Loading...
HomeMy WebLinkAboutContract 61879-PM1CSC No. 61879-PM1 FORT WORTH PROJECT MANUAL FOR THE CONSTRUCTION OF WATER, SANITARY SEWER, PAVING, STREET LIGHTS AND DRAINAGE IMPROVEMENTS FOR Tradition Phase 9A City Project No. 105255 IPRC23-0177 FID# 30114-0200431-105255-EO7685 W-3016 X-28007 Mattie Parker Mayor David Cooke City Manager Christopher P. Harder, P.E. Director, Water Department Lauren L. Prieur, P.E. Director, Transportation and Public Works Department Prepared for The City of Fort Worth August, 2024 mcivil Engineering &Surveying 2559 SW Grapevine Pkwy. Grapevine, Texas 76051 817.329.4373 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX 08/01 /2024 *. :* .......................... MAT rWW J. BAACKE ►'�;._ 99368 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 1 of 6 SECTION 00 00 10 TABLE OF CONTENTS DEVELOPER AWARDED PROJECTS Division 00 - General Conditions Last Revised 1001113 13 inyita4ion ie Bidders 03/20/2020 1002113 13 inst ,,etions t Bidders 03/20/2020 00 41 00 Bid Fefm 04/02/2014 00 42 43 Proposal Form Unit Price 05/22/2019 0043 13 Bid Ben 04/02/2014 00v0 45 11 Hidder0 iNmqualif^ 04/02/2014 0045 12 Prequalification Statement 09/01/2015 0045 13 Bidder- P -egti 1 fiea4 e A ,.plie.. ie 03/09/2020 00 45 26 Contractor Compliance with Workers' Compensation Law 04/02/2014 0045 g M iner-ity Business Enter-,, Fise Goa 08/21/2018 00 52 43 Agreement 06/16/2016 00 61 25 Certificate of Insurance 07/01/2011 00 62 13 Performance Bond 01/31/2012 00 62 14 Payment Bond 01/31/2012 00 62 19 Maintenance Bond 01/31/2012 00 7200 Gener-al Conditions 11/15/2017 007300 Supplementafy Conditions 07/01/2011 0073 10 Standard City Conditions of the Construction Contract for Developer 01/10/2013 Awarded Projects Division 01 - General Requirements Last Revised 01 1100 Summary of Work 12/20/2012 01 25 00 Substitution Procedures 08/30/2013 01 31 19 Preconstruction Meeting 08/30/2013 013120 Pr-ejeet Meet* — 07/01/2011 01 32 33 Preconstruction Video 08/30/2013 013300 Submittals 08/30/2013 01 35 13 Special Project Procedures 08/30/2013 01 45 23 Testing and Inspection Services 03/20/2020 01 50 00 Temporary Facilities and Controls 07/01/2011 01 5526 Street Use Permit and Modifications to Traffic Control 07/01/2011 0157 13 Storm Water Pollution Prevention Plan 07/01/2011 01 60 00 Product Requirements 03/20/2020 01 66 00 Product Storage and Handling Requirements 04/07/2014 01 70 00 Mobilization and Remobilization 04/07/2014 01 71 23 Construction Staking 04/07/2014 01 74 23 Cleaning 04/07/2014 01 77 19 Closeout Requirements 04/07/2014 01 78 23 Operation and Maintenance Data 04/07/2014 01 78 39 Project Record Documents 04/07/2014 CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 2 of 6 Technical Specifications which have been modified by the Engineer specifically for this Project; hard copies are included in the Project's Contract Documents NONE CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 3 of 6 Technical Specifications listed below are included for this Project by reference and can be viewed/downloaded from the City's website at: httD:Hfortworthtexas.aov/tDw/contractors/ or htti)s:HaDDs.fortworthtexas.gov/Proi ectResources/ Division 02 - Existing Conditions Last Revised 0241 13 Selective Site Demolition 12/20/2012 0241 14 Utility Removal/Abandonment 12/20/2012 0241 15 Paving Removal 02/02/2016 Division 03 - Concrete 03 30 00 Cast -In -Place Concrete 12/20/2012 03 34 13 Controlled Low Strength Material (CLSM) 12/20/2012 03 34 16 Concrete Base Material for Trench Repair 12/20/2012 03 80 00 Modifications to Existing Concrete Structures 12/20/2012 Division 26 - Electrical 26 05 00 Common Work Results for Electrical 11/22/2013 2605 10 Demolition for- >~leet.-iea Systems- 12/20/2012 26 05 33 Raceways and Boxes for Electrical Systems 12/20/2012 26 05 43 Underground Ducts and Raceways for Electrical Systems 07/01/2011 26 05 50 Communications Multi -Duct Conduit 02/26/2016 Division 31- Earthwork 31 1000 Site Clearing 12/20/2012 3123 16 Unclassified Excavation 01/28/2013 31�3• BeFFE) 01/28/2013 3124 00 an?,-nxx1+2 01/28/2013 31 25 00 Erosion and Sediment Control 12/20/2012 3 ! 4 00 Ga-biens 12/20/2012 31 37 00 Riprap 12/20/2012 Division 32 - Exterior Improvements 32 0117 Permanent Scphalt Paving R 12/20/2012 27�4o Temporary Asphalt Pa, v ag n opai 12/20/2012 320129 Concrete Paving Repair 12/20/2012 32 1123 Flexible Rase ram u-sus- 12/20/2012 32 1129 Lime Treated Base Courses 12/20/2012 32 11 3_ Cement Treated Base Gotff 12/20/2012 32 1137 Liquid Treated cal Fkaylizer 08/21/2015 37�v Asphalt 1%ving 12/20/2012 3''�3 Aoplhak %,Ang-C+adi Nalants 12/20/2012 32 13 13 Concrete Paving 12/20/2012 32 1320 Concrete Sidewalks, Driveways and Barrier Free Ramps 06/05/2018 32 1373 Concrete Paving Joint Sealants 12/20/2012 32 14 16 B��[ UkiitPm4fig 12/20/2012 CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 4 of 6 10/05/2016 11 /22/2013 17 25 Guf-b Addres3 Painting 11/04/2013 3L 3' 13 /''L,ai > enees and races- 12/20/2012 3q 3126 Wire Fenees and Gmes 12/20/2012 2''�9 Weed roxworzandCi4€s 12/20/2012 2''�3 Gast is - Lvo O aet:ete Retaining Walls 06/05/2018 3291 19 Topsoil Placement and Finishing of Parkways 12/20/2012 3292 13 Hydro -Mulching, Seeding, and Sodding 12/20/2012 3'� 43 Tfees-and F xmbz 12/20/2012 Division 33 - Utilities 330130 Sewer and Manhole Testing 12/20/2012 330131 Closed Circuit Television (CCTV) Inspection 03/03/2016 ZZ�v Bypa&3 ikwxp;ng .,f Existing Sewer- Syste 12/20/2012 33 04 10 Mst�o,ading ara Wee call bzat✓an 12/20/2012 33 04 C,,,-.-osio,, Control Test Stations 12/20/2012 33 04 Magnes;,,,,, Anode Cathodic Proteetio Systeffl 12/20/2012 33 04 30 Tom pe-afy W er- So,...;e 07/01/2011 33 04 40 Cleaning and Acceptance Testing of Water Mains 02/06/2013 33 04 50 Cleaning of Sewer Mains 12/20/2012 3305 10 Utility Trench Excavation, Embedment, and Backfill 12/12/2016 3�-A§ 12 12/20/2012 3305 13 Frame, Cover and Grade Rings — Cast Iron 01/22/2016 0 33 �sv5 13.10 tee,Coverz-ad Grade dings Compute 01/22/2016 Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to 33 05 14 Grade 12/20/2012 110 r re -ete W4ef Vaults 12/20/2012 33 05 17 r rer-ete r llafs 12/20/2012 33 05 20 Auger Boring 12/20/2012 330521 col L/.r.,,v Nate 12/20/2012 33 05 22 Steel Casing Pipe 12/20/2012 33 05 Hand T„aae4 ,. 12/20/2012 33 05 24 Installation of Carrier Pipe in Casing or Tunnel Liner Plate 06/19/2013 22�o Utility Mar4e-41.e,,.,tors 12/20/2012 33 05 30 Location of Existing Utilities 12/20/2012 33 11 05 Bolts, Nuts, and Gaskets 12/20/2012 33 11 10 Ductile Iron Pipe 12/20/2012 33 11 11 Ductile Iron Fittings 12/20/2012 33 11 12 Polyvinyl Chloride (PVC) Pressure Pipe 11/16/2018 3_ 11 13 Gonerete Pressufe Pipe,Wrapped, Steel Cylinder Type 12/20/2012 33 1 1 14 Tuufiea cool Pipe and Fiff n,.s 12/20/2012 33 12 10 Water Services 1-inch to 2-inch 02/14/2017 33 12 11 Large Water Meters 12/20/2012 33 1220 Resilient Seated Gate Valve 12/20/2012 3_ 1221 A NVA A R+tbber Seated BiAte,.fl„ V ly 12/20/2012 33 1225 Connection to Existing Water Mains 02/06/2013 Z2�v r c4isN* at, r Air- Valve Aaajrt,1x'ies for- Potable W +o . Syste 12/20/2012 33 1240 Fire Hydrants 01/03/2014 CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 5 of 6 33 1250 Water Sample Stations 12/20/2012 33 12 60 Stafidaf:d Blow off Valve Assembly 06/19/2013 3- 31 12 Gufod in Place Ripe (Cmn4 12/20/2012 3331 13 Fiberglass Reinforced Pipe for Gravity Sanitary Sewers 12/20/2012 33 31 15 K4gh Dory.* •' D4yethylefie (NDPE) Dips for- C'an tafy C`owef 1(Sanitary 12/20/2012 33 31 20 Polyvinyl Chloride (PVC) Gravity Sewer Pipe 06/19/2013 D.,1.,.,:.,.,1 Chloride (PNIG) ClosedU -e !`_ fie r-ay:tom, Eanit&r Uwe F � ?? ?' 21 Pipe 12/20/2012 3- 3122 Sanitafy Sewor V.ip Lining 12/20/2012 33 31 23 Sanita Er7r,c4-Dip3 E lafgefne t 12/20/2012 333150 50 San taFy Sewer- co. 4ee C rreefieas and S »o L;na 04/26/2013 33 31 70 CembiaeAion Apr Val-ra-o; Eonitary Sewe~ > ~^^ "� 12/20/2012 3339 10 Ga&t in Place Generete Manholes 12/20/2012 33 39 20 Precast Concrete Manholes 12/20/2012 333930 Fibe~Rl ass > a-ffi el es 12/20/2012 2'2�o Wastewater- n eeess Chamber- (W n r4 12/20/2012 33-39-60 >rpeicy r : ^ s for- Sanitary Sewer Stmet fe 12/20/2012 3341 10 Reinforced Concrete Storm Sewer Pipe/Culverts 07/01/2011 P- 1 i 11 High Pefis t-y Pel.,ed+yleae (14P E) Pipe for- StKm Drail, 12/20/2012 ?ii 11 12 Reinfer-eed Pelyet>,lene (S"E) Pip 11/13/2015 33 4600 Subdrainagee 12/20/2012 33 4601 Slotted Stom Draim 07/01/2011 33 4602 Trench Dmino 07/01/2011 3349 10 Cast -in -Place Manholes and Junction Boxes 12/20/2012 33 49 20 Curb and Drop Inlets 12/20/2012 33 49 40 Storm Drainage Headwalls and Wingwalls 07/01/2011 Division 34 - Transportation 34 4 10 T a-ff.v figmr b 10/12/2015 34 n�OT Attachment A ControllerGabinet 12/18/2015 3n 4�02 Attachment B ControllerSpeeifcatisn 02/2012 34 ^�03 Attachment C —So€ faro Epoc on 01/2012 311 1I 11 Te"'~"~^~" T o 9igaz 11/22/2013 311 11 13 Removing Traffic fib l 12/20/2012 M 11 15 Rectangular P_ap;d Flaohing Beaeo 11/22/2013 34 41 16 Pedestrian Hybrid Signal 11/22/2013 34 41 20 Roadway Illumination Assemblies 12/20/2012 34 41 20.01 Arterial LED Roadway Luminaires 06/15/2015 3n n�0z 117,vi`ll ay LED DXi1 nwras 06/15/2015 34 ^�003 Residen ial :T-D Roadw Darsinairec 06/15/2015 34 4130 Alur. mum Egns 11/12/2013 Zil�o Single Merle Fite~ Optie Cable 02/26/2016 3471 13 Traffic Control 11/22/2013 CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Appendix Page 6 of 6 GE-4.01 Availabifit-y of La -ads GC-4.02 Subsurface and Physical Conditions GG 4.06 Lazardetts Etwir-eamental r,,, di fi .., at Site GG 6.06 Minar-it , and Women ONN od Buci x)00 I—Eintar-pf:ise GompBa"-Q GG 6.09 llefmits and Utilities GG4.✓I Nandisefiminatien GR-01 60 00 Product Requirements END OF SECTION CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised March 20, 2020 DIVISION 00 GENERAL CONDITIONS UTILITIES UNIT PRICE I31D 13idlisl j 1tein SECTION au 42 43 Dcvelojrcr Awarded Projects-11ROPOSAL FORM '1'radiIiort Phase 9A, Cily ProireI f1105255 Projcoi ]rein laformaiion Description L.H. Lacy Spccificntion Unit of Bid UrsiI Price Bid Value Section No. I IVImure I Quantity Water Facilities 1 0 24 1, 1118 4"-12" Pressure Plug 0241 14 EA 4 $212,80 $861.20 2 3305.0003 8" Wateriine Lowering 33 05 12 EA 14 $6.245.68 $87,439.52 3 3305.0109 Trench Safety 33 05 10 LF 7,775 $0,35 $2.721,25 4 3311.0001 Ductile Iran Water Fittings wl Restraint 3311 11 TON 1.6 $25.645,20 $41,032.32 5 3311.0241 8" PVC Water Pipe 33 11 l3' LF 7,476 $50.17 $375,070,92 0 3311.0264 8" PVC Water Pipe, CLSM Backfll 3311 12 LF 17 $194.19 $3,301.23 7 3311.0441 12" PVC Water Pipe 33 1 i 10, 3311 12 LF 282 $133.14 $37,546.48 8 3312.0001 Std. Fire Hydrant Assembly wl6" Gate Valve & Valve Box 33 12 40 EA 11 $6.494.79 $71,442.69 9 3312,0117 Connection to Existing 4"-12" Water Main 33 12 25 EA 3 $1.860,62 $4.981,86 10 3312,2003 1" Water Service (Domestic) 331210 EA 209 $1.487.95 $310,981.65 11 3312.3005 12" Gate Valve 33 12 20 EA 1 $4.362.37 $4,362.37 12 3312,3003 8" Gate Valve R Valve Box 33 12 20 ;A 20 $2,177.63 $43 552.60 Water Subtotal $983,&2.99 Sanitary Sewer Facilities 13 3301,0002 Past -CCTV Inspection 330134 LF 6770 $1.96 $13.269,20 14 3301.0101 Vacuum Test Manholes 3301 30 EA 33 $140.00 $4,620.00 15 3306.0109 Trench Safety 33 05 10 LF 6770 $0.94 $6,363.80 16 3305,0113 Trench Water Stops 330515 EA 13 $1,422.58 $18.493.54 17 3305.1003 20" Casing By Open Cut 3310522 LF 120 $219.54 $26,344.60 18 3305A103 20" Casing By other Than open Cut 33 05 22 LF 126 $540.38 $67,647.50 19 3331,3101 SDR-26 4" Sewer Services 33 31 50 EA 203 $1,288.14 $261.492.42 3311 10, 20 3331.4115 8" SDR•26 PVC Sewer Pipe 3331 12, LF 5740 $64.53 $370,402.20 33 31 20 21 3331.4116 W PVC Sanitary Sewer Pipe wl CS Backfil1 3311 10, 3311 12 LF 287 $123.53 $35,453.11 22 3331.4119 8" DIP Sewer Pipe 3311 10 LF 612 $147.81 $90,459.72 23 3331,4120 8" DIP Sewer Pi a, CSS Backfill 33 '11 10 LF 131 $198.73 $26,033.63 24 3339.0001 Epoxy Manhole Liner 33 39 60 VF 99 $532,00 $52,668.00 25 3339,1001 4' Std. Dia. Manhole 33 39 10, 33 39 20 EA 32 $5.669.69 $178,230.08 26 3339.1002 4' Drop Manhole 33 39 10, 33 39 20 EA 1 $12,730.60 $12,730.60 27 3339.1003 4'Extra Depth Manhole 33 39 10, 33 39 20 VF 114 $221.41 $25,240.74 1 26 9999.0001 deep Trench 13ackfil1 00 00 00 LF 441 $46.55 $20.628.65 29 9999,0002 Connect to Existinq Drop MH 00 00 00 EA 2 $8,008.44 $18,016.68 30 9999.0003 Connect to Existing 8" S.S. 00 00 00 EA 1 $1.230.71 $1,230.71 31 9999,0004 Connect to Existinq 10" S.S. 00 00 00 EA 2 $2.234.87 $4,469.74 sanitary Sewer Subtotal $11231,698.22 CITY OFFORT WOR131 TrzJilioa T%w 9A STANDARD COPS i RUCr IM 1111) PROI'OSAI: DaW 0VF.It AWARF71•t1 PRI)JECTS City- lwja t 0 1052 55 Pwln Re.i ud 7+a'<lq 29, 2WO W 42 43_ 3W "A SEC1'1t7100 -12 43 Developer Aworded Projects - PRCI'OSA1, FORM Tradition Phase 9A, City Project 11105255 UNIT PRICE BID IProject Hem Informalion I -A Lacy Bidlisi Specification Ullit or Bid Item llescriptimi j Seclion No. I Measure I Qnanlity unit Price I laid Value I Storm Drain Facilities 32 0241.0800 Remove Rip Rap 0241 13 SY 12 $48.25 $579.00' 33 0241.4401 Remove Ex. Headwall 02 41 14 EA 1 $852,96 $852.96 34 0241.3021 Remove 42" Storm Line 0241 14 LF 28 S32.55 $91640 35 3137.0102 Large Sion RIprap, dry 31 37 00 SY 74 $196.00 . $14.504.00 36 3137,0104 Medium Riprap, dry 31137 00 SY 1,500 $140.00 $210,000.Fo 37 3305.0109 Trench Safel/yy 3305 10 LF 5.580 $0.63 $3,515.40 38 3305,0112 Concrete COLF 330517 EA 10 $810.92 $8.109.20 39 3341.0201 211" RCP, Class III 33411 10 LF 835 $86.59 $72,302.65 40 3341.0205 24" RCP, Class 111 3341 10 LF 573 $94.18 $53,965.14 41 3341,0208 27" RCP, Class 111 3341 10 LF 417 $108,26 $45,144.42 42 3341.0302 30" RCP, Class 111 3341 10 LF 438 $119.70 $52.428.60 43 3341,0309 36" RCP, Class 111 3341 10 LF 636 $160.80 $102.268.80 44 3341.002 42" RCP, Class 111 3341 10 LF 467 $212.70 $99,386.90 45 3341.0409 48" RCP, Class 111 3341 10 LF 588 $257.70 $151.527.60 46 3341,1201 5x3 Box Culvert 3341 10 LF 554 $409.22 $226.707.88 47 3341.1501 8x4 Box Culvert 33 41 10 LF 581 $686.71 $398,978.51 48 3341.1601 9x4 Box Culvert 34411 10 LF 491 $704.75 $390,222.25 49 3349.0001 4' Storm Junction Box 33 49 10 EA 3 $5,880.00 $17.640.00 50 3349,0002 5' Storm Junction Sax 33 49 10 EA 3 $8,232.00 $24.696.00 51 3349.0101 3' Round Manhole Riser 33 49 10 FA 4 $4,266.00 $17,024.00 52 3349.4104 21" SET, 1 pipe 334940 EA 2 $2.240.00 $4.480.00 53 3349,4105 24" SET, 1 pippe 33 49 40 EA 1 $2.464.00 $2.464.00 54 3349.4109 36' SET, 1 9pe 33 49 40 EA 1 $3,360.00 $3,360.00 55 3349,5001 10' Curb inlet 334920 EA 9 $7.280.00 $65.520.00 56 3349.6002 15' Curb Inlet 33 49 20 EA 16 $9.13ftoo $155,008.00 57 3349.7001 4' drop Inlet 33 49 20 FA 6 $7,000.00 $42.000.00 58 9999.0001 Connect to Exisiting RCP 00 00 00 EA 1 $1,174.96 $1,174.96 59 9 99 9.0 002 Parallel Headwall, 2 - 5' x T Boxes 00 00 00 EA 1 $2I,280,00 $21.280.00 60 9999.0003 4' x 14' Storm Junction Box 00 00 00 EA 2 $27.048.00 $54��096.00 Storm Drain subtotal $2,240,091.67 WaterlSanitary SewarlStorm Drain Facilities Subtotal $4,484,969.88 Bid SLInlmaN Water/Sanitary Sower/Storm Drain Facilities Subtolal I $4,454,969.88 Total Bid $4,454,969.8B This bld is submitted by the entity listed below: Company., L.H. Lacy Company, Ltd. By: Street Address: 1880 Crown Dr. Suite i200 City, State, Zip Code: Dallas, TX 75234 - - Phone: 214-357-0146 n Sfgn Title: it{r`- j"'r ` Cr Date: 15 `! Yj Con Irnctorngrees to enml,IV lc 5►'(SRK far F1NA1.,►CCEFTA NCR wilhin85 work Ingdnys nker Iliednte when the CONTR+►CTcamorcnre$1u run M 11rarlded in the Crnernl CID ndWeus. END or 5 ECTIUY MY Y OF FORT ► lmi I1 Tr4WQn Ph- 9A SIAA'OAU CONST Rue T ION 130 PROPOSAL DEVC1.01 rR A►VAROF:l1 PROIFC TS CRY IYajal C 05255 Fwm Roi nd 1hn•+ur 29. "a U DOdl d7_4SiJ I'+yu++l 0045 12 DAP PREQUALIPICATION STATEMENT Page I of I SECTION 00 4512 DAP — PREQUALIFICATION STATEMENT Each Bidder is required to complete the information below by identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed. In the "Maior Work Tvne" box provide the complete maior work tvpe and actual description as provided by the Water Department for water and sewer and TPW for pavina. Major Work Type Water and Wastewater New Development, Rehabilitation, and Redevelopment Open Cut (16- inches and Cinder) Concrete Construction/Reconstruction <15,000 SY Contractor/Subcontractor Company Name Prequalification Expiration Date L.H. Lacy Company, Ltd. 04/30/2025 The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are currently prequalified for the work types listed. BIDDER: L.H. Lacy Company, Ltd. 1880 Crown Dr. 41200 Dallas, TX 75234 l ie -M" ( p3ganature] TITLE: P[Q rA,,, - C es DATE: END OF SECTION CITY OF FORT WORTH Traditlon Phase DA, CPN 105255 STAN QARD CONSTRU CTION PREQUALI FICATION STATEMENT— i7EVELOPER AWARDED PROJECTS 00 45 12_Prequai if icatlon Statement 2015_DAP Form Version September 1, 2015 00 45 26 - 1 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Page I of 1 SECTION 00 45 26 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Pursuant to Texas Labor Code Section 406,096(a), as amended, Contractor certifies that it provides worker's compensation insurance coverage for all of its employees employed on City Project No. 105255 . Contractor further certifies that, pursuant to Texas Labor Code, Section 406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with worker's compensation coverage. CONTRACTOR: L.H. Lacy Company, Ltd. By: Company 1880 Crown Dr. #1200 Signature: Address Dallas, TX 75234 Title: City/State/Zip THE STATE OF TEXAS COUNTY OF TARRANT 1) Pa,A N, I C e0 BEFORE ME, the undersigned authority, on this day, personally appeared tk,� vn to me to be the person whose naive is subscribed to the foregoinP instru nit, an acknowledged to me that he/she executed the same as the act and deed ofl_.�k ,L Ca_k I t , or the purposes and consideration therein expressed and in the capacity therein stated. I GIVF-N UNDER MY HAND AND SEAL OF OFFICE this day of 52024. DARLID #CONEY �� n Naiary IQ #Sp3}7301 1L]l.natre My :amr clan Expires N Pub tc in and for Texas Mach 9, 2028 Y END OF SECTION CITY OF FORT WORTH Tradition Please 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project # 105255 Revised April 2, 2014 00 52 43 - 1 Developer Awarded Project Agreement Pagel of 4 SECTION 00 52 43 AGREEMENT THIS AGREEMENT, authorized on 08/09/2024 is made by and between the Developer. Ashton Dallas Residential. LLC authorized to do business in Texas and Contractor. L.H. Lacv Comnanv, Ltd. authorized to d❑ business in Texas, acting by and through its duly authorized representative. Developer and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as follows: Article 1. WORE: Contractor shall complete all Work as specified or indicated in the Contract Documents for the Project identified herein. Article 2. PROJECT The project for which the Work under the Contract Documents may be the whole or only a part is generally described as follows: Tradition Phase 9A 0tv Proieet 9105255 P'ID #301T4-0200431-105255-E07685 Article 3. CONTRACT TIME 3.1 Time is of the essence. All time limits for Milestones, if any, and Final Acceptance as stated in the Contract Documents are of the essence to this Contract. 3.2 Final Acceptance. The Work will be complete for Final Acceptance within 85 working days after the date when the Contract Time commences to run as provided in Paragraph 12.04 of the Standard City Conditions of the Construction Contract for Developer Awarded Projects. 3.3 Liquidated damages Contractor recognizes that time is of the essence of this Agreement and that Developer will suffer financial loss if the Work is not completed within the times specified in Paragraph 3.2 above, plus any extension thereof allowed in accordance with Article 10 of the Standard City Conditions of the Construction Contract for Developer Awarded Projects. The Contractor also recognizes the delays, expense and difficulties involved in proving in a legal proceeding the actual loss suffered by the Developer if the Work is not completed on time. Accordingly, instead of requiring any such proof , Contractor agrees that as liquidated damages for delay (but not as a penalty), Contractor shall pay Developer Two Hundred & Fifty Dollars ($250.00) for each day that expires after the time specified in Paragraph 3.2 for Final Acceptance until the City issues the Final Letter of Acceptance. CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DAP City Project 4105255 Revised .Tune 16,7016 005243 -2 Developer Awarded Project Agreement Page 2 of 4 Article 4. CONTRACT PRICE Developer agrees to pay Contractor for performance of the Work in accordance with the Contract Documents an amount in current funds of Four Million Four Hundred Fiftv Four Thousand Nine Hundred Sixty Nine & 88/100 Dollars ($4,454,969.88) Article 5. CONTRACT DOCUMENTS 5.1 CONTENTS: A. The Contract Documents which comprise the entire agreement between Developer and Contractor concerning the Work consist of the following: 1. This Agreement. 2. Attachments to this Agreement: a. Bid Form (As provided by Developer) 1) Proposal Form (DAP Version) 2) Prequalification Statement b. Insurance ACORD Form(s) c. Payment Bond (DAP Version) d. Performance Bond (DAP Version) e. Maintenance Bond (DAP Version) f. Power of Attorney for the Bonds g. Worker's Compensation Affidavit 3. Standard City General Conditions of the Construction Contract for Developer Awarded Projects, 4. Specifications specifically made a part of the Contract Documents by attachment or, if not attached, as incorporated by reference and described in the Table of Contents of the Project's Contract Documents. 5. Drawings. 6. Addenda. 7. Documentation submitted by Contractor prior to Notice of Award. The following which may be delivered or issued after the Effective Date of the Agreement and, if issued, became an incorporated part of the Contract Documents: a, Notice to Proceed. b. Field Orders. c. Change Orders. d. Letter of Final Acceptance. CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DAP City Project 4 105255 Revised June 16, 2016 00 52 43 - 3 DeveIoper Akvarded Project Agreement Page 3 of 4 Article 6. INDEMNIFICATION 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the city, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the contractor, its officers, agents, employees, subcontractors, licenses or invitees under this contract. This indemnification provision is svecifically intended to overate and be effective even if it is alleged or proven that all or some of the damaees being. sought were caused, in whole or in Dart. by any act, omission or neelieence of the city. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the city in defending against such claims and causes of actions. 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the city, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the city, arising out of, or alleged to arise out of, the work and services to be performed by the contractor, its officers, agents, employees, subcontractors, licensees or invitees under this contract. This indemnification provision is specifically intended to overate and be effective even if it is alleged or proven that all or some of the damages being soueht were caused. in whole or in Dart. by anv act, omission or neelizence of the city. Article 7. MISCELLANEOUS 7.1 Terms. Terms used in this Agreement are defined in Article 1 of the Standard City Conditions of the Construction Contract for Developer Awarded Projects. 7.2 Assignment of Contract. This Agreement, including all of the Contract Documents may not be assigned by the Contractor without the advanced express written consent of the Developer. 7.3 Successors and Assigns. Developer and Contractor each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, in respect to all covenants, agreements and obligations contained in the Contract Documents. 7.4 Severability. Any provision or part of the Contract Documents held to be unconstitutional, void or unenforceable by a court of competent jurisdiction shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon DEVELOPER and CONTRACTOR. 7.5 Governing Law and Venue. This Agreement, including all of the Contract Documents is performable in the State of Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the Northern District of Texas, Fort Worth Division, CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DAP City Project 4105255 Revised June 16, 2016 00 52 43 - 4 Developer Awarded Project Agreement Page 4 of 4 7.6 Authority to Sign. Contractor shall attach evidence of authority to sign Agreement, if other than duly authorized signatory of the Contractor. IN WITNESS WIEREDF, Developer and Contractor have executed this Agreement in multiple counterparts. This Agreement is effective as of the last date signed by the Parties ("Effective Date"). Contractor: L.H. Lacy Company, Ltd. By: � (Si ature) (Pr ted Name) Title: pa'A " Cl. Company Name: L.H. Lacy Company, Ltd. Address: 1880 Crown Dr. 91200 Dallas, TX 75234 Date: � 1 �) 1 I � 1 Developer: Ashton Dallas Residential, LLC By: Signature] (Printed Name) Title: Company Name: Ashton Dallas Residential, LLC Address: 1800 Valley View Lane 9100 Farmers Branch, TX 75234 Date: S 11 q It 2-9 CITY OF FORT WORTH Tradition Please 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DAP City Project # 10525 5 Revised June [ 6. 2016 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. CONTRACTOR'S BLANKET FLEX ADDITIONAL INSURED ENDORSEMENT - FORM A This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART Policy Number CPP20675291501 Policy Expiration Date 02/01/2025 Named Insured L. H. Lacy Company, Ltd. Agency Number 0765330 Date 02/01/2024 Agency BOWEN MICLETTE & BRITT LLC Policy Effective Date 02/01/2024 Account Number 20017633 Issuing Company AMERISURE INSURANCE COMPANY A. SECTION II -WHO IS AN INSURED is amended to add as an additional insured: 1. Any person ororganization with whom you have agreed in a "written agreement' that such person or organization be added as an additional insured on this policy, and any other person or organization you are required to add as an additional insured under such "written agreement". 2. If "your work" began under a written letter of intent or written work order, any person or organization who issued the written letter of intent or written work order, but: a. such coverage will apply only for 30 calendar days following the date the written letter of intent or written work order was issued; and b. the person or organization is an additional insured only for, and to the extent of, liability arising out of "bodily injury", "property damage", or "personal and advertising injury" caused, in whole or in part, by your negligent acts or omissions, or the negligent acts or omissions of others working on your behalf, in the performance of your work as specified in the written letter of intent or written work order. This coverage does not apply to liability arising out of the independent acts or omissions of the additional insured. For the purposes of the coverage provided by this endorsement, a "written agreement' means a written contract or written agreement that: 1. requires you to include a person or organization as an additional insured for a period of time during the policy period; and 2. is executed prior to the occurrence of "bodily injury", "property damage", or "personal and advertising injury" that forms the basis for a claim under this policy. The insurance provided by this endorsement does not apply to any person or organization that is specifically listed as an additional insured on another endorsement attached to this policy. CG 73 24 03 23 Includes copyrighted material of the Insurance Services Office, Inc., with its permission Page 1 of 3 Policy Number: CPP20675291501 Effective Date: 02/01/2024-02101/2025 B. The coverage provided to any person or organization added as an additional insured pursuant to Paragraph A.1 is limited as follows: 1. If the "written agreement" specifically and exclusively requires you to name the person or organization as an additional insured using the ISO CG 20 10 endorsement with edition dates of 11 85 or 10 01, or the ISO CG 20 37 10 01 endorsement, that person or organization is an additional insured, but only with respect to liability for "bodily injury", "property damage", or "personal and advertising injury" arising out of "your work" for that insured by or for you. 2. If the "written agreement" requires you to name the person or organization as an additional insured using the ISO CG 20 10 and or CG 20 37 endorsements without specifically and exclusively requiring the 11 85 or 10 01 edition dates, that person or organization is an additional insured, but only with respect to liability for "bodily injury", "property damage", or "personal and advertising injury" caused, in whole or in part, by your acts or omissions or the acts or omissions of those acting on your behalf. 3. If the "written agreement" requires you to name the person or organization as an additional insured for operations arising out of your work and does not specify an ISO additional insured endorsement, that person or organization is an additional insured, but only with respect to liability for "bodily injury", "property damage", or "personal and advertising injury" arising out of your acts or omissions, or the acts or omissions of others working on your behalf, in the performance of your work as specified in the "written agreement". This coverage does not apply to liability arising out of the sole negligence of the additional insured unless specifically required in the "written agreement". 4. If none of the above paragraphs apply, then the person or organization is an additional insured only for, and to the extent of, liability arising out of "bodily injury", "property damage", or "personal and advertising injury" caused, in whole or in part, by your negligent acts or omissions, or the negligent acts or omissions of others working on your behalf, in the performance of your work as specified in the "written agreement". This coverage does not apply to liability arising out of the independent acts or omissions of the additional insured. However, the insurance afforded to such additional insured only applies to the extent permitted by law. C. The insurance provided to an additional insured under this endorsement does not apply to: "Bodily injury" or "property damage" included in the "products -completed operations hazard" unless the "written agreement" specifically requires such coverage (including by specifically requiring the CG 20 10 11 85). To the extent the "written agreement" requires such coverage for a specified amount of time, the coverage provided by this endorsement is limited to the amount of time required for such coverage by the "written agreement". 2. "Bodily injury", "property damage", or "personal and advertising injury" arising out of an architect's, engineer's, or surveyor's rendering of, or failure to render, any professional services, including but not limited to: The preparing, approving, or failing to prepare or approve: (1) Maps; (2) Drawings; (3) Opinions; (4) Reports; (5) Surveys; (6) Change orders; CG 73 24 03 23 Includes copyrighted material of the Insurance Services Office, Inc., with its permission Page 2 of 3 Policy Number: CPP20675291501 Effective Date: 02/01/2024-02/01/2025 (7) Design specifications; and b. Supervisory, inspection, or engineering services. D. The limits of insurance that apply to the additional insured are the least of those specified in the "written agreement" or declarations of this policy. Coverage provided by this endorsement for any additional insured shall not increase the applicable Limits of Insurance shown in the Declarations. The limits of insurance that apply to the additional insured are inclusive of, and not in addition to, the Limits of Insurance shown in the Declarations. E. With respect to the coverage provided by this endorsement, SECTION IV— COMMERCIAL GENERAL LIABILITY CONDITIONS, Paragraph 4. Other Insurance is deleted and replaced with the following: 4. Other Insurance. a. Coverage provided by this endorsement is excess over any other valid and collectible insurance available to the additional insured whether: (1) Primary; (2) Excess; (3) Contingent; or (4) On any other basis. In addition, this insurance is excess over any self -insured retentions, deductibles, or captive retentions payable by the additional insured or payable by any person or organization whose coverage is available to the additional insured. However, if the "written agreement" requires primary and non-contributory coverage, this insurance will be primary and non-contributory relative only to the other insurance available to the additional insured which covers that person or organization as a Named Insured, and we will not share with that other insurance. For any other insurance available to the additional insured where that person or organization is not a Named Insured, this policy will share coverage with that other insurance based on the terms specified in Paragraph b. Method of Sharing below. b. Method of Sharing If all the other insurance permits contribution by equal shares, we will follow this method also. Under this method, each insurer contributes equal amounts until it has paid its applicable limit of insurance or none of the loss remains, whichever comes first. If any of the other insurance does not permit contribution by equal shares, we will contribute by limits. Under this method, each insurer's share is based on the ratio of its applicable limit of insurance to the total applicable limits of insurance of all insurers. CG 73 24 03 23 Includes copyrighted material of the Insurance Services Office, Inc., with its permission Page 3 of 3 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. CONTRACTOR'S BLANKET FLEX ADDITIONAL INSURED ENDORSEMENT - FORM A This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART Policy Number CPP20675291501 Policy Expiration Date 02/01/2025 Named Insured L. H. Lacy Company, Ltd. Agency Number 0765330 Date 02/01/2024 Agency BOWEN MICLETTE & BRITT LLC Policy Effective Date 02/01/2024 Account Number 20017633 Issuing Company AMERISURE INSURANCE COMPANY A. SECTION II -WHO IS AN INSURED is amended to add as an additional insured: 1. Any person ororganization with whom you have agreed in a "written agreement' that such person or organization be added as an additional insured on this policy, and any other person or organization you are required to add as an additional insured under such "written agreement". 2. If "your work" began under a written letter of intent or written work order, any person or organization who issued the written letter of intent or written work order, but: a. such coverage will apply only for 30 calendar days following the date the written letter of intent or written work order was issued; and b. the person or organization is an additional insured only for, and to the extent of, liability arising out of "bodily injury", "property damage", or "personal and advertising injury" caused, in whole or in part, by your negligent acts or omissions, or the negligent acts or omissions of others working on your behalf, in the performance of your work as specified in the written letter of intent or written work order. This coverage does not apply to liability arising out of the independent acts or omissions of the additional insured. For the purposes of the coverage provided by this endorsement, a "written agreement' means a written contract or written agreement that: 1. requires you to include a person or organization as an additional insured for a period of time during the policy period; and 2. is executed prior to the occurrence of "bodily injury", "property damage", or "personal and advertising injury" that forms the basis for a claim under this policy. The insurance provided by this endorsement does not apply to any person or organization that is specifically listed as an additional insured on another endorsement attached to this policy. CG 73 24 03 23 Includes copyrighted material of the Insurance Services Office, Inc., with its permission Page 1 of 3 Policy Number: CPP20675291501 Effective Date: 02/01/2024-02101/2025 B. The coverage provided to any person or organization added as an additional insured pursuant to Paragraph A.1 is limited as follows: 1. If the "written agreement" specifically and exclusively requires you to name the person or organization as an additional insured using the ISO CG 20 10 endorsement with edition dates of 11 85 or 10 01, or the ISO CG 20 37 10 01 endorsement, that person or organization is an additional insured, but only with respect to liability for "bodily injury", "property damage", or "personal and advertising injury" arising out of "your work" for that insured by or for you. 2. If the "written agreement" requires you to name the person or organization as an additional insured using the ISO CG 20 10 and or CG 20 37 endorsements without specifically and exclusively requiring the 11 85 or 10 01 edition dates, that person or organization is an additional insured, but only with respect to liability for "bodily injury", "property damage", or "personal and advertising injury" caused, in whole or in part, by your acts or omissions or the acts or omissions of those acting on your behalf. 3. If the "written agreement" requires you to name the person or organization as an additional insured for operations arising out of your work and does not specify an ISO additional insured endorsement, that person or organization is an additional insured, but only with respect to liability for "bodily injury", "property damage", or "personal and advertising injury" arising out of your acts or omissions, or the acts or omissions of others working on your behalf, in the performance of your work as specified in the "written agreement". This coverage does not apply to liability arising out of the sole negligence of the additional insured unless specifically required in the "written agreement". 4. If none of the above paragraphs apply, then the person or organization is an additional insured only for, and to the extent of, liability arising out of "bodily injury", "property damage", or "personal and advertising injury" caused, in whole or in part, by your negligent acts or omissions, or the negligent acts or omissions of others working on your behalf, in the performance of your work as specified in the "written agreement". This coverage does not apply to liability arising out of the independent acts or omissions of the additional insured. However, the insurance afforded to such additional insured only applies to the extent permitted by law. C. The insurance provided to an additional insured under this endorsement does not apply to: "Bodily injury" or "property damage" included in the "products -completed operations hazard" unless the "written agreement" specifically requires such coverage (including by specifically requiring the CG 20 10 11 85). To the extent the "written agreement" requires such coverage for a specified amount of time, the coverage provided by this endorsement is limited to the amount of time required for such coverage by the "written agreement". 2. "Bodily injury", "property damage", or "personal and advertising injury" arising out of an architect's, engineer's, or surveyor's rendering of, or failure to render, any professional services, including but not limited to: The preparing, approving, or failing to prepare or approve: (1) Maps; (2) Drawings; (3) Opinions; (4) Reports; (5) Surveys; (6) Change orders; CG 73 24 03 23 Includes copyrighted material of the Insurance Services Office, Inc., with its permission Page 2 of 3 Policy Number: CPP20675291501 Effective Date: 02/01/2024-02/01/2025 (7) Design specifications; and b. Supervisory, inspection, or engineering services. D. The limits of insurance that apply to the additional insured are the least of those specified in the "written agreement" or declarations of this policy. Coverage provided by this endorsement for any additional insured shall not increase the applicable Limits of Insurance shown in the Declarations. The limits of insurance that apply to the additional insured are inclusive of, and not in addition to, the Limits of Insurance shown in the Declarations. E. With respect to the coverage provided by this endorsement, SECTION IV— COMMERCIAL GENERAL LIABILITY CONDITIONS, Paragraph 4. Other Insurance is deleted and replaced with the following: 4. Other Insurance. a. Coverage provided by this endorsement is excess over any other valid and collectible insurance available to the additional insured whether: (1) Primary; (2) Excess; (3) Contingent; or (4) On any other basis. In addition, this insurance is excess over any self -insured retentions, deductibles, or captive retentions payable by the additional insured or payable by any person or organization whose coverage is available to the additional insured. However, if the "written agreement" requires primary and non-contributory coverage, this insurance will be primary and non-contributory relative only to the other insurance available to the additional insured which covers that person or organization as a Named Insured, and we will not share with that other insurance. For any other insurance available to the additional insured where that person or organization is not a Named Insured, this policy will share coverage with that other insurance based on the terms specified in Paragraph b. Method of Sharing below. b. Method of Sharing If all the other insurance permits contribution by equal shares, we will follow this method also. Under this method, each insurer contributes equal amounts until it has paid its applicable limit of insurance or none of the loss remains, whichever comes first. If any of the other insurance does not permit contribution by equal shares, we will contribute by limits. Under this method, each insurer's share is based on the ratio of its applicable limit of insurance to the total applicable limits of insurance of all insurers. CG 73 24 03 23 Includes copyrighted material of the Insurance Services Office, Inc., with its permission Page 3 of 3 SECTION 00 6213 PERFORMANCE BOND THE STATE OF TEXAS § COUNTY OF TARRANT § That we, L.H. Lacv Comnanv. Ltd, Great American Insurance Company 0062 13- 1 PERFORMANCE BOND Page 1 of Bond Number: 5316990 KNOW ALL BY THESE PRESENTS; . known as "Principal" herein and, a corporate so rety (sureties, if more than one) duly authorized to do business in the State of Texas, known as "Surety" herein (whether one or more), are held and firmly bound unto the Developer, Ashton Dallas Residential. LLC , authorized to do business in Texas ("Developer") and the City of Fort Worth, a Texas municipal corporation ("City"), in the penal sum of, Four Million Four Hundred Fifty Four Thousand Nine Hundred Sixtv Nine & 88/100 Dollars f$4.454.969.881 , lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas for the payment of which sum well and truly to be made jointly unto the Developer and the City as dual obligees, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, Developer and City have entered into an Agreement for the construction of community facilities in the City of Fort Worth by and through a Community Facilities Agreement, CFA Number 24-0075 ;and WHEREAS, the Principal has entered into a certain written contract with the Developer awarded the 9th day of August , 2024, which Contract is hereby referred to and made a part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment labor and other accessories defined by law, in the prosecution of the Work, including any Change Orders, as provided for in said Contract designated as Tradition Phase 9A. NOW, THEREFORE, the condition of this obligation is such that if the said Principal shall faithfully perform it obligations under the Contract and shall in all respects duly and faithfully perform the Work, including Change Orders, under the Contract, according to the plans, specifications, and contract documents therein referred to, and as well during any period of extension of the Contract that may be granted on the part of the Developer and/or City, then this obligation shall be and become null and void, otherwise to remain in full force and effect. PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division. CITY OF FORT WORTH Tradition Phase 9A STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project # 105255 Revised January 31, 2012 006213-2 PERFORMANCE BOND Page 2 of 2 This bond is made and executed in compliance with the provisions of Chapter 2253 of the Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said statue. IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED this instrument by duly authorized agents and officers on this the 9th day of August , 2024. ATTEST: n (Da l) ecretary Witness as to Principal 4 Wit /ssss to Surety David T. Miclette PRINCIPAL: L.H. Lacy Company, Ltd. BY: _ 5ignatur &t Jj OJT- L Narhe and Title Address: 1880 Crown Dr.. Suite 1200 Dallas. TX 792.34 SURETY: Great American Insurance Company BY: —lug 'ture Ashley Britt,, Attorney -In -Fact Name and Title Address: 301 E. Fourth Street Cincinnati. ❑H 45202 Telephone Number: (513) 369-5000 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH Tradition Phase 9A STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project # 105255 Revised January 31, 2012 SECTION 00 62 14 PAYMENT BOND THE STATE OF TEXAS § COUNTY OF TARRANT § 0062 14 - 1 PAYMENTSOND Page 1 of 2 Bond Number: 5316990 KNOW ALL BY THESE PRESENTS: That we, L.H. Laev COMDanv. Ltd. known as "Principal" herein, and Great American Insurance Companv . a corporate surety ( or sureties if more than one), duly authorized to do business in the State of Texas, known as "Surety" herein (whether one or more), are held and firmly bound unto the Developer, Ashton Dallas Residential, LLC , authorized to do business in Texas "(Developer"), and the City of Fort Worth, a Texas municipal corporation ("City"), in the penal sum of Four Million Four Hundred Fifty Four Thousand Nine Hundred Sixty Nine & 881100 Dollars ($4.454.969.88). lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for the payment of which sum well and truly be made jointly unto the Developer and the City as dual obligees, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents: WHEREAS, Developer and City have entered into an Agreement for the construction of community facilities in the City of Fort Worth, by and through a Community Facilities Agreement, CFA Number 24-0075 ; and WHEREAS, Principal has entered into a certain written Contract with Developer, awarded the 9th day of Auaust . 2024, which Contract is hereby referred to and made a part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment, labor and other accessories as defined by law, in the prosecution of the Work as provided for in said Contract and designated as Tradition Phase 9A. NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under the Contract, then this obligation shall be and become null and void; otherwise to remain in full force and effect. CITY OF FORT WORTH Tradition Phase 9A STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project 4105255 Revised January 31, 2012 006214-2 PAYMENT BOND Page 2 of 2 This bond is made and executed in compliance with the provisions of Chapter 2253 of the Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said statute. IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED this instrument by duly authorized agents and officers on this the 9th day of August , 2024. ATTEST: Pri ipai} Secretary Witness as to Principal ATTEST: (Surety) SUMSUMMW l koie .Jeannette, Witness Witness as to Surety David T. Miclette PRINCIPAL: L.H. Lacy Company. Ltd. BY: Signature &I"i C.,L Name add Title Address: 1880 Crown Dr., Suite 1200 Dallas, TX 75234 SURETY: Great American Insurance Company BY: Sign ure Ashlev Britt. Attornev-ln-Fact Name and Title Address: 301 E. Fourth Street Cincinnati, OH 45202 Telephone Number: (513) 359-5000 Note: If signed by an officer of the Surety, there must be on file a certified extract from the bylaws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH Tradition Phase 9A STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project N 105255 Revised January 31, 2012 SECTION 00 62 19 MAINTENANCE BOND THE STATE OF TEXAS § COUNTY OF TARRANT § 0062 19- 1 MAINTENANCE BOND Page I of 3 Bond [Dumber: 5315990 KNOW ALL BY THESE PRESENTS: That we, L.H. Laev Comnanv. Ltd. , known as "Principal" herein and Great American Insurance Company a corporate surety (sureties, if more than one) duly authorized to do business in the State of Texas, known as "Surety" herein (whether one or more), are held and firmly bound unto the Developer, Ashton Dallas Residential, LLC authorized to do business in Texas ("Developer") and the City of Fort Worth, a Texas municipal corporation ("City"), in the sum of Four Million Four Hundred Fiftv Four Thousand Nine Hundred Sixty Nine & 88/100 Dollars ($4,454,969.88) , lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for payment of which sum well and truly be made jointly unto the Developer and the City as dual obligees and their successors, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, Developer and City have entered into an Agreement for the construction of community facilities in the City of Fort Worth by and through a Community Facilities Agreement, CFA Number 24-0075 : and WHEREAS, the Principal has entered into a certain written contract with the Developer awarded the 9th day of Auqust , 2024, which Contract is hereby referred to and a made part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment labor and other accessories as defined by law, in the prosecution of the Work, including any Work resulting from a duly authorized Change Order (collectively herein, the "Work") as provided for in said Contract and designated as Tradition Phase 9A, and; WHEREAS, Principal binds itself to use such materials and to so construct the Work in accordance with the plans, specifications and Contract Documents that the Work is and will remain free from defects in materials or workmanship for and during the period of two (2) years after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and CITY OF FORT WORTH Tradition Phase 9A STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project #105255 Revised January 31, 2012 006219-2 MAINTENANCE BOND Page 2 of 3 WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part upon receiving notice from the Developer and/or City of the need thereof at any time within the Maintenance Period. NOW THEREFORE, the condition of this obligation is such that if Principal shall remedy any defective Work, for which timely notice was provided by Developer or City, to a completion satisfactory to the City, then this obligation shall become null and void; otherwise to remain in full force and effect. PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely noticed defective Work, it is agreed that the Developer or City may cause any and all such defective Work to be repaired and/or reconstructed with all associated costs thereof being borne by the Principal and the Surety under this Maintenance Bond; and PROVIDED FURTHER, that if any legal action be flied on this Bond, venue shall lie in Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division; and PROVIDED FURTHER, that this obligation shall be continuous in nature and successive recoveries may be had hereon for successive breaches. CITY OF FORT WORTH Tradition Phase 9A STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project # 105255 Revised January 31, 2012 006219-3 MAINTENANCE BOND Page 3 of 3 IN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this instrument by duly authorized agents and officers on this the 9th day of August , 2024. PRINCIPAL: L.H. Lacy Company, Ltd. ATTEST: ]� P cipa[} Secretary Witness as to Principal ATTEST: (Surety)ate ole Jeannette, Witness r• :/ness'as to Surety pavid T. Miclett BY: Signaturz) — __K�Li. "�'__ pa .j ca. Nan e and Title Address: 1880 Crown Dr.. Suite 1200 Dallas. TX 75234 SURETY: Great American Insurance Company BY.( /Attorney-in-Fact SAshley Bri Name and Title Address: 301 E. Fourth Street —Cincinnati, OH 452a7 Telephone Number: (5131369-5000 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the band shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH Tradition Phase 9A STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project #105255 Revised January 31, 2012 GREAT AMERICAN INSURANCE CCMPANYO Administrative Office: 301 E 4TH STREET • CINCINNATI, OHIO 45202 • 513-369-5000 • FAX 513-723-2740 Tile nunibcr of persons authorized by this power of attorney is tent mare than Fourteen No.0 22183 POWER OFATTORNEY KNOW ALLMEN BY141ESE PRESENTS: That the (AI:ATAMERICAN INSURANCE COMPANY, a corporation organized and exisling under and by virlue orthe laws of the Slate of Ohio, does hereby nominate, eonslittile and appoint the person or persons named below, each individually irmore than one is named, its true and lawful a11orney-in-riiteI, ror it and in its nntile, place and stead to ex cc tile on bell aIf orIlie said Company, as surely, any and all bonds, undertakings and contracts or suretyship, or other written obligalions in (lie nature thereof; provided that the liability or the said Conlpany on any such bond, undenirking or contract of suretyship cxccutCCI under this authorily shall not exceed the iliniI stated beio%v. Naive Address Limit of Power Stacey Bosley Nikole Jeannette Lucas Lomax All Ashley Britt David T. Miclette Norma Toups $100.000,000 Jennifer Mitchell Lacey Hitchcock Will Duke Robert M. Overbey, Jr. All of Rita G. Gulizo Stacy Owens Houston, Texas Robert C. Davis Harry K. McCord This Power ol'Anorney revokes all previous powers issued oil behall'of (lie altomey(s)-in-Fact named above. IN WITNESS WI IEREOF the GREATAMERICAN INSURANCE COMPANY has caused these presents to be signed and attested by its appropriate officers and its corporate seal hereunto affixed this 18th day of September 2023 Attest GREATAMERWAN RINSUIdANCECOMPAN L4��irrri� _ ' i`,a2r2 �, • s . -� 7 !T/ ICI ~/ :l.sirrrirar Sie•rY•rrir•i' ❑i+•irtriirerl Scirtrri• f'frti' Prxsietrrrr STATE OF 01110, COUNTY OF HAMILTON - ss: MARK viCARiv(977-377-2405) (air this ISth day of September 2023 , before me personallyappeam l MARK VICARiO, to me known. being duly swum, dlelhuses and says that he resides in Cincinnati, Ohio, that lie is a Divisional Senior Vice President or the Bund Division or Great American insurance Company, the Company described in and which executed the above instrument; that he knows the seat or(lie said Company; that Ilse seal affixed to the said instrument is such corporate seal; Ili aI it was so aIll xed by authority of his office under the lay -Laws of said Company, and that lie signed his name thereto by like authority, SUSAN AKOHORST o Notary Public - State of Ohio My Comm. Expires May 19, 2025 This PowerorAttomey is granted by aullhority of the following resolulions adopied by the Huns•[ of Directors orGrcal Anu:ricasi Insumnce Company by unaninhous written consent dated June 9, 2008. RF.S01.1 F.'1]: Thal the Divisional Pivsident, the ser•erai Ditirio►►al Se►riur ! 1ve Pr•rsidelas. Divisional 1 ice P►rside► is fruit !]r+'icouril�fssi.rinrrl lire Pivs*Ienls, or airy one r?f them, he and he► bi, is aulho►•izedf fi"m dare to little, 10 appoi►lt u►re fee' rrrnrr.11rurrrr}.