HomeMy WebLinkAboutContract 59573-A2CSC No. 59573-A2
AMENDMENT No . 2
TO CITY SECRETARY CONTRACT No. 59573
WHEREAS, the City of Fort Worth (CITY) and Lockwood, Andrews & Newnam,
INC., (ENGINEER) made and entered into City Secretary Contract No. 59573,
(the CONTRACT) on the 91-h day of June, 2023 in the amount of $ 95, 000. 00;
and
WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1
in the amount of $542,306.00 which was authorized by M&C # 23-0977 on
November 14, 2023,
WHEREAS, the CONTRACT involves engineering services for the following
project:
Staff Extension Services in Managing Transportation and Public
Works Arterials and Mobility Infrastructure Capital Projects; and
WHEREAS, it has become necessary to execute Amendment No. 2 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement, which
amends the CONTRACT:
1.
Article I of
the CONTRACT
is amended to include
the additional
engineering services
specified in
proposal attached hereto
and incorporated
herein. The cost to
City for the additional design services to be performed
by Engineer totals
$637,306.00.
(See Attached Funding
Breakdown Sheet,
Page -3-)
OFFICIAL RECORD
CITY SECRETARY
2 •
FT. WORTH, TX
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $1,274,612.00.
City of Fort Worth, Texas LAN Staff Extension Services
Prof Services Agreement Amendment Template NO. 59573
Revision Date: 03/08/2024
Page 1 of 3
3.
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as
designated Assistant City Manager.
APPROVED:
City of Fort Worth
o 1�
Jesica McEachern
Assistant City Manager
DATE: Aug 30, 2024
ATTEST:
A. s
Jannette Goodall
City Secretary
, -v k
a �411
p op 0000
v_o °-+d
Ovo oo
=d
p�P* °
as
1ti< n6X4?o�b
APPROVED AS TO FORM AND LEGALITY:
Rt�
Douglas Black (Aug 28, 202409:46 CDT)
Douglas W. Black
Sr. Assistant City Attorney
City of Fort Worth, Texas
Prof Services Agreement Amendment Template
Revision Date: 03/08/2024
Page 2 of 3
of the date subscribed by the City's
ENGINEER
Lockwood, Andrews & Newnam, Inc.
Justi C. eyes Aug 16, 2024 20:29 CDT)
Justin C. Reeves, PE
Vice President
DATE: Aug 16, 2024
M&C No.#: 24-0560
M&C Date: 6/25/24
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
LAN Staff Extension Services
NO. 59573
FUNDING BREAKDOWN SHEET
City Secretary No. 59573
Amendment No. 2
Fund Dept ID Account Project CF1- CF2 - Bond Amount
ID Activity Reference
Task order contract - various capital pro_ects
Total:
City of Fort Worth, Texas
Prof Services Agreement Amendment Template
Revision Date: 03/08/2024
Page 3 of 3
$637,306.00
LAN Staff Extension Services
NO. 59573
ATTACHMENT "A"
Scope for LAN Staff Extension Services
The scope set forth herein defines the work to be performed by the ENGINEER in
completing the project. Both the CITY and ENGINEER have attempted to clearly define the
work to be performed and address the needs of the Project. Under this scope, "ENGINEER"
is expanded to include any sub -consultant, including surveyor, employed or contracted by
the ENGINEER.
OBJECTIVE
The objective of this contract is to provide project management services for Capital
Improvement Projects Including arterials and mobility infrastructure transportation projects,
as well as to provide administrative support, from design through construction, as an
extension to City staff. The tasks outlined below are examples of duties that may or may not
be required to assist the City depending on the complexity and completeness of the projects
that are assigned.
