.
C-2 DUTIES OF THE OWNER: The Owner shall furnish surveys describing the physical characteristics, legal limits and utility
locations for the site of the Work; provided, however, that the Contractor hereby covenants that they have inspected the premises and
familiarized themselves therewith and that the locations of utilities and other obstacles to the prosecution of the Work as shown on
the Owner's survey are for information only, are not binding upon the Owner, and the Owner shall not incur any liability for loss or
damage by virtue of any inaccuracies or deficiencies in such surveys. The Owner shall secure and pay for title to the site and all
necessary permanent or construction easements. The Owner will cooperate with the Contractor in the prosecution of the Work in
such manner and to such extent as may be reasonable and shall furnish information under their control with reasonable promptness
at the request of the Contractor.
C-3 INSTRUCTIONS: The Owner shall issue all instructions to the Contractor through the Architect.
C-4 ACCESS TO JOB SITE: The Owner shall at all times have access to the Work whenever it is in preparation and progress.
The Contractor shall provide facilities for such access so the Owner may perform their assigned functions under the Contract
Documents.
C-5 PROGRESS INSPECTIONS: The Owner and Architect will make visits to the Site to familiarize themselves with the
progress and quality of the Work and to determine if the work is proceeding in accordance with the Contract Documents. On the basis
of on -site observations and reports concerning the progress and quality of the work, the Owner and Architect will approve and authorize
the Contractor's applications for payments.
C-6 AUTHORITY TO STOP WORK: The City will have authority to reject work that does not conform to the Plans and
Specifications. Whenever, in their reasonable opinion, the City considers it necessary or advisable in order to insure the proper
realization of the intent of the Plans and Specifications, the City will have authority to require the Contractor to stop the work or any
portion thereof, or to require special inspection or testing of the Work whether or not such Work be then fabricated, installed or
completed. The Contractor shall be responsible for the cost of investigations, special inspections and testing for work that is found not
to comply with the plans and specifications.
C-7 SUBSTANTIAL COMPLETION INSPECTION: Upon agreement of the Contractor and Architect that the Work is
substantially complete, the Owner will schedule a Substantial Completion Inspection to be conducted by the Architect and attended
by representatives of the Architect, Owner and Contractor. Items identified during this inspection as being incomplete, defective or
deficient shall be incorporated into a punch list and attached to the AIA document G704, which is to be prepared by the Architect and
signed by the Contractor, and accepted, approved and signed by the Owner.
C-8 RIGHT TO AUDIT: Contractor agrees that the City shall, until the expiration of three years after final payment under this
contract, have access to and the right to examine any directly pertinent books, documents, papers and records of the Contractor
involving transactions relating to this contract.
Contractor further agrees to include in all their subcontracts hereunder a provision to the effect that the subcontractor agrees that the
City shall, until the expiration of three years after final payment under the subcontract, have access to and the right to examine any
General Conditions of the Contract for Construction Lump Sum Contract Page 3 of 27
CFW PMD — Project Name March 2024
directly pertinent books, documents, papers and records of such subcontractor, involving transactions to the subcontract. The term
"subcontract" as used herein includes purchase orders.
Contractor agrees to photocopy such documents as may be requested by the city. The city agrees to reimburse Contractor for the
costs of copies at the rate published in the Texas Administrative Code.
C-9 TERMINATION AND SUSPENSION OF WORK: The Owner has the right to terminate the Project for any reason. If the
project is terminated, the Contractor shall:
a) Stop work under the Contract on the date and to the extent specified on the notice of termination.
b) Place no further orders or subcontracts except as may be necessary for the completion of the work not terminated.
c) Terminate all orders and subcontracts to the extent that they relate to the performance of the work terminated by the notice
of termination.
After termination as above, the City will pay the Contractor a proportionate part of the contract price based on the work completed;
provided, however, that the amount of payment on termination shall not exceed the total contract price as reduced by the portion
thereof allocable to the work not completed and further reduced by the amount of payments, if, any otherwise made. Contractor shall
submit their claim for amounts due after termination as provided in this paragraph within 30 days after receipt of such claim. In the
event of any dispute or controversy as to the propriety or allowability of all or any portion of such claim under this paragraph, such
dispute or controversy shall be resolved and be decided by the City Council of the City of Fort Worth, and the decision by the City
Council of the City of Fort Worth shall be final and binding upon all parties to this contract.
SECTION D
CONTRACTOR
D-1 IDENTIFICATION: The Contractor is the person or organization identified as such in the Contract. The term Contractor
means the Contractor or their authorized representative.
D-2 INDEPENDENT CONTRACTOR: Contractor shall perform all work and services hereunder as an independent contractor,
not as agent, or employee of the City. Contractor shall have exclusive control of and the exclusive right to control the details of the
Work and services performed hereunder, and all persons performing same, and Contractor shall be solely responsible for the acts of
their officers, agents, and employees. Nothing herein shall be construed as creating a partnership or joint enterprise between City
and the Contractor, their officers, agents and employees, and the doctrine of respondent superior shall not apply.
D-3 SUBLETTING: It is further agreed that the performance of this Contract, either in whole or in part, shall not be sublet or
assigned to anyone else by said Contractor without the prior written consent of the Director of the Property Management Department
of the City of Fort Worth.
D-4 REVIEW OF CONTRACT DOCUMENTS: The Contractor shall carefully study and compare the Agreement, Conditions of
the Contract, Drawings, Specifications, Addenda and modifications and shall at once report to the Owner and to the Architect any
error, inconsistency or omission they may discover. The Contractor shall do no work without approved Submittals, Drawings,
Specifications and Interpretations.
D-5 SUPERVISION: The Contractor shall supervise and direct the Work, using reasonable skill and attention. They shall be
solely responsible for all construction means, methods, safety, techniques, sequences and procedures and for coordinating all portions
of the Work under the Contract Documents.
D-6 LABOR AND MATERIALS: Unless otherwise specifically noted, the Contractor shall provide and pay for all labor,
materials, equipment, tools, construction equipment and machinery, water, heat, utilities, transportation and other facilities and
services necessary for the proper execution and completion of the Work.
The Contractor will use its reasonable best efforts to hire or contract with local laborers, workmen and materialmen. This general
condition is not to be construed as limiting the right of the Contractor to employ laborers, workmen or materialmen from outside local
area.
The Contractor shall at all times enforce strict discipline and good order among their employees, and shall not employ on the Work
any unfit person or anyone not skilled in the task assigned to them.
D-7 COMPLIANCE WITH AND ENFORCEMENT OF PREVAILING WAGE RATE
Dutv to oav Prevailing Wage Rates. The Contractor shall comply with all requirements of Chapter 2258, Texas Government Code
(Chapter 2258), including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the
prevailing wage rates in accordance with Chapter 2258. Such prevailing wage rates are included in these contract documents.
Penaltv for Violation. A contractor or any subcontractor who does not pay the prevailing wage shall, upon demand made by the City,
pay to the City $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the prevailing
wage rates stipulated in these contract documents. This penalty shall be retained by the City to offset their administrative costs,
pursuant to Texas Government Code 2258.023.
General Conditions of the Contract for Construction Lump Sum Contract Page 4 of 27
CFW PMD — Project Name March 2024
Complaints of Violations and Citv Determination of Good Cause. On receipt of information, including a complaint by a worker,
concerning an alleged violation of 2258.023, Texas Government Code, by a contractor or subcontractor, the City shall make an initial
determination, before the 315' day after the date the City receives the information, as to whether good cause exists to believe that the
violation occurred. The City shall notify in writing the contractor or subcontractor and any affected worker of their initial determination.
Upon the City's determination that there is good cause to believe the contractor or subcontractor has violated Chapter 2258, the City
shall retain the full amounts claimed by the claimant or claimants as the difference between wages paid and wages due under the
prevailing wage rates, such amounts being subtracted from successive progress payments pending a final determination of the
violation.
Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of Section 2258.023, Texas Government Code,
including a penalty owed to the City or an affected worker, shall be submitted to binding arbitration in accordance with the Texas
General Arbitration Act (Article 224 et seq., Revised Statutes) if the contractor or subcontractor and any affected worker do not resolve
the issue by agreement before the 15th day after the date the City makes their initial determination pursuant to paragraph (c) above.
If the persons required to arbitrate under this section do not agree on an arbitrator before the 11th day after the date that arbitration
is required, a district court shall appoint an arbitrator on the petition of any of the persons. The City is not a party in the arbitration.
The decision and award of the arbitrator is final and binding on all parties and may be enforced in any court of competent jurisdiction.
Records to be Maintained. The Contractor and each subcontractor shall, for a period of three (3) years following the date of
acceptance of the Work, maintain records that show (i) the name and occupation of each worker employed by the Contractor in the
construction of the Work provided for in this contract; and (ii) the actual per diem wages paid to each worker. The records shall be
open at all reasonable hours for inspection by the City. The provisions of the Audit section of these contract documents shall pertain
to this inspection.
Pav Estimates. With each partial payment estimate or payroll period, whichever is less, the Contractor shall submit a notarized
affidavit stating that the Contractor has complied with the requirements of Chapter 2258, Texas Government Code.
Posting of Wage Rates. The Contractor shall post the prevailing wage rates in a conspicuous place at the site of the project at all
times.
Subcontractor Compliance. The Contractor shall include in their subcontracts and/or shall otherwise require all of their subcontractors
to comply with paragraphs (a) through (g) above.
On projects where special wage rates apply (e.g. Davis -Bacon) the Contractor agrees to meet all requirements of such programs.
D-8 WARRANTY: The Contractor warrants to the Owner and the Architect that all materials and equipment furnished under
this Contract will be new unless otherwise specified, and that all work will be of good quality, free from faults and defects, and in
conformance with the Contract Documents. All work not so conforming to these standards may be considered defective. If required
by the Architect or the Owner, the Contractor shall furnish satisfactory evidence as to the kind and quality of materials and equipment.
Prior to occupancy of the Project by the Owner, the Contractor warranties and obligations to correct defective Work exclude remedy
for damage or defect caused by (i) abuse by the Owner's separate contractors, or (ii) modifications made by the Owner or the Owner's
separate contractors. After occupancy of the Project by the Owner, the Contractor warranties and obligations to correct defective Work
exclude remedy for damage or defect caused by (i) abuse, (ii) modifications not executed by the Contractor, (iii) improper or insufficient
maintenance, (iv) improper operation, (v) normal wear and tear, or (vi) normal usage.
The warranty provided in this Section shall be in addition to and not in limitation of any other warranty or remedy provided by law or
the Contract Documents.
D-9 TAXES: The Contractor is exempt from State Sales Tax on material incorporated into the finished construction, Excise and
Use Tax. Equipment and materials not consumed by or incorporated into the work are subject to State sales taxes under House Bill
11, enacted August 15, 1991.
D-10 LICENSES, NOTICES AND FEES: Contractor shall obtain all Permits, Licenses, Certificates, and Inspections, whether
permanent or temporary, required by law or these Contract Documents. City of Fort Worth Building and Trade Permit fees are waived.
Separate permits may be required for each work location. It is the responsibility of the contractor to ensure all permits are kept active
and do not expire. The contractor will be responsible for any reinstatement fees due to expired permits.
The Contractor shall give all Notices and comply with all Laws, Ordinances, Rules, Regulations and Orders of any public authority
bearing on the performance of the Work. If the Contractor observes or becomes aware that any of the Contract Documents are at
variance therewith in any respect, he shall promptly notify the Architect and Owner in writing and any necessary changes will be made.
If the Contractor performs any Work knowing that it is in violation of, or contrary to, any of such Laws, Statutes, Charter, Ordinances,
Orders or Directives, or Regulations without furnishing Notice to the Architect and Owner, the Contractor will assume full responsibility
therefore and bear all costs attributable thereto.
D-11 ALLOWANCES: The Contractor shall include in the Contract Sum all allowances stated in the Contract Documents.
These allowances shall cover the net cost of the materials and equipment delivered and unloaded at the site, and all applicable
taxes. The Contractor's handling costs on the site, labor, installation costs, overhead, profit and other expenses
contemplated for the original allowance shall be included in the Contractor Sum and not in the allowance. The Contractor shall cause
the Work covered by these allowances to be performed for such amounts and by such persons as the Owner may direct, but they will
not be required to employ persons against whom they make a reasonable objection. If the cost, when determined, is more than or
less than the allowance, the Contract Sum shall be adjusted accordingly by Change Order which will include additional handling costs
General Conditions of the Contract for Construction Lump Sum Contract Page 5 of 27
CFW PMD — Project Name March 2024
on the site, labor, installation costs, field overhead, profit and other direct expenses resulting to the Contractor from any increase over
the original allowance.
D-12 SUPERINTENDENT: The Contractor shall employ a competent superintendent and necessary assistants who shall be in
attendance at the Project site during the progress of the Work. The superintendent shall be satisfactory to the Owner. The
superintendent shall represent the Contractor and all communications given to the superintendent shall be binding as if given to the
Contractor. Important communications will be confirmed in writing. Other communications will be so confirmed on written request in
each case.
D-13 RESPONSIBILITIES FOR EMPLOYEES AND SUB -CONTRACTORS: The Contractor shall be responsible to the Owner
for the acts and omissions of all employees and all Sub -contractors, their agents and employees, and all other persons performing
any of the Work under a contract with the Contractor.
D-14 FAILURE TO COMMENCE WORK: Should the Contractor fail to begin the Work herein provided for within the time herein
fixed or to carry on and complete the same according to the true meaning of the intent and terms of said Plans, Specifications and
Contract Documents, then the Owner shall have the right to either demand the surety to take over the Work and complete same in
accordance with the Contract Documents or to take charge of and complete the Work in such a manner as it may deem proper, and
if, in the completion thereof, the cost to the said City shall exceed the contract price or prices set forth in the said plans and specifica-
tions made a part hereof, the Contractor and/or their Surety shall pay said City on demand in writing, setting forth and specifying an
itemized statement of the total cost thereof, said excess cost.
D-15 PROGRESS SCHEDULE: Contractor, immediately after execution of the contract, shall prepare and submit for the
Architect's approval, an estimated progress schedule for the Work. The progress schedule shall be related to the entire Project. This
schedule shall indicate the dates for the starting and completion of the various states of construction and shall be revised as required
by the conditions of the Work, subject to the Architect's approval. It shall also indicate the dates for submission and approval of shop
drawings and submittals as well as the delivery schedule for major pieces of equipment and/or materials.
Progress Schedule shall be GANT style and include
1. Base Line: Planned Start/Finish
2. Progress Schedule: Actual Start/Finish
3. Variance: Ahead+/Behind-
4. % of Completion
5. Total Float and Weather Days
6. Critical, Milestones and Commissioning
7. Inspections
8. Owner Activities and Owner Furnished/Contractor Installed
Contractor shall update the progress schedule monthly and submit to the Architect for approval with the Contractor's monthly progress
payment requests.
Contractor shall provide a two -week look -ahead schedule detailing actual work taking place during that period at all OAC meetings.
D-16 DRAWINGS AND SPECIFICATIONS AT THE SITE: The Contractor shall maintain at the site for the Owner one copy of
all Drawings, Specifications, Addenda, approved Shop Drawings, Change Orders, and other Changes and Amendments in good order
and marked to record all changes made during construction. These shall also be available to the Architect. The Drawings, clearly
marked to record all changes made during construction, shall be delivered to the Architect upon completion of the Work. The Architect
will prepare, and provide to the Owner, one complete set of reproducible record drawings of the Work.
D-17 SHOP DRAWINGS AND SAMPLES: Shop Drawings are drawings, diagrams, illustrations, schedules, performance charts,
brochures and other data which are prepared by the Contractor or any Subcontractor, manufacturer, supplier or distributor, and which
illustrate some portion of the Work. These may be provided in an electronic format if acceptable to the Architect.
Samples are physical examples furnished by the Contractor to illustrate materials, equipment or workmanship, and to establish
standards by which the Work will be judged. Three copies of all physical examples shall be provided.
The Contractor shall review, approve, and submit, with reasonable promptness and in orderly sequence so as to cause no delay in
the Work or in the work of any other contractor, normally within the first 90 days of the work, three copies of all shop Drawings and
Samples required by the Contract Documents or subsequently by the Architect as covered by changes or amendments. Shop
Drawings and Samples shall be properly identified as specified, or as the Architect may require. At the time of submission, the
Contractor shall inform the Architect in writing of any deviation in the Shop Drawings or Samples from the requirements of the Contract
Documents.
General Conditions of the Contract for Construction Lump Sum Contract Page 6 of 27
CFW PMD — Project Name March 2024
By approving and submitting Shop Drawings and Samples, the Contractor thereby represents that they have determined and verified
all field measurements, field construction criteria, materials, catalog numbers and similar data, and that they have checked and
coordinated each shop drawing given in the Contract Documents. The Architect's approval of a separate item shall not indicate
approval of an assembly in which the item functions.
The Architect will review and approve Shop Drawings and Samples with reasonable promptness so as to cause no delay, but only for
conformance with the design concept of the Project and with the information given in the Contract Documents. The Architect's approval
of a separate item shall not indicate approval of an assembly in which the item functions. The Contractor shall make any corrections
required by the Architect and shall resubmit the required number of corrected copies of Shop Drawings or new Samples until approved.
The Contractor shall direct specific attention in writing or on resubmitted Shop Drawings to revisions other than the corrections
requested by the Architect on previous submissions.
