HomeMy WebLinkAboutContract 40679-CO6 F6RT'W0R'FH,,, Col Fort Worth, C"SECWARY�, lop"
Change Order Request CONTRACT NOS L(0
Project Name C learforl Main Street Bridge-DOE#5950i City sec# 406791
Client Project#(s)l_ TPW-C,221-541200-30323-0010783
Project Description Bridge,Concrete Pavement,and Storm Drain Construction.
Contractor Concho Construction Co,. Change Order# 6 late _
ate =8/9/201 3 J
City Project Mgr. Leon,Wilson City Inspector _-Martina,Salinas
77 ar 11 a 11 y
Dept P
. TW Wte Sewer Select D Totals Type
Original Contract Amount $9,711,910.92 $9,711111910.9211 500
Extras to Date $277,547.44 $2771547.44 4817
Credits to Date $312,7251-76 $32,725.76
Pending Change Orders in M&C Process)
Contract Cost to Date %9,561732.60 $9,9561732.60 987
Ill I I 0110111 11001111111111,11,11111 Ill Ill
Amount of Proposed Change Order 11 111111,l"$351,863.09 $0.010, $0. $1351,8613i.og 20
Revised Contract Amount $0,912,595.69 $9,992,595.69 11007
Original Funds Available for Change Orders $291,357.00 $291,357.00
Remaining Fund's Available for this CO $46,535.3 $465535.32
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE),AS%OF ORIGINAL CONTRACT 2.189%
,000 1111,11,111, - I I
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+251) 11 21 139,888.65
Es 01]
111 NO 1.AM,X ,wjk=
AMR
11 No'
�FTT�1` '"I") Oft - - A
his change order no.,6 is the final change order for the project. Ins an effort to avoid further delays,the contractor performed some of this
,work at risk,prior to the execution of the change order. These items include: adding a modular retaining wall at the signal box adjacent to
Calloway I s nursery to minimize the slope after the location of the box was revised in the field,a rail mount for a traffic sign not include the
original design,a change in the seed specification for the banks of the Clearfork Trinity River as required by TRWID,hydromulch revisions as
requested by Edwards Ranch for areas disturbed during bridge construction,retaining wall improvements at southwest comer of Hulen and
Clearfork Main Street to match the existing wall,relaying existing brick pavers instead of installing new pavers in the median at the
intersection of Hulen,removal of a concrete column as requested by TRWD for maintenance access,,adding a,concrete apron to improve
the dralina�g�e from Kinde,rplatz,additional traffic control to coordinate with the,Hulen bridge,construction,additional intersection striping,
retrofitting the constructed abutment to accommodate the art installation by FWPA,additional sod not included in the odg al oesign,SKIM or
the streetlights,added by the City on a previous change order,stiffener plate and prestressed:beam changes to accomm IAL R "CORD
R
conditions,and silicon sealant for the pedestrian columns which was not specified in the original design. A portion of the r8W SECR !TARY
,pavement repair was deleted because the construction phasing used in the field did not require,the total quantity specifie
T
f 1.1 1
FT WORT TX
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction andl represents,
payment in full(both time and money)for all costs ads,ing out of,or incidental to,the above Change Order.
04
Concho,Construction Co.
III F I
Nil
0.0
gg F�f,
111 1111111A) I Alin, &No ffi
I—M .......................
.Al
Mro 3
IF
o
MW WJ
ar
M!&C Number I V, M&C t Pro
EP 0 4 2013 L 7,
I V5 S I RIO
Maly J. Ka titylgecretmy
M ► rW �wwr rMr r +Ir
�r
,
a► I i
ti r
i
�11r
1
ter,
1,
#M
I
I
w,
Mr
r
4'
err
r
I�
� I
r
rw �"
�a
w
r
� I
� 1► ,Ilr �w J1r
9
POI
rim
posm
too
i
CID
0
C
CL
CL
� I
0
cu
CD CD
C
a
cn
C) 429
I
C
4 C> w
to C> C ) to
I
ol
CD
co
c
c
W
cl
CIO
I
I
I
�I C IP
I
I
M
CL
CL
ui
I
I
I
.j
L
LL =
04-' I V) 0
Z C:
94KM CIO
I
I
c
w m
E
cu C
—,
CU
'"� CI7► 2
w�
0
I
0 CD
0 a); .. 21
a
� 0 a x CO
0
co m W
cl IM
� I
0
I
(
OQ
I i
�I
0I
CD
CD
a
0
i
I
4W IC>
L C>
-iC> C),
C
MI a m
MBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $00100
Previous Change Orders
co,# DATE AMOUNT
L
Total $0•00