WORK TO BE PERFORMED
Task 1. Assist in Procurement of Design Consultants
Task 2. Manage Project Design Process
Task 3. Manage Right of Way Acquisition Process
Task 4. Manage Utility Relocation Process
Task 5. Manage Project Construction Process
Task 6. Close Project
Basic Assumptions
• This scope assumes these services will be required by the City for approximately 52
weeks or 1,404, 520 and 1,040 hours of effort per project manager, program
manager and project controls respectively. The contract assumes 1 Project
Manager,1 Program Manager and 1 Project Controls.
• The City will make available needed information on existing and proposed projects in
a timely manner.
The presence or duties of Consultant's personnel at the construction site, whether as
onsite representatives or otherwise, do not make CONSULTANT or Consultant's
personnel in any way responsible for those duties that belong to OWNER's
inspection staff and/or the construction contractors or other entities. And do not
relieve the construction contractors or any other entity of their obligations, duties, and
responsibilities, including, but not limited to, all construction methods, job site safety,
means, techniques, sequences, and procedures necessary for coordinating and
completing all portions of the construction work in accordance with the construction
Contract Documents and any health or safety precautions required by such
construction work.
The Task effort and deliverables outlined under the Scope are subject to change based
on City needs and processes. The effort and deliverables are not limited to the items
listed for each Task
City of Fort Worth, Texas
Attachment A
Page 1 of 7
PMO Release Date: 07/23/2012
LAN Staff Extension Services
NO. 59573
TASK 1. Assist in Procurement of Design Consultants
Description of Work:
• Become familiar with the project, available funding, and schedule
• Review consultant scope, schedule, and fee
• Negotiate with the consultant to obtain the appropriate level of scope
• Obtain M/WBE goal for contract
• Prepare the Mayor and Council communication (M&C)
• Review the final contract for completeness
• Issue Notice to Proceed
• Maintain documentation of the aboveprocess
Deliverables:
• Recommendation of consultant scope and fee
• M/WBE or SBE project goal and Contract Compliance Memorandum
• M&C for consultant contract
• Executed contract
• Documentation of the above maintained in hard copy form and electronic form on the
City's BIM 360 site.
TASK 2. Manage Project Design Process
Description of Work:
• Act as the City's primary point of contact
• Work with City staff todevelop project charters, communication plans, stakeholder
registers, and total project budget estimates (TPBE)
• Coordinate with the consultant and City project control staff to develop a baseline schedule
• Charter the project team
• Schedule meetings as needed with City staff from all departments
• Attend weekly staff meeting with the program manager, City PMs, CPMs and
administrative staff
• Obtain and review monthly consultant project status reports (PSR), riskregisters
(RR) and schedules. Report project status to the program manager
• Track projects' progress in the City's PM/Program Manager dashboard
City of Fort Worth, Texas Page 2 of 7
Attachment A
LAN Staff Extension Services
PMO Release Date: 07/23/2012
• Update the City's overall project schedule as needed
• Review invoices for reasonableness, accuracy, and appropriate charges
• Review consultant submittals at 30%, 60%, 90%, and 100% design phases for
completeness, constructability, conformance with the City policies and standards
including MTP, Transportation Design Manual, Complete Streets Policy, ATPand
Access Management policy, Storm Water Management Design Manual and other
City design standards
• Schedule and lead review meetings of the consultant design submittals with the
City's technical review team members of every discipline. Coordinate reviewsas
needed with other City departments such as Water and Parks.
• Coordinate and conduct a public meeting at the 30% design stage
• Schedule project site visits as necessary
• Coordinate a construability review at the 60% design stage
• Proactively manage change on the project.
• Manage and coordinate all aspects of interlocal agreements with other agencies and
federally funded projects as stated in the LGPP manual
Deliverables:
• Monthly status reports (PSR, RR)
• Charters, Communication Plans, Stakeholder Registers, TPBE
• Recommendation of invoice payment
• Design review comments
• Budget reviews and updates
• Schedule updates
• Recommendation of amendment scope and fee
• Documentation of the above and other project activities, decisions and milestones
TASK 3. Manage Right of Way Acquisition Process
Description of Work:
• Act as task manager for the City's group staff and acquisition consultants, if used. Be
the primary point of contact with Real Property for the consultant and acquisition
consultants
• Review easement/ ROW and property acquisition documents againstthe
requirements of the design for appropriateness and accuracy
City of Fort Worth, Texas
Attachment A
Page 3 of 7
PMO Release Date: 07/23/2012
LAN Staff Extension Services
• Coordinate with Real Property so appraisals are completed in a timelymanner.
