HomeMy WebLinkAboutContract 57577-FP1-FP1 City Secretary Contract No. 57677 FORT WORTH.. Date Received 09/04/2024 AT NOTICE OF PROJECT COMPLETION (Developer Projects) The Transportation and Public Works Department upon the recommendation of the Project Manager has accepted the following project as complete: Project Name: North City Addition Ph. 2 Water & Sewer City Project No.: 103490 Improvement Type(s): Water ❑x Sewer ❑x Original Contract Price: $2,279,043.00 Amount of Approved Change Order(s): $487,371.00 Revised Contract Amount: $2,766,414.00 Total Cost of Work Complete: $2,766,414.00 Aug 27, 2024 Carmen EsteD (Aug 27. 20 4 15:27 CDT) Contractor Date Office Manager Title Jackson Construction Company Name Aug 28, 2024 y erLi(<....� . i r_ 28, 2024 07:56 CDT) Project Inspector Date Rawv r ,� Sep 4, 2024 Ram T-an (SeD 4, 202411:42 CDT) Project Manager Date Se 4 2024 Sep Rebecca Owen (SeD 4. 202411:51 CDT) CFA Manager Date Sep 4, 2024 Lauren Prieur (SeD 4, 202416:33 CDT) TPW Director Date cv� Sep 10, 2024 Asst. City Manager Date OFFICIAL RECORD CITY SECRETARY Page 1 of 2 FT. WORTH, TX Notice of Project Completion Project Name: North City Addition Ph. 2 Water & Sewer City Project No.: 103490 City's Attachments Final Pay Estimate ❑x Change Order(s): ❑x Yes ❑ N/A Pipe Report: ❑x Yes ❑ N/A Contractor's Attachments Affidavit of Bills Paid' Consent of Surety 0 Statement of Contract Time Contract Time: 120 WD Days Charged: 388 Work Start Date: 6/27/2022 Work Complete Date: 4/26/2024 Completed number of Soil Lab Test: 582 Completed number of Water Test: 45 Page 2 of 2 FORT WORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name NORTH CITY ADDITION, PHASE 2 Contract Limits Project Type WATER & SEWER IMPROVEMENTS City Project Numbers 103490 DOE Number 4900 Estimate Number 1 Payment Number 1 City Secretary Contract Number Contract Date 6/14/2022 For Period Ending 4/26/2024 WD Contract Time 12WD Days Charged to Date 388 Project Manager NA Contractor JACKSON CONSTRUCTION LTD 5112 SUN VALLEY DRIVE FORT WORTH, TX 76119 Inspectors WATSON / RODGERS Contract is 100.00 Complete Tuesday, August 13, 2024 Page 1 of 5 City Project Numbers 103490 DOE Number 4900 Contract Name NORTH CITY ADDITION, PHASE 2 Estimate Number 1 Contract Limits Payment Number I Project Type WATER & SEWER IMPROVEMENTS For Period Ending 4/26/2024 Project Funding UNIT I WATER IMPROVEMENTS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 PRESURE PLUG (CO #1) (CO #2) 33 EA $500.00 $16,500.00 33 $16,500.00 2 TRENCH SAFETY 6634 LF $2.00 $13,268.00 6634 $13,268.00 3 20" CASING BY OPEN CUT 158 LF $170.00 $26,860.00 158 $26,860.00 4 24" CASING BY OPEN CUT (CO #1) 194 LF $176.00 $34,144.00 194 $34,144.00 5 30" CASING BY OPEN CUT 160 LF $213.00 $34,080.00 160 $34,080.00 6 DUCTILE IRON WATER FITTING W/RESTRAINT 4.65 TN $15,000.00 $69,750.00 4.65 $69,750.00 (CO #2 & 3) 7 6" PVC WATER PIPE (CO # 1 & 3) 480 LF $64.00 $30,720.00 480 $30,720.00 8 8" PVC WATER PIPE (CO #1) (CO #2) 2913 LF $55.00 $160,215.00 2913 $160,215.00 9 8" PVC WATER PIPE,CSS BACKFILL 20 LF $110.00 $2,200.00 20 $2,200.00 10 12" PVC WATER PIPE (CO #1 & 3) 3693 LF $102.00 $376,686.00 3693 $376,686.00 11 12" WATER PIPE, CSS BACKFILL 100 LF $154.00 $15,400.00 100 $15,400.00 12 16" WATER PIPE (CO #1) 773 LF $159.00 $122,907.00 773 $122,907.00 13 16" WATERPIPE, CSS BACKFILL 20 LF $185.00 $3,700.00 20 $3,700.00 14 STD. FIRE HYDRANT ASSEMBLY W/6" GATE 7 EA $6,000.00 $42,000.00 7 $42,000.00 VALVE & VALVE BOX (CO #2 & 3) 15 CONNECT TO EXISTING 8" W.L. STUB -OUT 1 EA $1,200.00 $1,200.00 1 $1,200.00 16 CONN. TO EXISTING 4"-12" WATER MAIN (CO 4 EA $1,200.00 $4,800.00 4 $4,800.00 #3) 17 2" WATER SERVICE (CO #1) (CO #2) 10 EA $2,900.00 $29,000.00 10 $29,000.00 18 4" WATER METER & VAULT 2 EA $28,500.00 $57,000.00 2 $57,000.00 19 6" GATE VALVE & VALVE BOX (CO #1 & #3) 10 EA $1,300.00 $13,000.00 10 $13,000.00 20 8" GATE VALVE & VALVE BOX (CO #2) 15 EA $1,900.00 $28,500.00 15 $28,500.00 21 12" GATE VALVE & VALVE BOX (CO #3) 22 EA $3,300.00 $72,600.00 22 $72,600.00 22 16" GATE VALVE & VAULT 6 EA $25,000.00 $150,000.00 6 $150,000.00 23 6" BLOW OFF ASSEMBLY 1 EA $24,500.00 $24,500.00 1 $24,500.00 24 2" COMB. AIR RELEASE VALVE AND VAULT 1 EA $18,000.00 $18,000.00 1 $18,000.00 25 3" SERVICE CONNECTION (CO #1) 0 EA $400.00 $0.00 0 $0.00 26 4" SERVICE CONNECTION 1 EA $500.00 $500.00 1 $500.00 27 2" PRESSURE PLUG (CO #1) 10 EA $250.00 $2,500.00 10 $2,500.00 28 3" PRESSURE PLUG (CO #1) 0 EA $125.00 $0.00 0 $0.00 29 8" DIP WATER (CO #1) 20 LF $210.00 $4,200.00 20 $4,200.00 Tuesday, August 13, 2024 Page 2 of 5 City Project Numbers 103490 Contract Name NORTH CITY ADDITION, PHASE 2 Contract Limits Project Type WATER & SEWER IMPROVEMENTS Project Funding DOE Number 4900 Estimate Number 1 Payment Number I For Period Ending 4/26/2024 30 12" DIP WATER (CO #1) 117 LF $255.00 $29,835.00 117 $29,835.00 31 12" DIP WATER, CSS BACKFILL (CO #1) 10 LF $388.00 $3,880.00 10 $3,880.00 32 16" DIP WATER (CO #1) 90 LF $348.00 $31,320.00 90 $31,320.00 33 16" DIP WATER, CSS BACKFILL (CO #1) 20 LF $529.00 $10,580.00 20 $10,580.00 34 1" WATER SERVICE (CO #1) (CO #2) (CO #3) 25 EA $1,970.00 $49,250.00 25 $49,250.00 Sub -Total of Previous Unit $1,479,095.00 $1,479,095.00 UNIT H SANITARY SEWER IMPROVEMENTS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total --------------------------------------- 1 POST -CCTV INSPECTION (CO #1 & 3) 5282 LF $5.00 $26,410.00 5282 $26,410.00 2 VACUUM TEST MANHOLES (CO #1 & 3) 43 EA $450.00 $19,350.00 43 $19,350.00 3 TRENCH SAFETY (CO #1 & 3) 5282 LF $2.00 $10,564.00 5282 $10,564.00 4 CONCRETE COLLAR (CO #1 & 3) 23 EA $650.00 $14,950.00 23 $14,950.00 5 TRENCH WATER STOPS (CO #1) 26 EA $500.00 $13,000.00 26 $13,000.00 6 20" CASING BY OPEN CUT (CO #1) 526 LF $170.00 $89,420.00 526 $89,420.00 7 8" SDR-26 PVC SEWER PIPE (CO #1 & 3) 2292 LF $46.00 $105,432.00 2292 $105,432.00 8 8" PVC SCAN.SEW. PIPE W/CSS BACKFILL (CO 340 LF $86.00 $29,240.00 340 $29,240.00 #1) 9 8" DIP SEWER PIPE (CO #1) 1174 LF $147.00 $172,578.00 1174 $172,578.00 10 8" DIP SEWER PIPE, CSS BACKFILL (CO #1) 60 LF $153.00 $9,180.00 60 $9,180.00 11 EPDXY MANHOLE LINER (CO #1 & 3) 197 VF $385.00 $75,845.00 197 $75,845.00 12 T STD.DIA MANHOLE (CO # 1 & 3) 37 EA $5,900.00 $218,300.00 37 $218,300.00 13 T DROP MANHOLE (CO # 1) 6 EA $11,000.00 $66,000.00 6 $66,000.00 14 T EXTRA DEPTH MANHOLE (CO # 1 & 3) 343 VF $100.00 $34,300.00 343 $34,300.00 15 DEEP TRENCH BACKFILL (CO #1) 1503 LF $182.00 $273,546.00 1503 $273,546.00 16 CONNECT TO EXISTING MANHOLE AND 2 EA $10,000.00 $20,000.00 2 $20,000.00 INSTALL INTERNAL DROP 17 10" SEWER PIPE (CO #1) 1156 LF $59.00 $68,204.00 1156 $68,204.00 18 10" SEWER PIPE, CSS BACKFILL (CO #1) 100 LF $107.00 $10,700.00 100 $10,700.00 19 10" DIP SEWER (CO #1) 140 LF $172.00 $24,080.00 140 $24,080.00 20 10" DIP SEWER, CSS BACKFILL (CO #1) 20 LF $261.00 $5,220.00 20 $5,220.00 21 -------------------------------------- CONNECT TO EXISTING MANHOLE (CO #3) 1 EA $1,000.00 $1,000.00 1 $1,000.00 -------------------------------------- Sub-Total of Previous Unit $1,287,319.00 $1,287,319.00 Tuesday, August 13, 2024 Page 3 of 5 City Project Numbers 103490 Contract Name NORTH CITY ADDITION, PHASE 2 Contract Limits Project Type WATER & SEWER