+-ir+-Firer to e.yecure o,r ixlrrrlf r#'11re C'n►ujwtr l; as slaviv. (In l� foul a111m els• undertakings raid corilmets ofs1sive)ship• m-Other' +vr•itlea obligations ill the nattrit 1/1e► of to p►xst•rihe theh- n.speelive duties and the Bards n,f their' awhority: and to isevoke mte srtch appoi►in near at a►te Hare. RESOLYFI] FURTHER: That she Canymril'seat mid the xignanax a1'arlp of the rjbixsaid alfieers and arm Serrerar•l• w-Assistant Servitors' nrlhe C'aoipr►ri+- info he [+,(rived ha' frrr•si nIle to a►te pois•er' g1'attonim, ❑►• cei'thrrrte of either gAwn for the evermion of er►rs' hand, undertaking, routraet of :surf►+.ship• or other- written ohligalio►r in the ► eaur a the►roff such signarinx, and seed whelt so used being hettAi' adopted hr the Crinr mm, as the ariginol signature (.f srrc'h o(]ieer• and the o►•igival scat g1'1he C'omprlrtt: 10 he earn and NOif1iri4 upon the Cooalxt►rr with the sairle jbive a r lfec't rrs tlrnrtglr ►rrr+++rrrrlls rlUcerl. CERTIFICATION 1, STEPHEN Cf. BFRAHA. Assis[all I Secretary or6real American Insurance Company, du hereby cerliry Ihat the foregoing Power of Attomey and the Resolutions of the Board orDireclots of June 9, 2008 have not been revoked and are now in Bill Force and effect. Signed and Sealed this 9th day of August, 2024 i .f,rsistaR1 SCk•iY'rrrq' s1029AH 103/20) Great American Insurance Company of New York GREATAMERICAN Great American Alliance Insurance Company INSURANCE GROUP Great American Instrance Company IMPORTANT NOTICE: To obtain information or slake a complaint: You may contact the Texas Department of I11SUi'8?1CC to obtain 11110Yn1a11n11 ()n c()IrrpaIII CS. coverages, rights or complaints at: 1-800-252-3439 You may write the Texas Department of Insurance at; P.D. Box 149104 Austin, TX 78714-9091 FAX: 1-512-490-1007 Your nOtiCC of claim against the attached bond may be given to the surety company that issued the bond by sending it by certified or registered mail to the following address: Mailing Address: Great American Insurance Company P.D. Box 2119 Cincinnati, Ohio 45202 Physical Address: Great American Insurance Company 301 E. Fourth Street Cincinnati, Ohio 45202 You may also contact the Great American Insurance Company Claim office by: Fax: 1-888-290-3706 Telephone: 1-513-369-5091 Email: BondClaiins a GAIG.COM PREMIUM OR CLAIM DISPUTES: If you have a dispute concerning a premium, you should contact the agent first. If you have a dispute concerning a claim, you s11ou1d contact the company first. If the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR BOND: This notice is for Hiformation only and does not become a part or condition ❑]'the attached document. K9667A (06/22) PAVING cc SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Tfadil ion Phase 9A, City Project 9105255 UNIT PRICE BID Project Item information RPMx Construction Ridlist I Desctipilon I Specification I unit of I Bid unit Price , Bid Value Stem Section No. Measure Quantity Paving Facilities 1 0241.E 100 Remove Asphalt Pvmt 0241 15 SY 1,882.0 $9.00 $16.938.00 2 3123.0101 Unclassified Excavation (Sam Reynolds Road Dirtwork) 31 23 16 CY 2,175 $25.00 $54.375.00 3 3211.0400 Hydrated Lime @ 30lbs./&Y. 32 1129 TON 4241 $280.00 $118,748.00 4 3211,0400 Hydrated Lime @ 42 Ibs.1S.Y. (Sam Reynolds Road) 32 11 29 TOW 38.8 $280.00 $10,864.00 5 3211.0501 6" Lime Treated Subgrade 32 13 13 SY 28,273 $3.50 $98,955.50 6 3211.0502 6" Lime Treatment 32 1313 SY 1,848 $11.00 $20,328.00 7 3212.0302 2" Asphalt Pvmt Type D 32 12 16 SY 1.705 $19,00 $32,395.00 8 3212.0502 4.5" Asphalt Base Type B 32 12 16 SY 1,848 $37.00 $68,376.00 9 3213.0101 6" Concrete Pavement 32 13 13 SY 26,449 $48.00 $1,269.552.00 1 10 3213.0301 5' Cone Sidewalk 31 1320 LF 14,965 $34.50 $516,292.50 I 11 3213.0501 Barrier Free Ramp, Type R-1 32 13 20 EA 6 $2.400.00 $14.400.00 12 3213.0504 Barrier Free Ramp, Type M-2 32 13 20 EA 2 $2,300.00 S4,600.00 13 3213,0506 Barrier Free Ramp, Type P-1 32 13 20 EA 22 $2,200.00 $48,400.00 14 3441.4003 Furnishfinstall Alum Sign Ground Mount City Std. 34 41 30 EA 14 $375.00 $5,250.00 15 3741.0001 Traffic Control 3471 13 LS 1 $15,000.00 $15,000.00 16 9999.0001 Concrete Header 00 00 00 EA 5 $450,00 $2,250.00 17 9999.0002 Type Ili End -of -Road Barricade 00 00 00 EA 4 $1.100.00 $4,400.00 18 9999.0003 5awcut Existing Asphalt & Connect to Existing Pavement 00 00 00 LF 282 $25.00 $7\\050,00 19 9999.0004 Connect to Existing Pavement 00 00 00 EA 3 $450.00 $1,350.00 20 9999.0005 R1-1 Stop Sign 00 00 00 EA 14 $90.00 $1,260.00 21 9999.0006 St Marker Blade 00 00 00 EA 28 $200.00 $5.600.00 Paving Subtotal $2,316,384.00 Bid Summary Paving Facilities Subtotal $2,316,384.00 Total Bid 1 $2.316,384.00 P&P/ Maintenance Bonds Not Included in Contract Value Above This bid is submitted by the entity listed below: Company: RPMConstruction, LtC 8 6 Slreel Address: 500 Meyer Way, Suite 130 City, State, Zip Code: McKinney, TX 75070 Phone: 214.239-4722 -- SI nature Tide: D A-r M<*%aJ-A- Dais: .dal Contractor agrees to complete ►YORE[ to FINAL ACCEPTANCE whhin 55 working days aller the dale wheel the CONTRACT comnvacci to run as Provided in the General Conditions. END OF 5 ECTION CITY OF MRT WORTK STANDARD CONMUCUON BID PROPOSAL -DEVELOPER AWARDED PROIZCTS Fam Revrsod;x-y 29, 70V) Trad6o Pha.e 9A City Praw amms 00;4247 Did Prato 1 0045 12 DAP PREQUALIKCATION STATFMENT Page 1 of I SECTION 00 45 12 DAP --- PREQUALIFICATION STATEMENT Each Bidder is required to complete the information below by identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed. In the "Maior Work Tvne" box provide the complete maior work tvne and actual description as provided by the Water Denartment for water and sewer and TPW for Daving. Major Work Type Contractor/Subcontractor Company Name Prequalification Expiration Date Paving RPMx Construction, LLC 06/10/2025 The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are currently prequalified for the work types listed. BIDDER: RPM xConstruction ,LLC 6500 Meyer Way 4130 McKinney, TX 75070 M (Signature) TITLE: Vice President DATE: 06/24/2024 END OF SECTION CITY OF FORT WORTH Tradition Phase 9A, CPN 105255 SrANDARO CONSTRUCTION PREQUAUFICATION STATEMENT—DWIFLOPERAWARDED PROJECTS 004512_Prequalification Statement 2015_VAP Form Version September 1, 2015 00 45 26 - 1 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Page 1 of 1 SECTION Ua 45 26 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it provides worker's compensation insurance coverage for all of its employees employed on City Project No. 105255 . Contractor further certifies that, pursuant to Texas Labor Code, Section 406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with worker's compensation coverage. CONTRACTOR: RPM xConstruction LLC By: Peter Dawson Company 6500 Meyer Way #130 Signature: -P�cp ID� Address McKinnev. TX 75070 Title: Vice President City/State/Zip THE STATE OF TEXAS COUNTY OF TARRANT BEFORE ME, the undersigned authority, on this day, personally appeared known to me to be the person whose name is subscribed to the foregoing instrument, and acknowledged to me that he/she executed the same as the act and deed of for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this 24th day of June , 7024. Y"•. CHASITY IARAI JACK'S ON sao. Notary Pubft, stets of T97te! Comm. Expiroa 04?2.2026 •n�,si••' Na1ery II] 133i22934 Notary Public in and for the State of Texas END OF SECTION CITY OF FORT WORTH 'Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project #105255 Revised April 2, 2014 005243-1 Nveloper Awarded Project Agn.etnent Page I of 4 SECTION 00 52 43 AGREEMENT THIS AGREEMENT, authorized on 08/09/2024 is made by and between the Developer. Ashton Dallas Residential. LLC authorized to do business in Texas and Contractor, LLC authorized to do business in Texas, acting by and through its duly authorized representative. RPM xConstruction Developer and Contractor. in consideration of the mutual covenants hereinafter set forth, agree as follows: Article 1. WORK Contractor shall complete all Work as specified or indicated in the Contract Documents for the Project identified herein. Article 2. PROJECT The project for which the Work under the Contract Documents may be the whole or only a part is generally described as follows: Tradition Phase 9A City Proiect #105255 FID #30114 0200431-105255-E07685 Article 3. CONTRACT TIME 3.1 Time is of the essence. All time limits for Milestones, if any, and Final Acceptance as stated in the Contract Documents are of the essence to this Contract. 3.2 Final Acceptance. The Work will be complete for Final Acceptance within 55 working days after the date when the Contract Time commences to run as provided in Paragraph 12.04 of the Standard City Conditions of the Construction Contract for Developer Awarded Projects. 3.3 Liquidated damages Contractor recognizes that time is of the essence of this Agreement and that Developer will suffer financial loss if the Work is not completed within the times specified in Paragraph 3.2 above, plus any extension thereof allowed in accordance with Article 10 of the Standard City Conditions of the Construction Contract for Developer Awarded Projects. The Contractor also recognizes the delays, expense and difficulties involved in proving in a legal proceeding the actual loss suffered by the Developer if the Work is not completed on time. Accordingly, instead of requiring any such proof , Contractor agrees that as liquidated damages for delay (but not as a penalty), Contractor shall pay Developer Two Hundred & Fifty Dollars ($250.00) for each day that expires after the time specified in Paragraph 3.2 for Final Acceptance until the City issues the Final Letter of Acceptance. CITY OF FORT WORTH 'tradition Phase 9A STANDARD] CONSTRUCTION SPECIFICATION DOCUMENTS —DAP City Project 9I05255 Revised June 16, 2016 005243_2 Nveloper Awarded Project Agreement Page 2 of 4 Article 4. CONTRACT PRICE Developer agrees to pay Contractor for performance of the Work in accordance with the Contract Documents an amount in current funds of Two Million Three Hundred Sixteen Thousand Three Hundred Eighty Four & 00l100 Dollars i$2.316,384.001 Article 5. CONTRACT DOCUMENTS 5.1 CONTENTS: A. The Contract Documents which comprise the entire agreement between Developer and Contractor concerning the Work consist of the following: 1. This Agreement. 2. Attachments to this Agreement: a. Bid Form (As provided by Developer) 1) Proposal Form (DAP Version) 2) Prequalification Statement b. Insurance ACORD Form(s) c. Payment Bond (DAP Version) d. Performance Bond (DAP Version) e. Maintenance Bond (DAP Version) f. Power of Attorney for the Bonds g. Worker's Compensation Affidavit 3. Standard City General Conditions of the Construction Contract for Developer Awarded Projects. 4. Specifications specifically made a part of the Contract Documents by attachment or, if not attached, as incorporated by reference and described in the Table of Contents of the Project's Contract Documents. 5. Drawings. b. Addenda. 7. Documentation submitted by Contractor prior to Notice of Award. 8. The following which may be delivered or issued after the Effective Date of the Agreement and, if issued, become an incorporated part of the Contract Documents: a. Notice to Proceed. b. Field Orders. c. Change Orders. d. Letter of Final Acceptance. CITY OF FORT WORTH 'Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DAP City Project #105255 Revised June 16, 2016 005243-3 Developer Awarded Project Agrccniorit Page 3 of 4 Article 6. INDEMNIFICATION 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the city, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the contractor, its officers, agents, employees, subcontractors, licenses or invitees under this contract. This indemnification provision is snecificaliv intended to ❑nerate and be effective even if it is alleged or Droven that all or some of the damages being sought were caused, in whole or in part, by anv act, omission or negligence of the city. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the city in defending against such claims and causes of actions. 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the city, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the city, arising out of, or alleged to arise out of, the work and services to be performed by the contractor, its officers, agents, employees, subcontractors, licensees or invitees under this contract. This indemnification provision is snecifically intended to overate and be effective even if it is alleged or proven that all or some of the damages being sought were caused. in whole or in Dart. by anv act, omission or neal�ence of the city. Article 7. MISCELLANEOUS 7.1 Terms. Terms used in this Agreement are defined in Article 1 of the Standard City Conditions of the Construction Contract for Developer Awarded Projects. 7.2 Assignment of Contract. This Agreement, including all of the Contract Documents may not be assigned by the Contractor without the advanced express written consent of the Developer. 7.3 Successors and Assigns. Developer and Contractor each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, in respect to all covenants, agreements and obligations contained in the Contract Documents. 7.4 Scverability. Any provision or part of the Contract Documents held to be unconstitutional, void or unenforceable by a court of competent jurisdiction shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon DEVELOPER and CONTRACTOR. 7.5 Governing Law and Venue. This Agreement, including all of the Contract Documents is performable in the State of Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the Northern District of Texas, Fort Worth Division. CITY OF FORT WORTH Tradition Phase 9A STANDAPD CONSTRUCTION SPEC]VICATION n[1c:UMENTS -DAP City Project 4105255 Revised Atne 16, 2016 005243-4 Nveloper Awarded Project Agreement Page 4 of 4 7.6 Authority to Sign. Contractor shall attach evidence of authority to sign Agreement, if other than duly authorized signatory of the Contractor. IN WITNESS WHEREOF, Developer and Contractor have executed this Agreement in multiple counterparts. This Agreement is effective as of the last date signed by the Parties ("Effective Date") Contractor: ,LLC RPM xConstruction By: + "(MO 4ol� (Signature) Peter Dawson (Printed Name) Title: Vice President Company Name: , P44 Censtr-u tiea LLC RPM xConstruction Address: 6500 Meyer Way # 130 McKinney, TX 75070 Date: 06/24/2024 Developer: Ashton Dallas Residential, LLC Bv: 7f�A lk�:, ('Signature) (Printed Name) Title: Company Name: Ashton Dallas Residential, LLC Address: 1800 Valley View Lane #480 Farmers Branch, TX 75234 Date: 0' ( I CITY OF FORT WORTH Tradition Phan: 9A STANDARD CONSTRUCTION SPECIF1CA11ON DOCUMENTS —DAP City Project #105255 Revised Atne 16, 2016 006213-1 PERFORMANCE BOOT) Page I of 2 Bond No. 2359021 SECTION 00 62 13 PERFORMANCE BOND THE STATE OF TEXAS § § KNOW ALL BY THESE PRESENTS. COUNTY OF TARRANT § Tilat we, RPMx Construction. LLC .. known as "Principal" herein and, Swiss Re Corporate Solutions America Insurance Corporation a corporate surety(sureties, if more than one) duly authorized to do business in the State of Texas, known as "Surety" herein (wlie ther one or more), are held and firmly bound unto the Developer, Ashton Dallas Residential. LLC , authorized to do business in Texas ("Developer') and the City of Fort Worth, a Texas municipal corporation ("City"), in the penal sum of, Two Million Three Hundred Sixteen Thousand Three Hundred Eightv Four & 00/100 Dollars (S2316384.00) , lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas for the payment of which sum well and truly to be made jointly unto the Developer and the City as dual obligees. we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, Developer and City have entered into an Agreement for the construction of communily facilities in the City or Fort Worth by and (hrougli a Community Facilities Agreement, CFA Number 24-0075 ;and WHEREAS, the Principal has entered into a certain written contract with the Developer awarded the 9th day of August , 2024 which Contract is hereby referred to and made a part hereof for ail purposes as if fully set forth herein, to famish all materials, equipment labor and other accessories defined by law, in the prosecution of the Work, including any Change Orders, as provided for in said Contract designated as Tradition Phase 9A. NOW, THEREFORE, the condition of this obligation is such that if the said Principal shall faithfully perform it obligations under the Contract and shall in all respects duly and faithfully perform the Work, including Change Orders, under the Contract, according to the plans, specifications, and contract documents therein referred to, and as well during any period of extension of the Contract that may be granted on the part of the Developer and/or City, then this obligation shall be and become null and void, otherwise to remain in full force and effect. PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division. CUT OF FORT WOR'IZI Tradition Phase 9A STANDAI?1)CITY CONDITIONS DT-W]'A OPER AWARDED PRi].t1{M's City Project #105255 Revised January 31, 2012 00G2 B-2 ITRFORMANCE 130\17 Page 2 of 2 This bond is made and executed in compliance witli the provisions of Chapter 2253 of the Texas Government Code, as amended; and all liabilities on this bond shall be determined in accordance with the provisions of said statue. IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED this instrulnent by duly authorized agcn(s and officers on this the day of , 2024. PRINCIPAL; rI RPM xCo truction, LLC BY:!/r/f/n/� • Y Signature ATTEST: f , 1 W i(lr pw PAP Ylt a Peesd e*J erinci a c tary Nannc and Address: 6500 Mever Way. Suite 100 McKinney, TX 75070 Witness as to Principal SURETY. - Swiss Re Corporate Solutions America In u nce Corporation B Ar �3vj— S�gnaturc Andrea Rose Crawford, Attornev-in-Fact Nance and Title Address: 1200 Maln Street. Suite 800 Kansas Citv. MO 64105 IY!� Witn s as tXNrety Telephone Number: 816-235-3700 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mmailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. crrY OF FORTWORTH Tradition Phase 9A STANDARD CITY CONDITIONS - DI'Vl11.O1'1;IZ AWAIZIND PRC FFICIS City Project If105255 Raised January 31, 2012 SECTION DU 62 14 PAYMENT BOND THE STATE OF TEXAS § COUNTY OF TARRANT § 0062 14 - 1 PAYMEINTi' I3CNI) Page 1 of 2 Bond No, 2359021 KNOW ALL BY THESE PRESENTS: That we, RPMx Construction, LLC , known as "Principal" herein, and Swiss Re CorporateSatutlons America Insurance Corporation a corporate surety (or sureties if more than one), duly authorized to do business in the State of Texas, known as "Surety" herein (whether one or more), are held and firmly bound unto the Developer, Ashton Dallas Residential, LLC. authorized to do business in Texas "(Developer`), and the City of Fort Worth, a Texas municipal corporation ("City"), in the penal sum of Two Million Three Hundred Sixteen Thousand Three Hundred Eighty Four & 00l100 Dollars f$2.316.384.001 _ lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for the payment of which sum well and truly be made jointly unto the Developer and the City as dual obligees, we bind ourselves, our heirs; executors, administrators, successors and assigns, jointly and severally, firmly by these presents: WHEREAS, Developer and City have entered into an Agreement for the construction of community facilities in the City of Fort Worth, by and through a Community Facilities Agreement, CFA Number 24-0075 ; and WHEREAS, Principal has entered into a certain written Contract with Developer, awarded the 9th day of August , 2024, which Contract is hereby referred to and made a part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment, labor and other accessories as defined by law, in the prosecution of the Work as provided for in said Contract and designated as Tradition Phase 9A. NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under the Contract, then this obligation shall be and become null and void; otherwise to remain in full force and effect. crrY or• rox'r wnRTr 1 Tradition ]'Erase 9 q STANDARD CITY CONDITIONS — DEVI:I,[)1'EN AWARDED 13MO EC:I'S Lily l'rojectN05255 Revised January 31, 2012 006214-2 PAYMGNr 13DND Page 2 of 2 This bond is made and executed in compliance with the provisions of Chapter 2253 of the Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said statute, IN WITNESS WHEREOF, the Principal and Surety have each SIGNFn and SEALED this instrument by duly authorized agents and officers on this the day of 2D24. PRINCIPAL: RPM xConstruction, LLC ATTEST: BY_ /,�/ 6�-Signature —:4p� ui 1l[-P�VN pet?2 Ulm &L'Siled (Prin al} Se rotary Name and Title Address: 6500 Mever Way. Suite 100 � tt de 4 � 'A McKinney, TX 75070 Gn d � Witness as to Principal SURETY: Swiss Re Corporate Solutions America Insu j Corparat[o�n ` _ �� ATTEST: BY: Lam,"-- j4\\ Signa-tore V,-0,V\-n Andreae Rose Crawford Attornau-in-Pant (Surety) Sec tary Name and Title Address: 1200 Main Street, Suite 800 Kansas Citv. MO 64105 r itn s as to S� Telephone Number: 816-235-3700 Note: If signed by an officer of the Surety, there must be on file a certified extract from the bylaws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORT I Tradition Phase 9A STANDARD CITY CONDITIONS - DEVE11.0PER AWARDED PROIFICI S City Project #105255 Revised January 31, 2012 0062I9.1 MAINTENANCE 13AN'f] Page I of 3 Bond No. 2359021 SECTION 00 62 19 MAINTENANCE BOND THE STATE OF TEXAS § § KNOW ALL BY THESE PRESENTS: COUNTY OF TARRANT § That we.. RPMx Construction. LLC known as "Principal' herein and Swiss Re Corpora[a Sofufions Arnedca Insurance ComoraUon a corporate surety (sureties, if more than one) duly authorized to do business in the State of Texas, known as "Surety" herein (whether one or more), arc held and firmly bound unto the Developer, Ashton Dallas Residential. LLC . authorized to do business in Texas ("Developer") and the City of Fort Worth, a Texas municipal corporation ("City"), in the sum of Two Million Three Hundred Sixteen Thousand Three Hundred E ightv Four & 001100 Dollars ($2.316,384.00) , lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for payment of which sum well and truly be made jointly unto the Developer and the City as dual obligees and their successors, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, Developer and City have entered into an Agreement for the construction of community facilities in the City of Fort Worth by and through a Community Facilities Agreement, CFA Number 24-0075 : and WHEREAS, the Principal has entered into a certain written contract with the Developer awarded the 9th day of August . 2024, which Contract is hereby referred to and a made part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment labor and other accessories as defined by Iaw, in the prosecution of the Work, including any Work resulting from a duly authorized Change Order (collectively herein, the "Work") as provided for in said Contract and designated as Tradition Phase 9A, and; WHEREAS, Principal binds itself to use such materials and to so construct the Work in accordance with the plans, specifications and Contract Documents that the Work is and will remain free from defects in materials or workmanship for and during the period of two (2) years after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and CITY of FORT W01MI 'Tradition Phaso 9A STANDARD CITY CONDITIONS — DEVI'sI.0111"R AWAI{I)1 D PROJIiCI'S Uly 1'mjocl ft105255 Revisod January 31, 2012 (106219-2 MAINT ENAXICL BOND Page 2 oC3 WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part upon receiving notice from the Developer and/or City of the need thereof at any time within the Maintenance Period. NOW THEREFORE, the condition of this obligation is such that if Principal shall remedy any defective Work, for which timely notice was provided by Developer or City, to a completion satisfactory to the City, then this obligation shall become null and void; otherwise to remain in full force and effect. PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely noticed defective Work, it is agreed that the Developer or City may cause any and all such defective Work to be repaired and/or reconstructed with all associated costs thereof being borne by the Principal and the Surety under this Maintenance Bond; and PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division; and PROVIDED FURTHER, that this obligation shall be continuous in nature and successive recoveries may be had hereon for successive breaches. CITY of FORT WORTH Tradition Phase 9A S I'ANDAltD CITY CC]Vl)1'1'1C)VS—1}I:Vlii.{)I�li[i AWAIt])Isl] 1'R()lliCi"8 C ify 1'mjccl 111[]5255 Revised ]auivary 31, 2012 0062 19 - 3 MAINTENANCE BOIND Page 3 OD IN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this instrument by duly authorized agents and officers on this the _ _ day of .2024. ATTEST: (Princ Sec tary 7D si" v yazn Witness as to Principal I►:rrr*19 S�(S . ty7 Sec ry itne s t Surety PRINCIPAL: RPM xConstruction, LLC BY: i,,7� IX'5 --- Signature 64)1 ) Na �e �/ffl�iC(' pfeside�l-f �Namcand Address: 6500 Meyer Way, Suite 100 McKinney, TX 75070 SURETY: Swiss Re Corporate Solutions America Ins, ran a Coroora . ,n BY: k . k I ) l ,Y gn um Andrea Rose Crawford, Attorney -in -Fact Name and Title Address: 1200 Main Street, Suite 800 Kansas ON MO 64105 Telephone Number: 816-235-3700 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTI3 'Tradition Phase 9A STANDARD CITY — ] ENBLOPER AWAIMED PROJIVI's City Pmjccl #105255 Reviwd January 31, 2012 SWISS RE CORPORATE SOLUTIONS SWISS RE CORPORATE SOLUTIONS AMERICA INSURANCE CORPORATION ("SRCSAIC") SWISS RG CORPORATE SOLUTIONS PREMIER INSURANCE CORPORATION ("SRCSPIC") W E5•TPORT INSURANCE CORPORAr10N ("W 1C") GENERAL POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS, TI•iAT SRCSAIC, a corporation duly organized and existing under laws of the State of Missouri, and having its principal office in the City of Kansas City, Missouri, and SRCSPIC, a corporation organized and existing under the laws of the State of Missouri and having its principal office in the City of Kansas City, Missouri, and WIC, organized under the laves of the State of Missouri, and having its principal office in the City of Kansas City, Missouri, each does hereby make, constitute and appoint: JOHN R. WARD, THOMAS DOUGLAS MOORE, EMILY ALLISON MIKESKA, ALLYSON W. DEAN, MONICA RUBY VEAZrY,1014N WILLIAM N11WRY, TROY RUSSELL KEY. DEB RA LI:F MOON, ANDREA ROSE CRAWFORD. SANDRA 1.11: RONEY. FAtTII ANN IIILTV. ANDRE W GARETI I ADDISON. PATRICx' nIOMAS COYLE. MICIIALL. DONALD IIENDRiCKSON, aRYAN KELLY MOORI: ELI'l,AnLMI ORTt% AMA OW ENS, nITPY I RYU1, AND ANDRLW PATRICK CLARK 3DINTLY OR SEVERALLY Its true and lawful Attorneys) -in -Fact, to make, execute, seal and deliver, for and on its behalf and as its act and deed, bonds or other writings obligatory in the nature ofa bond on behalf of each of said Companies, as surety, on contracts ofsuretyship as are or may be required or permitted by law, regulation, contract or otherwise, provided that no bond or undcrtaking or contract or suretyship executed under this authority shall exceed the amount of: TWO I IUNDRED MILLION (S200,000,000.00) DOLLARS This Power of Attorney is granted and is signed by facsimile under and by the authority of the following Resolutions adopted by the Boards of Directors of both SRCSAIC and SRCSPIC at meetings duly called and held on the 1$1lr ofNovcmbur 2021 and WIC by written consent of its Executive Committee dated July 18, 2011. "RESOLVED, that any two orthe President, any Managing Director, any Senior Vicc Presidcnt, any Vice Presidcnt, the Secretary or any Assistant Secretary be, and each or any or them hereby is, authorized to cxccuto a Power of Attorney qualifying the attorney named in the given Powcr of Attorney to execute on behalf of Elie Corporation bonds, undertakings and all contracts of surely, and that each or any of them hereby is authorized to attest to the execution of any such Power of Attorney and to attach therein the seal of the Corporation; and it is FUR'fI-IER RESOLVED, that the signature of such officers and the seal of the Corporation may be affixed to any such Powcr of Attorney or to any certificate relating thereto by facsimile, and any sue Power of Attorney or ccrtificatc bearing such facsimile signatures or facsimile scat shall be bindine union the Corporation when so affixed and in the future with rclr_ard to anv bond, undertaking or contract of surety to which it is attached;' ,.�;��pN5 A4,ER. , � Jz�ONs PIiEF:.ER• �5a-'oRaOiqI '�•'; 'SEAL*� _ .a�• G r� =m= SEAL .— 1973 s�ssM!sso.Ie;:.aba Fs By Jans,e ns, Senior Vice Presi deaf of SRCSAIC & Senior Vice President of SRCSPIC & Senior Vice President or WIC ,, .Ia� B�� Geraf d J9,zruwski, Vice Preaident of S RCSA IC & Vi c r Preaiden t arSRCS PI C & Vice President or WIC IN WITNESS W1-1ERE- OF, SRCSAIC, SRCSPIC, and WIC have caused their ofilcial seals to be hereunle affixed, and these presents to be signed by their authorized officers this 11th day ❑f January 20 24 Swiss Re Corporate Solutions America Insurance Corporation State of Illinois Swiss Re Corporate Solutions Premier Insurance Corporation County of Cook ss Westport Insurance Corporation On this 11th day of January , 204 , before me, a Notary Public personally appeared Erik Janssens , Senior Vice President of SRCSAIC and Senior Vice President of SRCSPIC and Senior Vice President of WIC and Gerald JaQrowski , Vice President of SRCSAIC and Vice President of SRCSPIC and Vice President of WIC, personally known to me, who being by me duly sworn, acknowledged that they signed [lie above PowcrofAttorney as officers ofand acknowledged said instrument to be the voluntary act and deed of their respective companies. OFFIGM SEAL C14RISTINA AMANiSCO NOTARY Pt1BMSTAIT OFLUHM . �I[km Womb 21L2= I, Jeffrev Goldbere, the duly elected Senior Vicc Presidcnt and Assistant Secretary of SRCSAIC and SRCSPIC and WIC, do hereby certify that the above and foregoing is a true and correct copy of a Power ofAttomcy given by said SRCSAIC and SRCSPIC and WIC, which is still in full force and effect. IN WITNESS WHEREOF, 1 have set my hand and affixed the seals of the Companies this 9th day of August 2D 24 Jeffrey Goldberg, Senior Vice President & Assistant Secretary of SRCSAIC and SRCSPIC and WIC IMPORTANT NOTICE In order to obtain information or make a complaint You may contact Jeffrey Goldberg, Vice President - Claims, at 1-800-338-0753. You may call Swiss Re Corporate Solutions America Insurance Corporation or Swiss Re Corporate Solutions Premier Insurance Corporation's toll -free number for information or to make a complaint at: 1-800-338-0753 You may also write to Swiss Re Corporate Solutions America Insurance Corporation or Swiss Re Corporate Solutions Premier Insurance Corporation at the following address: 1450 American Lane, Suite 1100 Schaumburg, IL 60173 You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at: 1- 800-252-3439 You may write the Texas Department of Insurance P.O. Box 149104 Austin, TIC 78714-9104 Fax: (512) 475-1771 Web: httv:llw-*v►v.tdi.state.tx.us E-ma i[: Co ns umerProtectio ri(a)..td i.sta te.tx, us PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim you should first contact the Swiss Re Corporate Solutions America Insurance Corporation or Swiss Re Corporate Solutions Premier Insurance Corporation. If the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR POLICY: This notice is for infonmation only and does not become a part or condition of the attached document. AVISO IMPORTANTE Para obtener informacion o Para someter un queja: Puede comunicarse con Jeffrey Goldberg, Vice President - Claims, a] 1-800-338-0753. Listed puede llamr al numeeo de telefono gratis de Swiss Re Corporate Solutions America Insurance Corporation o Swiss Re Corporate Solutions Premier Insurance Corporation's Para informacion o para someter una queja al: 1-800-338-0753 Usted tambien puede escribir a Swiss Re Corporate Solutions America Insurance Corporation o Swiss Re Corporate Solutions Premier Insurance Corporation al: 1450 American Lane, Suite 1100 Schaumburg, IL 60173 Puede escribir a] Departmento de Seguros de Texas Para obtener informacion acerca de companias, coberturas, derechos o quejas al: 1- 800-252-3439 Puede escribir al Departmento de Seguros de Texas: P.O. Box 149104 Austin, TX 78714-9104 Fax: (512) 475-1771 Web: htty://www.tdi.state.tx.us E-mail:ConsumerProtection &..tdi.state.tx,us DISPUTAS SOBRE PRIMAS O RECLAMOS: Si tiene una disputa concerniente a su prima o a un reclamo, debe comunicarse con el Swiss Re Corporate Solutions America Insurance Corporation o Swiss Re Corporate Solutions Premier Insurance Corporation primero. Si no se resuelve la disputa, puede entonces comunicarse con el Departmento de Seguros de Texas. UNA ESTE AVISO A SU POLIZA: Este aviso es solo Para proposito de infromacion y no se converte en parte o condicion del docuinento adjunto. LIGHTING SE(MON 00 42 43 rnidiiion Phase 9A, City Pruicet #105255 UNIT PRICE BID Project [win Infirrnxftion Indcprndcnt tftiiily Didlist I]cscriptinrl Specification unit of l I Bid unit Wm! Bid Value ftcm Section No. ` N[casurc Qu:ultitY Street Lighting Facilities #REF! 2605-3011 2 CQNDT PVC SCH 40 (T) 26 05 33 LF 1,615 $25.00 $40.375.00 #REF! 3441.1408 NO 6 insulated Elec Condr 3441 10 LF 4,845 $2.20 $10,659,00 #REF1 3441-1633 Type 33BArm 344120 EA 33 $42100 $13,959-00 #REF! 3441.32D1 LED 1-01hting Fixture (R-2) 3441 20 EA 29 $423.00 $12,267.00 #REF! 3441-3201 LED Li�htinAAFixture (R-4) 344120 EA 4 $423-00 S1,692.00 #REF! 3441.334, Rdwy ff!um TY 11 Pole 3441 20 EA 33 $2,504.00 $82.632.00 #REF! 3441.3301 Rdwy Ilium Foundation TY 1,2, and 4 35 41 20 EA 33 $2.2(1.00 $74.943.00 Street Lighting Subtotal $236,527,00 Bid Summary Street Lighting Facilities Subtotal I $236,527,00 Total Bid j $236,527,00 This bid is submitted by the entity listed below: Company. Independent Utility Construction, Inc. Street Address: 5109 Sun Valley Drive City, State, Zip Code? Ft. Worth, TX 76119 eY: � and Wolfe N Signature Title President Date: 05/13/2024 ('6111 rje i yr xK rce+ ur crimp lete LURK for F[YAL ACCEPTANCE wlWu 311 sr orkl ng d4%� after the da it when lie COKIRACT com men ee% I run s pro ridert In [he Crnerat Condli lone. £Pitt OF 9£CTION 4, in- of I-ORr woven[ r,PdIINm Eh� y.% STA%1).SR1)1YriS rR11C1& N IND?lWR SAL-DF V'EIA)PER,aW,%M)EI) M)M:r5 city Ym)n7 ald5_!5 1 m- Rn_. _.lrawy Yd. , Mn W 1: 1 i . Bid Ihiy,..4 004511 Or.P AREQUALiFICATIOx STATEMENT Pagr 1 of 1 SECTION 00 45 12 DAP — PREQUALIFICATION STATEMENT Each Bidder is required to complete the information below by identifying the prequafified contractors and/or subcontractors whom they intend to utilize for the major work type(s) fisted. In the "Mai or Work Tvve" box provide the complete major work tvpe and actual description as orovided by the Water Department for water and sewer and TPW for navine. Major Work Type Contractor/Subcontractor Company Name Prequalification Expiration Date Roadway and Pedestrian Independent Utility Construction, Inc. 02/27/2025 Lighting The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are currently prequalified for the work types Iisted. BIDDER: Independent Utility Construction, Inc. 5109 Sun Valley Drive Ft. Worth, TX 76119 BY: Ri and Wolfe (Signature) TITLE: President DATE: 08/09/2024 END OF SECTION OTY OF FORT WORTH Tradbon Phase 9A, CPNIO52SS STANDARDCON STRUCn NPREQUALIFICATICNaSTATEH4ENT—DEVELOPERAWARDEDPMECTS OD 4512_PrequalftatlonStatemeut2015DAP Farm Version September 1, 2015 00 45 26 - 1 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Page I of I SECTION 00 45 26 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Pursuant to Texas Labor Code Section 446-096(a), as amended, Contractor certifies that it provides worker's compensation insurance coverage for all of its employees employed on City Project No. 105255 . Contractor further certifies that, pursuant to Texas Labor Code, Section 406,496(b), as amended, it will provide to City its subcontractor's certificates of compliance with worker's compensation coverage. CONTRACTOR: Indeoendent Utilitv Construction, Inc. Company 5109 Sun Vallev Drive Address Ft. Worth. TX 76119 City/State/Zip THE STATE OF TEXAS COUNTY OF TARRANT By: Richar"o fe Signature - Title: President BEFORE ME, the undersigned authority, on this day, personally appeared Richard Wolfe, known to isle to be the person whose name is subscribed to the foregoing instrument, and acknowledged to me that he/she executed the same as the act and deed of Independent Utility Construction. Inc. for the purposes and consideration therein expressed and in the capacity therein stated. S G MY HAND AND SEAL OF OFFICE this � day of .2024. _ 0j r J' `��s*`�,'Y CHRISTINA GARCIA zr ;-I Notary Public. State of Texas l t+g Comm. Expires 12.20-2024 Rotary Public in and for the State of Texas �'••�;���ti�`..� Notary ID 130940785 END OF SECTION CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project 0105255 Revised April 2, 2014 00 52 43 - l Dcvcloper Awarded Project Agreement Page l ofd SECTION 00 52 43 AGREEMENT THIS AGREEMENT, authorized on 08/09/2024 is made by and between the Developer. Ashton Dallas Residential. LLC authorized to do business in Texas and Contractor, Indenendent Utility Construction. Inc. authorized to do business in Texas, acting by and through its duly authorized representative. Developer and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as follows: Article 1. WORK Contractor shall complete all Work as specified or indicated in the Contract Documents for the Project identified herein. Article 2. PROJECT The project for which the Work under the Contract Documents may be the whole or only a part is generally described as follows: Tradition Phase 9A Citv Proiect #105255 FID #30114-0200431-105255-E07685 Article 3. CONTRACT TIME 3.1 Time is of the essence. All time limits for Milestones, if any, and Final Acceptance as stated in the Contract Documents are of the essence to this Contract. 3.2 Final Acceptance. The Work will be complete for Final Acceptance within 30 working days after the date when the Contract Time commences to run as provided in Paragraph 12.04 of the Standard City Conditions of the Construction Contract for Developer Awarded Projects. 3.3 Liquidated damages Contractor recognizes that time is of the essence of this Agreement and that Developer will suffer financial loss if the Work is not completed within the times specified in Paragraph 3.2 above, plus any extension thereof allowed in accordance with Article 10 of the Standard City Conditions of the Construction Contract for Developer Awarded Projects. The Contractor also recognizes the delays, expense and difficulties involved in proving in a legal proceeding the actual loss suffered by the Developer if the Work is not completed on time. Accordingly, instead of requiring any such proof, Contractor agrees that as liquidated damages for delay (but not as a penalty), Contractor shall pay Developer Two Hundred & h'UN Dollars ($250.00) for each day that expires after the time specified in Paragraph 3.2 for Final Acceptance until the City issues the Final Letter of Acceptance. CITY OF FORT WORTH Tradition rase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DAP City Project # 105255 Revised Junc i 6. 2016 005243-2 Devcloper Awarded Project Agreement Page 2 of 4 Article 4. CONTRACT PRICE Developer agrees to pay Contractor for performance of the Work in accordance with the Contract Documents an amount in current funds of Two Hundred Thirty Six Thousand Five Hundred Twenty Seven & 00/1.00 Dollars ($236.527.00) Article 5. CONTRACT DOCUMENTS 5.1 CONTENTS: A. The Contract Documents which comprise the entire agreement between Developer and Contractor concerning the Work consist of the following; 1. This Agreement. 2. Attachments to this Agreement. a. Bid Form (As provided by Developer) 1) Proposal Form (DAP Version) 2) Prequalification Statement b. Insurance ACORD Form(s) c. Payment Bond (DAP Version) d. Performance Bond (DAP Version) e. Maintenance Bond (DAP Version) f. Power of Attorney for the Bonds g. Worker's Compensation Affidavit 3. Standard City General Conditions of the Construction Contract for Developer Awarded Projects. 4. Specifications specifically made a part of the Contract Documents by attachment or, if not attached, as incorporated by reference and described in the Table of Contents of the Project's Contract Documents. 5. Drawings. 6. Addenda, 7. Documentation submitted by Contractor prior to Notice of Award. 9. The following which may be delivered or issued after the Effective Date of the Agreement and, if issued, become an incorporated part of the Contract Documents: a. Notice to Proceed. b. Field Orders. c. Change Orders. d. Letter of Final Acceptance. CITY OF FORT WORTH Tradition Phasc 9A STANDARD CONSTRUCTION SPECIFFICATION DOCUMENTS —DAP City Projeet #105255 Revised June 16, 2016 005243-3 Developer Awarded Project Agreement Page 3 o[ 4 Article 6. INDEMNIFICATION 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the city, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the contractor, its officers, agents, employees, subcontractors, licenses or invitees under this contract. This indemnification provision is soeci#ically intended to onerate and be effective even if it is alleged or ❑raven that all or some of the damages being sought were caused. in whole or in Dart. by anv act. omission or negfigence of the city. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the city in defending against such claims and causes of actions. 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the city, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the city, arising out of, or alleged to arise out of, the work and services to be performed by the contractor, its officers, agents, employees, subcontractors, licensees or invitees under this contract. This indemnification provision is snecificaliv intended to onerate and be effective even if it is alleged or proven that all or some of the damages being sought were caused. in whole or in Dart. by anv act. omission or negligence of the city. Article 7. MISCELLANEOUS 7.1 Terms. Terms used in this Agreement are defined in Article 1 of the Standard City Conditions of the Construction Contract for Developer Awarded Projects. 7.2 Assignment of Contract. This Agreement, including all of the Contract Documents may not be assigned by the Contractor without the advanced express written consent of the Developer. 7.3 Successors and Assigns. Developer and Contractor each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, in respect to all covenants, agreements and obligations contained in the Contract Documents. 7.4 Severability. Any provision or part of the Contract Documents held to be unconstitutional, void or unenforceable by a court of competent jurisdiction shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon DEVELOPER and CONTRACTOR. 7.5 Governing Law and Venue. This Agreement, including all of the Contract Documents is performable in the State of Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the Northern District of Texas, Fort Worth Division. CrrY OF FORT WORTH Tradition Phase 4A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DAP City Project 0105255 Revised Imte 16. 2016 005243-4 DeveloM Awarded Pmjeet Agreement Page 4uf4 7.6 Authority to Sign. Contractor shall attach evidence of authority to sign Agreement, if other than duly authorized signatory of the Contractor. IN WITNESS WHEREOF, Developer and Contractor have executed this Agreement in multiple counterparts. This Agreement is effective as of the last date signed by the Parties ("Effective Date"). Contractor: Independent Utility Construction, Inc. Developer: Ashton Dallas Residential, LLC 1 By: O'y By; (Siena e) I (Siena ure) Richard Wolfe I N x gonrT Y (Printed Name) (Printed Name) C Title: President Company Name: Independent Utility Construction, Inc Address: 5109 Sun Valley Dr. Ft. Worth, TX 76119 Date: 08/09/2024 Title: kv- Company Name: Ashton Dallas Residential, LLC Address: 1800 Valley View Lane #480 Farmers Branch, TX 75234 Date; CITY- OF FORT WORTH Tradilion Phase 9A STANDARD CONMUCT[ON SPECIFICATION DOCUMENTS —DAP Ciry Project # 105255 Rnviwd June 16, 2016 _ 0061 13. 1 PERFORMANCE BOND Page 1 ar2 Bond No. 41154OX 1 SECTION 00 62 13 2 PERFORMANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 That we, lndeoendent Utility Construction, Inc. , known as "Principal" herein and 8 Westfield Insurance Comoanv . a corporate surety(sureties, if more than one) duly 9 authorized to do business in the State of Texas, known as "Surety" herein (whether one or more), i0 are held and firmly hound unto the Developer, Ashton Dalian Residential. LLC, authorized to do l I business in Texas ("Developer") and the City of Fort Worth, a Texas municipal corporation 12 ("City"), in the penal sum of, Two Hundred Thirty Six Thousand, Five Hundred Twenty -Seven 13 Dollars & Zero Cents ($236.527.00) lawful money of the United States, to be paid in Fort Worth, I4 Tarrant County, Texas for the payment of which sum well and truly to be made, jointly unto the 15 Developer and the City as dual obliges, we bind ourselves, our heirs, executors, administrators, 16 successors and assigns, jointly and severally, firmly by these presents. 17 WHEREAS, Developer and City have entered into an Agreement for the construction of 18 community facilities in the City of Fort Worth by and through a Community Facilities Agreement, 19 CFA Number 24-0075 ; and 20 WHEREAS, the Principal has entered into a certain written contract with the Developer 21 awarded the 9th day of August , 2011 which Contract is hereby referred to and 22 made a part hereof for ail purposes as if fully set forth herein, to furnish all materials, equipment 23 labor and other accessories defined by law, in the prosecution of the Work, including any Change 24 Orders, as provided for in said Contract designated as Street I.ightine Facilities to serve Tradition 25 Phase 9A. 26 NOW, THEREFORE, the condition of this obligation is such that if the said Principal 27 shaiI faithfully perform it obligations under the Contract and shall in all respects duly and faithfully 28 perform the Work, including Change Orders, under the Contract, according to the plans, 29 specifications, and contract documents therein referred to, and as well during any period of 30 extension of the Contract that may be granted on the part of the Developer and/or City, then this 31 obligation shall be and became null and Void, otherwise to remain in full force and effect. 32 CITY OF FORT WORTH Tradition Phase 9A STANDARD CITY CONDITSONS -- DEVELOPER AWARDED PROJECTS City project No 105255 Revised January 31, 2U 12 0061 13-2 PERFORMANCE BOND Pap 2 of 2 Bond No. 41154OX 2 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in 3 Tarrant County. Texas or the United States ❑istriet Court for the Northern District of Texas, Fort 4 Worth Division. 5 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 6 Texas Government Code, as alnendcd, and all liabilities on this bond shall be determined in 7 accordance with the provisions of said statue. 8 IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED this 9 instrument by duly authorized agents and officers on this the 9th day of August , 20 24 10 12 13 14 i5 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 A T- (Pn= 1) Secretary Richard Wolfe Witness as to Principal Christina Garcia ttn s to Suretyklizabeth Gray PRINCIPAL: INDEPENDENT UTILITY CONST L/FION.INC. BY: Signature Richard Wolfe. President Name and Title Address:,5109 Sun Vallev Drive Fort Worth, Texas 76119 SURETY: WESTFIEL❑ INSURANCE COMPANY Sign a y_ Kvle W. Sweenev. Attornev-in-Fact Name and Title Address: 955 Garden Park Drive. Suite 230 Allen. Texas 75013 Telephone Number: 972-516-2600 *Note: if signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not he prior to the date the Contract is awarded. CM OF FORT WORTH STANDARD CiTY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised January 31, 2012 Tradition Phase 9A City Project No 105255 0061 14-1 PAYEv FNr HOND f agc 1 of 2 Bond No. 41 154OX 1 SECTION 00 62 14 2 PAYMENT BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 That we, Indenendent Utilitv Construction, Inc. , known as "Principal" herein, 8 and Westfield Insurance Comoanv , a corporate surety (or sureties if more than 9 one), dilly authorized to do business in the State of Texas, known as "Surety" herein (whether one 10 oi- more), are held and firmly bound unto the Developer Ashton Dallas Residential. LLC. 1 i authorized to do business in Te..xas ("Developer"), and the City of Fort Worth, a Texas municipal 12 corporation ("City"), in the penal sum of Two Hundred Thirtv Six Thousand. Five Hundred 13 Twenty -Severs Dollars & Zero Cents f$236.527.001 lawful money of the United States, to be paid 14 in Fort Worth, Tarrant County, Texas, for the payment of which sum well and truly be made 15 jointly unto the Developer and City as dual obligees, we bind ourselves, our heirs, executors. 16 administrators, successors and ass igns,jointly and severally, firmly by these presents: 17 WHEREAS, Developer and City have entered into an Agreement for the construction of 18 community facilities in the City of Fort Worth, by and through a Community Facilities 19 Agreement, CFA Number 24-0075 : and 20 WHEREAS, Principal has entered into a certain written Contract with Developer, 21 awarded the 9th day of August , 2024 which Contract is hereby referred to and 22 made a part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment, 23 labor and other accessories as defined by law, in the prosecution of the Work as provided for in 24 said Contract and designated as Street L.iahtine Facilities to serve Tradition Phase 9A. 25 NOW, THERI,FORE, THE CONDITION OF THIS OBLIGATION is such that if 26 Principal shall pay al l monies owing to any (and all) payment bond beneficiary (as defined in 27 Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under 28 the Contract, then this obligation shall be and become null and void; otherwise to remain in full 29 force and effect. 30 CITY OF FORT WORTH Tradition Phase 9A STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Prajert No. 105255 Revised January 31, 2012 2 3 4 5 6 7 8 9 10 11 12 13 W61 14-2 PAYE{ENTBOND Page 2 oF2 Bond No. 4l 1540X This bond is made and executed in compliance with the provisions of Chapter 2253 of the Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said statute. IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED this instrument by duly authorized agents and officers on this the 9thlay of Auqust 20 24 ATT (Principal) Secretary Richard Wolfe Witness as to Principal Christina Garcia ATTEST: ��A f d,-, (Surety) Secretary Frank A. Carrino Witnes as to Surety Elizabeth Gray PRINCIPAL: INDEPENDENT UTILITY CONSTRL] GN.INC. BY: [� S igna ure Richard Wolfe- President Name and Title Address: 5I09 Sun Vallev Drive Fort Worth. Texas 76119 SURETY: WESTFIELD INSURANCE COMPANY, Kvle W. Sweenev. Attornev-in-Fact Name and Title Address: 955 Garden Park Drive, Suite 230 Allen. Texas 75013 Telephone Number: 972-516-2600 Note: If signed by an officer of the Surety, there must be on file a certified extract from the bylaws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. END OF SECTION CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised January 31, 2012 Tradition Phase 9A City Project No. 105255 006219.1 MAINTENANCE BOND Page I or 3 Bond No. 41 154OX 1 SECTION 00 62 19 2 MAINTENANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT 7 8 That we Indeoendent Utility Construction, Inc. , known as "Principal" herein and 9 Westfield Insurance Company , a corporate surety (sureties, if more than one) duly 10 authorized to do business in the State of Texas, known as "Surety" herein (whether one or more), I 1 are held and firmly bound (Into the Developer, Ashton Dallas Residentiai, LLC, authorized to do 12 business in Texas ("Developer") and the City of Fort Worth, a Texas municipal corporation 13 ("City"), in the sum of Two Hundred Thirtv Six Thousand. Five Hundred Twenty -Seven Dollars 14 & Zero Cents ($236.527.00) lawful money of the United States, to be paid in Fort Worth, Tarrant 15 County, Texas, for payment of which sum well and truly be [Wade jointly unto the Developer and 16 the City as dual obligees and their successors, we bind ourselves, our heirs, executors, 17 administrators, successors and assigns, jointly and severally, firmly by these presents. 18 19 WHEREAS, Developer and City have entered into an Agreement for the construction of 20 community facilities in the City of Fort Worth by and through a Community Facilities 21 Agreement, CPA Number 24-0075 : and 22 WHEREAS, the Principal has entered into a certain written contract with the Developer 23 awarded the 9th day of Auqust , 20 Z4which Contract is hereby referred to and 24 a made part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment 25 labor and other accessories as defined by law, in the prosecution of the Work, including any 26 Work resulting from a duly authorized Change Order (collectively herein, the "Work") as 27 provided for in said Contract and designated as Street Lishtine Facilities to serve Tradition Phase 28 9A; and 29 30 WHEREAS, Principal binds itself to use such materials and to so construct the Work in 31 accordance with the plans, speci fications and Contract Documents that the Work is and will 32 remain free from defects in materials or workmanship for and during the period of two (2) years 33 after the date of Final Acceptance of the Work by the City ("Maintenance Period"), and 34 CYrY OF FORT WORTH Tradition Phase 9A STANDARD CITY CONurr[ONS — DEVELOPER AWARDED PROJECTS City Projec! No 105253 Revised January 31, 2012 006219-2 MAINTENANCE BOND Page 2 of Bond No. 41 154OX 1 WHEREAS, Principal binds itself to repair or reconstruct the Worst in whole or in part 2 upon receiving notice from the Developer and/or City of the need thereof at any time within the 3 Maintenance Period. 4 5 NOW THEREFORE, the condition of this obligation is such that if Principal shall 6 remedy any defective Work. For which timely notice was provided by Developer or City, to a 7 completion satisfactory to the City, then this obligation shall become nuii and void; otherwise to 8 remain in full force and effect, 9 10 PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely i l noticed defective Work, it is agreed that the Developer or City may cause any and all such 12 defective Work to be repaired and/or reconstructed with all associated costs thereof being borne 13 by the Principal and the Surety under this Maintenance Bond; and 14 15 PROVIDED FURTHER, that if any legal action be filed an this Bond, venue shall lie in 16 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort 17 Worth Division; and 18 19 PROVIDED FURTHER, that this obligation shall be continuous in nature and 20 successive recoveries may be had hereon for successive breaches. 