Project Name Thomas PI SDR City Sec # l 61454
aient Project #(s)l 103057
Project Description) Reroute existing storm drain pipe that runs under private property, outside of City easements, so the pipe is within City Right of Way on Thomas PI..
Contractorl Woody Contractors Change Order #1 1 Date 6/17/2024
City Project Mgr.l Mike Bennett, PE, PMP City InspectorL
Stanley Butterfield
Dept. TPW Water Sewer Contract Time
Totals (CDI
Original Contract Amount $2,179,010.00 $2,179,010.00 180
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
$2,179,010.00
$2179 010.00 180
�99�24.00
Amount of Prop�osed Change Order
$99 624.00 $0.00 $0.00
40
evised--- clAmount
$2,278,634.00
$2,278,634.00 220
Original Funds Available for Change Orders
$87,160.40
$87,160.40
Remaining Funds Available for this CO
$87,160.40
$87,160.40
Additional Funding (if necessary)
$12,463.60 1
$12,463.60
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
4.57%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%)
$2,723,762.50
JUSTIFICATION (REASONS) FOR CHANGE ORDER
The purpose of this change order is to add water and storm drain items that were not included in the original bid. The following are justifications support these additions:
-For the addition of the water items, a design change was necessary. After coordination with the water department, it was determined that the 8-inch Water Line A along Thomas
PI, between Birchman Avenue and Calmont Avenue, should be placed under the street rather than under the curb and gutter. The addition of 2- 8" gate valves and 1-12" gate
valve is required to enable complete shutdown of flow during maintenance and repairs. This allows for the selective shutdown of sections of the pipe instead of the entire line
which expedites the project.
-For the addition of the storm drain items, the design change was required due to a failing/deteriorating 72" arch pipe that runs diagonally from the 18' Alley Way to Thomas PI.
The removal and addition of the following items are included with this change: removal of two additional curb inlets, 38 linear feet of 72-inch arch pipe, installation of an
additional 16 linear feet of 24" RCP CL III, installation of a 6-foot by 5-foot box over a length of 20 linear feet, installation of 1-10' inlet, and installation of 1-5' curb inlet.
Contract item additions have been evaluated by City staff as necessary and the unit prices were determined to be reasonable when compared to City standard prices.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that
he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements.
Woody Contractors I Trent Woody L— ., .. I Aug 9, 2024 1
Inspector/Inspection Supervisor
Date
Project and Contract Compliance Manager
Date
024151ac
Aug 9, 2024-
---
Aug 12, 2024
Program Man q
a
��•
Date
Aug 12, 2024
Senior Capital Proiect Officer
4%"
Date
Aug 12, 2024
Assistant Director
Date
Director, Contracting Department (Dept)
Date
at L
YlG a WGGIraGIT
Aug 13, 2024
�&
Aug 13, 2024
City
Assistant i Attorney
Date
Sep 3.2024
Date
Sep 3.2024
Council Action if required)
a oFo �QQ
V e
dvo omo
Jannette Goodall, City Secretary
QQQ�°�°�Eop54tip
M&C Number l M&C 24-0337 1 M&C Date Approved 1 4/23/20241
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT W R_ TH
City of Fort Worth
" r
Change Order Additions
Project Name I Thomas PI SDR
I City Sec # 61454 1
Client Project # 1 103057
1
Contractorl Woody Contractors
I PMI Mike Bennett,
PE, PMP
Inspectorl Troy Gardner
l
Change Order Submittal #
0 Date 1 6/17/2024
ADDITIONS
I I EM UESCRIP I IUN
DEP I
Uty
Unit Unit Cost
I otal 1
REM 5' UR LESS CURB INLE I
I PW
2
EA $1,15U.UU
$2,3UU.001
REMOVE 72" ARCH PIPE
TPW
38
LF $200.OU
$7,600.001
24" RCP CL III
TPW
16
LF $379.00
$6,064.001
5X5 BOX
TPW
20
LF $1,283.OU
$25,660.001
CONNECT 24" RCP TO8X8 JB
TPW
1
EA $2,000.00
$2,000.001
10' STANDARD CURB INLET
TPW
1
EA $12,000.OU
$12,000.001
10' STANDARD CURB INLET 10' DEPTH
TPW
1
EA $27,300.0d
$27,300.001
5' CURB INLET
TPW
1
EA $8,200.OU
$8,200.001
8" G.V.
TPW
2
EA $2,000.00
$4,000.001
12" G.V.