The Architect's approval of Shop Drawings or Samples shall not relieve the Contractor of responsibility for any deviation from the
requirements of the Contract Documents unless the Contractor has informed the Architect in writing of such deviation at the time of
submission and the Architect has given written approval to the specific deviation. Architect's approval shall not relieve the Contractor
from responsibility for errors or omissions in the Shop Drawings or Samples.
No portion of the Work requiring a Shop Drawing or Sample submission shall be commenced until the Architect has approved the
submittal. All such portions of the Work shall be in accordance with approved Shop Drawings and Samples. Payment for Shop
Drawings will not be made until they are approved by the Architect or City.
D-18 SITE USE: The Contractor shall confine operations at the site to areas permitted by law, ordinances, permits and the
Contract Documents and shall not unreasonably encumber the site with any materials or equipment. Until acceptance of the Work by
the City, the entire site of the Work shall be under the exclusive control, care and responsibility of the Contractor. Contractor shall take
every precaution against injury or damage to persons or property by the action of the elements or from any other cause whatsoever.
The Contractor shall rebuild, repair, restore and make good at their own expenses all injuries or damages to any portions of the Work
occasioned by any of the above, caused before acceptance.
D-19 CUTTING AND PATCHING OF WORK: The Contractor shall do all cutting, fitting or patching of their Work that may require
making several parts fit together properly, and shall not endanger any Work by cutting, excavating or otherwise altering the Work or
any part of it.
D-20 CLEAN UP: The Contractor at all times shall keep the premises free from accumulation of waste materials or rubbish. At
the completion of the Work the contractor shall remove all their waste materials and rubbish from and about the Project as well as all
their tools, construction equipment, machinery and surplus materials, and shall clean all glass surfaces and leave the Work "Broom -
clean" or equivalent, except at otherwise specified. In addition to removal of rubbish and leaving the buildings "broom -clean",
Contractor shall clean all glass, replace any broken glass, remove stains, spots, marks and dirt from decorated work, clean hardware,
remove paint spots and smears from all surfaces, clean fixtures and wash all concrete, tile and terrazzo floors.
If the Contractor fails to clean up, the Owner may do so, and the cost thereof shall be charged to the Contractor.
D-21 COMMUNICATIONS: The Contractor shall copy the Owner on all communications to the Architect and copy Architect an
all communications to Owner.
D-22 CONTRACTOR REQUIREMENTS ON FEDERALLY FUNDED PROJECTS: Contractor shall observe and comply with the
requirements of the City of Fort Worth Fiscal Department, Intergovernmental Affairs and Grants Management as outlined in the
Supplemental Conditions contained in the Project Manual.
SECTION E
SUBCONTRACTORS
E-1 DEFINITION: A Subcontractor is a person or organization that has a direct contract with the Contractor to perform any of
the Work at the site. The term Subcontractor is referred to throughout the Contract Documents as if singular in number and masculine
in gender and means a Subcontractor or their authorized representative.
Nothing contained in the Contract, Documents shall create any contractual relation between the Owner and the Architect and any
subcontractor or any of their sub -subcontractors or materialmen.
E-2 AWARD OF SUBCONTRACTS: The Contractor shall furnish a list of the names of the subcontractors or other persons or
organizations (including those who are to furnish materials or equipment fabricated to a special design) proposed for such portions of
the Work as may be designated in the bidding requirements, or if none is so designated in the bidding requirements, the names of
the Subcontractors proposed for the principal portions of the Work. Prior to the award of the Contract, the Architect shall notify the
successful bidder in writing if either the Owner or Architect, after due investigation, has reasonable objection to any person or
organization on such list. Failure of the Owner and Architect to make an objection to any person or organization on the list prior to
the award of this Contract shall not constitute acceptance of such person or organization.
If, prior to the award of the Contract, the Owner or Architect has an objective to any person or organization on such list, and refuses
to accept such person or organization, the apparent low bidder may, prior to the award, withdraw their bid without forfeiture of bid
security. If such bidder submits an acceptable substitute, the Owner may, at their discretion, accept the bid or he may disqualify the
bid. If, after the award, the Owner or Architect objects in writing to any person or organization on such list, the Contractor shall provide
an acceptable substitute.
General Conditions of the Contract for Construction Lump Sum Contract Page 7 of 27
CFW PMD — Project Name March 2024
The Contractor shall not make any substitution for any Subcontractor or person or organization that has been accepted by the Owner
and the Architect, unless the substitution is also acceptable to the Owner and the Architect.
Contractor must publicly advertise and solicit competitive bids or competitive sealed proposals for all major elements of work other
than General Conditions. To Self -Perform work, the Contractor must submit a bid or proposal in same manner as trade
subcontractors and subcontractors.
The Contractor shall not make any substitution for any Subcontractor or person or organization that has been accepted by the Owner
and the Architect, unless the substitution is also acceptable to the Owner and the Architect.
E-3 TERMS OF SUBCONTRACTS: All work performed for the Contractor by a Subcontractor shall be pursuant to an
appropriate agreement between the Contractor and the Subcontractor (and where appropriate between Subcontractors and Sub -
subcontractors) which shall contain provisions that:
1. Preserve and protect the rights of the Owner and the Architect under the Contract with respect to the Work to be performed under
the subcontract so that the subcontracting thereof will not prejudice such rights;
2. Require that such Work be performed in accordance with the requirements of the Contract Documents;
3. Require submission to the Contractor of applications for payment under each subcontract to which the Contractor is a party, in
reasonable time to enable the Contractor to apply for payment;
4. Require that all claims for additional costs, extensions of time, damages for delays or otherwise with respect to subcontracted
portions of the Work shall be submitted to the Contractor (via any Subcontractor or Sub -subcontractor where appropriate) in the
manner provided in the Contract Documents for like claims by the Contractor upon the Owner;
5. Waive all rights the contracting parties may have against one another for damages caused by fire or other perils covered by the
property insurance, except such rights, if any, as they may have to proceeds of such insurance held by the Owner, and,
6. Obligate each Subcontractor specifically to consent to the provisions of this Section
All of the provisions set out in this section shall be deemed to have been included in every subcontract, and every subcontract shall
be so construed and applied as to the Owner and the Architect, whether or not such provisions are physically included in the sub-
contract.
E-4 MINORITY AND WOMEN -OWNED BUSINESS ENTERPRISES (M/WBEI:
The City will consider the Contractor's performance on other City Projects regarding its M/WBE program in the evaluation of bids.
Failure to comply with the City's M/WBE program, or to demonstrate a "good faith effort", shall result in a bid being considered
irresponsible.
Upon request, Contractor must provide the City with complete and accurate information regarding actual work performed by a Minority
or Women -Owned Business Enterprises (M/WBE) on the contract and proof of payment thereof. Contractor further agrees to permit
an audit and/or examination of any books, records or files in it's possession that will substantiate the actual work performed by an
M/WBE. The misrepresentation of acts (other than a negligent misrepresentation) and/or the commission of fraud by the Contractor
will be grounds for termination of the contract and/or initiating action under appropriate federal, state, or local laws or ordinances
relating to false statement. Further any such misrepresentation (other than a negligent misrepresentation) and/or commission of fraud
will result on the Contractor being determined to be irresponsible and barred from participating in City work for a period of time of not
less than three years.
Contractor shall provide copies of subcontracts or cosigned letters of intent with approved M/WBE subcontractors prior to execution
of the contract. Contractor shall also provide monthly reports on utilization of the subcontractors electronically in the Business Equity
Management System (B2GNow System).
The Contractor may count any tier subcontractors and/or suppliers toward meeting the goals. The Contractor may count toward its
goal a portion of the total dollar amount of the contract with a joint venture equal to the percentage of the M/WBE participation in the
joint venture for a clearly defined portion of the work to be performed. All subcontractors used in meeting the goals must be certified
by either the North Central Texas Regional Certification Agency, Dallas/Fort Worth Minority Business Development Council (DFW
MSDC), or Women's Business Council - Southwest (WBCS) prior to the award of the Contract.
Whenever a change order affects the work of an M/WBE subcontractor or supplier, the M/WBE shall be given an opportunity to perform
the work. Whenever a change order is in excess of 10% of the original contract, the Business Equity Project Coordinator shall
determine the goals applicable to the work to be performed under the change order.
During the term of the contract the Contractor shall:
1. Make no unjustified changes or deletions in its M/WBE participation commitments submitted with or subsequent to the bid, and,
General Conditions of the Contract for Construction Lump Sum Contract Page 8 of 27
CFW PMD — Project Name March 2024
2. If substantial subcontracting and/or substantial supplier opportunities arise during the term of the contract which the Contractor
had represented he would perform with his forces, the Contractor shall notify the City before subcontracts or purchase orders
are let, and shall be required to comply with modifications to goals as determined by the City, and,
3. Submit a REQUEST FOR APPROVAL ELECTRONICALLY IN THE B2GNow SYSTEM, if the Contractor desires to change or
delete any of the M/WBE subcontractors or suppliers.
Justification for change may be granted for the following:
1. Failure of subcontractor to provide evidence of coverage by Workers' Compensation Insurance
2. Failure of subcontractor to provide required general liability or other insurance.
3. Failure of subcontractor to execute a standard subcontract form in the amount of the proposal used by the CONTRACTOR in
preparing their M/WBE Participation plan
4. Default by the MIWBE subcontractor or supplier in the performance of the subcontract.
Other reasons at the discretion of the Business Equity Project Coordinator
Before final payment from the City, the Contractor shall provide the Department of Diversity & Inclusion Office with documentation to
reflect final participation of each M/WBE subcontractor and supplier used on the project. Upon verification by the Department of
Diversity & Inclusion Office that the Contractor has fulfilled its Business Equity goal commitment with bond fide M/WBEs performing
commercially useful functions, a recommendation will be made to the Director, Property Management Department that no reduction
in fee should be withheld from the final payment.
E-5 PAYMENTS TO SUBCONTRACTORS: The Contractor shall pay each Subcontractor, upon receipt of payment from the
Owner, an amount equal to the percentage of completion allowed to the Contractor on account of such Subcontractor's Work. The
Contractor shall also require each Subcontractor to make similar payments to their subcontractors.
If the Owner refuses to issue a Certificate for Payment for any cause which is the fault of the Contractor and not the fault of a particular
subcontractor, the Contractor shall pay that Subcontractor on demand, made at any time after the Certificate for Payment would
otherwise have been issued, for their Work to the extent completed, less the retained percentage.
The Contractor shall pay each Subcontractor a just share of any insurance monies received by the Contractor, and they shall require
each Subcontractor to make similar payments to their Subcontractors.
The Owner may, on request and at their discretion, furnish to any Subcontractor, if practicable, information regarding percentages of
completion certified to the Contractor on account of Work done by such Subcontractors.
Neither the Owner nor the Architect shall have any obligation to pay or to see to the payment of any monies to any Subcontractor.
E-6 SUBCONTRACTOR REQUIREMENTS FOR ECONOMIC DEVELOPMENT ADMINSTRATION (EDA) FUNDED
PROJECTS: The Contractor will cause appropriate provisions to be inserted in all subcontracts to bind subcontractors to FDA contract
requirements as contained herein and to 15 CFR 24 or OMB Circular A-110, as appropriate.
Each subcontractor must agree to comply with all applicable Federal, State, and local requirements in addition to those set forth in
this section.
No subcontractor will be employed on this Project, except as specifically approved by the City, who is contained in the listing of
contractors debarred, ineligible, suspended or indebted to the United States from contractual dealings with Federal government
departments. The work performed by any such contractor or subcontractor will be ineligible for reimbursement wholly or partially from
EDA grant fluids.
All subcontracts in excess of $10,000 shall include, or incorporate by reference, the equal opportunity clause of Executive Order
11246.
All subcontracts must contain a nondiscrimination clause.
Each subcontract must contain a requirement for compliance with the Davis -Bacon and related acts.
Each subcontractor must submit weekly each weekly payroll record and a weekly statement of compliance. These documents will be
submitted to the prime contractor who will compile them and submit to the City. The subcontractor can satisfy this requirement by
submitting a properly executed Department of Labor Form WH-347.
Each subcontract with every subcontractor must contain a clause committing the subcontractor to employment of local labor to the
maximum extent possible.
All subcontractors who employ more than 50 employees, and is a prime or first tier subcontractor, and has a subcontract or purchase
order of $50,000 or more must submit a completed Standard Form 100 (Compliance Report) by March 30 of each year.
Subcontractors performing work in areas covered by published goals for minorities will be required to report monthly on Form CC-
257.
General Conditions of the Contract for Construction Lump Sum Contract Page 9 of 27
CFW PMD — Project Name March 2024
SECTION F
SEPARATE CONTRACTS
F-1 OWNER'S RIGHT: The Owner reserves the right to award separate contracts in connection with other portions of the Work.
When separate contracts are awarded for other portions of the Work, "the Contractor" in the Contract Documents in each case shall
be the contractor who signs each separate contract.
F-2 MUTUAL RESPONSIBILITY OF CONTRACTORS: The Contractor shall afford other contractors reasonable opportunity
for the introduction and storage of their materials and equipment and the execution of their work, and shall properly connect and
coordinate work with theirs.
If any part of the Contractor's Work depends for proper execution or results upon the work of any other separate contractor, the
Contractor shall inspect and promptly report to the Owner any apparent discrepancies or defects in such work that render it unsuitable
for such proper execution and results. Failure of the Contractor to inspect and report shall constitute an acceptance of the other
contractor's work as fit and proper to receive their Work, except as to defects which may develop in the other separate contractor's
work after the execution of the Contractor's Work.
Should the Contractor cause damage to the work or property of any separate contractor on the site, the Contractor shall, upon due
notice, settle with such other contractor by agreement, if he will so settle. If such separate contractor sues the Owner on account of
any damage alleged to have been so sustained, the Owner shall notify the Contractor who shall defend against such suit at the
Contractor's expense, and if any judgment against the Owner arises therefrom, the Contractor shall pay or satisfy such judgment and
shall reimburse the Owner for all attorney's fees, court costs and expenses which the Owner has incurred in connection with such
suit.
F-3 CUTTING AND PATCHING UNDER SEPARATE CONTRACTS: The Contractor shall do all cutting, fitting or patching of
work that may be required to fit it to receive or be received by the work of other contractors shown in the Contract Documents. The
Contractor shall not endanger any work or any other contractors by cutting, excavating or otherwise altering any work and shall not
cut or alter the work of any other contractor except with the written consent of the Architect.
Any costs caused by defective or ill-timed work shall be borne by the party responsible therefor.
F-4 OWNER'S RIGHT TO CLEAN UP: If a dispute arises between the separate contractors as to their responsibility for cleaning
up, the Owner may clean up and charge the cost thereof to the several contractors as the Director of the Project Management
Department shall determine to be just.
SECTION G
MISCELLANEOUS PROVISIONS
G-1 CONFLICT OF LAWS: The Contractor and strictly comply with all Federal, State, County and City Laws, Statutes, Charter,
Ordinances, Regulations, or Directives controlling the action or operation of those engaged upon the work affecting the materials
used. He shall indemnify and save harmless the City and all of its officers and agents against any claim or liability arising from or
based on the violation of any such Laws, Statutes, Charter, Ordinances, Regulations, or Directives, whether by himself, his employees,
agents or subcontractors.
G-2 GOVERNING LAWS AND VENUE: It is mutually agreed and understood that this agreement is made and entered into by
the parties hereto with reference to the existing Charter and Ordinances of the City of Fort Worth and the laws of the State of Texas
with reference to and governing all matters affecting this Contract, and the Contractor agrees to fully comply with all the provisions of
the same. Venue for any cause of action arising out of this Contract shall lie exclusively in the state courts of Tarrant County, Texas
and contracts consents to such jurisdiction.
G-3 PERSONAL LIABILITY OF PUBLIC OFFICIALS: In performing their duties under the Statutes of the State of Texas and
the Charter and Ordinances of the City of Fort Worth in connection with this Contract, or in exercising any of the powers granted the
Owner herein, the officers, agents and employees of the City of Fort Worth are engaged in the performance of a governmental function
and shall not incur any personal liability by virtue of such performance hereunder, except for gross negligence or willful wrong.
G-4 COMPLIANCE WITH LAWS: Contractor agrees to comply with all laws, Federal, state and local, including all ordinances,
rules and regulations of the City of Fort Worth, Texas. Materials incorporated into the finished Project are not subject to State Sales
Tax.
The Architect is responsible for obtaining the Building Permit. The Contractor and the appropriate subcontractor are responsible for
obtaining all other construction permits from the governing agencies. Contractor shall schedule all code inspections with the Code
Inspection Division in accordance with the permit requirements. Building, plumbing, electrical and mechanical building permits are
issued without charge. Water and sewer tap, impact & access fees will be paid by the City. Any other permit fees are the responsibility
of the Contractor.
G-5 INDEMNIFICATION: Contractor covenants and agrees to indemnify City's engineer and architect, and their
personnel at the project site for Contractor's sole negligence. In addition, Contractor covenants and agrees to indemnify,
hold harmless and defend, at their own expense, the Owner, their officers, servants and employees, from and against any
and all claims or suits for property loss, property damage, personal injury, including death, arising out of, or alleged to arise
out of, the work and services to be performed hereunder by Contractor, their officers, agents, employees, subcontractors,
licensees or invitees, whether or not anv such iniurv, damage or death is caused, in whole or in part, by the negligence or
alleged negligence of Owner, their officers, servants, or emplovees. Contractor likewise covenants and agrees to indemnify
General Conditions of the Contract for Construction Lump Sum Contract Page 10 of 27
CFW PMD — Project Name March 2024
and hold harmless the Owner from and against any and all injuries to Owner's officers, servants and employees and any
damage, loss or destruction to property of the Owner arising from the performance of any of the terms and conditions of
this Contract, whether or not anv such iniury or damage is caused in whole or in part by the nealiaence or alleaed nealiaence
of Owner, their officers. servants or emplovees.
