NOTICE OF PROJECT COMPLETION
(Developer Projects)
The Transportation and Public Works Department upon the recommendation of the Project
Manager has accepted the following project as complete:
Project Name: North Beach Street
City Project No.: 103773
Improvement Type(s): x❑ Water x❑ Sewer
Developer Costs
City Costs
Total Costs
Original Contract Price: Water
$346,140.00
$150,780.00
$496,920.00
Original Contract Price:Sewer
$52,960.00
$73,150.00
$126,110.00
Amount of Approved Change Order(s): Water
$52,500.00
($52,500.00)
$0.00
Amount of Approved Change Order(s): Sewer
$0.00
$0.00
$0.00
Revised Contract Amount: Water
$398,640.00
$98,280.00
$496,920.00
Revised Contract Amount: Sewer
$52,960.00
$73,150.00
$126,110.00
Total Cost of Work Completed
$451,600.00
$171,430.00
$623,030.00
La —
Arturo San cen IAue 30. 202410:03 CDT) Aug 30, 2024
Contractor Date
Superintendent
Title
Conatser Construction
Company Name
klsj, .!Auv30202410:05CDTI
Aug 30,2024
Project Inspector
Date
., CDT)
V'irtnr iia V_Tornern lr_P_F. (A3f1.7 si1056CDTl
Aug 30, 2024
Project Manager
Date
Aug 30 2024
7c6eccn1� Owen (A—30. 202411:15 CDT)
CFA Manager
Date
LzurenPneur ,202411:2I CDT)
Aug 30, 2024
TPW Director
Date
rv�
Aug 30, 2024
Asst. City Manager
Date
OFFICIAL RECORD
CITY SECRETARY Page 1 of 2
FT. WORTH, TX
Notice of Project Completion
Project Name: North Beach Street
City Project No.: 103773
City's Attachments
Final Pay Estimate x❑
Change Order(s): ❑x Yes ❑ N/A
Contractor's Attachments
Affidavit of Bills Paid
Consent of Surety
Statement of Contract Time
Contract Time 95 WD
Work Start Date: 5/22/2023
Completed number of Soil Lab Test: 691
Completed number of Water Test: 11
Days Charged: 131 WD
Work Complete Date: 12/11/2023
Page 2 of 2
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name
NORTH BEACH STREET
Contract Limits
SH170 TO SARATOGA DOWNS WAY
Project Type
WATER & SEWER IMPROVEMENTS
City Project Numbers 103773
DOE Number
3773
Estimate Number 1 Payment Number 1 For Period Ending 7/12/2024
WD
City Secretary Contract Number Contract Time 9WD
Contract Date Days Charged to Date 131
Project Manager NA Contract is 100.00 Complete
Contractor CONATSER CONSTRUCTION TxLP
5327 WICHITA ST
FORT WORTH, TX 76119
Inspectors D. WATSON / D. RODGERS
Wednesday, August 28, 2024 Page 1 of 4
City Project Numbers 103773
Contract Name NORTH BEACH STREET
Contract Limits SH170 TO SARATOGA DOWNS WAY
Project Type WATER & SEWER IMPROVEMENTS
Project Funding
CFW - WATER IMPROVEMENTS
Item Description of Items
No.
1 CONCRETE ENCASEMENT FOR UTILITY PIPES
2 36" AWWA BUTTERFLY VALVE (CO #1)
3 IMPORT DIRT - FROM ADJACENT PROPERTY
OWNER BY DEVELOPER
DOE Number 3773
Estimate Number I
Payment Number 1
For Period Ending 7/12/2024
Estimated Unit
Unit Cost
Estimated
Completed
Completed
Quanity
Total
Quanity
Total
15 CY
$800.00
$12,000.00
15
$12,000.00
0 EA
$52,500.00
$0.00
0
$0.00
10785 CY
$8.00
$86,280.00
10785
$86,280.00
Sub -Total of Previous Unit $98,280.00 $98,280.00
-------------------
CFW - SANITARY SEWER IMPROVEMENTS
Item
Description of Items
Estimated Unit
Unit Cost
Estimated
Completed
Completed
No.
Quanity
Total
Quanity
Total
1
42" STEEL ENCASEMENT OVER EX 24" SEWER
77 LF
$950.00
$73,150.00
77
$73,150.00
-------------
Sub -Total of Previous Unit
$73,150.00
$73,150.00
HILLWOOD WATER IMPROVEMENTS
Item
Description of Items
Estimated Unit
Unit Cost
Estimated
Completed
Completed
No.
Quanity
Total
Quanity
Total
1
RING CONNECTION TO 36" WATER MAIN CPP
2 EA
$92,500.00
$185,000.00
2
$185,000.00
2
12" DIP WATER, SELECT BACKFILL
260 LF
$360.00
$93,600.00
260
$93,600.00
(RESTRAINED JOINTS)
3
12" GATE VALVE
4 EA
$3,800.00
$15,200.00
4
$15,200.00
4
DUCTILE IRON WATER FITTINGS W/
0.25 TN
$20,000.00
$5,000.00
0.25
$5,000.00
RESTRAINT
5
6" HDPE WATER PIPE
789 LF
$60.00
$47,340.00
789
$47,340.00
6
--------------------------------------
36" AWWA BUTTERFLY VALVE (CO #1)
1 EA
$52,500.00
$52,500.00
1
$52,500.00
Sub-Total of Previous Unit
$398,640.00
$398,640.00
HILLWOOD SANITARY SEWER IMPROVEMENTS
Item
Description of Items
Estimated Unit
Unit Cost
Estimated
Completed
Completed
No.