21 22 23 CITY OF FORT WORTEI Tradition Phase 9A STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROI£CT5 City Projcct No. 105255 Revised January 31, 2012 4 5 6 7 8 9 10 11 12 13 14 15 16 17 I8 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 006219-3 MAINTENANCE 13OND PW 3 aF3 Bond No. 41 1540X IN WITNESS WHEREOF, the Principal and the Surety have each SIGNET] and SEALED this instrument by duly authorized agents and officers on this the 9th day of August , 20 24 AT S [Principal} Secretary Richard Wolfe VY►r ` itness as to Principal Christina Garcia ATTEST: (Surety) Secretary rlFr`ank A. Carrino A ,1 J jt .h . f ( , Witnes sad to urety Elizabeth Gray PRINCIPAL: INDEPENDENT UTILITY CONST �I'ION.INC. BY: Signature Richard Wolfe. President Name and Tift Address: 5109 Sun Vallev Drive Fart Worth. Texas 76119 SURETY: WESTFIELD INSURANCE COMPANY BY: Signature T Kvle W. Sweenev. Attornev-in-Fact Name and Title Address: 955 Garden Park Drive. Suite 230 Allen. Texas 75013 Telephone Number: 972-516-2600 *Note: If signed by an officer of the Surety Company, there must be on file a certifled extract from the by-laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shah not be prior to the date the Contract is awarded. CITY OF FORT WORTH STANDARD CI CY CONDIT10NS - DEVELOPER AWARDED PROTECTS Revised January 31.2012 Tradition Phase 9A City Project No. 105255 IMPORTANT NOTICE To obtain information or make a complaint You may call Westfield Insurance Company's and/or Ohio Farmers Insurance Company's toll -free telephone number for information or to make a complaint at: 1-800-368-3697 You may also write to Westfield Insurance Company and/or Ohio Farmers Insurance Company at: 955 Garden Park Drive, Suite 230 Allen, Texas 75013-3742 You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at: 1-800-252-3439 You may write the Texas Department of Insurance- P. 0. Box 149104 Austin, TX 78714-9104 Fax: (512) 475-1771 Web: hlp://www.tdi.state.tx.us E-mail: ConsumerProtection(cbtdi.state.tx.us PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim you should contact the agent or Westfield Insurance Company and/or Ohio Farmers Insurance Comapny First. If the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR POLICY: This notice is for information only and does not become a part or condition of the attached document. AVISO IMPORTANTE Para obtener information o para someter una queja: Listed puede Ilamar at numero de telefono gratis de Westfield Insurance Company's / Ohio Farmers Insurance Company's para information o para someter una queja at: 1-800-368-3597 Usted tambien puede escribir a Westfield Insurance Company / Ohio Farmers Insurance Company: 955 Garden Park Drive, Suite 230 Allen, Texas 75013-3742 Puede comunicarse con el Departamento de Seguros de Texas para obtener information acerca de companies, coberturas, derechos o quejas at: 1-800-252-3439 Puede escribir al Departamento de Seguros de Texas: P. 0. Box 149104 Austin, TX 78714-9104 Fax: (512) 475-1771 Web: httD://www.tdi.state.tx.us E-mail: ConsumerProtectionCcDtdi.state. N.us ❑ISPUTAS SOBRE PRIMAS O RECLAMOS: Si tiene una disputa concerniente a su prima ❑ a un reclamo, debe comunicarse con el agente o Westfield Insurance Company / Ohio Farmers Insurance Company primer❑. Si no se resuelive la disputa, puede entonces comunicarse con el departamento (TDI). UNA ESTE AVISO A SU POLIZA: Este aviso es solo para proposito de information y no se convierte en parte o condition del documento adjunto. THIS POWER OF ATTORNEY SUPERCEDES ANY PREVIOUS POWER BEARING THIS SAME POWER #AND ISSUED PRIOR TO 09lY Pn, FOR ANY PERSON OR PERSONS NAMED BELOW. POWER NO. 4220052 06 General Power Westfield Insurance Co. of Attorney Westfield National Insurance Co. CERTIFIED COPY Ohio Farmers Insurance Co. Westfield Center, Ohio KnoW All Alien oy These PreSeRIS, Ttat WESTFIELD INSURANCE COMPANY, VVESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY, corporations, hereinafter referred to individually as a 'Company" and collectively as -Companies,' duly organized and existing under the laws of the State of Ohio, and having its principal office in Westfield Center. Medina County, Ohio, do by these presents make, constitute and appoint CHARLES D. SWEENEY, MICHAEL A. SWEENEY, KYLE W. SWEENEY. ELIZABETH GRAY. DAVID W. SWEENEY, JOINTLY OR SEVERALLY of FORT WORTH and State of TX its true and lawful Attorney(s)-in-Face, with Tull power ane authority hereby conferred in its name, place and stead. 10 execute, acknowledge and deliver any and all bonds, reca"ances, undertakings, or other Insgwnents or contracts of suretyship In any penal limit. . . . . . . . . . . . . . . . . . . • - - . . . - - - - • - - . - - - - - - - . . . . . . - - • - • - - LIMITATION: THIS POWER OF ATTORNEY CANNOT BE USED TO EXECUTE NOTE GUARANTEE, MORTGAGE DEFICIENCY, MORTGAGE UU14nHn Icz, OR BANK DEPOSITORY BONDS. and to INnd any of the Companies thereby as fully and to the same extent as I such bonds were signed by the President, sealed with the corporate seal of the applicable Company and duly attested by its Secretaryt hereby ratifying and cdn`Irming all that the saic Attorney{s}•In-Fact may do In the premises. Said appointment is made under and by authority of the lollowing resolution adopted by the Board of Directors of each of the WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY: 'Be It Resolved, that the President, any Senior Executive, any Secretary or any Fidelity & Surety Operations Executive or other Executive shall be and is hereby vested with full power and authority to appoint any one or more suitable persons as Attorrey(s)-In-Fact to represent and act for and on behalf of the Company subject to the following provislons: The Attorney- in- Fa+:t. may be glVan full power and authority for and In the name of and on behalf of the Company, to execute, acknowledge and delver, any and all bondst recognirances, contracts, ag•eements of Indemnity and other conditional or obligatory undertakings and any and all notices and documents canceling or terminating the Company's liability thereunder, and any Such instruments so executed by any such Attorney-In•Fact shall be as bIndIr•g upon the Company as if signed by the President and sealed and attested by the Corporate Secretary:' 'Be it Further Resolved, that the signature of any such designated person and the seal of the Company heretofore or hereafter affixed to any power of attorney or any certificate relating thereto by facsimile, and any power of attorney or certificate bearing facsimile signatures or facsimile seal shall be valid and binding upon the Company with respect to any bond or undertaking to which it is attached.' (Each adopted at a meeting held on February 8, 2000). In Witness Whereof, WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and CHIO FARMERS tNSURANCE COMPANY have caused these presents to be signed by their National Surety Leader and Senior Executive and their corporate seals to be hereto affixed this 281h day of SEPTEMBER A.D., 2023 . Corporate ytj "''•,, "gin A..'�'•., WESTFIELD INSURANCE COMPANY Seals Q - 'UC'�'-� �'�;�t• ",;sC�•. WESTFIELD NAT10NAL INSURANCE COMPANY Affixed ivlii'.t o qr =. !" i OH10 FARMERS INSURANCE COMPANY �`1:14`7LI iv = SEAL tn=�:CN�IR]EP�p� } �. 1 ran .r�' �•_ 184�r} r^'. _.... State of Ohio ` Count of Medina ss.: By: W. �tumper, Nafiona! Surety Leader and Y Senior Executive On this 28th day of SEPTEMBER A.D., 2023 , before me personally came Gary W. Stunsper to me known. who, being by me duly sworn, did depose and say, that he resides in Medina, DH; that he is National Surety Leader and Senior Executive of WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY, the companies described in and which executed the above instrument: that he knows the seals of said Companies: that the sea is affixed to sold IrStir umen t are such corporate seals; that they were so affixed by order of the Boards of Directors of said Companies. and that he signed hrs name thereto by Ilke order. Notarial Seal AAPp""I A L S Affixed 16 2� State at Oh:o ,ri 40 David A. Kotnik, Attorney at taw, !Votary Public County of Medina SS.' ?, 4 +r r+` My Commission Does Nct Expire (Sec. 147.03 Ohio Revised Code) Yam•'? �.� �.�,,.�"''° I, Frank A. Carrine, Secretary of WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY, do hereby certify that she above and foregoing is a true and correct copy of a Power of Attorney, owultea by said Companies; which is still in Fall force and effect; and furthermore, the resolutions of tte Boards of Directors, set out in the Power or Attorney are In full force and effect. In Witness Whereof, I have Hereunto set my hand and affixed the seals of said Companies at Westfield Center, Ohio, this gth day of August A-D', 2024• �Vryy��.. v r� _ flRiiFR�p i 5EAL �pll SEAL i + Frank A. Carrino, 5eererary EIPOAC2 (combined) (03-22) STANDARD CITY CONDITIONS OF THE CONSTRUCTION CONTRACT FOR DEVELOPER AWARDED PROJECTS CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 STANDARD CITY CONDITIONS OF THE CONSTRUCTION CONTRACT FOR DEVELOPER AWARDED PROJECTS TABLE OF CONTENTS Page Article1 — Definitions and Terminology.......................................................................................................... I 1.01 Defined Terms............................................................................................................................... 1 1.02 Terminology..................................................................................................................................5 Article2 — Preliminary Matters......................................................................................................................... 6 2.01 Before Starting Construction........................................................................................................6 2.02 Preconstruction Conference.......................................................................................................... 6 2.03 Public Meeting.............................................................................................................................. 6 Article 3 — Contract Documents and Amending............................................................................................... 6 3.01 Reference Standards..................................................................................................................... 6 3.02 Amending and Supplementing Contract Documents.................................................................. 6 Article 4 — Bonds and Insurance....................................................................................................................... 7 4.01 Licensed Sureties and Insurers..................................................................................................... 7 4.02 Performance, Payment, and Maintenance Bonds........................................................................ 7 4.03 Certificates of Insurance............................................................................................................... 7 4.04 Contractor's Insurance.................................................................................................................. 9 4.05 Acceptance of Bonds and Insurance; Option to Replace...........................................................12 Article 5 — Contractor's Responsibilities........................................................................................................12 5.01 Supervision and Superintendent.................................................................................................12 5.02 Labor; Working Hours................................................................................................................13 5.03 Services, Materials, and Equipment...........................................................................................13 5.04 Project Schedule..........................................................................................................................14 5.05 Substitutes and "Or-Equals".......................................................................................................14 5.06 Pre -Qualification of Bidders (Prime Contractors and Subcontractors).....................................16 5.07 Concerning Subcontractors, Suppliers, and Others...................................................................16 5.08 Wage Rates..................................................................................................................................18 5.09 Patent Fees and Royalties...........................................................................................................19 5.10 Laws and Regulations.................................................................................................................19 5.11 Use of Site and Other Areas.......................................................................................................19 5.12 Record Documents......................................................................................................................20 5.13 Safety and Protection.................................................................................................................. 21 5.14 Safety Representative.................................................................................................................21 5.15 Hazard Communication Programs.............................................................................................22 5.16 Submittals....................................................................................................................................22 5.17 Contractor's General Warranty and Guarantee..........................................................................23 CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 5.18 Indemnification........................................................................................................................... 24 5.19 Delegation of Professional Design Services..............................................................................24 5.20 Right to Audit: ............................................................................................................................ 25 5.21 Nondiscrimination.......................................................................................................................25 Article 6 - Other Work at the Site...... 6.01 Related Work at Site ...... Article 7 - City's Responsibilities ............................................ 7.01 Inspections, Tests, and Approvals ....................... 7.02 Limitations on City's Responsibilities ................ 7.03 Compliance with Safety Program ........................ Article 8 - City's Observation Status During Construction.... 8.01 City's Project Representative .............................. 8.02 Authorized Variations in Work ........................... 8.03 Rejecting Defective Work ................................... 8.04 Determinations for Work Performed ................... Article 9 - Changes in the Work ...................... 9.01 Authorized Changes in the Work 9.02 Notification to Surety ................... Article 10 - Change of Contract Price; Change of Contract Time 10.01 Change of Contract Price ........................................... 10.02 Change of Contract Time ........................................... 10.03 Delays......................................................................... 26 26 26 26 26 27 .27 .27 .27 .27 .28 a Article 11 - Tests and Inspections; Correction, Removal or Acceptance of Defective Work ...................... 29 11.01 Notice of Defects........................................................................................................................29 11.02 Access to Work...........................................................................................................................29 11.03 Tests and Inspections.................................................................................................................. 29 11.04 Uncovering Work....................................................................................................................... 30 11.05 City May Stop the Work.............................................................................................................30 11.06 Correction or Removal of Defective Work................................................................................30 11.07 Correction Period........................................................................................................................30 11.08 City May Correct Defective Work............................................................................................. 31 Article12 - Completion.................................................................................................................................. 32 12.01 Contractor's Warranty of Title................................................................................................... 32 12.02 Partial Utilization........................................................................................................................ 32 12.03 Final Inspection...........................................................................................................................32 12.04 Final Acceptance.........................................................................................................................33 Article 13 - Suspension of Work....................................................................................................................33 13.01 City May Suspend Work............................................................................................................ 33 Article14 - Miscellaneous.............................................................................................................................. 34 14.01 Giving Notice.............................................................................................................................. 34 CITY OF FORT WORTH STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 14.02 Computation of Times ....... 14.03 Cumulative Remedies ........ 14.04 Survival of Obligations ...... 14.05 Headings ............................. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 34 34 35 35 0073 10- 1 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 1 of 35 ARTICLE 1— DEFINITIONS AND TERMINOLOGY 1.01 Defined Terms A. Wherever used in these General Conditions or in other Contract Documents, the terms listed below have the meanings indicated which are applicable to both the singular and plural thereof, and words denoting gender shall include the masculine, feminine and neuter. Said terms are generally capitalized or written in italics, but not always. When used in a context consistent with the definition of a listed -defined term, the term shall have a meaning as defined below whether capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms. 1. Agreement - The written instrument which is evidence of the agreement between Developer and Contractor covering the Work 2. Asbestos —Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration. 3. Business Day — A business day is defined as a day that the City conducts normal business, generally Monday through Friday, except for federal or state holidays observed by the City. 4. Buzzsaw — City's on-line, electronic document management and collaboration system. 5. Calendar Day — A day consisting of 24 hours measured from midnight to the next midnight. 6. City— The City of Fort Worth, Texas, a Texas home -rule municipal corporation, acting by, its governing body through its City Manager, his designee, or agents authorized pursuant to its duly authorized charter on his behalf. 7. Community Facilities Agreement (CFA) A Contract between the Developer and the City for the Construction of one or more following public facilities within the City public right-of- way or easement: Water, Sanitary Sewer, Street, Storm Drain, Street Light, and Street Signs. A CFA may include private facilities within the right-of-way dedicated as private right-of- way or easement on a recorded plat. 8. Contract —The entire and integrated written document incorporating the Contract Documents between the Developer, Contractor, and/or City concerning the Work. The Contract supersedes prior negotiations, representations, or agreements, whether written or oral. 9. Contract Documents —Those items that make up the contract and which must include the Agreement, and it's attachments such as standard construction specifications, standard City Conditions, other general conditions of the Developer, including: a. An Agreement CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10-2 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 2 of 35 b. Attachments to the Agreement i. Bid Form ii. Vendor Compliance with State Law Non -Resident Bidder iii. Prequalification Statement C. Current Prevailing Wage Rates Table (if required by City) d. Insurance Accord Form e. Payment Bond f. Performance Bond g. Maintenance Bond h. Power of Attorney for Bonds i. Workers Compensation Affidavit j. MWBE Commitment Form( If required by City) k. General Conditions 1. Supplementary Conditions M. The Standard City Conditions n. Specifications specifically made part of the Contract Documents by attachment, if not attached, as incorporated by reference and described in the Table of Contents of the Project's Contract Documents o. Drawings P. Documentation submitted by contractor prior to Notice of Award. q. The following which may be delivered or issued after the effective date if the Agreement and, if issued become an incorporated part of the Contract Documents i. Notice to Proceed ii. Field Orders iii. Change Orders iv. Letters of Final Acceptance r. Approved Submittals, other Contractor submittals, and the reports and drawings of subsurface and physical conditions are not Contract Documents. 10. Contractor —The individual or entity with whom Developer has entered into the Agreement. 11. Day or day — A day, unless otherwise defined, shall mean a Calendar Day. 12. Developer — An individual or entity that desires to make certain improvements within the City of Fort Worth 13. Drawings —That part of the Contract Documents prepared or approved by Engineer which graphically shows the scope, extent, and character of the Work to be performed by Contractor. Submittals are not Drawings as so defined. 14. Engineer —The licensed professional engineer or engineering firm registered in the State of Texas performing professional services for the Developer. 15. Final Acceptance — The written notice given by the City to the Developer and/or Contractor that the Work specified in the Contract Documents has been completed to the satisfaction of the City. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 3 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 3 of 35 16. Final Inspection — Inspection carried out by the City to verb that the Contractor has completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in conformance with the Contract Documents. 17. General Requirements —A part of the Contract Documents between the Developer and a Contractor. 18. Laws and Regulations Any and all applicable laws, rules, regulations, ordinances, codes, and orders of any and all governmental bodies, agencies, authorities, and courts having jurisdiction. 19. Liens —Charges, security interests, or encumbrances upon Project funds, real property, or personal property. 20. Milestone —A principal event specified in the Contract Documents relating to an intermediate Contract Time prior to Final Acceptance of the Work. 21. Non -Participating Change Order —A document, which is prepared for and reviewed by the City, which is signed by Contractor, and Developer, and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 22. Participating Change Order —A document, which is prepared for and approved by the City, which is signed by Contractor, Developer, and City and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 23. Plans — See definition of Drawings. 24. Project Schedule —A schedule, prepared and maintained by Contractor, in accordance with the General Requirements, describing the sequence and duration of the activities comprising the Contractor's plan to accomplish the Work within the Contract Time. 25. Project —The Work to be performed under the Contract Documents. 26. Project Representative —The authorized representative of the City who will be assigned to the Site. 27. Public Meeting — An announced meeting conducted by the Developer to facilitate public participation and to assist the public in gaining an informed view of the Project. 28. Regular Working Hours — Hours beginning at 7: 00 a.m. and ending at 6:00 p.m., Monday thru Friday (excluding legal holidays). 29. Samples Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will be judged. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 4 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 4 of 35 30. Schedule of Submittals —A schedule, prepared and maintained by Contractor, of required submittals and the time requirements to support scheduled performance of related construction activities. 31. Site —Lands or areas indicated in the Contract Documents as being furnished by City or Developer upon which the Work is to be performed, including rights -of -way, permits, and easements for access thereto, and such other lands furnished by City or Developer which are designated for the use of Contractor. 32. Specifications —That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto. Specifications may be specifically made a part of the Contract Documents by attachment or, if not attached, may be incorporated by reference as indicated in the Table of Contents (Division 00 00 00) of each Project. 33. Standard City Conditions — That part of the Contract Documents setting forth requirements of the City. 34. Subcontractor —An individual or entity having a direct contract with Contractor or with any other Subcontractor for the performance of a part of the Work at the Site. 35. Submittals All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work. 36. Superintendent — The representative of the Contractor who is available at all times and able to receive instructions from the City and/or Developer and to act for the Contractor. 37. Supplementary Conditions —That part of the Contract Documents which amends or supplements the General Conditions. 38. Supplier —A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by Contractor or Subcontractor. 39. Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including but not limited to, those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems. 40. Weekend Working Hours — Hours beginning at 9: 00 a. in. and ending at 5: 00 p.m., Saturday, Sunday or legal holiday, as approved in advance by the City. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 5 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 5 of 35 41. Work —The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such construction including any Participating Change Order, Non -Participating Change Order, or Field Order, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents. 42. Working Day — A working day is defined as a day, not including Saturdays, Sundays, or legal holidays authorized by the City for contract purposes, in which weather or other conditions not under the control of the Contractor will permit the performance of the principal unit of work underway for a continuous period of not less than 7 hours between 7 a.m. and 6 p. m. 1.02 Terminology A. The words and terms discussed in Paragraph 1.02.13 through D are not defined but, when used in the Bidding Requirements or Contract Documents, have the indicated meaning. B. Defective: 1. The word "defective," when modifying the word "Work," refers to Work that is unsatisfactory, faulty, or deficient in that it: a. does not conform to the Contract Documents; or b. does not meet the requirements of any applicable inspection, reference standard, test, or approval referred to in the Contract Documents; or c. has been damaged prior to City's written acceptance. C. Furnish, Install, Perform, Provide: 1. The word "Furnish" or the word "Install" or the word "Perform" or the word "Provide" or the word "Supply," or any combination or similar directive or usage thereof, shall mean furnishing and incorporating in the Work including all necessary labor, materials, equipment, and everything necessary to perform the Work indicated, unless specifically limited in the context used. D. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with such recognized meaning. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 6 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 6 of 35 ARTICLE 2 — PRELIMINARY MATTERS 2.01 Before Starting Construction Baseline Schedules: Submit to City in accordance with the Contract Documents, and prior to starting the Work. New schedules will be submitted to City when Participating Change Orders or Non - Participating Change Orders occur. 2.02 Preconstruction Conference Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as specified in the Contract Documents. 2.03 Public Meeting Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor attending the Public Meeting as scheduled by the City. ARTICLE 3 — CONTRACT DOCUMENTS AND AMENDING 3.01 Reference Standards A. Standards, Specifications, Codes, Laws, and Regulations 1. Reference to standards, specifications, manuals, or codes of any technical society, organization, or association, or to Laws or Regulations, whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or Laws or Regulations in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there were no Bids), except as may be otherwise specifically stated in the Contract Documents. 2. No provision or instruction shall be effective to assign to City, or any of its officers, directors, members, partners, employees, agents, consultants, or subcontractors, any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of the Contract Documents. 3.02 Amending and Supplementing Contract Documents A. The Contract Documents may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof by a Participating Change Order or a Non -Participating Change Order. B. The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work not involving a change in Contract Price or Contract Time, may be authorized, by one or more of the following ways: 1. A Field Order; CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 7 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 7 of 35 1. City's or Engineer's review of a Submittal (subject to the provisions of Paragraph 5.16.C); or 2. City's written interpretation or clarification. ARTICLE 4 — BONDS AND INSURANCE 4.01 Licensed Sureties and Insurers All bonds and insurance required by the Contract Documents to be purchased and maintained by Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized in the State of Texas to issue bonds or insurance policies for the limits and coverage so required. Such surety and insurance companies shall also meet such additional requirements and qualifications as may be provided Section 4.04. 4.02 Performance, Payment, and Maintenance Bonds A. Contractor shall furnish performance and payment bonds in the name of Developer and City, in accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount equal to the Contract Price as security for the faithful performance and payment of all of Contractor's obligations under the Contract Documents. B. Contractor shall furnish maintenance bonds in the name of Developer and City in an amount equal to the Contract Price as security to protect the City against any defects in any portion of the Work described in the Contract Documents. Maintenance bonds shall remain in effect for two (2) years after the date of Final Acceptance by the City. C. All bonds shall be in the form prescribed by the Contract Documents except as provided otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed by an agent or attorney -in -fact must be accompanied by a sealed and dated power of attorney which shall show that it is effective on the date the agent or attorney -in -fact signed each bond. D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in the State of Texas or it ceases to meet the requirements of Paragraph 4.02.C, Contractor shall promptly notify City and shall, within 30 days after the event giving rise to such notification, provide another bond and surety, both of which shall comply with the requirements of Paragraphs 4.01 and 4.02.C. 4.03 Certificates of Insurance Contractor shall deliver to Developer and City, with copies to each additional insured and loss payee identified in these Standard City Conditions certificates of insurance (and other evidence of insurance requested by City or any other additional insured) which Contractor is required to purchase and maintain. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 8 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 8 of 35 1. The certificate of insurance shall document the City, an as "Additional Insured" on all liability policies. 2. The Contractor's general liability insurance shall include a, "per project" or "per location", endorsement, which shall be identified in the certificate of insurance provided to the City. 3. The certificate shall be signed by an agent authorized to bind coverage on behalf of the insured, be complete in its entirety, and show complete insurance carrier names as listed in the current A.M. Best Property & Casualty Guide 4. The insurers for all policies must be licensed and/or approved to do business in the State of Texas. Except for workers' compensation, all insurers must have a minimum rating of A-: VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. If the rating is below that required, written approval of City is required. 5. All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor of the City. In addition, the Contractor agrees to waive all rights of subrogation against the Engineer (if applicable), and each additional insured identified in these Standard City Conditions. Failure of the City to demand such certificates or other evidence of full compliance with the insurance requirements or failure of the City to identify a deficiency from evidence that is provided shall not be construed as a waiver of Contractor's obligation to maintain such lines of insurance coverage. 6. If insurance policies are not written for specified coverage limits, an Umbrella or Excess Liability insurance for any differences is required. Excess Liability shall follow form of the primary coverage. 7. Unless otherwise stated, all required insurance shall be written on the "occurrence basis". If coverage is underwritten on a claims -made basis, the retroactive date shall be coincident with or prior to the date of the effective date of the agreement and the certificate of insurance shall state that the coverage is claims -made and the retroactive date. The insurance coverage shall be maintained for the duration of the Contract and for three (3) years following Final Acceptance provided under the Contract Documents or for the warranty period, whichever is longer. An annual certificate of insurance submitted to the City shall evidence such insurance coverage. 8. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the required lines of coverage, nor decrease the limits of said coverage unless such endorsements are approved in writing by the City. In the event a Contract has been bid or executed and the exclusions are determined to be unacceptable or the City desires additional insurance coverage, and the City desires the contractor/engineer to obtain such coverage, the contract price shall be adjusted by the cost of the premium for such additional coverage plus 10%. 9. Any self -insured retention (SIR), in excess of $25,000.00, affecting required insurance coverage shall be approved by the City in regards to asset value and stockholders' equity. In CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10-9 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 9 of 35 lieu of traditional insurance, alternative coverage maintained through insurance pools or risk retention groups, must also be approved by City. 10. Any deductible in excess of $5,000.00, for any policy that does not provide coverage on a first -dollar basis, must be acceptable to and approved by the City. 11. City, at its sole discretion, reserves the right to review the insurance requirements and to make reasonable adjustments to insurance coverage's and their limits when deemed necessary and prudent by the City based upon changes in statutory law, court decision or the claims history of the industry as well as of the contracting party to the City. The City shall be required to provide prior notice of 90 days, and the insurance adjustments shall be incorporated into the Work by Change Order. 12. City shall be entitled, upon written request and without expense, to receive copies of policies and endorsements thereto and may make any reasonable requests for deletion or revision or modifications of particular policy terms, conditions, limitations, or exclusions necessary to conform the policy and endorsements to the requirements of the Contract. Deletions, revisions, or modifications shall not be required where policy provisions are established by law or regulations binding upon either party or the underwriter on any such policies. 13. City shall not be responsible for the direct payment of insurance premium costs for Contractor's insurance. 4.04 Contractor's Insurance A. Workers Compensation and Employers' Liability. Contractor shall purchase and maintain such insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers' Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for Employers' Liability as is appropriate for the Work being performed and as will provide protection from claims set forth below which may arise out of or result from Contractor's performance of the Work and Contractor's other obligations under the Contract Documents, whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable: 1. claims under workers' compensation, disability benefits, and other similar employee benefit acts; 2. claims for damages because of bodily injury, occupational sickness or disease, or death of Contractor's employees. 3. The limits of liability for the insurance shall provide the following coverages for not less than the following amounts or greater where required by Laws and Regulations a. Statutory limits b. Employer's liability CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10-10 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 10 of 35 1) $100,000 each accident/occurrence 2) $100,000 Disease - each employee 3) $500,000 Disease - policy limit B. Commercial General Liability. Coverage shall include but not be limited to covering liability (bodily injury or property damage) arising from: premises/operations, independent contractors, products/completed operations, personal injury, and liability under an insured contract. Insurance shall be provided on an occurrence basis, and as comprehensive as the current Insurance Services Office (ISO) policy. This insurance shall apply as primary insurance with respect to any other insurance or self-insurance programs afforded to the City. The Commercial General Liability policy, shall have no exclusions by endorsements that would alter of nullify premises/operations, products/completed operations, contractual, personal injury, or advertising injury, which are normally contained with the policy, unless the City approves such exclusions in writing. 1. For construction projects that present a substantial completed operation exposure, the City may require the contractor to maintain completed operations coverage for a minimum of no less than three (3) years following the completion of the project 2. Contractor's Liability Insurance under this Section which shall be on a per project basis covering the Contractor with minimum limits o£ a. $1,000,000 each occurrence b. $2,000,000 aggregate limit 3. The policy must have an endorsement (Amendment — Aggregate Limits of Insurance) making the General Aggregate Limits apply separately to each job site. 4. The Commercial General Liability Insurance policies shall provide "X", "C", and "U" coverage's. Verification of such coverage must be shown in the Remarks Article of the Certificate of Insurance. C. Automobile Liability. A commercial business auto policy shall provide coverage on "any auto", defined as autos owned, hired and non -owned and provide indemnity for claims for damages because bodily injury or death of any person and or property damage arising out of the work, maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable. 1. Automobile Liability, Contractor's Liability Insurance under this Section, which shall be in an amount not less than the following amounts: a. Automobile Liability - a commercial business policy shall provide coverage on "Any Auto", defined as autos owned, hired and non -owned. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 11 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 11 of 35 1) ,$1, 000, 000 each accident on a combined single limit basis. Split limits are acceptable if limits are at least: 2) $250,000 Bodily Injury per person 3) $500,000 Bodily Injury per accident / 4) $100,000 Property Damage D. Railroad Protective Liability. If any of the work or any warranty work is within the limits of railroad right-of-way, the Contractor shall comply with the following requirements: 1. The Contractor's construction activities will require its employees, agents, subcontractors, equipment, and material deliveries to cross railroad properties and tracks owned and operated by: None Write the name of the railroad company. (If none, then write none) 2. The Contractor shall conduct its operations on railroad properties in such a manner as not to interfere with, hinder, or obstruct the railroad company in any manner whatsoever in the use or operation of its/their trains or other property. Such operations on railroad properties may require that Contractor to execute a "Right of Entry Agreement" with the particular railroad company or companies involved, and to this end the Contractor should satisfy itself as to the requirements of each railroad company and be prepared to execute the right -of -entry (if any) required by a railroad company. The requirements specified herein likewise relate to the Contractor's use of private and/or construction access roads crossing said railroad company's properties. 3. The Contractual Liability coverage required by Paragraph 5.04D of the General Conditions shall provide coverage for not less than the following amounts, issued by companies satisfactory to the City and to the Railroad Company for a term that continues for so long as the Contractor's operations and work cross, occupy, or touch railroad property: a. General Aggregate: None Enter limits provided by Railroad Company (If none, write none) b. Each Occurrence:: None Enter limits provided by Railroad Company (If none, write none) 4. With respect to the above outlined insurance requirements, the following shall govern: a. Where a single railroad company is involved, the Contractor shall provide one insurance policy in the name of the railroad company. However, if more than one grade separation or at -grade crossing is affected by the Project at entirely separate locations on the line or lines of the same railroad company, separate coverage may be required, each in the amount stated above. b. Where more than one railroad company is operating on the same right-of-way or where several railroad companies are involved and operated on their own separate rights -of - CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 12 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 12 of 35 way, the Contractor may be required to provide separate insurance policies in the name of each railroad company. If, in addition to a grade separation or an at -grade crossing, other work or activity is proposed on a railroad company's right-of-way at a location entirely separate from the grade separation or at -grade crossing, insurance coverage for this work must be included in the policy covering the grade separation. d. If no grade separation is involved but other work is proposed on a railroad company's right-of-way, all such other work may be covered in a single policy for that railroad, even though the work may be at two or more separate locations. 5. No work or activities on a railroad company's property to be performed by the Contractor shall be commenced until the Contractor has furnished the City with an original policy or policies of the insurance for each railroad company named, as required above. All such insurance must be approved by the City and each affected Railroad Company prior to the Contractor's beginning work. 6. The insurance specified above must be carried until all Work to be performed on the railroad right-of-way has been completed and the grade crossing, if any, is no longer used by the Contractor. In addition, insurance must be carried during all maintenance and/or repair work performed in the railroad right-of-way. Such insurance must name the railroad company as the insured, together with any tenant or lessee of the railroad company operating over tracks involved in the Project. E. Notification of Policy Cancellation: Contractor shall immediately notify City upon cancellation or other loss of insurance coverage. Contractor shall stop work until replacement insurance has been procured. There shall be no time credit for days not worked pursuant to this section. 4.05 Acceptance of Bonds and Insurance; Option to Replace If City has any objection to the coverage afforded by or other provisions of the bonds or insurance required to be purchased and maintained by the Contractor in accordance with Article 5 on the basis of non-conformance with the Contract Documents, the Developer and City shall so notify the Contractor in writing within 10 Business Days after receipt of the certificates (or other evidence requested). Contractor shall provide to the City such additional information in respect of insurance provided as the Developer or City may reasonably request. If Contractor does not purchase or maintain all of the bonds and insurance required by the Contract Documents, the Developer or City shall notify the Contractor in writing of such failure prior to the start of the Work, or of such failure to maintain prior to any change in the required coverage. ARTICLE 5 — CONTRACTOR'S RESPONSIBILITIES 5.01 Supervision and Superintendent A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 13 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 13 of 35 Work in accordance with the Contract Documents. Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction. B. At all times during the progress of the Work, Contractor shall assign a competent, English- speaking, Superintendent who shall not be replaced without written notice to City. The Superintendent will be Contractor's representative at the Site and shall have authority to act on behalf of Contractor. All communication given to or received from the Superintendent shall be binding on Contractor. C. Contractor shall notify the City 24 hours prior to moving areas during the sequence of construction. 5.02 Labor; Working Hours A. Contractor shall provide competent, suitably qualified personnel to perform construction as required by the Contract Documents. Contractor shall at all times maintain good discipline and order at the Site. B. Except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work at the Site shall be performed during Regular Working Hours. Contractor will not permit the performance of Work beyond Regular Working Hours or for Weekend Working Hours without City's written consent (which will not be unreasonably withheld). Written request (by letter or electronic communication) to perform Work: 1. for beyond Regular Working Hours request must be made by noon at least two (2) Business Days prior 2. for Weekend Working Hours request must be made by noon of the preceding Thursday 3. for legal holidays request must be made by noon two Business Days prior to the legal holiday. 5.03 Services, Materials, and Equipment A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities and incidentals necessary for the performance, Contractor required testing, start-up, and completion of the Work. B. All materials and equipment incorporated into the Work shall be as specified or, if not specified, shall be of good quality and new, except as otherwise provided in the Contract Documents. All special warranties and guarantees required by the Specifications shall expressly run to the benefit of City. If required by City, Contractor shall furnish satisfactory evidence (including reports of required tests) as to the source, kind, and quality of materials and equipment. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 14 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 14 of 35 C. All materials and equipment to be incorporated into the Work shall be stored, applied, installed, connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of the applicable Supplier, except as otherwise may be provided in the Contract Documents. 5.04 Project Schedule A. Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.01 and the General Requirements as it may be adjusted from time to time as provided below. 1. Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.01 and the General Requirements) proposed adjustments in the Project Schedule. 2. Proposed adjustments in the Project Schedule that will change the Contract Time shall be submitted in accordance with the requirements of Article 9. Adjustments in Contract Time for projects with City participation shall be made by participating change orders. 5.05 Substitutes and "Or -Equals " A. Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function, appearance, and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent, or "or -equal" item or no substitution is permitted, other items of material or equipment of other Suppliers may be submitted to City for review under the circumstances described below. 1. "Or -Equal" Items: If in City's sole discretion an item of material or equipment proposed by Contractor is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by City as an "or -equal" item, in which case review and approval of the proposed item may, in City's sole discretion, be accomplished without compliance with some or all of the requirements for approval of proposed substitute items. For the purposes of this Paragraph 5.05.A.1, a proposed item of material or equipment will be considered functionally equal to an item so named if: a. City determines that: 1) it is at least equal in materials of construction, quality, durability, appearance, strength, and design characteristics; 2) it will reliably perform at least equally well the function and achieve the results imposed by the design concept of the completed Project as a functioning whole; and 3) it has a proven record of performance and availability of responsive service; and b. Contractor certifies that, if approved and incorporated into the Work: 1) there will be no increase in cost to the City or increase in Contract Time; and CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 15 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 15 of 35 2) it will conform substantially to the detailed requirements of the item named in the Contract Documents. 2. Substitute Items: a. If in City's sole discretion an item of material or equipment proposed by Contractor does not qualify as an "or -equal" item under Paragraph 5.05.A.1, it may be submitted as a proposed substitute item. b. Contractor shall submit sufficient information as provided below to allow City to determine if the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefor. Requests for review of proposed substitute items of material or equipment will not be accepted by City from anyone other than Contractor. c. Contractor shall make written application to City for review of a proposed substitute item of material or equipment that Contractor seeks to furnish or use. The application shall comply with Section 0125 00 and: 1) shall certify that the proposed substitute item will: i. perform adequately the functions and achieve the results called for by the general design; ii. be similar in substance to that specified; iii. be suited to the same use as that specified; and 2) will state: i. the extent, if any, to which the use of the proposed substitute item will prejudice Contractor's achievement of final completion on time; ii. whether use of the proposed substitute item in the Work will require a change in any of the Contract Documents (or in the provisions of any other direct contract with City for other work on the Project) to adapt the design to the proposed substitute item; iii. whether incorporation or use of the proposed substitute item in connection with the Work is subject to payment of any license fee or royalty; and 3) will identify: i. all variations of the proposed substitute item from that specified; ii. available engineering, sales, maintenance, repair, and replacement services; and CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 16 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 16 of 35 4) shall contain an itemized estimate of all costs or credits that will result directly or indirectly from use of such substitute item, including costs of redesign and Damage Claims of other contractors affected by any resulting change. B. Substitute Construction Methods or Procedures: If a specific means, method, technique, sequence, or procedure of construction is expressly required by the Contract Documents, Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure of construction approved by City. Contractor shall submit sufficient information to allow City, in City's sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. Contractor shall make written application to City for review in the same manner as those provided in Paragraph 5.05.A.2. C. City's Evaluation: City will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to Paragraphs 5.05.A and 5.05.13. City may require Contractor to furnish additional data about the proposed substitute. City will be the sole judge of acceptability. No "or -equal" or substitute will be ordered, installed or utilized until City's review is complete, which will be evidenced by a Change Order in the case of a substitute and an accepted Submittal for an "or -equal." City will advise Contractor in writing of its determination. D. Special Guarantee: City may require Contractor to furnish at Contractor's expense a special performance guarantee, warranty, or other surety with respect to any substitute. Contractor shall indemnify and hold harmless City and anyone directly or indirectly employed by them from and against any and all claims, damages, losses and expenses (including attorneys fees) arising out of the use of substituted materials or equipment. E. City's Cost Reimbursement: City will record City's costs in evaluating a substitute proposed or submitted by Contractor pursuant to Paragraphs 5.05.A.2 and 5.05.B. Whether or not City approves a substitute so proposed or submitted by Contractor, Contractor may be required to reimburse City for evaluating each such proposed substitute. Contractor may also be required to reimburse City for the charges for making changes in the Contract Documents. F. Contractor's Expense: Contractor shall provide all data in support of any proposed substitute or "or -equal" at Contractor's expense. G. Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a substitute shall be incorporated to the Contract by Participating Change Order. 5.06 Pre -Qualification of Bidders (Prime Contractors and Subcontractors) A. The Contractor and any subcontractors are required to be prequalified for the work types requiring pre -qualification 5.07 Concerning Subcontractors, Suppliers, and Others A. Minority and Women Owned Business Enterprise Compliance: CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 17 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 17 of 35 ❑ Required for this Contract. (Check this box if there is any City Participation) ❑x Not Required for this Contract. It is City policy to ensure the full and equitable participation by Minority and Women Business Enterprises (MWBE) in the procurement of goods and services on a contractual basis. If the Contract Documents provide for a MWBE goal, Contractor is required to comply with the intent of the City's MWBE Ordinance (as amended) by the following: 1. Contractor shall, upon request by City, provide complete and accurate information regarding actual work performed by a MWBE on the Contract and payment therefor. 2. Contractor will not make additions, deletions, or substitutions of accepted MWBE without written consent of the City. Any unjustified change or deletion shall be a material breach of Contract and may result in debarment in accordance with the procedures outlined in the Ordinance. 