In the event Owner receives a written claim for damages against the Contractor or their subcontractors prior to final payment,
final payment shall not be made until Contractor either (a) submits to Owner satisfactory evidence that the claim has been
settled and/or a release from the claimant involved, or (b) provides Owner with a letter from Contractor's liability insurance
carrier that the claim has been referred to the insurance carrier.
The Director may, if deemed appropriate, refuse to whom a claim for damages is outstanding as a result of work performed
under a City Contract.
G-6 SUCCESSORS AND ASSIGNS: Except as provided in Paragraph E-2, this contract shall be binding upon and insure to
the benefit of the parties hereto, their Successors or Assigns. Contractor shall not assign or sublet all or any part of this Contract or
their rights or duties hereunder without the prior written consent of the Owner. Any such purported assignment or subletting without
the prior written consent of Owner shall be void.
G-7 WRITTEN NOTICE: Written Notice shall be deemed to have been duly served if delivered in person to the individual or
member of the firm or to an officer of the corporation for whom it was intended, or if delivered at or sent by registered or certified mail
to the last business address known to them who gives the notice.
G-8 SURETY BONDS: Surety Bonds are required on all Owner contracts in excess of $25,000. Contractor agrees, on the
execution of the contract to make, execute and deliver to said City of Fort Worth good and sufficient surety bonds for the faithful
performance of the terms and stipulations of the Contract and for the payment to all claimants for labor and/or materials furnished in
the prosecution of the work, such bonds being as provided and required in Chapter 2253, Texas Government Code.
Bonds shall be made on the forms furnished by or otherwise acceptable to the Owner. Both the Contractor and the Surety Company
shall properly execute each bond.
If the total contract price is $25,000 or less, payment to the contractor shall be made in one lump sum. Payment shall not be made for
a period of 45 calendar days from the date the work has been completed and accepted by the Owner.
If the contract amount is in excess of $25,000, a Payment Bond shall be executed, in the amount of the contract, solely for the
protection of all claimants supplying labor and material in the prosecution of the work.
If the contract amount is in excess of $100,000, a Performance Bond shall be executed, in the amount of the contract conditioned on
the faithful performance of the work in accordance with the plans, specifications, and contract documents. Said bond shall solely be
for the protection of the City of Fort Worth.
In order for a surety to be acceptable to the Owner, the surety must (1) hold a certificate of authority from the United States secretary
of the treasury to qualify as a surety on obligations permitted or required under federal law; or (2) have obtained reinsurance for any
liability in excess of $100,000 from a reinsurer that is authorized and admitted as a reinsurer in the state of Texas and is the holder of
a certificate of authority from the United States secretary of the treasury to qualify as a surety on obligations permitted or required
under federal law. Satisfactory proof of any such reinsurance shall be provided to the Owner upon request. The Owner, in its sole
discretion, will determine the adequacy of the proof required herein.
No sureties will be accepted by the Owner that are at the time in default or delinquent on any bonds or which are interested in any
litigation against the Owner. Should any surety on the contract be determined unsatisfactory at any time by the Owner, notice will be
given to the Contractor to that effect and the Contractor shall immediately provide a new surety satisfactory to the Owner.
Until bonds are sent to the city and verified no Notice to Proceed will be issued.
G-9 OWNER'S RIGHT TO CARRY OUT THE WORK: If the Contractor defaults or neglects to carry out the Work in accordance
with the Contract Documents or fails to perform any provision of the Contract, the Owner may, without prejudice to any other remedy
they may have, enter the site and make good such deficiencies. In such case an appropriate Change Order shall be issued deducting
from the payments then or thereafter due the Contractor the cost of correcting such deficiencies, including the cost of the Architect's
additional services made necessary by such default, neglect or failure. If the payments then or thereafter due the Contractor are not
sufficient to cover such amount, the Contract shall pay the difference to the Owner.
G-10 ROYALTIES AND PATENTS: The Contractor shall pay all royalties and license fees. they shall defend all suits or claims
for infringement of any patent rights and shall save the Owner harmless from loss on account thereof and shall be responsible for all
such loss when a particular design, process or the product of a particular manufacturer or manufacturers is specified; however, if the
Contractor has reason to believe that the design, process or product specified is an infringement of a patent, they shall be responsible
for such loss unless they promptly give such information to Owner.
G-11 TESTS: If the Contract Documents, Laws, Ordinances, Rules, Regulations or Orders of any public authority having
jurisdiction require any Work to be inspected, tested or approved, the Contractor shall give the Owner timely notice of their readiness
and the date arranged so the Architect may observe such inspection, testing or approval. The Owner shall bear all costs of such
inspection, tests and approvals unless otherwise provided.
If after the commencement of the Work, the Owner determines that any work requires special inspection, testing or approval not
included above, the Architect, upon written authorization from the Owner, will instruct the Contractor to order such special inspection,
General Conditions of the Contract for Construction Lump Sum Contract Page 11 of 27
CFW PMD — Project Name March 2024
testing or approval, and the Contractor shall give notice as required in the preceding paragraph. If such special inspection or testing
reveals a failure of the Work to comply (1) with the requirements of the Contract Documents or (2) with respect to the performance of
the Work, with Laws, Statutes, Charter, Ordinances, Regulations or Orders of any public authority having jurisdiction, the Contractor
shall bear all costs thereof, including the Architect's additional services made necessary by such costs; otherwise the Owner shall
bear such costs, and an appropriate Change Order shall be issued.
The Contractor shall secure certificate of inspection, testing or approval, and three copies will be promptly delivered by them to the
Architect. The Architect will review the certificates and forward one copy of each with their recommendation(s) to the Owner and one
copy will be kept onsite for review by the Owner, Architect and AHJ. Contractor shall provide a graphic log documenting all testing
and inspection locations and dates.
If the Owner wishes to observe the inspections, tests or approvals required by this Section, they will do so promptly and, where
practicable, at the source of supply.
Neither the observations of the Architect or the Owner in their administration of the Construction Contract, nor inspections, tests or
approvals by persons other than the Contractor shall relieve the Contractor from their obligations to perform the Work in accordance
with the Contract Documents.
G-12 INTERRUPTION OF EXISTING UTILITIES SERVICES: The Contractor shall perform the Work under this Contract with a
minimum of outage time for all utilities. Interruption shall be by approved sections of the utility. In some cases, the Contractor may be
required to perform the Work while the existing utility is in service. The existing utility service may be interrupted only when approved
by the Owner. When it is necessary to interrupt the existing utilities, the Contractor shall notify the Owner in writing at least ten days
in advance of the time that they desire the existing service to be interrupted. The interruption time shall be kept to a minimum.
Depending upon the activities at an existing facility that requires continuous service from the existing utility, an interruption may not
be subject to schedule at the time desired by the Contractor. In such cases, the interruption may have to be scheduled at a time of
minimum requirements of demand for the utility. The amount of time requested by the Contractor of existing utility services shall be
as approved by the Owner.
G-13 LAYING OUT WORK: The Contractor shall verify dimensions and elevations indicated in layout of existing work.
Discrepancies between Drawings, Specifications, and existing conditions shall be referred to the Architect for adjustment before work
affected is performed. Failure to make such notification shall place responsibility upon Contractor to carry out work in satisfactory
workmanlike manner at the Contractor's sole expense.
The Contractor shall be held responsible for the location and elevation of all the construction contemplated by the Construction
Documents. The contractor shall video document all undersalb work and provide such documentation to the City prior to slab
placement.
Prior to commencing work, the Contractor shall carefully compare and check all Architectural, Structural, Mechanical an Electrical
drawings; each with the other that in any affects the locations or elevation of the work to be executed, and should any discrepancy be
found, they shall immediately report the same to the Architect for verification and adjustment. Any duplication of work made necessary
by failure or neglect on their part to comply with this function shall be done at the Contractor's sole expense.
G-14 MEASUREMENTS: Before ordering any material or doing any work, the Contractor shall verify all measurements at the
site or at the building and shall be wholly responsible for the correctness of same. No extra charge or compensation will be allowed
on account of any difference between actual dimensions and dimensions indicated on the drawings. Any difference that may be found
shall be submitted to the Architect for consideration and adjustment before proceeding with the project.
G-15 EXISTING OVERHEAD OR UNDERGROUND WORK: The Contractor shall carefully check the site where the project is
to be erected and observe any existing overhead wires and equipment. Any such work shall be moved, replaced or protected, as
required, whether or not shown or specified at the Contractor's sole expense.
Attention is directed to the possible existence of pipe and other underground improvements that may or may not be shown on the
Drawings. All reasonable precautions shall be taken to preserve and protect any such improvements whether or not shown on the
Drawings.
Location of existing underground lines, shown on the Drawings are based on the best available sources, but are to be regarded as
approximate only. Exercise extreme care in locating and identifying these lines before excavation in adjacent areas.
G-16 ALIGNMENT OF JOINTS IN FINISH MATERIALS: It shall be the responsibility of the Contractor to make certain in the
installation of jointed floor, wall and ceiling materials that:
1. Preserve and protect the rights of the Owner and the Architect under the Contract with respect to the Work to be performed under
the subcontract so that the subcontracting thereof will not prejudice such rights;
2. Place joints to relate to all opening and breaks in the structure and be symmetrically placed wherever possible. This includes
heating registers, light fixtures, equipment, etc.
If because of the non -related sizes of the various materials and locations of openings, etc., it is not possible to accomplish the above,
the Contractor shall request the Architect to determine the most satisfactory arrangement. The Contractor shall establish centerlines
for all trades.
General Conditions of the Contract for Construction Lump Sum Contract Page 12 of 27
CFW PMD — Project Name March 2024
G-17 INTEGRATING EXISTING WORK: The Contractor shall protect all existing street and other improvements from damages
Contractor's operations shall be confined to the immediate vicinity of the new work and shall not in any interfere with or obstruct the
ingress or egress to and from existing adjacent facilities.
Where new site work is to be connected to existing work, special care shall be exercised by the Contractor not to disturb or damage
the existing work more than necessary. All damaged work shall be replaced, repaired and restored to original condition at no cost to
the Owner.
G-18 HAZARDOUS MATERIAL CERTIFICATION: It is the intent of the contract documents, whether expressly stated or not,
that nothing containing hazardous materials, such as asbestos, shall be incorporated in to the project. The Contractor shall exercise
every reasonable precaution to ensure that asbestos -containing materials are not incorporated into any portion of the project, including
advising all materials suppliers and subcontractors of this requirement. The Contractor shall verify that components containing lead
do not contact the potable water supply.
G-19 LOCATION OF EQUIPMENT AND PIPING: Drawing showing location of equipment, piping, ductwork, etc. are
diagrammatic and job conditions may not always permit their installation in the location shown. When this situation occurs, it shall be
brought to the Architect's attention immediately and the relocation determined in a joint conference. The Contractor will be held
responsible for the relocating of any items without first obtaining the Architect's approval. They shall remove and relocate such items
at their own expense if so directed by the Architect. Where possible; uniform margins shall be maintained between parallel lines and/or
adjacent wall, floor or ceiling surfaces.
G-20 OVERLOADING: The Contractor shall be responsible for loading of any part or parts of structures beyond their safe carrying
capacities by placing of materials, equipment, tools, machinery or any other item thereon. No loads shall be placed on floors or roofs
before they have attained their permanent and safe strength.
G-21 MANUFACTURER'S INSTRUCTIONS: Where it is required in the Specifications that materials, products, processes,
equipment, or the like be installed or applied in accordance with manufacturer's instructions, direction or specifications, or words to
this effect, it shall be construed to mean that said application or installation shall be in strict accordance with printed instructions
furnished by the manufacturer of the material concerned for use under conditions similar or those at the job site. Six copies of such
instructions shall be furnished to the Architect and their approval thereof obtained before work is begun.
G-22 CLEANING UP: The Contractor shall keep the premises free from accumulation of waste material or rubbish caused by
employees or as a result of the Work.
At completion of work, the General Contractor shall, immediately prior to final inspection of complete building, execute the following
final cleaning work with trained janitorial personnel and with material methods recommended by the manufactures of installed
materials.
1. Sweep and buff resilient floors and base, and vacuum carpeting.
2. Dust all metal and wood trim and similar finished materials.
3. Clean all cabinets and casework.
4. Dust all ceilings and walls.
5. Dust, and if necessary wash, all plumbing and electrical fixtures.
6. Wash all glass and similar non -resilient materials.
7. All hardware and other unpainted metals shall be cleaned and polished and all equipment and paint or decorated work shall be
cleaned and touched -up if necessary, and all temporary labels, tags, and paper coverings removed throughout the buildings.
Surfaces that are waxed shall be polished.
8. The exterior of the building, the grounds, approaches, equipment, sidewalks, streets, etc. shall be cleaned similar to interior of
buildings and left in good order at the time of final acceptance. All paint surfaces shall be clean and unbroken, hardware shall
be clean and polished, all required repair work shall be completed and dirt areas shall be scraped and cleared of weed growth.
9. Clean all glass surfaces and mirrors of putty, paint materials, etc., without scratching or injuring the glass and leave the work
bright, clean and polished. Cost of this cleaning work shall be borne by Contractor.
10. Cleaning, polishing, scaling, waxing and all other finish operations indicated on the Drawings or required in the Specifications
shall be taken to indicate the required condition at the time of acceptance of all work under the Contract.
11. Burning: Burning of rubbish on the premises will not be permitted.
G-23 DUST CONTROL: Precaution shall be exercised at all times to control dust created as a result of any operations during
the construction period. If serious problems or complaints arise due to air -borne dust, or when directed by the Architect, operations
causing such problems shall be temporarily discontinued and necessary steps taken to control the dust.
General Conditions of the Contract for Construction Lump Sum Contract Page 13 of 27
CFW PMD — Project Name March 2024
G-24 FIRE PROTECTION: The Contractor shall at all times maintain good housekeeping practices to reduce the risk of fire
damage or injury to workmen. All scrap materials, rubbish and trash shall be removed daily from in and about the building and shall
not be permitted to be scattered on adjacent property.
Suitable storage space shall be provided outside the immediate building area for storing flammable materials and paints; no storage
will be permitted in the building. Excess flammable liquids being used inside the building shall be kept in closed metal container and
removed from the building during unused periods.
A fire extinguisher shall be available at each location where cutting or welding is being performed. Where electric or gas welding or
cutting work is done, interposed shields of incombustible material shall be used to protect against fire damage due to sparks and hot
metal. When temporary heating devices are used, a watchman shall be present to cover periods when other workmen are not on the
premises.
The Contractor shall provide fire extinguishers in accordance with the recommendations and NFPA Bulletins Nos. 10 and 241.
However, in all cases a minimum of two fire extinguishers shall be available for each floor of construction.
G-25 CUTTING AND PATCHING: Wherever cutting and removal of portions of the existing work is indicated, such work shall be
neatly sawed or cut by Contractor in a manner that will produce a neat straight line, parallel to adjacent surfaces or plumb for vertical
surfaces. Care should be exercised not to damage any work that is to remain.
At no time shall any structural members be cut without written consent from the Architect.
G-26 PROJECT CLOSEOUT:
Electronic submission of Close Out documentation must be submitted 30 days prior to substantial completion for review and approval
of Architect and Owner.
Final Inspection. Record Drawinas: Attention is called to General Conditions Section entitled, "Substantial Completion and Final
Payment".
Maintenance Manual: Sheets shall be 8'/2" x 11", except pull out sheets may be neatly folded to 8'/2 "x 11". Manuals shall be bound
in plastic covered, 3 ring, loose leaf binder with title of project lettered on front and shall contain:
1) Name, address and trade of all sub -contractors.
2) Complete maintenance instructions; name, address, and telephone number of installing Contractor, manufacturer's local
representative, for each piece of operative equipment.
3) Catalog data on plumbing fixtures, valves, water heaters, heating and cooling equipment, temperature control, fan, electrical
panels, service entrance equipment and light fixtures.
4) Manufacturer's name, type, color designation for resilient floors, windows, doors, concrete block, paint, roofing, and other
materials.
5) Provide complete copies of ALL APPROVED product and material submittals.
Submit two digital electronic copies and one hard copy of Maintenance Manuals, prior to request for final payment including any video
documentation of work recorded over the duration of the project..
Commissioning and Test and Balance Reports (Final)
Operational Inspection and Maintenance Instruction: The Contractor shall provide at their expense, competent manufacturer's
representatives to completely check out all mechanical and electrical systems and items covered by the Drawings and Specifications.
This requirement shall be scheduled just prior to and during the initial start-up. After all systems are functioning properly the
representatives shall instruct maintenance personnel of the Owner in the proper operation and maintenance of each item.
G-27 GUARANTEE AND EXTENDED GUARANTEE: Upon completion of the Project, prior to final payment, guarantees
required by technical divisions of Specifications shall be properly executed in quadruplicate by subcontractors and submitted through
the Contractor to Architect. Delivery of guarantees shall not relieve Contractor from any obligation assumed under Contract.
The Contractor shall guarantee the entire Project for one year. In addition, where separate guarantees, for certain portions of work,
are for longer periods, General Contractor's guarantee shall be extended to cover such longer periods. Manufacturer's extended
warrantees shall be included in this contract.