Quanity
Total
Quanity
Total
1
10" SEWER PIPE
106 LF
$180.00
$19,080.00
106
$19,080.00
2
10" SEWER PIPE, CSS BACKFILL
154 LF
$220.00
$33,880.00
154
$33,880.00
--------------------------------------
Sub -Total of Previous Unit
$52,960.00
$52,960.00
Wednesday, August 28, 2024 Page 2 of 4
City Project Numbers 103773
Contract Name NORTH BEACH STREET
Contract Limits SH170 TO SARATOGA DOWNS WAY
Project Type WATER & SEWER IMPROVEMENTS
Project Funding
Contract information Summary
Original Contract Amount
Change Orders
Change Order Number 1
Change Order Number
Total Contract Price
DOE Number 3773
Estimate Number 1
Payment Number 1
For Period Ending 7/12/2024
$623,030.00
($52,500.00)
$623,030.00
Total Cost of Work Completed $623,030.00
Less % Retained $0.00
Net Earned $623,030.00
Earned This Period $623,030.00
Retainage This Period $0.00
Less Liquidated Damages
Days @ / Day
LessPavement Deficiency
Less Penalty
Less Previous Payment
Plus Material on Hand Less 15%
Balance Due This Payment
$0.00
$0.00
$0.00
$0.00
$0.00
$623,030.00
Wednesday, August 28, 2024 Page 3 of 4
City Project Numbers 103773
Contract Name NORTH BEACH STREET
Contract Limits SH170 TO SARATOGA DOWNS WAY
Project Type WATER & SEWER IMPROVEMENTS
Project Funding
Project Manager NA
Inspectors D. WATSON / D. RODGERS
Contractor CONATSER CONSTRUCTION TxLP
5327 WICHITA ST
FORT WORTH, TX 76119
DOE Number 3773
Estimate Number I
Payment Number 1
For Period Ending 7/12/2024
City Secretary Contract Number
Contract Date
Contract Time 95 WD
Days Charged to Date 131 WD
Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $623,030.00
Less % Retained $0.00
Net Earned $623,030.00
Earned This Period $623,030.00
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 / Day
$0.00
LessPavement Deficiency
$0.00
Less Penalty
$0.00
Less Previous Payment
$0.00
Plus Material on Hand Less 15%
$0.00
Balance Due This Payment
$623,030.00
Wednesday, August 28, 2024 Page 4 of 4
STATION Q(ds) ..%..'
01a 1A
733 m 615.69 4.6
]oo m ns.s2 u
650 m 6]s.33 a7 I
WO m fi]s.1s a6 I
550 ]A 6ia97 a4 I
500 m 6 . a3 I
O50 m 6J0.63 I
400 m -32 I
0 I
350 m 6)4.32 3.8 I
300 m 6]a.18 3.6 I
J50 m 6)4.05 3.5 I
Y22 m 6)4.11 31 I
2. m 6)2.84 B3 I
NO m 6]3.81 B2 t
19/ m 6J3.53 12 I
m m 6J3.53 LI 1
133 m 93.53 LI I
m m 6J3.53 0.8 I
99 m 6J3.54 0.5 I
a9 m 6J3.54 0.3 1
-PROP POND
BY OTHERS-
, -- - �_
\=
�SMI
GROUNuISl
25'
f00
GROUND�I
1
v VR WSEL Q}
8'
MIN 5'DEPTH
Q - 775 dK
V = SEE TABLE
D=0.016(v) SECTION 'A'
SECTION
NOTE 1: OW
WAS TAKEN
`n=0.05 (ND) CATO SCALE
FROMODEL i
SC-ASTAO+62.i6 iSCASTA 0+93.06 .:
' o(31 exa'MeC
JUNCTION BOX INSTALL', '-
RIM=fi75.50 SETBTCD ND TREATMENT �/
NR37270M=El. 3 SEIETYE /N
E23-6 74 176 BY OF RIP RAP PN R' BEDDING
tl50 = 8- DIAMETER
BEGINCHANNEL _
1
PROJECT BENCHMARKS
BM NO. 1
NORTHEAST CORNER OF
WATER VAULT+I-120'
BM NO. 2
NORTHEAST CORNER OF AN INLET IN THE EAST
SOUTH WEST OF A SIGN
ISLANDATTHE SOUTHWEST
INTER SECTION OF FUTURE
AND STATE HIGHWAY 170.+/_
OF EXISTING PAVING.
IN THE SOUTHWEST
CORNER OFTHE
NORTH BEACH STREET
KSNORTH OF THE END
CURB LINE OF NORTH BEACH STREET.+/_18-
FROM THE END OF EXISTING PAVING OF NORTH
BEACH STREET+/q06' NORTH OF SANATOGA
DOWN WAYS
ELEVATION 67798
AIL INVESTMENT, L.P.
FORMERLY KNOWN AS
HI LLWOOOIFREEWAY, LTD.
6M.22
SC-ASTA 6+0880=
SD -A STA 0+00.00 '
TRACTS
TC VOL 9527 PG 1011
CONST 33k7'
JUNCTION BOX
(ANENT
EMENT BY
/
RIM = 687.00
END (3)Bx4'MBC / II111'f 1 III
N 701111111 /
PROPOSED E2340i58.56/
n MAINTENANCE RAMP _----
I
'. T_ �..-
I
-- - NTA 8+20.70 II
� ()
/ NSTALL:tl'xa'Mnt- /
SAFETY END TREATMENT SETBECD
Hal 7.1o8.20
NOTE THE HOURS PRCONTRACTOR OR
48 HOURS PRIOR TO EXCAVATING
TEXAS 811
CONTACT THE FOLLOWING AT LEAST
T THIS AREA:
1-800344-03]7
FORT WORTH WATER DEPARTMENT
AT_ GAS
817J92-8296
1-800344R8]7
TXU ELECTRIC DELIVERY
1-800 ,M77
cnuearoaErou wo I
CHARTER COMMUNICATIONS
1-BOOJ44-03]]
FORT WORTH TRANSPORTATIOWPUBLIC
WORKS 81 92E100
FOR OTHER FACILITIES
1-800J44d377
PROPOSED
CHANNEL SCHC REVIEWED
By Victor V Tornero
Jr. at 9:51 am, Oc[ 27, 2023
SC -A
--__ 1 } '1-- ----,L-'I _=___-_______________-_
__ __ __ _
-----------------_________--'---------------------------"------------------------_-I-�'-------I----
-------- -----------------
-/---------_-_--__-----------------------_-_-_-_------------------�(----- ---1} ✓�lLl i`Hlr*I--------1_
�---��;=;,---�r----j6-_�______________-_________._._____�_.________ __�-I-,�'-'.-iu'-�-�-� ---I_ �L_W__._4________� 690
-------- - 1=z_dz_: t 1=1=I-Ln-- - ,_I-1-1-1555=-------_Zlj ----=- ------------------
-----
__ -'E=--------'_'--'_'_' ------ _ - -- --
it ---_ _ L
------I- -�- 153 LLF
680�=fT'-------- - -------------I -+1�===--��.,=,_,_I_-; 1.PhY`-=�-i= - _ -- =1 - -_ -' 660
- 1=Flh-,-,-, ---_---'---- I-------------------/--
__,
y
AP
RM
`PRO POSEO
CHANNELSC-B
0
40 80 120
GRAPHIC SCALE IN FEET
PROFILE SCALES.