3. Contractor shall, upon request by City, allow an audit and/or examination of any books, records, or files in the possession of the Contractor that will substantiate the actual work performed by an MWBE. Material misrepresentation of any nature will be grounds for termination of the Contract. Any such misrepresentation may be grounds for disqualification of Contractor to bid on future contracts with the City for a period of not less than three years. B. Contractor shall be fully responsible to City for all acts and omissions of the Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work just as Contractor is responsible for Contractor's own acts and omissions. Nothing in the Contract Documents: 1. shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity any contractual relationship between City and any such Subcontractor, Supplier or other individual or entity; nor 2. shall create any obligation on the part of City to pay or to see to the payment of any moneys due any such Subcontractor, Supplier, or other individual or entity except as may otherwise be required by Laws and Regulations. C. Contractor shall be solely responsible for scheduling and coordinating the Work of Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work under a direct or indirect contract with Contractor. D. All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing any of the Work shall communicate with City through Contractor. E. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an appropriate agreement between Contractor and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of these Contract CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 18 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 18 of 35 Documents, Contractor shall provide City contract numbers and reference numbers to the Subcontractors and/or Suppliers. 5.08 Wage Rates ❑ Required for this Contract. ® Not Required for this Contract. A. Duty to pay Prevailing Wage Rates. The Contractor shall comply with all requirements of Chapter 2258, Texas Government Code (as amended), including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258. Such prevailing wage rates are included in these Contract Documents. B. Penalty for Violation. A Contractor or any Subcontractor who does not pay the prevailing wage shall, upon demand made by the City, pay to the City $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the prevailing wage rates stipulated in these contract documents. This penalty shall be retained by the City to offset its administrative costs, pursuant to Texas Government Code 2258.023. C. Complaints of Violations and City Determination of Good Cause. On receipt of information, including a complaint by a worker, concerning an alleged violation of 2258.023, Texas Government Code, by a Contractor or Subcontractor, the City shall make an initial determination, before the 31 st day after the date the City receives the information, as to whether good cause exists to believe that the violation occurred. The City shall notify in writing the Contractor or Subcontractor and any affected worker of its initial determination. Upon the City's determination that there is good cause to believe the Contractor or Subcontractor has violated Chapter 2258, the City shall retain the full amounts claimed by the claimant or claimants as the difference between wages paid and wages due under the prevailing wage rates, such amounts being subtracted from successive progress payments pending a final determination of the violation. D. Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected worker, shall be submitted to binding arbitration in accordance with the Texas General Arbitration Act (Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any affected worker does not resolve the issue by agreement before the 15th day after the date the City makes its initial determination pursuant to Paragraph C above. If the persons required to arbitrate under this section do not agree on an arbitrator before the 1 lth day after the date that arbitration is required, a district court shall appoint an arbitrator on the petition of any of the persons. The City is not a party in the arbitration. The decision and award of the arbitrator is final and binding on all parties and may be enforced in any court of competent jurisdiction. E. Records to be Maintained. The Contractor and each Subcontractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) the name and CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 19 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 19 of 35 occupation of each worker employed by the Contractor in the construction of the Work provided for in this Contract; and (ii) the actual per diem wages paid to each worker. The records shall be open at all reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right to Audit, shall pertain to this inspection. F. Progress Payments. With each progress payment or payroll period, whichever is less, the Contractor shall submit an affidavit stating that the Contractor has complied with the requirements of Chapter 2258, Texas Government Code. G. Posting of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at all times. H. Subcontractor Compliance. The Contractor shall include in its subcontracts and/or shall otherwise require all of its Subcontractors to comply with Paragraphs A through G above. 5.09 Patent Fees and Royalties A. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any infringement of patent rights or copyrights incident to the use in the performance of the Work or resulting from the incorporation in the Work of any invention, design, process, product, or device not specified in the Contract Documents. 5.10 Laws and Regulations A. Contractor shall give all notices required by and shall comply with all Laws and Regulations applicable to the performance of the Work. Except where otherwise expressly required by applicable Laws and Regulations, the City shall not be responsible for monitoring Contractor's compliance with any Laws or Regulations. B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws or Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such Work. However, it shall not be Contractor's responsibility to make certain that the Specifications and Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of Contractor's obligations under Paragraph 3.01. 5.11 Use of Site and Other Areas A. Limitation on Use of Site and Other Areas: 1. Contractor shall confine construction equipment, the storage of materials and equipment, and the operations of workers to the Site and other areas permitted by Laws and Regulations, and shall not unreasonably encumber the Site and other areas with construction equipment or CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 20 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 20 of 35 other materials or equipment. Contractor shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas resulting from the performance of the Work. 2. At any time when, in the judgment of the City, the Contractor has obstructed or closed or is carrying on operations in a portion of a street, right-of-way, or easement greater than is necessary for proper execution of the Work, the City may require the Contractor to finish the section on which operations are in progress before work is commenced on any additional area of the Site. 3. Should any Damage Claim be made by any such owner or occupant because of the performance of the Work, Contractor shall promptly attempt to resolve the Damage Claim. 4. Pursuant to Paragraph 5.18, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages arising out of or relating to any claim or action, legal or equitable, brought by any such owner or occupant against City. B. Removal of Debris During Performance of the Work: During the progress of the Work Contractor shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to applicable Laws and Regulations. C. Site Maintenance Cleaning: 24 hours after written notice is given to the Contractor that the clean-up on the job site is proceeding in a manner unsatisfactory to the City or Developer, if the Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as the City deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written notice (by letter or electronic communication), and shall be entitled to recover its cost in doing so. The City may withhold Final Acceptance until clean-up is complete and cost are recovered. D. Final Site Cleaning: Prior to Final Acceptance of the Work Contractor shall clean the Site and the Work and make it ready for utilization by City or adjacent property owner. At the completion of the Work Contractor shall remove from the Site all tools, appliances, construction equipment and machinery, and surplus materials and shall restore to original condition or better all property disturbed by the Work. E. Loading Structures: Contractor shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endanger it. 5.12 Record Documents A. Contractor shall maintain in a safe place at the Site or in a place designated by the Contractor and approved by the City, one (1) record copy of all Drawings, Specifications, Addenda, Change Orders, Field Orders, and written interpretations and clarifications in good order and annotated to show changes made during construction. These record documents together with all approved CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 21 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 21 of 35 Samples and a counterpart of all accepted Submittals will be available to City for reference. Upon completion of the Work, these record documents, any operation and maintenance manuals, and Submittals will be delivered to City prior to Final Inspection. Contractor shall include accurate locations for buried and imbedded items. 5.13 Safety and Protection A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. Such responsibility does not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: 1. all persons on the Site or who may be affected by the Work; 2. all the Work and materials and equipment to be incorporated therein, whether in storage on or off the Site; and 3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, utilities, and Underground Facilities not designated for removal, relocation, or replacement in the course of construction. B. Contractor shall comply with all applicable Laws and Regulations relating to the safety of persons or property, or to the protection of persons or property from damage, injury, or loss; and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and of Underground Facilities and other utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation, and replacement of their property. C. Contractor shall comply with the applicable requirements of City's safety programs, if any. D. Contractor shall inform City of the specific requirements of Contractor's safety program, if any, with which City's employees and representatives must comply while at the Site. E. All damage, injury, or loss to any property referred to in Paragraph 5.13.A.2 or 5.13.A.3 caused, directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any other individual or entity directly or indirectly employed by any of them to perform any of the Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor. F. Contractor's duties and responsibilities for safety and for protection of the Work shall continue until such time as all the Work is completed and City has accepted the Work. 5.14 Safety Representative Contractor shall inform City in writing of Contractor's designated safety representative at the Site. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 22 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 22 of 35 5.15 Hazard Communication Programs Contractor shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers in accordance with Laws or Regulations. 5.16 Submittals A. Contractor shall submit required Submittals to City for review and acceptance. Each submittal will be identified as required by City. 1. Submit number of copies specified in the General Requirements. 2. Data shown on the Submittals will be complete with respect to quantities, dimensions, specified performance and design criteria, materials, and similar data to show City the services, materials, and equipment Contractor proposes to provide and to enable City to review the information for the limited purposes required by Paragraph 5.16.C. 3. Submittals submitted as herein provided by Contractor and reviewed by City for conformance with the design concept shall be executed in conformity with the Contract Documents unless otherwise required by City. 4. When Submittals are submitted for the purpose of showing the installation in greater detail, their review shall not excuse Contractor from requirements shown on the Drawings and Specifications. 5. For -Information -Only submittals upon which the City is not expected to conduct review or take responsive action may be so identified in the Contract Documents. 6. Submit required number of Samples specified in the Specifications. 7. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers, the use for which intended and other data as City may require to enable City to review the submittal for the limited purposes required by Paragraph 5.16.C. B. Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any related Work performed prior to City's review and acceptance of the pertinent submittal will be at the sole expense and responsibility of Contractor. C. City's Review: 1. City will provide timely review of required Submittals in accordance with the Schedule of Submittals acceptable to City. City's review and acceptance will be only to determine if the items covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 23 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 23 of 35 2. City's review and acceptance will not extend to means, methods, techniques, sequences, or procedures of construction (except where a particular means, method, technique, sequence, or procedure of construction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and acceptance of a separate item as such will not indicate approval of the assembly in which the item functions. 3. City's review and acceptance shall not relieve Contractor from responsibility for any variation from the requirements of the Contract Documents unless Contractor has complied with the requirements of Section 01 33 00 and City has given written acceptance of each such variation by specific written notation thereof incorporated in or accompanying the Submittal. City's review and acceptance shall not relieve Contractor from responsibility for complying with the requirements of the Contract Documents. 5.17 Contractor's General Warranty and Guarantee A. Contractor warrants and guarantees to City that all Work will be in accordance with the Contract Documents and will not be defective. City and its officers, directors, members, partners, employees, agents, consultants, and subcontractors shall be entitled to rely on representation of Contractor's warranty and guarantee. B. Contractor's warranty and guarantee hereunder excludes defects or damage caused by: 1. abuse, modification, or improper maintenance or operation by persons other than Contractor, Subcontractors, Suppliers, or any other individual or entity for whom Contractor is responsible; or 2. normal wear and tear under normal usage. C. Contractor's obligation to perform and complete the Work in accordance with the Contract Documents shall be absolute. None of the following will constitute an acceptance of Work that is not in accordance with the Contract Documents or a release of Contractor's obligation to perform the Work in accordance with the Contract Documents: 1. observations by City; 2. recommendation or payment by City or Developer of any progress or final payment; 3. the issuance of a certificate of Final Acceptance by City or any payment related thereto by City; 4. use or occupancy of the Work or any part thereof by City; 5. any review and acceptance of a Submittal by City; 6. any inspection, test, or approval by others; or CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 24 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 24 of 35 7. any correction of defective Work by City. D. The Contractor shall remedy any defects or damages in the Work and pay for any damage to other work or property resulting therefrom which shall appear within a period of two (2) years from the date of Final Acceptance of the Work unless a longer period is specified and shall furnish a good and sufficient maintenance bond, complying with the requirements of Article 4.02.13. The City will give notice of observed defects with reasonable promptness. 5.18 Indemnification A. Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the City, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licenses or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the City in defending against such claims and causes of actions. B. Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the City, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the City, arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licensees or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. 5.19 Delegation of Professional Design Services A. Contractor will not be required to provide professional design services unless such services are specifically required by the Contract Documents for a portion of the Work or unless such services are required to carry out Contractor's responsibilities for construction means, methods, techniques, sequences and procedures. B. If professional design services or certifications by a design professional related to systems, materials or equipment are specifically required of Contractor by the Contract Documents, City will specify all performance and design criteria that such services must satisfy. Contractor shall cause such services or certifications to be provided by a properly licensed professional, whose signature and seal shall appear on all drawings, calculations, specifications, certifications, and Submittals prepared by such professional. Submittals related to the Work designed or certified by such professional, if prepared by others, shall bear such professional's written approval when submitted to City. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 25 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 25 of 35 C. City shall be entitled to rely upon the adequacy, accuracy and completeness of the services, certifications or approvals performed by such design professionals, provided City has specified to Contractor performance and design criteria that such services must satisfy. D. Pursuant to this Paragraph 5.19, City's review and acceptance of design calculations and design drawings will be only for the limited purpose of checking for conformance with performance and design criteria given and the design concept expressed in the Contract Documents. City's review and acceptance of Submittals (except design calculations and design drawings) will be only for the purpose stated in Paragraph 5.16.C. 5.20 Right to Audit: A. The City reserves the right to audit all projects utilizing City funds B. The Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of the Contractor involving transactions relating to this Contract. Contractor agrees that the City shall have access during Regular Working Hours to all necessary Contractor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Contractor reasonable advance notice of intended audits. C. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of such Subcontractor, involving transactions to the subcontract, and further, that City shall have access during Regular Working Hours to all Subcontractor facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Subcontractor reasonable advance notice of intended audits. D. Contractor and Subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse Contractor for the cost of the copies as follows at the rate published in the Texas Administrative Code in effect as of the time copying is performed. 5.21 Nondiscrimination A. The City is responsible for operating Public Transportation Programs and implementing transit - related projects, which are funded in part with Federal financial assistance awarded by the U.S. Department of Transportation and the Federal Transit Administration (FTA), without discriminating against any person in the United States on the basis of race, color, or national origin. B. Title VI, Civil Rights Act of 1964 as amended: Contractor shall comply with the requirements of the Act and the Regulations as further defined in the Supplementary Conditions for any project receiving Federal assistance. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 26 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 26 of 35 ARTICLE 6 — OTHER WORK AT THE SITE 6.01 Related Work at Site A. City may perform other work related to the Project at the Site with City's employees, or other City contractors, or through other direct contracts therefor, or have other work performed by utility owners. If such other work is not noted in the Contract Documents, then written notice thereof will be given to Contractor prior to starting any such other work; and B. Contractor shall afford each other contractor who is a parry to such a direct contract, each utility owner, and City, if City is performing other work with City's employees or other City contractors, proper and safe access to the Site, provide a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work, and properly coordinate the Work with theirs. Contractor shall do all cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together and properly integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering such work; provided, however, that Contractor may cut or alter others' work with the written consent of City and the others whose work will be affected. C. If the proper execution or results of any part of Contractor's Work depends upon work performed by others under this Article 7, Contractor shall inspect such other work and promptly report to City in writing any delays, defects, or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of Contractor's Work. Contractor's failure to so report will constitute an acceptance of such other work as fit and proper for integration with Contractor's Work except for latent defects in the work provided by others. ARTICLE 7 — CITY'S RESPONSIBILITIES 7.01 Inspections, Tests, and Approvals City's responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph 11.03. 7.02 Limitations on City's Responsibilities A. The City shall not supervise, direct, or have control or authority over, nor be responsible for, Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. City will not be responsible for Contractor's failure to perform the Work in accordance with the Contract Documents. B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 5.13. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 27 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 27 of 35 7.03 Compliance with Safety Program While at the Site, City's employees and representatives shall comply with the specific applicable requirements of Contractor's safety programs of which City has been informed pursuant to Paragraph 5.13. ARTICLE 8 — CITY'S OBSERVATION STATUS DURING CONSTRUCTION 8.01 City's Project Representative City will provide one or more Project Representative(s) during the construction period. The duties and responsibilities and the limitations of authority of City's representative during construction are set forth in the Contract Documents. A. City's Project Representative will make visits to the Site at intervals appropriate to the various stages of construction as City deems necessary in order to observe the progress that has been made and the quality of the various aspects of Contractor's executed Work. Based on information obtained during such visits and observations, City's Project Representative will determine, in general, if the Work is proceeding in accordance with the Contract Documents. City's Project Representative will not be required to make exhaustive or continuous inspections on the Site to check the quality or quantity of the Work. City's Project Representative's efforts will be directed toward providing City a greater degree of confidence that the completed Work will conform generally to the Contract Documents. B. City's Project Representative's visits and observations are subject to all the limitations on authority and responsibility in the Contract Documents. 8.02 Authorized Variations in Work City's Project Representative may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Time and are compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. These may be accomplished by a Field Order and will be binding on City Developer, and also on Contractor, who shall perform the Work involved promptly. 8.03 Rejecting Defective Work City will have authority to reject Work which City's Project Representative believes to be defective, or will not produce a completed Project that conforms to the Contract Documents or that will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. City will have authority to conduct special inspection or testing of the Work as provided in Article 11, whether or not the Work is fabricated, installed, or completed. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 28 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 28 of 35 8.04 Determinations for Work Performed Contractor will determine the actual quantities and classifications of Work performed. City's Project Representative will review with Contractor the preliminary determinations on such matters before rendering a written recommendation. City's written decision will be final (except as modified to reflect changed factual conditions or more accurate data). ARTICLE 9 — CHANGES IN THE WORK 9.01 Authorized Changes in the Work A. Without invalidating the Contract and without notice to any surety, City may, at any time or from time to time, order Extra Work. Upon notice of such Extra Work, Contractor shall promptly proceed with the Work involved which will be performed under the applicable conditions of the Contract Documents (except as otherwise specifically provided). Extra Work shall be memorialized by a Participating Change Order which may or may not precede an order of Extra work. B. For minor changes of Work not requiring changes to Contract Time or Contract Price on a project with City participation, a Field Order may be issued by the City. 9.02 Notification to Surety If the provisions of any bond require notice to be given to a surety of any change affecting the general scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract Price or Contract Time), the giving of any such notice will be Contractor's responsibility. The amount of each applicable bond will be adjusted by the Contractor to reflect the effect of any such change. ARTICLE 10 — CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIME 10.01 Change of Contract Price A. The Contract Price may only be changed by a Participating Change Order for projects with City participation. 10.02 Change of Contract Time A. The Contract Time may only be changed by a Participating Change Order for projects with City participation. 10.03 Delays A. If Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) sustained by Contractor on or in connection with any other project or anticipated project. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 29 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 29 of 35 ARTICLE 11— TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK 11.01 Notice of Defects Notice of all defective Work of which City has actual knowledge will be given to Contractor. Defective Work may be rejected, corrected, or accepted as provided in this Article 13. 11.02 Access to Work City, independent testing laboratories, and governmental agencies with jurisdictional interests will have access to the Site and the Work at reasonable times for their observation, inspection, and testing. Contractor shall provide them proper and safe conditions for such access and advise them of Contractor's safety procedures and programs so that they may comply therewith as applicable. 11.03 Tests and Inspections A. Contractor shall give City timely notice of readiness of the Work for all required inspections, tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. B. If Contract Documents, Laws or Regulations of any public body having jurisdiction require any of the Work (or part thereof) to be inspected, tested, or approved, Contractor shall assume full responsibility for arranging and obtaining such independent inspections, tests, retests or approvals, pay all costs in connection therewith, and furnish City the required certificates of inspection or approval; excepting, however, those fees specifically identified in the Supplementary Conditions or any Texas Department of Licensure and Regulation (TDLR) inspections, which shall be paid as described in the Supplementary Conditions. C. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests, re -tests, or approvals required for City's acceptance of materials or equipment to be incorporated in the Work; or acceptance of materials, mix designs, or equipment submitted for approval prior to Contractor's purchase thereof for incorporation in the Work. Such inspections, tests, re -tests, or approvals shall be performed by organizations approved by City. D. City may arrange for the services of an independent testing laboratory ("Testing Lab") to perform any inspections or tests ("Testing") for any part of the Work, as determined solely by City. 1. City will coordinate such Testing to the extent possible, with Contractor; 2. Should any Testing under this Section 11.03 D result in a "fail", "did not pass" or other similar negative result, the Contractor shall be responsible for paying for any and all retests. Contractor's cancellation without cause of City initiated Testing shall be deemed a negative result and require a retest. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 30 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 30 of 35 3. Any amounts owed for any retest under this Section 11.03 D shall be paid directly to the Testing Lab by Contractor. City will forward all invoices for retests to Developer/Contractor. 4. If Contractor fails to pay the Testing Lab, City will not issue a letter of Final Acceptance until the Testing Lab is Paid E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by Contractor without written concurrence of City, Contractor shall, if requested by City, uncover such Work for observation. 11.04 Uncovering Work A. If any Work is covered contrary to the Contract Documents or specific instructions by the City, it must, if requested by City, be uncovered for City's observation and replaced at Contractor's expense. 11.05 City May Stop the Work If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials or equipment, or fails to perform the Work in such a way that the completed Work will conform to the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of City to stop the Work shall not give rise to any duty on the part of City to exercise this right for the benefit of Contractor, any Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent of any of them. 11.06 Correction or Removal of Defective Work A. Promptly after receipt of written notice, Contractor shall correct all defective Work pursuant to an acceptable schedule, whether or not fabricated, installed, or completed, or, if the Work has been rejected by City, remove it from the Project and replace it with Work that is not defective. Contractor shall pay all claims, costs, additional testing, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such correction or removal (including but not limited to all costs of repair or replacement of work of others). Failure to require the removal of any defective Work shall not constitute acceptance of such Work. B. When correcting defective Work under the terms of this Paragraph 11.06 or Paragraph 11.07, Contractor shall take no action that would void or otherwise impair City's special warranty and guarantee, if any, on said Work. 11.07 Correction Period A. If within two (2) years after the date of Final Acceptance (or such longer period of time as may be prescribed by the terms of any applicable special guarantee required by the Contract CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 31 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 31 of 35 Documents), any Work is found to be defective, or if the repair of any damages to the land or areas made available for Contractor's use by City or permitted by Laws and Regulations as contemplated in Paragraph 5.10.A is found to be defective, Contractor shall promptly, without cost to City and in accordance with City's written instructions: 1. repair such defective land or areas; or 2. correct such defective Work; or 3. if the defective Work has been rejected by City, remove it from the Project and replace it with Work that is not defective, and 4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work of others or other land or areas resulting therefrom. B. If Contractor does not promptly comply with the terms of City's written instructions, or in an emergency where delay would cause serious risk of loss or damage, City may have the defective Work corrected or repaired or may have the rejected Work removed and replaced. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such correction or repair or such removal and replacement (including but not limited to all costs of repair or replacement of work of others) will be paid by Contractor. C. Where defective Work (and damage to other Work resulting therefrom) has been corrected or removed and replaced under this Paragraph 11.07, the correction period hereunder with respect to such Work may be required to be extended for an additional period of one year after the end of the initial correction period. City shall provide 30 days written notice to Contractor and Developer should such additional warranty coverage be required. Contractor's obligations under this Paragraph 11.07 are in addition to any other obligation or warranty. The provisions of this Paragraph 11.07 shall not be construed as a substitute for, or a waiver of, the provisions of any applicable statute of limitation or repose. 11.08 City May Correct Defective Work A. If Contractor fails within a reasonable time after written notice from City to correct defective Work, or to remove and replace rejected Work as required by City in accordance with Paragraph 11.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any other provision of the Contract Documents, City may, after seven (7) days written notice to Contractor and the Developer, correct, or remedy any such deficiency. B. In exercising the rights and remedies under this Paragraph 11.09, City shall proceed expeditiously. In connection with such corrective or remedial action, City may exclude Contractor from all or part of the Site, take possession of all or part of the Work and suspend Contractor's services related thereto, and incorporate in the Work all materials and equipment incorporated in the Work, stored at the Site or for which City has paid Contractor but which are CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 32 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 32 of 35 stored elsewhere. Contractor shall allow City, City's representatives, agents, consultants, employees, and City's other contractors, access to the Site to enable City to exercise the rights and remedies under this Paragraph. C. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph 13.09 will be charged against Contractor, and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and City shall be entitled to an appropriate decrease in the Contract Price. D. Contractor shall not be allowed an extension of the Contract Time because of any delay in the performance of the Work attributable to the exercise of City's rights and remedies under this Paragraph 11.09. ARTICLE 12 — COMPLETION 12.01 Contractor's Warranty of Title Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any Application for Payment will pass to City no later than the time of Final Acceptance and shall be free and clear of all Liens. 12.02 Partial Utilization A. Prior to Final Acceptance of all the Work, City may use or occupy any substantially completed part of the Work which has specifically been identified in the Contract Documents, or which City, determines constitutes a separately functioning and usable part of the Work that can be used by City for its intended purpose without significant interference with Contractor's performance of the remainder of the Work. City at any time may notify Contractor in writing to permit City to use or occupy any such part of the Work which City determines to be ready for its intended use, subject to the following conditions: 1. Contractor at any time may notify City in writing that Contractor considers any such part of the Work ready for its intended use. 2. Within a reasonable time after notification as enumerated in Paragraph 14.05.A.1, City and Contractor shall make an inspection of that part of the Work to determine its status of completion. If City does not consider that part of the Work to be substantially complete, City will notify Contractor in writing giving the reasons therefor. 3. Partial Utilization will not constitute Final Acceptance by City. 12.03 Final Inspection A. Upon written notice from Contractor that the entire Work is complete in accordance with the Contract Documents: CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 33 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 33 of 35 1. within 10 days, City will schedule a Final Inspection with Contractor. 2. City will notify Contractor in writing of all particulars in which this inspection reveals that the Work is incomplete or defective. Contractor shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies. 12.04 Final Acceptance A. Upon completion by Contractor to City's satisfaction, of any additional Work identified in the Final Inspection, City will issue to Contractor a letter of Final Acceptance upon the satisfaction of the following: 1. All documentation called for in the Contract Documents, including but not limited to the evidence of insurance required by Paragraph 5.03; 2. consent of the surety, if any, to Final Acceptance; 3. a list of all pending or released Damage Claims against City that Contractor believes are unsettled; and 4. affidavits of payments and complete and legally effective releases or waivers (satisfactory to City) of all Lien rights arising out of or Liens filed in connection with the Work. 5. after all Damage Claims have been resolved: a. directly by the Contractor or; b. Contractor provides evidence that the Damage Claim has been reported to Contractor's insurance provider for resolution. 6. Issuing Final Acceptance by the City shall not relieve the Contractor of any guarantees or other requirements of the Contract Documents which specifically continue thereafter. ARTICLE 13 — SUSPENSION OF WORK 13.01 City May Suspend Work A. At any time and without cause, City may suspend the Work or any portion thereof by written notice to Contractor and which may fix the date on which Work will be resumed. Contractor shall resume the Work on the date so fixed. During temporary suspension of the Work covered by these Contract Documents, for any reason, the City will stop contract time on City participation projects. B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the control of and without the fault or negligence of the Contractor, and should it be determined by mutual consent of the Contractor and City that a solution to allow construction to proceed is not CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 34 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 34 of 35 available within a reasonable period of time, Contractor may request an extension in Contract Time, directly attributable to any such suspension. C. If it should become necessary to suspend the Work for an indefinite period, the Contractor shall store all materials in such a manner that they will not obstruct or impede the public unnecessarily nor become damaged in any way, and he shall take every precaution to prevent damage or deterioration of the work performed; he shall provide suitable drainage about the work, and erect temporary structures where necessary. ARTICLE 14 — MISCELLANEOUS 14.01 Giving Notice A. Whenever any provision of the Contract Documents requires the giving of written notice, it will be deemed to have been validly given i£ 1. delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended; or 2. delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice. B. Business address changes must be promptly made in writing to the other parry. C. Whenever the Contract Documents specifies giving notice by electronic means such electronic notice shall be deemed sufficient upon confirmation of receipt by the receiving parry. 14.02 Computation of Times When any period of time is referred to in the Contract Documents by days, it will be computed to exclude the first and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last day of the period. 14.03 Cumulative Remedies The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 35 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 35 of 35 14.04 Survival of Obligations All representations, indemnifications, warranties, and guarantees made in, required by, or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion, and acceptance of the Work or termination or completion of the Contract or termination of the services of Contractor. 14.05 Headings Article and paragraph headings are inserted for convenience only and do not constitute parts of these General Conditions. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 DIVISION Ol GENERAL REQUIREMENTS 011100-1 DAP SUMMARY OF WORK SECTION 01 11 00 SUMMARY OF WORK PART1- GENERAL 1.1 SUMMARY A. Section Includes: Paget of 3 1. Summary of Work to be performed in accordance with the Contract Documents B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 - Bidding Requirements, Contract Forms, and Conditions of the Contract 2. Division 1 - General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Work Covered by Contract Documents 1. Work is to include furnishing all labor, materials, and equipment, and performing all Work necessary for this construction project as detailed in the Drawings and Specifications. B. Subsidiary Work Any and all Work specifically governed by documentary requirements for the project, such as conditions imposed by the Drawings or Contract Documents in which no specific item for bid has been provided for in the Proposal and the item is not a typical unit bid item included on the standard bid item list, then the item shall be considered as a subsidiary item of Work, the cost of which shall be included in the price bid in the Proposal for various bid items. C. Use of Premises 1. Coordinate uses of premises under direction of the City. 2. Assume full responsibility for protection and safekeeping of materials and equipment stored on the Site. Use and occupy only portions of the public streets and alleys, or other public places or other rights -of -way as provided for in the ordinances of the City, as shown in the Contract Documents, or as may be specifically authorized in writing by the City. a. A reasonable amount of tools, materials, and equipment for construction purposes may be stored in such space, but no more than is necessary to avoid delay in the construction operations. CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects CPN #105255 Revised December 20, 2012 011100-2 DAP SUMMARY OF WORK Page 2 of 3 b. Excavated and waste materials shall be stored in such a way as not to interfere with the use of spaces that may be designated to be left free and unobstructed and so as not to inconvenience occupants of adjacent property. c. If the street is occupied by railroad tracks, the Work shall be carried on in such manner as not to interfere with the operation of the railroad. 1) All Work shall be in accordance with railroad requirements set forth in Division 0 as well as the railroad permit. D. Work within Easements 1. Do not enter upon private property for any purpose without having previously obtained permission from the owner of such property. 2. Do not store equipment or material on private property unless and until the specified approval of the property owner has been secured in writing by the Contractor and a copy furnished to the City. 3. Unless specifically provided otherwise, clear all rights -of -way or easements of obstructions which must be removed to make possible proper prosecution of the Work as a part of the project construction operations. 4. Preserve and use every precaution to prevent damage to, all trees, shrubbery, plants, lawns, fences, culverts, curbing, and all other types of structures or improvements, to all water, sewer, and gas lines, to all conduits, overhead pole lines, or appurtenances thereof, including the construction of temporary fences and to all other public or private property adjacent to the Work. 5. Notify the proper representatives of the owners or occupants of the public or private lands of interest in lands which might be affected by the Work. a. Such notice shall be made at least 48 hours in advance of the beginning of the Work. b. Notices shall be applicable to both public and private utility companies and any corporation, company, individual, or other, either as owners or occupants, whose land or interest in land might be affected by the Work. c. Be responsible for all damage or injury to property of any character resulting from any act, omission, neglect, or misconduct in the manner or method or execution of the Work, or at any time due to defective work, material, or equipment. 6. Fence a. Restore all fences encountered and removed during construction of the Project to the original or a better than original condition. b. Erect temporary fencing in place of the fencing removed whenever the Work is not in progress and when the site is vacated overnight, and/or at all times to provide site security. c. The cost for all fence work within easements, including removal, temporary closures and replacement, shall be subsidiary to the various items bid in the project proposal, unless a bid item is specifically provided in the proposal. CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects CPN #105255 Revised December 20, 2012 011100-3 DAP SUMMARY OF WORK Page 3 of 3 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] I Biel 1ZII IM X011 I fflei Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects CPN #105255 Revised December 20, 2012 012500-1 DAP SUBSTITUTION PROCEDURES SECTION 0125 00 SUBSTITUTION PROCEDURES PART1- GENERAL 1.1 SUMMARY A. Section Includes: Paget of 4 The procedure for requesting the approval of substitution of a product that is not equivalent to a product which is specified by descriptive or performance criteria or defined by reference to 1 or more of the following: a. Name of manufacturer b. Name of vendor c. Trade name d. Catalog number 2. Substitutions are not "or -equals". B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Request for Substitution - General 1. Within 30 days after award of Contract (unless noted otherwise), the City will consider formal requests from Contractor for substitution of products in place of those specified. 2. Certain types of equipment and kinds of material are described in Specifications by means of references to names of manufacturers and vendors, trade names, or catalog numbers. a. When this method of specifying is used, it is not intended to exclude from consideration other products bearing other manufacturer's or vendor's names, trade names, or catalog numbers, provided said products are "or -equals," as determined by City. 3. Other types of equipment and kinds of material may be acceptable substitutions under the following conditions: a. Or -equals are unavailable due to strike, discontinued production of products meeting specified requirements, or other factors beyond control of Contractor; or, CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised August 30, 2013 012500-2 DAP SUBSTITUTION PROCEDURES Page 2 of 4 b. Contractor proposes a cost and/or time reduction incentive to the City. 1.5 SUBMITTALS A. See Request for Substitution Form (attached) B. Procedure for Requesting Substitution 1. Substitution shall be considered only: a. After award of Contract b. Under the conditions stated herein 2. Submit 3 copies of each written request for substitution, including: a. Documentation 1) Complete data substantiating compliance of proposed substitution with Contract Documents 2) Data relating to changes in construction schedule, when a reduction is proposed 3) Data relating to changes in cost b. For products 1) Product identification a) Manufacturer's name b) Telephone number and representative contact name c) Specification Section or Drawing reference of originally specified product, including discrete name or tag number assigned to original product in the Contract Documents 2) Manufacturer's literature clearly marked to show compliance of proposed product with Contract Documents 3) Itemized comparison of original and proposed product addressing product characteristics including, but not necessarily limited to: a) Size b) Composition or materials of construction c) Weight d) Electrical or mechanical requirements 4) Product experience a) Location of past projects utilizing product b) Name and telephone number of persons associated with referenced projects knowledgeable concerning proposed product c) Available field data and reports associated with proposed product 5) Samples a) Provide at request of City. b) Samples become the property of the City. c. For construction methods: 1) Detailed description of proposed method 2) Illustration drawings C. Approval or Rejection 1. Written approval or rejection of substitution given by the City 2. City reserves the right to require proposed product to comply with color and pattern of specified product if necessary to secure design intent. 3. In the event the substitution is approved, if a reduction in cost or time results, it will be documented by Change Order. CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised August 30, 2013 012500-3 DAP SUBSTITUTION PROCEDURES Page 3 of 4 4. Substitution will be rejected if: a. Submittal is not through the Contractor with his stamp of approval b. Request is not made in accordance with this Specification Section c. In the Developer's opinion, acceptance will require substantial revision of the original design d. In the City's or Developer's opinion, substitution will not perform adequately the function consistent with the design intent 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. In making request for substitution or in using an approved product, the Contractor represents that the Contractor: 1. Has investigated proposed product, and has determined that it is adequate or superior in all respects to that specified, and that it will perform function for which it is intended 2. Will provide same guarantee for substitute item as for product specified 3. Will coordinate installation of accepted substitution into Work, to include building modifications if necessary, making such changes as may be required for Work to be complete in all respects 4. Waives all claims for additional costs related to substitution which subsequently arise 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised August 30, 2013 012500-4 DAP SUBSTITUTION PROCEDURES Page 4 of 4 EXHIBIT A REQUEST FOR SUBSTITUTION FORM: PROJECT: DATE: We hereby submit for your consideration the following product instead of the specified item for the above project: SECTION PARAGRAPH SPECIFIED ITEM Proposed Substitution: Reason for Substitution: Include complete information on changes to Drawings and/or Specifications which proposed substitution will require for its proper installation. Fill in Blanks Below: A. Will the undersigned contractor pay for changes to the building design, including engineering and detailing costs caused by the requested substitution? B. What effect does substitution have on other trades? C. Differences between proposed substitution and specified item? D. Differences in product cost or product delivery time? E. Manufacturer's guarantees of the proposed and specified items are: Equal Better (explain on attachment) The undersigned states that the function, appearance and quality are equivalent or superior to the specified item. Submitted By: For Use by City Signature as noted Firm Address Date Telephone For Use by City: Approved City Recommended Recommended Not recommended _Received late By Date Remarks Date Rejected CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised August 30, 2013 0131 19- 1 DAP PRECONSTRUCTION MEETING SECTION 013119 PRECONSTRUCTION MEETING PART1- GENERAL 1.1 SUMMARY A. Section Includes: Paget of 3 1. Provisions for the preconstruction meeting to be held prior to the start of Work to clarify construction contract administration procedures B. Deviations from this City of Fort Worth Standard Specification 1. No construction schedule required unless requested by the City. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Attend preconstruction meeting. 2. Representatives of Contractor, subcontractors and suppliers attending meetings shall be qualified and authorized to act on behalf of the entity each represents. 3. Meeting administered by City may be tape recorded. a. If recorded, tapes will be used to prepare minutes and retained by City for future reference. B. Preconstruction Meeting 1. A preconstruction meeting will be held within 14 days after the delivery of the distribution package to the City. a. The meeting will be scheduled and administered by the City. 2. The Project Representative will preside at the meeting, prepare the notes of the meeting and distribute copies of same to all participants who so request by fully completing the attendance form to be circulated at the beginning of the meeting. 3. Attendance shall include: a. Developer and Consultant b. Contractor's project manager c. Contractor's superintendent d. Any subcontractor or supplier representatives whom the Contractor may desire to invite or the City may request CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised August 30, 2013 0131 19 - 2 DAP PRECONSTRUCTION MEETING Page 2 of 3 e. Other City representatives f. Others as appropriate 4. Preliminary Agenda may include: a. Introduction of Project Personnel b. General Description of Project c. Status of right-of-way, utility clearances, easements or other pertinent permits d. Contractor's work plan and schedule e. Contract Time f. Notice to Proceed g. Construction Staking h. Progress Payments i. Extra Work and Change Order Procedures j. Field Orders k. Disposal Site Letter for Waste Material 1. Insurance Renewals in. Payroll Certification n. Material Certifications and Quality Control Testing o. Public Safety and Convenience p. Documentation of Pre -Construction Conditions q. Weekend Work Notification r. Legal Holidays s. Trench Safety Plans t. Confined Space Entry Standards u. Coordination with the City's representative for operations of existing water systems v. Storm Water Pollution Prevention Plan w. Coordination with other Contractors x. Early Warning System y. Contractor Evaluation z. Special Conditions applicable to the project aa. Damages Claims bb. Submittal Procedures cc. Substitution Procedures dd. Correspondence Routing ee. Record Drawings ff. Temporary construction facilities gg. MBE/SBE procedures hh. Final Acceptance ii. Final Payment J. Questions or Comments CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised August 30, 2013 0131 19 - 3 DAP PRECONSTRUCTION MEETING Page 3 of 3 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] M Ble ix1=1011 I Mei Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised August 30, 2013 01 32 33 - 1 DAP PRECONSTRUCTION VIDEO Page 1 of 2 SECTION 0132 33 PRECONSTRUCTION VIDEO PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Administrative and procedural requirements for: a. Preconstruction Videos B. Deviations from this City of Fort Worth Standard Specification 1. Though not mandatory, it is highly recommended on infill developer projects. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Preconstruction Video 1. Produce a preconstruction video of the site/alignment, including all areas in the vicinity of and to be affected by construction. a. Provide digital copy of video upon request by the City. 2. Retain a copy of the preconstruction video until the end of the maintenance surety period. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised August 30, 2013 01 32 33 - 2 DAP PRECONSTRUCTION VIDEO Page 2 of 2 PART 3 - EXECUTION [NOT USED] I Nei 1XII an x4m 11130 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised August 30, 2013 SECTION 0133 00 DAP SUBMITTALS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 013300-1 DAP SUBMITTALS Paget of 8 General methods and requirements of submissions applicable to the following Work -related submittals: a. Shop Drawings b. Product Data (including Standard Product List submittals) c. Samples d. Mock Ups B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Notify the City in writing, at the time of submittal, of any deviations in the submittals from the requirements of the Contract Documents. 2. Coordination of Submittal Times a. Prepare, prioritize and transmit each submittal sufficiently in advance of performing the related Work or other applicable activities, or within the time specified in the individual Work Sections, of the Specifications. b. Contractor is responsible such that the installation will not be delayed by processing times including, but not limited to: a) Disapproval and resubmittal (if required) b) Coordination with other submittals c) Testing d) Purchasing e) Fabrication f) Delivery g) Similar sequenced activities c. No extension of time will be authorized because of the Contractor's failure to transmit submittals sufficiently in advance of the Work. CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised August 30, 2013 013300-2 DAP SUBMITTALS Page 2 of 8 d. Make submittals promptly in accordance with approved schedule, and in such sequence as to cause no delay in the Work or in the work of any other contractor. B. Submittal Numbering When submitting shop drawings or samples, utilize a 9-character submittal cross- reference identification numbering system in the following manner: a. Use the first 6 digits of the applicable Specification Section Number. b. For the next 2 digits number use numbers 01-99 to sequentially number each initial separate item or drawing submitted under each specific Section number. c. Last use a letter, A-Z, indicating the resubmission of the same drawing (i.e. A=2nd submission, B=3rd submission, C=4th submission, etc.). A typical submittal number would be as follows: 03 30 00-08-B 1) 03 30 00 is the Specification Section for Concrete 2) 08 is the eighth initial submittal under this Specification Section 3) B is the third submission (second resubmission) of that particular shop drawing C. Contractor Certification 1. Review shop drawings, product data and samples, including those by subcontractors, prior to submission to determine and verify the following: a. Field measurements b. Field construction criteria c. Catalog numbers and similar data d. Conformance with the Contract Documents 2. Provide each shop drawing, sample and product data submitted by the Contractor with a Certification Statement affixed including: a. The Contractor's Company name b. Signature of submittal reviewer c. Certification Statement 1) `By this submittal, I hereby represent that I have determined and verified field measurements, field construction criteria, materials, dimensions, catalog numbers and similar data and I have checked and coordinated each item with other applicable approved shop drawings." D. Submittal Format 1. Fold shop drawings larger than 8 '/z inches x 11 inches to 8 '/z inches x 11 inches. 2. Bind shop drawings and product data sheets together. 3. Order a. Cover Sheet 1) Description of Packet 2) Contractor Certification b. List of items / Table of Contents c. Product Data /Shop Drawings/Samples /Calculations E. Submittal Content 1. The date of submission and the dates of any previous submissions CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised August 30, 2013 01 33 00 - 3 DAP SUBMITTALS Page 3 of 8 2. The Project title and number 3. Contractor identification 4. The names of: a. Contractor b. Supplier c. Manufacturer 5. Identification of the product, with the Specification Section number, page and paragraph(s) 6. Field dimensions, clearly identified as such 7. Relation to adjacent or critical features of the Work or materials 8. Applicable standards, such as ASTM or Federal Specification numbers 9. Identification by highlighting of deviations from Contract Documents 10. Identification by highlighting of revisions on resubmittals 11. An 8-inch x 3-inch blank space for Contractor and City stamps F. Shop Drawings 1. As specified in individual Work Sections includes, but is not necessarily limited to: a. Custom -prepared data such as fabrication and erection/installation (working) drawings b. Scheduled information c. Setting diagrams d. Actual shopwork manufacturing instructions e. Custom templates f. Special wiring diagrams g. Coordination drawings h. Individual system or equipment inspection and test reports including: 1) Performance curves and certifications i. As applicable to the Work 2. Details a. Relation of the various parts to the main members and lines of the structure b. Where correct fabrication of the Work depends upon field measurements 1) Provide such measurements and note on the drawings prior to submitting for approval. G. Product Data 1. For submittals of product data for products included on the City's Standard Product List, clearly identify each item selected for use on the Project. 2. For submittals of product data for products not included on the City's Standard Product List, submittal data may include, but is not necessarily limited to: a. Standard prepared data for manufactured products (sometimes referred to as catalog data) 1) Such as the manufacturer's product specification and installation instructions 2) Availability of colors and patterns 3) Manufacturer's printed statements of compliances and applicability 4) Roughing -in diagrams and templates 5) Catalog cuts 6) Product photographs CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised August 30, 2013 01 33 00 - 4 DAP SUBMITTALS Page 4 of 8 7) Standard wiring diagrams 8) Printed performance curves and operational -range diagrams 9) Production or quality control inspection and test reports and certifications 10) Mill reports 11) Product operating and maintenance instructions and recommended spare -parts listing and printed product warranties 12) As applicable to the Work H. Samples As specified in individual Sections, include, but are not necessarily limited to: a. Physical examples of the Work such as: 1) Sections of manufactured or fabricated Work 2) Small cuts or containers of materials 3) Complete units of repetitively used products color/texture/pattern swatches and range sets 4) Specimens for coordination of visual effect 5) Graphic symbols and units of Work to be used by the City for independent inspection and testing, as applicable to the Work I. Do not start Work requiring a shop drawing, sample or product data nor any material to be fabricated or installed prior to the approval or qualified approval of such item. 1. Fabrication performed, materials purchased or on -site construction accomplished which does not conform to approved shop drawings and data is at the Contractor's risk. 2. The City will not be liable for any expense or delay due to corrections or remedies required to accomplish conformity. 3. Complete project Work, materials, fabrication, and installations in conformance with approved shop drawings, applicable samples, and product data. J. Submittal Distribution 1. Electronic Distribution a. Confirm development of Project directory for electronic submittals to be uploaded to City's Buzzsaw site, or another external FTP site approved by the City. b. Shop Drawings 1) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals b) If Contractor requires more than 1 hard copy of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. c. Product Data 1) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals d. Samples 1) Distributed to the Project Representative 2. Hard Copy Distribution (if required in lieu of electronic distribution) CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised August 30, 2013 013300-5 DAP SUBMITTALS Page 5 of 8 a. Shop Drawings 1) Distributed to the City 2) Copies a) 8 copies for mechanical submittals b) 7 copies for all other submittals c) If Contractor requires more than 3 copies of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. b. Product Data 1) Distributed to the City 2) Copies a) 4 copies c. Samples 1) Distributed to the Project Representative 2) Copies a) Submit the number stated in the respective Specification Sections. 3. Distribute reproductions of approved shop drawings and copies of approved product data and samples, where required, to the job site file and elsewhere as directed by the City. a. Provide number of copies as directed by the City but not exceeding the number previously specified. K. Submittal Review 1. The review of shop drawings, data and samples will be for general conformance with the design concept and Contract Documents. This is not to be construed as: a. Permitting any departure from the Contract requirements b. Relieving the Contractor of responsibility for any errors, including details, dimensions, and materials c. Approving departures from details furnished by the City, except as otherwise provided herein 2. The review and approval of shop drawings, samples or product data by the City does not relieve the Contractor from his/her responsibility with regard to the fulfillment of the terms of the Contract. a. All risks of error and omission are assumed by the Contractor, and the City will have no responsibility therefore. 3. The Contractor remains responsible for details and accuracy, for coordinating the Work with all other associated work and trades, for selecting fabrication processes, for techniques of assembly and for performing Work in a safe manner. 4. If the shop drawings, data or samples as submitted describe variations and show a departure from the Contract requirements which City finds to be in the interest of the City and to be so minor as not to involve a change in Contract Price or time for performance, the City may return the reviewed drawings without noting an exception. 5. Submittals will be returned to the Contractor under 1 of the following codes: a. Code 1 1) "NO EXCEPTIONS TAKEN' is assigned when there are no notations or comments on the submittal. a) When returned under this code the Contractor may release the equipment and/or material for manufacture. b. Code 2 CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised August 30, 2013 01 33 00 - 6 DAP SUBMITTALS Page 6 of 8 1) "EXCEPTIONS NOTED". This code is assigned when a confirmation of the notations and comments IS NOT required by the Contractor. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. c. Code 3 1) "EXCEPTIONS NOTED/RESUBMIT". This combination of codes is assigned when notations and comments are extensive enough to require a resubmittal of the package. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. b) This resubmittal is to address all comments, omissions and non -conforming items that were noted. c) Resubmittal is to be received by the City within 15 Calendar Days of the date of the City's transmittal requiring the resubmittal. d. Code 4 1) "NOT APPROVED" is assigned when the submittal does not meet the intent of the Contract Documents. a) The Contractor must resubmit the entire package revised to bring the submittal into conformance. b) It may be necessary to resubmit using a different manufacturer/vendor to meet the Contract Documents. 6. Resubmittals a. Handled in the same manner as first submittals 1) Corrections other than requested by the City 2) Marked with revision triangle or other similar method a) At Contractor's risk if not marked b. Submittals for each item will be reviewed no more than twice at the City's expense. 1) All subsequent reviews will be performed at times convenient to the City and at the Contractor's expense, based on the City's or City Representative's then prevailing rates. 2) Provide Contractor reimbursement to the City within 30 Calendar Days for all such fees invoiced by the City. c. The need for more than 1 resubmission or any other delay in obtaining City's review of submittals, will not entitle the Contractor to an extension of Contract Time. 7. Partial Submittals a. City reserves the right to not review submittals deemed partial, at the City's discretion. b. Submittals deemed by the City to be not complete will be returned to the Contractor, and will be considered "Not Approved" until resubmitted. c. The City may at its option provide a list or mark the submittal directing the Contractor to the areas that are incomplete. 8. If the Contractor considers any correction indicated on the shop drawings to constitute a change to the Contract Documents, then written notice must be provided thereof to the Developer at least 7 Calendar Days prior to release for manufacture. CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised August 30, 2013 013300-7 DAP SUBMITTALS Page 7 of 8 9. When the shop drawings have been completed to the satisfaction of the City, the Contractor may carry out the construction in accordance therewith and no further changes therein except upon written instructions from the City. 10. Each submittal, appropriately coded, will be returned within 30 Calendar Days following receipt of submittal by the City. L. Mock ups 1. Mock Up units as specified in individual Sections, include, but are not necessarily limited to, complete units of the standard of acceptance for that type of Work to be used on the Project. Remove at the completion of the Work or when directed. M. Qualifications 1. If specifically required in other Sections of these Specifications, submit a P.E. Certification for each item required. N. Request for Information (RFI) 1. Contractor Request for additional information a. Clarification or interpretation of the contract documents b. When the Contractor believes there is a conflict between Contract Documents c. When the Contractor believes there is a conflict between the Drawings and Specifications 1) Identify the conflict and request clarification 2. Sufficient information shall be attached to permit a written response without further information. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised August 30, 2013 013300-8 DAP SUBMITTALS Page 8 of 8 PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D. Johnson 1.4.K.8. Working Days modified to Calendar Days CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised August 30, 2013 0135 13- 1 DAP SPECIAL PROJECT PROCEDURES SECTION 0135 13 SPECIAL PROJECT PROCEDURES PART1- GENERAL 1.1 SUMMARY A. Section Includes: Page 1 of 7 The procedures for special project circumstances that includes, but is not limited to: a. Coordination with the Texas Department of Transportation b. Work near High Voltage Lines c. Confined Space Entry Program d. Air Pollution Watch Days e. Use of Explosives, Drop Weight, Etc. f. Water Department Notification g. Public Notification Prior to Beginning Construction h. Coordination with United States Army Corps of Engineers i. Coordination within Railroad permits areas j. Dust Control k. Employee Parking B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 3. Section 33 12 25 — Connection to Existing Water Mains 1.2 REFERENCES A. Reference Standards 1. Reference standards cited in this Specification refer to the current reference standard published at the time of the latest revision date logged at the end of this Specification, unless a date is specifically cited. 2. Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. High Voltage Overhead Lines. 3. North Central Texas Council of Governments (NCTCOG) — Clean Construction Specification 1.3 ADMINISTRATIVE REQUIREMENTS A. Coordination with the Texas Department of Transportation 1. When work in the right-of-way which is under the jurisdiction of the Texas Department of Transportation (TxDOT): a. Notify the Texas Department of Transportation prior to commencing any work therein in accordance with the provisions of the permit CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised August, 30, 2013 013513-2 DAP SPECIAL PROJECT PROCEDURES Page 2 of 7 b. All work performed in the TxDOT right-of-way shall be performed in compliance with and subject to approval from the Texas Department of Transportation B. Work near High Voltage Lines 1. Regulatory Requirements a. All Work near High Voltage Lines (more than 600 volts measured between conductors or between a conductor and the ground) shall be in accordance with Health and Safety Code, Title 9, Subtitle A, Chapter 752. 2. Warning sign a. Provide sign of sufficient size meeting all OSHA requirements. 3. Equipment operating within 10 feet of high voltage lines will require the following safety features a. Insulating cage -type of guard about the boom or arm b. Insulator links on the lift hook connections for back hoes or dippers c. Equipment must meet the safety requirements as set forth by OSHA and the safety requirements of the owner of the high voltage lines 4. Work within 6 feet of high voltage electric lines a. Notification shall be given to: 1) The power company (example: ONCOR) a) Maintain an accurate log of all such calls to power company and record action taken in each case. b. Coordination with power company 1) After notification coordinate with the power company to: a) Erect temporary mechanical barriers, de -energize the lines, or raise or lower the lines c. No personnel may work within 6 feet of a high voltage line before the above requirements have been met. C. Confined Space Entry Program 1. Provide and follow approved Confined Space Entry Program in accordance with OSHA requirements. 2. Confined Spaces include: a. Manholes b. All other confined spaces in accordance with OSHA's Permit Required for Confined Spaces D. Use of Explosives, Drop Weight, Etc. When Contract Documents permit on the project the following will apply: a. Public Notification 1) Submit notice to City and proof of adequate insurance coverage, 24 hours prior to commencing. 2) Minimum 24 hour public notification in accordance with Section 01 31 13 E. Water Department Coordination During the construction of this project, it will be necessary to deactivate, for a period of time, existing lines. The Contractor shall be required to coordinate with the Water Department to determine the best times for deactivating and activating those lines. CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised August, 30, 2013 013513-3 DAP SPECIAL PROJECT PROCEDURES Page 3 of 7 2. Coordinate any event that will require connecting to or the operation of an existing City water line system with the City's representative. a. Coordination shall be in accordance with Section 33 12 25. b. If needed, obtain a hydrant water meter from the Water Department for use during the life of named project. c. In the event that a water valve on an existing live system be turned off and on to accommodate the construction of the project is required, coordinate this activity through the appropriate City representative. 1) Do not operate water line valves of existing water system. a) Failure to comply will render the Contractor in violation of Texas Penal Code Title 7, Chapter 28.03 (Criminal Mischief) and the Contractor will be prosecuted to the full extent of the law. b) In addition, the Contractor will assume all liabilities and responsibilities as a result of these actions. F. Public Notification Prior to Beginning Construction Prior to beginning construction on any block in the project, on a block by block basis, prepare and deliver a notice or flyer of the pending construction to the front door of each residence or business that will be impacted by construction. The notice shall be prepared as follows: a. Post notice or flyer 7 days prior to beginning any construction activity on each block in the project area. 1) Prepare flyer on the Contractor's letterhead and include the following information: a) Name of Project b) City Project No (CPN) c) Scope of Project (i.e. type of construction activity) d) Actual construction duration within the block e) Name of the contractor's foreman and phone number f) Name of the City's inspector and phone number g) City's after-hours phone number 2) A sample of the `pre -construction notification' flyer is attached as Exhibit A. 3) Submit schedule showing the construction start and finish time for each block of the project to the inspector. 4) Deliver flyer to the City Inspector for review prior to distribution. b. No construction will be allowed to begin on any block until the flyer is delivered to all residents of the block. G. Public Notification of Temporary Water Service Interruption during Construction 1. In the event it becomes necessary to temporarily shut down water service to residents or businesses during construction, prepare and deliver a notice or flyer of the pending interruption to the front door of each affected resident. 2. Prepared notice as follows: a. The notification or flyer shall be posted 24 hours prior to the temporary interruption. b. Prepare flyer on the contractor's letterhead and include the following information: 1) Name of the project 2) City Project Number CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised August, 30, 2013 0135 13 - 4 DAP SPECIAL PROJECT PROCEDURES Page 4 of 7 3) Date of the interruption of service 4) Period the interruption will take place 5) Name of the contractor's foreman and phone number 6) Name of the City's inspector and phone number c. A sample of the temporary water service interruption notification is attached as Exhibit B. d. Deliver a copy of the temporary interruption notification to the City inspector for review prior to being distributed. e. No interruption of water service can occur until the flyer has been delivered to all affected residents and businesses. f. Electronic versions of the sample flyers can be obtained from the Project Construction Inspector. H. Coordination with United States Army Corps of Engineers (USACE) At locations in the Project where construction activities occur in areas where USACE permits are required, meet all requirements set forth in each designated permit. I. Coordination within Railroad Permit Areas At locations in the project where construction activities occur in areas where railroad permits are required, meet all requirements set forth in each designated railroad permit. This includes, but is not limited to, provisions for: a. Flagmen b. Inspectors c. Safety training d. Additional insurance e. Insurance certificates f. Other employees required to protect the right-of-way and property of the Railroad Company from damage arising out of and/or from the construction of the project. Proper utility clearance procedures shall be used in accordance with the permit guidelines. 2. Obtain any supplemental information needed to comply with the railroad's requirements. J. Dust Control 1. Use acceptable measures to control dust at the Site. a. If water is used to control dust, capture and properly dispose of waste water. b. If wet saw cutting is performed, capture and properly dispose of slurry. K. Employee Parking 1. Provide parking for employees at locations approved by the City. CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised August, 30, 2013 013513-5 DAP SPECIAL PROJECT PROCEDURES Page 5 of 7 1.4 SUBMITTALS [NOT USED] 1.5 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.6 CLOSEOUT SUBMITTALS [NOT USED] 1.7 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.8 QUALITY ASSURANCE [NOT USED] 1.9 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.10 FIELD [SITE] CONDITIONS [NOT USED] 1.11 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] 111\I IZII 8M *111 Mei Revision Log DATE NAME SUMMARY OF CHANGE 1.3.13— Added requirement of compliance with Health and Safety Code, Title 9. 8/31/2012 D. Johnson Safety, Subtitle A. Public Safety, Chapter 752. High Voltage Overhead Lines. CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised August, 30, 2013 013513-6 DAP SPECIAL PROJECT PROCEDURES Page 6 of 7 EXHIBIT A (To be printed on Contractor's Letterhead) Date: CPN No.: Project Name: Mapsco Location: Limits of Construction: THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT WORTH, OUR COMPANY WILL WORK ON UTILITY LINES ON OR AROUND YOUR PROPERTY. CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE OF THIS NOTICE. IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER ISSUE, PLEASE CALL: Mr. <CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO.> m Mr. <CITY INSPECTOR> AT < TELEPHONE NO.> AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306 PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised August, 30, 2013 bate: EXHIBIT B FORT WORTH DOE HQ. XXXX Project Home: 013513-7 DAP SPECIAL PROJECT PROCEDURES Page 7 of 7 NOTICE OF TEMPORARY WATER SERVICE INTERRUPTION DUE TO UTILITY IMPROVEMENTS IN YOUR NEIGHBORHOOD, YOUR WATER SERVICE WILL BE INTERRUPTED ON BETWEEN THE HOURS OF AND IF YOU HAVE QUESTIONS ABOUT THIS SHUT -OUT, PLEASE CALL: MR. AT (CONTRACTORS SUPERINTENDENT) (TELEPHONE NUMBER) OR MR. AT (CITY INSPECTOR) (TELEPHONE NUMBER) THIS INCONVENIENCE WILL BE AS SHORT AS POSSIBLE. THANK YOU, ,CONTRACTOR CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised August, 30, 2013 01 45 23 DAP TESTING AND INSPECTION SERVICES Page 1 of 2 SECTION 0145 23 TESTING AND INSPECTION SERVICES PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Testing and inspection services procedures and coordination B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. a. Contractor is responsible for performing, coordinating, and payment of all Quality Control testing. b. City is responsible for performing and payment for first set of Quality Assurance testing. 1) If the first Quality Assurance test performed by the City fails, the Contractor is responsible for payment of subsequent Quality Assurance testing until a passing test occurs. a) Final acceptance will not be issued by City until all required payments for testing by Contractor have been paid in full. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Testing 1. Complete testing in accordance with the Contract Documents. 2. Coordination a. When testing is required to be performed by the City, notify City, sufficiently in advance, when testing is needed. b. When testing is required to be completed by the Contractor, notify City, sufficiently in advance, that testing will be performed. 3. Distribution of Testing Reports a. Electronic Distribution 1) Confirm development of Project directory for electronic submittals to be uploaded to the City's document management system, or another form of distribution approved by the City. CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN# 105255 Revised March 20, 2020 01 45 23 DAP TESTING AND INSPECTION SERVICES Page 2 of 2 2) Upload test reports to designated project directory and notify appropriate City representatives via email of submittal posting. 3) Hard Copies a) 1 copy for all submittals submitted to the Project Representative b. Hard Copy Distribution (if required in lieu of electronic distribution) 1) Tests performed by City a) Distribute 1 hard copy to the Contractor 2) Tests performed by the Contractor a) Distribute 3 hard copies to City's Project Representative 4. Provide City's Project Representative with trip tickets for each delivered load of Concrete or Lime material including the following information: a. Name of pit b. Date of delivery c. Material delivered B. Inspection 1. Inspection or lack of inspection does not relieve the Contractor from obligation to perform work in accordance with the Contract Documents. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 03/20/2020 D.V. Magana Removed reference to Buzzsaw and noted that electronic submittals be uploaded through the City's document management system. CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised March 20, 2020 01 50 00 - 1 DAP TEMPORARY FACILITIES AND CONTROLS Paget of 4 SECTION 0150 00 TEMPORARY FACILITIES AND CONTROLS PART1- GENERAL 1.1 SUMMARY A. Section Includes: Provide temporary facilities and controls needed for the Work including, but not necessarily limited to: a. Temporary utilities b. Sanitary facilities c. Storage Sheds and Buildings d. Dust control e. Temporary fencing of the construction site B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Temporary Utilities 1. Obtaining Temporary Service a. Make arrangements with utility service companies for temporary services. b. Abide by rules and regulations of utility service companies or authorities having jurisdiction. c. Be responsible for utility service costs until Work is approved for Final Acceptance. 1) Included are fuel, power, light, heat and other utility services necessary for execution, completion, testing and initial operation of Work. 2. Water a. Contractor to provide water required for and in connection with Work to be performed and for specified tests of piping, equipment, devices or other use as required for the completion of the Work. b. Provide and maintain adequate supply of potable water for domestic consumption by Contractor personnel and City's Project Representatives. c. Coordination 1) Contact City 1 week before water for construction is desired CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised JULY 1, 2011 015000-2 DAP TEMPORARY FACILITIES AND CONTROLS Page 2 of 4 d. Contractor Payment for Construction Water 1) Obtain construction water meter from City for payment as billed by City's established rates. 3. Electricity and Lighting a. Provide and pay for electric powered service as required for Work, including testing of Work. 1) Provide power for lighting, operation of equipment, or other use. b. Electric power service includes temporary power service or generator to maintain operations during scheduled shutdown. 4. Telephone a. Provide emergency telephone service at Site for use by Contractor personnel and others performing work or furnishing services at Site. 5. Temporary Heat and Ventilation a. Provide temporary heat as necessary for protection or completion of Work. b. Provide temporary heat and ventilation to assure safe working conditions. B. Sanitary Facilities 1. Provide and maintain sanitary facilities for persons on Site. a. Comply with regulations of State and local departments of health. 2. Enforce use of sanitary facilities by construction personnel at job site. a. Enclose and anchor sanitary facilities. b. No discharge will be allowed from these facilities. c. Collect and store sewage and waste so as not to cause nuisance or health problem. d. Haul sewage and waste off -site at no less than weekly intervals and properly dispose in accordance with applicable regulation. 3. Locate facilities near Work Site and keep clean and maintained throughout Project. 4. Remove facilities at completion of Project C. Storage Sheds and Buildings 1. Provide adequately ventilated, watertight, weatherproof storage facilities with floor above ground level for materials and equipment susceptible to weather damage. 2. Storage of materials not susceptible to weather damage may be on blocks off ground. 3. Store materials in a neat and orderly manner. a. Place materials and equipment to permit easy access for identification, inspection and inventory. 4. Equip building with lockable doors and lighting, and provide electrical service for equipment space heaters and heating or ventilation as necessary to provide storage environments acceptable to specified manufacturers. 5. Fill and grade site for temporary structures to provide drainage away from temporary and existing buildings. 6. Remove building from site prior to Final Acceptance. D. Temporary Fencing 1. Provide and maintain for the duration or construction when required in contract documents E. Dust Control CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised JULY 1, 2011 015000-3 DAP TEMPORARY FACILITIES AND CONTROLS Page 3 of 4 1. Contractor is responsible for maintaining dust control through the duration of the project. a. Contractor remains on -call at all times b. Must respond in a timely manner F. Temporary Protection of Construction 1. Contractor or subcontractors are responsible for protecting Work from damage due to weather. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. Temporary Facilities 1. Maintain all temporary facilities for duration of construction activities as needed. 3.5 [REPAIR] / [RESTORATION] 3.6 RE -INSTALLATION 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES A. Temporary Facilities CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised JULY 1, 2011 01 50 00 - 4 DAP TEMPORARY FACILITIES AND CONTROLS Page 4 of 4 1. Remove all temporary facilities and restore area after completion of the Work, to a condition equal to or better than prior to start of Work. 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised JULY 1, 2011 01 55 26 - 1 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Paget of 3 SECTION 0155 26 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Administrative procedures for: a. Street Use Permit b. Modification of approved traffic control c. Removal of Street Signs B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 3. Section 34 71 13 — Traffic Control 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES A. Reference Standards 1. Reference standards cited in this specification refer to the current reference standard published at the time of the latest revision date logged at the end of this specification, unless a date is specifically cited. 2. Texas Manual on Uniform Traffic Control Devices (TMUTCD). 1.4 ADMINISTRATIVE REQUIREMENTS A. Traffic Control 1. General a. When traffic control plans are included in the Drawings, provide Traffic Control in accordance with Drawings and Section 34 71 13. b. When traffic control plans are not included in the Drawings, prepare traffic control plans in accordance with Section 34 71 13 and submit to City for review. 1) Allow minimum 10 working days for review of proposed Traffic Control. B. Street Use Permit 1. Prior to installation of Traffic Control, a City Street Use Permit is required. a. To obtain Street Use Permit, submit Traffic Control Plans to City Transportation and Public Works Department. CITY OF FORT WORTH Tradition, Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised July 1, 2011 01 55 26 - 2 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 2 of 3 1) Allow a minimum of 5 working days for permit review. 2) Contractor's responsibility to coordinate review of Traffic Control plans for Street Use Permit, such that construction is not delayed. C. Modification to Approved Traffic Control Prior to installation traffic control: a. Submit revised traffic control plans to City Department Transportation and Public Works Department. 1) Revise Traffic Control plans in accordance with Section 34 71 13. 2) Allow minimum 5 working days for review of revised Traffic Control. 3) It is the Contractor's responsibility to coordinate review of Traffic Control plans for Street Use Permit, such that construction is not delayed. D. Removal of Street Sign 1. If it is determined that a street sign must be removed for construction, then contact City Transportation and Public Works Department, Signs and Markings Division to remove the sign. E. Temporary Signage 1. In the case of regulatory signs, replace permanent sign with temporary sign meeting requirements of the latest edition of the Texas Manual on Uniform Traffic Control Devices (MUTCD). 2. Install temporary sign before the removal of permanent sign. 3. When construction is complete, to the extent that the permanent sign can be reinstalled, contact the City Transportation and Public Works Department, Signs and Markings Division, to reinstall the permanent sign. F. Traffic Control Standards 1. Traffic Control Standards can be found on the City's Buzzsaw website. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION CITY OF FORT WORTH Tradition, Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised July 1, 2011 015526-3 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 3 of 3 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Tradition, Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised July 1, 2011 0157 13- 1 DAP STORM WATER POLLUTION PREVENTION Paget of 3 SECTION 0157 13 STORM WATER POLLUTION PREVENTION PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Procedures for Storm Water Pollution Prevention Plans B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 3. Section 3125 00 — Erosion and Sediment Control f�► ' : ��/:��I�77�'/u1�1►YM'a�Zy�1�111;7�6y A. Measurement and Payment 1. Construction Activities resulting in less than 1 acre of disturbance a. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 2. Construction Activities resulting in greater than 1 acre of disturbance a. Measurement and Payment shall be in accordance with Section 3125 00. InjitX101 y 01;7 DM.coml A. Abbreviations and Acronyms 1. Notice of Intent: NOI 2. Notice of Termination: NOT 3. Storm Water Pollution Prevention Plan: SWPPP 4. Texas Commission on Environmental Quality: TCEQ 5. Notice of Change: NOC A. Reference Standards 1. Reference standards cited in this Specification refer to the current reference standard published at the time of the latest revision date logged at the end of this Specification, unless a date is specifically cited. 2. Integrated Storm Management (iSWM) Technical Manual for Construction Controls 1.4 ADMINISTRATIVE REQUIREMENTS A. General 1. Contractor is responsible for resolution and payment of any fines issued associated with compliance to Stormwater Pollution Prevention Plan. CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised July 1, 2011 01 57 13 - 2 DAP STORM WATER POLLUTION PREVENTION Page 2 of 3 B. Construction Activities resulting in: 1. Less than 1 acre of disturbance a. Provide erosion and sediment control in accordance with Section 3125 00 and Drawings. 2. 1 to less than 5 acres of disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) TCEQ Small Construction Site Notice Required under general permit TXR150000 a) Sign and post at job site b) Prior to Preconstruction Meeting, send 1 copy to City Department of Transportation and Public Works, Environmental Division, (817) 392- 6088. 2) Provide erosion and sediment control in accordance with: a) Section 3125 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 5 acres or more of Disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) Prepare a TCEQ NOI form and submit to TCEQ along with required fee a) Sign and post at job site b) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 2) TCEQ Notice of Change required if making changes or updates to NOI 3) Provide erosion and sediment control in accordance with: a) Section 3125 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 4) Once the project has been completed and all the closeout requirements of TCEQ have been met a TCEQ Notice of Termination can be submitted. a) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 1XIM111:30 1101I1 16I A. SWPPP Submit in accordance with Section 0133 00, except as stated herein. a. Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City as follows: 1) 1 copy to the City Project Manager a) City Project Manager will forward to the City Department of Transportation and Public Works, Environmental Division for review CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised July 1, 2011 0157 13 - 3 DAP STORM WATER POLLUTION PREVENTION Page 3 of 3 B. Modified SWPPP 1. If the SWPPP is revised during construction, resubmit modified SWPPP to the City in accordance with Section 0133 00. 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised July 1, 2011 SECTION 0160 00 PRODUCT REQUIREMENTS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 01 60 00 DAP PRODUCT REQUIREMENTS Page 1 of 2 1. References for Product Requirements and City Standard Products List B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES [NOT USED] 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A list of City approved products for use is available through the City's website at: httus:Hapes.fortworthtexas.2ov/ProiectResources/ and following the directory path: 02 - Construction Documents\Standard Products List A. Only products specifically included on City's Standard Product List in these Contract Documents shall be allowed for use on the Project. 1. Any subsequently approved products will only be allowed for use upon specific approval by the City. B. Any specific product requirements in the Contract Documents supersede similar products included on the City's Standard Product List. 1. The City reserves the right to not allow products to be used for certain projects even though the product is listed on the City's Standard Product List. C. Although a specific product is included on City's Standard Product List, not all products from that manufacturer are approved for use, including but not limited to, that manufacturer's standard product. D. See Section 0133 00 for submittal requirements of Product Data included on City's Standard Product List. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised March 20, 2020 01 60 00 DAP PRODUCT REQUIREMENTS Page 2 of 2 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 10/12/12 D. Johnson Modified Location of City's Standard Product List 4/7/2014 M.Domenech Revised for DAP application 03/20/2020 D.V. Magana Removed reference to Buzzsaw and noted that the City approved products list is accessible through the City's website. CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised March 20, 2020 01 66 00 - 1 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Paget of 4 SECTION 0166 00 PRODUCT STORAGE AND HANDLING REQUIREMENTS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Scheduling of product delivery 2. Packaging of products for delivery 3. Protection of products against damage from: a. Handling b. Exposure to elements or harsh environments B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements L2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY AND HANDLING A. Delivery Requirements 1. Schedule delivery of products or equipment as required to allow timely installation and to avoid prolonged storage. 2. Provide appropriate personnel and equipment to receive deliveries. 3. Delivery trucks will not be permitted to wait extended periods of time on the Site for personnel or equipment to receive the delivery. CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised April 7, 2014 016600-2 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 2 of 4 4. Deliver products or equipment in manufacturer's original unbroken cartons or other containers designed and constructed to protect the contents from physical or environmental damage. 5. Clearly and fully mark and identify as to manufacturer, item and installation location. 6. Provide manufacturer's instructions for storage and handling. B. Handling Requirements 1. Handle products or equipment in accordance with these Contract Documents and manufacturer's recommendations and instructions. C. Storage Requirements 1. Store materials in accordance with manufacturer's recommendations and requirements of these Specifications. 2. Make necessary provisions for safe storage of materials and equipment. a. Place loose soil materials and materials to be incorporated into Work to prevent damage to any part of Work or existing facilities and to maintain free access at all times to all parts of Work and to utility service company installations in vicinity of Work. 3. Keep materials and equipment neatly and compactly stored in locations that will cause minimum inconvenience to other contractors, public travel, adjoining owners, tenants and occupants. a. Arrange storage to provide easy access for inspection. 4. Restrict storage to areas available on construction site for storage of material and equipment as shown on Drawings, or approved by City's Project Representative. 5. Provide off -site storage and protection when on -site storage is not adequate. a. Provide addresses of and access to off -site storage locations for inspection by City's Project Representative. 6. Do not use lawns, grass plots or other private property for storage purposes without written permission of owner or other person in possession or control of premises. 7. Store in manufacturers' unopened containers. 8. Neatly, safely and compactly stack materials delivered and stored along line of Work to avoid inconvenience and damage to property owners and general public and maintain at least 3 feet from fire hydrant. 9. Keep public and private driveways and street crossings open. 10. Repair or replace damaged lawns, sidewalks, streets or other improvements to satisfaction of City's Project Representative. a. Total length which materials may be distributed along route of construction at one time is 1,000 linear feet, unless otherwise approved in writing by City's Project Representative. CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised April 7, 2014 016600-3 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 3 of 4 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 ERECTION [NOT USED] 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL A. Tests and Inspections 1. Inspect all products or equipment delivered to the site prior to unloading. B. Non -Conforming Work 1. Reject all products or equipment that are damaged, used or in any other way unsatisfactory for use on the project. 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION A. Protect all products or equipment in accordance with manufacturer's written directions. B. Store products or equipment in location to avoid physical damage to items while in storage. C. Protect equipment from exposure to elements and keep thoroughly dry if required by the manufacturer. 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised April 7, 2014 01 66 00 - 4 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 4 of 4 Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised April 7, 2014 01 70 00 - 1 DAP MOBILIZATION AND REMOBILIZATION Paget of 4 SECTION 0170 00 MOBILIZATION AND REMOBILIZATION PART1- GENERAL 1.1 SUMMARY A. Section Includes: Mobilization and Demobilization a. Mobilization 1) Transportation of Contractor's personnel, equipment, and operating supplies to the Site 2) Establishment of necessary general facilities for the Contractor's operation at the Site 3) Premiums paid for performance and payment bonds 4) Transportation of Contractor's personnel, equipment, and operating supplies to another location within the designated Site 5) Relocation of necessary general facilities for the Contractor's operation from 1 location to another location on the Site. b. Demobilization 1) Transportation of Contractor's personnel, equipment, and operating supplies away from the Site including disassembly 2) Site Clean-up 3) Removal of all buildings and/or other facilities assembled at the Site for this Contract c. Mobilization and Demobilization do not include activities for specific items of work that are for which payment is provided elsewhere in the contract. 2. Remobilization a. Remobilization for Suspension of Work specifically required in the Contract Documents or as required by City includes: 1) Demobilization a) Transportation of Contractor's personnel, equipment, and operating supplies from the Site including disassembly or temporarily securing equipment, supplies, and other facilities as designated by the Contract Documents necessary to suspend the Work. b) Site Clean-up as designated in the Contract Documents 2) Remobilization a) Transportation of Contractor's personnel, equipment, and operating supplies to the Site necessary to resume the Work. b) Establishment of necessary general facilities for the Contractor's operation at the Site necessary to resume the Work. 3) No Payments will be made for: a) Mobilization and Demobilization from one location to another on the Site in the normal progress of performing the Work. b) Stand-by or idle time c) Lost profits 3. Mobilizations and Demobilization for Miscellaneous Projects a. Mobilization and Demobilization CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised April 7, 2014 017000-2 DAP MOBILIZATION AND REMOBILIZATION Page 2 of 4 1) Mobilization shall consist of the activities and cost on a Work Order basis necessary for: a) Transportation of Contractor's personnel, equipment, and operating supplies to the Site for the issued Work Order. b) Establishment of necessary general facilities for the Contractor's operation at the Site for the issued Work Order 2) Demobilization shall consist of the activities and cost necessary for: a) Transportation of Contractor's personnel, equipment, and operating supplies from the Site including disassembly for each issued Work Order b) Site Clean-up for each issued Work Order c) Removal of all buildings or other facilities assembled at the Site for each Work Oder b. Mobilization and Demobilization do not include activities for specific items of work for which payment is provided elsewhere in the contract. 4. Emergency Mobilizations and Demobilization for Miscellaneous Projects a. A Mobilization for Miscellaneous Projects when directed by the City and the mobilization occurs within 24 hours of the issuance of the Work Order. B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Mobilization and Demobilization a. Measure 1) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work performed and materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. 2. Remobilization for suspension of Work as specifically required in the Contract Documents a. Measurement 1) Measurement for this Item shall be per each remobilization performed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price per each "Specified Remobilization" in accordance with Contract Documents. c. The price shall include: 1) Demobilization as described in Section 1.1.A.2.a.1) 2) Remobilization as described in Section 1.1.A.2.a.2) d. No payments will be made for standby, idle time, or lost profits associated this Item. CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised April 7, 2014 017000-3 DAP MOBILIZATION AND REMOBILIZATION Page 3 of 4 Remobilization for suspension of Work as required by City a. Measurement and Payment 1) This shall be submitted as a Contract Claim in accordance with Article 10 of Section 00 72 00. 2) No payments will be made for standby, idle time, or lost profits associated with this Item. 4. Mobilizations and Demobilizations for Miscellaneous Projects a. Measurement 1) Measurement for this Item shall be for each Mobilization and Demobilization required by the Contract Documents b. Payment 1) The Work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price per each "Work Order Mobilization" in accordance with Contract Documents. Demobilization shall be considered subsidiary to mobilization and shall not be paid for separately. c. The price shall include: 1) Mobilization as described in Section l.l.A.3.a.1) 2) Demobilization as described in Section 1.1.A.3.a.2) d. No payments will be made for standby, idle time, or lost profits associated this Item. Emergency Mobilizations and Demobilizations for Miscellaneous Projects a. Measurement 1) Measurement for this Item shall be for each Mobilization and Demobilization required by the Contract Documents b. Payment 1) The Work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price per each "Work Order Emergency Mobilization" in accordance with Contract Documents. Demobilization shall be considered subsidiary to mobilization and shall not be paid for separately. c. The price shall include 1) Mobilization as described in Section 1.1.A.4.a) 2) Demobilization as described in Section 1.1.A.3.a.2) d. No payments will be made for standby, idle time, or lost profits associated this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS [NOT USED] 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised April 7, 2014 01 70 00 - 4 DAP MOBILIZATION AND REMOBILIZATION Page 4 of 4 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised April 7, 2014 017123-1 CONSTRUCTION STAKING AND SURVEY Page 1 of 7 1 SECTION 017123 2 CONSTRUCTION STAKING AND SURVEY 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Requirements for construction staking and construction survey 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. See Changes (Highlighted in Yellow). 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division 1 — General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Construction Staking 15 a. Measurement 16 1) This Item is considered subsidiary to the various Items bid. 17 b. Payment 18 1) The work performed and the materials furnished in accordance with this 19 Item are subsidiary to the various Items bid and no other compensation will 20 be allowed. 21 2. Construction Survey 22 a. Measurement 23 1) This Item is considered subsidiary to the various Items bid. 24 b. Payment 25 1) The work performed and the materials furnished in accordance with this 26 Item are subsidiary to the various Items bid and no other compensation will be 27 allowed. 28 3. As -Built Survey 29 a. Measurement 30 1) This Item is considered subsidiary to the various Items bid. 31 b. Payment 32 1) The work performed and the materials furnished in accordance with this 33 Item are subsidiary to the various Items bid and no other compensation will be 34 allowed. 35 1.3 REFERENCES 36 A. Definitions 37 1. Construction Survev - The survey measurements made prior to or while 38 construction is in progress to control elevation, horizontal position, dimensions and 39 configuration of structures/improvements included in the Project Drawings. CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised February 14, 2018 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 017123-2 CONSTRUCTION STAKING AND SURVEY Page 2 of 7 2. As -built Survey —The measurements made after the construction of the improvement features are complete to provide position coordinates for the features of a project. 3. Construction Staking — The placement of stakes and markings to provide offsets and elevations to cut and fill in order to locate on the ground the designed structures/improvements included in the Project Drawings. Construction staking shall include staking easements and/or right of way if indicated on the plans. 4. Survey "Field Checks" — Measurements made after construction staking is completed and before construction work begins to ensure that structures marked on the ground are accurately located per Project Drawings. B. Technical References 1. City of Fort Worth — Construction Staking Standards (available on City's Buzzsaw website) — 01 71 23.16.01— Attachment A —Survey Staking Standards 2. City of Fort Worth - Standard Survey Data Collector Library (fxl) files (available on City's Buzzsaw website). 3. Texas Department of Transportation (TxDOT) Survey Manual, latest revision 4. Texas Society of Professional Land Surveyors (TSPS), Manual of Practice for Land Surveying in the State of Texas, Category 5 20 1.4 ADMINISTRATIVE REQUIREMENTS 21 A. The Contractor's selection of a surveyor must comply with Texas Government 22 Code 2254 (qualifications based selection) for this project. 23 1.5 SUBMITTALS 24 A. Submittals, if required, shall be in accordance with Section 0133 00. 25 B. All submittals shall be received and reviewed by the City prior to delivery of work. 26 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS 27 A. Field Quality Control Submittals 28 1. Documentation verifying accuracy of field engineering work, including coordinate 29 conversions if plans do not indicate grid or ground coordinates. 