Loading...
HomeMy WebLinkAboutContract 59834-CO2�A� Attest:,--=0�_____,=-=---,-=--­Jannette S. Goodall City Secretary City Of Fort Worth Change Order Request CSC No. 59834-C02 Facility and ProJect ;:: 'F =lre=S=ta=tlo=n=1=5=============================.------''Clty Sec No l:=59=8=34======� Description:_ , 1 City Pro]. No.I104080Funding {FIO) No.(s) 30100·0210410-5430101-105302·CAPEX•9999 Contractor. I RJM Contractors, Inc. City Project Mgr. !Don Isaacs Phone Number. ::;;l(B;:;:;17;:) 39:;:;:;;:2.:;;;so;::;:14:;:=================::::: tract Amoun' OriglnalCon Extras to Dal Credilsto 0a Pending Cha Contract Cost Amount of Pro Revised Con Original Funds RemainingF Additional Fu CHANGEOR MAXALLOW. ·�le nge Orders (in M&C Process'toDa!: posed Change Order lmclAmou-• Available for Change Oldersunds Available for this CO mfing {If necessary) OERS to DATE {INCLUDING THIS ONE} AS% OF ORIGINAL CONTRACT rtBLE CONTRACT AMOUNT {ORIGINAL CONTRACT COST+ 25%} Change Order#City Inspector. Phone Number: The purpose to Change Older #2 will add Scope of Work to the project In the form of project time and project sum. CD '=aa-:-te--;: J= SJ::::;:1:::;9/20::::;:2::::;:4:::: !Jason Buchanan!(682} 201-1882 53,UIJll1UUU,00 561,598.811 50,00 50,00 53,065,598.88 s12, ....... n 53,078,493.00 so.w ;,v,uu so.oo 2.47 % 53,755,000.00 Contract Time (CD) 240 0 0 0 240 611 :SIRS PCO #004 for grade beam project lime extension, PCO #013 to replace door and hardware that Yt'ere demoed by the asbestos abatement team, PCO #015 for the addillon of 2 roof anchor posts and 18 additional days,PCO #017 to add 2 additional roof access ladders that were all required by Code but not included Inthe Contract Documents and 20 additional days. PCO #019 for the additi on of 2 electrleal cord drops in the apparatus bay that Yt'ere requested by Fim Department but were not included in the ContractDocuments. Previously approved Change Order#1, ($61,598.88) increased the Oliglnat contract amount of $3,004,000.00, approved by M&C 23-057 4, to $3,065,598.88.Change order#2 will Increase the project sum an additional $12,894.12 for a total contract amount of $3,078,493.00, a 2.47% increase In funding. Additional project time (PCO #004) is added to the due to poor concrete strength in grade beams located at the norihslde of new additions. These grade beamshad to Ile removed and replaced by Conlmctorwith no additional costs to Owner but requ'rred an additional 30 days. The total addlft0nal project lime requested for this change order Is 68 days for a total of 308 calendar days for the project. It Is understood aml agreed Iha! the acceptance of this Change Order by the contractor consltules an accord and satisfaction and represents payment in full (both(ZflTWf1Jl!!ITlJ:!1Z:ttM?!!!e L ... @tfa,a_I Aug21,20241 M&CNumber Contract Compliance Manager: IM&e 23-0574 Sy signing I acknowledge that I am the person responsible for the monitoring and admlnstratlon of this contract, Including ensuring all performance and reporting requirements. Augl8,l024 M&C Dale Approved Aug29,2024 Aug30,2024 Sep3,2024 Sep3,2024 6/27/2023 Nikita Wattr Nikita Watts (Aug 29, 202405:11 CDT} Nikita Watts Sr. Capital Projects Officer City of Fort Worth – Fire Station #15 2/20/24 PCO #04 – Time Extension for Grade Beams RJM Contractors is requesting an additional 30 calendar days from the original completion date of 5/30/24 due to the grade beam issue that occurred last month. This is at no cost to the City of Fort Worth. Subtotal $0 RJM fee (8%) $0 Total $0 Mitch McLeod Mitch McLeod RJM Contractors, Inc. City of Fort Worth Fire Station #15 6/13/24 PCO #13 - Replace Existing Doors & Hardware (Doors 111 & 112) Woodards Furnish and deliver doors and hardware $1,700.00 JP Acoustics Hand Doors & Install Hardware $ 600.00 Paint Doors $ 250.00 Subtotal $2,550.00 RJM fee (8%) $204.00 Total $2,754.00 Tristan Browne Tristan Browne RJM Contractors, Inc. City of Fort Worth Fire Station #15 7/22/24 PCO #15 Install 2) Roof Anchor Post Per City Inspector Anchor Roof Cut out roof and install 2) anchor post per city inspector. $2,955.00 Time extension to contract 18 days Subtotal $2,955.00 RJM fee (8%) $236.40 Total $3,191.40 Tristan Browne Tristan Browne RJM Contractors, Inc. City of Fort Worth Fire Station #15 7/26/24 PCO #17 Roof Ladders Requested by City ADS Steel Fabricate and install 2) roof ladders $5,234.00 Posada Painting Paint ladders $400.00 Time extension to contract - 20 days Subtotal $5,634.00 RJM fee (8%) $450.72 Total $6,084.72 Tristan Browne Tristan Browne RJM Contractors, Inc. City of Fort Worth Fire Station #15 8/13/24 PCO #19 2) Electrical Drops in the Apparatus Bay All-Tech Electric $800.00 Subtotal $800.00 RJM fee (8%) $64.00 Total $864.00 Tristan Browne Tristan Browne RJM Contractors, Inc.