1' = 4O' HORZ.
1' = 4' VERT
KD�izmisE6
05/OS/23
eal ap ,. PIN. 120316n[was aulM1o4retl
by. T weber. P E .. ,2o3is
,Ieratlonw1'a Ibl l tlocumeM wltl�octpurger nwtlticatlon
onalbla englnaer Is an a8ensa un4x i8e
Teus Englreetlng Prsctice It
T-
S.----__� - -- ---r1T�--- T------,---
' ------
,�.,y ---
--__.,------- �- ------
_ ------------------ 670
(REV DATE J REMARKS
m-DESIGNED CHANNEL ALIGNMENT
F-=------- -- ----------
------_------___,
_ ____ _
- -rl
I'===`---1=1=1=1=1=-!_
NORTH BEACH STREET
-----� - -- ------------------
r---=---------
-'-'-1-1-1-1-1-1---1=----==--=='-1_1=
------------
--
--f_h,--1-1--=1---1-I-I-I_I
SH 170 TO SARATOGA
-----,-,
----=-C--------
--
STORM DRAIN PLAN & PROFILE
-------- --- -----------
��'---'-'
5 I I
------------------------
CHANNFI • •_
CITY OF FORT WORTH TEXAS
----------- ----- -_------------------------------------
F� _ ---
^ PRO I
`-I'I
-1_=I_I_I_I=&(}
-------'--"----'-- '1 __..-
_- -----I--
_/_-_
--'TI - �=
-------------
--
L /I I 660
------------'-'-
���Y �
,
WORKS DEPT.
AND SERVICES
DEVELOPMENT SERVICES
it
ELOTO
I'�'�....
i�
a a„aahvaa
......... P mwxa,nm
DATE SHEET
E
11
O+Oil 1+00 2+D17
3+06 4+00 5+00 6+00
7+00 B+DO
I Aa6lLzoz Xs1131 C701
CHECKED XZ
700
_ 690
a 670
AIL INVESTMENT, L P.
FORME TWOODLV KNOWN AS
HILLWOOD/F�RCEE3 LTD
EX 24' SANITARY SEWER
FILE NO. X-15389
Te VOL 952i PG 1011
—VARIABLE WIDTH
PERMANENT PUBLIC
DRAINAGE EASEMENT
Q $ @+y
SI}A2 STA Of110.0012 T IT=
21" LATERAL CONNECTION
N 703.81.21
E 2340783.92
BY SEPARATE INSTRUMENT
f
SD -A STA 0+0000
CONET -1Ttl660
RIM fiB].0S X
J MAINTENANCE
CONTINUE WITH
I34N, 4MBC /
N 482.27
f
,l' ACCESS RAM
E234075fi.5fi
---8RD11
���y�-1— t_
(12 i•RT=
V+IlU.OB/
21" LATERAL CONNECTION /
N 7037455.53 /
E2340]85.04
SAWN ARQ IW�jJq A CROSSING
INSTALL:
37LF OF 42" STEEL ENCASEMENT
OVER EXISTING 24" SEWER LINE
N 703i471A8
E 234070.70
PROJECT BENCHMARKS
C THE FOLLOWING AT LEAST
NOTE TIEIINT48
ITIRI—PRIOR
HOURS TO EX NGI
4B HOURS PRIOR TO EXCAVATING IN THIS AREA:
BM NO.
1
BM NO. 2
TEXAS 811 1$00344-8377
NORTHEAST
CORNER OF WATER VAULT +I-120'
NORTHEAST CORNER OF AN INLET IN THE EAST
FORT WORTH WATER DEPARTMENT 817$92$296
SOUTH WEST OF A SIGN IN THE SOUTHWEST
ISLAND AT THE SOUTHWEST CORNER OF THE
CURB LINE OF NORTH BEACH STREET.+/-18-
FROM THE END OF EXISTING PAVING OF NORTH
ATMOSGAS 1$00344R3]7
TXU ELECTRIC DELIVERY 1-800344$317
TA 1111 INTER SECTION OF FUTURE NORTH BEACHSTREET
ANDSTATE HIGHWAY 170.+/-65-NORTH OFTHE END
BEACH STREET+/-0O6' NORTH OF SARATOGA cnuesroaErwu wo
DOWN WAYS
CHARTER COMMUNICATIONS 1$00$94$377
WATER CROSSING
"ATER-ROFOG ONCRETE OF EXISTING PAVING.
FORT WORTH TRANSPORTATIOWPUBLIC WORKS A-92$100
ENCASEMENT ELEVATION
OVER E.LLXISTING WATER LINE
fi]798
ELEVATION 69 22
FOR OTHER FACILITIES 1$00344$3]7
PER DETAIL 0017
N 70374]6 82
E 2340823.1fi
1r'w-m
w12•w-1a
s f
�
/ 4
'i f L
�1 f � w
Culvert Outfall Protection
DSO=v11.8 0.5))A0.5
1o•ss1
B
_
�
� S
� ��
i (29(Ys-Vw)/yw))"
V= 10.45 fps
//
9
\�
Y. = b/ft'
160
S0.A 6TA 0+I095127LT=
STA1+5900
�1 \�M1
v -21"LATERAL
CONNEC(`TLION
/ CONST TXDOT HDWL ttPE(PW)
L
YW= 62.4 Ib/R4
�x
N ]03]491.35
TOP OF STRUCTURE = 687.00
�'' i \;
2
E 2340844.74
/
1
END 3-8W'NBQ
r
g- 322 0/s
INS TALL ]7 SV OF 18• THICK
ROCK RIP RAP ON fi' BEDDING ,�(
J
/ 6
D50 = 9.13 10
J50=E DIAMETER (
N703749sas /
J /
<
16"Thick, 6" Bedding
_
/
��EjJ
fff
H
/
!