Review appraisals forcompleteness
• Coordinate with the City's Legal Department on Eminent Domain issues
• Review Real Property project tracking spreadsheet with estimated easement/ROW
costs
• Review final Right of way acquisition cost and update budget accordingly
Deliverables:
• Easement/ROW/property acquisition review comments
• Appraisal reviewcomments
• Acquisition M&C review comments
• Budget reviews and updates
• Documentation of the above and other project activities, decisions and milestones
maintained in hard copy form and electronic form on the City's BIM 360 site
TASK 4. Manage Utility Relocation Process
Description of Work:
• Ensure appropriate Level of Subsurface Utility Engineering (SUE) is being conducted
by the consultant
• Review consultant SUE plan sheets for conformance to the SUE Quality Level
scoped
• Coordinate with the consultant to identify options that minimize utility conflicts
• Submit plans to the City's Utility Coordinator
• Coordinate with the City's Utility Coordinator for utility relocations
• Prepare M&Cs if necessary to fund utility relocations and update the budget
Deliverables:
• SUE plan sheet review comments
• M&C for utility relocation costs
• Executed Discretionary Service Agreements (if applicable)
• Budget reviews and updates
City of Fort Worth, Texas Page 4 of 7
Attachment A
LAN Staff Extension Services
PMO Release Date: 07/23/2012
• Documentation of the above and other project activities, decisions and milestones
maintained in hard copy form and electronic form on the City's BIM 360 site
TASK 5. Manage Project Construction Process
Description of Work:
• Obtain M/WBE or SBE construction project goal
• Review consultant prepared Notice to Bidders and Comprehensive Notice to Bidders
for accuracy and advertise the project
• Lead pre -bid meeting
• Coordinate with Designer to provide responses to contractor's questions and issue
addenda
• Attend Bid Opening
• Review consultants bid tab summary for completeness and accuracy
• Review contractor's bid package for conformance with the contract requirements
• Recommend successful bidder for contract award
• Prepare M&C for authorization to award contract
• Coordinate routing of contract books with contract coordinator
• Coordinate Grading Permit through Development Services and Storm Water
Pollution Prevention Plan with Environmental Department
• Issue the Notice to Proceed
• Act as the main of point of contact between the contractor, inspector and consultant
and exercise authority over project decisions
• Coordinate and lead pre -construction meeting with Construction Services
• Coordinate and conduct a public meeting prior to start of construction
• Coordinate with the design consultant on responses to Request forinformation (RFI)
and construction submittal reviews. Maintain hard copies of these documents on the
City's document management system (BIM 360)
• Coordinate site visits with the inspector and consultant as appropriate
• Ensure contractor and inspector are maintaining as -built mark-ups
City of Fort Worth, Texas Page 5 of 7
Attachment A
LAN Staff Extension Services
PMO Release Date: 07/23/2012
• Review contractor and consultant invoices for reasonableness, accuracy, and
appropriate charges
• Proactively manage change on the project (Coordinate RFI responses and
processing of change orders and construction allowances)
Deliverables:
• Advertisement
• Addenda (if applicable)
• Recommendation to award contract
• M&C for construction contract
• Notice to proceed
• Budget reviews and updates
• Recommendation for change order or construction allowance approval
• M&C for change order
• Documentation of the above and other project activities, decisions and milestones
maintained in hard copy form and electronic form on the City's BIM 360 site.
