Loading...
HomeMy WebLinkAboutContract 46607-A4CSC No. 46607-A4 AMENDMENT No . 4 TO CITY SECRETARY CONTRACT No. 46607 WHEREAS, the City of Fort Worth (CITY) and A.N.A Consultants, LLC, (ENGINEER) made and entered into City Secretary Contract No. 46607, (the CONTRACT) which was authorized by M&C (C-27261) on the 14th day of April, 2015, in the amount of $107,865.00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment No.1 in the amount of $314,000.00 authorized by M&C (C-28195) on April 18, 2017, Amendment No.2 in the amount of $272,324.00 authorized by M&C (C-29097) on April 16, 2019, and Amendment No.3 in the amount of $258,780.00 authorized by M&C 21-0992 on December 14, 2021; and WHEREAS, the CONTRACT involves engineering services for the following project: Near Southside Medical District Water and Sanitary Sewer Improvements; and WHEREAS, it has become necessary to execute Amendment No. 4 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $86,815.00 (Water: $72,816.00; Sewer: $13,999.00). 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $1,039,784.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD City of Fort Worth, Texas Near Southside Medical District W/SS Improvements Prof Services Agreement Amendment Template CITY SECRETARY CPN CO2445 Revision Date: 12/08/2023 Page 1 of 2 FT. WORTH, TX EXECUTED and EFFECTIVE as designated Assistant City Manager. APPROVED: City of Fort Worth Fernando Costa Assistant City Manager DATE: Aug 28, 2024 4,o�voungIl a pORl �p nOF00000000 �y Od ATTEST: ago oiA /) aaaa dezas4a Jannette Goodall City Secretary APPROVAL RECOMMENDED: Christopher Harder (Aug 27, 2024 09:25 CDT) Christopher Harder, P. E. Director, Water Department Contract Compliance Manager: of the date subscribed by the City's ENGINEER nark Assaad, P.E. �,0 r DATE : ALIg[15 t 21, 2024 By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. 2024.08.14 1 -47:01-05'00' Abolfazl Zakersalehi, P.E. Project Manager M&C No.#: N/A APPROVED AS TO FORM AND LEGALITY: M&C Date: N/A Douglas Black (Aug 28, 2024 10:16 CDT) Douglas W. Black Form 1295: N/A Sr. Assistant City Attorney OFFICIAL RECORD City of Fort Worth, Texas Near Southside Medical District W/SS Improvements CITY SECRETARY Prof Services Agreement Amendment Template CPN CO2445 Revision Date: 12/08/2023 FT. WORTH, TX Page 2 of 2 A%N CONSULTANTS, L,-.' ENGINEERS SURVEYORS PLANNERS June 25, 2024 Mr. John Kasavich, P.E. City of Fort Worth Water Department 200 Texas Street Fort Worth, Texas 76102 5000 Thompson Terrace Colleyville, Texas 76034 (817) 335-9900 Fax (817) 335-9955 Re: Amendment No. 4 -Professional Services Near Southside Medical District Water and Sanitary Sewer Main Improvements City Project No.: 02445 Dear Mr. Kasavich: At the request of the City, A.N.A. Consultants has been asked to provide Engineering and Survey Design services for the above referenced project. This request for additional services is not part of our existing contract and will exceed our current scope. A.N.A. Consultants, L.L.C. is recommending that our current contract be amended to include these additional services as well as the corresponding fee adjustments. The expected fee for Amendment No. 4 is $86,815 for these additional engineering and survey design for FY21 Near Southside Medical District Water and Sanitary Sewer Main Improvements. We expect to use J.S. Ground Engineering, LLC to meet our Minority goal of 13% this Amendment. This amendment will increase the total lump sum fee to $1.039.784. The following table summarizes the water and sewer design fee: Contract / Amendment Water Fee Sewer Fee Total Original Contract $92,192 $15,673 $107,865 Amendment No. 1 $195,000 $119,000 $314,000 Amendment No. 2 $223,979 $48,345 $272,324 Amendment No. 3 $199,310 $59,470 $258,780 Amendment No. 4 $72,816 $13,999 $86,815 Total $783,297 $256,487 $1,039,784 If you have any questions or require additional information, please give me a call. Sincerely, A.N.A. Consultants L.L.C. Mark . ssaad, E. President J:11404151ContractlAmendment No4.