HomeMy WebLinkAboutContract 46607-A4CSC No. 46607-A4
AMENDMENT No . 4
TO CITY SECRETARY CONTRACT No. 46607
WHEREAS, the City of Fort Worth (CITY) and A.N.A Consultants, LLC,
(ENGINEER) made and entered into City Secretary Contract No. 46607, (the
CONTRACT) which was authorized by M&C (C-27261) on the 14th day of April,
2015, in the amount of $107,865.00; and
WHEREAS, the CONTRACT was subsequently revised by: Amendment No.1 in
the amount of $314,000.00 authorized by M&C (C-28195) on April 18, 2017,
Amendment No.2 in the amount of $272,324.00 authorized by M&C (C-29097) on
April 16, 2019, and Amendment No.3 in the amount of $258,780.00 authorized
by M&C 21-0992 on December 14, 2021; and
WHEREAS, the CONTRACT involves engineering services for the following
project:
Near Southside Medical District Water and Sanitary Sewer
Improvements; and
WHEREAS, it has become necessary to execute Amendment No. 4 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement, which
amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and incorporated
herein. The cost to City for the additional design services to be performed
by Engineer totals $86,815.00 (Water: $72,816.00; Sewer: $13,999.00).
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $1,039,784.00.
3.
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
OFFICIAL RECORD
City of Fort Worth, Texas Near Southside Medical District W/SS Improvements
Prof Services Agreement Amendment Template CITY SECRETARY CPN CO2445
Revision Date: 12/08/2023
Page 1 of 2 FT. WORTH, TX
EXECUTED and EFFECTIVE as
designated Assistant City Manager.
APPROVED:
City of Fort Worth
Fernando Costa
Assistant City Manager
DATE: Aug 28, 2024
4,o�voungIl
a pORl �p
nOF00000000 �y Od
ATTEST: ago oiA
/) aaaa dezas4a
Jannette Goodall
City Secretary
APPROVAL RECOMMENDED:
Christopher Harder (Aug 27, 2024 09:25 CDT)
Christopher Harder, P. E.
Director, Water Department
Contract Compliance Manager:
of the date subscribed by the City's
ENGINEER
nark Assaad, P.E.
�,0 r
DATE : ALIg[15 t 21, 2024
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
2024.08.14
1 -47:01-05'00'
Abolfazl Zakersalehi, P.E.
Project Manager
M&C No.#: N/A
APPROVED AS TO FORM AND LEGALITY:
M&C Date: N/A
Douglas Black (Aug 28, 2024 10:16 CDT)
Douglas W. Black Form 1295: N/A
Sr. Assistant City Attorney
OFFICIAL RECORD
City of Fort Worth, Texas Near Southside Medical District W/SS Improvements
CITY SECRETARY
Prof Services Agreement Amendment Template CPN CO2445
Revision Date: 12/08/2023 FT. WORTH, TX
Page 2 of 2
A%N
CONSULTANTS, L,-.'
ENGINEERS
SURVEYORS
PLANNERS
June 25, 2024
Mr. John Kasavich, P.E.
City of Fort Worth
Water Department
200 Texas Street
Fort Worth, Texas 76102
5000 Thompson Terrace
Colleyville, Texas 76034
(817) 335-9900
Fax (817) 335-9955
Re: Amendment No. 4 -Professional Services
Near Southside Medical District Water and Sanitary Sewer Main Improvements
City Project No.: 02445
Dear Mr. Kasavich:
At the request of the City, A.N.A. Consultants has been asked to provide Engineering and Survey Design
services for the above referenced project.
This request for additional services is not part of our existing contract and will exceed our current scope.
A.N.A. Consultants, L.L.C. is recommending that our current contract be amended to include these additional
services as well as the corresponding fee adjustments.
The expected fee for Amendment No. 4 is $86,815 for these additional engineering and survey design for
FY21 Near Southside Medical District Water and Sanitary Sewer Main Improvements. We expect to use J.S.