TASK 6. Close Project
Description of Work:
• Once the improvements are completed and the assets are in service and
construction is deemed complete, initiate the project close out processand
coordinate with the inspector and consultant
• Coordinate and attend afinal walk through with the consultant, inspector, and
contractor
• Ensure final punch list is issued by the inspector and completed by the contractor
• Coordinate completion of Record Drawings and deliver to the City's record storage
(the "vault") in electronic form
• Review consultant and contractor final invoices for reasonableness, accuracyand
appropriate charges
• Prepare and route reconciliation change order
• Recommend final project closure and complete the City's "green" sheet
City of Fort Worth, Texas Page 6 of 7
Attachment A
LAN Staff Extension Services
PMO Release Date: 07/23/2012
• Close design contract with the processing of "yellow" or "blue sheet"
• Coordinate with business support partner to issue, update and submit Capitalization
Form for In Service Assets to Financial Management Services
• Verify that all necessary documentation is uploaded on BIM 360 according to the
document audit checklist
Deliverables:
• Final punch list
• Record drawings
• Recommendation of final invoice payment
• Expenditure and budget reconciliation
• Final closure recommendation "green sheet"
• Yellow or blue sheets
• Documentation of the above and other project activities, decisions and milestones
maintained in hard copy form and electronic form on the City's BIM 360 site
City of Fort Worth, Texas Page 7 of 7
Attachment A
LAN Staff Extension Services
PMO Release Date: 07/23/2012
ATTACHMENT B
COMPENSATION
Design Services for
LAN Staff Extension Services
Time and Materials with Rate Schedule Project
I. Compensation
A. The ENGINEER shall be compensated in an hourly amount not -to -exceed
$637,306.00 for personnel time, non -labor expenses, and subcontract expenses
in performing services enumerated in Attachment A as follows:
i. Personnel Time. Personnel time shall be compensated based upon hours
worked directly in performing the PROJECT multiplied by the appropriate Labor
Cateaory Rate for the ENGINEER's team member performing the work. Fee is
based on 3,023 hours (52 weeks at 24 hours per week).
Labor Cateaory Rate as presented in the rate schedule table below is the rate for
each labor category performing the work and includes all direct salaries, overhead,
and profit.
Labor Category
2023 Rate
($/hour)
Principal
390
Program Manager
286
Project Manager
208
Project Control
180
Administrative
107
ii. Non -Labor Expenses. Non -labor expenses shall be reimbursed as Direct
Expenses at invoice or internal office cost.
Direct Expenses (non -labor) include, but are not limited to, mileage, travel and
lodging expenses, mail, supplies, printing and reproduction services, other direct
expenses associated with delivery of the work; plus applicable sales, use, value
added, business transfer, gross receipts, or other similar taxes.
iii. Subcontract Expenses. Subcontract expenses and outside services shall be
reimbursed at cost to ENGINEER plus a markup of ten percent (10%).
City of Fort Worth, Texas
Attachment B
Revised Date: 12/9/2022
LAN Staff Extension Services
Page 1 of 4
B-1
LAN Staff Extension Services
NO. 59573
ATTACHMENT B
COMPENSATION
iv. Budgets. ENGINEER will make reasonable efforts to complete the work within
the budget and will keep the City informed of progress toward that end so that
the budget or work effort can be adjusted if found necessary.
ENGINEER is not obligated to incur costs beyond the indicated budgets, as may be
adjusted, nor is the City obligated to pay ENGINEER beyond these limits.
If ENGINEER projects, in the course of providing the necessary services, that the
PROJECT cost presented in Article 2 of this Agreement will be exceeded, whether
by change in scope of the project, increased costs or other conditions, the
ENGINEER shall immediately report such fact to the City and, if so instructed by the
City, shall suspend all work hereunder.
When any budget has been increased, ENGINEER's excess costs expended prior
to such increase will be allowable to the same extent as if such costs had been
incurred after the approved increase.
