FORT WORTH City of Fort worth
'Ir- I Change Order Request
Project Name: Northside IV 24-Inch Water Transmission Main Phase 1 B City Sec No.: 58684 1
Project No.(s)] 56020 0700430 5740010 102687 001780 1 DOE No. I N/A City Proj. No.: 102687
24-inch water transmission main extends from Heritage Trace Parkway to Bonds Ranch Road along Business Highway
Project Description: 287
Contractors1 Jackson Construction, Ltd.
City Project Mgr.1 Suzanne Abbe
Phone Number: 817-392-8209
Dept. Water
Change Order # 2 I Date: 9/6/2024
City Inspector: Shane Behn
Phone Number: 682-328-1264
I Totals I Contract Time
fCalender days)
Original Contract Amount $10,499,744.25
Extras to Date $0.00
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date $10,499,744.25
Amount of Proposed Change Order $0.00
Revised Contract Amount $10,499,744.25
Original Funds Available for Change Orders $262,494.00
Remaining Funds Available for this CO $262,494.00
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAXALLOWABLE CONTRACTAMOUNT (ORIGINAL CONTRACT COST+ 25%)
$10,499,744.25
1460
0120
$0.00
$10,499,744.25
$0.00
045
$10,499,744.25
625
$262,494.00
$262,494.00
0.00%
$13,124,680.31
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Change Order No. 2 provides for the cost to extend electrical service to the flow transfer station site.
Staff recommends an addition of 45 calendar days to final acceptance to allow replacement of the flow meter at the flow transfer station. The
flow meter is in service but the manufacturer wishes to replace it because of a faulty empty pipe indicator.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full (both time and money) for all costs arising out of, or incidental to, the above Change Order.
Contractor's Company Name Contractor Name I Contractor i nature Date
Jackson Construction, Ltd. Troy Jackson 8
Inspector
Date
Project Manager
Date
9/9/24
5/9/2024
Director(Water Dept)
Date
Construction Supervisor Water Dept
Date
T.S.
Sep 10, 2024
9/9/2024
Senior Assistant City Attorney
Date
A tant City Manager
Date
G
Sep 11, 2024
Sep 11, 2024
Council Action If Required)
M&C Number N/A
M&C Date Approved ' N/A
UFFIGIAL Kt(:UKU
CITY SECRETARY
FT. WORTH, TX
FORT WORTH City of Fort Worth
----�''!Change Order Additions
Project Name Northside IV 24-Inch Water Transmission Main Phase 1 B City Sec No.: 1 58684
Project No.(s): 56020 0700430 5740010 102687 001780 1 DOE No.1 N/A I City Proj. No.: 1 102687
Project 24-inch water transmission main extends from Heritage Trace Parkway to Bonds Ranch Road along Business Highway
Description 287.
Contractor Jackson Construction, Ltd. Change Order: 2 Date: 1 9/6/2024 9/6/2024
City Project Mgr. Suzanne Abbe City Inspector I Shane Behn
ADDITIONS
I I tM UESCRIF I IUN DEPT Qty Unit Unit Cost Total
56 TriCounty Electric Service Extension Water 1.00 LS $1,483.75 $1,483.75
Water $1,483.75
Page 1 of 1 lAdditions Sub Total $1,483.75
FORT` W"a-r" City of Fort Worth
-VI.- Change Order Deletions
Project Name I Northside IV 24-Inch Water Transmission Main Phase 1 B City Sec No.: 58684
Project No.(s): 56020 0700430 5740010 102687 001780 I DOE No. I N/A City Proj. No.: 102687
Project Description 24-inch water transmission main extends from Heritage Trace Parkway to Bonds Ranch Road along Business
Highway 287.
Contractor Jackson Construction, Ltd. I Change Order: F2 Date I 9/6/2024
City Project Mgr. Suzanne Abbe City Inspector: I Shane Behn
ITEM IDESCRIPTION
50 Construction Allowance
DELETIONS
I DEPT I Qty (Unit IUnit Cost (Total
Water 0.009273438 LS $160,000.00 $1,483.75
Water $1,483.75
Deletions Sub Total $1,483.75
Page 1 of 1
I
MIWBE Breakdown for this Change Order
MWBE Sub I Type of Service I Amount for this CO
Total $0.00 1
Previous Change Orders
CO# I DATE I AMOUNT
Total $0.00 1
Page 1 of 1
TO:
TRI-COUNTY ELECTRIC COOPERATIVE
Taking Care of Our Member -Owners
Field Services: 817-752-8172
WHECO CONTROLS
FOR: 11501 N SAGINAW BLVD
JOB COSTS
Construction Costs:
Miscellaneous Sales:
JOB CREDITS
Miscellaneous Credits (If Applicable):
Member Credit (If Applicable):
Total Cost:
Total Credit:
Tax:
Expires On: October 07, 2024
TYPE
PRI
SVC
SEC
CONS
INSTALL
OH
0
30
0
1
INSTALL
UG
0
0
0
0
RETIRE
OH
0
0
0
0
RETIRE
UG
0
0
0
0
INVOICE #: PT41466
DATE: 07/09/2024
EXPIRES: 10/07/2024
BY: Lani
$ 2,272.17
$ 0.00
Total Costs: $ 2,272.17
$
0.00
$
-901.49
Total Credits: $
-901.49
$
2,272.17
$
-901.49
$
113.08
Grand Total: $
1,483.76
INVOICE
POLES
TRANSF
LIGHTS
METERS
0
1
0
0
0
0
0
0
ALEDO AZLE GRANBURY
KELLER SEYMOUR
200 Bailey Ranch Rd 600 N W Parkway 1623 Weatherford Hwy
4900 Keller Hicks Rd 419 North Main Street
Aledo, TX 76008 Azle, TX 76020 Granbury, TX 76048
Keller, TX 76244 Seymour, TX 76380
THIS COST ESTIMATE IS GOOD FOR 90 DAYS.
EXPIRATION: 10/07/2024 2
9/6/2024
Northside IV 24-Inch Water Transmission Main Phase 113
CSC No.: 58684
CPN:102687
Change Order 2 Notes
Staff has reviewed the requested days and considers them to be fair and reasonable.
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Signature
Suzanne Abbe
Name of Employee
Senior Engineer, Capital Project Delivery