Guarantees shall become valid and operative and commence upon issuance of Certificate of Inspection and Acceptance by Owner.
Guarantees shall not apply to work where damage is result of abuse, neglect by Owner or their successor(s) in interest.
The Contractor agrees to warrant their work and materials provided in accordance with this contract and the terms of the Technical
Specifications contained herein. Unless supplemented by the Technical Specifications or the manufacturer's normal extended
warrantees, the Contractor shall warrant all work materials, and equipment against defects for a period of one year from the date of
final acceptance. The Contractor further agrees to bear all costs of making good all work that is found to be defective or not provided
in accordance with the Contract Documents. Additionally if the facility or contents are damaged due to defective materials or
workmanship of the Contractor, the Contractor further agrees to bear all cost of repairing and/or replacing damaged items and
components to bring such items back to at least their original condition.
General Conditions of the Contract for Construction Lump Sum Contract Page 14 of 27
CFW PMD — Project Name March 2024
G-28 RECORD DRAWINGS: Upon completion of the Work and prior to application for final payment, one print of each of the
drawings accompanying this specification shall be neatly and clearly marked in red by the Contractor to show variations between the
construction actually provided and that indicated or specified in the Contract Documents. The annotated documents shall be delivered
to Architect. Where a choice of materials and/or methods is permitted herein and where variations in the scope or character of the
work from the entire work indicated or specified are permitted either by award of bidding items specified for that purpose, or by
subsequent change to the drawings, the record drawings shall define the construction actually provided. The representation of such
variations shall conform to standard drafting practice and shall include supplementary notes, legends and details which may be
necessary for legibility and clear portrayal of the actual construction. The record drawings shall indicate, in addition, the actual location
of all sub -surface utility lines, average depth below the surface and other appurtenances. All diagrammatic designs shall be indicated
with the actual locations on the plans.
G-29 CONSTRUCTION FENCE: The Contractor shall provide a substantial chain -link construction fence around all or a part of
the site. The fences and gates must be maintained throughout the construction period. Remove the fences and gates upon completion
of the Project and restore the site to the required original or contract condition.
G-30 PRODUCT DELIVERY. STORAGE, HANDLING: The Contractor shall handle, store and protect materials and products,
including fabricated components, by methods and means which will prevent damage, deterioration and loss, including theft (and
resulting delays), thereby ensuring highest quality results as the work progresses. Control delivery schedules so as to minimize
unnecessary long-term storage at project site prior to installation.
G-31 REMOVAL OF SALVAGED MATERIAL: The Contractor shall remove salvaged material and equipment from the Project
site and dispose of it in accordance with the law. Equipment or material identified in the Specifications or Plans for Owner salvage
shall be carefully removed and delivered to the Owner at any location in within the City limits as directed by the City.
G-32 MANUFACTURER'S REFERENCE: Catalog, brand names, and manufacturer's references are descriptive, not restrictive.
Bids on brands of like nature and quality will be considered. Contractor shall inform the City of any substitutions intended for the
project within 5 business days of bid opening. Failure to inform the City of substitute projects will obligate the Contractor to provide
the specified material if awarded the contract. Within 14 days after bid opening and upon request of the Contractor, the Contractor
will submit a full-sized sample and/or detailed information as required to allow the architect to determine the acceptability of proposed
substitutions. Where equipment has been listed as "no substitute accepted'; the City will accept no alternates to the specified
equipment.
SECTION H
CONTRACT TIME
H-1 DEFINITIONS
The Contract Time is the period of time allotted in the Contract Documents for completion of the Work and is the number of calendar
days elapsing between the date of commencement and the date of Substantial Completion plus additional days assessed for failure
to complete punch list items from the Final Inspection in a timely manner and additional weather days beyond what is allotted in the
contract.
The Date of Commencement of the Work is the date established in the Notice to Proceed. If there is no notice to proceed, it shall be
the date of the Agreement or such other date as may be established therein.
The Date of Substantial Completion of the Work or designated portion thereof is the Date certified by the Architect with the approval
of the Owner that construction is sufficiently complete, in accordance with the Contract Documents, so the Owner may occupy the
Work or designated portion thereof for the use for which it is intended. Final acceptance of the completed work or any portion thereof
can be made only by the Owner, and no other form of acceptance will be binding upon the Owner.
A Calendar Dav constitutes 24 hours of time and is any one of the seven days of a week, including Sunday, regardless of whether a
"Working Day" or not, and regardless of weather conditions or any situation which might delay construction. An extension of contract
time shall be in accordance with this Section. Extensions of time will be as recommended by the Architect with final approval by City
of Fort Worth.
A Workino Dav is defined as a calendar day, not including Saturdays, Sundays, and legal holidays, in which weather or other conditions
not under the control of the Contractor permit the performance of work for a continuous period of not less than seven hours between
7:00 a.m. and 6:00 p.m. However, nothing in these Contract Documents shall be construed as prohibiting the Contractor from working
on Saturdays if he so desires. Should the Contractor choose to work on Saturdays, one day will be charged as contract -working time
when weather or other conditions permit seven hours of work as delineated above. Legal holidays are defined as being New Year's
Day, Martin Luther King Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Thanksgiving Day, the day after
Thanksgiving, and Christmas Day. If Juneteenth, Independence Day, Christmas Day or New Year's Day falls on a Saturday, the
preceding Friday is a legal holiday. If Juneteenth, Independence Day, Christmas Day or New Year's Day falls on a Sunday, the
following Monday will be a legal holiday.
H-2 PROGRESS AND COMPLETION: All the time limits stated in the Contract Documents are of essence to the Contract. The
Contractor shall begin the Work on the date of commencement as defined in this Section. He shall carry the Work forward expeditiously
with adequate forces and shall complete it within the Contract Time.
H-3 CONSTRUCTION WORK: Noise created by construction work within three hundred (300) feet of an occupied residential
structure involving the erection, excavation, demolition, alteration, or repair of any building, structure, or flatwork is prohibited as
follows:
General Conditions of the Contract for Construction Lump Sum Contract Page 15 of 27
CFW PMD — Project Name March 2024
Before 7:00 a.m. or after 8:00 p.m. Monday -Friday
Before 9:00 a.m. or after 8:00 p.m. Saturday -Sunday
H-4 DELAYS AND EXTENSIONS OF TIME: If the Contractor is delayed at any time in the progress of the Work by any act or
neglect of the Owner or the Architect, or by any employee of the Owner, or by any separate contractor employed by the Owner, or by
changes ordered in the Work, or by labor disputes, fire, unusual delay in transportation, unavoidable casualties or any causes beyond
the Contractor's control, or by any cause which the Architect determines may justify the delay, then the contract time may be extended
by Change Order for such reasonable time as recommended by the Architect and approved by the Owner. When the Contractor is
delayed due to abnormal weather conditions, the Fort Worth Weather Table provided in these Contract Documents shall be used as
the basis for providing a fair and equitable adjustment of the contract time.
All claims for extension of time shall be made in writing to the Architect no more than fifteen days after the occurrence of the delay;
otherwise they shall be waived.
If no schedule or agreement is made stating the dates upon which written interpretations shall be furnished, then no claim for delay
shall be allowed on account of failure to furnish such interpretation until fifteen days after demand is made for them, and not then
unless such a claim is reasonable.
H-5 WEATHER: The Fort Worth Weather Table is to be used as a basis for calculation of excess rain or weather days for
projects with duration in calendar days. If the site records indicate that the Contractor was unable to carry out operations due to
weather, it is counted as a weather day. If the number of weather days exceeds the number of average rain days plus the snow/ice-
pellet days for the contract duration, the contract period will be adjusted by Change Order.
H-6 NO DAMAGE FOR DELAY: Notwithstanding anything to the contrary contained herein, the Contractor shall never be
entitled to any compensation or damages for delay of any nature. In that regard, the Contractor shall receive no compensation for
delays or hindrances to the work, as a result of price escalation in the marketplace, labor, material shortages or to increases in the
GMP. When such extra compensation is claimed a written statement thereof shall be presented by the Contractor to the Architect
and if found to be correct shall be approved and referred by him to the Council for final approval or disapproval; and the action thereon
by the Council shall be final and binding. If delay is caused by specific orders given by the Architect or Owner to stop work, or by the
performance of extra work, or by the failure of the Owner to provide material or necessary instructions for carrying on the work, then
such delay will entitle the Contractor to an equivalent extension of time, his application for which shall, however, be subject to the
approval of the Owner and no such extension of time shall release the Contractor or the surety on its performance bond from all his
obligations here under which shall remain in full force until the discharge of the contract.
SECTION I
PAYMENTS AND COMPLETION
1-1 CONTRACT SUM: The Contract Sum is stated in the contract and is the total amount payable by the Owner to the
Contractor for the performance of the Work under the Contract Documents.
1-2 SCHEDULE OF VALUES: Before the first Application for Payment, the Contractor shall submit to the Architect and owner
a Schedule of Values of the various portions of the Work broken out by labor and materials, including quantities if required by the
Architect, aggregating the total Contract Sum, divided so as to facilitate payments to Sub -contractors, prepared in such form as
specified or as the Architect and the Contractor may agree upon, and supported by such data to substantiate correctness as the
Architect may require. Each item in the Schedule of Values shall include proper share of overhead and profit. This Schedule, when
approved by the Architect and the Owner, shall be used as a basis for the Contractor's Applications for Payment.
1-3 PROGRESS PAYMENTS: On the first day of each month after the first month's work has been completed, the Contractor
will make current estimates in writing for review by the Architect and Owner of materials in place complete and the amount of work
performed during the preceding month or period and the value thereof at the prices contracted for as shown on the approved Schedule
of Values and Progress Schedule.
If payments are to be made on account of materials or equipment not incorporated in the Work but delivered and suitably stored at
the site or in a warehouse, such payments shall be conditioned upon submission by the Contractor of bills of sale or such other
procedures satisfactory to the Owner to establish the Owner's title to such materials or equipment or otherwise protect the Owner's
interest including applicable insurance and transportation to the site.
Contractor warrants and guarantees that title to all Work, materials and equipment covered by an Application for Payment, whether
incorporated into the Project or not, will pass to the Owner upon the receipt of such payment by the Contractor, free and clear of all
liens, claims, security interests or encumbrances hereinafter referred to as "liens'; and that no Work, materials or equipment covered
by an Application for Payment will have been acquired by the Contractor, or by any other persons performing the Work at the site or
furnishing materials and equipment for the Work, subject to an agreement under which an interest therein or an encumbrance thereon
is retained by the seller or otherwise imposed by the Contractor or such other person. Contractor shall provide access to the red -lined
drawings for that period for approval by Owner.
The Contractor shall prepare each application for payment on AIA Document G702, "Application and Certificate for Payment", and
attached thereto AIA Document G703, "Continuation Sheet", to indicate the progress made to date and the period or month for which
payment is requested for each Item listed in the Schedule of Values. A copy of the revised monthly work progress schedule must be
attached before the pay request can be accepted.
General Conditions of the Contract for Construction Lump Sum Contract Page 16 of 27
CFW PMD — Project Name March 2024
1-4 CERTIFICATES FOR PAYMENT: If the Contractor has made Application for Payment as above, the Architect will, with
reasonable promptness but not more than seven days after the receipt of the Application, prepare a Certificate of Payment, with a
copy to the Contractor, for such amount determined to be properly due, or state in writing reasons for withholding a Certificate.
The issuance of a Certificate for Payment will constitute a representation by the Owner, based on the Architect's observations at the
site and the data comprising the Application for Payment, that the Work has progressed to the point indicated; that the quality of the
Work is in accordance with the Contract Documents (subject to an evaluation of the Work as a functioning whole upon Substantial
Completion, to the results of any subsequent tests required by the Contract Documents, to minor deviations from the Contract
Documents correctable prior to completion, and to any specific qualifications stated in the Certificate); and recommendations to the
Owner that the Contractor be paid in the amount certified. In addition, the Architect's approval of final payment assures the Owner
that the conditions precedent to the Contractor's being entitled to final payment as set forth in this Section have been fulfilled.
After the Architect has issued a Certificate for Payment, the Owner shall approve or disapprove same within ten days after it has been
delivered to the Owner. For contracts less than $400,000, Owner shall pay 90% of the approved estimate to the Contractor within
seven days after approval, and the remaining 10% of each such estimate will be retained by the Owner until Substantial Completion.
For contracts in excess of $400,000, the Owner will retain only 5% of each estimate until Substantial Completion.
No Certificate for a progress payment, nor any progress payment, nor any partial or entire use or occupancy of the Project by the
Owner, shall constitute an acceptance of any Work not in accordance with the Contract Documents, or relieve the Contractor of liability
in respect to any warranties or responsibility for faulty materials or workmanship. The Contractor shall promptly remedy any defects
in the Work and pay for any damage to other work resulting therefrom that shall appear within a period of one year from the date of
final acceptance of the Work unless a longer period is specified.
1-5 PAYMENTS WITHHELD: The Architect may decline to approve an Application for Payment and may withhold the
Certificate in whole or in part if in their opinion they are unable to make the representations to the Owner as provided in this Section.
The Architect may also decline to approve any Applications for Payment or, because of subsequently discovered evidence or
subsequent inspections, may nullify the whole or any part of any Certificate for Payment previously issued to such extent as may be
necessary in their opinion to protect the Owner from loss because of:
1) Defective work not remedied;
2) Claims filed or reasonable evidence indicating probable filing of claims;
3) Failure of the Contractor to make payments properly to Subcontractors, or for labor, materials or equipment;
4) Reasonable doubt that the Work can be completed for the unpaid balance of the Contract Sum;
5) Damage to another contractor;
6) Reasonable indication that the Work will not be completed within the Contract Time; or
7) Unsatisfactory prosecution of the Work by the Contractor.
When such grounds for the refusal of payment are removed, payment shall be made for amounts withheld because of them, without
payment of interest. The Owner reserves the right to withhold the payment of any monthly estimate, without payment of interest, if the
Contractor fails to perform the Work in accordance with the specifications or instructions of the Architect.
1-6 LIQUIDATED DAMAGES: The parties agree and acknowledge that actual damages are uncertain and difficult to ascertain
because the Project relates to construction for a municipality. Normal damages of lost rent or profit are not applicable in this
circumstance because the City is a municipality and the Project will not receive rent and the City will not have lost profits. Therefore,
the parties agree that because City's actual damages are too difficult to ascertain that the liquidated damages stated below are
reasonable and a correct representation of actual damages to the City. The parties also agree that the liquidated damages called for
in this contract are not a penalty but an agreed upon damages calculation by two sophisticated parties. The deduction for liquidated
damages shall be as follows:
Amount of Contract Liquidated Damages per Day
$15,000 or less
$45
$15,001 to $25,000
$63
$25,001 to $50,000
$105
$50,001 to $100,000
$154
$100,000to $500,000
$210
$500,001to $1,000,000
$315
$1,000,001to $2,000,000
$420
$2,000,001 to $5,000,000
$630
$5,000,001 to $10,000,000
$840
Over $10,000,000
$980
1-7 FAILURE OF PAYMENT: If, without fault on the part of the Contractor, the Architect should fail to issue any Certificate for
Payment within seven days after receipt of the Contractor's Application for Payment, if the Contractor's Application for Payment, or if,
without fault on the part of the Contractor, the Owner should fail to approve such estimate or to pay to the Contractor 90% or 95% (as
applicable) of the amount thereof within the period of time specified, then the Contractor may, upon seven (7) days additional written
notice to the Owner and to the Architect, stop the Work until payment of the amount owing has been received.
General Conditions of the Contract for Construction Lump Sum Contract Page 17 of 27
CFW PMD — Project Name March 2024
1-8 SUBSTANTIAL COMPLETION AND FINAL PAYMENT: Prior to the request for final payment, the Contractor must meet
all provisions for Project Closeout.
When the Contractor determines that the Work is substantially complete, the Contractor will prepare a "Preliminary Punch List" and
then the City shall inspect the project with the Contractor. The Contractor will provide an updated punch list weekly, to be sent to the
Owner. The punch list will include the Contractor's initials by each item that is closed. This process will continue at all subsequent
OAC meetings until 100% completion of the punch list items are confirmed by the A/E and Contractor in writing, along with the project
specific Attic Stock List. Final PMD's Construction Inspector's written confirmation is mandatory.
When the Architect, on the basis of a subsequent inspection, determines that the Work is substantially complete, they then will prepare
a Certificate of Substantial Completion (G704) which, when approved by the Owner, shall allow the Contractor to request and obtain
a Certificate of Occupancy which will establish the Date of Substantial Completion. The Certificate of Substantial Completion shall
state the responsibilities of the Owner and the Contractor for maintenance, heat, utilities, and insurance, shall set forth the remaining
work as a "final punch list". The Contractor shall complete the remaining work listed therein within 30 calendar days. When the
Certificate of Occupancy has been issued, the retainage may be reduced to 4%.
Upon completion of the work listed on the final punch list to the satisfaction of the City of Fort Worth, the retainage may be reduced to
2.5%.
Should the Contractor fail to complete all contractual requirements of the contract, including submittals and final pay request within
the fixed time, the contract time will again commence. Should the Contractor fail to complete the work within the contract duration,
liquidated damages will be assessed
Upon receipt of written notice that the Work is ready for final inspection, the City will conduct a joint inspection and certify completion
of the final punch list by cosigning it with the Contractor.
