Loading...
HomeMy WebLinkAboutIR 7275 INFORMAL REPORT TO CITY COUNCIL MEMBERS No. 7275 April 12, 1988 To the Mayor and Members of the City Council Subject: Review and Authorization Process . for Fort Worth Zoo 1671 1 Exhibits During the discussion of the Texas Diorama Exhibit , the City Council was informed that a process would be developed for the review and authorization of the construction of new exhibits proposed by the Fort Worth Zoological Association at the Fort Worth Zoo. Transmitted in this report is a proposed process which will ensure that the citizenry of Fort Worth has an opportunity to review and comment on proposed plans to construct new exhibits at the zoo. The proposed process is intended to be flexible and may be altered as needed . The proposed process includes three basic steps , with provisions for a fourth step as necessary . The first three steps will include: 1 ) an open meeting with the architect to discuss the concept of each exhibit , 2) a public hearing at a Park and Recreation Board meeting , and; 3) review by the City Council of the proposed exhibit deli g n and consi derati on and authori zati on of the exhibit as presented . The fourth step involves review of change orders . Should any change order (as defined in this process) be needed , the change order must also be reviewed and approved by the City Council . CONCEPT MEETING The Zoological Association will conduct a meeting to discuss the proposed exhibit (additional meetings will be held if needed ) . The active participants of the meeting will be the Zoo Exhibit Review Committee , which will be made up of the Park and Recreation Zoo Committee , representatives of Zoological Association , the architect of the exhibit and city staff . The purpose of the meeting will be to' provide the architect with guidelines to be used in designing the exhibit . Although the meeting will be open to the public, only the members of the Zoo Exhibit Review Committee will be allowed to take part in the discussion . Members of the audience who desire to have input may do so by contacting a member of the Park and Recreation Board Zoo Committee. The Park and Recreation Zoo Committee will report to the full Park and Recreation Board . ZOO EXHIBIT PUBLIC HEARING Upon completion of t e design drawings , the architect will make a presentation in a public hearing before the Park and Recreation Board which will include a model and the design drawings of the exhibit . Citizens will have the opportunity to speak before the ISSUED BY THE CITY MANAGER FORT WORTH, TEXAS INFORMAL REPORT TO CITY COUNCIL MEMBERS No. 7275 - p.2 U G'D April 12, 1988 i1ok.), To the Mayor and Members of the City Council X Review and Authorization Process for Fort Worth Zoo 1073 Exhibits Board regarding the proposed design of the exhibit . The Board will makea recommendation either to the architect to modify the design or to the City Council to authorize the construction of the exhibit as submitted by the architect . CONSTRUCTION AUTHORIZATION the Park and Recreation' Board and the City staff regarding the construction of the exhibit . After reviewing the model and design drawings of the exhibit , the Council may request changes in the design or authorize the construction of the exhibit as presented. CHANGE ORDERS Change orders which would increase the square footage of the facilities in the exhibit , increase the projected operating cost , or change the location of the facilities within the exhibit would have to be reviewed by the Zoo Exhibit Review Committee and %W approved by the City Council . If the City Council agrees with this process , an, M&C approving the process will be prepared for your consideration at the next Council ��,Zr ZIAOUGLAS HARMA�7�� CITY MANAGER ISSUED BY THE CITY MANAGER FORT WORTH, TEXAS