AIL INVESTMENT L.P.
FORMERLY KNOWN AB
SD -A
f
VARIABLE WIDTH -
SC43 PERMANENT PRIVATE
/
HILLWOODIFREEWAY, LTD.
TR527P
(REVIEWED
3)-8'X 4'SD-A
�I
DRAINAGE EASEMENT
- BV SEPARATE INSTRUMENT
i�
TC VOL 952]PG 1011
F
W
vO•il
/
{
/
C
l
By Victor V Tornero Jr. at 9:51 am, Oct 27, 2023
,.'
_
NOTES.
Q $$� q�d
S0.A0.STA 6r 1.4197 FT
PROTECTION IN -PLACE REQUIRED FOR THE EXISTING 2 INCH FORCE MAIN WHERE
D:�
O=
l 48"LATERAL CONNECTION Jti/
THE PROPOSEDBOXCULVERTSARE CROSSING THE EXISTING FORCE MAIN, —INCH
STEEL SPLIT CASING IS REQUIRED. THE CASING SHOULD BE FIT CUTBEVELED
ZU
21'S�4a-�
�l
EJ
/Ezb?.
LONGITUDINALLY AND WELDED BOTH AT THE JOINTS AND ALONG THE LONGITUDINAL
I
) f
/
f %
�r SEAMS AFTER IT IS FIT IN THE FIELD.
r
�;Il:
Ij
) (j J-
j
v) THE EXISTING SANTARY SEWER FORCE MAIN MUST HAVE SPLIT CASING
INSTALE ED W/W TEN. (2 OTHER STORM CROSSIN LOCATION AS DEFINED
NTHE FEET VERTICALLY,5-FEETHORIZONTALFOR STORM, ETC.).
24"CODCM.T
PIPE REQUIRES 4EAI-S, LCASING. N
THE DI2IO , ALL
IN ADDITION, ALL MORTAR BANDS, SPACERS, END SEALS, ETC. SHOULD BE INSTALLED
O
ER
EXE NO.
FILE NO. x-15369
PER CFW
STANDARD CONSTRUCTION DETAILS
0 40 SO 120
SD -A
EE
EEM OPINION M r
-
-- -=E _ I_�G
- ---- _---_---_--_---_----_--_-------_---_--_----
-------------
-----------_
=-
---.= ..---
------�-----e-
WHO
E E E
E E E E E
EGee�
_— '—
-----_---_— --,_ ------------------------------in
_ Eel■EEEEEEEEEEE■_E■_EEE_EEE■_EEEEEEEEEEEEEEEEEEEEEEEE
ME I in
�G inG �G E■E
.._ �6
MEN
G
G
G
G
ee G
Mee
AGE■EEGEeGEEeGEEeGEEe
EE
in----------------------
in— EEiiiiiii
_
in
in
in
in
in
in
in in in
G
�G
E ��
E�e��e=wee==�
��
�
if
110
E■�_�I
E_88=__
_�_R
p
----------------------
=.=_:
eeeeeeeeeeedeeeeeeeeedeeeeeeeeeeeeeeeeeeedeeeeee
—
�G
EE
Ipp_ Ipp_ EE
G G �G
________
-� -E� �
______8911B��naee�E�®�e•��ga®EE��J
__pp
■■3l�ar r!al�c�.■_===�.sF.Y[E
in
in
NOON
_- tee•
®E���Ea®��E���S®�EE��E���Ea®Ein
`=iiEe=�
ERN--___
- -
1
ED
MMC
Win
EEE
EC MM-------
E■■EEEEE�EE�
—_—-----_--_ — �+000el
I
yp�p�I
�EEEEE
EE_EEEE_gEEE_EEEE
1011
in
Ezz�E� IMP.!•ipp
_________________________=.._
- - - - - - -■
- . EEEBr
EEGE�]
EEGE�]EE■
�G �
�G
_EE
EAB18E____________________________________________________
MOWN
-
-=------======================================---------
� ■- sYEM ENME
Ee8�EE88EE8EE8�E88��E8�Ee8�EE��EE8�E88EE8�
EEEE�EEE�EEEEEa•EEE�EEEE�EE�EEEEEEE�eEEEEEME�
0+00 1+00
GRAPHIC SCALE IN FEET
PROFILE SCALES.
1-=40' HORZ.
= 4' VERT
700
�a xD-120916��
690 05/05/23
seal apFearing on,�M1lsoaocument was autl,oazea
by Kole T. Weber, P.E. No. 12MI6.