The Contractor shall submit the following items to the City prior to requesting final payment:
1) Contractor's Affidavit of Payment of Debts and Claims (G706) stating that all payrolls, bills for materials and equipment, and
other indebtedness connected with the Work for which the Owner or their property might in any way be responsible, have been
paid or otherwise satisfied,
2) Consent of Surety to Final Payment (G707), if any, to final payment,
3) Contractor's Affidavit of Release of Liens (G706A), and,
4) Other data establishing payment or satisfaction of all such obligations, such as receipts, releases, and waivers of liens arising
out of the Contract, to the extent and in such form as may be designated by the Owner.
5) Contractor's Warranty
6) Statement that all outstanding work has been completed
7) Issuance of the Final Certificate of Substantial Completion
8) Final acceptance by the City of Fort Worth.
If any Subcontractor, materialman or laborer refuses to furnish a Contractor's Affidavit of Release of Liens, the Contractor may, at the
election of the Owner, furnish a bond satisfactory to the Owner to indemnify them against any right, claim or lien which might be
asserted by such Subcontractor, materialman or laborer. If any such right, claim or lien remains unsatisfied after all payments are
made. The Contractor shall refund to the Owner all monies that the latter may be compelled to pay to discharging such right, claim or
lien, including all costs and reasonable attorney's fees.
The Contractor may then request final payment. The acceptance of final payment shall constitute a waiver of all claims by the
Contractor except those previously made in writing and still unsettled.
The Contractor's one-year warranty will commence upon Substantial Completion of the Project. Trees will be warranted for a period
of two -years per City ordinance. All landscaping and irrigation shall be cared for and maintained by the contractor for 1 year from the
date of substantial completion. This includes but not limited to grass/turf, trees, shrubs, and plant beds. Prior to the expiration of the
one-year warranty there will be a walk through attended by the Owner, Architect, and Contractor to identify any items that need to
be addressed. These items will be agreed upon by all parties and the contractor will complete the work within 30 days.
The designated representative of the City of Fort Worth will make final acceptance and no other form of acceptance will be binding
upon the Owner.
1-9 FINAL PAYMENT FOR UN -BONDED PROJECTS: Final payment will not be made for a period of 30 calendar days and
until all requirements have been met, with the exception of Consent of Surety for Final Payment.
SECTION J
PROTECTION OF PERSONS AND PROPERTY
J-1 SAFETY PRECAUTIONS AND PROGRAMS: The Contractor shall be responsible for initiating, maintaining and
supervising all safety precautions and programs in connection with the Work. The Contractor shall designate a responsible member
of their organization at the site whose duty shall be the prevention of accidents. This person shall be the Contractor's superintendent
unless otherwise designated in writing by the Contractor to the Architect.
J-2 SAFETY OF PERSONS AND PROPERTY: The Contractor shall take all reasonable precautions for the safety of, and shall
provide all reasonable protection to prevent damage, injury or loss to:
General Conditions of the Contract for Construction Lump Sum Contract Page 18 of 27
CFW PMD — Project Name March 2024
(1) All employees on the Work and all other persons who maybe affected thereby;
(2) All the Work and all materials and equipment to be incorporated therein, whether in storage on or -off the site, under the care,
custody or control of the Contractor or any of their Subcontractors or Sub -contractors; and
(3) Other property at the site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures and utilities
not designated for removal, relocation or replacement in the course of construction.
Until acceptance of the Work, it shall be under the charge and care of the Contractor, and they shall take every precaution against
injury or damage to the Work by the action of the elements or from any other cause whatsoever, whether arising from the execution
or from the non -execution of the Work. The Contractor shall rebuild, repair, restore and make good, at his own expense, all injuries or
damages to any portion of the Work occasioned by any of the above, caused before completion and acceptance.
The Contractor shall comply with all applicable Laws, Ordinances, Rules, Regulations and Orders of any public authority having
jurisdiction for the safety of persons or property or to protect them from damage, injury or loss. They shall erect and maintain, as
required by existing conditions and progress of the Work, all reasonable safeguards for safety and protection, including posting danger
signs and other warnings against hazards, promulgating safety regulations and notifying owners and users of adjacent utilities.
When the use or storage of explosives or other hazardous materials or equipment is necessary for the execution of the Work, the
Contractor shall exercise the utmost care and shall carry on such activities under the supervision of properly qualified personnel.
All damage or loss to any property referred to in the preceding paragraphs caused in whole or in part by the Contractor, any
Subcontractor, or anyone directly or indirectly employed by any of them, or by anyone for whose acts any of them may be liable, shall
be remedied by the Contractor, including damage or loss attributable to faulty Drawings or Specifications and acts or omissions of the
Architect or anyone employed by them or for whose acts they may be liable, and not attributable to the fault or negligence of the
Contractor or anyone claiming through the Contractor for such damage or loss.
The Contractor shall not load or permit any part of the Work to be loaded so as to endanger safety.
J-3 HARD HATS: Hard Hats will be required at all construction sites included in this Contract from start to completion of work.
Each Contractor, employee and visitor at any construction site included in the Contract will be required to wear a hard hat. The
Contractor shall enforce the wearing of hard hats by Contractor, employees and visitors. Contractor shall provide hard hats for use by
the consulting Architects and Engineers and visitors.
J-4 EMERGENCIES: In any emergency affecting the safety of persons or property, the Contractor shall act at their discretion
to prevent threatened damage, injury or loss. Any additional compensation or extension of time claimed by the Contractor on account
of emergency work shall be determined as provided in Changes in the Work.
J-5 SAFE WORK PRACTICES: The Contractor shall employ safe practices in handling materials and equipment used in
performing required work so as to insure the safety of their workmen, City employees and the public. The Contractor shall keep the
premise free at all times from accumulation of waste materials or rubbish. At the completion of the work, the Contractor shall remove
all their wastes and rubbish from and about the work area, as well as their tools, equipment and surplus materials and shall leave the
area as clean and free of spot, stains, etc., as before the work was undertaken.
J-6 TRENCH SAFETY: The Contractor shall be responsible for all design and implementation of trench shoring and
stabilization to meet regulatory requirements. If the Proposal requires, the Contractor shall include a per -unit cost for trench safety
measures in their bid. If not included in the Proposal, the Contractor shall include a cost for trench safety measures for all trenches
over 5 feet in depth in their Schedule of Values.
SECTION K - INSURANCE
K-1 INSURANCE REQUIRED: The Contractor shall not commence work under this Contract until they have obtained all
insurance required under this Section and such insurance has been approved by the City of Fort Worth, nor shall the Contractor allow
any Subcontractor to commence work to be performed under this Contract until all similar insurance of the Subcontractor has been
so obtained and approved. The City of Fort Worth will be listed as an "additional insured" on all policies except Worker's
Compensation.
K-2 WORKERS' COMPENSATION INSURANCE
1) General:
a) Contractor's Worker's Compensation Insurance. Contractor agrees to provide to the Owner (City) a certificate showing that
it has obtained a policy of workers compensation insurance covering each of their employees employed on the project in
compliance with state law. No Notice to Proceed will be issued until the Contractor has complied with this section.
b) Subcontractor's Worker's Compensation Insurance. Contractor agrees to require each and every subcontractor who will
perform work on the project to provide to it a certificate from such subcontractor stating that the subcontractor has a policy
of workers compensation insurance covering each employee employed on the project. Contractor will not permit any
subcontractor to perform work on the project until such certificate has been acquired. Contractor shall provide a copy of all
such certificates to the Owner (City).
c) By signing this Contract or providing or causing to be provided a certificate of coverage, the Contractor is representing to
the City that all employees of the Contractor who will provide services on the project will be covered by worker's
compensation coverage for the duration of the project, that the coverage will be based on proper reporting of classification
General Conditions of the Contract for Construction Lump Sum Contract Page 19 of 27
CFW PMD — Project Name March 2024
codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the
case of a self -insured, with the Texas Worker's Compensation Commission's Division of Self -Insurance Regulation.
Providing false or misleading information may subject the Contractor to administrative penalties, criminal penalties, civil
penalties or other civil actions.
d) The Contractor's failure to comply with any of these provisions is a breach of contract by the Contractor which entitles the
City to declare the contract void if the Contractor does not remedy the breach within ten days after receipt of notice of breach
from the City.
2) Definitions:
a) Certificate of Coverage ("certificate"). A copy of a certificate of insurance, a certificate of authority to self -insure issued by
the Texas Workers' Compensation Commission, or a coverage agreement (TWCC-81, TWCC-82, TWCC-83, or TWCC-
84), showing statutory workers' compensation insurance coverage for the person's or entity's employees providing services
on a project, for the duration of the project.
b) Duration of the Project. Includes the time from the beginning of the work on the project until the Contractor's/person's work
on the project has been completed and accepted by the City.
c) Persons providing services on the project ("subcontractor" in section 406.096)-includes all persons or entities performing
all or part of the services the Contractor has undertaken to perform on the project, regardless of whether that person
contracted directly with the Contractor and regardless of whether that person has employees. This includes, without
limitation, independent contractors, subcontractors, leasing companies, motor carriers, owner -operators, employees of any
such entity, or employees of any entity which furnishes persons to provide services on the project. "Services" include,
without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other
services related to a project. "Services" does not include activities unrelated to the project, such as food/beverage vendors,
office supply deliveries, and delivery of portable toilets.
3) Requirements:
a) The Contractor shall provide coverage, based on proper reporting of classification codes and payroll amounts and filing of
any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all
employees of the Contractor providing services of the project, for the duration of the project.
b) The Contractor must provide a certificate of coverage to the governmental entity prior to being awarded the contract.
c) If the coverage period shown on the Contractor's current certificate of coverage ends during the duration of the project, the
Contractor must, prior to the end of the coverage period, file a new certificate of coverage with the City showing that
coverage has been extended.
d) The Contractor shall obtain from each person providing services on a project, and provide to the City:
i) a certificate of coverage, prior to that person beginning work on the project, so the governmental entity will have on file
certificates of coverage showing coverage for all persons providing services on the project; and
ii) no later than seven days after receipt by the Contractor, a new certificate of coverage showing extension of coverage,
if the coverage period shown on the current certificate of coverage ends during the duration of the project.
e) The Contractor shall retain all required certificates of coverage for the duration of the project and for one year thereafter.
f) The Contractor shall notify the City in writing by certified mail or personal delivery, within ten (10) days after the Contractor
knew or should have known, of any change that materially affects the provision of coverage of any person providing services
on the project.
g) The Contractor shall post on each project site a notice, in the text, form and manner prescribed by the Texas Worker's
Compensation Commission, informing all persons providing services on the project that they are required to be covered,
and stating how a person may verify coverage and report lack of coverage.
h) The Contractor shall contractually require each person with whom it contracts to provide services on a project, to:
i) provide coverage, based on proper reporting on the classification codes and payroll amounts and filing of any coverage
agreements, which meets the statutory requirements of Texas labor Code, Section 401.011(44) for all of its employees
providing services on the project, for the duration of the project;
ii) provide to the Contractor, prior to that person beginning work on the project, a certificate of coverage showing that
coverage is being provided for all employees of the person providing services on the project, for the duration of the
project;
iii) provide the Contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of
coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project;
iv) obtain from each other person with whom it contracts, and provide to the Contractor:
(1) a certificate of coverage, prior to the other person beginning work on the project; and
(2) a new certificate of coverage showing extension of coverage, prior to the end of the coverage period, if the
coverage period shown on the current certificate of coverage ends during the duration of the project;
v) retain all required certificates of coverage on file for the duration of the project and for one year thereafter.
General Conditions of the Contract for Construction Lump Sum Contract Page 20 of 27
CFW PMD — Project Name March 2024
vi) notify the City in writing by certified mail or personal delivery, within ten (10) days after the person knew or should have
known, of any change that materially affects the provision of coverage of any person providing services on the project;
and
vii) contractually require each person with whom it contracts, to perform as required by paragraphs h-i) - vii), with the
certificates of coverage to be provided to the person for whom they are providing services.
4) Posting of Required Worker's Compensation Coverage.
a) The Contractor shall post a notice on each project site informing all persons providing services on the project that they are
required to be covered, and stating how a person may verify current coverage and report failure to provide coverage. This
notice does not satisfy other posting requirements imposed by the Texas Worker's Compensation Act or other Texas
Worker's Compensation Commission rules. This notice must be printed with a title in at least 30-point bold type and text in
at least 19-point normal type, and shall be in both English and Spanish and any other language common to the worker
population. The text for the notices shall be the following text, without any additional words or changes:
"REQUIRED WORKER'S COMPENSATION COVERAGE
The law requires that each person working on this site or providing services related to this construction project
must be covered by worker's compensation insurance. This includes persons providing, hauling, or delivering
equipment or materials, or providing labor or transportation or other service related to the project, regardless of
the identity of their employer or status as an employee".
Call the Texas Worker's Compensation Commission at 512-440-3789 to receive information on the legal
requirement for coverage, to verify whether your employer has provided the required coverage, or to report an
employer's failure to provide coverage."
K-3 LIABILITY INSURANCE: The Contractor shall procure and maintain during the term of this Contract such Liability
Insurance as shall protect them, the City of Fort Worth and any Subcontractor performing work covered by this Contract, from claims
of damage which may arise from operations under this Contract, including blasting, when blasting is done on, or in connection with
the Work of the Project, whether such operations be by themselves or by any Subcontractor or by anyone directly or indirectly
employed by either of them and the limits of such insurance shall be not less than the following:
1) Automobile Liability: $1,000,000 each accident or reasonably equivalent split limits for bodily injury and property damage.
Coverage shall be on "any auto" including leased, hired, owned, non -owned and borrowed vehicles used in connection with this
Contract.
2) Commercial General Liability: $1,000,000 each occurrence. Coverage under the policy shall be as comprehensive as that
provided in a current Insurance Services Office (ISO) policy form approved for use in Texas and the policy shall have no
exclusions by endorsement unless such are approved by the City.
3) Asbestos Abatement Liability Insurance: When the Project specifically requires the removal of Asbestos Containing Materials,
the Contractor, or subcontractor performing the removal, shall be required to maintain Asbestos Abatement Liability Insurance
as follows: $1,000,000 per occurrence; $2,000,000 aggregate limit. The coverage shall include any pollution exposure, including
environmental impairment liability, associated with the services and operations performed under this contract in addition to
sudden and accidental contamination or pollution liability for gradual emissions and clean-up costs.
K-4 BUILDER'S RISK INSURANCE: Unless stated otherwise in the Proposal or Invitation, the Contractor shall procure, pay
for and maintain at all times during the term of this Contract, Builder's Risk Insurance against the perils of fire, lightning, windstorm,
hurricane, hail, riot, explosion, civic commotion, smoke, aircraft, land vehicles, vandalism, and malicious mischief, at a limit equal to
100% of the Contract Sum.
The policy shall include coverage for materials and supplies while in transit and while being stored on or off site. If specifically required
in the Instructions to Bidders, the policy shall include coverage for flood and earthquake. Different sub -limits for these coverages must
be approved by the City.
Consequential damage due to faulty workmanship and/or design performed by the Contractor or their agents shall be covered.
Upon completion of the Work, the Contractor shall notify the City of Fort Worth in writing before terminating this insurance.
K-5 PROOF OF CARRIAGE OF INSURANCE: The Contractor shall provide a certificate of insurance documenting the Property
Management Department, City of Fort Worth as a "Certificate Holder", and noting the specific project(s) covered by the Contractor's
insurance as documented on the certificate of insurance. More than one certificate may be required of the Contractor depending upon
the agents and/or insurers for the Contractor's insurance coverages specified for the project(s).
K-6 OTHER INSURANCE RELATED REQUIREMENTS
1) The City of Fort Worth shall be added as an additional insured, by endorsement, on all applicable insurance policies.
2) Applicable insurance policies shall each be endorsed with a waiver of subrogation in favor of the City of Fort Worth.
3) Insurers of policies maintained by Contractor and its subcontractor(s), if applicable, shall be authorized to do business in the
State of Texas, or otherwise approved by the City of Fort Worth, and such shall be acceptable to the City of Fort Worth insofar
as their financial strength and solvency are concerned. Any company through which the insurance is placed must have a rating
General Conditions of the Contract for Construction Lump Sum Contract Page 21 of 27
CFW PMD — Project Name March 2024
of at least A:VII, as stated in current edition of A. M. Best's Key Rating Guide. At the City's sole discretion, the City may accept
a less favorable rate.
4) Deductible limits on insurance policies and/or self -insured retentions exceeding $10,000 require prior written approval of the City
of Fort Worth as respects this Contract.
5) The City of Fort Worth shall be notified in writing a minimum of thirty days prior to an insurer's action in the event of cancellation,
non -renewal or material change in coverage regarding any policy providing insurance coverage required in this Contract. A 10-
day notice for failure to pay premium is acceptable.
6) Full limits of insurance shall be available for claims arising out of this Contract with the City of Fort Worth.
7) The Contractor shall provide certificates of insurance to the City prior to commencement of operations pursuant to this Contract.
Any failure on part of the City of Fort Worth to request such documentation shall not be construed as a waiver of insurance
requirements specified herein.
8) The City of Fort Worth shall be entitled, upon request and without incurring expense, to review the insurance policies including
endorsements thereto and, at its discretion, to require proof of payment for policy premiums.
9) The City of Fort Worth shall not be responsible for paying the cost of insurance coverages required herein.
10) Notice of any actual or potential claim and/or litigation that would affect insurance coverages required herein shall be provided
to the City in a timely manner.
11) "Other insurance" as referenced in any policy of insurance providing coverages required herein shall not apply to any insurance
policy or program maintained by the City of Fort Worth.