TPW
1
EA $4,500.00
$4,500.001
1
1
1
1
I
1
I
1
I
1
I
1
I
1
I
1
I
I
I
I
I
1
1
1
1
1
I
1
I
I
TPW
I
1
1
1
1
I
1
I
1
I
1
I
1
I
1
I
I
I
1
I
1
I
I
I
1
I
1
I
1
$99,624.001
1 Water
$0.001
1 Sewer
$0.001
I
Sub Total Additions
I
$99,624.001
Change Order Additions Page 2 of 4
HEM
FOR_ T1 W� City of Fort Worth
Change Order Deletions
Project Name 1 Thomas PI SDR CitySec # 1 61454
Client Project # 1 103057 1
Contractorl Woody Contractors IPMI Mike Bennett, PE, PMP I Inspectorl Troy Gardner
Change Order Submittal # 0 Date 1 6/17/2024 I
DELETIONS
UtSUKIF'I IUN UEFI Uty Unit Unit host Iotal
I TPW
Water
Sewer
Sub total Deletions
0.00
0.00
$0.00
$0.00
Change Order Deletions Page 3 of 4
MISBE for this Change Order
MISBE Sub Type of Service 7 Amount for this CO
Total $0.00
Previous Change Orders
CO # DATE AMOUNT
Total 1 $0.00 1
103057 Thomas Place CO 1 Revised
Final Audit Report 2024-08-09
Created: 2024-08-09
By: Sadie Ishmael (Sadie.Ishmael@fortworthtexas.gov)
Status: Canceled / Declined
Transaction ID: CBJCHBCAABAAQxiSmlyFilgnbY7oj2UUiw_IXBO6Sclh
"103057 Thomas Place CO 1 Revised" History
Document created by Sadie Ishmael (Sadie.Ishmael@fortworthtexas.gov)
2024-08-09 - 4:29:05 PM GMT- IP address: 204.10.90.100
Document approved by Sadie Ishmael (Sadie.Ishmael@fortworthtexas.gov)
Approval Date: 2024-08-09 - 4:37:06 PM GMT- Time Source: server- IP address: 204.10.90.100
Document emailed to Troy Woody (twoody202O@aol.com) for signature
2024-08-09 - 4:37:08 PM GMT
Email viewed by Troy Woody (twoody202O@aol.com)
2024-08-09 - 6:14:32 PM GMT- IP address: 69.147.87.121
J j Document e-signed by Troy Woody (twoody202O@aol.com)
Signature Date: 2024-08-09 - 6:26:12 PM GMT - Time Source: server- IP address: 47.51.211.209
Document emailed to Stanley Sutterfield (Stanley.Sutterfield@fortworthtexas.gov) for signature
2024-08-09 - 6:26:14 PM GMT
Email viewed by Stanley Sutterfield (Stanley.Sutterfield@fortworthtexas.gov)
2024-08-09 - 6:27:30 PM GMT- IP address: 107.115.171.90
Document canceled by Sadie Ishmael (Sadie.Ishmael@fortworthtexas.gov)
2024-08-09 - 7:50:33 PM GMT- IP address: 204.10.90.100
FDRTWORTHg I P—"ed6y
Adobe
Acrobat Sign
WOODY CONTRACTORS INC - Construction
Contract Change Order -
Final Audit Report 2024-09-04
Created: 2024-08-30
By: Sadie Ishmael (Sadie.Ishmael@fortworthtexas.gov)
Status: Canceled / Declined
Transaction ID: CBJCHBCAABAAxgo4VGTms_YE2Vy_U5Pckpk8BLGycSJt
"WOODY CONTRACTORS INC - Construction Contract Change
Order -" History
Document created by Sadie Ishmael (Sadie.Ishmael@fortworthtexas.gov)
2024-08-30 - 9:37:50 PM GMT- IP address: 204.10.90.100
Document emailed to Douglas Black (Douglas.Black@fortworthtexas.gov) for signature
2024-08-30 - 9:43:24 PM GMT
FSe Document e-signed by Douglas Black (Douglas.Black@fortworthtexas.gov)
Signature Date: 2024-09-03 - 7:31:54 PM GMT - Time Source: server- IP address: 208.184.124.181
Py Document emailed to Jesica McEachern aesica.mceachern@fortworthtexas.gov) for signature
2024-09-03 - 7:31:56 PM GMT
G3e Document e-signed by Jesica McEachern Qesica.mceachern@fortworthtexas.gov)
Signature Date: 2024-09-04 - 4:44:48 AM GMT- Time Source: server- IP address: 204.10.90.100
Cry Document emailed to Jannette Goodall Oannette.goodall@fortworthtexas.gov) for signature
2024-09-04 - 4:44:50 AM GMT
Email viewed by Jannette Goodall Qannette.goodall@fortworthtexas.gov)
2024-09-04 - 12:20:55 PM GMT- IP address: 208.184.124.181
� Document declined by Jannette Goodall Qannette.good all@fortworthtexas.gov)
Decline reason: You will need to separate my signature from Allison's. The way it is set up I have to complete Allison's role in order to sign it.
2024-09-04 - 12:24:34 PM GMT- IP address: 208.184.124.181
FDRTWORTHs I P-m`l8y
Adobe
Acrobat Sign
FORT WORTH,,:
Routing and Transmittal Slip
Transportation & Public Works Department
DOCUMENT TITLE: 103057 Thomas Place Storm Drain Construction CO 1
M&C: CPN: 103057
CSO: CS61454
DOC#:
Date:
To:
Name
Department Initials
Date Out
1.
Troy Woody
Contractor -
Aug 9, 2024
2.
Stanley Sutterfield
TPW-Inspector HSS
Aug 9, 2024
3.
Mike Bennett
TPW-PM-�pt4-
Aug 12, 2024
4.
Lissette Acevedo
TPW-Sr cro C�v
Aug 12, 2024
5.
Patricia Wadsack
TPW- AD �(,,'�/�/'
Aug 13, 2024
6.
Lauren Prieur
TPW-Director
Aug 13, 2024
7
Douglas Black
Legal pe as
Sep 3, 2024
8
Jesica McEachern
ACM CV`
NA
Sep 3, 2024
9
Jannette Goodall
CSO ,ya
Sep 4, 2024
10.
Allison Tidwell
.,
Sep 4, 2024
S/
Aug 13, 2024
11.
TPW-Contracts Contracts
TPW
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: ❑YES ®No SAME DAY: ❑YES ❑No NEXT DAY: ❑YES ❑No
ROUTING TO CSO: ®YES ❑No
Action Reauired: ❑ Attach Signature, Initial and Notary Tabs
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
Return To: Please notify tvw sw contracts(d),fortworthtexas.2ov when complete. Call ext. 817 228
3283 or ext. 6254 with questions. Thank you!