Plferatbn W a sealed aocumen, wXM1ou, proper nMMcallon
ro Ne responsible engineer a en o8ense uMer IM1e
Texas Englneerin9 Prac,ke Act -
f
x
AAO REV DATE J REMARKS �t
1 filBl20 ' ADDENDUM N0.3
2 2023 RE-DESIGNEGSTORM LINE $
NORTH BEACH STREET
SH 170 TO SARATOGA �,
STORM DRAIN PLAN & PROFILE
SD -A e
CITY OF FORT WORTH, TEXAS
670 TRANSPORTATION AND PUBLIC WORKS DEPT.
DEVELOPMENT SERVICES nr
Illy PELOTON
'w ............i DATE E Rwa �
CHECKED K I PHIL 6 „a, cTo2
City of Fort Worth, Texas
Mayor and Council Communication
DATE: 12/14/21 M&C FILE NUMBER: M&C 21-0945
LOG NAME: 06N. BEACH ST (SH170 TO SARATOGA)
SUBJECT
(CD 7) Authorize Execution of a Community Facilities Agreement with Hillwood Alliance Services, LLC, with City Participation in an Amount Up to
$3,100,000.00 for the Construction of Roadway Improvements and Water and Sewer Transmission Line Lowering for North Beach Street from
Alliance Gateway State Highway (SH 170) to Saratoga Drive, Adopt Attached Appropriation Ordinances, and Amend the Fiscal Years 2022-
2026 Capital Improvement Program
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize execution of a community facilities agreement with Hillwood Alliance Services, LLC, with City participation in an amount up to
$3,100,000.00 for construction of roadway improvements and water and sewer line lowering for North Beach Street between Alliance
Gateway (SH 170) and Saratoga Drive;
2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Transportation Impact Fee Capital
Fund, in the amount of $1,445,275.00, from available funds within the Revenue - Service Area A Transportation Impact Fees project (City
Project No. UN9911) and $1,445,275.00, from available funds within the Revenue - Service Area D Transportation Impact Fees project (City
Project No. UN9914) for the purpose of funding a portion ofthe Community Facilities Agreement North Beach Street (SH 170 to
Saratoga) (City Project No. 103773);
3. Adopt the attached appropriation ordinance adjusting estimated receipts and appropriations in the Water/Sewer Bond 2016 Fund, in the
amount of $209,450.00 by increasing appropriations in the Community Facilities Agreement -North Beach Street (SH 170 to Saratoga) (City
Project No. 103773) and decreasing appropriations in the Unspecified project (City Project No. UNSPEC) by the same amount; and
4. Amend the Fiscal Years 2022-2026 Capital Improvement Program.
DISCUSSION:
Hillwood Alliance Services, LLC (Developer) is partnering with the City of Fort Worth to construct four lanes of North Beach Street from Alliance
Gateway (SH 170 to Saratoga Drive) (City Project Number 103773). These lanes are being constructed to allow traffic to cross Alliance Gateway
(SH 170) as the existing Alta Vista Drive crossing is being reconfigured as a part of the Texas Department of Transportation (TxDOT) widening
project.
The costs stated herein are estimated and the project will follow the public bid process. The project includes an 20% MWBE requirement for the
project. The cost of the design and construction of the road improvements is estimated to be $4,017,350.00 with City participation as shown in the
table below.
Components Hillwood City Estimated
Alliance Services, LLC Participation Cost
Construction Costs
Paving $300,000.00 $2,187,600.00$2,487,600.00
Storm Drain
$0.00
$267,000.00
$267,000.00
Sanitary Sewer
$36,000.00
$101,500.00
$137,500.00
Water
$66,000.00
$76,000.00
$142,000.00
Construction Cost
$402,000.00
$2,632,100.00 $3,034,100.00
Estimate
10% Contingency
$40,200.00
$263,210.00
$303,410.00
Construction Subtotal $442,200.00 $2,895,310.00 $3,337,510.00
Soft Costs
Material Testing & $19,019.00 $102,345.00 $121,364.00
Inspection
Engineering & Design $359,112.00 $0.00 $359,112.00
Permitting $19,019.00 $102,345.00 $121,364.00
Platting $78,000.00 $0.00 $78,000.00
Soft Cost Subtotal $475,150.00 $204,690.00 $679,840.00
Project Total Cost $917,350.00 $3,100,000.00 $4,017,350.00
This project is located on the boundary between Transportation Impact Fee Service Areas A and D and was identified as impact fee eligible in the
2017 Transportation Impact Fee Study. The transportation impact fee funding provides a portion of the City participation in the developer
project. Revenues from Service Area A (City Project No. UN9911) and Service Area D (City Project No. UN9914) of the Transportation Impact Fee
Capital Fund will fund the City's participation in the construction of these improvements. Any residual funds left after project completion and
acceptance will be returned to the Service Area A and D revenues. Any expenses exceeding the City's participation amount, items that are
ineligible for transportation impact fee or water department funding will be funded by Hillwood Alliance Services, LLC.
Transportation Impact Fee funding for this project was not included in the Fiscal Years (FY) 2022-2026 Capital Improvement Program. City funds
were added to provide regional connectivity to the area. The action of this Mayor and Council Communication (M&C) will amend the FY2022-2026
Capital Improvement Program as approved in connection with Ordinance No. 25073-09-2021.
This project is located in COUNCIL DISTRICT 7.
APie-I mf►�� : i77�iF_�itN]:FL«]:1AAIsC6TIMNIZ10
The Director of Finance certifies that funds are currently available in the Unspecified -All Funds within the Water/Sewer Bond 2016 Fund and the
Revenue - SA A and D Transp Imp Fees projects within the Transportation Impact Fee Cap Fund; and upon approval of the above
recommendations and adoption of the attached appropriation ordinances, funds will be available in the Water/Sewer Bond 2016 Fund and the
Transportation Impact Fee Cap Fund for the CFA-N Beach St (SH170 to Sarat) project to support the approval of the above recommendations and
execution of the community facilities agreement. Prior to an expenditure being incurred, the Development Services, Water Department, and the
Transportation and Public Works Departments have the responsibility of verifying the availability of funds.
Submitted for Citv Manaaer's Office bv: Dana Burghdoff 8018
Oriainatina Business Unit Head: D.J. Harrell 8032
Additional Information Contact: Mirian Spencer 2677
M&C Review Page 1 of 2
Official site of the City of Fort Worth, Texas
CITY COUNCIL AGEND FORT
-
Create New From This M&C
DATE: 4/25/2023 REFERENCE **M&C 23- LOG NAME: 06N. BEACH ST (SH170
NO.: 0294 TO SARATOGA) #2
CODE: C TYPE: CONSENT PUBLIC NO
HEARING:
SUBJECT: (CD 7 / Future CD 10) Adopt Appropriation Ordinance Increasing Estimated Receipts and
Appropriations in the Community Facilities Agreement Developer Fund in the Amount of
$37,075.00 for the Construction of Roadway Improvements and Water and Sewer
Transmission Line Lowering for North Beach Street from Alliance Gateway State
Highway to Saratoga Downs Way, and Amend the Fiscal Years 2023-2027 Capital
Improvement Program
RECOMMENDATION:
It is recommended that the City Council:
1. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations
in the Community Facilities Agreement Developer Fund in the amount of $37,075.00 from
available funds, for the purpose of funding the CFA-N Beach St (SH170 to Saratoga Downs
Way) project (City Project No. 103773); and
2. Amend the Fiscal Years 2023-2027 Capital Improvement Program.
DISCUSSION:
On December 14, 2021 Mayor & Council Communication (M&C) (21-0945), the City Council
authorized execution of a Community Facilities Agreement with Hillwood Alliance Services, LLC, with
City participation, adopted an ordinance increasing estimated receipts and appropriations in the
Transportation Impact Fee Capital Fund, and adopted an ordinance adjusting estimated receipts and
appropriations in the Water/Sewer Bond 2016 Fund.