IMPROVEMENTS Project Funding Contract Information Summary Original Contract Amount Change Orders Change Order Number 1 Change Order Number 1 Change Order Number 2 Change Order Number 3 Change Order Number 3 DOE Number 4900 Estimate Number 1 Payment Number 1 For Period Ending 4/26/2024 $2,279,043.00 $62,751.00 $232,001.00 ($385.00) $175,754.00 $17,250.00 Total Contract Price $2,766,414.00 Total Cost of Work Completed $2,766,414.00 Less % Retained $0.00 Net Earned $2,766,414.00 Earned This Period $2,766,414.00 Retainage This Period $0.00 Less Liquidated Damages Days @ / Day LessPavement Deficiency Less Penalty Less Previous Payment Plus Material on Hand Less 15% Balance Due This Payment $0.00 $0.00 $0.00 $0.00 $0.00 $2,766,414.00 Tuesday, August 13, 2024 Page 4 of 5 City Project Numbers 103490 Contract Name NORTH CITY ADDITION, PHASE 2 Contract Limits Project Type WATER & SEWER IMPROVEMENTS Project Funding Project Manager NA Inspectors WATSON / RODGERS Contractor JACKSON CONSTRUCTION LTD 5112 SUN VALLEY DRIVE FORT WORTH, TX 76119 DOE Number 4900 Estimate Number 1 Payment Number 1 For Period Ending 4/26/2024 City Secretary Contract Number Contract Date 6/14/2022 Contract Time 120 WD Days Charged to Date 388 WD Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $2,766,414.00 Less % Retained $0.00 Net Earned $2,766,414.00 Earned This Period $2,766,414.00 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 / Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $2,766,414.00 Tuesday, August 13, 2024 Page 5 of 5 DEVELOPER CHANGE ORDER APPROVED -AWARDED -PROJECT PROJECT NAME: North City Addition, Phase 2 I CHANGE CONTRACT: (A) Water, Sewer ORDER No: ICFA# CFA22-0050 I CITY PARTICIPATION: No I CITY PROJECT# 103490 IFID # 30114-0200431-103490-EO7685 IX # X-27010 IIPRC # IPRC21-0081 I File # W-2788 INSPECTOR: Dennis Rodgers Phone No: 817-471-9351 PROJECT MANAGER: Kiran Konduru, P.E. Phone No: 817-392-2237 CONTRACT UNIT I WATER SEWER DRAINAGE PAVING STREETLIGHTS I CONTRACT Developer Developer Developer DAYS Cost City Cost Developer Cost City Cost Developer Cost City Cost Cost City Cost Cost City Cost ORIGINAL CONTRACT $1,240,975.00 $0.00 $1,038,068.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 120 EXTRAS TO DATE $0.00 $0.00 CREDITS TO DATE CONTRACT TO DATE $1,240,975.00 $0.00 $1,038,068.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 120 AMOUNT OF PROP. CHANGE ORDER $62,751.00 $0.00 $232,001.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0 REVISED CONTRACT AMOUNT $1,303,726.00 $0.00 $1,270,069.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 120 TOTAL REVISED CONTRACT AMOUNT PER UNIT $1,303,726.00 $1,270,069.00 $0.00 $0.00 $0.00 REVISED COST SHARE Dev. Cost: $2,573,795.00 City Cost: $0.00 TOTAL REVISED CONTRACT $2,573,795.00 Revised: 10-12-2011 Page 1 APPROVED You are directed to make the following Fhanges in contract documents : CITY BID ITEM I I PAY ITEM # I # UNIT ITEM DESCRIPTION UNIT PRICE TOTAL UNIT I: WATER IMPROVEMENTS 1 0241.1118 (1) EA 4"-12" Pressure Plug $500.00 ($500.00)I 4 3305.1004 74 LF 24" CasinQ by O en Cut $176.00 $13,024.001 7 3311.0161 (42) LF 6" PVC Watere $64.00 ($2,688.00)1 8 3311.0241 1 LF 8" PVC Water Pipe $55.00 $2,255.001 10 3311.0461 20) LF 12" PVC Water Pipe $102.00 $2,040.00 I 12 3311.0541 20)) LF 16" Water Pige $159.00 $3,180.00 I 17 3312.2203 25} EA 2" Water Service $2,900.00 $72,500.0 I 19 3312.3002 2 EA 6" Gate Valve & Valve Box $1,300.00 ($2,600.00�1 25 9999.0002 1 16� EA 3" Service Connection $400.00 ($400.000 27 9999.0004 EA 2" Pressure Plug $250.00 ($1,500.0 )I 28 9999.0005 (1) EA 3" Pressure Plug $125.00 ($125.00)I 29* 3311.0251 20 LF 8" DIP Water $210.00 $4,200.001 30* 3311.0451 117 LF 12" DIP Water $255.00 $29,835.001 31* 3311.0452 10 LF 12" DIP Water, CSS Backfill $388.00 $3,880.001 32* 3311.0551 90 LF 16" DIP Water $348.00 $31,320.001 33* 3311.0552 20 LF 16" DIP Water, CSS Backfill $529.00 $10,580.001 34* 3312.2003 27 EA 1" Water Service $1,970.00 $53,190.001 SUBTOTAL UNIT I: WATER IMPROVEMENTS $62,751.001 Revised: 10-12-2011 Page 2 APPR UNIT II: SANITARY SEWER IMPROVE111? LF Pos - TV Inspection $5.00 $375.00)) EA Vacuum Test Manholes $450.00 �$450.00) LF Trench Safe' $2.00 $150.00) EA Concrete Collar $650.00 ($ ,250.00) EA Trench Water Sto s $500.00 $5,500.00 LF 20" Casing by Open $170.00 $14,450.00 LF 8" SDR-26 PVC Sewer Pipe $46.00 ($89,516.00) LF 8" PVC San. Sew. Pipe w/ CSS Backfill $86.00 {$3,440.00) LF 8" DIP Sewer PiJg�e $147.00 66,885.00 LF 8" DIP Sewer Pipe, CS Backfill $153.00 $6,120.00 VF Epoxy Manhole Liner $385.00 $20,405.00 EA 4' Std. Dia. Manhole $5,900.00 ($11,800.00) EA 4' Drop Manhole $11,000.00 $11,000.00 VF 4' Extra Depth Manhole $100.00 ($600.00) LF Deep Trench Backfill $182.00 $109,018.00 LF 10'' Sewer Pigge $59.00 $68,204.00 LF 10" Sewer Pipe, CS5 Backfill $107.00 $10,700.00 LF 10" DIP Sewer $172.00 $24,080.00 LF 10" DIP Sewer, CSS Backfill $261.00 $5,220.00 EA Connect to Existing Manhole and Install Internal Drop $10,000.00 ($20,000.00) EA Connect to Existing Manhole and Install Internal Drop $10,000.00 $20,000.00 SUBTOTAL UNITJIy{I)):1SpA`N`I)TnAJRY ySyE�jW�rEjR{ IryM��PJR�{O�VXrE�1M(�EryNTS $232,001.00 IUTAL UNI f V S'ANI MA SEWER �MFJF R M>=N 1 S I $232,001.00 IUTAL UNANUt UtcueK $294.752.00 1 3301.0002 (75) 1 2 3301.0101 J1 I 3 3305.0109 (5 1 4 3305.0112 (5) 1 5 3305.0113 11 1 6 3305.1003 85 1 7 3331.4115 (1946) 1 8 3331.4116 (40) 1 9 3331.4119 455 1 10 3331.4120 40 1 11 3339.0001 53 1 12 3339.1001 (2) 1 13 3339.1002 1 1 14 3339.1003 (6) 1 15 9999.0006 599 1 17* 3331.4201 1156 1 18* 3331.4202 100 1 19* 3331.4205 140 1 20* 3331.4206 20 1 15 9999.0007 (2) 16* 9999.0007 REASONS FOR CHANGE ORDER 1 Changes for revising proposed streets from public to private and reviews associated with reapproval of plans. 2 To correct the discrepancy in the original bid proposal (pay item #15 was used twice instead of #16) NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100% OF THE CHANGE ORDER COST AND NO REIMBURSEMENT FROM THE CITY WILL BESOUGHT BY THE DEVELOPER. RECOMMENDED: APPROVED: APPROVED: GMcivil n � McKeever Compam� Jackson onstruchon LTD BY: , BY, By: J� Name: Ryan Spears Name: Steve McKeever Name: C rmpn Fsten Title: Project Engineer Tide: Manager Title: Office Manager Revised: 10-12-2011 Page 3 DEVELOPER -AWARDED -PROJECT CHANGE ORDER PROJECT NAME: North City Addition, Phase 2 CHANGE CONTRACT: (A) Water, Sewer ORDER No: ICFA# CFA22-0050 I CITY PARTICIPATION:( No ICITY PROJECT # 103490 IFID # 2 30114-0200431-103490-EO7685 IX # X-27010 IIPRC # IPRC21-0081 I File # W-2788 INSPECTOR: Dennis Rodgers Phone No: 817-471-9351 PROJECT MANAGER: Kiran Konduru, P.E. Phone No: 817-392-2237 WATER SEWER Developer Developer Cost City Cost Cost City Cost IORIGINAL CONTRACT $1,240,975.00 $0.00 $1,038,068.00 $0.00 I EXTRAS TO DATE $62,751.00 $0.00 $232,001.00 ICREDITS TO DATE I CONTRACT TO DATE $1,303,726.00 $0.00 $1,270,069.00 $0.00 (AMOUNT OF PROP. CHANGE ORDER ($385.00) $0.00 $0.00 $0.00 REVISED CONTRACT AMOUNT $1,303,341.00 $0.00 $1,270,069.00 $0.00 TOTAL REVISED CONTRACT AMOUNT PER UNIT $1,303,341.00 $1,270,069.00 REVISED COST SHARE Dev. Cost: $2,673,410.00 TOTAL REVISED CONTRACT CONTRACT UNIT DRAINAGE PAVING Developer Developer