12) Contractor agrees to either require its subcontractors to maintain the same insurance coverages and limits thereof as specified
herein or the Contractor shall provide such coverage on the Contractor's subcontractors.
SECTION L
CHANGES IN THE WORK
L-1 CHANGE ORDER: The Owner, without invalidating the Contract, may order Changes in the Work within the general scope
of the Contract consisting of additions, deletions or other revisions, the Contract Sum and the Contract Time being adjusted
accordingly. All Such Changes in the Work shall be authorized by Change Order, and shall be executed under the applicable
conditions of the Contract Documents.
A Change Order is a written order to the Contractor signed by the Contractor, Owner and the Architect, issued after the execution of
the Contract, authorizing a Change in the Work or adjustment in the Contract Sum or the Contract Time. The Contract Sum and the
Contract Time may be changed only by Change Order.
Any changes in work required due to changed or unforeseen conditions, or by request of either the Contractor or the City, shall be
coordinated with the Director, Property Management Department. A change order must be written and duly negotiated and executed
prior to performing changed work.
The cost or credit to the Owner resulting from a Change in the work shall be determined in one or more of the following ways:
1) by mutual acceptance of a lump sum property itemized, including the allowance to Contractor for overhead and profit stipulated
in the original contract proposal;
2) by unit prices stated in the Contract Documents or subsequently agreed upon; or
3) by cost and a mutually acceptable fixed or percentage fee.
If none of the methods set forth herein above is agreed upon, the Contractor, provided they receive a Change Order, shall promptly
proceed with the Work involved. The cost of such work shall then be determined on the basis of the Contractor's reasonable
expenditures and savings, including a reasonable allowance for overhead and profit as indicted in the original contract proposal. In
such cases, the Contractor shall keep and present, in such form as the Architect shall prescribe, an itemized accounting together with
appropriate supporting data. Pending final determination of cost to the Owner, payments on account shall be made on the Architect's
Certificate of Payment as approved by the Owner.
If after the Contract has been executed, the Architect, requests a price proposal from the Contractor for a proposed change in scope
of the work, Contractor shall process such proposal within seven days of receipt and return the price quote to the Architect in writing.
The Architect shall review the price quotation and if approval is recommended, forward the proposed change order request and price
proposal to the Owner for approval. If approval is not recommended, the Architect will attempt to negotiate with Contractor to revise
the proposal to a figure which is fair and reasonable and forward it on to the Owner for approval. If the negotiations do not result in an
equitable solution, the Architect shall prepare a cost-plus type Change Order with a price -not -to -exceed figure for approval by the City
and require specific documentation to be provided by Contractor in accordance with the paragraph above.
If after the contract has been executed, the Architect, requests a price proposal from the Contractor for a proposed change in scope
of the work, Contractor shall process such proposal within seven days of receipt and return the price quote to the Architect in writing.
General Conditions of the Contract for Construction Lump Sum Contract Page 22 of 27
CFW PMD — Project Name March 2024
Contractor is advised that when the cumulative effect of Change Orders results in an increase in contract valuation by over $100,000,
the City Council must approve all such Change Orders that will exceed this limit, once the recommended change order has been
approved by Council the normal processing time is approximately thirty (30) days. Owner, Architect and Contractor shall endeavor to
identify Change Order items as early in the Construction process as possible to minimize their impact on the construction schedule.
If the Contractor claims that additional cost or time is involved because of (1) any written interpretation issued pursuant to Section A,
(2) any order by the Architect or Owner to stop the Work pursuant to Section B, where the Contract was not at fault, or (3) any written
order for a minor change in the Work, the Contractor shall make such claim.
L-2 CLAIMS FOR ADDITIONAL COST OR TIME: If the Contractor wishes to make a claim for an increase in the Contract
Sum or an extension in the Contract Time, they shall give the Architect written notice thereof within a reasonable time after the
occurrence of the event that gave rise to such claim. This notice shall be given by the Contractor before proceeding to execute the
Work, except in an emergency endangering life or property in which case the Contractor shall proceed in accordance with Section J.
No such claim shall be valid unless so made. Any change in the Contract Sum or Contract Time resulting from such claim, if approved
by the Owner, shall be authorized by Change Order. Any claims submitted for additional cost or time shall be accompanied by a
recovery schedule.
L-3 OVERHEAD ALLOWANCES FOR CHANGES: Should any change in the work or extra work be ordered, the following
applicable percentage shall be added to Material and Labor costs to cover overhead and profit:
1. Allowance to the Contractor for overhead and profit for extra work performed by the Contractor's own forces shall not exceed
fifteen percent
2. Allowance to the Contractor for overhead and profit for extra work performed by a Subcontractor and supervised by the Contractor
shall not exceed ten percent LIQ%J.
L-4 MINOR CHANGES IN THE WORK: The Architect shall have authority to order minor changes in the Work not involving an
adjustment in the Contract Sum or an extension of the Contract Time and not inconsistent with the intent of the Contract Documents.
Such changes may be effected by Field Order or by other written order. Such changes shall be confirmed in writing by the Architect
and shall be binding on the Owner and the Contractor.
L-5 FIELD ORDERS: The Architect may issue written Field Orders which interpret the Contract Documents, or which order
minor changes in the Work without change in Contract Sum or Contract Time. The Contractor shall carry out such Field Orders
promptly.
SECTION M
UNCOVERING AND CORRECTION OF WORK
M-1 UNCOVERING OF WORK: If any Work should be covered contrary to the request of the Owner, it must be uncovered for
observation and replaced, at the Contractor's expense.
If any other work has been covered which the Owner has not specifically requested to observe prior to being covered, the Architect
or the Owner may request to see such work and it shall be uncovered by the Contractor. If such Work be found in accordance with
the Plans and Specifications, the cost of uncovering and replacement shall, by appropriate Change Order, be charged to the Owner.
If such work be found not in accordance with the Plans and Specifications, the Contractor shall pay such costs unless it is found that
this condition was caused by a separate contractor employed by the Owner.
M-2 CORRECTION OF WORK: The Contractor shall promptly correct all work rejected by the Architect or Owner as defective
or as failing to conform to the Plans and Specifications whether observed before or after Substantial Completion and whether or not
fabricated, installed or completed. The Contractor shall bear all costs of correcting such rejected Work, including the cost of the
Architect's additional service thereby made necessary.
If, within one year after the Date of Substantial Completion or within such longer period of time as may be prescribed by law or by the
terms of any applicable special guarantee required by the Contract Documents, any of the work is found to be defective or not in
accordance with the Contract Documents, the Contractor shall correct it promptly after receipt of a written notice from the Owner to
do so, unless the Owner has previously given the Contractor a written acceptance of such condition, describing same specifically and
not generally. The Owner shall give such notice promptly after discovery of the condition.
All such defective or non -conforming work under the preceding paragraphs shall be removed from the site where necessary and the
work shall be corrected to comply with the Contract Documents without cost to the Owner.
Defective or non -conforming work shall be completed in a timely manner. The Contractor shall respond and/or repair any work that is
deemed an emergency by the City within 24 hours. The Contractor shall respond and/or repair any other defective or non -conforming
work within three working days.
The Contractor shall bear the cost of making good all work of separate contractors destroyed or damaged by such removal or
correction.
If the Contractor does not remove such defective or non -conforming work within a reasonable time fixed by written notice from the
Owner, the Owner may remove it and may store the materials or equipment at the expense of the Contractor. If the Contractor does
not pay the cost of such removal and storage within ten days thereafter, the Owner may upon ten additional days' written notice sell
such work at auction or at private sale and shall account for the net proceeds thereof, after deducting all the costs that should have
been borne by the Contractor including compensation for additional architectural services. If such proceeds of sale do not cover all
General Conditions of the Contract for Construction Lump Sum Contract Page 23 of 27
CFW PMD — Project Name March 2024
costs that the Contractor should have borne, the difference shall be charged to the Contractor and an appropriate Change Order shall
be issued. If the payments then or thereafter due the Contractor are not sufficient to cover such amount, the Contractor shall pay the
difference to the Owner.
If the Contractor fails to correct such defective or non -conforming work, the Owner may correct it in accordance with Section G.
The obligation of the Contractor under this Section shall be in addition to and not in limitation of any obligations imposed upon them
by special guarantees required by the Contract Documents or otherwise prescribed by law.
M-3 ACCEPTANCE OF DEFECTIVE OR NON -CONFORMING WORK: If the Owner prefers to accept defective or non-
conforming work, he may do so instead of requiring its removal and correction, in which case an extended warranty or Change Order
will be issued to reflect an appropriate reduction in the final payment to the Contractor or if the amount is determined after final
payment, the Contractor shall pay Owner the amount of the appropriate reduction.
SECTION N
TERMINATION OF THE CONTRACT
N-1 TERMINATION BY THE CONTRACTOR: If the work is stopped for a period of 30 days under an order or any court or
other public authority having jurisdiction, through no act or fault of the Contractor or a Subcontractor or their agents or employees or
any other persons performing any of the work under a contract with the Contractor, or if the work should be stopped for a period of 30
days by the Contractor for the Owner's failure to make payment thereon as provided in Section I, then the Contractor may after the
end of such period of 30 days and upon seven additional days' written notice to the Owner , terminate the Contract.
N-2 TERMINATION BY THE OWNER: If the Contractor is adjudged as bankrupt, or if they make a general assignment for the
benefit of their creditors, or if a receiver is appointed on account of their insolvency, or if the Contractor refuses, except in cases for
which extension of time is provided, to supply enough properly skilled workmen or proper materials, or if they fail to make prompt
payment to Subcontractors or for materials or labor, or fails to comply with all Laws, Statutes, Charter, Ordinances, Regulations or
Orders of any public authority having jurisdiction, or otherwise is guilty of a substantial violation of a provision of the Contract
Documents, then the Owner, on their own initiative that sufficient cause exists to justify such action, may, without prejudice to any
rights or remedy and after giving the Contractor and their surety, if any, seven (7) days' written notice, terminate the employment of
the Contractor and take possession of the site and of all materials, equipment, tools, construction equipment and machinery thereon
owned by the Contractor and may finish the work by whatever method they may deem expedient. In such case the Contractor shall
not be entitled to receive any further payment until the Work is finished.
If the costs of finishing the Work, including compensation for the Architect's additional services exceed the unpaid balance of the
Contract, the Contractor shall pay the difference to the Owner.
The City of Fort Worth may terminate this contract in whole, or from time to time, in part, whenever such termination is in the best
interest of the City. Termination will be affected by delivering to the Contractor a notice of termination specifying to what extent
performance of the work of the contract is being terminated and the effective date of termination. After receipt of termination the
Contractor shall:
a) Stop work under the Contract on the date and to the extent specified on the notice of termination.
b) Place no further orders or subcontracts except as may be necessary for the completion of the work not terminated.
c) Terminate all orders and subcontracts to the extent that they relate to the performance of the work terminated by the notice of
termination.
After termination as above, the City will pay the Contractor a proportionate part of the contract price based on the work completed;
provided, however, that the amount of payment on termination shall not exceed the total contract price as reduced by the portion
thereof allocable to the work not completed and further reduced by the amount of payments, if, any otherwise made. Contractor shall
submit a claim for amounts due after termination as provided in this paragraph within 30 days after receipt of such claim. In the event
of any dispute or controversy as to the propriety or allowability of all or any portion of such claim under this paragraph, such dispute
or controversy shall be resolved and be decided by the City Council of the City of Fort Worth, and the decision by the City Council of
the City of Fort Worth shall be final and binding upon all parties to this contract.
SECTION O
SIGNS
The Contractor shall construct and install the project designation sign as required in the Contract Documents and in strict accordance
with the Specifications for "Project Designation Signs." This sign shall be a part of this Contract and shall be included in the Contractor's
Base Bid for the Project.
The Contractor may install their company sign and shall allow the Architect to install their company sign. No other signs will be allowed.
SECTION P
TEMPORARY FACILITIES
P-1 SCOPE: The Contractor shall furnish, erect, and maintain facilities and perform temporary work required in the performance
of this Contract, including those shown and specified.
General Conditions of the Contract for Construction Lump Sum Contract Page 24 of 27
CFW PMD — Project Name March 2024
P-2 USE OF TEMPORARY FACILITIES: All temporary facilities shall be made available for use by all workmen and
subcontractors employed on the project, subject to reasonable directions by the Contractor as to their proper and most efficient
utilization.
P-3 MAINTENANCE AND REMOVAL: The Contractor shall maintain temporary facilities in a proper, safe operating and
sanitary condition for the duration of the Contract. Upon completion of the Contract, all such temporary work and facilities shall be
removed from the premises and disposed of unless otherwise directed or specified hereunder.
P-4 FIELD OFFICES AND SHED: The Contractor is not required to provide a temporary field office or telephone for projects
under $1,000,000. Contractor shall equip the Project Superintendent with a pager and provide 24-hour contacts to the City.
The Contractor shall provide a temporary field office building for themselves, their subcontractors and use by the Architect and Owner.
For construction contracts with a bid price in excess of $1,000,000.00, the Contractor shall provide a separate field office for the City's
field representative (but the separate office may be in the same structure). The buildings shall afford protection against the weather,
and each office shall have a lockable door, at least one window, adequate electrical outlets and lighting, and a shelf large enough to
accommodate perusal of the project drawings. Openings shall have suitable locks. Field offices shall be maintained for the full time
during the operation of the work of the Contract. During cold weather months, the field offices shall be suitably insulated and equipped
with a heating device to maintain 70-degree Fahrenheit temperature during the workday. During warm weather the offices shall be
equipped with an air conditioning device to maintain temperature below 75 degrees F. Upon completion of the work of the Contract,
the Contractor shall remove the building from the premises. In addition to the drawing shelf, provide for the City field representatives
office: one desk, four chairs, plan rack and a four -drawer filing cabinet (with lock). Each office shall contain not less than 120 square
feet of floor space.
The Contractor shall provide and maintain storage sheds and other temporary buildings or trailers on the project site as required for
their use. Location of sheds and trailers shall be as approved by the Owner. Remove sheds when work is completed, or as directed.
P-5 WIRELESS CONNECTION: The Contractor shall provide and pay for wireless internet connection (WIFI) for the City and
Architect.
P-6 TOILET FACILITIES: The Contractor shall provide proper, sanitary and adequate toilet facilities for the use of all workmen
and subcontractors employed on the project.
P-7 UTILITIES: Contractor shall make all necessary arrangements and provide for temporary water and electricity required
during the construction. Contractor shall provide and install temporary utility meters during the contract construction period. These
meters will be read and the Contractor will be billed on this actual use. The Contractor shall provide all labor and materials required
to tap into the utilities. The Contractor shall make the connections and extend the service lines to the construction area for use of all
trades. Upon completion of the work all utility lines shall be removed and repairs made to the existing lines. Only utilities at existing
voltages, pressures, frequencies, etc. will be available to the Contractor.
Water. Provide an ample supply of potable water for all purposes of construction at a point convenient to the project or as shown on
the Drawings. Pipe water from the source of supply to all points where water will be required. Provide sufficient hose to carry water
to every required part of the construction and allow the use of water facilities to subcontractors engaged on the work. Provide pumps,
tanks and compressors as may be required to produce required pressures.
Electric Service. Provide adequate electric service for power and lighting to all points where required. Temporary, electric service
shall be of sufficient capacity and characteristics to supply proper current for various types of construction tools, motors, welding
machines, lights, heating plant, air conditioning system, pumps, and other work required. Provide sufficient number of electric outlets
so that 50-foot-long extension cords will reach all work requiring light or power.
Lighting. Supply and maintain temporary lighting so that work of all trades may be properly and safely performed, in such areas and
at such time that day -lighting is inadequate. Provide at least 0.75 watts of incandescent lighting per squgr4e foot and maintain a
socket voltage of at least 110 volts. Use at least 100-watt lamps. In any event, the lighting intensity shall not be less than 5-foot
candles in the vicinity of work and traffic areas.
P-8 CONDITIONED SPACE: The Contractor shall provide HVAC services as required to protect all work and materials and to
keep the humidity down to the extent required to prevent corrosion of any metal and to prevent dampness or mildew which is potentially
damaging to materials and finishes. All such heating, ventilation and services shall be provided and maintained until final acceptance
of all work. In addition, the Contractor shall provide HVAC prior and during the following work operations as follows:
a) At all times during the placing, setting and curing of concrete provide sufficient heat to insure the heating of the spaces involved
to not less than 40 F.
b) From the beginning of the application of drywall and during the setting and curing period, provide sufficient heat to produce a
temperature in the spaces involved of not less than 50 F and above 95 F.
c) For a period of seven (7) days previous to the placing of interior finish materials and throughout the placing of finish painting,
decorating and laying of resilient flooring materials, provide sufficient heat to produce a temperature of not less than 50 F and
above 85 F.
P-9 TEMPORARY CONSTRUCTION. EQUIPMENT AND PROTECTION:
General Conditions of the Contract for Construction Lump Sum Contract Page 25 of 27
CFW PMD — Project Name March 2024
The Contractor shall provide, maintain, and remove upon completion of the work all temporary rigging, scaffolding, hoisting equipment,
rubbish chutes, ladders to roof, barricades around openings, and all other temporary work as required to complete all work of the
Contract. Contractor shall coordinate the use and furnishing of scaffolds with their sub -contractors.
The Contractor shall provide, maintain, and remove upon completion of the work, or sooner, if authorized by the Owner, all fences,
barricades, lights, shoring, pedestrian walkways, temporary fire escapes, and other protective structures or devices necessary for the
safety of workmen, City employees, equipment, the public and property.