The purpose of this M&C is to take actions associated with appropriating new developer funds from
CFA Developer (30114) Fund. A fund level summary of the appropriations needed are shown in the
table below.
Project Number
103443
Fund Fund Name
30114 CFA Developer
Total:
Receipts/Revenue Actuals
$37,075.00
$37,075.00
Funding for this project was not included in the FY2023-2027 Capital Improvement Program because
the amount of developer fees to be appropriated was not known at the time of CIP development. The
action of this M&C will amend the FY2023-2027 Capital Improvement Program as approved in
connection with Ordinance No. 25773-09-2022.
Funding is budgeted in the CFA Developer Fund for the purpose of funding the CFA-N Beach St
(SH170 to Saratoga Downs Way) project.
This project is located in COUNCIL DISTRICT 7/FUTURE COUNCIL DISTRICT 10.
FISCAL INFORMATION/CERTIFICATION:
The Director of Finance certifies that funds are currently available in the CFA-N Beach St (SH170 to
Saratoga Downs Way) project within the CFA Developer Fund and upon approval of the above
http://apps.cfwnet.org/council_packet/mc—review.asp?ID=3092 I&councildate=4/25/2023 11/7/2023
M&C Review
Page 2 of 2
recommendations and adoption of the attached appropriation ordinance, funds will be available in the
CFA Developer Fund for the CFA-N Beach St (SH170 to Saratoga Downs Way) project. Prior to an
expenditure being incurred the Development Services department has the responsibility of verifying
the availability of funds.
TO
Fund Department Account ' Project I Program Activity Budget Reference # Amount
ID ID Year (Chartfield 2)
FROM
Fund Department Account Project Program Activity Budget Reference # Amount
ID ID Year (Chartfield 2)
Submitted for Citv Manaaer's Office bv: Dana Burghdoff (8018)
Oriciinatina Department Head: D.J. Harrell (8032)
Additional Information Contact: Victor Tornero (7830)
ATTACHMENTS
06N BEACH ST (SH170 TO SARATOGA) #2 LOCATION MAP.Ddf (Public)
06N Beach St (SH170 to Saratoga) #2.docx (CFW Internal)
CFA N BEACH FID TABLE.xlsx (CFW Internal)
ORD.APP06N. BEACH ST (SH170 TO SARATOGA) #2 30114 A023(1r).docx (Public)
http://apps.cfwnet.org/council_packet/mc review.asp?ID=30921&councildate=4/25/2O23 11/7/2023
DEVELOPER -AWARDED -PROJECT CHANGE ORDER
CSC No. 59151-CO1
PROJECT NAME:
North Beach Street SH 170 To Saratoga Downs Way
CHANGE
CONTRACT:
Storm Drain, Paving, Water, Sanitary Sewer and Street Light Improvements
ORDER No:
CFA#
CFA22-0024 CITY PARTICIPATION:( YES
CITY PROJECT #
103773
CITY SECRETARY CONTRACT #
59151
FID #
30114-0200431-103773-EO7685
FILE #
K-2878
INSPECTOR:
Dennis Rodgers Phone No: 817-471-9351
PROJECT MANAGER:
Victor V. Tornero Jr., P.E. Phone No: 817-247-5378
CONTRACT UNIT
WATER SEWER DRAINAGE
PAVING
TxDOT*
STREET LIGHTS
CONTRACT
Developer Developer Developer Developer
Developer
Developer
DAYS
Cost City Cost Cost City Cost Cost City Cost Cost
City Cost
Cost City Cost
Cost
City Cost
ORIGINAL CONTRACT
$346,140.00 $150,780.00 I $52,960.00 I $73,150.00 I $0.00 $1,209,599.00 $0.00
$2,230,868.25
$174,430.00 $0.00
$0.00
$249,250.00
95
EXTRAS TO DATE
CREDITS TO DATE
CONTRACT TO DATE
$346,140.00 $150,780.00 I $52,960.00 I $73,150.00 I $0.00 $1,209,599.00 $0.00
$2,230,868.25
$174,430.00 $0.00
$0.00
$249,250.00
95
AMOUNT OF PROP. CHANGE ORDER
$52,500.00 ($52,500.00) I I I $869,564.00 ($869,564.00)
0
REVISED CONTRACT AMOUNT
$398,640.00 $98,280.00 I $52,960.00 I $73,150.00 I $869,564.00 $340,035.00 $0.00
$2,230,868.25
$174,430.00 $0.00
$0.00
1 $249,250.00
95
TOTAL REVISED ACT AMOUNT
PER UNIT
$496,920.00 I $126,110.00 I $1,209,599.00 $2,230,868.25
$174,430.00
$249,250.00
REVISED COST SHARE
Dev. Cost: $1,495,594.00 City Cost:
$2,991,583.25
TOTAL REVISED CONTRACT
$4,487,177.25
Revised: 12-17-2018 Page 1
You are directed to make the followinq
;hanges in the
contract documents
CITY
BID
PAY ITEM #
ITEM #
QUANTITY
UNIT
CFW - Water Improvements
2
3312.5000
-1
EA
Hillwood -Water Improvements
6*
3312.5000
1
EA
CFW - Storm Drain Improvements
1
3137.0102
-699
SY
2
3305.0109
-2644
LF
3
3341.0201
-978
LF
4
3341.0205
-194
LF
6
3341.0305
-41
LF
7
3341.1102
-630
LF
8
9999.0009
-13
LF
9
3341.1201
-14
LF
10
3341.1501
-345
LF
11
3349.0011
-5
EA
12
3349.0003
-2