Cost City Cost Cost City Cost $0.00 $0.00 $0.00 _ $0.00 1 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00 $0.00 City Cost: $2,573,410.00 REVIEWED 1 l By Kiran Konduru at 8:54 am, Apr 12, 2023 J I STREET LIGHTS I CONTRACT Developer DAYS Cost City Cost $0.00 $0,00 120 I I I $0.00 120 I $0.00 0 $0.00 i 120 I $0.00 $0.00 - Revised: 10-12-2011 Page 1 REVIEWED 1 l By Kiran Konduru at 8:54 am, Apr 12, 2023 J You are directed to make the followinq chanqes in the contract documents: I CITY B#D ITEM I I I I I PAY ITEM # QUANTITY UNIT ITEM DESCRIPTION UNIT PRICE TOTAL UNIT I: WATER IMPROVEMENTS 1 0241.1118 �1� EA 1"-12" Pressure plu, $500.00 $500.00)1 6 3311.0001 ( 5) TON Ductile Iron Water Fittin s w estraint $15,000.00 $750.00 1 8 3311.0241 (21) LF 8" PVC Water �e $55.00 (1,155.00 1 14 3312.0001 1 EA Std. Fire Hydrant Assembly w/ 6"a}e Valve & Valve Box $6,000.00 $6,000.0 1 17 3312.2203 2 EA 2"Wafer Service $2,900.00 $5,800.001 20 3312.3003 ((1) EA 8" Gate Valve & Valve Box $1,900.00 $1,900.00 1 34 3312.2003 i4) EA 1"Water Service $1,970.00 j$7,880.001 SUBTOTAL UNIT I: WATER IMPROVEMENTS ($385.00 1 1 I U I AL UNI I I: WA I LK IMPKUVEMEN I S 1 ($385.00)� TOTAL CHANGE ORDERI ($385.00) REASONS FOR CHANGE ORDER 1 Address building permit comments for Lot 3, Block 3. Removed 2 - 2" water services and switched 2 - 1" water services to 2" services. Added 1 fire hydrant NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100% OF THE CHANGE ORDER COST AND NO REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER. RECOMMENDED: APPROVED: APPROVED: GMcivlln/ By McKeever Companies Jackso onstruchonLTD By. Name: Ryan Spears Name: Steve McKeever Name: Carmen Esters Title: Project Engineer Title: Manager Title: Office Office Man — Revised: 10-12-2011 Page 2 DEVELOPER -AWARDED -PROJECT CHANGE ORDER PROJECT NAME: North City Addition, Phase 2 CHANGE CONTRACT: (A) Water, Sewer ORDER No: ICFA# CFA22-0050 I CITY PARTICIPATION:( No ICITY PROJECT # 103490 IFID # 3 30114-0200431-103490-EO7685 IX # X-27010 IIPRC # IPRC21-0081 I File # W-2788 INSPECTOR: Dennis Rodgers Phone No: 817-471-9351 PROJECT MANAGER: Ram Tiwari, P.E. Phone No: 817-392-2237 WATER SEWER Developer Developer Cost City Cost Cost City Cost IORIGINAL CONTRACT $1,240,975.00 $0.00 $1,038,068.00 $0.00 I EXTRAS TO DATE $62,751.00 $0.00 $232,001.00 ICREDITS TO DATE ($385.00) I CONTRACT TO DATE $1,303,341.00 $0.00 $1,270,069.00 $0.00 (AMOUNT OF PROP. CHANGE ORDER $175,754.00 $0.00 $17,250.00 $0.00 REVISED CONTRACT AMOUNT $1,479,095.00 $0.00 $1,287,319.00 $0.00 TOTAL REVISED CONTRACT AMOUNT PER UNIT $1,479,095.00 $1,287,319.00 REVISED COST SHARE Dev. Cost: $2,766,414.00 TOTAL REVISED CONTRACT CONTRACT UNIT DRAINAGE PAVING Developer Developer Cost City Cost Cost City Cost $0.00 $0.00 $0.00 _ $0.00 1 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00 $0.00 City Cost: $2,766,414.00 REVIEWED By T/WAR/R at 9:53 am, Aug 09, 2024 I STREET LIGHTS I CONTRACT Developer DAYS Cost City Cost $0.00 $0,00 120 I I I $0.00 120 I $0.00 0 $0.00 i 120 I $0.00 $0.00 - Revised: 10-12-2011 Page 1 You are directed to make the followinq chanqes in the contract documents: I CITY B#D ITEM I I I I I PAY ITEM # QUANTITY UNIT ITEM DESCRIPTION UNIT PRICE TOTAL UNIT I: WATER IMPROVEMENTS 6 3311.0001 0.6 TON Ductile Iron Water Fittings w/ Restraint $15,000.00 $9,000.001 7 3311.0161 30 LF 6" PVC Water Pipe $64.00 $1,920.001 10 3311.0461 1397 LF 12" PVC Water Pllepa $102.00 $142 494.001 14 3312.0001 1 EA Std. Fire Hydrant Assembly w/ 6" Ga{e Valve & Valve Box $6,000.00 $6,&.001 16 3312.0117 1 EA Conn. To Existing� 4"-12" Water Main $1,200.00 $1,200.001 