HomeMy WebLinkAboutContract 59320-CO2CSC No. 59320-CO2
FORT WORTH,. City of Fort Worth
`1 Change Order Request
Project Namel 103664 - Grand Ave Ph2 Pt2 City Sec # l 59320
Client Project #(s)l 103664/103665/C00969
Project Description This will be the continuation in Phase 2 which will include the installation of (3)-72" RCPs to connect the existing Grand Avenue line with the new outfall to the
West Fork downstream of the isolation gates
Contractorl S.J. Louis Construction of Texas Change Order #1 2 1 Date 7/22/2024
City Project Mgr.l Max Aransen, P.E. l City Inspectorl James Ruiz
Dept. Storm Drain Sewer Contract Time
Totals (CD�
Original Contract Amount $22,750,084.50 400
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
IGo to ADD & DEL Tabs to Enter CO Backup
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 0.00%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $28,437,605.63
JUSTIFICATION (REASONS) FOR CHANGE ORDER
This change order will be to add days to the contract time for the delay caused by the multiple revisions of the USACE package submittal. The original package was submitted
9/12/2023 and the package was approved with permission to mobilize on 2/9/2024. The total days for this delay on this change order will be 150 calendar days. We are granting
these days as SJ Louis was not allowed to mobilize on the project without the approved USACE package or approved FWWR permits (approved 4/4/2024). Without these
permits, they were unable to start on any portion of the project until 2/9/2024. We are only adding the days caused by the multiple revisions to the USACE package and not the
92 day period from the NTP (6/1212023) to the first USACE package submittal. That time period is accounted for as part of there contract under the city spec 0133 00
Submittals. The intent is to add these extra days in order to proceed with pay applications, however days may still be added to this project in the future pending discussions
between the city and the contractor.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that
he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements.
Contractor's Company Name WContractor (Namel Contract Si natur Date
S.J. Louis Construction of Texas Adam Lunsford ,ra ,w �,a,a o gqm Zunsfonq I Aug 5, 2024
Inspector/Inspection Supervisor
Date
Project and Contract Compliance Manager
Date
�6r-
Aug 6, 2024
Aug 6, 2024
Program Manager
Date
Senior Capital Project Officer
Date
Y'--a
Aug 6, 2024
4%Lo-
Aug 6, 2024
Assistant Director (Dept)
Date
Director, Contracting Department (Dept)
Date
G G
Aug 9, 2024
Aug 9, 2024
Assistant City Attorney
Date
Assistant City Manager
Date
Sep 3, 2024
Sep 3, 2024
Council Action if required)
{ M&C Number l
/, pOgt°nC
V9
Jannette Goodall, City Secretary d°o°$o=;
0
aQan�=6sQga
M&C Date Approved l
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
$1,635,338.50
$21,114,746.00
HEM
EM
FORT WORTH City of Fort Worth
Change Order Additions
Project Name 1 103664 - Grand Ave Ph2 Pt2 City Sec # 1 59320
Client Project # I 10366411036651C00969 I
Contractorl S.J. Louis Construction of Texas PMI Max Aransen, P.E. I Inspectorl James Ruiz
Change Order Submittal # 0 Date 1 7122/2024
ADDITIONS
UESUKINI IUN UEPI Uty Unit Unit Cost total 1
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Storm brain $0.001
Sewer $0.001
I
I
Sub Total Additions $0.001
Change Order Additions Page 2 of 4
HEM
EM
FORTWORTH City of Fort Worth
Change Order Deletions
Project Name 1 103664 - Grand Ave Ph2 Pt2 I City Sec # 1 59320 1
Client Project# 1 10366411036651C00969 1
Contractorl S.J. Louis Construction of Texas I PMl Max Aransen, P.E. Inspectorl James Ruiz
Change Order Submittal # Date 1 712212024 1
DELETIONS
UtSUKll`llUN UEFI Uty Unit Unll Uost total
Stormbrain
I
I
I
I
I
I
I
I
I
I
I
I
I
1
1
1
I
I
I
I
I
I
I
I
I
I
I
I
1
1
1
1
I
I
I
I
I
I
I
I
I
I
I
1
1
1
1
1
1
1
1
1
1
1
1
1
I
0.001
�0.001
I Sewer
I
I
Sub Total Deletions
$0.001
Change Order Deletions Page 3 of 4
MISBE for this Change Order
M/SBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
CO # DATE I AMOUNT
Total I $0.00 I
FORTWORTH,
Routing and Transmittal Slip
Transportation & Public Works Department
DOCUMENT TITLE: Grand Ave Change Order 2
M&C:
CPN: 103665 CSO:
DOC#:
Date:
To:
Name
Department
Initials
Date Out
1.
Adam Lunsford
Contractor
rcw
Aug 5, 2024
2.
James Ruiz
TPW - Inspector
Aug 6, 2024
3.
Max Aransen
TPW - Project Manager
'
Aug 6, 2024
4.
Mike Bennett
TPW —Interim Program Manager _111t4_
Aug 6 2024
5.
Lissette Acevedo
TPW —Sr CPO
C�v
Aug 6, 2024
6.
Patricia Wadsack
TPW -Assistand Director
I>(.,W
Aug 9, 2024
7.
Lauren Prieur
TPW- Director
Aug 9, 2024
8.
Douglas Black
Legal - Assistant City Attorney
Sep 3, 2024
9.
Jesica McEachern
CMO — Assistant City Manager
a`
Sep 3, 2024
10.
Jannette Goodall
CSO — City Secretary
Sep 4, 2024
11.
Allison Tidwell
CSO — City Secretary
JJ_
Sep 4, 2024
12.
Tpw—SW—Contract
TPW Stormwater
60
1
Aug 9, 2024
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: []YES ®No
RUSH: []YES ®No SAME DAY: ❑YES ®No NEXT DAY: ❑YES ®No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return to: tuw sw contracts(a,fortworthtexas.g_ov Call 817-229-3283 with questions. Thank you!