B. The ENGINEER shall be paid monthly payments as described in Section II -
Method of Payment.
II. Method of Payment
A. The ENGINEER shall be paid by the City based upon an invoice created on the
basis of statements prepared from the books and records of account of the
ENGINEER, based on the actual hours and costs expended by the ENGINEER in
performing the work.
B. Each invoice shall be verified as to its accuracy and compliance with the terms of
this Agreement by an officer of the ENGINEER.
C. ENGINEER shall prepare and submit invoices in the format and including content
as presented in Exhibit B-1.
D. Payment of invoices will be subject to certification by the City that such work has
been performed.
III. Progress Reports
A. The ENGINEER shall prepare and submit to the designated representative of the
Transportation and Public Works Department monthly progress reports and
schedules in the format required by the City.
City of Fort Worth, Texas
Attachment B
Revised Date: 12/9/2022
LAN Staff Extension Services
Page 2 of 4
B-2
LAN Staff Extension Services
NO. 59573
ATTACHMENT B
COMPENSATION
IV. Summary of Total Project Fees
Firm Primary Responsibility
Prime Consultant
Lockwood, Andrews & Project Management Services
Newnam, Inc.
Proposed MWBE Sub -Consultants
White Stone
Environmental
Non-MWBE Consultants
Fee Amount
$573,575.40 90%
$63,730.60 10%
TOTAL $ 637,306.0 100%
Project Number & Name Total Fee MWBE Fee MWBE %
$ 637,306.00 $ 63,730.60 10
City MWBE Goal = 10% Consultant Committed Goal = 10%
City of Fort Worth, Texas
Attachment B
Revised Date: 12/9/2022
LAN Staff Extension Services
Page 3 of 4
B-3
LAN Staff Extension
Services NO. 59573
EXHIBIT "B-1"
ENGINEER INVOICE
(Supplement to Attachment B)
Insert required invoice format following this page, including negotiated total budget and
allocations of budgets across desired work types and work phases.
City of Fort Worth, Texas
Attachment B
Revised Date: 12/9/2022
LAN Staff Extension Services
Page 4 of 4
LAN Staff Extension Services
NO. 59573
Professional Services Invoice Project Manager: ILissetteAcevedo
Project: �PM Services for Capital Improvement Projects
City Project #: N/A
City Sec Number:
Company Name: ILockwood, Andrews & Newnam, Inc.
Supplier's PM: Jonalyn Janey
Supplier Invoice M
Payment Request #:
Service Date:From
Service Date:To
Invoice Date:
Supplier Instructions:
Summary
Fill in green cells including Invoice Number, From and To Dates and the included worksheets.
When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the
Consultant folder within Project's folder.
email: JNJaney@Ian-inc.com
Office Address 1300 Summit Ave., Ste 300 Fort Worth, TX 76102
Telephone: 469-357-4248
Fax: 214-526-4433
Remit Address PO Box 30065 Omaha, NE 68103-1165
Sheet FID and Work Type Description
Work Type 1 Project Management
Work Type 2
Work Type 3
Work Type 4
Work Type 5
Work Type 6
Agreement LTD
Agreement Amendment Amount to Completed Percent ($) Invoiced Current Remaining
Amount Amount Date Amount Spent Previously Invoice Balance
$637,306.00 $637,306.0C $637,306.00
Totals This Invoice $637.306.00 $637.306.00 $637.306.00
Overall Percentage Spent:
Lockwood, Andrews & Newnam, 469-357-4248
214-526-4433
1300 Summit Ave., Ste 300 IPO Box 30065 Omaha, NE 68103-1165
Fort Worth, TX 76'
CFW Project Manager Lissette Acevedo
Supplier's Project Manager: JJonalyn Janey
Supplier's PM email: JNJaney@lan-inc.com
Name of Project:
PM Services for Capital Improvement Projects
Labor c:ateaory
Controls
Total Labor
Subcontract Service
Subcontractor Subtotal
10 Percent Markup on Subcontract Services
Nonlabor Expenses
Nonlabor Expense Subtotal
0.0
Total Expenses (Subcontract Services+Markup+Nonlabor Expenses)
Invoice
Supplier Project No.