19 3312.3002 1 EA 6" Gate Valve &Valve Box $1,300.00 $1 300.001 21 3312.3005 3 EA 12' Gate Valve & Valve Box $3,300.00 $9�J00.001 34 3312.2003 2 EA 1"Water Service $1,970.00 $3,940.001 SUBTOTAL UNIT I: WATER IMPROVEMENTS $175,754.001 REVIEWED By TIWARIR at 10:20 am, Aug 09, 2024 Revised: 10-12-2011 Page 2 UNIT II: SANITARY SEWER IMPROVEME�� 3301.0002 30 LF Post- Inspection 3301.0101 1 EA Vacuum Test Manholes 3305.0109 30 LF Trench Safety 3305.0112 1 EA Concrete Collar 3331.4115 30 LF 8" SDR-26 PVC Sewer 3339.0001 16 VF E�oxY Manhole Liner 3339.1001 1 EA � Std. Dia. Manhole 3339.1003 15 VF 4' Extra D�y�h Manhole 9999.0008 1 EA Connect to Existing SUBTOTAL UNIT II: TOTAL UNIT TOTAL UNIT II: 1 Provide services in support of a replat of Lot 2, Block 5 $5.00 $150.001 2 $450.00 $450.001 3 $2.00 $60.001 4 $650.00 $650.001 7 Pipe $46.00 $1,380.001 11 $385.00 $6,160.001 12 $5,900.00 $5,900.001 14 $100.00 $1 21' Manhole $1,000.00 \\500.001 $1,000.001 Y SEWER IMPROVEMENTS $17,250.001 I: WATER IMPPOVEMENTSI $175,754.00 Y SEWER MPROVEMENTS $17,250.00 TOTAL CHANGE ORDER $193,004.00 REASONS FOR CHANGE ORDER NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100% OF THE CHANGE ORDER COST AND NO REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER. RECOMMENDED: APPROVED: APPROVED: GMcivil C/ By: r McKeever Companies By: `// J, Jackson gnnstruchon LTD By: l Amw� Name Ryan Spears/ Name Steve McKeever Name: Carmen Ester) Title: Project Engineer Title: Manager Title: Office Manaaer REVIEWED By TIWARIR at 9:53 am, Aug 09, 2024 Revised: 10-12-2011 Page 3 FORTWORTH TRANSPORTATION AND PUBLIC WORKS PIPE REPORT FOR: PROJECT NAME: North Cith Addition Ph. 2 PROJECT NUMBER: 103490 DOE NUMBER: 3490 WATER PIPE LAID SIZE TYPE OF PIPE LF Yes 6" PVC 480 LF Yes 8" PVC 2923 LF Yes 12" PVC 3793 LF Yes 16" PVC 793 LF Yes 8" DIP 20 LF Yes 12" DIP 127 LF Yes 16" DIP 110 LF FIRE HYDRANTS: 7 VALVES (16" OR LARGER) 6 PIPE ABANDONED SIZE TYPE OF PIPE LF NA DENSITIES: Yes NEW SERVICES: 1" Copper 250 2" Copper 100 4" DIP 60 SEWER PIPE LAID SIZE TYPE OF PIPE LF Yes 8" PVC 2632 LF 8" DIP 1234 LF 10" PVC 1256 LF loft DIP 160 LF PIPE ABANDONED SIZE TYPE OF PIPE LF NA NA NA NA DENSITIES: Yes NEW SERVICES: 8" PVC 40 LF TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth • 1000 Throckmorton Street • Fort Worth, TX 76012-6311 (817) 392 - 7941 • Fax: (817) 392 - 7845 FORT WORTH.., TRANSPORTATION AND PUBLIC WORKS August 9, 2024 Jackson Construction, LTD 5112 Sun Valley Dr. Fort Worth, TX 76119 RE: Acceptance Letter Project Name: North City Addition Ph. 2 Project Type: Water & Sewer City Project No.: 103490 To Whom It May Concern: On July 1, 2024 a final inspection was made on the subject project. There were punch list items identified at that time. The punch list items were completed on August 6, 2024. The final inspection and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on August 6, 2024, which is the date of the punch list completion and will extend of two (2) years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at 817392- 2237. Sincerely, Ram Tiwan (Sep 4, 202411:42 CDT) Andrew Goodman, Project Manager Cc: Dennis Rodgers, Inspector Donald Watson, Inspection Supervisor Oscar Aguillon, Senior Inspector Andrew Goodman, Program Manager Goodwin & Marshall, Inc, Consultant Jackson Construction, LTD, Contractor McKeever Companies, Developer File E-Mail: TPW_Acceptance@fortworthtexas.gov 8JACKSON CONSTRUCTI N LTD. 5112 SUN VALLEY D IVE FORT WORTH, TX 761 19 TEL: 81 T572-3303 FAX: 817-478-0443 STATE OF TEXAS COUNTY OF TARRANT AFFIDAVIT Before me, the undersigned authority, a notary public