All temporary construction and equipment shall conform to all regulations, ordinances, laws and other requirements of the authorities
having jurisdiction, including insurance companies, with regards to safety precautions, operation and fire hazard.
The Contractor shall provide and maintain pumping facilities, including power, for keeping the site, all times, whether from underground
seepage, rainfall, drainage of broken lines.
The Contractor shall maintain provision for closing and locking the building at such time as possible to do so. If this is not feasible,
maintain a night
The Contractor shall provide and maintain all barricades or enclosures, required to protect the work in progress from outside elements,
dusts, and other disturbances as a result of work under this Contract. Such protection shall be positive, shall meet the approval of
the Owner and shall be maintained for the duration of the construction period or as required to provide for the protection as specified.
P-10 PROJECT BULLETIN BOARD: The Contractor shall furnish, install and maintain during the life of the project a weather -
tight bulletin board approximately 3 feet high by 5 feet wide having not less than two hinged or sliding glass doors with provisions for
locking. The bulletin board shall be mounted where and as approved by the Owner, in a prominent place accessible to employees of
the Contractor and sub -contractors, and to applicants for employment. The bulletin board shall remain the property of the Contractor
and shall be removed by them upon completion of the Contract work. The following information which will be furnished by the City to
the Contractor shall be posted on the bulletin board and shall be maintained by the Contractor in easily readable condition at all times
for the duration of the Contract.
A. The Equal Opportunity Poster and Notice Nondiscrimination of Employment (Standard Form 38).
B. Wage Rate Information Poster (Form SOL 155), with the Contract Schedule of minimum wage rates as required by the
Davis -Bacon Act.
C. Safety Posters.
SECTION Q
VENUE
Should any action arise out of the terms and conditions of this contract, venue for said action shall lie in Tarrant County, Texas.
END OF GENERAL CONDITIONS
General Conditions of the Contract for Construction Lump Sum Contract Page 26 of 27
CFW PMD — Project Name March 2024
FORT WORTH,
,2024
SUBJECT: Notice to Proceed
Notice to Proceed Date: ---------------- 2024
Project Duration: 000 Days
Substantial Completion Date: ----------------, 2024
City Council Contract Date: ---------------, 2024
Dear Sir or
Madam,
----------------- located at ------------------- was awarded to -
, VP of Construction, in
the amount of (Contract Amount, on (Date). This letter shall serve to substantiate a Notice to Proceed
with the below scope of work for the Project.
You are hereby directed to proceed on the following work, in accordance with provisions of City
Secretary Contract Number CSC# ----------------
All work is to be done in accordance with plans, specifications and conditions provided in the contract.
Please acknowledge receipt of this Notice by signing the space below and returning a copy to the Property Management Office. Please
contact Jackson Jones, Construction Superintendent at (817) 269-6578 if there are any questions and prior to commencing work.
Sincerely,
Dana Burghdoff, AICP
Assistant City Manager
Acceptance of Notice Receipt of the above Notice to Proceed is hereby acknowledged this day
BY:
TITLE:
CC:
City Project Manager
Nikita Watts
Brian Glass
City Construction Super
City Sr. Construction
PROPERTY MANAGEMENT DEPARTMENT
FACILITIES DIVISION / ARCHITECTURAL
SERVICES
THE CITY OF FORT WORTH * 200 TEXAS STREET
FORT WORTH, TEXAS 76102 (817) 392-2586 * FAX
(817)392-8488
12024.
General Conditions of the Contract for Construction Lump Sum Contract Page 27 of 27
CFW PMD — Project Name March 2024
CITY OF FORT WORTH, TEXAS
CONSTRUCTION CONTRACT (LUMP SUM)
THE STATE OF TEXAS
KNOW ALL BY THESE PRESENTS:
COUNTY OF TARRANT
This Agreement is made effective as of the date signed by the Assistant City Manager below between the
CITY OF FORT WORTH, a municipal corporation of Tarrant County, Texas, organized and existing under
and by virtue of a special charter adopted by the qualified voters within said City on the 11th day of
December, A.D. 1924, under the authority (vested in said voters by the "Home Rule" provision) of the
Constitution of Texas, and in accordance with a resolution duly passed at a regular, meeting of the City
Council of said City, hereinafter called OWNER, and Cowboys Roofing "C of the City of Bedford County of Tarrant
State of Texas, hereinafter called CONTRACTOR.
WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned to
be made and performed by the Owner, and under the conditions expressed in the bond bearing even
date herewith, the said Contractor hereby agrees with the said Owner to commence and complete the
construction of certain improvements described as follows:
City of Fort Worth
PSB Municipal Building Roof Replacement
200 Texas Street
Fort Worth, Texas 76102
City Project #2024-02
That the work herein contemplated shall consist of furnishing as an independent contractor all labor, tools,
appliances and materials necessary for the construction and completion of said project in accordance with
the Plans and Specifications and Contract Documents adopted by the City Council of the City of Fort Worth,
which Plans and Specifications and Contract Documents are hereto attached and made a part of this
contract the same as if written herein.
The Contractor hereby agrees and binds himself to commence the construction of said work within ten (10)
days after being notified in writing to do so by the Owner.
City agrees and binds itself to pay, and the said Contractor agrees to receive, for all of the aforesaid work,
and for stated additions thereto or deductions there from, the price shown on the Proposal submitted by
the successful bidder hereto attached and made a part hereof. Payment will be made in monthly
installments upon actual work completed by contractor and accepted by the Owner and receipt of invoice
from the Contractor.
The agreed upon total contract amount shall be $685,716.40
including the Base Proposal ($837,875.7), Owner's Contingency Allowance ($47,840.68), and Alternate Nos.
NA ($ 0 ).
Insurance Requirements:
The Contractor shall not commence work under this contract until it has obtained all insurance
required under the Contract Documents, and the Owner has approved such insurance. The
Contractor shall be responsible for delivering to the Owner the sub -contractors' certificates of
insurance for approval. The Contractor shall indicate on its certificate of insurance included in the
documents for execution whether or not its insurance covers subcontractors. It is the intention of
the Owner that the insurance coverage required herein shall include the coverage of all
subcontractors.
WORKER'S COMPENSATION INSURANCE:
OFFICIAL RECORD
• Statutory limits. CITY SECRETARY
• Employer's liability: FT. WORTH, TX
• $100,000 disease each employee.
Instruction to Offerors Page 26 of 37
PSB Municipal Building Roof Replacement (March 2024)
• $500,000 disease policy limit.
• $100,000 each accident.
COMMERCIAL GENERAL LIABILITY INSURANCE:
The Contractor shall procure and shall maintain during the life of this contract public liability
insurance coverage in the form of a Commercial General Liability insurance policy to cover
bodily injury, including death, and property damage at the following limits: $1,000,000 each
occurrence and $2,000,000 aggregate limit.
• The insurance shall be provided on a project specific basis and shall be endorsed
accordingly.
• The insurance shall include, but not be limited to, contingent liability for independent
contractors, XCU coverage, and contractual liability.
C. BUSINESS AUTOMOBILE LIABILITY:
• $1,000,000 each accident.
• The policy shall cover any auto used in the course of the project.
BUILDER'S RISK OR INSTALLATION FLOATER:
This insurance shall be applicable according to the property risks associated with the
project and commensurate with the contractual obligations specified in the contract
documents.
EXCESS LIABILITY UMBRELLA:
$1,000,000 each occurrence; $2,000,000 aggregate limit.
This insurance shall provide excess coverage over each line of liability insurance
required herein. The policy shall follow the form(s) of the underlying policies.
SCOPE OF INSURANCE AND SPECIAL HAZARD:
The insurance required under the above paragraphs shall provide adequate protection for
the Contractor and its subcontractors, respectively, against damage claims which may
arise from operations under this contract, whether such operations be by the insured or by
anyone directly or indirectly employed by it, against any insurable hazards which may be
encountered in the performance of the Contract.
PROOF OF CARRIAGE OF INSURANCE:
The Contractor shall furnish the owner with satisfactory proof of coverage by insurance
required in these Contract Documents in the amounts and by insurance carriers
satisfactory to the Owner. The form to be used shall be the current Accord certificate of
insurance form or such other form as the Owner may in its sole discretion deem acceptable.
All insurance requirements made upon the Contractor shall apply to the sub -contractors,
should the Contractor's insurance not cover the subcontractor's work operations performed
in the course of this contracted project.
ADDITIONAL INSURANCE REQUIREMENTS:
The Owner, its officers, employees and servants shall be endorsed as an additional
insured on Contractor's insurance policies excepting employer's liability insurance
coverage under Contractor's workers' compensation insurance policy.
b. Certificates of insurance shall be delivered to the City of Fort Worth, contract
administrator in the respective department as specified in the bid documents, 200
OFFICIAL RECORD
Instruction to Offerors Page 27 of 37
PSB Municipal Building Roof Replacement (March 2024) CITY SECRETARY
FT. WORTH, TX
Texas Street, Fort Worth, TX 76102, prior to commencement of work on the
contracted project.
C. Any failure on part of the Owner to request required insurance documentation shall
not constitute a waiver of the insurance requirements specified herein.
d. Each insurance policy shall be endorsed to provide the Owner a minimum thirty days'
notice of cancellation, non -renewal, and/or material change in policy terms or coverage.
A ten days' notice shall be acceptable in the event of non-payment of premium.
e. Insurers must be authorized to do business in the State of Texas and have a current
A.M. Best rating of A:VII or equivalent measure of financial strength and solvency.
f. Deductible limits, or self -funded retention limits, on each policy must not exceed
$10,000.00 per occurrence unless otherwise approved by the Owner.
In lieu of traditional insurance, Owner may consider alternative coverage or risk
treatment measures through insurance pools or risk retention groups. The Owner
must approve in writing any alternative coverage.
Workers' compensation insurance policy(s) covering employees employed on the
project shall be endorsed with a waiver of subrogation providing rights of recovery in
favor of the Owner.
Owner shall not be responsible for the direct payment of insurance premium costs for
contractor's insurance.
Contractor's insurance policies shall each be endorsed to provide that such
insurance is primary protection and any self -funded or commercial coverage
maintained by Owner shall not be called upon to contribute to loss recovery.
k. In the course of the project, Contractor shall report, in a timely manner, to Owner's
officially designated contract administrator any known loss occurrence which could
give rise to a liability claim or lawsuit or which could result in a property loss.
Contractor's liability shall not be limited to the specified amounts of insurance
required herein.
M. Upon the request of Owner, Contractor shall provide complete copies of all insurance
policies required by these contract documents.
If this Contract is in excess of $25,000, the Contractor shall provide a Payment Bond in the full amount of
the contract. If the contract is in excess of $100,000 Contractor shall provide both Payment and
Performance Bonds for the full amount of the contract.
Construction shall not start without a "Notice to Proceed". The Notice to Proceed shall not be issued without
bonds in place.
Contractor shall apply for all City of Fort Worth Permits and for any other permits required by this project.
City of Fort Worth Permit fees are waived. Separate permits will be required for each facility.
If the Contractor should fail to complete the work as set forth in the Plans and Specifications and Contract
Documents within the time so stipulated, plus any additional time allowed as provided in the General Condi-
tions, there shall be deducted from any monies due or which may thereafter become due him, the liquidated
damages outlined in the General Conditions, not as a penalty but as liquidated damages, the Contractor
and their Surety shall be liable to the Owner for such deficiency.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Instruction to Offerors Page 28 of 37
PSB Municipal Building Roof Replacement (March 2024)
IMMIGRATION NATIONALITY ACT: City actively supports the Immigration & Nationality Act (INA) which
includes provisions addressing employment eligibility, employment verification, and nondiscrimination. Vendor
shall verify the identity and employment eligibility of all employees who perform work under this Agreement.
Vendor shall complete the Employment Eligibility Verification Form (1-9), maintain photocopies of all supporting
employment eligibility and identity documentation for all employees, and upon request, provide City with copies
of all 1-9 forms and supporting eligibility documentation for each employee who performs work under this
Agreement. Vendor shall establish appropriate procedures and controls so that no services will be performed
by any employee who is not legally eligible to perform such services. Vendor shall provide City with a
certification letter that it has complied with the verification requirements required by this Agreement. Vendor
shall indemnify City from any penalties or liabilities due to violations of this provision. City shall have the right
to immediately terminate this Agreement for violations of this provision by Vendor.
No Bovcott of Israel. If Contractor has fewer than 10 employees or the Agreement is for less than
$100,000, this section does not apply. Contractor acknowledges that in accordance with Chapter 2270 of
the Texas Government Code, City is prohibited from entering into a contract with a company for goods or
services unless the contract contains a written verification from the company that it: (1) does not boycott
Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and
"company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government
Code. By signing this Agreement, Contractor certifies that Contractor's signature provides written
verification to City that Contractor: (1) does not boycott Israel; and (2) will not boycott Israel during the
term of the Agreement.
Prohibition on Bovcottinq Enerqv Companies. Vendor acknowledges that in accordance with Chapter 2274
of the Texas Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2), the City is prohibited
from entering into a contract for goods or services that has a value of $100,000 or more, which will be paid
wholly or partly from public funds of the City, with a company (with 10 or more full-time employees) unless
the contract contains a written verification from the company that it: (1) does not boycott energy companies;
and (2) will not boycott energy companies during the term of the contract. The terms "boycott energy
company" and "company" have the meaning ascribed to those terms by Chapter 2274 of the Texas
Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2). To the extent that Chapter
2274 of the Government Code is applicable to this Agreement, by signing this Agreement, Vendor
certifies that Vendor's signature provides written verification to the City that Vendor: (1) does not
boycott energy companies; and (2) will not boycott energy companies during the term of this
Agreement.
Prohibition on Discrimination Aqainst Firearm and Ammunition Industries. Vendor acknowledges that
except as otherwise provided by Chapter 2274 of the Texas Government Code (as added by Acts 2021,
87th Leg., R.S., S.B. 19, § 1), the City is prohibited from entering into a contract for goods or services that
has a value of $100,000 or more which will be paid wholly or partly from public funds of the City, with a
company (with 10 or more full-time employees) unless the contract contains a written verification from the
company that it: (1) does not have a practice, policy, guidance, or directive that discriminates against a
firearm entity or firearm trade association; and (2) will not discriminate during the term of the contract against
a firearm entity or firearm trade association. The terms "discriminate," "firearm entity" and "firearm trade
association" have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code
(as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1). To the extent that Chapter 2274 of the
Government Code is applicable to this Agreement, by signing this Agreement, Vendor certifies that
Vendor's signature provides written verification to the City that Vendor: (1) does not have a practice,
policy, guidance, or directive that discriminates against a firearm entity or firearm trade association;
and (2) will not discriminate against a firearm entity or firearm trade association during the term of
this Agreement.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Instruction to Offerors Page 29 of 37
PSB Municipal Building Roof Replacement (March 2024)
This Agreement is made effective as of the date signed by the Assistant City Manager below.
FORT WORTH:
City of Fort Worth
ByDana Burghdoff (Au 3, 2024t1 :25 CDT)
Name: Dana Burghdoff, AICP
Title: Assistant City Manager
Date: Aug 23, 2024
Approval Recommended:
By:
Name: Marilyn Marvin
Title: Interim Director, Property Management
4,d.64Upn��
�b�F�!??pdA
Attest: Q a , a" o9� p
_ti0
Ovo 8=d
Contract Compliance Manager:
By signing I acknowledge that I am the
person responsible for the monitoring and
administration of this contract, including
ensuring all performance and reporting
requirements.
By:;
Name: Nikita N. Watts
Title: Sr. Capital Projects Officer
Approved as to Form and Legality:
f�
By:Douglas Black (Aug 22, 202410:27 CDT)
Name: Douglas Black
Title: Senior City Attorney
EXpSood� Contract Authorization:
By: uaaaoo M&C: 24-0584
Name: Jannette Goodall
Title: City Secretary
CONTRACTOR:
Tien Ebel
Tim Ebel (Aug 12, 202415:04 CDT)
By: Cowboys Roofing LLC
Name Tim Ebel
Title: Project Manager
Date: July 16, 2024
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Instruction to Offerors Page 30 of 37
Meadowbrook Golf Course Maintenance Facility (February 2024)
Band # GM 220901
PAYMENT BOND
THE STATE OF TEXAS §
§ KNOW ALL BY THESE PRESENTS:
COUNTY OF TARRANT §
That we, Cowboys Roofing LLC dha DSA Contractors , known as "Principal" herein, and
Great Midwest Insurance Company a corporate
surety (sureties), duly authorized to do business in the State of Texas, known as "Surety" herein (whether
one or more), are held and firmly bound unto the City of Fort Worth, a municipal corporation created
pursuant to the laws of the State of Texas, known as "City" herein, in the penal sum of, _
Six Hundred Eighty -Five Thousand Seven -hundred Sixteen Qallars and Forry cents , lawful money of the United States, to be
paid in Fort Worth, Tarrant County, Texas, for the payment of which sum well and truly be made, we bind
ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these
presents;
WHEREAS, Principal has entered into a certain written Contract with City, awarded the _"day
of July , 2024, which Contract is hereby referred to and made a part hereof for all purposes as
if fully set forth herein, to furnish all materials, equipment, labor and other accessories as defined by law,
in the prosecution of the Work as provided for in said Contract and designated as PSB municipal Building
Roof Replacement 200 Texas Street, Fort Worth, Texas 76102 (City Project #2024-021.