Ground Engineering, LLC to meet our Minority goal of 13% this Amendment. This amendment will increase
the total lump sum fee to $1.039.784.
The following table summarizes the water and sewer design fee:
Contract / Amendment
Water Fee
Sewer Fee
Total
Original Contract
$92,192
$15,673
$107,865
Amendment No. 1
$195,000
$119,000
$314,000
Amendment No. 2
$223,979
$48,345
$272,324
Amendment No. 3
$199,310
$59,470
$258,780
Amendment No. 4
$72,816
$13,999
$86,815
Total $783,297
$256,487
$1,039,784
If you have any questions or require additional information, please give me a call.
Sincerely,
A.N.A. Consultants L.L.C.
Mark . ssaad, E.
President
J:11404151ContractlAmendment No4.-Water-CD 9 FW South-FY21-02445-ANA 14-0415.docx
CLIENT SATISFACTION IS OUR BUSINESS
STREET
WATER
SEWER
5
-
fn
N
N_
N
N_
U
_
(n
N
N_
N
N_
U)
U
0
U)
U)
'V
C
_v5
X
2
C
X
0
o
Water Map
w
Length
o
Sewer Map w
Length
Street / Limits
U
No
(LF)
U
No
(LF)
E. Broadway Avenue
1-35 South Fwy
9
2054-388
6"
8"
220
9
-
-
West Dead -End
May Street
W. Peter Smith St.
9
2048-388
2"
8"
400
9
-
- -
W. Broadway Ave.
*Cleveland Ave. (60%)
S. Main Street
9
-
-
-
9
2048-388 NA
8" 210
West Dead -End
Ram! TH.
Henderson St.
9
2048-388
NA
8"
450
9
2048-388 NA
8" 460
S. Adams St.
S. Adams St.
W. Broadway Ave
9
2048-388
8"
8"
910
9
-
-
W. Vickery Blvd.
Morphy St.
S. Jennings Ave.
9
2048-384
6"
8"
585
9
-
St. Louis Ave.
Galveston Ave.
W. Broadway Ave.
9
2048-388
6"
8"
920
9
-
W. Vickey Blvd.
*Cleveland Ave. Removed from
project scope after the 60%
review.
Water Total
13,485
0
Sewer Total
670
EXHIBIT B-2
Level of Effort Spreadsheet
TASK/HOUR BREAKDOWN
AMENDMENT NO.4 - DESIGN SERVICES FOR
FY21 NEAR SOUTHSIDE MEDICAL DISTRICT WATER AND SANITARY SEWER MAIN IMPROVEMENTS
CProject No. 02445
26 ho rs) Expense
Task Description Project Project Project Survey Survey Total Labor Total Expense Task No. Principal EIT/ SIT CADD Admin Subconsultant Task Sub Total
Manager Engineer RPLS Tech Field Crew Cost Cost
Rate $300 $260 $220 $185 $1�� $225 $150 $250 $140 MWBE J Non-MWBEJ Repro.