in the state and county aforesaid, on this day personally appeared Ali Jackson, Secretary. Of Jackson Construction, Ltd, known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said; That all persons, firms, associations, corporations, or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been paid in full; That there are no claims pending for personal injury and/or property damages; On Contract described as; North City Addition Phase 2 BY C/w \ 0 V ►�V �' Ali Jackson, Secretary Subscribed and sworn before me on this date 14th of August, 2024. :r Tarrant, Texas CARMEN L. ESTEP Notary Public, State of Texas . ' Comm. Expires 04-06-2028 ��,°;1�`,`�� Notary ID 2910811 CONSENT OF SURETY TO FINAL PAYMENT AIA Doc=ennt G707 Bond No. 1086244 TO OWNEL rName surd addresr•1 City of Fort Worth 200 Texas Street Fort Worth, TX 76102 PROJECT`: (n -IF and ad&-.1} North City Addition, Phase 2 07JNFR CONTRACTOR SURLTY OTHER ARCHITECT'S PROJECT NO.: CONTRACC FOR: CONTRACT DATEDz August 31, 2022 In accordance with the provisican5 of the Contract bemn--en the Owner and the Contractor as indicated above, the flnsr�! ria+nr aird r�+t� of.S7�+-evr J The Hanover Insurance Company 440 Lincoln Street Worcester, MA 01653 SURETY, on bcod of flnwrl na+ne ant! addrva [(Cmztraa,,r) Jackson Construction, Ltd. 5112 Sun Valley Drive Fort Worth, TX 76119 , CONTRACTOR, hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Sure of any of irs obligations to Crnwn nan+eanduddmga,fOuver! City of Fort Worth 200 Texas Street Fort Worth, TX 76102 as set forth in said Surety's bona. +''' ` g IN WITNESS WRl3RROR, the Surety Iw hereunto set its hand on this elate: August 14, 2024 (fnsttrl hi o lting (be nwntb followed kt The nwrrerk ctrr+rural rear r .Fattest: r �,lrury, '' The Hanover Insurance Company � 1 By: fS�gna+urr oJurr/bor�zrrl +�rJ�r ii Holly Clevenger Attorney -in -Fact (Aiolled r+a+r+e awl +&&) G707---1994 THE HANOVER INSURANCE COMPANY MASSACHUSETTS BAY INSURANCE COMPANY CITIZENS INSURANCE COMPANY OF AMERICA POWER OF ATTORNEY THIS Power of Attorney limits the acts of those named herein, and they have no authority to bind the Company except in the manner and to the extent herein stated. KNOW ALL PERSONS BY THESE PRESENTS: That THE HANOVER INSURANCE COMPANY and MASSACHUSETTS BAY INSURANCE COMPANY, both being corporations organized and existing underthe laws of the State of New Hampshire, and CITIZENS INSURANCE COMPANY OF AMERICA, a corporation organized and existing under the laws of the State of Michigan, (hereinafter individually and collectively the "Company') does hereby constitute and appoint, Jack M. Crowley, Laurie Pflug, Holly Clevenger and/or Christine Clinger Of Willis Towers Watson Insurance Services West, Inc of Dallas, TX each individually, ifthere be more than one named, as its true and lawful attorneys) -in -fact to sign, execute, seal, acknowledge and deliver for, and on its behalf, and as its act and deed any place within the United States, any and all surety bonds, recognizances, undertakings, or other surety obligations. The execution of such surety bonds, recognizances, undertakings or surety obligations, in pursuance of these presents, shall be as binding upon the Company as if they had been duly signed by the president and attested by the secretary of the Company, in their own proper persons. Provided however, that this power of attorney limits the acts of those named herein; and they have no authority to bind the Company except in the manner stated and to the extent of any limitation stated below: Any such obligations in the United States, not to exceed Fifty