Proj. Invoice No.
Invoice date:
Period Service Date:From
Service Date:To
City Secretary Contract #:
P.O. Number:
Amount
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL DUE THIS INVOICE $0.00
Level of Effort Spreadsheet TASKIHOUR BREAKDOWN
LAN Staff Extension Services in Managing Tr`'ancypotti].tign and Public Works Arterials and Mobility Infrastructure Capital Projects
Tas�C Oescnphon
Task No. Principal Program Project Project
Manager Manager Control
Rate $390 $286 $208
1.0 Projeet Man�Q�ment
1.1 Managinglhe Team 8 5201 1404
Totals 8 5201 1404
Notes
1. City will not be invoiced for expenses,
holidays, vacation, or internal LAN tasks
Project Summary
Total Hours
3,023
Total Labor
$636,529
Total E j� set
MWBE Subcensu lard
$777
$O
Non-MWBE Subconsultas
$0
5% Sub Markup
$0
MWBE Participation
Total Project Cost
$637,306
City of Fort Worth, Texas
Attachment B -Level of Effort Supplement PMO Official Release Date8.09 2012
loft
RPLS ISurvey Survey I SUE
Expense ITotal Expense
Subconsultsnt I I IC"' Reproduction
FORT WORTH
ATTACHMENT "D"
PROJECT SCHEDULE
A. ENGINEER Project Schedule Development
ENGINEER shall prepare a project schedule for the services to be provided in fulfilling the
requirements of the Agreement and encompassing the Scope of Work defined in
Attachment A to the Agreement.
ENGINEER shall prepare and maintain project schedule throughout the life of the project
as defined in the Agreement in compliance with the City's Specification 00 31 15 entitled
Engineer Project Schedule.
ENGINEER's project schedule will follow the Critical Path Methodology (CPM) for planned
sequencing of the work activity and timing of the work.
B. Schedule "Tier" Selection
City has identified three "Tier" levels for project schedules as defined in City's Specification
00 31 15, to align with the size and complexity of the project as a basis for schedule
development. City's Project Manager will determine the "Tier" level for the ENGINEER's
project schedule as part of the negotiation of the Agreement.
C. Project Baseline Schedule
ENGINEER will produce an initial project schedule and submit as a "baseline" for review
and acceptance by City's Project Manager as defined in City's Specification 00 31 15
which will be referred to as the Project Baseline Schedule. Updates to the baseline
schedule follow the requirements of City's Specification 00 31 15.
D. Project Progress Schedule
ENGINEER will provide to the City, monthly updates to their project schedule indicating
progress of the Work in compliance with the requirements of City's Specification 00 31 15
and said schedule will be referred to as the Project Progress Schedule.
E. Master Project Schedule
City will develop and maintain a master project schedule for the overall project.
ENGINEER's project baseline and progress schedule submittals will be an integral part of
the development and updating process of City's Master Project Schedule.
City of Fort Worth, Texas
Attachment D
LAN Staff Extension Services
Revision Date: 07.20.2018
Page 1 of 1
LAN Staff Extension Services
NO. 59573
M&C Review
Page 1 of 2
CI-M COUNCILAGEND
Create New From This M&C
Official site of the City of Fort Worth, Texas
F0 RTV4'0 RT H
*111-
REFERENCE **M&C 24- 2024LOCKWOOD, ANDREWS &
DATE: 6/25/2024 NO.: 0560 LOG NAME: NEWNAM, INC FOR TPW
AMENDMENT 2
CODE: G TYPE: CONSENT PUBLIC NO
HEARING:
SUBJECT: (ALL) Authorize Execution of Amendment No. 2, in the Amount of $637,306.00, to
a Professional Services Agreement with Lockwood, Andrews & Newnam, Inc., for Staff
Extension Services in Managing Transportation and Public Works Arterials and Mobility
Infrastructure Capital Projects for a Revised Contract Amount of $1,274,612.00
RECOMMENDATION:
It is recommended that the City Council authorize execution of Amendment No. 2 to City Secretary
Contract No. 59573, a professional services agreement with Lockwood Andrews & Newnam, Inc., in
the amount of $637,306.00 for staff extension services in managing Transportation and Public Works
Arterials and Mobility Infrastructure capital projects for a revised contract amount of $1,274,612.00.