30 2. Submit "Cut -Sheets" conforming to the standard template provided by the City 31 (refer to 01 71 23.16.01 — Attachment A — Survey Staking Standards). 32 1.7 CLOSEOUT SUBMITTALS 33 B. As -built Redline Drawing Submittal 34 1. Submit As -Built Survey Redline Drawings documenting the locations/elevations of 35 constructed improvements signed and sealed by Registered Professional Land 36 Surveyor (RPLS) responsible for the work (refer to 01 71 23.16.01 — Attachment A 37 — Survey Staking Standards) . 38 2. Contractor shall submit the proposed as -built and completed redline drawing 39 submittal one (1) week prior to scheduling the project final inspection for City 40 review and comment. Revisions, if necessary, shall be made to the as -built redline 41 drawings and resubmitted to the City prior to scheduling the construction final 42 inspection. CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised February 14, 2018 017123-3 CONSTRUCTION STAKING AND SURVEY Page 3 of 7 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 2 1.9 QUALITY ASSURANCE 3 A. Construction Staking 4 1. Construction staking will be performed by the Contractor. 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 2. Coordination a. Contact City and Developer's Project Representative at least one week in advance notifying the City of when Construction Staking is scheduled. b. It is the Contractor's responsibility to coordinate staking such that construction activities are not delayed or negatively impacted. 3. General a. Contractor is responsible for preserving and maintaining stakes. If Developer's Project Representative is required to re -stake for any reason, the Contractor will be responsible for costs to perform staking. If in the opinion of the City, a sufficient number of stakes or markings have been lost, destroyed disturbed or omitted that the contracted Work cannot take place then the Contractor will be required to stake or re -stake the deficient areas. B. Construction Survey 1. Construction Survey will be performed by the Contractor. 2. Coordination a. Contractor to verify that horizontal and vertical control data established in the design survey and required for construction survey is available and in place. 3. General a. Construction survey will be performed in order to construct the work shown on the Construction Drawings and specified in the Contract Documents. b. For construction methods other than open cut, the Contractor shall perform construction survey and verify control data including, but not limited to, the following: 1) Verification that established benchmarks and control are accurate. 2) Use of Benchmarks to furnish and maintain all reference lines and grades for tunneling. 3) Use of line and grades to establish the location of the pipe. 4) Submit to the City copies of field notes used to establish all lines and grades, if requested, and allow the City to check guidance system setup prior to beginning each tunneling drive. 5) Provide access for the City, if requested, to verify the guidance system and the line and grade of the carrier pipe. 6) The Contractor remains fully responsible for the accuracy of the work and correction of it, as required. 7) Monitor line and grade continuously during construction. 8) Record deviation with respect to design line and grade once at each pipe joint and submit daily records to the City. 9) If the installation does not meet the specified tolerances (as outlined in Sections 33 05 23 and/or 33 05 24), immediately notify the City and correct the installation in accordance with the Contract Documents. C. As -Built Survey 1. Required As -Built Survey will be performed by the Contractor. CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised February 14, 2018 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 01 71 23 - 4 CONSTRUCTION STAKING AND SURVEY Page 4 of 7 2. Coordination a. Contractor is to coordinate with City to confirm which features require as - built surveying. b. It is the Contractor's responsibility to coordinate the as -built survey and required measurements for items that are to be buried such that construction activities are not delayed or negatively impacted. c. For sewer mains and water mains 12" and under in diameter, it is acceptable to physically measure depth and mark the location during the progress of construction and take as -built survey after the facility has been buried. The Contractor is responsible for the quality control needed to ensure accuracy. 3. General a. The Contractor shall provide as -built survey including the elevation and location (and provide written documentation to the City) of construction features during the progress of the construction including the following: 1) Water Lines a) Top of pipe elevations and coordinates for waterlines at the following locations: (1) Minimum every 25O linear feet, including (2) Horizontal and vertical points of inflection, curvature, etc. (3) Fire line tee (4) Plugs, stub -outs, dead-end lines (5) Casing pipe (each end) and all buried fittings 2) Sanitary Sewer a) Top of pipe elevations and coordinates for force mains and siphon sanitary sewer lines (non -gravity facilities) at the following locations: (1) Minimum every 25O linear feet and any buried fittings (2) Horizontal and vertical points of inflection, curvature, etc. 3) Stormwater — Not Applicable b. The Contractor shall provide as -built survey including the elevation and location (and provide written documentation to the City) of construction features after the construction is completed including the following: 1) Manholes a) Rim and flowline elevations and coordinates for each manhole 2) Water Lines a) Cathodic protection test stations b) Sampling stations c) Meter boxes/vaults (All sizes) d) Fire hydrants e) Valves (gate, butterfly, etc.) f) Air Release valves (Manhole rim and vent pipe) g) Blow off valves (Manhole rim and valve lid) h) Pressure plane valves i) Underground Vaults (1) Rim and flowline elevations and coordinates for each Underground Vault. 3) Sanitary Sewer a) Cleanouts (1) Rim and flowline elevations and coordinates for each CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised February 14, 2018 01 71 23 - 5 CONSTRUCTION STAKING AND SURVEY Page 5 of 7 1 b) Manholes and Junction Structures 2 (1) Rim and flowline elevations and coordinates for each 3 manhole and junction structure. 4 4) Stormwater — Not Applicable 5 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 6 1.11 FIELD [SITE] CONDITIONS [NOT USED] 7 1.12 WARRANTY 8 PART2- PRODUCTS 9 A. A construction survey will produce, but will not be limited to: 10 1. Recovery of relevant control points, points of curvature and points of intersection. 11 2. Establish temporary horizontal and vertical control elevations (benchmarks) 12 sufficiently permanent and located in a manner to be used throughout construction. 13 3. The location of planned facilities, easements and improvements. 14 a. Establishing final line and grade stakes for piers, floors, grade beams, parking 15 areas, utilities, streets, highways, tunnels, and other construction. 16 b. A record of revisions or corrections noted in an orderly manner for reference. 17 c. A drawing, when required by the client, indicating the horizontal and vertical 18 location of facilities, easements and improvements, as built. 19 4. Cut sheets shall be provided to the City inspector and Survey Superintendent for all 20 construction staking projects. These cut sheets shall be on the standard city template 21 which can be obtained from the Survey Superintendent (817-392-7925). 22 5. Digital survey files in the following formats shall be acceptable: 23 a. AutoCAD (.dwg) 24 b. ESRI Shapefile (.shp) 25 c. CSV file (.csv), formatted with X and Y coordinates in separate columns (use 26 standard templates, if available) 27 6. Survey files shall include vertical and horizontal data tied to original project 28 control and benchmarks, and shall include feature descriptions 29 PART 3 - EXECUTION 30 3.1 INSTALLERS 31 A. Tolerances: 32 1. The staked location of any improvement or facility should be as accurate as 33 practical and necessary. The degree of precision required is dependent on many 34 factors all of which must remain judgmental. The tolerances listed hereafter are 35 based on generalities and, under certain circumstances, shall yield to specific 36 requirements. The surveyor shall assess any situation by review of the overall plans 37 and through consultation with responsible parties as to the need for specific 38 tolerances. 39 a. Earthwork: Grades for earthwork or rough cut should not exceed 0.1 ft. vertical 40 tolerance. Horizontal alignment for earthwork and rough cut should not exceed 41 1.0 ft. tolerance. CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised February 14, 2018 017123-6 CONSTRUCTION STAKING AND SURVEY Page 6 of 7 1 b. Horizontal alignment on a structure shall be within .0.lft tolerance. 2 c. Paving or concrete for streets, curbs, gutters, parking areas, drives, alleys and 3 walkways shall be located within the confines of the site boundaries and, 4 occasionally, along a boundary or any other restrictive line. Away from any 5 restrictive line, these facilities should be staked with an accuracy producing no 6 more than 0.05ft. tolerance from their specified locations. 7 d. Underground and overhead utilities, such as sewers, gas, water, telephone and 8 electric lines, shall be located horizontally within their prescribed areas or 9 easements. Within assigned areas, these utilities should be staked with an 10 accuracy producing no more than 0.1 ft tolerance from a specified location. 11 e. The accuracy required for the vertical location of utilities varies widely. Many 12 underground utilities require only a minimum cover and a tolerance of 0.1 ft. 13 should be maintained. Underground and overhead utilities on planned profile, 14 but not depending on gravity flow for performance, should not exceed 0.1 ft. 15 tolerance. 16 B. Surveying instruments shall be kept in close adjustment according to manufacturer's 17 specifications or in compliance to standards. The City reserves the right to request a 18 calibration report at any time and recommends regular maintenance schedule be 19 performed by a certified technician every 6 months. 20 1. Field measurements of angles and distances shall be done in such fashion as to 21 satisfy the closures and tolerances expressed in Part 3.1.A. 22 2. Vertical locations shall be established from a pre -established benchmark and 23 checked by closing to a different bench mark on the same datum. 24 3. Construction survey field work shall correspond to the client's plans. Irregularities 25 or conflicts found shall be reported promptly to the City. 26 4. Revisions, corrections and other pertinent data shall be logged for future reference. 27 28 3.2 EXAMINATION [NOT USED] 29 3.3 PREPARATION [NOT USED] 30 3.4 APPLICATION 31 3.5 REPAIR / RESTORATION 32 A. If the Contractor's work damages or destroys one or more of the control 33 monuments/points set by the Developer's Project Representative, the monuments shall be 34 adequately referenced for expedient restoration. 35 1. Notify City or Developer's Project Representative if any control data needs to be 36 restored or replaced due to damage caused during construction operations. 37 a. Contractor shall perform replacements and/or restorations. 38 b. The City or Developer's Project Representative may require at any time a 39 survey "Field Check" of any monument or benchmarks that are set be verified 40 by the Developer's Project Representative before further associated work can 41 move forward. CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised February 14, 2018 017123-7 CONSTRUCTION STAKING AND SURVEY Page 7 of 7 1 3.6 RE -INSTALLATION [NOT USED] 2 3.7 FIELD [OR] SITE QUALITY CONTROL 3 A. It is the Contractor's responsibility to maintain all stakes and control data placed by the 4 Developer's Project Representative in accordance with this Specification. This includes 5 easements and right of way, if noted on the plans. 6 B. Do not change or relocate stakes or control data without approval from the City. 7 3.8 SYSTEM STARTUP 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 A. Survey Checks 1. The City reserves the right to perform a Survey Check at any time deemed necessary. 2. Checks by City personnel or 3' party contracted surveyor are not intended to relieve the contractor of his/her responsibility for accuracy. 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D. Johnson Added instruction and modified measurement & payment under 1.2; added 8/31/2017 M. Owen definitions and references under 1.3; modified 1.6; added 1.7 closeout submittal requirements; modified 1.9 Quality Assurance; added PART 2 — PRODUCTS ; Added 3.1 Installers; added 3.5 Repair/Restoration; and added 3.8 System Startup. Removed "blue text"; revised measurement and payment sections for Construction Staking and As -Built Survey; added reference to selection compliance with TGC 2/14/2018 M Owen 2254; revised action and Closeout submittal requirements; added acceptable depth measurement criteria; revised list of items requiring as -built survey "during" and "after" construction; and revised acceptable digital survey file format CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised February 14, 2018 SECTION 0174 23 CLEANING PART1- GENERAL 1.1 SUMMARY 017423-1 DAP CLEANING Page 1 of 4 A. Section Includes: 1. Intermediate and final cleaning for Work not including special cleaning of closed systems specified elsewhere B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 3. Section 32 92 13 — Hydro -Mulching, Seeding and Sodding flf► ' : �9/:��I�77�'/u1�1►Y1��:Z�Z�J�1�111,7�fy A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Scheduling 1. Schedule cleaning operations so that dust and other contaminants disturbed by cleaning process will not fall on newly painted surfaces. 2. Schedule final cleaning upon completion of Work and immediately prior to final inspection. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 STORAGE, AND HANDLING A. Storage and Handling Requirements 1. Store cleaning products and cleaning wastes in containers specifically designed for those materials. CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised April 7, 2014 01 74 23 - 2 DAP CLEANING Page 2 of 4 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS 2.1 OWNER -FURNISHED [OR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 2.2 MATERIALS A. Cleaning Agents 1. Compatible with surface being cleaned 2. New and uncontaminated 3. For manufactured surfaces a. Material recommended by manufacturer 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 APPLICATION [NOT USED] 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING A. General 1. Prevent accumulation of wastes that create hazardous conditions. 2. Conduct cleaning and disposal operations to comply with laws and safety orders of governing authorities. 3. Do not dispose of volatile wastes such as mineral spirits, oil or paint thinner in storm or sanitary drains or sewers. 4. Dispose of degradable debris at an approved solid waste disposal site. 5. Dispose of nondegradable debris at an approved solid waste disposal site or in an alternate manner approved by City and regulatory agencies. CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised April 7, 2014 01 74 23 - 3 DAP CLEANING Page 3 of 4 6. Handle materials in a controlled manner with as few handlings as possible. 7. Thoroughly clean, sweep, wash and polish all Work and equipment associated with this project. 8. Remove all signs of temporary construction and activities incidental to construction of required permanent Work. 9. If project is not cleaned to the satisfaction of the City, the City reserves the right to have the cleaning completed at the expense of the Contractor. 10. Do not burn on -site. B. Intermediate Cleaning during Construction 1. Keep Work areas clean so as not to hinder health, safety or convenience of personnel in existing facility operations. 2. At maximum weekly intervals, dispose of waste materials, debris and rubbish. 3. Confine construction debris daily in strategically located container(s): a. Cover to prevent blowing by wind b. Store debris away from construction or operational activities c. Haul from site at a minimum of once per week 4. Vacuum clean interior areas when ready to receive finish painting. a. Continue vacuum cleaning on an as -needed basis, until Final Acceptance. 5. Prior to storm events, thoroughly clean site of all loose or unsecured items, which may become airborne or transported by flowing water during the storm. C. Exterior (Site or Right of Way) Final Cleaning 1. Remove trash and debris containers from site. a. Re -seed areas disturbed by location of trash and debris containers in accordance with Section 32 92 13. 2. Sweep roadway to remove all rocks, pieces of asphalt, concrete or any other object that may hinder or disrupt the flow of traffic along the roadway. 3. Clean any interior areas including, but not limited to, vaults, manholes, structures, junction boxes and inlets. 4. If no longer required for maintenance of erosion facilities, and upon approval by City, remove erosion control from site. 5. Clean signs, lights, signals, etc. 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised April 7, 2014 01 74 23 - 4 DAP CLEANING Page 4 of 4 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised April 7, 2014 SECTION 0177 19 CLOSEOUT REQUIREMENTS PART1- GENERAL 1.1 SUMMARY 017719-1 DAP CLOSEOUT REQUIREMENTS Paget of 3 A. Section Includes: 1. The procedure for closing out a contract B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Guarantees, Bonds and Affidavits 1. No application for final payment will be accepted until all guarantees, bonds, certificates, licenses and affidavits required for Work or equipment as specified are satisfactorily filed with the City. B. Release of Liens or Claims 1. No application for final payment will be accepted until satisfactory evidence of release of liens has been submitted to the City. iWIM111:3u 110 ky.3 &I A. Submit all required documentation to City's Project Representative. CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised April 7, 2014 017719-2 DAP CLOSEOUT REQUIREMENTS Page 2 of 3 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 CLOSEOUT PROCEDURE A. Prior to requesting Final Inspection, submit: 1. Project Record Documents in accordance with Section 0178 39 2. Operation and Maintenance Data, if required, in accordance with Section 0178 23 B. Prior to requesting Final Inspection, perform final cleaning in accordance with Section 01 74 23. C. Final Inspection 1. After final cleaning, provide notice to the City Project Representative that the Work is completed. a. The City will make an initial Final Inspection with the Contractor present. b. Upon completion of this inspection, the City will notify the Contractor, in writing within 10 business days, of any particulars in which this inspection reveals that the Work is defective or incomplete. 2. Upon receiving written notice from the City, immediately undertake the Work required to remedy deficiencies and complete the Work to the satisfaction of the City. 3. Upon completion of Work associated with the items listed in the City's written notice, inform the City, that the required Work has been completed. Upon receipt of this notice, the City, in the presence of the Contractor, will make a subsequent Final Inspection of the project. 4. Provide all special accessories required to place each item of equipment in full operation. These special accessory items include, but are not limited to: a. Specified spare parts b. Adequate oil and grease as required for the first lubrication of the equipment c. Initial fill up of all chemical tanks and fuel tanks d. Light bulbs e. Fuses f. Vault keys g. Handwheels h. Other expendable items as required for initial start-up and operation of all equipment D. Notice of Project Completion CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised April 7, 2014 017719-3 DAP CLOSEOUT REQUIREMENTS Page 3 of 3 1. Once the City Project Representative finds the Work subsequent to Final Inspection to be satisfactory, the City will issue a Notice of Project Completion (Green Sheet). E. Supporting Documentation 1. Coordinate with the City Project Representative to complete the following additional forms: a. Final Payment Request b. Statement of Contract Time c. Affidavit of Payment and Release of Liens d. Consent of Surety to Final Payment e. Pipe Report (if required) f. Contractor's Evaluation of City g. Performance Evaluation of Contractor F. Letter of Final Acceptance 1. Upon review and acceptance of Notice of Project Completion and Supporting Documentation, in accordance with General Conditions, City will issue Letter of Final Acceptance and release the Final Payment Request for payment. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised April 7, 2014 01 78 23 - 1 DAP OPERATION AND MAINTENANCE DATA Paget of 5 SECTION 0178 23 OPERATION AND MAINTENANCE DATA PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Product data and related information appropriate for City's maintenance and operation of products furnished under Contract 2. Such products may include, but are not limited to: a. Traffic Controllers b. Irrigation Controllers (to be operated by the City) c. Butterfly Valves B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Schedule 1. Submit manuals in final form to the City within 30 calendar days of product shipment to the project site. 1.5 SUBMITTALS A. Submittals shall be in accordance with Section 01 33 00. All submittals shall be approved by the City prior to delivery. [prim lei 0191907/:11I1110FRIL111:3uI10ky.1ski A. Submittal Form 1. Prepare data in form of an instructional manual for use by City personnel. 2. Format a. Size: 8 %2 inches x 11 inches b. Paper 1) 40 pound minimum, white, for typed pages 2) Holes reinforced with plastic, cloth or metal c. Text: Manufacturer's printed data, or neatly typewritten CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised April 7, 2014 01 78 23 - 2 DAP OPERATION AND MAINTENANCE DATA Page 2 of 5 d. Drawings 1) Provide reinforced punched binder tab, bind in with text 2) Reduce larger drawings and fold to size of text pages. e. Provide fly -leaf for each separate product, or each piece of operating equipment. 1) Provide typed description of product, and major component parts of equipment. 2) Provide indexed tabs. f. Cover 1) Identify each volume with typed or printed title "OPERATING AND MAINTENANCE INSTRUCTIONS". 2) List: a) Title of Project b) Identity of separate structure as applicable c) Identity of general subject matter covered in the manual 3. Binders a. Commercial quality 3-ring binders with durable and cleanable plastic covers b. When multiple binders are used, correlate the data into related consistent groupings. 4. If available, provide an electronic form of the O&M Manual. B. Manual Content 1. Neatly typewritten table of contents for each volume, arranged in systematic order a. Contractor, name of responsible principal, address and telephone number b. A list of each product required to be included, indexed to content of the volume c. List, with each product: 1) The name, address and telephone number of the subcontractor or installer 2) A list of each product required to be included, indexed to content of the volume 3) Identify area of responsibility of each 4) Local source of supply for parts and replacement d. Identify each product by product name and other identifying symbols as set forth in Contract Documents. 2. Product Data a. Include only those sheets which are pertinent to the specific product. b. Annotate each sheet to: 1) Clearly identify specific product or part installed 2) Clearly identify data applicable to installation 3) Delete references to inapplicable information 3. Drawings a. Supplement product data with drawings as necessary to clearly illustrate: 1) Relations of component parts of equipment and systems 2) Control and flow diagrams b. Coordinate drawings with information in Project Record Documents to assure correct illustration of completed installation. c. Do not use Project Record Drawings as maintenance drawings. 4. Written text, as required to supplement product data for the particular installation: a. Organize in consistent format under separate headings for different procedures. b. Provide logical sequence of instructions of each procedure. CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised April 7, 2014 01 78 23 - 3 DAP OPERATION AND MAINTENANCE DATA Page 3 of 5 5. Copy of each warranty, bond and service contract issued a. Provide information sheet for City personnel giving: 1) Proper procedures in event of failure 2) Instances which might affect validity of warranties or bonds C. Manual for Materials and Finishes 1. Submit 5 copies of complete manual in final form. 2. Content, for architectural products, applied materials and finishes: a. Manufacturer's data, giving full information on products 1) Catalog number, size, composition 2) Color and texture designations 3) Information required for reordering special manufactured products b. Instructions for care and maintenance 1) Manufacturer's recommendation for types of cleaning agents and methods 2) Cautions against cleaning agents and methods which are detrimental to product 3) Recommended schedule for cleaning and maintenance Content, for moisture protection and weather exposure products: a. Manufacturer's data, giving full information on products 1) Applicable standards 2) Chemical composition 3) Details of installation b. Instructions for inspection, maintenance and repair D. Manual for Equipment and Systems 1. Submit 5 copies of complete manual in final form. 2. Content, for each unit of equipment and system, as appropriate: a. Description of unit and component parts 1) Function, normal operating characteristics and limiting conditions 2) Performance curves, engineering data and tests 3) Complete nomenclature and commercial number of replaceable parts b. Operating procedures 1) Start-up, break-in, routine and normal operating instructions 2) Regulation, control, stopping, shut -down and emergency instructions 3) Summer and winter operating instructions 4) Special operating instructions c. Maintenance procedures 1) Routine operations 2) Guide to "trouble shooting" 3) Disassembly, repair and reassembly 4) Alignment, adjusting and checking d. Servicing and lubrication schedule 1) List of lubricants required e. Manufacturer's printed operating and maintenance instructions f. Description of sequence of operation by control manufacturer 1) Predicted life of parts subject to wear 2) Items recommended to be stocked as spare parts g. As installed control diagrams by controls manufacturer h. Each contractor's coordination drawings 1) As installed color coded piping diagrams CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised April 7, 2014 01 78 23 - 4 DAP OPERATION AND MAINTENANCE DATA Page 4 of 5 i. Charts of valve tag numbers, with location and function of each valve j. List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage k. Other data as required under pertinent Sections of Specifications 3. Content, for each electric and electronic system, as appropriate: a. Description of system and component parts 1) Function, normal operating characteristics, and limiting conditions 2) Performance curves, engineering data and tests 3) Complete nomenclature and commercial number of replaceable parts b. Circuit directories of panelboards 1) Electrical service 2) Controls 3) Communications c. As installed color coded wiring diagrams d. Operating procedures 1) Routine and normal operating instructions 2) Sequences required 3) Special operating instructions e. Maintenance procedures 1) Routine operations 2) Guide to "trouble shooting" 3) Disassembly, repair and reassembly 4) Adjustment and checking f. Manufacturer's printed operating and maintenance instructions g. List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage h. Other data as required under pertinent Sections of Specifications 4. Prepare and include additional data when the need for such data becomes apparent during instruction of City's personnel. 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Provide operation and maintenance data by personnel with the following criteria: 1. Trained and experienced in maintenance and operation of described products 2. Skilled as technical writer to the extent required to communicate essential data 3. Skilled as draftsman competent to prepare required drawings CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised April 7, 2014 01 78 23 - 5 DAP OPERATION AND MAINTENANCE DATA Page 5 of 5 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] DATE NAME 8/31/2012 D. Johnson 4/7/2014 M.Domenech END OF SECTION Revision Log SUMMARY OF CHANGE 1.5.A.1 — title of section removed Revised for DAP Application CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised April 7, 2014 01 78 39 - 1 DAP PROJECT RECORD DOCUMENTS Paget of 4 SECTION 0178 39 PROJECT RECORD DOCUMENTS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Work associated with the documenting the project and recording changes to project documents, including: a. Record Drawings b. Water Meter Service Reports c. Sanitary Sewer Service Reports d. Large Water Meter Reports B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS A. Prior to submitting a request for Final Inspection, deliver Project Record Documents to City's Project Representative. 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Accuracy of Records 1. Thoroughly coordinate changes within the Record Documents, making adequate and proper entries on each page of Specifications and each sheet of Drawings and other Documents where such entry is required to show the change properly. 2. Accuracy of records shall be such that fixture search for items shown in the Contract Documents may rely reasonably on information obtained from the approved Project Record Documents. CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised April 7, 2014 017839-2 DAP PROJECT RECORD DOCUMENTS Page 2 of 4 3. To facilitate accuracy of records, make entries within 24 hours after receipt of information that the change has occurred. 4. Provide factual information regarding all aspects of the Work, both concealed and visible, to enable future modification of the Work to proceed without lengthy and expensive site measurement, investigation and examination. 1.10 STORAGE AND HANDLING A. Storage and Handling Requirements 1. Maintain the job set of Record Documents completely protected from deterioration and from loss and damage until completion of the Work and transfer of all recorded data to the final Project Record Documents. 2. In the event of loss of recorded data, use means necessary to again secure the data to the City's approval. a. In such case, provide replacements to the standards originally required by the Contract Documents. 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS 2.1 OWNER -FURNISHED [OR] OWNER -SUPPLIED PRODUCTS [NOT USED] 2.2 RECORD DOCUMENTS A. Job set 1. Promptly following receipt of the Notice to Proceed, secure from the City, at no charge to the Contractor, 1 complete set of all Documents comprising the Contract. B. Final Record Documents 1. At a time nearing the completion of the Work and prior to Final Inspection, provide the City 1 complete set of all Final Record Drawings in the Contract. 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED 3.3 PREPARATION [NOT USEDI 3.4 MAINTENANCE DOCUMENTS A. Maintenance of Job Set 1. Immediately upon receipt of the job set, identify each of the Documents with the title, "RECORD DOCUMENTS - JOB SET". CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised April 7, 2014 017839-3 DAP PROJECT RECORD DOCUMENTS Page 3 of 4 2. Preservation a. Considering the Contract completion time, the probable number of occasions upon which the job set must be taken out for new entries and for examination, and the conditions under which these activities will be performed, devise a suitable method for protecting the job set. b. Do not use the job set for any purpose except entry of new data and for review by the City, until start of transfer of data to final Project Record Documents. c. Maintain the job set at the site of work. 3. Coordination with Construction Survey a. At a minimum clearly mark any deviations from Contract Documents associated with installation of the infrastructure. 4. Making entries on Drawings a. Record any deviations from Contract Documents. b. Use an erasable colored pencil (not ink or indelible pencil), clearly describe the change by graphic line and note as required. c. Date all entries. d. Call attention to the entry by a "cloud" drawn around the area or areas affected. e. In the event of overlapping changes, use different colors for the overlapping changes. Conversion of schematic layouts a. In some cases on the Drawings, arrangements of conduits, circuits, piping, ducts, and similar items, are shown schematically and are not intended to portray precise physical layout. 1) Final physical arrangement is determined by the Contractor, subject to the City's approval. 2) However, design of future modifications of the facility may require accurate information as to the final physical layout of items which are shown only schematically on the Drawings. b. Show on the job set of Record Drawings, by dimension accurate to within 1 inch, the centerline of each run of items. 1) Final physical arrangement is determined by the Contractor, subject to the City's approval. 2) Show, by symbol or note, the vertical location of the Item ("under slab", "in ceiling plenum", "exposed", and the like). 3) Make all identification sufficiently descriptive that it may be related reliably to the Specifications. c. The City may waive the requirements for conversion of schematic layouts where, in the City's judgment, conversion serves no useful purpose. However, do not rely upon waivers being issued except as specifically issued in writing by the City. B. Final Project Record Documents Transfer of data to Drawings a. Carefully transfer change data shown on the job set of Record Drawings to the corresponding final documents, coordinating the changes as required. b. Clearly indicate at each affected detail and other Drawing a full description of changes made during construction, and the actual location of items. c. Call attention to each entry by drawing a "cloud" around the area or areas affected. CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised April 7, 2014 01 78 39 - 4 DAP PROJECT RECORD DOCUMENTS Page 4 of 4 d. Make changes neatly, consistently and with the proper media to assure longevity and clear reproduction. 2. Transfer of data to other Documents a. If the Documents, other than Drawings, have been kept clean during progress of the Work, and if entries thereon have been orderly to the approval of the City, the job set of those Documents, other than Drawings, will be accepted as final Record Documents. b. If any such Document is not so approved by the City, secure a new copy of that Document from the City at the City's usual charge for reproduction and handling, and carefully transfer the change data to the new copy to the approval of the City. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP Application CITY OF FORT WORTH Tradition Phase 9A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #105255 Revised April 7, 2014 FORT WORTH. CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 12/29/2023 IApprovall Spec No. IClasssification Manufacturer Model No. National Spec Size Water & Sewer - Manholes & Bases/Components 33-39-10 (Rev 2/3/16) 07/23/97 33 05 13 Urethane Hydrophilic Waterstop Asahi Kogyo K.K. Adeka Ultra -Seal P-201 ASTM D2240/D412/D792 04/26/00 33 05 13 Offset Joint for 4' Diam. MH Hanson Concrete Products Drawing No. 35-0048-001 04/26/00 33 05 13 Profile Gasket for 4' Diam. MH. Press -Seal Gasket Corp. 250-4G Gasket ASTM C-443/C-361 SS MH 1/26199 33 05 13 HDPE Manhole Adjustment Rings Ladtech, Inc HDPE Adjustment Ring Traffic and Non -traffic area 5/13105 33 05 13 Manhole External Wrap Canusa - CPS WrapidSeal Manhole Encapsulation System Water & Sewer - Manholes & Bases/Fiberelass 33-39-13 (1/8/13) 1/26/99 33 39 13 Fiberglass Manhole Fluid Containment, Inc. Flowtite ASTM 3111 Non -traffic area 08/30/06 33 39 13 Fiberglass Manhole L.F. Manufacturing Non -traffic area Water &Sewer - Manholes & Bases/Frames & Covers/Rectangular 33-05-13 (Rev 2/3/16(1 * 33 05 13 IManhole Frames and Covers I Western Iron Works, Bass & Hays Foundry 1001 24"x40" WD Water & Sewer - Manholes & Bases/Frames & Covers/Standard (Round) 33-05-13 (Rev 2/3/16) * 3305 13 Manhole Frames and Covers Western Iron Works, Bass & Hays Foundry 30024 24" Dia. * 33 05 13 Manhole Frames and Covers McKinley Iron Works Inc. A 24 AM 24" Dia. 08/24/18 33 05 13 Manhole Frames and Covers Neenah Foundry R-1272 ASTM A48 & AASHTO M306 24" Dia. 08/24/18 33 05 13 Manhole Frames and Covers Neenah Foundry NF 1274 ASTM A48 & AASHTO M306 30" Dia. 33 05 13 Manhole Frames and Covers Sigma Corporation MH-144N 33 05 13 Manhole Frames and Covers Sigma Corporation MH-143N 33 05 13 Manhole Frames and Covers Pont-A-Mmoson GTS-STD 24" dia. 33 05 13 Manhole Frames and Covers Neenah Casting 24" dia. 10/31/06 33 05 13 Manhole Frames and Covers (Hinged) Powerseal Hinged Ductile Iron Manhole ASTM A536 24" Dia. 7/25/03 33 05 13 Manhole Frames and Covers Saint-Gobain Pipelines (Pamrex/rexus) RE32-R8FS 30" Dia. 01/31/06 33 05 13 30" Dia. MH Ring and Cover East Jordan Iron Works V1432-2 and V1483 Designs AASHTO M306-04 30" Dia. 11/02/10 33 05 13 30" Dia. MH Ring and Cover Sigma Corporation MH1651FWN & MH16502 30" Dia 07/19/11 33 05 13 30" Dia. MH Ring and Cover Star Pipe Products MR32FTWSS-DC 30" Dia 08/10/11 33 05 13 30" Dia. MH Ring and Cover Accucast 220700 Heavy Duty with Gasket Ring 30" Dia 30" ERGO XL Assembly 10/14/13 33 05 13 30" Dia. MH Ring and Cover (Hinged & Lockable) East Jordan Iron Works with Cam Lock/MPIC/T-Gasket ASSFITO M105 & ASTM A536 30" Dia 06/01/17 3405 13 30" Dia. MH Rine and Covcr (Lockablc) CI SIP Industrics 2290 (32") ASTM A 48 30" Dia. CAP-ONE-30-FT W, Composite, w/ Lock 09/16/19 33 05 13 30" Dia. MH Ring and Cover Composite Access Products, L.P. w/o Hmg 30" Dia. 10/07/21 3405 13 30" Dia. MH Ring and Cover Trumbull Manufacturing 32"(30") Frame and Cover 30" Dia. Water & Sewer - Manholes & Bases/Frames & Covers/Water Tight & Pressure Tight 33-05-13 (Rev 2/3/16) * 33 05 13 Manhole Frames and Covers Pont-A-Mousson Pamfight 24" Dia. * 33 05 13 Manhole Frames and Covers Neenah Casting 24" Dia. * 3305 13 Manhole Frames and Covers Western Iron Works,Bass & Hays Foundry 300-24P 24" Dia. * 3305 13 Manhole Frames and Covers McKinley Iron Works Inc. WPA24AM 24" Dia. 03/08/00 33 05 13 Manhole Frames and Covers Accum st RC-2100 ASTM A 48 24" Dia. 04/20/01 33 05 13 Manhole Frames and Covers (SIP)Serampore Industries Private Ltd. 300-24-23.75 Ring and Cover ASTM A 48 24" Dia. Water & Sewer - Manholes & Bases/Precast Concrete (Rev 1/8/13) * 33 39 10 Manhole, Precast Concrete Hydro Conduit Corp SPL Item 949 ASTM C 478 48" * 33 39 10 Manhole, Precast Concrete Wall Concrete Pipe Co. Inc. ASTM C-443 48" 09/23/96 33 39 10 Manhole, Precast Concrete Concrete Product Inc. 48" I.D. Manhole w/ 32" Cone ASTM C 478 48" w/32" cone 1.513 33 39 10 Manhole, Precast Concrete The Turner Company 72" I.D. Manhole w/ 32" Cone ASTM C 478 72" 05/08/18 33 39 10 Manhole, Precast Concrete The Turner Company 48", 60" I.D. Manhole w/ 32" Cone ASTM C 478 48", 60" 10/27/06 33 39 10 Manhole, Precast Concrete Oldcastle Precast Inc. 48" I.D. Manhole w/ 24" Cone ASTM C 478 48" Diana w 24" Ring 06/09/10 33 39 10 Manhole, Precast (Reinforced Polymer)Concrete US Composite Pipe Reinforced Polymer Concrete ASTM C-76 48" to 72" 09/06/19 33 3920 Manhole, Precast Concrete Forterra Pipe and Precast 60" & 72" I.D. Manhole w/32" Cone ASTM C-76 60" & 72" 10/07/21 32 39 20 Manhole, Precast Concrete Forterra Pipe and Precast 48" I.D. Manhole w/32" Cone ASTM C-77 48" 10/07/21 33 3920 Manhole, Precast (Reinforced Polymer) Concrete Armorock 48" & 60" I.D. Manhole w/32" Cone 48" & 60" 10/07/21 33 3920 Manhole, Precast (Hybrid) Polymer & PVC Predl Systems 48" & 60" I.D. Manhole w/32" Cone 48" & 60" Non Traffic Areas ASTM C-478; ASTM C-923; 03/07/23 33 3920 Manhole, Precast Concrete AmeriTex Pipe and Products, LLC 48" & 60" I.D. Manhole w/32" Cone ASTM C-443 03/07/23 33 3920 Manhole, Precast (Reinforced Polymer) Concrete P3 Polymers, RockHardscp 48" & 60" I.D. Manhole w/32" Cone 04/28/07 Manhole, Precast (Reinforced Polymer) Concrete Amitech USA Meyer Polycrete Pipe Sewer -(WACI Wastewater Access Chamber 33 39 40 For use when Std. MH cannot be 1.9123 11112. Wastewater Access Chamber ickstream Solutions, Inc. Type 8 Maintenace Shaft Po it mstalled due to depth Water & Sewer - Manholes & Bases/Rehab Svstems/Cementitious * EI-14 Manhole Rehab Systems Quadex 04/23/01 E1-14 Manhole Rehab Systems Standard Cement Materials, Inc. Reliner MSP E1-14 Manhole Rehab Systems AP/M Permaform 4/20/01 E1-14 Manhole Rehab System Strong Company Strong Seal MS2A Rehab System 5/12/03 E1-14 Manhole Rehab System (Liner) Triplex Lining System MH repair product to stop infiltration ASTM D5813 08/30/06 General Concrete Repar F1exKrete Technologies Vinyl Polyester Repair Product Misc. Use * From Original Standard Products List 1 FORT WORTH. CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST (Approval Spec No. IClasssification I Manufacturer Water & Sewer - Manholes & Bases/Rehab Svstems/NonCementitious 05/20/96 EI-14 Manhole Rehab Systems Spravroq, 12/14/01 Coating for Corrosion protection(Exterior) ERTECH 01/31/06 Coatings for Corrosion Protection Chesterton 8/28/2006 Coatings for Corrosion Protection Warren Environmental 33 01 16, 33 3910, 03/19/18 33 39 20 Coating for Corrosion protection(Exterior) Sherwin Williams Water & Sewer - Manhole Inserts - Field Operations Use Only (Rev 2/3/16) * 33 05 13 Manhole Insert Knutson Enterprises * 33 05 13 Manhole Insert South Western Packaging * 33 05 13 Manhole Insert Noilm-Inflow 09/23/96 33 05 13 Manhole Insert Southwestern Packing & Seals, Inc. 09/23/96 33 05 13 Manhole Insert Southwestern Packing & Seals, Inc. Water & Sewer - Pine Casing Spacers 33-05-24 (07/01/13) 11/04/02 Steel Band Casing Spacers Advanced Products and Systems, Inc. 02/02/93 Stainless Steel Casing Spacer Advanced Products and Systems, Inc. 04/22/87 Casing Spacers Cascade Waterworks Manufacturing 09/14/10 Stainless Steel Casing Spacer Pipeline Seal and Insulator 09/14/10 Coated Steel Casin Spacers Pipeline Seal and Insulator 05/10/11 Stainless Steel Casing Spacer Powerseal 03/19/18 Casing Spacers BWM 0311-18 Casing Spacers BWM 03/29/22 33 05 13 Casing Spacers CCI Pipeline Systems Water & Sewer - Pines/Ductile Iron 33-11-10(1/8/13) Model No. National Spec Spray Wall Polyurethane Coating ASTM D639/D790 Series 20230 and 2100 (Asphatic Emulsion) Are 791, SIBB, SI, S2 Acid Resistance Test S-301 and M-301 RR&C Dampproofing Non-Fibered Spray Grade (Asphatic Emulsion) Made to Order - Plastic ASTM D 1248 Made to Order - Plastic ASTM D 1248 Made to Order - Plastic ASTM D 1248 Lifesaver - Stainless Steel TetherLok - Stainless Steel Carbon Steel Spacers, Model SI Stainless Steel Spacer, Model SSI Casing Spacers Stainless Steel Casing Spacer Coated Steel Casin Spacers 4810 Powerchock SS-12 Casing Spacer(Stainless Steel) FB-12 Casing Spacer (Coated Carbon Steel) for Non pressure Pipe and Grouted Casing CSC12, CSS12 * 33 11 10 Ductile Iron Pipe Griffin Ape Products, Co. Super Bell-Tite Ductile Iron Pressure Pipe, AW WA C150, C151 08/24/18 33 11 10 Ductile It. Pipe American Ductile Iron Pipe Co. American Futile Pipe (Bell Spigot) AW WA C150, C151 08/24/18 33 11 10 Ductile Iron Pipe American Ductile Iron Pipe Co. American Flex Ring (Restrained Joint) AW WA C150, C151 * 33 11 10 Ductile Iron Pipe U.S. Pipe and Foundry Co. AW WA C150, C151 * 33 11 10 Ductile Iron Pipe McWane Cast Iron Pipe Co. AW WA C150, C151 Water & Sewer - Utility Line Marker (08/24/2018) Sewer - CoatinQs/Enoxv 33-39-60 (01/08/13) 02/25/02 Epoxy Lining System Sauereisen, Inc SewerGard 210RS LA County #210-1.33 12/14/01 Epoxy Lining System Ertech Technical Coatings Ertech 2030 and 2100 Series 04/14/05 Interior Ductile Iron Pope Coating Induron Protecto 401 ASTM B-117 01/31/06 Coatings for Corrosion Protection Chesterton Arc 791, SIBB, Sl, S2 Acid Resistance Test 8/28/2006 Coatings for Corrosion Protection Warren Environmental S-301 and M-301 Sewer - Coatines/Polvurethane Updated: 12/29/2023 Size Structures Only Sewer Applications Sewer Applications For Exterior Coating of Concrete Structures Only For 24" dia. For 24" dia. For 24" dia. For 24" dia. For 24" dia Up to 48" Up to 48" Up to 48" 3" thru 24" 4" th nt 30" 4" thru 30" Ductile Iron Pipe Only Sewer Applications Sewer Applications Sewer - Combination Air Valves 05/25/18 33-31-70 Air Release Valve A.RI. USA, Inc. DOZSLTP02(Composite Body) 2" Sewer - Pines/Concrete * E:- onc. Pipe, Reinforced Wall Concrete Pipe Co. Inc. ASTM C 76 E I-04 Conc. Pipe, Reinforced �CCm Hydro Conduit Corporation Class III T&G, SPL Item #77 ASTM C 76 E I-04 Conc. Pipe, Reinforced Hanson Concrete Products ASTM C 76 * E I-04 c. Pipe, Reinforced Concrete Pipe & Products Co. Inc. ASTM C 76 Sewer - Pine Enlar¢ment Svstem (Method)33-31-23 (01/18/13) PIM System PIM Corporation Polyethylene PIM Corp., Piscam Way, N.J. Approved Previously McConnell Systems McLat Construction Polyethylene Houston, Texas Approved Previously TRS Systems Trenchless Replacement System Polyethylene Calgary, Canada Approved Previously * From Original Standard Products List 2 �r CITY OF FORT WORTH Fo RT ry Q RT H, WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 12/29/2023 (Approval Spec No. ]Classsification Manufacturer Model No. National Spec Size Sewer- PiDe/Fiberelass Reinforced/33-31-13(1/8/131 7/21/97 33313 Cent. Cast Fiberglass (FRP) Hobm Pipe USA, Inc. Hobas Pipe (Non -Pressure) ASTM D3262/D3754 03/22/10 33 31 13 Fiberglass Pipe (FRP) Amemn Bondstrand RPMP Pipe ASTM D3262/D3754 04/09/21 33 31 13 Glass -Fiber Reinforced Polymer Pipe (FRP) Thompson Pipe Group Thompson Pipe (Flowtite) ASTM D3262/D3754 03/07/23 3331 13 Fiberglass Pipe (FRP) Future Pipe Industries Fiberstrong FRP ASTM D3262, ASTM D3681, ASTM D4161, AW WA M45 Sewer - PiDe/Polvmer PiDe 4/14/05 Polymer Modified Concrete Pioe Amnech USA Meyer Polycrete Pipe ASTM C33, A276, -17 8" to 10T% Class V 06/09/10 EI-9 Reinforced Polymer Concrete Pipe US Composite Pipe Reinforced Polymer Concrete Pipe ASTM C-76 Sewer - PiDes/HDPE 33-31-23(1/8/13) * Polyethylene pipe Phillips Driscooipe, Inc. Ooncore Ductile Polyethylene Pipe ASTM D 1248 8" * �11igh-density High -density Polyethylene pipe Plexco Inc. ASTM D 1248 8" * High -density Polyethylene pipe Polly Pipe, Inc. ASTMD 1248 8" High -density Polyethylene pipe CSR Hydro Conduit/Pipeline Systems McConnell Pipe Enlargement ASTM D 1248 Sewer - PiDes/PVC (Pressure Sewer) 33-11-12 (4/1/13) 12/02/11 33-11-11 DR -Id PVC Pressure Pipe Pipelife Jetstream PVC Pressure Pipe AW WA C900 4" thin 12" 10/22/14 33-11-12 DR-14 PVC Pressure Pipe Royal Budding Products Royal Seal PVC Pressure Pipe AW WA C900 4" thin 12" Sewer - PiDes/PVC* 33-31-20 (7/1/13) * 33-31-20 PVC Sewer Pipe 1-M Manufacturing Co., Inc. (1M Eagle) SDR-2(i (PSI 15) ASTM D 3034 4" - 15" 12/23/97* 33-31-20 PVC Sewer Pipe Diamond Plastics Corporation SDR-26 (PS115) ASTM D 3034 4" thin 15" * 33-31-20 PVC Sewer Pipe Lamson Vylon Pipe SDR-26(PSI 15 ASTM D 3034 4" thin 15" 1LOS/23 33-31-20 PVC Sewer Pipe Vin (tech PVC Pipe SDR-26 PS115 ASTM D3034 4" thin 15" 12/OS/23 33-31-20 PVC Sewer Pre Vin (tech PVC Pie Gravity Sewer PS 115 ASTM F 679 18" 33-31-20 PVC Sewer Pipe J-M ManufacturinsCo, Inc. OM eagle) PS 115 ASTM F 679 18" - 28" 05/06/05 33-31-20 PVC Solid Wall Pipe Diamond Plastics Corporation PS 115 ASTM F-679 18" to 48" 04/27/06 33-31-20 PVC Sewer Fittings Harco SDR-26 (PS 115) Gasket Fittings ASTM D-3034, D-1784, etc 4" - 15" * 33-31-20 PVC Sewer Fittings Plastic Trends, Inc.(Westlak) Gasketed PVC Sewer Main Fittings ASTM D 3034 3/19/2018 33 3120 PVC Sewer Pipe Pipelife Jet Stream SDR 26 (PS 115) ASTM F679 18"- 24" 3/19/2018 33 3120 PVC Sewer Pipe Pipelife Jet Stream SDR 26 ASTM D3034 41'- IS" 3/29/2019 33 3120 Gasketed Fittings (PVC) GPK Products, Inc. SDR 26 ASTM D3034 4"- 15" 10/21/2020 333120 PVC Sewer Pipe NAPCO(Westlak) SDR 26 ASTM D3034 4"-IS" 10/22/2020 33 3120 PVC Sewer Pipe Sanderson Pipe Corp. SDR 26 ASTM D3034 4"- IS" 10/21/2020 33 3120 PVC Sewer Pipe NAPCO(Westlal , SDR 26 PS 1 l5 ASTM F-679 18"- 36" Sewer - PiDes/Rehab/CIPP 33-31-12 (01/18/131 * Cured in Place Pipe I. in— Texurk, Inc ASTM F 1216 05/03/99 Cured in Place Pipe National Envirotech Group National Liner, (SPL) Item 427 ASF-1216/D-5813 05/29/96 Cured in Place Pipe Reynolds Inc/Inliner Technolgy (Inliner USA) Inliner Technology ASTM F 1216 Sewer - Pitles/Rehab/Fold & Form * Fold and Form Pipe Cullum Pipe Systems, Inc. 11/03/98 Fold and Form Pipe Insimform Technologies, Inc. Insuuform "NuPIpe" ASTM F-1504 Fold and Form Pipe American Pipe & Plastics, Inc. Demo. Purpose Only 12/04/00 Fold and Form Pipe Ultralmer Ultraliner PVC Alloy Pipeliner ASTM F-1504, 1871, 1867 06/09/03 Fold and Form Pipe Miller Pipeline Corp. EX Method ASTM F-1504, F-1947 Up to 18" diameter Sewer - Pipes/ODen Profile Laree Diameter 09/26/91 E100-2 PVC Sewer Pipe, Ribbed Lamson Vylon Pipe Carton Vylon H.C. Closed Profile Pipe, ASTM F 679 18" to 48" 09/26/91 E100-2 PVC Sewer Pipe, Ribbed Extrusion Technologies, Inc. Ultra -Rib Open Profile Sewer Pipe ASTM F 679 18" to 48" E100-2 PVC Sewer Pipe, Ribbed Uponor ETI Company 11/10/10 (E100-2) Polypropylene (PP) Sewer Pipe, Double Wall Advanced Drainage Systems (ADS) SaniTite HP Double Wall (Corrugated) ASTM F 2736 24"-30" 11/10/10 (E100-2) Polypropylene (PP) Sewer Pipe, Triple Wall Advanced Drainage Systems (ADS) SaniTite HP Triple Wall Pipe ASTM F 2764 30" to 60" * From Original Standard Products List 3 �r CITY OF FORT WORTH Fo RT ry Q RT H, WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 12/29/2023 (Approval Spec No. Classsification Manufacturer Model No. National Spec Size Water - Ammr enances 33-12-10 (07/01/13) 01/18/18 33-12-10 Double Strap Saddle Romac 202NS Nylon Coated AW WA C800 1"-2" SVC, up to 24" Pipe 08/28/02 Double Strap Saddle Smith Blair #317 Nylon Coated Double Strap Saddle 07/23/12 33-12-10 Double Strap Service Saddle Mueller Company DR2S Double (SS) Strap DI Saddle AW WA C800 1"-2" SVC, up to 24" Pipe 03/07/23 33-12-10 Double Strap Service Saddle Powerseal 3450AS, Incl. Corp. Stop, Dbl Strap, Stainless NSF ANSI 372 1"1" SVC, up to 24" Pipe 10/27/87 Curb Stops -Ball Meter Valves McDonald 6100M,6100MT & 61 OMT 3/4" and 1" 10/27/87 Curb Stops -Ball Meter Valves McDonald 4603B, 4604B, 6100M, 610OTM and 6101M 1 %" and 2" FB600-7NL, FB1600-7-NL, FV23-777-W-NL, 1/25/2018 33-12-10 Curb Stops -Ball Meter Valves Ford Meter Box Co., Inc. L22-77NL AW WA C800 2" FB600-6-NL, FB1600-6-NL, FV23-666-W- 1111018 33-12-10 Curb Stops -Ball Meter Valves Ford Meter Box Co., Inc. NL, L22-66NL AW WA C800 1-1/2" FB6004-NL, FB1600-4-NL, B11-444-WR- 1111018 33-12-10 Curb Stops -Ball Meter Valves Ford Meter Box Co., hic. NIL, B22444-WR-NL, L28-44NL AW WA C800 1" 13-25000N, B-24277N-3, B-20200N-3, H. AW WA C800, ANSF 61, 1/25/2018 33-12-10 Curb Stops -Ball Meter Valves Mueller Co., Ltd. 15000N, , H-1552N, H142276N ANSI/NSF 372 2" B-25000N, B-20200N-3, B-24277N-3,H- AW WA C800, ANSF 61, 1/21/2.1. 