EA
13
3349.0003
-2
EA
14
3349.6001
-11
EA
15
3349.6003
-1
EA
16
3349.7003
-1
EA
17
9999.0012
-2
EA
18
9999.0013
-2
EA
19
9999.0014
-3
EA
20
9999.0015
-2996
SY
Hillwood - Storm Drain Improvements*
1*
3137.0102
699
SY
2*
3305.0109
2644
LF
3*
3341.0201
978
LF
4*
3341.0205
194
LF
5*
3341.0305
41
LF
6*
3341.1102
630
LF
7*
9999.0009
13
LF
8*
3341.1201
14
LF
9*
3341.1501
345
LF
10*
3349.0011
5
EA
11*
3349.0003
2
EA
12*
3349.0003
2
EA
13*
3349.6001
11
EA
14*
3349.6003
1
EA
15*
3349.7003
1
EA
16*
9999.0012
2
EA
17*
9999.0013
2
EA
18*
9999.0014
3
EA
19*
9999.0015
2996
SY
Asterisk (*) indicates New Unit or Pay Item
REASONS FOR CHANGE ORDER
ITEM DESCRIPTION
UNIT PRICE
TOTAL
36"AWWA Butterfly Valve
$52,500.0
(($52,500.00)
TOTAL
($52,500.00)
36" AWWA Butterfly Valve
$52,500.00
$52,500.00
TOTAL
$52,500.00
Lar_a Stone Rieerap,Dry
�rench
$125A
($87,375.00)
Saitey
$2.00
$5,288.00
21" RCP, Class III
$75.0 �
$73,350.00�
24" RCP, Class III
$80.00
$15,520.00)
33" RCP, Class III
$115.0)
($4,715.00
4x3 Box Culvert
$250.00
($157,500.00)
5x2 Box Culvert
$285.0�
($3,705.00)
5x3 Box Culvert
$325.00
$4,550.00
8'x4' Box Culvert
$585.0 �
($ 01,825.00
4' Storm Junction Box
$6,000.00
0,000.00
5' Storm Junction Box
$7,000.0 �
4,000.00
6' Storm Junction Box
$9,000.00
8,000.00)
E9,
10' Recessed Inlet
$5,400.0
400.00
20' Recessed Inlet
$7400.00
($7400.00))
6' Drop Inlet
$10:500.0 1
$10:500.00)
TXDOT Headwall
$42,500.00
$85,000.00)
Gabion Basket 3ft wide by 2' talli
$7,500.0
$15,000.00
Gabion Basket aft wide b�2.5'tall`
$9,500.00
$28,500.00
Erosion Control Blanket (RollmaxVmax SC250)
$16.0
$47,936.00)
TOTAL
( 869,564.00)
Larqe Stone RipRap, Dry
$125.00
$87,375.00
Trench Saftey
$2.00
$5,288.00
21" RCP, Class III
$75.00
$73,350.00
24" RCP, Class III
$80A
$15,520.00
33" RCP, Class III
$115.00
$4,715.00
4x3 Box Culvert
$250.0)
$157,500.00
5x2 Box Culvert
$285.00
$3,705.00
5x3 Box Culvert
$325.0
$4,550.00
8'x4' Box Culvert
$585.00
$201,825.00
4' Storm Junction Box
$6,00031
$30,000.00
5' Storm Junction Box
$7,000.00
$14,000.00
6' Storm Junction Box
$9,000.0
$18,000.00
10' Recessed Inlet
$5,400.00
$59,400.00
20' Recessed Inlet
$7,400.0
$7,400.00
6' Dr9 Inlet
$10,500.00
$10,500.00
TxDOT PHeadwall
$42,500.0
$85,000.00
Gabion BasketsPit 3ft wide by 2' tall)
$7,500.00
$15,000.00
Gabion Baskets (3ft wide b2.5' tall
$9,500.0
$28,500.00
Erosion Control Blanket (RollmaxVmax 150)
$16.00
$47,936.00
TOTAL
$869,564.00
GRAND TOTAL
$0.00
A change order is required to align the executed bid proposal in the project manual with the executed CFA.
*The Hillwood TxDOT Improvements in the project manual will not be owned by the City and are not be part of the CFA.
Revised: 12-17-2018 Page 2
RECOMMENDED:
Peloton Land Solutions
Kole Weber
By; We Weber(Feb 7,202413:16 CST)
Name: Kole Weber
Title: Project Manager
APPROVAL RECOMMENDED:
CFW- Sponsoring`` Department
By; Suby Var ese P E(Fe 8,20241321CST)
Name: Subv Varunhese, PE
Title: Interim Engineer Manager - DSWS
RECOMMENDED:
APPROVED:
Hillwood Alliance Services, LLC
By: Eric Elrod (Feb 7, 202413:23 CST)
Name: Eric Elrod
Title: Senior Vice President
APPROVAL RECOMMENDED:
CFW- Sponsoring Department
By; ifer Ro ea,(Feb9,202409.26CS1)
Name: Jennifer H. Roberts, PE, PMP, CMQ/QE
Title: Assistant Director - Development Services
APPROVED:
CFW- *Contract Compliance Manager CFW-Assistant City Manager
VicEo, V. rei s>e.» 1e , p. E. Dalla 8[IY P
By: Nc[ Tornero Jr, P E.(Fe67, 202418 02CST) By: Dana Burehdoff f57 9. 02411:0 STI
Name: Victor V. Tornero Jr., PE Name: Dana Burghdoff, AICP
Title: Sr. Capital Projects Officer Title: Assistant Citv Manager
M&C Number: 21-0945; 23-0294
M&C Date Approved: 12/14/2021; 4/25/2023
APPROVED:
Conatser Construction 7;C, L.P.
B�och I*Walhs
By: Brock Huggins (Feb 7;21413:39 CST)
Name: Brock Huggins
Title: President
APPROVED AS TO FORM AND LEGALITY:
CFW- Senior Assistant City Attorney
By: Richard MCC2cken Feb 9, 202409:52 CST)
Name: Richard A. McCracken
Title: Senior Assistant City Attorney
ATTEST:
CFW- City Secretary
By:
Name: Jannette S. Goodall
Title: City Secretary
Contract Compliance Manager (Project Manager):
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, include
ensuring all performance and reporting requirements.