1.0 Project Management 4 6 9 $4,400 $ I $ I $0 $0 $4,40(
1.2.1
1.2.2
1.2.3
1.2.4
1.2.5
2.0
2.1
Pre -Design Coordination Meeting
Design Submittal Review Meetings
Prepare Baseline Schedule
Prepare Monthly Progress Reports with Schedule
Prepare Monthly MBE/SBE Reports
Concep�tual Design (30-Percent)
Data Collection
0
4
4
0
0
0
0 0
0
0
$1,040
$1,040
$0
$0
$0
0 $0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$1,040
$1,040
$0
$0
$0
$0
$0
Design2.2
I
I
I
I
r
2.2.1
-Conceptual
Cover Sheet
$0
$0
$0
2.2.2
Exhibits and Summary
$0
$0
$0
2.2.4
Construction Estimate
$0
$0
$0
3.0
Prelimmarn( Design (60 Percent)
resign
1A
41
117
0
Q
6
0 $33,260$
$6
$d
$0
$0
$33,265
3.1
3.1.1
Preliminary Package
Cover
1
$19
$0
$0
$0
$185
3.1.2
Overall Layout
8
$1,480
$0
$1,480
3.1.3
Plan and Plan/Profile Sheets
4
34
82
$23,690
$0
$23,690
3.1.4
Specifications
2
2
8
$2,440
$0
$2,440
3.1.5
Construction Estimate
4
5
18
$5,470
$0
$5,470
3.2
Constructability Review
$0
$0
$0
3.3
4.0
Utility Clearance
Final Design
0
10
��
Sby
0 0
0
0
$0
0 $29,950
$0
$0
$0
$0
$0
$0
$29,950
4.1
Final Draff (90 %) Construction Plans and Specifications
4
24
52
$15,940
$0
$15,940
4.2
Final (100%) Plans and Specifications
4
24
24
$10,760
$0
$10,760
4.3
Construction Estimates (900% and 100%)
2
4
10
$3,250
$0
$3,250
5.0
Bid Phase
6
d
d
6
0 6
6
Q
0 0
$6
$6
$0
$0
$0
5.1.2
Sell Contract Documents and Maintain Plan Holders List
$0
$0
$0
5.1.3
Issue Addenda
$0
$0
$0
5.1.4
Attend Bid Opening
$0
$0
$0
5.1.5
Tabulate Bids and Recommend Award
$0
$0
$0
6.0
Construction Phase Services
0 0
0
0
0 0
0 0 0
$0
$0
$0
$0 $0
$0
• 6.1.1
Attend Precons1ruction Conference
$0
$0
$0
6.1.2
Attend Public MeetingS�
$0
$0
$0
6.2
Record Drawings/As fihil[
$0
$0
$0
8.0
Survey
0 0
0
0
0 10
23 54 0
$19,200
$0
$6
$0 $0
$19,200
8.1
Design Survey
10
23 54
$19,200
$0
$19,200
8.2
Additional Services
$0
$0
$0
8.3
Subsurface Utility Engineering Level D-A
$0
$0
$0
Totals
4 2fl
93
209
8 16
21 54 8'
$86,819
$U
$U
$0 $6
$86,815
Water and Sanitary Sewer Breakdown
Project Summary
Water
Sanitary Sewer
Total Hours
423
LF
% J Cost
LF
7 J Cost
Total Cost I% Complete
)Remaining,
Total Labor
$86,815
1
3,485
84°°I $72,816
670
16°°I $13,999
$86,815
0°°I
$86, 51
Total Expense
$0
1
Total LF
4,155
MBE/SBE Subconsultan
$0
Non-MBE/SBE Subconsultant
$0
10% Sub Markup
$0
MBE/SBE Participation
0.0%
Total Project Cos
$86,815
FY21 NEAR SOUTHSIDE MEDICAL DISTRICT WATER AND SANITARY SEWER MAIN IMPROVEMENTS
City of Fort Worth, Texas COFW Project No.: 02445
Attachment B - Level of Effort Supplement ANA Project No.: 14-0415
LOCATION MAP
NEAR SOUTHSIDE MEDICAL DISTRICT
WATER AND SANITARY SEWER MAIN IMPROVMENTS
CITY PROJECT NO.: 02445
w .
A '
yS� (yam
lA%1
OPP I F /i
lw,
Page 1
r
N
LOCATION MAP
NEAR SOUTHSIDE MEDICAL DISTRICT
WATER AND SANITARY SEWER MAIN IMPROVMENTS
CITY PROJECT NO.: 02445
Ore
IL
lop_ +
Ad
IL
F it I
7e7
to aal:
+i
Page 2
LOCATION MAP
NEAR SOUTHSIDE MEDICAL DISTRICT
WATER AND SANITARY SEWER MAIN IMPROVMENTS
CITY PROJECT NO.: 02445
V
1
Page 3
LOCATION MAP
NEAR SOUTHSIDE MEDICAL DISTRICT
WATER AND SANITARY SEWER MAIN IMPROVMENTS
CITY PROJECT NO.: 02445
0A
a�
C � ,
)d C _
Z$
Page 4