33-12-10 Curb Stops -Ball Meter Valves Mueller Co., Ltd. 15000N, H-14276N, H-15525N ANSI/NSF 372 1-1/2" B-25000N, B-20200N-3,H-15000N, H- AW WA C800, ANSF 61, 1/21/2.18 33-12-10 Curb Stops -Ball Meter Valves Mueller Co., Ltd. 15530N ANSI/NSF 372 1" 01/26/00 Coated Tapping Saddle with Double SS Straps 1CM Industries, Inc. 4406 Double Band SS Saddle 1"-2" Taps on up to 12" 0/5/21/12 33-12-25 Tapping Sleeve (Coated Steel) 1CM Industries, hic. 412 Tapping Sleeve ESS AW WA C-223 Up to 30" w/12" Out 03/29/22 33-12-25 Tapping Sleeve (Coated or Stainless Steel) JCM Industries, Inc. 415 Tapping Sleeve AW WA C-223 Concrete Pipe Only 05/10/11 Tapping Sleeve (Stainless Steel) Powerseal 3490AS (Flange) & 3490MJ 4"-1" and 16" 02/29/12 33-12-25 Tapping Sleeve (Coated Steel) Romac FTS 420 AW WA C-223 U p to 42" w/24" Out 02/29/12 33-12-25 Tapping Sleeve (Stainless Steel) Roane SST Stainless Steel AW WA C-223 Up to 24" w/12" Out 02/29/12 33-12-25 Tapping Sleeve (Stainless Steel) Romac SST III Stainless Steel AW WA C-223 Up to 30" w/12" Out 05/10/11 Joint Repair Clamp Powerseal 3232 Bell Joint Repair Clamp 4" to 30" Plastic Meter Box w/Composite Lid DFW Plastics Inc. DFW37C-12-]EPAF FTW Plastic Meter Box w/Composite Lid DFW Plastics Inc. DFW39C-12-]EPAF FTW 08/30/06 Plastic Meter Box w/Composite Lid DFW Plastics Inc. DFW65C-14-]EPAF FTW Class "A" Concrete Meter Box Bass & Hays CMB37-1312 1118 LID-9 Concrete Meter Box Bass & Hays CMB-18-Dual 1416 LID-9 Concrete Meter Box Bass & Hays CMB65-1365 1527 LID-9 Water - Bolts. Nuts, and Gaskets 33-11-05 (01/08/13) Water - Combination Air Release 33-31-70 (01/08/13) * EI-11 Combination Air Release Valve GA Industries, Inc. Empire Air and Vacuum Valve, Model 935 ASTM A 126 Class B, ASTM A 1" & 2" * EI-11 Combination Air Release Valve Multiplex Manufacturing Co Crispin Air and Vacuum Valves, Model No. 1/2" 1" & 2" * EI-11 Combination Au Release Valve Valve and Primer Corp. APCO #143C, 4145C and 4147C 1", 2" & 3" Water - Dry Barrel Fire Hvdrants 33-1240 (01/15/14) 10/01/87 E-1-12 Dry Barrel Fire Hydrant American -Darling Valve Drawing Nos. 90-18608, 94-18560 AWWA C-502 03/31/88 E-1-12 Dry Barrel Fire Hydrant American Darling Valve Shop Drawing No. 94-18791 AW WA C-502 09/30/87 E-1-12 Dry Barrel Fire Hydrant Clow Corporation Shop Drawing No. D-19895 AW WA C-502 01/12/93 E-1-12 Dry Barrel Fire Hydrant American AVK Company Model 2700 AW WA C-502 08/24/88 E-1-12 Dry Barrel Fire Hydrant Clow Corporation Drawings D20435, D20436, B20506 AW WA C-502 E-1-12 Dry Barrel Fire Hydrant ITT Kennedy Valve Shop Drawing No. D-80783FW AW WA C-502 0.1.7 E-1-12 Dry Barrel Fire Hydrant M&H Valve Company Shop Drawing No. 13476 AW WA C-502 Shop Drawings No. 6461 l0/14/87 E-1-12 Dry Barrel Fire Hydrant Mueller Company A-423 Centurion AW WA C-502 Shop Drawing FH-12 01/15/88 E1-12 Dry Barrel Fire Hydrant Mueller Company A-423 Super Centurion 200 AW WA C-502 10/09/87 E-1-12 Dry Barrel Fire Hydrant U.S. Pipe & Foundry Shop Drawing No. 960250 AW WA C-502 09/16/87 E-1-12 Dry Barrel Fire Hydrant American Flow Control (AFC) Waterous Pacer WB67 AW WA C-502 08/12/16 33-12-40 Dry Barrel Fire Hydrant EJ (East Jordan Iron Works) WaterMaster 5CD250 Water - Meters 02/05/93 E101-5 Detector Check Meter Ames Company Mode] 1000 Detector Check Valve AW WA C550 4" - 10" 08/05/04 Magnetic Drive Vertical Turbine Hersey Magnetic Drive Vertical AW WA C701, Class 1 3/4" - 6" * From Original Standard Products List 4 CITY OF FORT WORTH �r Fo RT ry Q RT H, WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 12/29/2023 IApprovall Spec No. IClasssification Manufacturer Model No. National Spec Size Water - Pines/PVC (Pressure Water) 33-31-70 (01/08/13) AWWA C900, AW WA C605, 12/05/23 334142 PVC Pressure Pie Vin (tech PVC Pipe DR14 ASTM D1784 4"-16" AWWA C900, AWWA C605, 12/OS/23 33-11-12 PVC Pressure Pie Vmyltech PVC Pipe DR18 ASTM D1784 16"-18" 3/19/2018 33 11 12 PVC Pressure Pipe Pipelife Jet Stream DR14 AWWA C900 4"-12" 1 3/19/2018 3311 12 PVC Pressure Pipe Pipelife Jet Stream DR18 AWWA C900 I6"-24" 1 5/25/2018 3311 12 PVC Pressure Pipe Diamond Plastics Comoration DR 14 AWWA C900 4"-12" 5/25/2018 33 11 12 PVC Pressure Pipe Diamond Plastics Corporation DR 18 AWWA C900 16"-24" AWWA C900-16 UL 1285 12/6/2018 3311 12 PVC Pressure Pipe J-M Manufacturing Co., Inc d/b/a JM Eagle DR 14 ANSI/NSF 61 4"-28" FM 1612 12/6/2018 33 11 12 PVC Pressure Pipe J-M Manufacturing Co., Inc d/b/a JM Eagle DR 18 16"-24" 9/6/2019 33 11 12 PVC Pressure Pipe Underground Solutions Inc. DR14 Fusible PVC AWWA C900 4" - 8" 9/6/2019 331112 PVC Pressure Pipe NAPCO(Westlake) DR18 AWWA C900 16"-24" 9/6/2019 33 11 12 PVC Pressure Pipe NAPCO(Westlake) DR14 AWWA C900 4%12" 9/6/2019 33 11 12 PVC Pressure Pipe Sanderson Pipe Corp. DR14 AWWA C900 4% 12" Water - Piaes/Valves & Fittings/Ductile Iron Fittings 33-11-11 (01/08/13) 07/23/92 EI-07 Ductile Iron Fittings Star Pipe Products, Inc. Mechanical Joint Fittings AWWA C153 & C110 * E1-07 Ductile Iron Fittings Gnffin Pipe Products, Co. Mechanical Joint Fittiny AWWA C 110 * E1-07 Ductile Iron Fittings McWane/Tyler Pipe/ Umon Utilities Division Mechanical Joint Fittings, SSB Class 350 AWWA C 153, C 110, C 111 08/11/98 EI-07 Ductile Iron Fittings Sigma, Co. Mechanical Joint Finings, SSB Class 351 AWWA C 153, C 110, C 112 02/26/14 E1-07 MI Fittings Accucast Class 350 C-153 MJ Fittings AW WA C153 4"-12" 05/14/98 EI-07 Ductile Iron Joint Restraints Ford Meter Box Co /Uni-Flange Uni-Flange Series 1400 AW WA C111/C153 4" to 36" 05/14/98 EI-24 PVC Joint Restraints Ford Meter Box Co./Uni-Flange Uni-Flange Series 1500 Circle -Lock AW WA C111/C153 4" to 24" 11/09/04 EI-07 Ductile Iron Joint Rostrums One Bolt, Inc. One Bolt Restrained Joint Fitting AWWA C111/C1161CI53 4" to 12" 02/29/12 33-11-11 Ductile Iron Pipe Mechanical Joint Restraint EBAA Iron, Inc. Megalug Series 1100 (for DI Pipe) AWWA C111/C1161CI53 4" to I" 02/29/12 33-11-11 PVC Pipe Mechanical Joint Restraint EBAA Iron, Inc. Megalug Series 2000 (for PVC Pipe) AWWA C111/C116/C153 4" to 24" 08/05/04 EI-07 Mechanical Joint Retainer Glands(PVC) Sigma, Co. Sigma One-Lok SLC4 - SLC10 AW WA C111/C153 4" to 10" 03/06/19 33-11-11 Mechanical Joint Retainer Glands(PVC) Sigma, Co. Sigma One-Lok SLCS4 - SLCS12 AW WA C111/C153 4" to 12" 08/05/04 EI-07 Mechanical Joint Retainer Glands(PVC) Sigma, Co. Sigma One-Lok SLCE AW WA C111/C153 12" to 24" 08/10/98 EI-07 MJ Fittings(DIP) Sigma, Co. Sigma One-Lok SLDE AW WA C153 4" - 24" 10/12/10 EI-24 Interim Restrained Joint System S & B Techncial Products Bulldog System ( Diamond Lok 21 & JM ASTM F-1624 4" to 12" 08/16/06 EI-07 Mechanical Joint Fittings SIP Industries(Smampore) Mechanical Joint Fittings AWWA C153 4" to 24" 11/07/16 33-I1-I1 Mechanical Joint Retainer Glands Star Pipe Products, Inc. PVC Stargrip Series 4000 ASTM A536 AW WA Ct i t 11/07/16 33-I1-I1 Mechanical Joint Retainer Glands Star Pipe Products, Inc. DIP Stargrip Series 3000 ASTM A536 AW WA Ct l t EZ Grip Joint Restraint (EZD) Black For DIP 03/19/18 33-1141 Mechanical Joint Retainer Glands SIP Industries(Smampore) ASTM A536 AW WA CI I I 3"48" EZ Grip Joint Restraint (EZD) Red for C900 03/19/18 33-I1-I1 Mechanical Joint Retainer Glands SIP Industries(Serampore) DR14 PVC Pipe ASTM A536 AW WA C111 4"-12" EZ Grip Joint Restraint (EZD) Red for C900 03/19/18 33-I1-I1 Mechanical Joint Retainer Glands SIP Industries(Serampore) DR18 PVC Pipe ASTM A536 AW WA CI I I 16"-24" Water - Pines/Valves & Fittings/Resilient Seated Gate Valve* 33-12-20 (05/13/15) Resilient Wedged Gate Valve w/no Gears American Flow Control Series 2500 Drawing # 94-20247 16" 12/13/02 Resilient Wedge Gate Valve American Flow Control Series 2530 and Series 2536 AWWA C515 30" and 36" 08/31/99 Resilient Wedge Gate Valve American Flow Control Series 2520 & 2524 (SD 94-20255) AWWA C515 20" and 24" 05/18/99 Resilient Wedge Gate Valve American Flow Control Series 2516 (SD 94-20247) AWWA C515 16" 10/24/00 EI-26 Resilient Wedge Gate Valve American Flow Control Series 2500 (Ductile Iron) AWWA C515 4" to 12" 08/05/04 Resilient Wedge Gate Valve American Flow Control 42" and 48" AFC 2500 AWWA C515 42" and 48" 05/23/91 EI-26 Resilient Wedge Gate Valve American AVK Company American AVK Resilient Seaded GV AWWA C509 4" to 12" 01/24/02 EI-26 Resilient Wedge Gate Valve American AVK Company 20" and smaller * EI-26 Resilient Seated Gate Valve Kennedy 4" - 12" * EI-26 Resilient Seated Gate Valve M&H 4" - 12" * E1-26 Resilient Seated Gate Valve Mueller Co. 4" - 12" 11/08/99 Resilient Wedge Gate Valve Mueller Co. Series A2361 (SD 6647) AWWA C515 16" 01/23/03 Resilient Wedge Gate Valve Mueller Co. Series A2360 for 18"-24" (SD 6709) AWWA C515 24" and smaller 05/13/05 Resilient Wedge Gate Valve Mueller Co. Mueller 30" & 36", C-515 AWWA C515 30" and 36" 01/31/06 Resilient Wedge Gate Valve Mueller Co. Mueller 42" & 48", C-515 AWWA C515 42" and 48" 01/28/98 EI-26 Resilient Wedge Gate Valve Clow Valve Co. AWWA C509 4" - 12" 10/04/94 Resilient Wedge Gate Valve Clow Valve Co. 16" RS GV (SD D-20995) AWWA C515 16" 11/08/99 EI-26 Resilient Wedge Gate Valve Clow Valve Co. Clow RW Valve (SD D-21652) AWWA C515 24" and smaller 11/29/04 Resilient Wedge Gate Valve Clow Valve Co. Clow 30" & 36" C-515 AWWA C515 30" and 36" (Note 3) 1111./12 Resilient Wedge Gate Valve Clow Valve Co. Clow Valve Model 2638 AWWA C515 24" to 48" (Note 3) 05/08/91 E1-26 Resilient Seated Gate Valve Stockham Valves & Fittings AW WA C 509, ANSI 420 -stem, 4" - 12" * E1-26 Resilient Seated Gate Valve U.S. Pipe and Foundry Co. Metr°seal 250, requirements SPL #74 3" to 16" ] 0126/16 33-12-20 Resilient Seated Gate Valve EJ (East Jordan Iron Works) EJ FlowMaster Gate Valve & Boxes 08/24/18 Mateo Gate Valve Matco-Norca 225 MR AWWA/ANSI C115/An21.15 4" to 16" * From Original Standard Products List 5 FORT WORTH. CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 12/29/2023 (Approval Spec No. �Classsification I Manufacturer Water - Pioes alves & Fittings/Rubber Seated Butte Valve 33-12-21 (07/10/14) Model No. National Spec Size * y EI-30 Rubber Seated Butterfly Valve Henry Pratt Co. AW WA C-504 24" * EI-30 Rubber Seated Butterfly Valve Mueller Co. AW WA C-504 24"and smaller 1/11/99 E1-30 Rubber Seated Butterfly Valve Dezurik Valves Co. AW WA C-504 24" and larger 06/12/03 EI-30 Valmatic A.-- Butterfly Valve Valmatic Valve and Manufacturing Com. Valmatic American Butterfly Valve. AW WA C-504 Up to 84" diameter 04/06/07 E1-30 Rubber Seated Butterfly Valve M&H Valve M&H Style 4500 & 1450 AW WA C-504 24" to 48" 03/19/18 33 1221 Rubber Seated Butterfly Valve G. A. Industries (Golden Anderson) AW WA C504 Butterfly Valve AW WA C-504 30"-54" Water - Polvethvlene Encasement 33-11-10 (01/08/13) 05/12/05 E1-13 Polvethvlene Encasment Flexsol Packamng Fulton Enterrrises AW WA C105 8 mil LLD 05/12/05 E1-13 Polvethvlene Encasment Mountain States Plastics (MSP) and AEP Ind. Standard Hardware AW WA C105 8 —1 LLD 05/12/05 E1-13 Polvethvlene Encasment AEP Industries Bullstrong by Cowtown Bolt & Gasket AW WA C105 8 mil LLD 09/06/19 33-11-11 IPolvethylene Encasment Northtown Products Inc. PE Encasement for DIP AW WA C105 8 mil LLD Water - SaRlDlinE Station 03/07/23 33 12 50 l Water Sampling Station Eclipse Number 88 , 12-inch Depth of Bury As shown in spec. 33 12 50 Water - Automatic Flusher HG6-A-IN-2-BRN-LPRR(Portable) 10/21/20 Automated Flushing System Mueller Hvdroguard HG2-A-IN--2-PVC-018-LPLG(Permanent) 04/09/21 Automated Flushing System Kupferle Foundry Company Eclipse #9800wc 04/09/21 Automated Flushing System Kupferle Foundry Company Eclipse #9700 (Portable) The Fort Worth Water Department's Standard Products List has been developed to minimize the submittal review of products which meet the Fort Worth Water Department's Standard Specifications during utility construction pr jests. When Technical Specifications for specific products, are included as part of the Construction Contract Documents, the requirements of the Technical Specification will override the Fort Worth Water Department's Standard Specifications and the Fort Worth Water Department's Standard Products List and approval ofthe specific products will be based on the requirements of the Technical Specification whether or not the specific product meets the Fort Worth Water Department's Standard Specifications or is on the Fort Worth Water Yellow Highlight indicates recent changes * From Original Standard Products List ,2 • S � y r y�y 6 � R e � i L 3JgY i,5� 9 i Sri °y 1v3. 3Enu: t �yve��'c3xS�b yy yyyyyy E ryy,� ��x k2 � �'� pp��_ yp `��3 33.5g aEys Aj A; iNgriHigig MIN uu uvuvuv•• ud• uv rr.,....r E� 1- 1 ecce�S�t2�e �e c'2� i<,fq�p�m'mmm 65E:`:E`555551.5:58`E:`5`a= ark: saa` ` 55SEa5`a 58Eas.eaa&8xIIr55assg°p h r�xx xx xx X x x kx x xxx YJti llt lfkkk P II J, J., i " 33ES38R8€88888€8a8F��=_- 82538B3 3E=agggSSgg3gggg=888�5�8=��==s33s3 _ _ _ _ _ _ o�p•Ha Pa#saP C Y FORTWORTH. CITY OF FORT WORTH TRAWICIRTATIONIM RLI(NNORKSDEP%RT1{FST STANDARD PRODUCTS LISTAS OFMI6+2024 1991022 (o3 300tl rIu 1/ulen ON Cdlaee Camwna 70f1A25II 10IXi p. C.XXrck far {pulp 9921122 03 NOW -d1%1).. C- Cmnck C.imnna )OIiA200 �OOU Rw cpkrcic MrY� k[I.xlm��'' Srdenelk,, Fln[nwl. P,d, 992.22 0130N da%Dnlen Cm C-.�Mlck CamNn+ 15N1i25R 36LIU Rw GrnMe Mnf Ihdlcd llufl,[,¢hunR and TnlGc Sr,n.i Fin:nd.lnm• 9 92M.2 n) 1u M JI. Dr.- C,n Cnncnk C,.-. 5���yfHy3gCpyyr5u 1Fn01y1 Sh- [A and Unlld SF,O 9 9 2022 ni 19 R.1 •oa lo.. Cm C-W Cnm- 45 all 41M pn C.-I. Vn W Fond i5.cd I.-oo. 9 9 2122 03 3U,a • 't Ikn4n Cote CruwMe Cancun+ 36IA2DI I ]6M wo C+X+cnk %1n Fu Machmc Poed P.- 992n22 0339 Rq da 1k.Isn Cm Cnrcrcle Comrona 16JAI-U 1�p C..-. Mn to -Mooch- Pl-W Paon4 9Y2U22 03311 P1 .d,a Ikaqu Cm C.n.e]ek Ctmomt" 4ntA21,1144991p,tCm+cnkMnFnSlumIh.urStow- 11 I620.- S .11123 n3 7n a1 03)Isla M.a lkwtn Ma lknen C,Iv Cwraek Cw.Iw„+ C. Cjmnn. CLS025R36RNr QQP9 C,n,<.cle hu l]nllal SMU L.ahfiW wd iuuic 5)�ul F.wd.6.m• CCKA25t1Atl 1e1M pry C.-de FnlhUkrl Sb.Ila1: RIU�amf [nflic Fphyljrnn,{Rnnn• S 5 2021 V3 pt al Sox Momon cm cwwrck Cr: 0" CSSIJAZSUAG 3.6o ppqq Cuacnlc Iw Slwn IT.pkcm.m Stint. VW- . Stud• V 9:LM 93 30dr Mta Ik.- Coy T.- Red: �Mn 2S0 3Mh1 m C.Unma U. ho Sed-U.lhneu4.. AIIA 11- V 9 2J22 u3 311m M,x I)c Cw Twn RnB I50 31N.n ppRe llmc[ne MIx f. S,denall.. Ilnae v ADA R4mm V v 2n22 nl 31 I3 Ma Ik"R9 Cw Tuwn RW: Mn Y `rl ��4qll FlweMe Fd] •L'LSM v Y 2n22 91 34 1? M.x M- Cnr Town Rd: Sin -S.2'lNy, }loweblr Fdl •L'ISM vY112., U37411 Mx Deaen Cow Tuwn Rd, M.a 2204 SG. C'--Mn lim Fl-"M-� SM vv 2022 013411 hkx Ue.- Oc.wn co -Town R,d,M.a 3'" SO]p�l CvnlW Mn lm Flowabk F.0-L'L%M Y92022 v v 2022 01100D 01 M a1 Ma Cow Town RWt Mra 210475U�X CwkrckD.oMoom.1UuTm-hRo- 9 V 20^„• 0] 30 al WG Dew- M, Ikwtn C.m Tmm Rd. M.+ Cow i..xn RW I Nn 33OB6 736 C.mcrct, R.w M..md W T.ew.h Reeuo 1e 15130AP 1R�FF 1' perch We f Sid L.,. ADA C'wF A Il-, 1.kn 1 loo tmm c, Sim-T-X IT Rnn�n^gK',ur 9 92022 "I M M: Sba lkw¢n Con Tone RW l Mn .I7,r+ew.+•, 253•W 401YOI Cancrck 5.U+5.dn eR+, ADA , I][nswa++. turh R tlwvr. S.f n F:nd ir.nmem,, ��o-iaf X+i R,�twnR 992022 03low 1 Mn lkwm Cao Tnan RWl Mn 260.nm pF Cencrck Mn fm lu'k% Stool, tint ulr,m,lkad+aalh 9920- 0330aI M+a Ik.- Cnn Tnwn RWI Mn 2foI36�R pw Cawck MRc f FFt.rlvnll. 99 202-a 93 tow Mn MR.. Cmc' Tnwn Red: Mn 26 ]MO pY C- Ma frc Floc Cool-, Ikwlnall. 9920Y` 03 M110 Sk, D",- Cow Town Red:Mn 3604000 ppyy Cnen,kM:x fw lh,dRe Skh..Bm Cullne,,lk.dn.11. 9920- d.).R)Ug) Mn lkwtn Cnw Tnwn Red:Mn 360.13601ip. Caneek Sh% W IFn C'Wen1., If-4J AL,, Wmen,ll, 9Y2022 031000 M. lkvm Cmc T.- Red: Mn 26•l.V 4500 Cmcrde Mn W Fond %,ccd Pane 9v2,22 1+i 101KI Mn L7-" [on Toxn RWr him .i[�•41(IO Oni.'aXrek Mnfm shod %.cN F.nnt 99 2D22 Ui IU,tr h{,. [leatM Cw Tnwn Rd, Mn Y•5 d50n�w C-k Ma 1,r Iknd %.cd F.,m4 4720^� n1 in l.i Mn than Cow T9xn Redo Ni. 365 a51M�ppAA Cmnek Mx f I4nd %acd P,am4 972112 ni ?9aI hlrt Dave C:ow Iman Redo hl.x 179.�c 15�f Iw Cw..rnc Nu IONS Not" 99M23 n1 3:I n, S/n tln.an G. Tuwn Red, M., MI NC Soof) Ir C.mcrdc tm HEIC P-moo 99 21122 113 391a1 Mn Imo g. Cw I- Rcd, Mo. r5 a]C 5(0n U. C-0c 6u HFS hot. 9929122 2122 to) 3n W. Soa Ik.ml Car. r- Rood, MI. 26742M P Corc,r,r M„ hot Mmhdn.od Ihvn{{{FF % Imes V 92022 n1 3n ov h/ra Ikenn Co. Ton. Radr MIx 2TI S(XNIJ� Cwo:,ek M.a Im Gdvn%.,, Flea C'dra. v 9 2022 a? YI �nI M,a Lkwml Cow Tw. ICW M x 37U StNv, CmXkte Ma {m C..•-PI... Phil Cuir" V 9 21112 U3 3n t%1 Mn hewn Cow To.. RW, MIa 255-2 0a 1q, Com-c Mn la[ IRl- Tlwn R6vCUu C'•nXenc Lnc..cmml 49 NT 11100 111420. 32 1) I3 M:x low- Mrt 1ke,n tw Tw. RWr MIa Cw Twn RWr Mn 257HAgJx C,mcRnemalur Yellevc nrn 35T•M AFiWrJ1w C'urn]ek Shx h. M.cb.m PI.aW P.r+n¢ 4.Y2g1 33 13 13 M:a 1k+r- Cw Iwn Rdr M:x 23T•M 14erf�`• L'.un,ek M.a P. M.cM1rne %aoeJ Parrna 9V2{22 i413 !3 M:a]kw- Cur Tunn Red. Mn 2U6M 41Mf C'uncrekM.xfmWlk:14"P.11- P9 9 lW 3S f 3 13 M:I Ik-m ibr Twn Red, M:a 36[r•SL4W[F��++e Cnncrek Mrs GX NRehene IT.ceJ Pnunt �99212.` Oi 3000 M:a lk+rpn cur Town Red, h4a 25543' 3adpo um... M:1 ho C'ahAGunn 9 a 2022 a3 10 00 M:I I" . co- Ttrwn 1 dd Ma 3554.P 3U/19 nM Cmrcme M:a fw t lb A Cm 9 92022 '19 03 3D W 1a MIS I -im Co- Iwn Rdr Ma 255 a500 %�l"dwMr M+a for F1.1.,.t hdek. Thru,l R1wtu9y C•ma,Ic Iilc.wmem 2022 v 9 2022 03 W 0140M MIa Ln.- Ma ih..- C. Twn Nd, Ws Cnw Twn RW, hba 3SS 3000,�pnyyL`wrnnc 64a 6u Inkn, Tb,.m fSlncl:,PP•a. C oncn(c mmr 165.912E41100 nw Cmrrek (m li'W- gate. top ,I.In of dual h.ehc mken,, .tpo-h daFvTMIT Clae Sd4n FH A.h 9 Y2022 013D 0o MI, lkven Cnw T- RW. M11 3571600pR Cwn.elr Mn fm %,.Iln cmkr. 5 1 2. tl1 30 On Mx I..I. Cow Tnwn.: Stn 360.2t]5 3Aah„I C'mckk M% FIR IXIX)T C'6n C Dolled sh.m 6212021 0340 Do MI%Itevlm Cnw Town Red,M,, 360•U616a1�++C-c Wsmiled SUfl Lltknne.nd Ttafix S,n.F Fmn0ahon I I.2021 011U W Ma Ikon Cew T.nn Red, Sha NOW 4ltM!((++wo1 C'wwee,e fm Iff5 P..I.� 1292024 1 29 2024 141313 01 3O M M3lkenn tba Ik.rm @read,=Me. Ew.da RuJ, Mn 455AESC 7)O S.I. 4.Sa]p o?M po 4"n) Can M. W ITS ]'.oqr R7050AEWR S W Sat. ) mNl pw C'mane fn SW -AU, ,Wei.,: M mlmle. 1 29 2024 De in [q Rba Ikn.e Pdnd, Reads MIx R]655AE9•'R' S 50 Suk, lhoq pw Cmc[ek fm Ik.dwem. N',mm 11.. .ed Calton 1 29 =4 M io.011 M,a Ik.:en Egr.da Ready Sl,x R4060JtEV•'R ' 6 M Sulu- 4.aln �W• Cntwr,k fm D^� yff SI,M Tm� SI,M .nd Appmocb 51,6, 2 6 2M_4 1: 11 I S mn [hum lin.d. Radx Ma TI]]65SAEWR 5 M 4]w1, 1.f fffp�l Cmxxk In MaeFr:k Iv,ccd P o'" 127 2024 3: Ib I1 Mn Ikn- Funds Radr M,a R4S VXW''R 600 Sak. 4,5a1 PPoo �nxrck wr H.nJ i'IweJ !•m 231 7124 01 3,Inn Ma Un'" FfrrWa ReW+' Ma R36575A9WR 5 76 SacIa 3. ppw CmX W Fu IJI.LIW Sh.tl+1. // etne9 m4 Tn0i, S: Mmil F.wndalmm Y'12U22 U3 311 (MI M, D .,:. [iC'fi Cmcrek Senwe. OCH41KV 4mool CVeceae fm la l'rdewxlka R,,mn, lk dndt+.lniet,. aM Srmm Ikon titNLnlnH 9 Y 202I 0) RI Illy ,Wx Ikr:qt ['X"f1 GnNrek 5en.ce+ IiCFR') 4t%10 Crme.eFe Gu M.c6we %wW P.+rM 9 9 2p22 0334 al M5 fk.ivt GO c,m.' Sarua. OCHISq 41��1t C.mceek 1knJ IMw<J P,+rp}' V92u22 v v 2n22 033w 101 31:IM %k Iowa. �tnm C'�ncnkk A/Fn��e Aeenp in C47FV5E5 MMYI{P C,-orle N. SWexa1L, A(SA 7n.t VY2a72 07 ni 30In Mn Ikgen M.%Ion- Inenm C,,.,ck A In[nm C•nlrckk1tFleta,n 2MVIR-7012350( n C.-. 6v SW"""RJ}++1�9m'II• 2MRR•14T'a/]/11fU53r'pw Concrck hba ev Sdewelk+^IS^R,nna vv 2U22 u11- IMI M+x tow- {{77pram <'��ncr<kA Actlecln 2MWR•C56PSSU541.x: �.I C."'.. 4L.lonc]•kud Pnnne Iv v 2032 u3 .W ,Io lob, low- j0¢'nm L'. nuek k Atjo-k + IMWRL 11511iV5I1M 43,x1 wI Ccwcrmc 1,:r 1 oM Plwd Pnme I'J'+2U22 v Iliwm ors M., Ikwvt ten Cumnm A.1tr<o 2MWPWUMO650\45-�p--okhx ItmJ11-oll-to u pJ 20L' IY r -OL i0 W 11] 30M Mn Ikwm M,a Ik= jnF.m C'onc,nc A ace n rr „n C'•mcrc. k ARrf.. 16lPSSFT14SLlu pw L'ww, a w[ }knJ i9wtd PFltry� C47PVSES ?VXr qI C',xwrrk M,a Fr.+:Jex.l l._AfIA F4mn. CITY OF FORT WORTH TRANSPORTATIONIPCBLIC WORKS DFPARTIIlNT STANDARD PRODUCTS LIST AS OF OSA4l2D24 1i72033 03 3U (kf 17es+la Conrcrci ARnta IIt1.OSSON 3,hM.. L'-M fa Dnlld Sh. Lr/p1 Tulf., s-r Fn..da,-. 1992022 t!1301111 ,rat Matk.. k �Cmemtrd A[n W. .-d I61 PI'SPM 4SW Pu C-IMMr1 fa Il dPl.eed Y.anp I.2r42 u1300} Mn lknm -SOIL 1p. $1771nln px Ga+cMe hh. WSrdnWC. 199 21U2 n3 M W M. D.W • SOK - 1341 lnm - C- do Mn fw Stden3lk. 992M2 99Mn-2 44nW a 30W do lknPn .Ga lkmn }Idcan-SOR. Inc M&rm-sl*1 lar 21254S-&Ja.�C,nernefnrIRSP.-[ 1701"NN "Zmer-Mmfm StmmTSr.rn Sawl9rn. Savun-5envwNr.Ja.hmcr- 94M122 n330 [MI do lka,yn I4uMrm-SIR. Inc 54098000 okCrneeHe Mrafm Slden.Ik.. WH. '] 921122 u,l yi 1n .hs lkawn 13Ncim• 5, 61. Irx SSu7 JSrn q. Z'•rrxnrc Mn Inr }lead Placed Pnrnu I2 IS 2D73 33fllxl ,ti. Oe nyn } CI- SeRC Inc 1741 Irv,- e.mcrdr I.t 1I-N, fit MIA 49 n v 2d22 O4 Alfll 03 M W Aie lkupn Ara lhnpn IWdnm- SIR IM Ilulnm • SUR. Inc 51,17I[M+yN C.-M. W, [M.MemrW Wr T-h R ' 3fild{ par C.mcrere Iw NI Sha1h.. PP,I MrdoH.m. `9 v h22 03 W dry Iry dm • SOR. ,M P. qyFupw 3 4am %f: k.ln SOR, kc C11252022 1'*","M lul,.lRa SI.F1nna 142n24 33o( 5N 3rn aemrmrc rw Mx.ne Piw=emenl 14v O30W Mn 44nm, xc d22 AlI, S61t. Leldm[..d tr.thc 5-1 F-Watxmc 1422M4 9.13000 a13.nan W. OR. Lpc 5'14o-t J1 na'wnne GM Flrnd K-.1 19 v2022 1412al 11330W a.; Mou at3- alkr- Iklnm-SM. Iw L9md Some 1551_ gRyW+ C.-Mia 1:'r HL<I, p C'10111111dhpp/Rl:-WIMS,Jexa7l..Aprvwche...nd Dn.evlla 42 472021 033o Do 01 WW aDpu[a LJOrd 5rnne 1-d C3v,1I%SFA i,ls1[r Cmerclr forkwni�9yy wall,dmexrjj. 0rr.lxm hvc f(' .:-h 1 24 2023 01 40 W a❑.- S D .l4. 5tnw C'11N}k ir4M cMelix tlnlled%Kall laahnn.nd�aatLcSmruljKurmj11- C'451 D10FA 450- C•mcrH, for IRS fS.tn( `J 9 2022 0.4 30 M Mra IkxN h( an M.nnra R2132214 1,1104 px l'nncrHe f r SaJcnalWa A gip. 992022 03 JO W hha I).u[n Manor MJneru M/90SC 3.OWDr+c.aarcu Gv Sdex.t\+i �` 992D22 03 ;W W Ska IkuN Manor Mareeu R2131314 3.ODG w Cnncreu fnr srd.aan, s. 9v2032 0i 3OW %a tk.un M.rtrn Mureru R23311143." w C.- fir Sr&-4!\.A . 992022 03 30 p1 Mn Ik.�[n M.r1m 1lannlJ P2I wH 3.ON r C.mcnM for Sr"AL,A R- 992022 O1 Jp 00 Mrl lkei[n Menm M-11. R213621J MMM1 Cnnnru fw 5WexAU A Rana+ 992022 0310d1 Mr1 Lt- t M.mn.'.Le.nL R2Mt22d 4rxxl-L'.n.nele F�Sd-A"'" 992n22 Ol ;am M.UCNItn 11.rtm 1larmn. R21410244,.xl w Cnrwtu 4. 9.4-16 d k.nl.r 992022 M 100t Mn I*..m M.nm 1l,hHra R21.1422J 1f.1n - Cmutte fnr Curh 1.1.6 992n22 u11.101 hlry lkxfn M. l5.r,.u. R2141233 3.fJM1 Cnlur<u k. SGmn 5rrncturc. Wel., Rh..[rn4 A FtrwanmrM 9.92022 b1300r1 hha D.- M.rnn 1t.,au. MAMMA SO/I� crcu I„r Flowahle Fill CI SM 99W22 99 W22 03 30 an U3300r1 Mnikarw Mla lk.rpn h4ron M.,: M2.1W.11. R2142233 J. 0.�CuMrcle Wn MmMdrr. hdchA llv.d-Il. R21463333 fx101v`i.m.rHe Mt M,.61 . 10.UA I kvdwllr. C-M. r 9921R2 03 3.1n Mrc l3mrfn M.nm M.- R2 4123o4,utN+ypar [mcrek l` Mnrhnln. Inldc l NnJw.Uc. YHw p'W 992,0 633nm N1,.1J.npn M.Oin Man- R3I46035 Ilml On[,ncM.WrMal,Mlr. 1.1d, i lk dx.tla. VA'. Pad. 99 VM 1122032 03 30. 321313 Mn 173-- 14a OenPn M.nm M.nrn. Markn M1l.rle0. R2146335 43n0p� Cmxrete Wr HerW 11J..d Pdnl. WH.. Sl- Ann Sb.xrurc. Idlh'c'f dAMKtPgC'nnacM 6. M.:hrn<lMaenl p3 n[ 112202Z 1122022 321J IJ 13 M. 1k. 12caren %1-a Marrrna I41Kw liq �i'„IkMr fu. l,h- PI-4 Yalmt C+m.Mr Z4 J2 13 I I IS 2D22 33 13 13 rur a a Ik9pn M.- M.ne9. Nu- %Wlm, !46LZU pn far I WW P-N. 14MU6 4.SW1 or�l'wcuM 6r IW PJ.nd Pac.m 114&K36 11 IS 2u22 34 13 13 r c Ikn pn 11amn wnem 186I M 4,j(10 p.. wcxk fu H.J M.c.d Pnm. I t 22022 34113 13 13 M11la Ilnipn 1Wm SLnn4 4 - M nu C-,r fur 16.d ll.c p.nnII22on3213 `••".. Iknurr 11-Nl-R21MN35 11 a.rb 4,300P1� -odor hand - P.trnt lnlH..\Iend-lkoj-dh 11 22022 u 1i 13 �.L a lkw:n Matra M,nnu R214hK-. 4,0M mr CmxrcM lcelnlna, lLnhNn, 7luJxall. 1122022 321313 'hhl Lrn'. MJOtn M-14 R2141N244,OW OU Cx kfor Srd-ll. and Rk 11,2022 12 13 11 Mh De.r.n Mwtrn M.neru R2141 K24 4,OW pa, Cancr.M for Jnnennn Inn, _ d-lk, vd R.-, ...022 03300. Mra tk.rvn Marna Menpu R21J60194.SW nx C'rmcrcM for We.. tilwm [learn Strxaum '/92a� q1 30 W M. IkAPn MnOn Wnnb R21460364,54M pq C'.mcMe fn IUM PIacM P.cma. Wcb 9v2022 01 30 W Mrl lknm M.nrn M,nnl, RZl4 l4,SW - Cmrcrcre for r. . Ahead P.earra 9v 301' 03 3llw M.a 1 11.rtm M.ndla R214h24: 4,5m nv Cnncreee f 14nd Pl.cad pauru 993032 0330W MM,nM-n, I121J62.164.51N)px C'mxrd.for Ilud PIuWYJxmr 9 v 30� (f1 NI W ..lhs Ikxyr M.- h1uMb t ,,SC' 4.5n0 - C rvc.ne hx It M.c W Pnrn. 992= 0131 W Mrll=- 14rtm 11..x1u R21472J14.i•a1 WrI MFl-dP.- 4 1 2n2.1 12 1410 Mn D- M.a.. %1.r..lu ma.�'+m. R21N YI J S a ucl. r ran par cmxrck uv Srdcx.lk, 4 1 it 4 12n27 na v101 n3 ]01J7 hlry Ikxm M1ha DexPn 14nr.r M1t.r.en. M.mn M.r. R2146P33 r.'ll u:k. J!x5, erne lm RndP< Ikvk C.-- R2144013 d,M1ln px C.urcreM rkir..n `4 •! 2n23 32 13 S] 1 hba DexPtt M.rtrn 14nn11. h4r0v R2I36KId 3.W. px r.mcrd. 4+t ardcx.Ra .nJ r�q�f 14721t23 W i 63313 Mn [)Cxln M1[.nnr. 70 H2.4 R21617610 17 nRmrm1uq{{.;WG.xIbfRfC RP]6R0 IS 222023 �2 1) 13 1m,Fn 11-: .,.I!= 4M1P1a.,:iWnx F.xn 1,12112)033n,n%ha rx"" Mama%.- R2141o304MK,pCwa!CR,rmf H CITI'O5'FORTWORTR TRANS PORTATIOYlPU6LIC%ORKSD&PARTMENT .T:\SPARD PRODUCTS LIST AS OF D571612Q� C :5 :i.2G3 ISI' if JII`I Wx it 'M.". Menrna 'M#)_ld4 4.(0VI pv C mcrek fm Nndpr IX& If. 1203 t2 1 t N1 M" D..q Man. M1lar.cna R2136R20 3.DN p. Cw Mt t %drn.ILc aM Ramx+ 6 1 2011 12 13 SI S4a Uenp. Man. Mmena 9-11 wY20 IAA$ P�y Cnnekk fw S1deu.16 617.12) al 16 IM M. lkgFn M.." M14ncna 1%WN41 6 44- i fkVI P. Cmcrck by l�111ed 5�lh I I.I1pvp .nJ Tr.16c 5r nrl FnulWa4a+. 6 27 21)21 ni I,= M1llx Ixnxn M.n1n M.nma I l'Iu4C45 I.65:1. i-bw"Cmn.lc fnr POW SMII. 1-': a.d Tn6: S.�.W Fn�nJrp„n. F42023 nl 3111ai Mrs r/n+Rn M1Lrnn M.nctl. 112,4f R41 64J rtka 4,SW P+• Gxrcrek 4v 11nIIN Rn.laf 1'n c F..e. A'420I3 n3 y41x1 Mn ❑e.1x11 Men�n M.nrne R21mM S pll calk. 3.A10 pI1 Cmnn< WI Side.alla .ed R 84 2Y23 32 132n Mn D- M.nm M.rnna R214IR24 5 53 4 (w �'+�Cw�nne f.�r Jwn11.m &.�a. H..a CrJwrl, siJe+.ellr aW R.W. 942p23 013411U Mn tkgp. Man. M.ncno R21461L35 6 11 4 kq iw,cMa tm Ldpc. /daMlJe+. qrd lindadlc 14. t23 121111 Mn fk�� M.nm M-..' R:146RN• 6 17 4.Srxi' Cwlcra+r 1:m Ik1d Plrud Pau y F 30 2023 03 30 W M1IIx [k.m Mrrt. M.nrn• R:Id IR;O 5 1 5 SK 411� jjy9y� CwnMc kv kvi Cul+Mr i W dxall. Nd.12,3 PIJ 13 Mla lk.m Mrn. Mauna O214lKR7 SfN rut. 4.[Ifif�p.('w+cnle lw 6lech-HxN P-rr�p 11202D23 0130W M.a lkwA. M. Mrnrn. R21u,1t31 6YI Sxlr 4 1ha Iw CIP S<++<r Mmf'4r• 11 2p Am M 30W Mm D-pn M.nin Mack. 1J",)1qC-- R2146X33 6 n7 S.L. i.ra p.1 Cmnnc Mn fw Cap Scnae M.nheln 12222143 32 k] ti Mra fk°.�1FpP M.n1n Mnnn. R21414W 6 M Sacks 4,SIk1p . C-- m" '. H.411-d P. ru 12222023 32 I7 I S Mra tk.jel Marun Manen. R2146X44 6 M S.I. 4.300 T. ('•x,arne Mn f r }6nd HaccJ 1•a+,nngK Mra 992W2 321320 H 42022 013000 Mra m.m N.a 111- NCS RN.kks NBR Re.d�� MIa W55020A W10,C'_M. l�r Cwb&finenr,Ik.,<oa+e, SiJe..11. TX C-YY l(kM//// w1<Mp M+a I., I b W- 992022 0110 MI hha Ikgm NBR ReaJa Ma tX CdiY T00d1� C'wr.rck Nra I�r Cucb Inlet+ 91220'J bi tU 011 M1a lk..m M. Reach Mn CLS Pl-YY 6d1 S.L. 4,VNI 1'�l� �,nc.nc Icr C.1nn+. Manh,A ..Ion L'I11+n1. 11O4202J 3W0t1 M.s 1k 01 'MR Real'M1< CLSA•YY-SWSKL. 3CF.l L'mcee4l.n 51Jet alWh ., onJ Cwhh[nnkr �Ip4- �i 3DW NIx D-w NMR Ku MIt CIS ANY 500 Suk. 3, ppr('ana el< fw5ld.u-.tUk q1 ndCw6AGunn 110 42023 321111 M1a 1k-w NKX Kc d1 M.s TX C SF•YY 5 50 Sul. 3.661f P., Cwwrcl< hlr Nahlr. Pl-d IN-, 10 42b21 12 11 i1 Mrclknxn N75N Rnda Mn TX C SF•NY S 50 S.A. l,bOD p.1 L'.v.r<Ic by Nuhlnr HxN P.++.x 10 4.2021 32 13 13 Mla D..m NBR Rnd, M.a CIS P2-YY 6 50 SrLa 4,Sd1 q��++r L'wnrtle fnr 141W PIaxA f'•nnp 10 420 1 L 1.113 Mn 1kr.xn \7!R Rcada M1La ClS P2 YY 6 50 SuLa 4,SfI �11 Cmcne fw 141W FIxN P,nvp 1042021 03W13 ntkann \T1R Rwd+Nrt �t�•x-'FLt)W f-R.L IN('/j [w Flvu.lde 4 15 9"121 03111 W a lkryn NBR Re dv Mn TX S-NY $ SO S.cka Jia�f'n Cnncrcic S!n by C'la. S SI.71 PanRRRjjj -Yn Fh A.h ]5 2.124 n1 411 W la Ik.na N3R RcW+M1a TX S-YY 4 SU Sul. 4r+)'1p1. Cw+crc¢ Sh<61. L7u.9 Shb I'.w 1a42R21 i2 l i 20 s Ik.1}n KB RebcMw TX F NY 470 Sack. 4kk p+r ('rcfcrek fn SWexrik.. ThUn. Cur C[F 15 21124 0i 111011 .a 1]etyn KRR R..d.' Mw FIM.12 2 5 Sack. I Sn Cnntnk Lx / Inx F,rl 17 19 J121 01 N) ml n Dcrlald IhMun 31US0MR S SK i.0rr] m..xl:rek 6. Sldcntlk. 171,120 R 13 13 M1.a Dc.gn chhum 45AMUR 6 SK 4.f00 pw Clmcrek In Ikld 1•lac.d P.am3 11242021 n) W 00 1124 3n27 n1311 wl ♦La Ikg1n [�'�`' fkalpn R.qqd pUd. Mrc dd RcJ, Mix 320AI11`3500 qF Cwmne 7•x 14nd PtxW Pa+.1� 7525A 361U lRI Cmnelr G1r V.IM 11"- tirJeu�ll. Appru.rll.. AM K.M. 11 112ral 0110 W pits Ikgan Rapid Rc.h M1s 60WAS3S 411 yr C11rkn1e Iw Sl- rk- Sllulwn 1 112027 IU 3I1011 ZI Iknm Nat•lld KN, M1a RAA153.IA 11-Pn L - u1r RI..4gn 1192021 n13000 M+a lkgm R. RW,M1a RRM3020A3.xIMCwgr...lur('wbkrma.lh.+e.rxaS,JrualL.P- H921122 I11300U Mn Deq.n Rrd.•M., I)CA2054)Ikal vt'nnnr Mlahltll11�1�.yn 492.22 ..1 RI119 MIa l4cgxn RN1•h6a 9Ud11524 Nkx1 P1l ' wek M.i 4x l Bunn Y'420L' R334 I3 M.t lk9m RcJ1•lEr F0C1 Wtt L7.SM 4 Y 2022 vl 10M Mn L',,- &d1-h6a 10311324 3041f prr L'w.crek M,i fw Dn+rxm, Sodeu.F1+. AIM Ramp+ 9 9 2022 03 30 W Mrx V..m RO'-MIa 10J1 I S01 30001F! Cwcmk M.a 4. i1d.r.kl. 94 202_-1 01 3000 lLx Ilnm KeJI .M1a IOLI ISDI 6 W Lack. 'JKM '� ('mclne Mla 1. SW--Jk,-Curb A Cuner, Scup Manh,Je. lnlna 4 JurcLm Rv 992D22 017000 Mrx Dts.. ReJI•M1a 10L11f24 6MSuL+ 41W 1�('ancnk hLx NanhNn.Iv4a.1nnc6m Nnan,Ikadxail+ 992022 01 t0 qr Mnikr.m R'J140a IW115241fOp)J•• C-,..f.( f iMm 91. V.hr Pda 9292022 P110M M.x Deem RN1-Mn 10331524 i0o0 p1('.wc1c1<Mw 6n M.nMle. ')92aL' 03301Nr Mrs tx.n. kcm.Wa IS6II5244aW�'•+Cwai<k SGa 6xCul..r.4'Ixc svxm lka.o Slroctwr. 912f b1 M Mrs lk.yn Re .%P. IOL115E4 36/%(////nn Cnnc.el. Mta rnr 2MdR<cWwlucnnn 9Y2022 0110M %4 [kvyn kcdl•Mn 11611911400dpu It 1%1F1lal.. 4H2022 01413 Mlefkuyn RN1-M1a . p.fI..iWe FAI. CI.551 F3R58 N.; 992022 0 3i 11 M., lkum R<J�\fn FOUIlaVM 1(kl1�Fl.mabl<F+II-Clchl 9Y2022 013413 hfn ikvm RNI\Ua I011 if543t100 Pp 1'mcrck Mre fa lypRyl H) 20:1 Pt It11x1 h4a Ik..m Rad.•h1n RRO136K91 M Cmerele Mla fv Yrcnrl, Tlcpur ll.rr'.l.fend 992p22 Ili in rr1 !.t1a lkrrdn RN.•Mtx )r1K11524 *M pq Cwxrele S!{a fn Fnra.cn.nt 19 4211+_3 nt to IU �tfia lkarxn kd.aln IDN11im 45M11r .+J+U pq d 25 hn rCl.nnk hhx Im IIFS M+ml 92n22 p3 3n nlf Nt'a fknxn kd1-i1 11W I SM 51W p.lv+xl d 2 danlCmerele Mtr Iw IONS 1".nnl leiA 4 92022 1/3 30 tx1 19 �Jn Dayn Red1-Mn nk) YIKt15id 3fi0pp�r Cwci I:r Machnrr 19ud ILngF 49 "22 u3 30 to la lkalan Rd I PhM 115D1451.* M gnclsk M.. k. 14nJ I'InN PannF. Xlcrm lh.m 5lruc[we. 492022 .11311 q1 Mla 1- RNI•MlI I0M115244AUJ••.i v+cM< Mn4elknJ Hoed P.n... HH 2022 .,Ip 01. %b D�.lan RNI•Mla Ium115M 451kl p. C•mcrnc M.x 6.1knJ H...4 P"'.. n 9 2022 k1 31, W M..a Deem R Jlq&x 14SCD5P4451. pn C'.r.+Iiti kka 1,. H.J 11-d Pa+ln.r i4.n. tkkn 56uclu,n t 22rR2 {I] pllkl Mla Degnm R do& 145P25P44f1U mn C.mnnc fw Sl1.m DT-S111Iatwr. 12 5 2022 u3 3ll d1 and De.m RN.-ft, 10K1 I5C4 350U pq C-eg IM lb- li"ka. V.l+e Pb 125 2122 O/ MI M MI rkga. ked.•M1a 1561 ISCi 4" 1A C..W, 69 ('lP S... lk.. Svucrinn 12 5 2022 03 W fU Mra Iknan Rd.M1a I0L115C4 760UPp. C.x.nne I:rt M1fgdndc. ldn, lu.tr•n FM_ lkd.dl S IS 2021 9) 30 M Mm Ik.m Rcd'-Mn 00U ISD5 34t11f Py k 6. DniIN Sh.R. I.l�r�p a1w TMDc Synal F•gnJrnvn. j5152021 0)3OM M.a lk.m RN1-M1a 10NII5WSIurn U+'�,Iy�smanl SluRa.'nlnuxirr 11111jN .6aR. 19421R2 OlN I1 Mrx ikYRn SNM L'rxalnr 10IUD 3,oM xn+l'.x.rrets 4x S.J-Ak+.w Ra Cwb A fl. I41 2022 03 34 I3 Mn Ikgpn SRH Cmw-.ck 41AM4J11K y Coocreec 1hr IlmJna!!s. Ne+n �Wql. Milan 1992U22 01 tO 9tI M.a Larnm .SRM L'�xwY<Ir 351+21 1,Mkf pa. l'.xrcrerc fi.r M.chine Plaacd 199 2022 Ot 1uM Mm lknm SRM ('w.crn< 40LYb 1Jtkl x.. Ca--- fnr Mxh- H•c<d P. 1 , (ITN OF FORT WORTH TRA75SPORTATION; PC'BI.If' W )RKS DFPARTNF,\T STA%D,%RD PROM CTS LIST AS OF CMI6/20_xa 992022 P1 :t6x tk-. 0 SR%Tc-rle 45300 4.5Wm Ci trkf IWd PI-d P4nlat 991022 x2�•2 N hi txi Mn Ikun SW Cmrrck 45000 4 "0 I C,rrrek by 11'4nd Placed 1l 993 It{ i�l nl the Ik rµn iR11 Cane 1. y 1502` IMM C-W 6r11-s pl11xf kcV .hp gill. 992022 ni il lnl ILr lk„pn SRM CrOcmlc RKISn 33KI4pn Cnl.crck6v S.dcaa.lt, R.mpr. hlkU hmcnnn F3nxe..Thru.164.\.. L'mfi and Unnrr. lFnrcvn• Wnlcr R,n,p 2 I010S1 01 3 t rxl the IknAn SRM Crmurle 54110 SAan P. C.... to IF-% fl- 1 13 N.21 121113 Mu [kw, SW Cmnrte 45W34.5M M Cnn.rck 1. Dud Pled 1'.tnl. 4 1 7W4 ❑i 7n txi Mt. [knwr SRM C'.rinpe 9U64,I1 Cmcrete Fr FLn.abk Fdl 4 1 ]074 03 31,11, Mn lkxpr SRM C�urcle: 901 IS�mcrck ltv CLSM iruvh Rc, 4 1 2924 al 3,10t1 Mra Uc.SWW SR.M Celvm 910 I51 beck Fv MM 412o7J ni 10 WI thxlkFvr SRMCuncrrtr 45W. conrrck S 5. )27 ay 7tl IKI Mlx lkxPn SRM Gulcrcle Dl0a101! B 4,MKI pr, C-trek to BilwK .�pRn ^A�5k6 1kck 51aF 992022 ui]a r19 Mn Ikam T..rrvlcmrntc FWM1nAHPd51xl 11BB�Cmcrrk 6ka W}bw F�lr.nl Pr 912921 n3 30IXI M , Ikxm T. -I Cnnrrck FW6oibA1� 45d0JJ,,�Bl Cmcme M.a 6r 1km.1 I9.eN P.++Ort q 920L+ n3 3u rKi Wz Ikvwl T.-1 C'unxrck TCFW64WAH1r4Slrl ('muck Mrx Fx 1I4nd I'IxN l a++ne q q 2922 03 30 tKi hhatkupn 7.rrrnt Lonrtc[c FW7570AMR 45g1 i3 t n 1da.n pu crnaek 11FS Y.t,ne Ill 9 2072 63 30IXi Mn Dc..m iart.nt L'•ixrete F.,."A.450R f309(1 pn a 3-da+ai�p.i IIFC Pn}}A4 199 2W2 by la (la hhc [kiwi T.Irm, c'uxrck cc.-l' FW5120ANP 1600 ppR C-1, ka Mx .111-1I tn. 19,,10" 0y 1a w Mn lkn.n 7.nml FW'332uA 30a0 qq/ C'mrrete Mla fn RfeekrR/ 1,-t". 0)3413 Mn lRvm Tmanl Concrctc FWFFISUCISM30.150 pa F19,takie Fdl-CI. 19920E all 1413 Mla lkar.n T.mn1 C•uwrrc FWFF27530450 I'q l-hkfdl-CISM 1'l92422 0330(KI Mn)kxun T.rlot C.Irack FW6WOA2r pu1'oncnk Mra fa Slmn DIV. S.-bion 1191a3z2 0330 KI xtka+m TamntC'owek TCFW6WSL40[IO Rt'rncrckf Mrn64er l0 fa 2W2 43 30 u0 • ]k T Cz=' TCFW5070A 3"F mk f« S,JmtiU 9R2a^ 9921122 a33000 N[�ix ]kftYn TC1. TIW Rradr ,W1 FWtlA yam lyVt. M, fur Cob 3 Sinurr, tln+xluxa. Sldrnalk,, ADA Rowe rr1WOAF.3f100j1n C'dcrtk fur SMevalkr 9-4 ]022 a3 low �^ n iknen T m1 Cmrrelc CASWOA apFp emcrrk Mrc fw I:urh W ciWkr 992.22 u3 Fu p1 to lkxm T.rr.ntCmuar FW5325A2 Rn Crmerck Mr:Wr 5ldea.It, Dntc Arpnachca. ADA hemp 79 2,t22 Y1 W /u ha Uul{n TIw Real, hhs TRC4520 454M m Cnncrek Tn Wild Pk,N P.n1F 1992M_2 n3 urlrl Mniknnn Tlue Uz RN+M.n -250 ZVIM 10�•kC-1-Ma lln I'Li-k Curb A G.11 e.I>rr+eur,e.Srdenalkc.ADAIt- 1993M2 nt ulr>,I M. kn{n Tlur tint RNl Mn ?'Rt2i031KK1 PAC nrrek lnf4ld N.crd VagQF 199 2:22 ell NI l,1 the Ikrlen Tnlr thrt RNi hhn r25071n1 3n(d1 px 12-1 Mn io Ctah R 1 '(11. lhncr+m. Gdnalk. ADA R.I. 199,1122 n) 30011 Wa tx.ien True l3nl Rd' M. n26021rR 4nm//rrvv cZ"' Minf�v M.rh- M-d 1'29 2u22 03 30011 Mn Dn¢n Ttur Got Rrdi Mn U755I3o1 36Udpv Cmnele Mn fur M.chlnr 17.1d P-m. 14N 2u22 (0300, , hha 15avr1 Tru = RNI hha U26023u1 43W Pa C.nnae Mrr hx }wed f9r[N Ynrgll g92U22 Wan l. Mrx Dresn Tux G. RNl Mrx a2652-10145MQP Cmnge Mn7w Vdln tWnac 16.1d l9.cN Pr.11y 1130 2W3 32 13 I l Mrs [krul W Ihk.nn RNI-hha .1671rA1 6 (R! S.cl. 3,6ar AI Cmcrcte Ula for M.cirl,+e 19acN P.a.n. I I202M3 32 13 Il M,x Ikwen Wddeitua Red ,,2,IA1 6 SO S..k..Sul+w C-mli Mn Wr lww m..j pFt, 11202W3 03 30 w M,s [kxor WddwOer Rrdl-Mra 7W9A1 5 tin S.cb ).-I R C-0r Min be S,4-AU.nd 6dr1. 412024 033400 M,xl7nm WddCatln RNrhha 517 S..V JW�IICaurnr Mlzf Frwnialunt 5lrwmlr. 11 302W3 0) 30 W Mrx lk•wi W' t kattn RNi-Mn 4020A1 6 W S. 1, 4.ASKi13P Cmc.c+:Mrz 1•n Sldrwslks .nJ inlet tilt+ M I000 Mls lk9sn W',u RNr lWx 367R 3M100 nu Cmccclr hkaFJr Ltahune aM tulle 5+eN1 F'wnd.inm, gg20.22 .a' 1• I�. 'Mra lk,qw AurOnA MII 1t5jj}}137965 ]'abl-27 Tsa DF,er 5urkce 993022 12 IS IM1 Mra l)c..{n Avqur A. Wt DAS3)135g65 PWrJ•227+DQ((Di'Ine Smwx 99ZU22 321216 Mn lle,µn Anxrn Ar FtSH117965 Pfa.4-27 Tspeti f,nr Fkx 9921M 32 U2 fi Wr them /t mA I FT16139905 Pri64-227111E B fines 992022 512W4 ;21216 �312 f6 Mn Decr.n Mn Dk'il Atp Nt il. A. 1a1t Eli" FTIB1172 P(''W-22 hl�RFeK Bam MDMC•BNWM1 221v, U-V.- 992022 ]21R Mnikn.n I9DID Pt16A-22T��Pr Flx Snrlr9e 992u72 I 321216 Mn lkerun R-Wd,A alt {1128 POt'A•22 Y,x H frnc Has 9 9 2022 ,12 i2 16 Mn Ik.ren R_4d. AllA 1612H M.1•R T,ne B Fore B.x 1120222-4 321216 Mla Tkam RnaWd.A d1 2101DIt0W,L•T 1)h. S. f- 992022 321216 Mn D-o suaarx.11 ,vie .1DVW22=-A T" D Fllk Snr4.c 1126202.1 .IQ 1216 Mrx Drlm SunwnW Prune 34oDVW2219;6.i. ;TanebFlnr Sur4cc I752022 33121M1 xlkrlew 5uvm�.rnt Pr+.ne 3076BVW22 P[162•L'7aj� HF,ne Fill 992W2 991023 321216 12 16 La lkvo =sf,{ lknp Suem ,I."'. TXBTr ,141•BRAP6422EROPl36!-2 T7J�,RFrve FWw J7.2I13032" P "" 7.pc R Fn,c 99 2p72 .:2 32 12 I6 ��SIS T7[BTT Rae 44•I11105.17 M 4.22 T,Rr R 1- Rue 992032 321214 �/8x r%BTT IIYIStI757) Fiik4227-HFnlr11- '47511S5T) 9 9 202, 32 12 I6 !.R{ Dees. MIT F4V-4--=2 Tv D F,ne %.it-. 9 9 2022 12 12 14 :.R. Dew(n TX91T 29.22L75.19 P(I r422 h-1) F,nr Surface 99=2 371216 I.i{Deese Tx'B1T 1•I77J7540 Pcd422 Tsm UF,nc Sot.. 99 2u22 9 q 2oZ2 M 1216 1216 Fh.13.een hhx r2ee4. ' rxBn 'ttXHTT ,S4•224125.111 P070-22 TJ,pr D F.-Snrl.=r 12-222475.49 P5164.22 T.j�F D F,x Surf c 4 I Z,12J �52 12 1!• n 1k. ftlT 544 MAC.SP•D 71a=R 4AC MR )tee D Fret Surll- D.rrl.hk r II 1. 1213N S-P.rn, Pare FWl Bnck(W'meun tiatw,Ncl T.c6k P.ivr. 912"M 32 1120 1. Pnm Wewm Hr.ct Cn tFh.,ew T)t) Ikxrvhlr w.rrva. Pnm 902n22 1213-NI DWS-Crwopxlk EnprwrN p1whm her IW,..11. Acme Trk q t121,22 12172(I DWS-Gm.txrk A,it APA SuIWInm((wil-IWm M limk.r Nnd C�C•,mr•xtr Y+,rr �41 Z"v 32172n TIWS•Y.- ALYk5WullaK.111'dlnurWm MAI brtalrfilr Wnn,nr P.wr. R.........w»^.========�3$'S�3��$E�$��S�E��$ `s t t c s a x E 5 �aEw E�E b g xxx '�kxxyx�%m K x �Lxkxx xY tl xx� Hc.ih rg _ kxer',, 555� ss �h �Fti y� 4 qp al 11 K d � 2 F L L C � ! � J z � � t1i , �la la � � Y w W � � � �,� � � � � � h,� � � � � C•C" � F � � � � � � � � � � 'S S � � � � � • � S� �g�s� �k�s �g�- �yyy �y>���91tl i{tl�i[M�ittl�pp •• 7 r 3 J ti 3 i 3?=` �! y �E! r y [€� F 6 is�56Ey■y66r E I IIEI !'Vs �t yqs �SYL dex-..&d6i iSi d�$�¢E k E Y� 7 eZYg&u�}�i�5,�S �S wS £FFFY1- �P0 oS�S.��ee _��lY..Y x x •Y LCL L CS Ys Yii4M k A �M -,.. n R -1 A A A A A A A ABAR -------ryRn-----_----'gF: R.?3F:---- -- ��_-------r. .,M .,.., ...M...»»..-----_ _.. CITY OF FORT WORTH TRANSPORTATIONAMBLIC WORKS D£PARTNI ENT STA.NDAKO PRODUCTS LIST AS OF 194612%a I ieorm S..rrr-�Bnn33G.F] ' 1ao70.1 .,i al 13 II12575p3 nPBg ed M-1-1AMi ADS In'7F, PA, �Srx rPPll'Irc�5ur-12'41 �i- AMM FMI s AASIrFu tauw 33 19 f0 Ill 7i M) i3a9111 $tam bnnn pn CymsBor o4r. .s[ iLa1a .'aNarrEr f[cmWreedC me Ir rrd wk-I N�e1 ter-2]'er4ru.l Nnnlaccds�ie (s"-l'anw.l ASTM(!%,CAS5 ASTM C7P/.[:E5a I19127d23 i3Jl fu Scae.lw Apr.. A-eT,SP..RPredurla Rm.[rcad m w mr)0i mnl 14pe•ISrx-15-a1—) ASrMC76,C9% lln fx--'Rx3 Yll lu Lltl grr. A—T. Ir lPrpduel. ys Rnefne.ra reeenrrp Bas�uT.erlip:r-vMpuA ASYMCui3.e IS77 1W 132P23 35 a1 1a lw Ie7n7z 3a al 10 $roan file lipr. cyan Roa Tl Tur.rr Tk Tumor C. Pnntcr.ed Coxrrelr N, Lonyoe uN aryax 7eini Rom• IAix-15-n irworf Rk rc ccd cmercie NnS Cu1.trl tore - Vanrual ANTMCM.CVM ASTM e1e11.C1577 GEOTECHNICAL REPORT ALPHA ftTESTING Geotechnical 5058 Brush Creek Road Tel: 817.496.5600 Construction Materials Fort Worth, Texas 76119 Fax: 817.496.5608 Environmental www.alphatesting.com A Universal Engineering Sciences Company TBPELS Firm No. 813 October 20, 2023 Ashton Woods Homes - Dallas 1800 Valley View Lane, Suite 100 Farmers Branch, TX 75234 Attention: Mr. Patrick McIntyre Re: Pavement Recommendations Tradition North Phase 9A & 913 Off Sam Reynolds Road and Winding Meadows Drive Fort Worth, Texas ALPHA Report No. W232027-A Submitted herein are the recommended pavement sections for the proposed residential subdivision (Tradition North Phase 9A & 913) on a tract of land located at the northwest corner of the intersection of Sam Reynolds Road and Winding Meadows Drive in Fort Worth, Texas. This study was authorized using the Ashton Woods Work Agreement on July 18, 2023 and performed in accordance with ALPHA Proposal No. 99032 dated July 17, 2023.. This report is an extension of ALPHA Report No. W232027 dated September 6, 2023 containing geotechnical recommendations for residential foundations. The purpose of this revision is to rename phases 7C and 7D to 9A and 9B, respectively. The purpose of this study is to develop pavement sections for the planned streets in the subject subdivision in accordance with the City of Fort Worth Pavement Design Manual (January 2015). We understand the proposed streets within the subdivision could be classified as "Residential - Urban", "Collector" or "Arterial", as described in the referenced manual. PURPOSE AND SCOPE The purpose of this geotechnical exploration is for ALPHA TESTING, LLC (ALPHA) to evaluate for the Ashton Woods Homes - Dallas (Client) some of the physical and engineering properties of subsurface materials at selected locations on the subject site with respect to formulation of appropriate geotechnical design parameters for the proposed pavement. The field exploration was accomplished by securing subsurface samples from widely spaced test borings performed across the expanse of the site. Engineering analyses were performed from results of the field exploration and results of laboratory tests performed on representative samples. Also included are general comments pertaining to reasonably anticipated construction problems and recommendations concerning earthwork and quality control testing during construction. This information can be used to evaluate subsurface conditions and to aid in ascertaining construction meets project specifications. Recommendations provided in this report were developed from information obtained in test borings depicting subsurface conditions only at the specific boring locations and at the particular time designated on the logs. Subsurface conditions at other locations may differ from those observed at the boring locations, and subsurface conditions at boring locations may vary at ALHA Report No. W232027-A different times of the year. The scope of work may not fully define the variability of subsurface materials and conditions that are present on the site. The nature and extent of variations between borings may not become evident until construction. If significant variations then appear evident, our office should be contacted to re-evaluate our recommendations after performing on -site observations and possibly other tests. SUMMARY OF RECOMMENDATIONS Table A contains a summary of pavement section requirements for proposed streets at the subject project. TABLE A Summary of Pavement Section Requirements Street Classification Residential -Urban Collector Arterial PCC Pavement Thickness(in) placed 6 7'/2 10 on lime stabilized subgrade soil 28-day Concrete Compressive 3,600 3,600 3,600 Strength (psi) Subgrade Treatment 6 inches Lime 8 inches Lime 8 inches Lime Application Rate (lbs per sq yd) 30 36 36 Reinforcing Bar No. 3 3 4 Reinforcing Bar Spacing (in) 18 18 18 Further recommendations and analyses used to develop the summary in Table A are provided further in this report. FIELD EXPLORATION Subsurface conditions on the site were explored by drilling a total of 68 test borings to a depth of about 20 ft. The borings were drilled in general accordance with ASTM Standard D 420 using standard rotary drilling equipment The approximate location of each test boring is shown on the Boring Location Plan, Figure 1, enclosed in the Appendix. Subsurface types encountered during the field exploration are presented on the attached Log of Boring sheets (boring logs). These boring logs contain our Field Technician's and Engineer's interpretation of conditions believed to exist between actual samples retrieved. Therefore, the boring logs contain both factual and interpretive information. Lines delineating subsurface strata on the boring logs are approximate and the actual transition between strata may be gradual. PJ ALHA Report No. W232027-A LABORATORY TESTS Selected samples of the subsurface materials were tested in the laboratory to evaluate their engineering properties as a basis in providing recommendations for pavement sections design and earthwork construction. The following laboratory tests were performed to facilitate pavement section recommendations: • Moisture Content (ASTM D 2216) • Atterberg-Limits (ASTM D 4318) • Unconfined Compressive Strength (ASTM D 2166) • Sulfate Content (TX-145-E Part II) • Lime Series (Plasticity Index vs. Lime Content) Individual test results are presented on the attached Log of Boring or summary data sheets. GENERAL SUBSURFACE CONDITIONS Based on geological maps available from the Bureau of Economic Geology, published by The University of Texas at Austin, the project site lies within the undivided Fort Worth Limestone and Duck Creek formation. This undivided formation generally consist of limestone with marl layers. Residual soils associated with this undivided formation generally consist of clay soils with low to high shrink/swell potential. Subsurface conditions encountered in most of the borings generally consisted of clay and/or shaly clay to depths of about 1 ft to 19 ft underlain by weathered limestone, limestone and/or shale extending to the 20 ft termination depth of the borings. Subsurface conditions encountered in Borings 22, 29, and 30 generally consisted of limestone at the surface extending to the 20 ft termination depth of the borings. Subsurface conditions encountered in Borings 4, 43, 48, 50, 56, and 59 generally consisted of alternating layers of clay, shaly clay, weathered limestone, limestone and/or shale extending to the 20 ft termination depth of the borings. More detailed stratigraphic information is presented on the attached Log of Boring sheets. Most of the materials encountered in the borings are considered relatively impermeable and are anticipated to have a relatively slow response to water movement. Therefore, several days of observation would be required to evaluate actual groundwater levels within the depths explored. Also, the groundwater level at the site is anticipated to fluctuate seasonally depending on the amount of rainfall, prevailing weather conditions and subsurface drainage characteristics. Free groundwater was not encountered in the borings. However, it is common to encounter seasonal groundwater from natural fractures within the clayey matrix, at the soil/rock (limestone and/or shale) interface and from fractures within the rock (limestone and/or shale), particularly during or after periods of precipitation. If more detailed groundwater information is required, monitoring wells or piezometers can be installed. Further details concerning subsurface materials and conditions encountered can be obtained from the Log of Boring sheets provided in the Appendix. ALHA Report No. W232027-A #X ENGINEERING ANALYSIS AND RECOMENDATIONS Calculations used to determine the required pavement thickness are based only on the physical and engineering properties of the materials and conventional thickness determination procedures. Related civil design factors such as subgrade drainage, shoulder support, cross -sectional configurations, surface elevations, joint design and environmental factors will significantly affect the service life and must be included in preparation of the construction drawings and specifications but were not included in the scope of this study. Normal periodic maintenance will be required for all pavement to achieve the design life of the pavement system. Pavement Subgrade Preparation Based on review of the borings and grading plans, we expect the pavement subgrade could consist of clay or similar onsite materials used for grading the site. In addition, the pavement subgrade could also consist of limestone in some areas depending on the given location along the alignment and grading requirements. Since the subgrade conditions and required treatments could vary along the proposed road alignment, ALPHA should be retained to observe construction to verify conditions are as expected. Also, we should be provided with the final grading plan for review prior to construction to verify or modify in writing the recommendations contained in this report. The exposed clayey surface soils should be scarified to a depth of 6 inches and 8 inches for Residential Urban and Collector/Arterial streets, respectively, and mixed with a minimum 30 and 36 lbs per sq yard of hydrated lime (by dry soil weight) in conformance with TxDOT Standard Specifications Item 260. The application rate for Residential Urban streets is the minimum required by the City of Fort Worth. The application rate for Collector/Arterial streets equates to about 6 percent lime based on a dry unit soil weight of 100 pcf. The results of lime series tests performed on representative clay samples are attached (Figures 2A and 213) We recommend lime stabilization procedures extend at least 1 ft beyond the edge of the pavement to reduce effects of seasonal shrinking and swelling upon the extreme edges of pavement. The soil -lime mixture should be compacted to at least 95 percent of standard Proctor maximum dry density (ASTM D 698) and within the range of 0 to 4 percentage points above the mixture's optimum moisture content. In all areas where hydrated lime is used to stabilize subgrade soil, routine Atterberg-limit tests should be performed to verify the resulting plasticity index of the soil -lime mixture is at/or below 15. Lime stabilization of the pavement subgrade is not required where the pavement subgrade consists of limestone. In pavement areas where limestone is exposed after final subgrade elevation is achieved, on -site lime stabilized clay cuttings, on -site processed limestone cuttings, or flexible base material could be used as a leveling course (as needed) to provide a smooth surface for placement of the pavement. Mechanical lime stabilization of the pavement subgrade soil will not prevent normal seasonal movement of the underlying untreated materials. Pavement and other flatwork constructed at final grades could experience soil -related potential seasonal movements of up to about more than 8 inches as discussed in the referenced foundation report (ALPHA Report No. W232027). 4 ALHA Report No. W232027-A #X A California Bearing Ratio (CBR) test was not performed for this specific project. Based on our experience with similar projects, we anticipate the CBR for native subgrade material is estimated to be between 2.0 and 3.0. Following improvement with lime, the CBR value for the lime stabilized clayey soils is expected to be at least 10. Portland Cement Concrete Pavement Section Using the 1993 AASHTO pavement design procedures (WinPAS computer program distributed by American Concrete Pavement Association), the following design parameters were used in analyses of the PCC pavement section. • Compressive strength of concrete 3,600 psi at 28 days • Modulus of Elasticity 4,000,000 psi • Modulus of Rupture 620 psi • Modulus of Subgrade Reaction* 280 pci • Load Transfer Co -efficient 3.0 • Drainage Coefficient 1.0 • Initial PSI 4.5 • Terminal PSI for 2.0 (Residential Urban) 2.25 (Collector) 2.5 (Arterial) • Standard Deviation 0.39 • Reliability 85 percent *Subgrade prepared with lime stabilization, or graded limestone as discussed in the previous section. Using the Street Classification of "Residential -Urban" as described in the referenced Fort Worth Pavement Design Manual, it is estimated annual traffic volume will be about 35,000 Equivalent Single Axle Loads (ESALs) in one direction over a 25-year design life with 0.5 percent annual traffic growth. Based on this, we estimate the cumulative ESALs over the design life of the Residential Urban street pavement to be about 930,000. Using the Street Classification of "Collector" as described in the referenced Fort Worth Pavement Design Manual, the annual traffic volume will be about 100,000 Equivalent Single Axle Loads (ESALs) in one direction over a 25-year design life with 1.5 percent annual traffic growth. Based on this, we estimate the cumulative ESALs over the design life of the pavement to be about 3,000,000. Using the Street Classification of "Arterial" as described in the referenced Fort Worth Pavement Design Manual, the annual traffic volume will be about 300,000 Equivalent Single Axle Loads (ESALs) in one direction over a 30-year design life with 2.5 percent annual traffic growth. Based on this, we estimate the cumulative ESALs over the design life of the pavement to be about 13,000,000. If the actual expected traffic volume is different than used for our analysis herein, our office should be provided with the actual expected traffic volume so that we can re-evaluate our recommendations. 5 ALHA Report No. W232027-A Based on the subgrade preparations recommended herein, the projected traffic volume and stated design parameters, a minimum 6-inch section of Portland cement concrete is required for Residential Urban classified streets, a minimum 7%2-inch section of Portland cement concrete is required for Collector classified streets and a minimum 10-inch section of Portland cement concrete is required for Arterial classified streets at this project. PCC should have a minimum 3,600 psi compressive strength at 28 days. The concrete section should be placed over a properly prepared subgrade as discussed herein. Concrete should be designed with 4.5 ± 1.5 percent entrained air. Reinforcing steel for concrete pavement should be in accordance with Table 4.1 of the referenced Pavement Design Manual. Joints and saw -cutting in concrete should be in accordance with Section Four of the referenced Pavement Design Manual. Drainage and Maintenance Routine maintenance, including sealing of cracks and joints should be performed over the life of the pavement. Adequate drainage should be provided to reduce seasonal variations in the moisture content of subgrade soils. Maintaining positive surface drainage throughout the life of the pavement is essential. Soluble Sulfates A total of 15 samples obtained from the borings were tested for soluble sulfate concentrations. Results of the laboratory testing (TxDOT Test Method TEX-145-E Part II) are summarized in Table B. TABLE B Soluble Sulfates Sample Boring Depth, Material Type Soluble Sulfate, No. No. ft m /K m g g Epp ) 1 5 2-4 Dark Brown CLAY 58 2 10 0-2 Dark Brown CLAY 43 3 15 0-2 Dark Brown CLAY 49 4 20 0-2 Brown CLAY with limestone pebbles 47 5 25 0-2 Dark Brown CLAY with calcareous nodules 50 6 27 0-2 Dark Brown CLAY 46 7 33 0-2 Tan CALCAREOUS CLAY 59 8 36 0-2 Dark Brown CLAY with limestone fragments 51 9 41 0-2 Dark Brown CLAY 41 10 43 0-2 Dark Brown CLAY 61 11 46 0-2 Tan CLAY with calcareous deposits 20 12 58 0-2 Dark Brown CLAY 1 1 13 60 0-2 Dark Brown CLAY 44 14 64 0-2 Dark Brown CLAY 56 15 68 0-2 Dark Brown CLAY 46 6 ALHA Report No. W232027-A #X Based on the results of laboratory testing, the soluble sulfate content measured in the samples tested is considered relatively low (<3,000 ppm). It should be noted that concentrations of soluble sulfates in soil are typically very localized and concentrations in other areas of the site could vary significantly. Therefore, it is recommended sulfate sampling/testing be performed along the pavement subgrade during construction. During construction, experienced geotechnical personnel should make close observations for possible sulfate reactions. GENERAL CONSTRUCTION PROCEDURES AND RECOMMENDATIONS Variations in subsurface conditions could be encountered during construction. To permit correlation between test boring data and actual subsurface conditions encountered during construction, it is recommended a registered Professional Engineering firm be retained to observe construction procedures and materials. Some construction problems, particularly degree or magnitude, cannot be reasonably anticipated until the course of construction. The recommendations offered in the following paragraphs are intended not to limit or preclude other conceivable solutions, but rather to provide our observations based on our experience and understanding of the project characteristics and subsurface conditions encountered in the borings. Site Preparation and Grading Limestone was encountered within 4 ft of the ground surface in several of the borings. We expect limestone will be encountered during general excavation at this site. From our experience, this limestone can be hard and may be difficult to excavate. Rock excavation methods (including, but not limited to rock teeth, rippers, jack hammers, or sawcutting) may be required to remove the limestone. Crushing equipment may be required to process this limestone if it is desired to use this material as compacted fill on the site. The contractor selected should have experience with excavation in this hard limestone. All areas supporting pavement or areas to receive new fill should be properly prepared. • After completion of the necessary stripping, clearing, and excavating and prior to placing any required fill, the exposed subgrade should be carefully evaluated by probing and testing. Any undesirable material (organic material, wet, soft, or loose soil) still in place should be removed. • The exposed subgrade should be further evaluated by proof -rolling with a heavy pneumatic tired roller, loaded dump truck or similar equipment weighing approximately 25 tons to check for pockets of soft or loose material hidden beneath a thin crust of possibly better soil. • Proof -rolling procedures should be observed routinely by a Professional Engineer or his designated representative. Any undesirable material (organic material, wet, soft, or loose soil) exposed from the proof -roll should be removed and replaced with well -compacted material as outlined in the Fill Compaction section. 