City Of Fort Worth
Change Order Request
CSC No. 59834-C02
Facility and ProJect
;::
'F =lre=S=ta=tlo=n=1=5=============================.------''Clty Sec No l:=59=8=34======� Description:_ , 1 City Pro]. No.I104080Funding {FIO) No.(s) 30100·0210410-5430101-105302·CAPEX•9999
Contractor. I RJM Contractors, Inc. City Project Mgr. !Don Isaacs Phone Number. ::;;l(B;:;:;17;:) 39:;:;:;;:2.:;;;so;::;:14:;:=================:::::
tract Amoun' OriglnalCon Extras to Dal Credilsto 0a Pending Cha Contract Cost Amount of Pro Revised Con Original Funds RemainingF Additional Fu CHANGEOR MAXALLOW.
·�le nge Orders (in M&C Process'toDa!: posed Change Order lmclAmou-• Available for Change Oldersunds Available for this CO mfing {If necessary) OERS to DATE {INCLUDING THIS ONE} AS% OF ORIGINAL CONTRACT rtBLE CONTRACT AMOUNT {ORIGINAL CONTRACT COST+ 25%}
Change Order#City Inspector. Phone Number:
The purpose to Change Older #2 will add Scope of Work to the project In the form of project time and project sum.
CD '=aa-:-te--;: J=
SJ::::;:1:::;9/20::::;:2::::;:4:::: !Jason Buchanan!(682} 201-1882
53,UIJll1UUU,00
561,598.811
50,00
50,00 53,065,598.88
s12, ....... n 53,078,493.00 so.w
;,v,uu so.oo 2.47 %
53,755,000.00
Contract Time (CD)
240 0
0
0 240
611
:SIRS
PCO #004 for grade beam project lime extension, PCO #013 to replace door and hardware that Yt'ere demoed by the asbestos abatement team, PCO #015 for the addillon of 2 roof anchor posts and 18 additional days,PCO #017 to add 2 additional roof access ladders that were all required by Code but not included Inthe Contract Documents and 20 additional days. PCO #019 for the additi on of 2 electrleal cord drops in the apparatus bay that Yt'ere requested by Fim Department but were not included in the ContractDocuments. Previously approved Change Order#1, ($61,598.88) increased the Oliglnat contract amount of $3,004,000.00, approved by M&C 23-057 4, to $3,065,598.88.Change order#2 will Increase the project sum an additional $12,894.12 for a total contract amount of $3,078,493.00, a 2.47% increase In funding. Additional project time (PCO #004) is added to the due to poor concrete strength in grade beams located at the norihslde of new additions. These grade beamshad to Ile removed and replaced by Conlmctorwith no additional costs to Owner but requ'rred an additional 30 days. The total addlft0nal project lime requested for this change order Is 68 days for a total of 308 calendar days for the project.
It Is understood aml agreed Iha! the acceptance of this Change Order by the contractor consltules an accord and satisfaction and represents payment in full (both(ZflTWf1Jl!!ITlJ:!1Z:ttM?!!!e L ... @tfa,a_I Aug21,20241
M&CNumber Contract Compliance Manager: IM&e 23-0574
Sy signing I acknowledge that I am the person responsible for the monitoring and admlnstratlon of this contract, Including ensuring all performance and reporting requirements.
Augl8,l024
M&C Dale Approved
Aug29,2024
Aug30,2024
Sep3,2024
Sep3,2024
6/27/2023
Nikita Wattr Nikita Watts (Aug 29, 202405:11 CDT} Nikita Watts Sr. Capital Projects Officer
City of Fort Worth – Fire Station #15 2/20/24
PCO #04 – Time Extension for Grade Beams
RJM Contractors is requesting an additional 30 calendar days from the
original completion date of 5/30/24 due to the grade beam issue that occurred
last month. This is at no cost to the City of Fort Worth.
Subtotal $0
RJM fee (8%) $0
Total $0
Mitch McLeod
Mitch McLeod
RJM Contractors, Inc.
City of Fort Worth Fire Station #15 6/13/24
PCO #13 - Replace Existing Doors & Hardware (Doors 111 & 112)
Woodards Furnish and deliver doors and hardware $1,700.00
JP Acoustics Hand Doors & Install Hardware $ 600.00
Paint Doors $ 250.00
Subtotal $2,550.00
RJM fee (8%) $204.00
Total $2,754.00
Tristan Browne
Tristan Browne
RJM Contractors, Inc.
City of Fort Worth Fire Station #15 7/22/24
PCO #15 Install 2) Roof Anchor Post Per City Inspector
Anchor Roof Cut out roof and install 2) anchor post per city inspector.
$2,955.00
Time extension to contract 18 days
Subtotal $2,955.00
RJM fee (8%) $236.40
Total $3,191.40
Tristan Browne
Tristan Browne
RJM Contractors, Inc.
City of Fort Worth Fire Station #15 7/26/24
PCO #17 Roof Ladders Requested by City
ADS Steel Fabricate and install 2) roof ladders $5,234.00
Posada Painting Paint ladders $400.00
Time extension to contract - 20 days
Subtotal $5,634.00
RJM fee (8%) $450.72
Total $6,084.72
Tristan Browne
Tristan Browne
RJM Contractors, Inc.
City of Fort Worth Fire Station #15 8/13/24
PCO #19 2) Electrical Drops in the Apparatus Bay
All-Tech Electric $800.00
Subtotal $800.00
RJM fee (8%) $64.00
Total $864.00
Tristan Browne
Tristan Browne
RJM Contractors, Inc.