-Water-CD 9 FW South-FY21-02445-ANA 14-0415.docx CLIENT SATISFACTION IS OUR BUSINESS STREET WATER SEWER 5 - fn N N_ N N_ U _ (n N N_ N N_ U) U 0 U) U) 'V C _v5 X 2 C X 0 o Water Map w Length o Sewer Map w Length Street / Limits U No (LF) U No (LF) E. Broadway Avenue 1-35 South Fwy 9 2054-388 6" 8" 220 9 - - West Dead -End May Street W. Peter Smith St. 9 2048-388 2" 8" 400 9 - - - W. Broadway Ave. *Cleveland Ave. (60%) S. Main Street 9 - - - 9 2048-388 NA 8" 210 West Dead -End Ram! TH. Henderson St. 9 2048-388 NA 8" 450 9 2048-388 NA 8" 460 S. Adams St. S. Adams St. W. Broadway Ave 9 2048-388 8" 8" 910 9 - - W. Vickery Blvd. Morphy St. S. Jennings Ave. 9 2048-384 6" 8" 585 9 - St. Louis Ave. Galveston Ave. W. Broadway Ave. 9 2048-388 6" 8" 920 9 - W. Vickey Blvd. *Cleveland Ave. Removed from project scope after the 60% review. Water Total 13,485 0 Sewer Total 670 EXHIBIT B-2 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN AMENDMENT NO.4 - DESIGN SERVICES FOR FY21 NEAR SOUTHSIDE MEDICAL DISTRICT WATER AND SANITARY SEWER MAIN IMPROVEMENTS CProject No. 02445 26 ho rs) Expense Task Description Project Project Project Survey Survey Total Labor Total Expense Task No. Principal EIT/ SIT CADD Admin Subconsultant Task Sub Total Manager Engineer RPLS Tech Field Crew Cost Cost Rate $300 $260 $220 $185 $1�� $225 $150 $250 $140 MWBE J Non-MWBEJ Repro. 1.0 Project Management 4 6 9 $4,400 $ I $ I $0 $0 $4,40( 1.2.1 1.2.2 1.2.3 1.2.4 1.2.5 2.0 2.1 Pre -Design Coordination Meeting Design Submittal Review Meetings Prepare Baseline Schedule Prepare Monthly Progress Reports with Schedule Prepare Monthly MBE/SBE Reports Concep�tual Design (30-Percent) Data Collection 0 4 4 0 0 0 0 0 0 0 $1,040 $1,040 $0 $0 $0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,040 $1,040 $0 $0 $0 $0 $0 Design2.2 I I I I r 2.2.1 -Conceptual Cover Sheet $0 $0 $0 2.2.2 Exhibits and Summary $0 $0 $0 2.2.4 Construction Estimate $0 $0 $0 3.0 Prelimmarn( Design (60 Percent) resign 1A 41 117 0 Q 6 0 $33,260$ $6 $d $0 $0 $33,265 3.1 3.1.1 Preliminary Package Cover 1 $19 $0 $0 $0 $185 3.1.2 Overall Layout 8 $1,480 $0 $1,480 3.1.3 Plan and Plan/Profile Sheets 4 34 82 $23,690 $0 $23,690 3.1.4 Specifications 2 2 8 $2,440 $0 $2,440 3.1.5 Construction Estimate 4 5 18 $5,470 $0 $5,470 3.2 Constructability Review $0 $0 $0 3.3 4.0 Utility Clearance Final Design 0 10 �� Sby 0 0 0 0 $0 0 $29,950 $0 $0 $0 $0 $0 $0 $29,950 4.1 Final Draff (90 %) Construction Plans and Specifications 4 24 52 $15,940 $0 $15,940 4.2 Final (100%) Plans and Specifications 4 24 24 $10,760 $0 $10,760 4.3 Construction Estimates (900% and 100%) 2 4 10 $3,250 $0 $3,250 5.0 Bid Phase 6 d d 6 0 6 6 Q 0 0 $6 $6 $0 $0 $0 5.1.2 Sell Contract Documents and Maintain Plan Holders List $0 $0 $0 5.1.3 Issue Addenda $0 $0 $0 5.1.4 Attend Bid Opening $0 $0 $0 5.1.5 Tabulate Bids and Recommend Award $0 $0 $0 6.0 Construction Phase Services 0 0 0 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 • 6.1.1 Attend Precons1ruction Conference $0 $0 $0 6.1.2 Attend Public MeetingS� $0 $0 $0 6.2 Record Drawings/As fihil[ $0 $0 $0 8.0 Survey 0 0 0 0 0 10 23 54 0 $19,200 $0 $6 $0 $0 $19,200 8.1 Design Survey 10 23 54 $19,200 $0 $19,200 8.2 Additional Services $0 $0 $0 8.3 Subsurface Utility Engineering Level D-A $0 $0 $0 Totals 4 2fl 93 209 8 16 21 54 8' $86,819 $U $U $0 $6 $86,815 Water and Sanitary Sewer Breakdown Project Summary Water Sanitary Sewer Total Hours 423 LF % J Cost LF 7 J Cost Total Cost I% Complete )Remaining, Total Labor $86,815 1 3,485 84°°I $72,816 670 16°°I $13,999 $86,815 0°°I $86, 51 Total Expense $0 1 Total LF 4,155 MBE/SBE Subconsultan $0 Non-MBE/SBE Subconsultant $0 10% Sub Markup $0 MBE/SBE Participation 0.0% Total Project Cos $86,815 FY21 NEAR SOUTHSIDE MEDICAL DISTRICT WATER AND SANITARY SEWER MAIN IMPROVEMENTS City of Fort Worth, Texas COFW Project No.: 02445 Attachment B - Level of Effort Supplement ANA Project No.: 14-0415 LOCATION MAP NEAR SOUTHSIDE MEDICAL DISTRICT WATER AND SANITARY SEWER MAIN IMPROVMENTS CITY PROJECT NO.: 02445 w . A ' yS� (yam lA%1 OPP I F /i lw, Page 1 r N LOCATION MAP NEAR SOUTHSIDE MEDICAL DISTRICT WATER AND SANITARY SEWER MAIN IMPROVMENTS CITY PROJECT NO.: 02445 Ore IL lop_ + Ad IL F it I 7e7 to aal: +i Page 2 LOCATION MAP NEAR SOUTHSIDE MEDICAL DISTRICT WATER AND SANITARY SEWER MAIN IMPROVMENTS CITY PROJECT NO.: 02445 V 1 Page 3 LOCATION MAP NEAR SOUTHSIDE MEDICAL DISTRICT WATER AND SANITARY SEWER MAIN IMPROVMENTS CITY PROJECT NO.: 02445 0A a� C � , )d C _ Z$ Page 4