7 ALHA Report No. W232027-A #X • Prior to placement of any fill, the exposed subgrade should then be scarified to a minimum depth of 6 inches and recompacted as outlined in the Fill Compaction section. If fill is to be placed on existing slopes (natural or constructed) steeper than six horizontal to one vertical (6:1), the fill materials should be benched into the existing slopes in such a manner as to provide a minimum bench width of five (5) ft. This should provide a good contact between the existing soils and new fill materials, reduce potential sliding planes, and allow relatively horizontal lift placements. Even if fill is properly compacted as recommended in the Fill Compaction section, fills in excess of about 10 ft are still subject to settlements over time of up to about 1 to 2 percent of the total fill thickness. This should be considered when planning or placing deep fills. Slope stability analysis of embankments (natural or constructed) and global stability analysis for retaining walls was not within the scope of this study. The contractor is responsible for designing any excavation slopes, temporary sheeting or shoring. Design of these structures should include any imposed surface surcharges. Construction site safety is the sole responsibility of the contractor, who shall also be solely responsible for the means, methods and sequencing of construction operations. The contractor should also be aware that slope height, slope inclination or excavation depths (including utility trench excavations) should in no case exceed those specified in local, state and/or federal safety regulations, such as OSHA Health and Safety Standard for Excavations, 29 CFR Part 1926, or successor regulations. Stockpiles should be placed well away from the edge of the excavation and their heights should be controlled so they do not surcharge the sides of the excavation. Surface drainage should be carefully controlled to prevent flow of water over the slopes and/or into the excavations. Construction slopes should be closely observed for signs of mass movement, including tension cracks near the crest or bulging at the toe. If potential stability problems are observed, a geotechnical engineer should be contacted immediately. Shoring, bracing or underpinning required for the project (if any) should be designed by a professional engineer registered in the State of Texas. Due to the nature of the clay soils found near the surface at most of the borings, traffic of heavy equipment (including heavy compaction equipment) may create pumping and general deterioration of shallow soils. Therefore, some construction difficulties should be anticipated during periods when these soils are saturated. Fill Compaction The following compaction recommendations pertain to general filling and site grading. The pavement subgrade should be prepared as discussed in the "Pavement Subgrade Preparation" section. Clay with a plasticity index equal to or greater than 25 should be compacted to a dry density between 95 and 100 percent of standard Proctor maximum dry density (ASTM D 698). The compacted moisture content of the clays during placement should be within the range of 2 to 5 percentage points above optimum. K ALHA Report No. W232027-A #X Clay with a plasticity index less than 25 should be compacted to a dry density of at least 95 percent of standard Proctor maximum dry density (ASTM D 698) and within the range of 1 percentage point below to 3 percentage points above the material's optimum moisture content. Clayey materials used as fill should be processed and the largest particle or clod should be less than 6 inches prior to compaction. Processed limestone used as fill should be compacted to at least 95 percent of standard Proctor maximum dry density. The compacted moisture content of the processed limestone is not considered crucial to proper performance. However, if the material's moisture content during placement is within 3 percentage points of optimum, the compactive effort required to achieve the minimum compaction criteria may be minimized. Individual rock pieces larger than 6 inches in dimension should not be used as fill. However, if rock fill is utilized within 3 ft below the bottom of floor slabs, the maximum allowable size of individual rock pieces should be reduced to 3 inches. Processed limestone used as fill should incorporate sufficient fines to prevent the presence of voids around larger diameter rock pieces. A gradation of at least 40 percent passing a standard No. 4 sieve is recommended. Where mass fills are deeper than 10 ft, the fill/backfill below 10 ft should be compacted to at least 100 percent of standard Proctor maximum dry density (ASTM D-698) and within 2 percentage points of the material's optimum moisture content. The portion of the fill/backfill shallower than 10 ft should be compacted as outlined herein. Compaction should be accomplished by placing fill in about 8-inch thick loose lifts and compacting each lift to at least the specified minimum dry density. Field density and moisture content tests should be performed on each lift. In general site grading areas where final fill slopes will be four horizontal to one vertical (4:1) or steeper and greater than 5 ft in height, field density and moisture content tests should be performed on each lift. Utilities Where utility lines are deeper than 10 ft, the fill/backfill below 10 ft should be compacted to at least 100 percent of standard Proctor maximum dry density (ASTM D 698) and within —2 to +2 percentage points of the material's optimum moisture content. The portion of the fill/backfill shallower than 10 ft should be compacted as previously outlined. Density tests should be performed on each lift (maximum 12-inch thick) and should be performed as the trench is being backfilled. Even if fill is properly compacted, fills in excess of about 10 ft are still subject to settlements over time of up to about 1 to 2 percent of the total fill thickness. This should be considered when designing pavement over utility lines and/or other areas with deep fill. If utility trenches or other excavations extend to or beyond a depth of 5 ft below construction grade, the contractor or others shall be required to develop an excavation safety plan to protect personnel entering the excavation or excavation vicinity. The collection of specific geotechnical data and the development of such a plan, which could include designs for sloping and benching or various types of temporary shoring, is beyond the scope of this study. Any such designs and 9 ALHA Report No. W232027-A #X safety plans shall be developed in accordance with current OSHA guidelines and other applicable industry standards. Groundwater Groundwater was not encountered in the borings. However, from our experience, groundwater seepage could be encountered from the subsurface stratigraphy in excavations for pavement, utilities and other general excavations at this site. The risk of seepage increases with depth of excavation and during or after periods of precipitation. Standard sump pits and pumping may be adequate to control seepage on a local basis. In any areas where cuts are made, attention should be given to possible seasonal water seepage that could occur through natural cracks and fissures in the newly exposed stratigraphy. The risk of seepage is increased where limestone is exposed in excavations and slopes or is near final grade. In these areas subsurface drains may be required to intercept seasonal groundwater seepage. The need for these or other dewatering devices should be carefully addressed during construction. Our office could be contacted to visually observe final grades to evaluate the need for such drains. LIMITATIONS Professional services provided in this geotechnical exploration were performed, findings obtained, and recommendations prepared in accordance with generally accepted geotechnical engineering principles and practices. The scope of services provided herein does not include an environmental assessment of the site or investigation for the presence or absence of hazardous materials in the soil, surface water or groundwater. ALPHA, upon written request, can be retained to provide same. ALPHA is not responsible for conclusions, opinions or recommendations made by others based on this data. Information contained in this report is intended for the exclusive use of the Client (and their designated design representatives), and is related solely to design of the specific structures outlined on the cover page of this report. No party other than the Client (and their designated design representatives) shall use or rely upon this report in any manner whatsoever unless such party shall have obtained ALPHA's written acceptance of such intended use. Any such third party using this report after obtaining ALPHA's written acceptance shall be bound by the limitations and limitations of liability contained herein, including ALPHA's liability being limited to the fee paid to it for this report. Recommendations presented in this report should not be used for design of any other structures except those specifically described in this report. In all areas of this report in which ALPHA may provide additional services if requested to do so in writing, it is presumed that such requests have not been made if not evidenced by a written document accepted by ALPHA. Further, subsurface conditions can change with passage of time. Recommendations contained herein are not considered applicable for an extended period of time after the completion date of this report. It is recommended our office be contacted for a review of the contents of this report for construction commencing more than one (1) year after completion of this report. Non-compliance with any of these requirements by the Client or anyone else shall release ALPHA from any liability resulting from the use of, or reliance upon, this report. 10 ALHA Report No. W232027-A Recommendations provided in this report are based on our understanding of information provided by the Client about characteristics of the project. If the Client notes any deviation from the facts about project characteristics, our office should be contacted immediately since this may materially alter the recommendations. Further, ALPHA is not responsible for damages resulting from workmanship of designers or contractors and it is recommended the Owner retain qualified personnel, such as a Geotechnical Engineering firm, to verify construction is performed in accordance with plans and specifications. CLOSING All recommendations in the referenced geotechnical report remain unchanged unless specifically modified herein. We appreciate the opportunity to be of service. Please contact us with any questions or comments. Sincerely, ALPHA TESTING, LLC � � 1 Karina Cohuo Geotechnical Project Manager KC/GSF/mm Copies: (1-PDF) Client i S�P�E OF T � cS�WI 10 * . * I .. 0 ................... GREGORY S. FAGAN V �............................ � 116518 \' 810NALEN�— October 20, 2023 Attachments: Boring Location Plan — Figure 1 Mechanical Lime Series — Figure 2A and 2B WinPAS Analysis Results Log of Borings Key to Soil Symbols and Classifications F�o Gregory S. Fagan, P.E. Senior Geotechnical Engineer 11 '`.� 1 � � 1 1. 1 1 1. ■. 1 1I �'J i ■ � ■ i . .. 1I�FIy 1 N . _....—� I■ B-1 B-2 B-3 i + * 4 ■ B-4 I r B-5 B-6 as ar a�a a B-7 k B-8 B-9 owocimum mm B-10 B-11 ` B-12 . B-13 B-14 — B-15 B-16 B-17 B-18 2 1* ' 1 L-� i ! B-19 .B-20 B-21 B-22LAUD ■ 7 B-23 1 B-24 B-25 B-26 B-27 B-28 i B-29 i `B-30. B-31 B-32 B-3 * 4 it * * . ■ * * f f i ! i i = ■ B-34 B-35 B-36 B-37 B-38,B-4' 1 B-46 B-47 B-42� B-43� A B-44! ,, B-45 y l C 4r- I■ - 1 -1 . t . B-41 \Nl B-49 B 50 •a ti-JS + -�`+ V ■ 1! 3 -J5. ' YS-Ji5 B-59-GI i1�- i +a � a0 N — B-60, 1 B-63 B-65 B-6— 4-.B-66r : J [:A� ]D iT �I f 1 + S PAVEMENT RECOMMENDATIONS A L PH A #'%TESTING T APPROXIMATE BORING LOCATION TRADITION NORTH PHASE 9A & 9B OFF SAM REYNOLDS ROAD AND WHERE IT ALL BEGINS WINDING MEADOWS DRIVE FORT WORTH, TEXAS FIGURE I ALPHA PROJECT NO. W232027-A BORING LOCATION PLAN 70 65 60 55 50 45 40 a 35 30 25 20 15 10 5 ALPNA /TEST ING WHERE IT ALL BEGINS Geotechnica/ • Construction Materials • Environmental • TBPE Firm No. 813 REPORT OF MECHANICAL LIME SERIES RESULTS Project No: W232027 Date: 08/12/23 % Lime 0% 4% 6% 8% 10% PI 36 16 13 10 8 + ++ ++ ++ ++++++++++ + +++ +++ +++++++++++++++ +++++++++++++++ �,'1+++++++++++++-H +++++++ 0 0% 1% 2% 3% 4% 5% 6% 7% 8% 9% 10% 11% 12% 13% 14% 15% Percent Dry Weight of Lime a fell] N 4+II_1 70 65 60 55 50 45 40 a 35 30 25 20 15 10 5 ALPNA /TEST ING WHERE IT ALL BEGINS Geotechnica/ • Construction Materials • Environmental • TBPE Firm No. 813 REPORT OF MECHANICAL LIME SERIES RESULTS Project No: W232027 Date: 08/16/23 % Lime 0% 4% 6% 8% 10% PI 39 17 13 11 9 ++++++++++++-fl ++++++++++++ + ++ + +++ +++++++++++++++ +++++++++++++++ ++++++++++++++ ++++++++ 0 0% 1% 2% 3% 4% 5% 6% 7% 8% 9% 10% 11% 12% 13% 14% 15% Percent Dry Weight of Lime Iacell] N4VV Win PAS Pavement Thickness Design According to 1993 AASHTO Guide for Design of Pavements Structures American Concrete Pavement Association Rigid Design Inputs Agency: City of Fort Worth Company: Alpha Testing Inc. Contractor: Project Description: Residential Pavement Analysis Location: Fort Worth, TX Rigid Pavement Design/Evaluation PCC Thickness 5.91 inches Load Transfer, J Design ESALs 930,000 Mod. Subgrade Reaction, k Reliability 85.00 percent Drainage Coefficient, Cd Overall Deviation 0.39 Initial Serviceability Modulus of Rupture 620 psi Terminal Serviceability Modulus of Elasticity 4,000,000 psi Modulus of Subqrade Reaction (k-value) Determination Resilient Modulus of the Subgrade 0.0 psi Resilient Modulus of the Subbase 0.0 psi Subbase Thickness 0.00 inches Depth to Rigid Foundation 0.00 feet Loss of Support Value (0,1,2,3) 0.0 Modulus of Subgrade Reaction 280.00 psi/in 3.00 280 psi/in 1.00 4.50 2.00 Thursday, April 23, 2015 1:12:04PM Engineer: Win PAS Pavement Thickness Design According to 1993 AASHTO Guide for Design of Pavements Structures American Concrete Pavement Association Rigid Design Inputs Agency: City of Fort Worth Company: Alpha Testing Inc. Contractor: Project Description: Collector Pavement Analysis Location: Fort Worth, TX Rigid Pavement Design/Evaluation PCC Thickness 7.52 inches Load Transfer, J Design ESALs 3,000,000 Mod. Subgrade Reaction, k Reliability 85.00 percent Drainage Coefficient, Cd Overall Deviation 0.39 Initial Serviceability Modulus of Rupture 620 psi Terminal Serviceability Modulus of Elasticity 4,000,000 psi Modulus of Subqrade Reaction (k-value) Determination Resilient Modulus of the Subgrade 0.0 psi Resilient Modulus of the Subbase 0.0 psi Subbase Thickness 0.00 inches Depth to Rigid Foundation 0.00 feet Loss of Support Value (0,1,2,3) 0.0 Modulus of Subgrade Reaction 280.00 psi/in 3.00 280 psi/in 1.00 4.50 2.25 Thursday, April 23, 2015 1:11:04PM Engineer: WinPAS Pavement Thickness Design According to 1993 AASHTO Guide for Design of Pavements Structures American Concrete Pavement Association Rigid Design Inputs Agency: City of Fort Worth Company: Alpha Testing Inc. Contractor: Project Description: Arterial Pavement Analysis Location: Fort Worth, TX Rigid Pavement Design/Evaluation PCC Thickness 9.87 inches Load Transfer, J Design ESALs 13,000,000 Mod. Subgrade Reaction, k Reliability 85.00 percent Drainage Coefficient, Cd Overall Deviation 0.39 Initial Serviceability Modulus of Rupture 620 psi Terminal Serviceability Modulus of Elasticity 4,000,000 psi Modulus of Subqrade Reaction (k-value) Determination Resilient Modulus of the Subgrade 0.0 psi Resilient Modulus of the Subbase 0.0 psi Subbase Thickness 0.00 inches Depth to Rigid Foundation 0.00 feet Loss of Support Value (0,1,2,3) 0.0 Modulus of Subgrade Reaction 280.00 psi/in 3.00 280 psi/in 1.00 4.50 2.50 Thursday, April 23, 2015 1:09:59PM Engineer: ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/10/2023 End Date: 8/10/2023 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS On Rods (ft): DRY Drilling (ft): DRY oAfter 'yAfter Hours (ft): O MATERIAL DESCRIPTION / Dark Brown CLAY with limestone fragments Tan LIMESTONE with clay seams 5 10 Gray SHALE with limestone layers _15 — _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a N� >j �o of �a� L.L.+ cn F, mo �a ° -o o� U� O� d aN ��..� (> .0 3 U W xCD ��_ �_ o O J 0- (n Ha a- Z 4.5+ 11 56 20 36 1.0 13.0 ' 100/ 2.50" ' 100/ 3.50" 100/ 20.0 2.50" ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 2 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/10/2023 End Date: 8/10/2023 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS On Rods (ft): DRY oAfter Drilling (ft): DRY O 'yAfter Hours (ft): MATERIAL DESCRIPTION Dark Brown CLAY with calcareous nodules Tan CLAY with calcareous deposits — Tan LIMESTONE _10 _15 Gray LIMESTONE _20_ TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a � n - o� aN �..° >O�U .0 3 x 0�_ (1)o O J D_ (n Ha a- Z 1 4.5+ 22 4.0 ' 100/ 3.50" 11 18.0 100/ 20.0 1.50" 4.5 22 68 23 45 1.7 4.0 15 3.5 14 ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 3 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/4/2023 End Date: 8/4/2023 West: CONTINUOUS FLIGHT AUGER North: GROUND WATER OBSERVATIONS On Rods (ft): DRY After Drilling (ft): DRY 'yAfter Hours (ft): MATERIAL DESCRIPTION Dark Brown CLAY Tan WEATHERED LIMESTONE Tan LIMESTONE with clay seams Gray LIMESTONE TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E t o _ x _ N .� C >>N O E_ E_ C 8-1 >� O U E (� (6� ['Q O -O U N CL � O� d aN �`� U U 3 U) X O� o O J 0- (n Ha a- Z 4.5+ 11 60 19 41 1.0 2.0 13.0 100/ 1.50" ' 100/ 1.50" 11 100/ 20.0 1.50" ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 4 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/10/2023 End Date: 8/10/2023 West: CONTINUOUS FLIGHT AUGER North: GROUND WATER OBSERVATIONS 0) On Rods (ft): DRY Drilling (ft): DRY oAfter 'yAfter Hours (ft): O MATERIAL DESCRIPTION — % Dark Brown CLAY with calcareous nodules _5 Tan LIMESTONE —10— '� Tan and Gray SHALY CLAY 15 Gray SHALE _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a � LaF nL °C J - J .T o N >O�U .0 3 x 0�_ (1)o O J D_ (n Ha a- Z 1 4.5+ 20 4.5+ 18 61 20 41 0.0 5.0 4.5+ 15 11.0 4.5+ 22 18.0 100/ 19 20.0 ik 3.50" 5058 Brush Creek Rd. BORING NO.: 5A L PHA TESTING Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 WHERE IT ALL BEGINS www.alphatesting.com Client: Project: Start Date: Drilling Method: Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/4/2023 End Date: 8/4/2023 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS On Rods (ft): DRY oAfter Drilling (ft): DRY O 'yAfter Hours (ft): MATERIAL DESCRIPTION Dark Brown CLAY Tan CLAY withlimestone fragments and — 5 �calcareous deposits j/ 10 _15_ — —Y Gray LIMESTONE with shale seams _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a N�>O -OL � Lagy nL °C J - J .T o U N >O .0 3 x 0�_ (1)o O J D_ (n H a a- Z 1 4.5+ 8 4.0 17.0 20.0' 100/ 2" 4.5+ 2.3 101 23 4.5+ 71 15 42 17 25 0.1 4.5+ 11 4.5+ 15 ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 6 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/4/2023 End Date: 8/4/2023 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS On Rods (ft): DRY oAfter Drilling (ft): DRY O 'yAfter Hours (ft): MATERIAL DESCRIPTION jDark Brown CLAY with limestone fragments Tan LIMESTONE with clay layers 5 10 Gray LIMESTONE _15 _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): w a �.S E _ ° t o _ X N .� C >>N E_ E_ C 8-1 � n ° oa U X ° ca n ° .E m � o- Ha a- Z 4.5+ 10 51 18 33 2.0 100/ 3.50" 13.0 ' 100/ 1" 100/ 20.0 1 5058 Brush Creek Rd. BORING NO.: 7 A L PHA TESTING Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 WHERE IT ALL BEGINS www.alphatesting.com Client: Project: Start Date: Drilling Method: Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/10/2023 End Date: 8/10/2023 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS On Rods (ft): DRY oAfter Drilling (ft): DRY O 'yAfter Hours (ft): MATERIAL DESCRIPTION Dark Brown CLAY Tan CLAY with calcareous deposits 5 _10 _15 Gray LIMESTONE _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a � LaF nL °C J - J .T o N >O�U .0 3 x 0�_ (1)o O J D_ (n H a a- Z 1 4.5+ 23 4.0 18.0 20.0' 100/ 1.50" 3.5 25 4.0 21 3.75 18 45 18 27 0.4 4.5 22 4.5+ 13 ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 8 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/4/2023 End Date: 8/4/2023 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS On Rods (ft): DRY Drilling (ft): DRY oAfter 'yAfter Hours (ft): O MATERIAL DESCRIPTION — j Dark Brown CLAY Tan CLAY with calcareous deposits Tan and Gray SHALY CLAY with calcareous 5 deposits 10 Grayish Tan LIMESTONE 15 Gray LIMESTONE 20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a � n ° - o a N >O�U .0 3 x 0�_ (1)o O J D_ (n Ha a- Z 1 4.5+ 20 4.0 13.0 11 18.0 20.0' 100/ 2" 4.5+ 14 4.0 14 3.5 23 63 20 43 0.0 4.5+ 13 ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 9 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/4/2023 End Date: 8/4/2023 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS On Rods (ft): DRY Drilling (ft): DRY oAfter 'yAfter Hours (ft): O MATERIAL DESCRIPTION 1 / Dark Brown CLAY with limestone fragments Tan WEATHERED LIMESTONE Tan LIMESTONE with clay layers _5_ 10 Gray LIMESTONE _15 _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a �o of �a� cn mo �a ° -o o� U� O� d aN ��..� (> .0 3 U W xCD ��_ �_ o O J 0- (n Ha a- Z 4.5+ 9 50 19 31 1.0 I 4.0 13.0 ' 100/ 2.50" 11 100/ 20.0 1 ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 10 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/1/2023 End Date: 8/1/2023 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS On Rods (ft): DRY oAfter Drilling (ft): DRY O 'yAfter Hours (ft): MATERIAL DESCRIPTION Dark Brown CLAY Tan CLAY with limestone fragments 5 Tan LIMESTONE with clay seams and 10 layers 15 Gray LIMESTONE with shale seams _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a � LaF nL °C J - J .T o N >O�U .0 3 x 0�_ (1)o O J D_ (n Ha a- Z 1 4.5+ 10 4.0 9.0 17.0 20.0' 4.5+ 17 71 23 48 3.9 4.5+ 19 17 100/ 16 7.50" 1001 1.50" ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 1 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/3/2023 End Date: 8/3/2023 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS On Rods (ft): DRY oAfter Drilling (ft): DRY O 'yAfter Hours (ft): MATERIAL DESCRIPTION Dark Brown CLAY Tan and Gray SHALY CLAY with calcareous deposits 5 10 Tan LIMESTONE with clay seams _15_ Gray LIMESTONE _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a � LaF nL >�w" °C J - J .T o N >O�U .0 3 x 0�_ (1)o O J D_ (n Ha a- - Z 3 1 4.5+ 5.4 107 18 10.0 16.0 20.0' 4.5+ 15 3.5 20 59 18 41 0.0 2.5 22 4.5+ 13 ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 12 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/4/2023 End Date: 8/4/2023 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS On Rods (ft): DRY oAfter Drilling (ft): DRY O 'yAfter Hours (ft): MATERIAL DESCRIPTION Dark Brown CLAY with limestone fragments Tan LIMESTONE with weathered limestone layers 5 _10_ _15 Gray LIMESTONE _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a �o of �a� cn mo �a ° -o o� U� O� d aN ��..� (> .0 3 U W xCD ��_ �_ o O J 0- (n Ha a- Z 4.5+ 8 46 19 27 1.0 ' 100/ 2.50" 11 17.0 100/ 20.0 1.50" ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 13 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/1/2023 End Date: 8/1/2023 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS On Rods (ft): DRY Drilling (ft): DRY oAfter 'yAfter Hours (ft): O MATERIAL DESCRIPTION Dark Brown CLAY Tan CLAY with limestone fragments 5 Tan LIMESTONE with clay seams and layers 10 _15_ Gray LIMESTONE with shale seams _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a � LaF nL >�w" °C J - J .T o N >O�U .0 3 x 0�_ (1)o O J D_ (n Ha a- - Z 3 1 4.5+ 9.2 105 18 4.0 8.0 k " 15 k 100/ 1" 17.0 100/ 20.0 Jk1 4.5+ 18 4.5+ 15 65 21 44 0.3 4.5+ 17 ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 14 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/3/2023 End Date: 8/3/2023 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS On Rods (ft): DRY oAfter Drilling (ft): DRY O 'yAfter Hours (ft): MATERIAL DESCRIPTION Dark Brown CLAY Tan and Gray SHALY CLAY with calcareous 5 deposits 10 Tan LIMESTONE with clay seams _15 Gray LIMESTONE _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a � LaF nL °C J - J .T o N >O�U .0 3 x 0�_ (1)o O J D_ (n Ha a- Z 1 4.5+ 18 4.0 11.0 ' 100/ 2.50" 18.0 100/ 20.0 1 4.5+ 16 63 20 43 0.4 4.5+ 17 4.5+ 13 4.5+ 17 5058 Brush Creek Rd. BORING NO.: 15 A L PHA TESTING Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 WHERE IT ALL BEGINS www.alphatesting.com Client: Ashton Wood Homes - Dallas Location: Fort Worth, Texas Project: Tradition North Phase 9A & 9B Surface Elevation: Start Date: 8/2/2023 End Date: 8/2/2023 West: Drilling Method: CONTINUOUS FLIGHT AUGER North: Hammer Drop (lbs / in): CL GROUND WATER OBSERVATIONS E-, i-t o _ x On Rods (ft): DRY i o U � -"N .� m E c o 0 0 n a oo , v) moo-oAfter Drilling (ft): DRY o c yAfter_ Hours (ft):"`lo°' °'aN 0 = CU cn X a _ U) C0 Z J a_MATERIAL DESCRIPTION - Dark Brown CLAY with limestone fragments j 4.5+ 9 J% 4.0 49 8 42 19 23 0.0 j 4.0 Tan WEATHERED LIMESTONE with clay 5 seams 8.0 Tan LIMESTONE with clay seams and layers ' 21" 10 �� _ 14.0 Gray SHALE with limestone layers 15 100/ _20 20.0 1.50" TEST BORING TERMINATED AT 20 FT ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 16 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/1/2023 End Date: 8/1/2023 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS On Rods (ft): DRY Drilling (ft): DRY oAfter 'yAfter Hours (ft): O MATERIAL DESCRIPTION - % Dark Brown CLAY Tan WEATHERED LIMESTONE with clay 5 _ layers Tan LIMESTONE with clay seams and layers _10 Gray LIMESTONE with shale seams and layers _15 _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a � LaF nL °C J - J .T o N >O�U .0 3 x 0�_ (1)o O J D_ (n Ha a- Z 1 4.5+ 15 4.5+ 20 79 24 55 4.0 15" 7 8.0 -f 8 13.0 ' 100/ 1.50" 100/ 20.0 2 ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 17 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/3/2023 End Date: 8/3/2023 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS On Rods (ft): DRY Drilling (ft): DRY oAfter 'yAfter Hours (ft): O MATERIAL DESCRIPTION — % Dark Brown CLAY Tan and Gray SHALY CLAY with calcareous deposits 5 10 Gray LIMESTONE 15 20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a � La7, nL >�w.. °C J - J .T o N >O�U .0 3 x 0�_ (1)o O J D_ (n Ha a- Z 1 4.5+ 12 14.0 1 100/ 20.0 1.50" 4.5+ 12 4.5+ 17 4.5+ 18 76 23 53 6.4 4.5+ 13 ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 18 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/2/2023 End Date: 8/2/2023 West: CONTINUOUS FLIGHT AUGER North: GROUND WATER OBSERVATIONS 0) On Rods (ft): DRY Drilling (ft): DRY oAfter 'yAfter Hours (ft): O MATERIAL DESCRIPTION Dark Brown CLAY with limestone fragments ' Brown WEATHERED CLAY Tan WEATHERED LIMESTONE with clay seams and layers _5 _10_ _15 Gray LIMESTONE with shale seams _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a :o of �a� cn mo �a ° -o oof U� O� d aN ��..� (> .0 3 U W xCD ��_ �_ o O J 0- (n Ha a- Z 1 4.5+ 8 40 17 23 2.0 3.0 I ' " 15 11 18.0 100/ 20.0 2.50" 4.5+ 7 ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 19 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/1/2023 End Date: 8/1/2023 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS On Rods (ft): DRY Drilling (ft): DRY oAfter 'yAfter Hours (ft): O MATERIAL DESCRIPTION — % Dark Brown CLAY Tan CLAY with limestone fragments _5 Tan LIMESTONE with clay seams and layers _10_ Gray LIMESTONE _15_ _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a � n ° - o a N >O�U .0 3 x 0�_ (1)o O J D_ (n Ha a- Z 1 4.5+ 13 4.0 5.0 11 ' " 13 14.0 100/ 20.0 2 4.5+ 18 ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 20 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/3/2023 End Date: 8/3/2023 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS On Rods (ft): DRY Drilling (ft): DRY oAfter 'yAfter Hours (ft): O MATERIAL DESCRIPTION — j Brown CLAY with limestone pebbles Tan CLAY with limestone fragments Tan and Gray SHALY CLAY with limestone 5 fragments 10 Tan LIMESTONE with clay seams _15_ Gray LIMESTONE 20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a � n - o aN �..° >O�U .0 3 x 0�_ (1)o O J D_ (n Ha a- Z 1 4.5+ 17 2.0 4.0 12.0 11 18.0 20.0' 100/ 1.50" 4.5+ 12 4.5+ 14 52 19 33 0.0 3.5 24 4.5+ 11 ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 21 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/2/2023 End Date: 8/2/2023 West: CONTINUOUS FLIGHT AUGER North: GROUND WATER OBSERVATIONS 0) On Rods (ft): DRY Drilling (ft): DRY oAfter 'yAfter Hours (ft): O MATERIAL DESCRIPTION Dark Brown CLAY with limestone fragments Tan WEATHERED LIMESTONE with clay seams _5_ 10 Tan LIMESTONE —_ Gray SHALE 15 — _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a � La7, nL >�w.. °C J - o N >O�UCD 3 U W x �� J0- n a a- 4.5+ 10 45 18 27 2.0 ' 13" 12.0 14.0 I 100/ 20.0 66 3.50" ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 22 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/10/2023 End Date: 8/10/2023 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS On Rods (ft): DRY oAfter Drilling (ft): DRY O 'After Hours (ft): MATERIAL DESCRIPTION Tan LIMESTONE Tan LIMESTONE with clay seams _5 Gray LIMESTONE _15_ _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C O O .� E_ E_ C 8-1 >>N a o � n - aN �..° >O�U .0 3 0�_ (1)o O J D_ (n x Ha Z a- 100/ 66 1.50" ' 100/ 1.50" 14.0 100/ 20.0 1 ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 23 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 7/31/2023 End Date: 7/31/2023 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS On Rods (ft): DRY Drilling (ft): DRY oAfter 'yAfter Hours (ft): O MATERIAL DESCRIPTION — % Dark Brown CLAY Tan CLAY with limestone fragments 5 Tan LIMESTONE with clay seams 10 Gray LIMESTONE with shale seams _15_ _20 TEST BORING TERMINATED AT 20 FT 4.0 R 12.0 Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a � n ° - o a N >O�U .0 3 x 0�_ (1)o O J D_ (n Ha a- - Z 3 1 4.5+ 10.7 100 15 11 k " 12 100/ 20.0 2 4.5+ 17 66 21 45 4.5+ 12 ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 24 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/3/2023 End Date: 8/3/2023 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS On Rods (ft): DRY oAfter Drilling (ft): DRY O 'yAfter Hours (ft): MATERIAL DESCRIPTION Dark Brown CLAY with calcareous deposits _ F0/ ��j, Brown CLAY with calcareous deposits Tan and Gray SHALY CLAY with calcareous 5 deposits 10 Tan LIMESTONE with clay seams _15_ Gray LIMESTONE 20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a � n ° - o� a N >O�U .0 3 x 0�_ (1)o O J D_ (n Ha a- Z 1 4.5+ 17 4.0 12.0 11 18.0 20.0' 4.5+ 10 42 17 25 0.0 4.5+ 15 4.5+ 18 3.0 21 ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 25 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/2/2023 End Date: 8/2/2023 West: CONTINUOUS FLIGHT AUGER North: GROUND WATER OBSERVATIONS 0) On Rods (ft): DRY Drilling (ft): DRY oAfter 'yAfter Hours (ft): O MATERIAL DESCRIPTION 1 jDark Brown CLAY with calcareous nodules Tan WEATHERED LIMESTONE _5 Tan LIMESTONE _10_ Gray SHALE with limestone layers _15 — _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a � n - o aN �..° >O�U .0 3 CD U W� x � J0- n Ha a- 4.5+ 16 58 19 39 2.0 13.0 k 100/ 4" ' 100/ 2.50" 100/ 20.0 k 2 ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 26 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/10/2023 End Date: 8/10/2023 West: CONTINUOUS FLIGHT AUGER North: GROUND WATER OBSERVATIONS 0) On Rods (ft): DRY Drilling (ft): DRY oAfter 'yAfter Hours (ft): O MATERIAL DESCRIPTION Dark Brown CLAY with calcareous nodules Tan WEATHERED LIMESTONE Tan LIMESTONE _5_ 10 Gray LIMESTONE _15_ _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a � n - o aN �..° >O�U .0 3 CD U W� x � J0- n Ha a- 4.5+ 10 46 19 27 1.0 2.0 100/ 1.50" 14.0 ' 100/ 1.50" 100/ 20.0 1.50" ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 27 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 7/31/2023 End Date: 7/31/2023 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS On Rods (ft): DRY oAfter Drilling (ft): DRY O 'yAfter Hours (ft): MATERIAL DESCRIPTION Dark Brown CLAY Tan CALCAREOUS CLAY 5 Tan WEATHERED LIMESTONE with clay seams and layers Tan LIMESTONE with clay seams _10_ Gray LIMESTONE with shale seams _15_ _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a � n - o� aN �..° >O�U .0 3 x 0�_ (1)o O J D_ (n Ha a- Z 1 4.5+ 11 4.5+ 14 4.0 4.5+ 16 43 17 26 0.0 5.0 9.0 ' 100/ 2.50" 12.0 11 100/ 20.0 1.50" ALPHA #\TESTING WHERE IT ALL BEGINS 5058 Brush Creek Rd. BORING NO.: 28 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Client: Ashton Wood Homes - Dallas Location: Fort Worth, Texas Project: Tradition North Phase 9A & 9B Surface Elevation: Start Date: 8/3/2023 End Date: 8/3/2023 West: Drilling Method: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS On Rods (ft): DRY oAfter Drilling (ft): DRY O 'yAfter Hours (ft): MATERIAL DESCRIPTION jDark Brown CLAY Tan and Gray SHALY CLAY —5 —10 j Tan LIMESTONE with clay seams _15 Gray LIMESTONE _20 TEST BORING TERMINATED AT 20 FT Me 13.0 Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C O O .� E_ E_ C 8-1 >>N a o � n - � aN �..° >O�U .0 3 0�_ (1)o O J D_ (n x Ha Z a- 11 19.0 100/ 20.0 1.50" 4.5+ 19 4.0 14 4.5+ 19 4.5+ 14 33 17 16 0.7 4.5+ 19 0 ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 29 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/2/2023 End Date: 8/2/2023 West: CONTINUOUS FLIGHT AUGER North: GROUND WATER OBSERVATIONS On Rods (ft): DRY After Drilling (ft): DRY After_ Hours (ft): MATERIAL DESCRIPTION Tan LIMESTONE fragments Tan WEATHERED LIMESTONE Tan LIMESTONE Gray LIMESTONE with shale seams TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E t o _ x _ N .� C >>N O E_ E_ C 8-1 >� O U E (� (6� ['Q O -O U N CL � O� d aN �`� U U 3 Ha a- Z 1.0 7.0 I 13.0 ' 100/ 1.50" 11 100/ 20.0 1.50" ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 30 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/10/2023 End Date: 8/10/2023 West: CONTINUOUS FLIGHT AUGER North: GROUND WATER OBSERVATIONS 0) On Rods (ft): DRY Drilling (ft): DRY oAfter 'yAfter Hours (ft): O MATERIAL DESCRIPTION Tan BROKEN LIMESTONE Tan LIMESTONE with clay seams and layers Gray LIMESTONE with shale seams TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a � LaF nL °C J - J .T o N >O�U .0 3 x 0�_ (1)o O J D_ (n Ha a- Z 1 7 2.0 100/ 2.50" ' 100/ 2.50" 12.0 100/ 20.0 2 ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: _10— 15 _20 5058 Brush Creek Rd. BORING NO.: 31 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/9/2023 End Date: 8/9/2023 West: CONTINUOUS FLIGHT AUGER North: GROUND WATER OBSERVATIONS On Rods (ft): DRY After Drilling (ft): DRY 'yAfter Hours (ft): MATERIAL DESCRIPTION Dark Brown CLAY with limestone fragments Tan WEATHERED LIMESTONE with clay seams Gray LIMESTONE with shale seams TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E t o _ x _ N .� C >>N O E_ E_ C 8-1 >� O U E (� (6� ['Q O -O U N CL � O� d aN �`� U U 3 U) X O� o O J 0- (n Ha a- Z 4.5+ 17 74 24 50 1.0 100/ 66 2.50" ' " 12 100/ 20.0 2 ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 32 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/2/2023 End Date: 8/2/2023 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS On Rods (ft): DRY oAfter Drilling (ft): DRY O 'yAfter Hours (ft): MATERIAL DESCRIPTION jDark Brown CLAY with limestone fragments Tan WEATHERED LIMESTONE Tan LIMESTONE _5 _10_ Gray SHALY LIMESTONE _15_ _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a � n - o aN �..° >O�U .0 3 CD U W� x � J0- n Ha a- 4.5+ 23 77 24 53 2.0 3.0 ' " 13 14.0 100/ 20.0 2 ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 33 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/1/2023 End Date: 8/1/2023 West: CONTINUOUS FLIGHT AUGER North: GROUND WATER OBSERVATIONS 0) On Rods (ft): DRY Drilling (ft): DRY oAfter 'After Hours (ft): O MATERIAL DESCRIPTION Tan CALCAREOUS CLAY Tan WEATHERED LIMESTONE 5 Tan LIMESTONE _10_ Gray LIMESTONE _15_ _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a :o of �a� cn mo �a ° -o oof U� O� d aN ��..� (> .0 3 U W xCD ��_ �_ o O J 0- (n Ha a- Z 4.5+ 37 6 39 18 21 2.0 12.0 k " 15 11 100/ 20.0 1.50" ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 34 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 7/31/2023 End Date: 7/31/2023 West: CONTINUOUS FLIGHT AUGER North: GROUND WATER OBSERVATIONS 0) On Rods (ft): DRY Drilling (ft): DRY oAfter 'j'After Hours (ft): O MATERIAL DESCRIPTION — % Dark Brown CLAY Tan CLAY _5 Tan CLAY with limestone fragments Tan LIMESTONE 10 Gray LIMESTONE _15 _20 TEST BORING TERMINATED AT 20 FT 4.0 5.0 13.0 Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a � n - o O�U N (°> .0 3 x 0�_ (1)o O J D_ (n Ha a- Z 1 4.5+ 8 ' 100/ 1" 11 100/ 20.0 1.50" 4.5+ 17 61 20 41 0.0 4.0 19 ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 35 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/3/2023 End Date: 8/3/2023 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS On Rods (ft): DRY oAfter Drilling (ft): DRY O 'yAfter Hours (ft): MATERIAL DESCRIPTION jDark Brown CLAY with limestone fragments Tan WEATHERED LIMESTONE _5 10 _15 Gray LIMESTONE _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a �o of �a� cn mo �a ° -o o� U� O� d aN ��"� (> .0 3 U W xCD ��_ �_ o O J 0- (n Ha a- Z 4.5+ 13 57 20 37 2.0 100/ 66 5.50" ' " 12 17.0 100/ 20.0 1 ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 36 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/2/2023 End Date: 8/2/2023 West: CONTINUOUS FLIGHT AUGER North: GROUND WATER OBSERVATIONS 0) On Rods (ft): DRY Drilling (ft): DRY oAfter 'yAfter Hours (ft): O MATERIAL DESCRIPTION Dark Brown CLAY with limestone fragments Tan WEATHERED LIMESTONE 5 Tan LIMESTONE 10 Gray SHALY LIMESTONE _15 _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a N� >j :o Y O of -OL �a� L.L.+ cn (gyp mo �a ° -o oof U� O� d aN ��..� (> .0 3 U W xCD ��_ �_ o O J 0- (n Ha a- Z 4.5+ 8 41 17 24 2.0 7.0 11.0 6 100/ 4" ' " 12 100/ 20.0 2 ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 37 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/9/2023 End Date: 8/9/2023 West: CONTINUOUS FLIGHT AUGER North: GROUND WATER OBSERVATIONS On Rods (ft): DRY After Drilling (ft): DRY 'yAfter Hours (ft): MATERIAL DESCRIPTION Tan CLAY with limestone fragments Tan WEATHERED LIMESTONE with clay seams Gray LIMESTONE with shale seams TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E t o _ x _ N .� C >>N O E_ E_ C 8-1 >� O U E (� (6� ['Q O -O U N CL � O� d aN �`� U U 3 U) X O� o O J 0- (n Ha a- 4.5+ 9 50 21 29 1.0 ,.on 13.0 ' 100/ 2.50" 11 100/ 20.0 1.50" ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 38 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/9/2023 End Date: 8/9/2023 West: CONTINUOUS FLIGHT AUGER North: GROUND WATER OBSERVATIONS 0) On Rods (ft): DRY Drilling (ft): DRY oAfter 'yAfter Hours (ft): O MATERIAL DESCRIPTION Tan CLAY with limestone fragments Tan BROKEN LIMESTONE Tan WEATHERED LIMESTONE _5_ Tan LIMESTONE with clay seams _10_ Gray LIMESTONE with shale seams _15 _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a �o of �a� cn mo �a ° -o o� U� O� d aN ��"� (> .0 3 U W xCD ��_ �_ o O J 0- (n Ha a- Z 4.5+ 20 6 43 18 25 1.0 2.0 13.0 k " 12 k " 13 100/ 20.0 2 ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 39 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/1/2023 End Date: 8/1/2023 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS On Rods (ft): DRY oAfter Drilling (ft): DRY O 'yAfter Hours (ft): MATERIAL DESCRIPTION jDark Brown CLAY Tan WEATHERED LIMESTONE _5 Tan LIMESTONE with clay seams _10 _15_ Gray SHALE with limestone layers _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C O O .� E_ E_ C 8-1 >>N a o � n - aN �..° >O�U .0 3 CD W� � J0- n U x Ha --) a- 4.5 4.8 97 21 71 23 48 2.0 100/ 66 2.50" ' 100/ 17 2.50" 19.0 20.0 13 ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 40 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/1/2023 End Date: 8/1/2023 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS On Rods (ft): DRY oAfter Drilling (ft): DRY O 'yAfter Hours (ft): MATERIAL DESCRIPTION jDark Brown CLAY with limestone fragments Tan CLAY _5� Tan LIMESTONE with clay seams _10 Gray SHALY LIMESTONE _15 _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a � n - o� aN �..° >O�U .0 3 x 0�_ (1)o O J D_ (n Ha a- Z 1 4.5+ 11 Me 6.0 ' 100/ 2.50" 11.0 11 100/ 20.0 2 4.5+ 12 38 16 22 0.0 4.5+ 15 ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 41 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/1/2023 End Date: 8/1/2023 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS On Rods (ft): DRY oAfter Drilling (ft): DRY O 'yAfter Hours (ft): MATERIAL DESCRIPTION jDark Brown CLAY Tan BROKEN LIMESTONE Tan LIMESTONE with clay seams _5_ 10 Gray LIMESTONE with shale seams _15_ _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a � n ° - o a N >O�U .0 3 CD U W� x � J0- n Ha a- 4.5+ 14 55 19 36 2.0 5 4.0 100/ 2.50" 12.0 k " 13 20.0 -f ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 42 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 7/31/2023 End Date: 7/31/2023 West: CONTINUOUS FLIGHT AUGER North: GROUND WATER OBSERVATIONS 0) On Rods (ft): DRY Drilling (ft): DRY oAfter 'yAfter Hours (ft): O MATERIAL DESCRIPTION — % Dark Brown CLAY Tan CLAY 5 Tan BROKEN LIMESTONE with clay layers Tan LIMESTONE with clay seams and layers 10 Gray LIMESTONE 15 _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a � n - o aN �..° >O�U .0 3 x 0�_ (1)o O J D_ (n Ha a- - Z 3 1 4.5+ 10.6 106 18 4.0 6.0 8.0 ' 100/ 1.50" 12.0 u 100/ 20.0 2 4.5+ 16 63 20 43 0.0 4.5+ 17 ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 43 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/3/2023 End Date: 8/3/2023 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS On Rods (ft): DRY oAfter Drilling (ft): DRY O 'yAfter Hours (ft): MATERIAL DESCRIPTION jDark Brown CLAY Tan WEATHERED LIMESTONE with clay Tan and Gray SHALY CLAY with limestone - 5%// fragments Tan LIMESTONE with clay seams 10 _15 Gray LIMESTONE _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a � LaF nL °C J - J .T o N >O�U .0 3 x 0�_ (1)o O J D_ (n Ha a- 4.5+ 4.5+ 14 2.0 4.0 8.0 ' 100/ 4.50" 100/ 20.0 1 4.5+ 13 3.5 14 32 15 17 0.0 ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 44 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/2/2023 End Date: 8/2/2023 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS On Rods (ft): DRY Drilling (ft): DRY oAfter 'yAfter Hours (ft): O MATERIAL DESCRIPTION — j Dark Brown CLAY with calcareous deposits �� Tan CLAY with calcareous deposits // Tan LIMESTONE with clay seams 5 _10 Gray SHALY LIMESTONE _15_ _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a � n - o� aN �..° >O�U .0 3 x 0�_ (1)o O J D_ (n Ha a- - Z 3 4.5+ 8.2 112 11 2.0 4.5+ 11 41 17 24 0.0 4.0 11 ' " 13 14.0 100/ 20.0 2 ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 45 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/2/2023 End Date: 8/2/2023 West: CONTINUOUS FLIGHT AUGER North: GROUND WATER OBSERVATIONS 0) On Rods (ft): DRY Drilling (ft): DRY oAfter 'yAfter Hours (ft): O MATERIAL DESCRIPTION Dark Brown CLAY with calcareous nodules Tan LIMESTONE with clay seams 5 10 Gray SHALY LIMESTONE _15 _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a N� >j �o Y O of -OL �a� L.L.+ cn (gyp mo �a ° -o o� U� O� d aN ��..� (> .0 3 U W xCD ��_ �_ o O J 0- (n Ha a- Z 4.5+ 6 45 21 24 2.0 k " 13 k " 13 20.0 -f ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 46 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/2/2023 End Date: 8/2/2023 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS On Rods (ft): DRY Drilling (ft): DRY oAfter 'yAfter Hours (ft): O MATERIAL DESCRIPTION — % Tan CLAY with calcareous deposits _5 Tan LIMESTONE with clay seams 10 _ Gray SHALE with limestone layers 15 _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a � n - o aN �..° >O�U .0 3 x 0�_ (1)o O J D_ (n Ha a- Z 1 4.5+ 9 11 k " 13 14.0 I 100/ 20.0 hk 2 4.5+ 15 61 19 42 4.1 4.5+ 6 ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 47 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/1/2023 End Date: 8/1/2023 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS On Rods (ft): DRY oAfter Drilling (ft): DRY O 'yAfter Hours (ft): MATERIAL DESCRIPTION jDark Brown CLAY Tan CLAY with limestone fragments Tan LIMESTONE with clay seams 5 _10 _15 Gray SHALY LIMESTONE _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a � n - o aN �..° >O�U .0 3 x 0�_ (1)o O J D_ (n Ha a- Z 4.5+ 20 2.0 4.5+ 15 59 20 39 2.1 4.0 11 ' " 13 11 18.0 100/ 20.0 2.50" ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 48 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/1/2023 End Date: 8/1/2023 West: CONTINUOUS FLIGHT AUGER North: GROUND WATER OBSERVATIONS 0) On Rods (ft): DRY Drilling (ft): DRY oAfter 'yAfter Hours (ft): O MATERIAL DESCRIPTION — j Dark Brown CLAY Tan WEATHERED LIMESTONE with clay seams _5 10 ' Tan and Gray SHALY CLAY Tan LIMESTONE with clay seams _15_ Gray SHALY LIMESTONE _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a � n - o aN �..° >O�U .0 3 CD U W� x � J0- n Ha a- 4.5+ 20 68 22 46 2.0 8 ' 100/ 3.50" 11.0 14.0 19.0 100/ 20.0 2.50" ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 49 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/1/2023 End Date: 8/1/2023 West: CONTINUOUS FLIGHT AUGER North: GROUND WATER OBSERVATIONS 0) On Rods (ft): DRY Drilling (ft): DRY oAfter 'yAfter Hours (ft): O MATERIAL DESCRIPTION - j Dark Brown CLAY Tan WEATHERED LIMESTONE with clay seams _5 10 Gray SHALY LIMESTONE with shale seams _15_ _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a � n - o aN �..° >O�U .0 3 CD U W� x � J0- n Ha a- 4.5+ 8 50 18 32 2.0 8 6 " 15 14.0 L100/ 2.5050" 20.0 -f 5058 Brush Creek Rd. BORING NO.: 50 A L PHA TESTING Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 WHERE IT ALL BEGINS www.alphatesting.com Client: Project: Start Date: Drilling Method: Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 7/31/2023 End Date: 7/31/2023 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS On Rods (ft): DRY oAfter Drilling (ft): DRY O 'yAfter Hours (ft): MATERIAL DESCRIPTION jDark Brown CLAY -� Tan CLAY _5 Tan WEATHERED LIMESTONE _10 — twx Tan and Gray SHALY CLAY j _15 Gray SHALY LIMESTONE _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a � n - o aN �..° >O�U .0 3 x 0�_ (1)o O J D_ (n H a a- Z 1 4.5+ 19 Me 16.0 100/ 20.0J1.50" 4.5+ 2.1 112 14 4.5+ 12 33 15 18 0.0 4.5+ 16 ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 51 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 7/31/2023 End Date: 7/31/2023 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS On Rods (ft): DRY Drilling (ft): DRY oAfter 'yAfter Hours (ft): O MATERIAL DESCRIPTION — j Dark Brown CLAY Tan BROKEN LIMESTONE with clay seams and layers _5 10 Gray LIMESTONE _15_ _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a � n ° - o a N >O�U .0 3 CD U W� x � J0- n Ha a- 4.5+ 19 67 22 45 2.0 12.0 k " 12 11 100/ 20.0 2 ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 52 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/8/2023 End Date: 8/8/2023 West: CONTINUOUS FLIGHT AUGER North: GROUND WATER OBSERVATIONS 0) On Rods (ft): DRY Drilling (ft): DRY oAfter 'yAfter Hours (ft): O MATERIAL DESCRIPTION Dark Brown CLAY Tan CLAY Tan WEATHERED LIMESTONE _5 Tan LIMESTONE _10 _15 Gray LIMESTONE _20_ TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a � La7, nL >�w.. °C J - o N >O�UCD 3 U W x �� J0- n a a- 4.5+ 10 36 17 19 2.0 4.5+ 10 3.0 k 100/ 1" 17.0 100/ 20.0 1.50" ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 53 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/8/2023 End Date: 8/8/2023 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS On Rods (ft): DRY oAfter Drilling (ft): DRY O 'yAfter Hours (ft): MATERIAL DESCRIPTION jDark Brown CLAY with limestone fragments Tan CLAY with calcareous deposits 5 Tan WEATHERED LIMESTONE 10 _15_ Gray LIMESTONE _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a � n - o aN �..° >O�U .0 3 x 0�_ (1)o O J D_ (n Ha a- Z 1 4.5+ 12 Me 11 ' 100/ 2.50" 17.0 100/ 20.0 1.50" 4.5+ 12 4.5 18 61 19 42 3.3 4.5+ 13 ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 54 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/9/2023 End Date: 8/9/2023 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS On Rods (ft): DRY oAfter Drilling (ft): DRY O 'yAfter Hours (ft): MATERIAL DESCRIPTION jDark Brown CLAY Tan and Gray SHALY CLAY _5 j j r —10— Tan WEATHERED LIMESTONE —15— Gray LIMESTONE 20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a � n - o� aN �..° >O�U .0 3 x 0�_ (1)o O J D_ (n Ha a- Z 1 4.5+ 16 Me 12.0 11 18.0 20.0 66 100/ 1.50" 4.5+ 14 4.25 9 4.5+ 15 34 17 17 0.1 4.0 24 ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 55 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/9/2023 End Date: 8/9/2023 West: CONTINUOUS FLIGHT AUGER North: GROUND WATER OBSERVATIONS 0) On Rods (ft): DRY Drilling (ft): DRY oAfter 'yAfter Hours (ft): O MATERIAL DESCRIPTION Dark Brown CLAY Tan CLAY with limestone fragments — j Tan WEATHERED LIMESTONE _5 Tan LIMESTONE 10 _15 Gray LIMESTONE _20_ TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a � n - o aN �..° >O�U .0 3 0�_ (1)o O J D_ (n x Ha Z a- Id 3.0 4.5+ 12 37 17 20 8.0 4.5 23 11 18.0 100/ 20.0 1.50" ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 56 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/9/2023 End Date: 8/9/2023 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS On Rods (ft): DRY oAfter Drilling (ft): DRY O 'yAfter Hours (ft): MATERIAL DESCRIPTION jDark Brown CLAY Tan CLAY with limestone fragments Tan WEATHERED LIMESTONE 5 Tan and Gray SHALY CLAY _10 j 15 j 20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): w a �.S E _ ° t o _ X N .� C >>N E_ E_ C 8-1 N�>-OL Lgy � nL>w °C oa U X ° ca n ° .E m � o- Ha a- Z 4.5+ 20 66 21 45 2.0 3.0 4.5+ 9 8.0 3.75 18 40 17 23 20.0 4.5+ 16 4.5+ 16 ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 57 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/1/2023 End Date: 8/1/2023 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS On Rods (ft): DRY oAfter Drilling (ft): DRY O 'yAfter Hours (ft): MATERIAL DESCRIPTION jDark Brown CLAY — �� Tan CLAY —5� j j j Tan and Gray SHALY CLAY 10 Tan LIMESTONE 15 20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a � La7, nL >�w.. °C J - J .T o N >O�U .0 3 x 0�_ (1)o O J D_ (n Ha a- Z 1 4.5+ 20 Me 14.0 1 100/ 20.0 hk 2.50" 4.5+ 61 11 37 16 21 0.1 4.5+ 14 3.0 15 4.0 23 58 21 37 0.0 ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 58 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 7/31/2023 End Date: 7/31/2023 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS On Rods (ft): DRY oAfter Drilling (ft): DRY O 'yAfter Hours (ft): MATERIAL DESCRIPTION jDark Brown CLAY Tan CLAY Tan WEATHERED LIMESTONE with clay 5 seams Tan LIMESTONE with clay seams _10_ _15 Tan LIMESTONE with shale seams _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a � n - o aN �..° >O�U .0 3 CD U W� x � J0- n Ha a- 4.5+ 9 51 19 32 2.0 4.5+ 9 4.0 7.0 I ' 100/ 2.50" 11 18.0 100/ 20.0 1.50" ALPHA #\TESTING WHERE IT ALL BEGINS 5058 Brush Creek Rd. BORING NO.: 59 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Client: Ashton Wood Homes - Dallas Location: Fort Worth, Texas Project: Tradition North Phase 9A & 9B Surface Elevation: Start Date: 7/31/2023 End Date: 7/31/2023 West: Drilling Method: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS On Rods (ft): DRY oAfter Drilling (ft): DRY O 'yAfter Hours (ft): MATERIAL DESCRIPTION jTan CLAY with limestone fragments Tan and Gray SHALY CLAY _5� Tan WEATHERED LIMESTONE _10 15 Tan and Gray SHALY CLAY _ Gray LIMESTONE _20� TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C O O .� E_ E_ C 8-1 >>N a o � n - � aN �..° >O�U .0 3 0�_ (1)o O J D_ (n x Ha Z a- 001 6.0 14.0 17.0 20.0' 100/ 2" 4.5+ 7 4.5+ 12 44 17 27 1.2 4.5+ 12 12 ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 60 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 7/31/2023 End Date: 7/31/2023 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS On Rods (ft): DRY Drilling (ft): DRY oAfter 'yAfter Hours (ft): O MATERIAL DESCRIPTION — % Dark Brown CLAY Tan BROKEN LIMESTONE with clay layers _5_ Tan LIMESTONE with clay layers 10 Gray LIMESTONE _15 _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a � La7, nL >�w.. °C J - J .T o N >O�U .0 3 x 0�_ (1)o O J D_ (n Ha a- Z 1 4.5+ 13 4.0 100/ 1.50" 6.0 13.0 100/ 20.0 2 4.5+ 22 70 23 47 0.0 ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 61 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/8/2023 End Date: 8/8/2023 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS On Rods (ft): DRY oAfter Drilling (ft): DRY O 'yAfter Hours (ft): MATERIAL DESCRIPTION jDark Brown CLAY with limestone fragments Tan BROKEN LIMESTONE Tan LIMESTONE with clay seams _5_ 10 Gray LIMESTONE _15_ _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a �o of �a� cn mo �a ° -o o� U� O� d aN ��..� (> .0 3 U W xCD ��_ �_ o O J 0- (n Ha a- Z 4.5+ 16 64 20 44 2.0 4.0 100/ 1.50" 12.0 11 100/ 20.0 1.50" ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 62 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/8/2023 End Date: 8/8/2023 West: CONTINUOUS FLIGHT AUGER North: GROUND WATER OBSERVATIONS 0) On Rods (ft): DRY Drilling (ft): DRY oAfter 'yAfter Hours (ft): O MATERIAL DESCRIPTION — % Dark Brown CLAY with calcareous nodules Tan CLAY with calcareous deposits and limestone fragments 5 Tan WEATHERED LIMESTONE Tan LIMESTONE 10 Gray LIMESTONE _15 _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a � n - o aN �..° >O�U .0 3 x 0�_ (1)o O J D_ (n Ha a- - Z 3 1 4.5+ 9.2 99 23 MCI 6.0 8.0 -f ' 100/ 1.50" 11.0 11 100/ 20.0 Jk1 4.5+ 10 55 19 36 ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 63 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/8/2023 End Date: 8/8/2023 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS On Rods (ft): DRY oAfter Drilling (ft): DRY O 'yAfter Hours (ft): MATERIAL DESCRIPTION jDark Brown CLAY with calcareous nodules Tan and Gray SHALY CLAY —5 f 10 Tan LIMESTONE —15— Gray LIMESTONE _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a N� >j :o Y O of -OL �a� L.L.+ cn (gyp mo �a ° -o oof U� O� d aN ��..� (> .0 3 U W xCD ��_ �_ o O J 0- (n Ha a- Z 1 4.5+ 17 64 20 44 10.0 16.0 20.0' 100/ 1.50" 4.5+ 10 4.5+ 16 4.5+ 16 4.5+ 22 ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 64 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/8/2023 End Date: 8/8/2023 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS On Rods (ft): DRY oAfter Drilling (ft): DRY O 'yAfter Hours (ft): MATERIAL DESCRIPTION jDark Brown CLAY Tan and Gray SHALY CLAY —5� j j _10 j Tan LIMESTONE —15— Gray LIMESTONE _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a � LaF nL >�w" °C J - J .T o� N >O�U .0 3 x 0�_ (1)o O J D_ (n Ha a- Z 1 4.5+ 17 Me 12.0 17.0 20.0' 100/ 1,. 4.5+ 14 4.5 16 44 18 26 0.3 4.5+ 19 4.5 24 ALPHA #\TESTING WHERE IT ALL BEGINS 5058 Brush Creek Rd. BORING NO.: 65 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Client: Ashton Wood Homes - Dallas Location: Fort Worth, Texas Project: Tradition North Phase 9A & 9B Surface Elevation: Start Date: 8/8/2023 End Date: 8/8/2023 West: Drilling Method: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS On Rods (ft): DRY oAfter Drilling (ft): DRY O 'yAfter Hours (ft): MATERIAL DESCRIPTION jDark Brown CLAY Tan and Gray SHALY CLAY X _5 _10� j Tan WEATHERED LIMESTONE with clay seams _15 _20 TEST BORING TERMINATED AT 20 FT Me 13.0 Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a � n ° - o� a N >O�U .0 3 0�_ (1)o O J D_ (n x Ha Z a- 11 100/ 20.0 2 4.5+ 18 4.5+ 10 4.5+ 12 4.5+ 12 35 16 19 0.0 4.5+ 15 ALPHA #\TESTING WHERE IT ALL BEGINS 5058 Brush Creek Rd. BORING NO.: 66 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Client: Ashton Wood Homes - Dallas Location: Fort Worth, Texas Project: Tradition North Phase 9A & 9B Surface Elevation: Start Date: 7/31/2023 End Date: 7/31/2023 West: Drilling Method: CONTINUOUS FLIGHT AUGER North: Hammer Drop (lbs / in): GROUND WATER OBSERVATIONS -6•E 2 E-, i-t o x On Rods (ft): DRY i 0 o v'a'- -"� .( V7 .ff_ m E c o U n a After Drilling (ft): DRY a o� o o a, v� o, mo �a i� J -o �, m j'After Hours (ft): @ (j'-' a o �' °' aN o" Xa � C0 Z C J a d ?U) MATERIAL DESCRIPTION % Dark Brown CLAY - 4.5+ 5.0 99 19 - 4.5+ 16 63 20 43 2.0 _ 4.0 Tan CLAY - 5 4.5+ 13 - 4.0 18 _ 8.0 Tan WEATHERED LIMESTONE with clay seams and layers ' �� 1" 13 10 2 11 _15_ 100/ 15 _20 20.0 4" TEST BORING TERMINATED AT 20 FT ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 67 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 7/31/2023 End Date: 7/31/2023 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS On Rods (ft): DRY oAfter Drilling (ft): DRY O 'yAfter Hours (ft): MATERIAL DESCRIPTION — AN// Tan CLAY with limestone fragments %f — —j _5_%� Tan WEATHERED LIMESTONE with clay seams 10 —15— Tan LIMESTONE with clay seams and layers _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a � n - o� aN �..° >O�U .0 3 x 0�_ (1)o O J D_ (n Ha a- Z 1 4.5+ 6 R 11 ' 100/ 5.50" 11 17.0 100/ 20.0 2.50" 4.5+ 12 43 18 25 4.5+ 11 ALPHA #\TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 68 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W232027 www.alphatesting.com Ashton Wood Homes - Dallas Location: Fort Worth, Texas Tradition North Phase 9A & 9B Surface Elevation: 8/1/2023 End Date: 8/1/2023 West: CONTINUOUS FLIGHT AUGER North: GROUND WATER OBSERVATIONS 0) On Rods (ft): DRY Drilling (ft): DRY oAfter 'yAfter Hours (ft): O MATERIAL DESCRIPTION — % Dark Brown CLAY Tan CLAY 5 10 15 Gray LIMESTONE _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): �.S w a E ° t o _ x _ N .� �> C >>N O O .� E_ E_ C 8-1 a � LaF nL °C J - J .T o N >O�U .0 3 x 0�_ (1)o O J D_ (n Ha a- Z 1 4.5+ 15 4.0 17.0 20.0' 100/ 3.50" 4.5+ 9 4.5+ 16 4.0 17 50 18 32 0.0 2.5 18 4.5+ 18 ALPHA fXTESTING KEY TO SOIL SYMBOLS WHERE IT ALL BEGINS AND CLASSIFICATIONS SOIL & ROCK SYMBOLS RELATIVE DENSITY OF COHESIONLESS SOILS (blows/ft) ® (CH), High Plasticity CLAY VERY LOOSE 0 TO 4 ® (CL), Low Plasticity CLAY LOOSE 5 TO 10 MEDIUM 11 TO 30 (SC), CLAYEY SAND DENSE 31 TO 50 VERY DENSE OVER 50 (SP), Poorly Graded SAND (SW), Well Graded SAND SHEAR STRENGTH OF COHESIVE SOILS (tsf) Ell (SM), SILTY SAND VERY SOFT LESS THAN 0.25 SOFT 0.25 TO 0.50 IN (ML), SILT FIRM 0.50 TO 1.00 STIFF 1.00 TO 2.00 ® (MH), Elastic SILT VERY STIFF 2.00 TO 4.00 HARD OVER 4.00 LIMESTONE RELATIVE DEGREE OF PLASTICITY (PI) ® SHALE / MARL LOW 4 TO 15 SANDSTONE MEDIUM 16 TO 25 HIGH 26 TO 35 o (GP), Poorly Graded GRAVEL VERY HIGH OVER 35 r.' (GW), Well Graded GRAVEL ® (GC), CLAYEY GRAVEL RELATIVE PROPORTIONS (%) (GM), SILTY GRAVEL (OL), ORGANIC SILT TRACE 1 TO 10 LITTLE 11 TO 20 SOME 21 TO 35 (OH), ORGANIC CLAY AND 36 TO 50 11����� ��1♦ S SAMPLING SYMBOLS PARTICLE SIZE IDENTIFICATION (DIAMETER) ■SHELBY TUBE (3" OD except where BOULDERS 8.0" OR LARGER noted otherwise) COBBLES 3.0" TO 8.0" SPLIT SPOON (2" OD except where COARSE GRAVEL 0.75' TO 3.0" noted otherwise) FINE GRAVEL 5.0 mm TO 3.0" ® AUGER SAMPLE COURSE SAND 2.0 mm TO 5.0 mm ❑ TEXAS CONE PENETRATION MEDIUM SAND FINE SAND 0.4 mm TO 5.0 mm 0.07 mm TO 0.4 mm ❑SILT ROCK CORE (2" ID except where CLAY 0.002 mm TO 0.07 mm LESS THAN 0.002 mm noted otherwise)