DISCUSSION:
On June 9, 2023, the City of Fort Worth administratively authorized a professional service agreement
in the amount of $95,000.00 with Lockwood, Andrews & Newnam, Inc. (City Secretary Contract No.
59573) for staff extension services in managing Transportation and Public Works Arterials and Mobility
Infrastructure capital projects. The agreement provided two full-time equivalent (FTE) positions - one
project manager and one program manager - for approximately two months to assist with delivering
capital projects associated with the 2022 Bond Program.
On November 14, 2023, the contract was amended to extend the schedule by ten months to a full year
for the two FTE positions. These staff extension services are providing needed resources for the
execution of projects while the City navigates challenges in recruiting and retaining critical positions in
the current competitive environment.
This second amendment, the renewal of City Secretary Contract No. 59573, will serve current and
future capital projects as needed. Funds availability verification will be performed by Transportation &
Public Works Contract Compliance Managers prior to task order assignment. It will allow for three
FTE positions - one project manager, one program manager, and one project controls - for
approximately twelve months to assist with delivering capital projects associated with the 2022 Bond
Program.
In April 2020, the Transportation Public Works Department, Capital Delivery Division, published a
Request for Qualifications (RFQ) for various technical services associated with engineering services
including capital project management support contracts. Lockwood, Andrews & Newnam, Inc. was one
of four firms prequalified to provide project management support services. Staff extension services
contracts have been executed with all four prequalified consultants.
Business Equity: Lockwood, Andrews & Newnam, Inc. agrees to maintain its initial M/WBE
commitment of 10\% that it made on the original agreement and extend and maintain that same
M/WBE commitment of 10\% to all prior amendments up to and inclusive of this Amendment No. 2.
Therefore Lockwood, Andrews & Newnam, Inc. remains in compliance with the City's M/WBE
Ordinance and attests to its commitment by its signature on the Acceptance of Previous M/WBE
Commitment form executed by an authorized representative of its company.
The project is located in ALL COUNCIL DISTRICTS.
http://apps.cfwnet.org/council_packet/mc review.asp?ID=32266&councildate=6/25/2O24 7/10/2024
M&C Review
Page 2 of 2
FISCAL INFORMATION/CERTIFICATION:
The Director of Finance certifies that funds are available in the current capital budgets, as previously
appropriated, in the various capital improvement program funds to support the approval of the
recommendation and execution of the amendment. Prior to any expenditure being incurred, the
Transportation & Public Works Department has the responsibility to validate the availability of funds.