Million and No/100 ($50,000,000) in any single instance That this power is made and executed pursuant to the authority of the following Resolutions passed by the Board of Directors of said Company, and said Resolutions remain in full force and effect: RESOLVED: That the President or any Vice President, in conjunction with any Vice President, be and they hereby are authorized and empowered to appoint Attorneys -in -fact of the Company, in its name and as it acts, to execute and acknowledge for and on its behalf as surety, any and all bonds, recognizances, contracts of indemnity, waivers of citation and all other writings obligatory in the nature thereof, with powerto attach thereto the seal ofthe Company. Any such writings so executed by such Attorneys -in -fact shall be binding upon the Company as if they had been duly executed and acknowledged by the regularly elected officers of the Company in their own proper persons. RESOLVED: That any and all Powers of Attorney and Certified Copies of such Powers of Attorney and certification in respect thereto, granted and executed by the President or Vice President in conjunction with any Vice President of the Company, shall be binding on the Company to the same extent as if all signatures therein were manually affixed, even though one or more of any such signatures thereon may be facsimile. (Adopted October 7,1981— The Hanover Insurance Company; Adopted April 14, 1982 — Massachusetts Bay Insurance Company; Adopted September 7, 2001— Citizens Insurance Company of America and affirmed by each Company on March 24, 2014) IN WITNESS WHEREOF, THE HANOVER INSURANCE COMPANY, MASSACHUSETTS BAY INSURANCE COMPANY and CITIZENS INSURANCE COMPANY OF AMERICA have caused these presents to be sealed with their respective corporate seals, duly attested by two Vice Presidents, this 28' day of June, 2024 C.:. O(Z) ,�,,, I he Ilaauver IUNUMICe l:umpaay Massachusetts Bay Insurance Company Citizens Insurance Company -of America Vs H. Kawiecki. Vice President STATE OF CONNECTICUT ) COUNTY OF HARTFORD ) ss. The Ilanoter Insurdnce Cumpany achusetta Bay Insurance Company G li ss Insurance CompanN of America Ilan M. Mendoza, Vice President On this 2811 day of June, 2024 before me came the above named Executive Vice President and Vice President of The Hanover Insurance Company, Massachusetts Bay Insurance Company and Citizens Insurance Company of America, to me personally known to be the individuals and officers described herein, and acknowledged that the seals affixed to the preceding instrument are the corporate seals of The Hanover Insurance Company, Massachusetts Bay Insurance Company and Citizens Insurance Company of America, respectively, and that the said corporate seals and their signatures as officers were duly affixed and subscribed to said instrument by the authority and direction of said Corporations. Wendy Latoumes Notary Fabric, State of conreclicut ir+ty Coirmissim Expires July 31. 2025 I t wx 6 Mndr atouWies, otstjublillc My eommissor expires July 31, 2025 I, the undersigned Vice President of The Hanover Insurance Company, Massachusetts Bay Insurance Company and Citizens Insurance Company of America, hereby certify that the above and foregoing is a full, true and correct copy of the Original Power of Attorney issued by said Companies, and do hereby further certify that the said Powers of Attorney are still in force and effect. GIVEN under my hand and the seals of said Companies, at Worcester, Massachusetts, this 14th day of August 2024. CERTIFIED COPY Thalesurance .omezey >i c u Bar Ins Ci n sursace he Rowedder, Vice Presides