❑ There are NO City Funds associated with this Contract
0 There are City Funds associated with this Contract
Revised: 12-17-2018 Page 3
FORTWORTH
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
PROJECT NAME: North Beach Street- IH 170 to Saratoga
PROJECT NUMBER: 103773
DOE NUMBER: 3773
WATER
PIPE LAID SIZE TYPE OF PIPE
Yes 12" PVC
Yes
Yes
Yes
LF
260.3 LF
FIRE HYDRANTS: NA VALVES (16" OR LARGER) 1
PIPE ABANDONED SIZE TYPE OF PIPE LF
NA
DENSITIES: Yes
NEW SERVICES:
SEWER
PIPE LAID SIZE TYPE OF PIPE LF
Yes 10" PVC (Dry Barrel for Future Use) 260 LF
PIPE ABANDONED SIZE TYPE OF PIPE LF
NA NA NA NA
DENSITIES: Yes
NEW SERVICES: 1 PVC 5 LF
TRANSPORTATION AND PUBLIC WORKS
FORTWORTH.
TRANSPORTATION AND PUBLIC WORKS
December 11, 2023
Constser Construction TX, L.P.
5327 Wichita St.
Fort Worth, TX 76119
RE: Acceptance Letter
Project Name: North Beach Steet- SH 170 to Saratogs Downs Way
Project Type: Water, Sewer, Paving, Storm Drain & Street Lights
City Project No.: 103773
To Whom It May Concern:
On December 11, 2023 a final inspection was made on the subject project. There were punch list items
identified at that time. The punch list items were completed on July 12, 2024. The final inspection and
the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is
therefore accepted by the City. The warranty period will start on July 12, 2024, which is the date of the
punch list completion and will extend of two (2) years in accordance with the Contract Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at 817-
392-7830.
Sincerely,
Victor V. Torn ero Jr., P.E.(Aug 30, Z 10:56CDT)
Victor Tornero, Project Manager
Cc: Dennis Rodgers, Inspector
Donald Watson, Inspection Supervisor
Oscar Aguillon, Senior Inspector
Andrew Goodman, Program Manager
Peloton Land Solutions, Consultant
Conatser Construction TX, L.P., Contractor
Hillwood Alliance Service, LLC, Developer
File
E-Mail: TPW_Acceptance@fortworthtexas.gov
Rev. 8/20/19
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me, the undersigned authority, a Notary Public in the state and county aforesaid,
on this day personally appeared Brack Huggins, President of Conatser Management Group, Inc.,
general partner of Q2Datscr Construction TX. 1.11, known to me to be a credible r rson, who
being by inc duly sworn, upon leis oath deposed and said:
Thut all persons, firms, associations, wrporations or other organizations furnishing
labor and/or materials have been paid in fu11,
That the wage scale established by the City Council in the City of Fort Worth. has
been }paid in fall; and
That there are no claims pending for personal injury and/or property damages;
On Contract described as-
N. BEACH ST. SH 170 TO SARATOGA DOWNS WAY
WATER, SANITARY SEWER, DRAINAGE, &
PAYING IMPROVEMENTS
CFA PRJ #: 22-0024
CITY PROJECT #: 103773
CITY OF FORT WORTH
STATE OF TEXAS
CONATSER CONSTRUCTION TX, LP
t�r4}C ' 1lligg S
Subscribed and sworn to before me this 30n day of August, 2024.
Notay Palic in Tarrant County. Texas
CONSENT OF
SURETY COMPANY
TO FINAL PAYMENT
Conforms with the American tnatituts of
ArrhiTwets, AfA aaoumant r.7137
OWNER
ARCHITECT
C7
CONTRACTOR
C
SURETY
�]
OTHER
PROJECT:
(name, addreaa)N AeaO St , 5H170 to Saratoga Dawns Way
Fon Worth, TX
TO (Owner)
Bond No 0251914
CITY OF FORTYVQk-rH ANO H1LLVVCM AI. W11CF7 ARCHITECT'S PROJECT NO: crA7z oo�a
SEWCES. LLC CONTRACT FOR:
low TZ , . P jy,c Stout Dnwt, 4Vaie►, & Sanitary Sewer I
for North Sao& L SNJ71CI to Saratoga Downs Way
L v4D M TX 76102 J CONTRACT DATE:
CONTRACTOR.- CONATSER CONSTRUCTION TX. L P
In wcordanrc with the provisions of the Contract between the Owner ertd the Contractor as indicated above, the
thin ~ reins Anil awl*U of S,x*tr Comparly)
BERKLEY JNSURANCE COMPANY
475 Sleambroat Road
Greenwich CT %030 . SURETY COMPANY
oilbondof iwv moon nfrnf fin¢ address of Contractor]
CONATSER CONSTRUCTION TX, L P
27 Wichita st
Fort worth Tx 75! 19-W35 CONTRACTOR,
hereby appmyes of the final payment to the C... _ .... , and agrees that final payment to tho C� SWI ttat Vero"
the Surety Company of any of its obligations to Lhws rnwn n.me"w*kr a 0 0wrw1
CITY OF FORT WORTH AND HFLLWOO❑ ALLIANCE SERVICES, t_LC
1000 Throck mar on
Fad Worth TX 76102 , OMk11 M
asset forth in the said Surcty Company's bond.
IN WITNESS, WHEREOF.
the Surety Company has hereunto set its hand this
11 st
W)-. j4n�' 44--
2VM day Of August, 2024
BERKLEY INSURANCE COMPANY
Surety compatty
Lgnaturc of Authorirjcd Represeniatirfe
Attorney-in-f act
MOY6: ?NIP farm u to to used Es a Cof"Donpn doC mom To ALA DOCUMENT 0704, CON RACTotrS AFF$MVrr OF PAVINIEFrT 4F DEBTS ANC CLAIMS,
QV aR EAitiw*
ONE PAGE