TO
Fund Department Account i Project I Program Activity Budget Reference # Amount
ID ID Year (Chartfield 2)
FROM
Fund Department Account Project Program Activity Budget I Reference # Amount
ID ID Year (Chartfield 2)
Submitted for Citv Manaaer's Office bv: Jesica McEachern (5804)
Oriainatina Department Head: Lauren Prieur (6035)
Additional Information Contact: Monty Hall (8662)
ATTACHMENTS
LAN 1295 Form.odf (CFW Internal)
LAN Level -of -Effort Amend2.pdf (Public)
http://apps.cfwnet.org/council_packet/mc review.asp?ID=32266&councildate=6/25/2O24 7/10/2024
CS59573-EPAM-LAN Staff Extension Services:
Professional Services Agreement Amendment
#2
Final Audit Report 2024-08-20
Created: 2024-08-16
By: Andrea Munoz (Andrea.Munoz@fortworthtexas.gov)
Status: Signed
Transaction ID: CBJCHBCAABAAkzS6ECRDHAiD4KNRjS7RacuxAtl4QAC3
"CS59573-EPAM-LAN Staff Extension Services: Professional Se
rvices Agreement Amendment #2rr History
Document created by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov)
2024-08-16 - 11:18:40 PM GMT- IP address: 204.10.90.100
Document emailed to Jaylyn Harrelson (jaylyn.harrelson@fortworthtexas.gov) for filling
2024-08-16 - 11:21:57 PM GMT
Document emailed tojreeves@lan-inc.com for signature
2024-08-16 - 11:21:57 PM GMT
Email viewed byjreeves@lan-inc.com
2024-08-17 - 1:27:52 AM GMT- IP address: 170.85.100.174
Signer jreeves@Ian-inc.com entered name at signing as Justin C. Reeves
2024-08-17 - 1:29:37 AM GMT- IP address: 170.85.100.174
Document e-signed by Justin C. Reeves (jreeves@Ian-inc.com)
Signature Date: 2024-08-17 - 1:29:39 AM GMT - Time Source: server- IP address: 170.85.100.174
Email viewed by Jaylyn Harrelson (jaylyn.harrelson@fortworthtexas.gov)
2024-08-20 - 3:40:56 PM GMT- IP address: 204.10.90.100
>', Form filled by Jaylyn Harrelson (jaylyn.harrelson@fortworthtexas.gov)
Form filling Date: 2024-08-20 - 3:41:59 PM GMT - Time Source: server- IP address: 204.10.90.100
® Agreement completed.
2024-08-20 - 3:41:59 PM GMT
FoRTWORTH, I P—e'b'
Adobe
Acrobat Sign
FORT WORTH
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: LAN Staff Extension Services:
Professional Services Agreement Amendment #2
M&C 24-0560 CPN Various CSO # 59573 DOC# 1
DATE: 2-27-2024
TO:
1. Jaylyn Harrelson
2. Justin C. Reeves (external)
3. Chad Allen
4. Lissette Acevedo
5. Lauren Prieur
6. Doug Black
7. Jesica McEachern
8. Jannette Goodall
9. TPW Contracts
INITIALS DATE OUT
- review Aug 20, 2024
- signature Aug 16, 2024
- review Arinvd via A`iloft. TT)- 1339
- review " "
- review
- review
- signature °B
cu
- signature 0#`
- signature JG 56
Aug 28, 2024
Aug 30, 2024
Aug 30, 2024
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City
Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: ❑ Yes ❑ No
RUSH: ❑ Yes ❑ No SAME DAY: ❑ Yes ❑ No NEXT DAY: ❑ Yes ❑ No
ROUTING TO CSO: ❑ Yes ❑ No
Action Reauired:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return To: Please calITPW Contracts at ext. 7233 for pick up when completed. Thank you.
Amendment Purnose Statement:
The purpose of this second amendment, the renewal of City Secretary Contract No. 59573, will
serve current and future capital projects as needed. Funds availability verification will be
performed by Transportation & Public Works Contract Compliance Managers prior to task order
assignment. It will allow for three FTE positions - one project manager, one program manager, and
one project controls - for approximately twelve months to assist with delivering capital projects
associated with the 2022 Bond Program. In April2020, the Transportation Public Works
Department, Capital Delivery Division, published a Request for Qualifications (RFQ) for various
technical services associated with engineering services including capital project management
support contracts. Lockwood, Andrews & Newnam, Inc. was one of four firms prequalified to
provide project management support services. Staff extension services contracts have been
executed with all four prequalified consultants.
Previous Amendment:
Amendment 1: the contract was amended to extend the schedule by ten months to a full year for
the two FTE positions.