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if Principal shall
pay all monies owing to any {and all) payment bond beneficiary (as defined in Chapter 2253 of the Texas
Government Code, as amended) in the prosecution of the Work under the Contract, then this obligation
shall be and become null and void; otherwise to remain in fitll farce and effect.
This bond is made and executed in compliance with the provisions of Chapter 2253 of the Texas
Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the
provisions of said statute.
Instruction to Offerors Page 31 of 37
PSB Municipal Building Root Replacement (March 2024)
IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED tilis
instrument by duly authorized agents and officers on this the 15th day of _= July , 2424.
ATTEST:
(Principal) Secretary
Witness as to Principal
ATTEST:
Wit ess as to Surety
Witness as to Surely
PRINCIPAL:
Cowboys Hoofing LLC dba DSA Contractors
r
Signature
rut Ear L_ 4�"gon-f a Al ITR,
Name and Title
Address: 2500 Texas Drive, Irving, TX 75062
SURETY: _
{iH9
Great Midwest Insurance Company c
Boa
13Y.� '&cbero��`
Signature
Zach Mefferd, Attorney -in -Fact
Name and Title
Address: 800 Gessrter. Suite 600
HoustQD. TX 77024
Telephone Number: __713-935-0226
*Note: If signed by an officer of the Surety, there must be on file a certified extract from the bylaws showing that
this person has authority to sign Stich obligation. If Surety's physical address is different from its mailing address,
both must be provided. The date of the bond shall not be prior to the date the Contract is awarded,
Instruction to DffeMrs
P58 Municipal Building Roof Replacement (March 2024)
Page 32 of 37
Bond # GM 229901
PERFORMANCE BOND
THE STATE OF TEXAS §
§ KNOW ALL BY THESE PRESENTS:
COUNTY OF TARRANT §
That we, Cowboys Roofing LLC dba DSA contractors , known as "Principal" herein and
Great Midwest Insurance Company , a corporate surety
(sureties, if more than one) duly authorized to do business in the State of Texas, known as "Surety" herein
(whether one or more), are held and firmly bound unto the City of Fort Worth, a municipal corporation
Sam amount as
created pursuant to the laws of Texas, known as "City" herein, in the penal sum of, Performance bond Dollars
( $ 685.716,40), lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas for the
payment of which sum well and truly to be made, we mind ourselves, our heirs, executors, administrators,
successors and assigns, jointly and severally, firmly by these presents.
WHEREAS, the Principal has entered into a certain written contract with the City awarded the
xst, day of July , 2024, which Contract is hereby referred to and madc a part hereof for all
purposes as if fully set forth herein, to furnish all materials, equipment labor and other accessories defined
by law, in the prosecution of the Work, including any Change Orders, as provided for in said Contract
designated as P5B Muiucipal Buildinu Roof Replacement 240 Texas Street, Fort Worth, Texas
Ifs.102 (City Project #2024-02).
NOW, THEREFORE, the condition of this obligation is such that if the said Principal shall
faithfully perform it obligations under the Contract and shall in all respects duly and faithfully perform
the Work, including Change Orders, under the Contract, according to the plans, specifications, and
contract documents therein referred to, and as well during any period of extension of the Contract that
may be granted on the part of the City, then this obligation shall be and become null and void, otherwise
to remain in full force and effect.
PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in Tarrant
County, Texas or the United States District Court for the Northern district of Texas, Fort Worth Division.
This bond is made and executed in compliance with the provisions of Chapter 2253 of the Texas
Government Code, as amended, &id all liabilities on this bond shall be determined in accordance with the
provisions of said statue.
Instruction to Offerors Psge 33 of 37
PSB Municipal Building Roof Replacement (March 2024)
IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED this
instrument by duly authorized agents and officers on this the 25th day of JUN , 2024,
ATTEST:
(Principal) Secretary
Witness as to Principal
_Z�j �
itness as to Surety
PRINCIPAL:
Cowboys Roating LLC dba d5A Contractors
Signature
Name and Title
Address: 2500 Texas Drive, Irving, TX 75062
SURETY:
Great Midwest Insurance Company Gave)
Signature
Zach Mefferd, Attorney -in -Fact
Name and Title
Address: —000 t;ASSnHr- S1u[te'.6W
Houston, TX 77024
Telephone Number: 713-935-0226
*Note: If signed by an officer of the Surety Company, there must be on file a certified extract: from the by-laws
showing that this person has authority to sign such obligation. If Surety's physical address is different fintta its mailing
address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded.
Instruction to Offerors
P33 Municipal Building Roof Replacement (March 2024)
Page 34 of 37
POWER OF ATTORNEY
Great Midwest Insurance Company
KNOW ALL MEN BY THESE PRESENTS, that GREAT MIDWEST INSURANCE COMPANY, a Texas Corporation, with its principal office
in Houston, TX, does hereby constitute and appoint:
Zach Matter, Zach Mefferd, Tina Bockholt, Havilah Watson, Jimmy Brown, Shannon Cox, Kamri Wolfe
its true and lawful Attorneys) -In -Fact to make, execute, seal and deliver for, and on its behalf as surety, any and all bonds, undertakings or other
writings obligatory in nature of a bond.
This authority is made under and by the authority of a resolution which was passed by the Board of Directors of GREAT MIDWEST
INSURANCE COMPANY, on the 1` day of October, 2018 as follows:
Resolved, that the President, or any officer, be and hereby is, authorized to appoint and empower any representative of the Company or
other person or persons as Attorney -In -Fact to execute on behalf of the Company any bonds, undertakings. policies, contracts of indemnity or other
writings obligatory in nature of a band not to exceed Twenty -Five Million dollars ($25,000,000.00), which the Company might execute through its
duty elected officers, and affix the seat of the Company thereto. Any said execution of such documents by an Attorney -In -Fact shall be as binding
upon the Company as if they had been duly executed and acknowledged by the regularly elected officers of the Company. Any Attorney -In -Fact, so,
appointed, may be removed in the Company's sole discretion and the authority so granted may be revoked as specified in the Power of Attorney.
Resolved, that the signature of the President and the seal of the Company may be affixed by facsimile on any power of attorney granted,
and the signature of the Secretary, and the seal of the Company may be affixed by facsimile to any certificate of any such power and any such
power or certificate bearing such facsimile signature and seal shall be valid and binding on the Company. Any such power so executed and sealed
and certificate so executed and sealed shall, with respect to any bond of undertaking to which it is attached, continue to be valid and binding on the
Company,
iN WITNESS THEREOF, GREAT MIDWEST INSURANCE COMPANY, has caused this instrument to be signed by its President, and its
Corporate Seal to be affixed this 11th day of February, 2021.
GREAT MIDWEST INSURANCE COMPANY
BY H.�, Q ��
Marls W. Haushill
President
ACKNOWLEDGEMENT
On this 11th day of February, 2021. before me, personally came Mark W. Haushill to me known, who being duly sworn, did depose and
say that he is the President of GREAT MIDWEST INSURANCE COMPANY, the corporation described in and which executed the above instrument-,
that he executed said instrument on behalf of the corporation by authority of his office under the By-laws of said corporation.
•kisvf%�rAUa, CHRISTINA BISHOP
Notary Public, Stale of Texas
COMM Expires Od 1 d•2t326
rr" iilNolery ID 131090488
CERTIFICATE
BY ,
Christina Bishop
Notary Public
I, the undersigned, Secretary of GREAT MIDWEST INSURANCE COMPANY, A Texas Insurance Company, DO HEREBY CERTIFY that
the original Power of Attorney of which the foregoing is a true and correct copy, is in full farce and effect and has not been revoked and the resolutions
as set forth are now in force.
Signed and Sealed at Houston, TX this 115f"% Day of
Iiikissuq
GORPORATE SEAL
BY
Leslie K, Shaunty
Secretary
"WARNING: Any person who knowingly and with intent to defraud any insurance company or other person, files and application for insurance of claim,
containing any materially false information, or conceals for the purpose of misleading, information concerning any fact materlal thereto, commits a
fraudulent insurance act, which Is a crime and subjects such person to criminal and civil penalties.
CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW
Pursuant to Texas Labor Cade Section 406.096(a), as amended, Contractor certifies that it provides
worker's compensation insurance coverage for all of its employees employed on City Project, PSB
Municipal Buildine Roof Replacement 200 Texas Street, Fort Worth. Texas 76102 (City Project
#2024-02). Contractor further certifies that, pursuant to Texas Labor Cade, Section 406.096(b), as
amended, it will provide to City its subcontractor's certificates of compliance with worker's compensation
coverage.
CONTRACTOR:
Cowboys Roofing LLC
Company
1320 Brown Trail
Address
Bedterd TX 76022
City/State/Zip
By: Tim Ebel
(Please Print)
~� Signature:
Title: Proiect Manaaer
(Please Print)
THE STATE OF TEXAS §
§ KNOW AI.L BY THESE PRESENTS:
COUNTY OF TARRANT §
BEFORE ME, the undersigned authority, on this day personally appeared
I t vvl � l , known to me to
be the person whose name is subscribed to the foregoing instrument, and acknowledged to me that he/she
executed the same as the act and deed of Aagia JpAa man+ for the
purposes and consideration therein expressed and in the capacity therein stated.
GIVEN UNDER MY HAND AND SEAL OF OFFICE this 23 day of , 2024.
OW""I"fi,
SUNNIE RENNEA EBEL
Notary ID #f 33404467
My Commission Expires
October 20, 2025
a
s--, W V .
Notary Public in and for the State of Texas
Instruction to Offerors
P58 Municipal Building Roof Replacement (March 2024)
Page 36 of 37
4'—O"
2' —0" 2' —0"
CENTERLINE OF
SIGN, LOGO & 1
TEXT INFORMATION
FORT WORTH.
Project Title
Architect:
Architect's Name
Contractor:
Contractor's Name
FUNDED BY
(List Bond Fund, etc.)
SCHEDULED COMPLETION DATE
*4%, YEAR J
SIGN COLOR & FONT:
U
t
BACKGROUND - WHITE
BORDER - 5116"WIDE, 3"RADIUS CORNERS, PMS 288 (BLUE)
TEXT - HELVETICA or ARIAL, PMS 288 (BLUE)
FORT WORTH LOGO COLORS & FONT:
FORT WORTH - PMS 288 (BLUE), CHELTENHAM BOLD
LONGHORN LOGO - PMS 725 (BROWN)
PROJECT DESIGNATION SIGN
Instruction to Offerors Page 37 of 37
PSB Municipal Building Roof Replacement (March 2024)
From:
Chris Brown
To:
McDonald. Vicki
Subject:
RE: PAYMENT & PERFORMANCE BOND - GM 229901
Date:
Friday, August 9, 2024 10:08:59 AM
Attachments:
imaae002.ona
imaae056377.ona
CAUTION: This email originated from outside of the City of Fort Worth email system. Do not click any links or open
attachments unless you recognize the sender and know the content is safe.
Hi Vicki,
Yes, the bond is enforce for $685,716.40. Thanks!
CHRIS BROWN
AWitS1anll 4Jr1amyriter - surety
CHRIS BROWN
Assistant Underwriter - Surety
W: 770.701.2622
BEST
PLACES
�
COMPANIES
COMPANIES
WORK FOR
T-0 W ORK 202:
TO W
IN THE SOUTH
SURETY
Follow us: Linkedln
Until further notice, we ask that all correspondence, contracts, pleadings, discovery or other documents be
sent in digital form, via email, instead of (or in addition to) US Mail. Please understand that any
documents sent to our physical offices may require additional response time, as much of our staff has
transitioned to remote work arrangements. {SSI210915]
Emails cannot be guaranteed to be error -free, as information can be corrupted, lost, delayed, or contain viruses. Skyward Specialty Insurance
accepts no liability for the content of any e-mail, or for the consequences of any actions taken on the basis of information provided. All a -mails
are retained and subject to review by clients, federal and state regulatory authorities, and legal discovery. Skyward Specialty
Insurance internal security may unintentionally prevent your e-mail from reaching its destination. If you do not receive a timely response to
your email, please call us. This e-mail (including attachments) may contain confidential and/or legally privileged information, including
information subject to the Health Insurance Portability and Accountability Act (HIPAA), and is intended solely for the use of the addressee. If
you receive this e-mail in error, please delete the e-mail and any attachments from your e-mail system, destroy any copies. If you are not the
intended recipient, sender hereby notifies you that any use, distribution, copying, or storage of this message or any attachment by you is
strictly prohibited. {SkywardSpecialtylnsurance2O201 1 17]
From: McDonald, Vicki <Vicki.McDonald @fortworthtexas.gov>
Sent: Friday, August 9, 2024 10:42 AM
To: Chris Brown <cbrown@skywardinsurance.com>
Subject: PAYMENT & PERFORMANCE BOND - GM 229901
EXTERNAL SENDER
Can you please verify bond # GM 229901 for Cowboys Roofing LLC dba DSA Contractors? City
project PSB Municipal Building Roof Replacement in the amount of $685,716.40. Thanks.
Administrative Assistant
Property Management Department
817-392-2586 — Office
682-213-0633 — Cell
Mailing Address: 100 Fort Worth Trail, Fort Worth Texas 76102
Physical Address: City Hall — Tunnel, 200 Texas Street Fort Worth Texas 76102
vicki.mcdonaldna fortworthtexas.aov
FORT WORTIL
Working together to build a strong community.
From: Murohv. Donnette I
To: McDonald. Vicki; Hinton. ]oanne
Subject: RE: PSB MUNICIPAL BUILDING ROOF REPLACEMENT - COI
Date: Monday, August 12, 2024 11:30:05 AM
Attachments: Contract PSB Roof Reolacement Cowbovs (002:.Ddf
imaoe001.Dno
imaoe002.Dna.
1maoe003.Dno,
imaae004.Dno
imaoe005.Dno
Cowbovs Roofing COI.Ddf
Looks good.
Thanks Vicki.
-Donnette
Donnette Murphy
HR Manager -Property and Casualty
HRIRisk Management
200 Texas Street
Fort Worth, Texas 76102
Office: (917) 392-7794
Cell: (682) 760-6749
Email: donnette.muWhy fortworthtexas.Lyov
City of Fort Worth — Working together to build a strong community
FORT WORTH
awtv®
Please note: Our department will be moving to New City Hall on September 13th 2024. Our new
address will be 100 Fort Worth Trail, Fort Worth, Texas 76102. Please continue to send any mail
to the current address listed above until the date noted or you have been notified otherwise.
From: McDonald, Vicki <Vicki.McDonald @fortworthtexas.gov>
Sent: Monday, August 12, 2024 10:55 AM
To: Murphy, Donnette J <Donnette.Murphy@ fortworthtexas.gov>; Hinton, Joanne
<Joanne.Hinton@fortworthtexas.gov>
Subject: RE: PSB MUNICIPAL BUILDING ROOF REPLACEMENT - C01
Here is the updated form. Thanks.
ViC& UdD4vtau
Administrative Assistant
Property Management Department
817-392-2586 - Office
682-213-0633 - Cell
Mailing Address: 100 Fort Worth Trail, Fort Worth Texas 76102
Physical Address: City Hall - Tunnel, 200 Texas Street Fort Worth Texas 76102
vicki. mcdonald(a)fortworthtexas.aov
FORT WORTH,,
Working together to build a strong community.
From: Murphy, Donnette J <Donnette.Murohv(@fortworthtexas.eov>
Sent: Saturday, August 10, 2024 9:29 AM
To: McDonald, Vicki <Vicki. McDonald(@fortworthtexas.Rov>; Hinton, Joanne
<Joanne.Hinton(@fortworthtexas.t7ov>
Subject: RE: PSB MUNICIPAL BUILDING ROOF REPLACEMENT - COI
Hello, please ask that they add in commentary the following statement ...
"Additional Insured status is granted to the City as required by written contract. The term City
shall include its employees, officers, officials and agents as respects to the contracted service.
Coverage shall be on a Primary Non -Contributory basis. A blanket waiver of subrogation is
granted in favor of the City of Fort Worth as required by written contract. (*)All policies include
an endorsement providing that 30 day notice of cancellation, except 10 day notice for non-
payment of premium, will be given if required by written contract."
In addition, note our address has changed. Please update the COI. New City Hall address
is :
100 Fort Worth Trail, Fort Worth, Texas 76102
Donnette Murphy
HR Manager -Property and Casualty
HR/Risk Management
200 Texas Street
Fort Worth, Texas 76102
Office: (817) 392-7784
Cell: (682) 760-6749
Email: donnette.murphvn.fortworthtexas.gov
City of Fort Worth — Working together to build a strong community
FORT WORTH:,
• Please note: Our department will be moving to New City Hall on September 13th 2024. Our new
address will be 100 Fort Worth Trail, Fort Worth, Texas 76102. Please continue to send any mail
to the current address listed above until the date noted or you have been notified otherwise.
From: McDonald, Vicki <Vicki. McDonald(@fortworthtexas.eov>
Sent: Monday, August 5, 2024 4:01 PM
To: Murphy, Donnette J<Donnette.Murohv(@fortworthtexas.eov>; Hinton, Joanne
<J oa n ne. H i nton (@fortworthtexas. eov>
Subject: PSB MUNICIPAL BUILDING ROOF REPLACEMENT -COI
Attached is the certificate of insurance and contract for Cowboys Roofing, LLC. Contract is for
$685,716.40. Please verify. Thanks.
Administrative Assistant
Property Management Department
817-392-2586 — Office
682-213-0633 — Cell
City Hall - Tunnel
200 Texas Street Fort Worth Texas 76102
vicki. mcdonald(cDfortworthtexas.aov