HomeMy WebLinkAboutContract 59845-CO1*14 • C031 FORT W00R1H City of Fort worth W"— Change Order Request Project Name:1 Backup Power and Electrical Improvements at Four Pump Stations City Sec No.: 1 59846 Project No.(s):I I DOE No. IN /A I City Proj. No.:, p 03410-2 1 Project Description: Installation of Backup Generators, Electric Motor and Switchgear Replacement and otherimprovements at Four Pump Stations (Altamesa, Edwards Ranch Easlside and Como Pump Stations Contractor:I ACME Electric Company Change Order # 1 Date: 7/10/2024 City Project Mgr.I David R. Townsend, P.E. City Inspector: Ronnie Cardenas Phone Number:' 716-392-8430 Phone Number: 682-309-3761 Dept. Water Unit I Sewer Unit 2 TPW Unit 3 Totals Contract Time I (Calender days] Original Contract Amount $23,119,632.00 $23,119,632.00 1,090 Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date 1.090 Amount of Proposed Chanqe Order $39.177.34 $39„177.34 evised Contract Amount $23 158,809.34 $23,158,809.34 1,090 Original Funds Available for Change Orders $3�6,794.00 $346,794.00 Remaining Funds Available for this CO $346,794.00 $346,794.00 Additional Funding (if necessary) CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 0.17% MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $28,899,540.00 JUSTIFICATION (REASONS) FOR CHANGE ORDER The contract change is to add'two inches of encapsulated insulation in the precast wall of the two electrical buildings at Altalmesa Pump Station and Edwards Ranch Pump Station r� ,h OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents CD payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. I Contractor's Company Name I re Contractor Name I Contractor SZr7qa4w I Date CD 1180, ACME Electric Company 1�rr`tri f' �✓� IfScrl,t / %/'%/,(�1 nsAotor Date ProluuAega er Date 2 y Director ater Dept) r Date Constrryction Supervisor Date o _ . X S.Sep 16, 2024/'�� 4age'r* Assistant City Attorney Date AssistantCityI Date Sep 16, 2024 �� Sep 16, 2024 Council Action (if Required) M&C Number N/A M&C Dale Approved NIA FoRI NVosrt_t City of Fort Worth 7' Change Order Additions Project Name I Backup Power and Electrical Improvements at Four Pump Stations I City Sec k 1 59846 1 Client Project# 1 2699 1 Conlractorl Acme Electric Company I PMI David R. Townsend, P.E. Inspectorl Ronnie Cardenas I Change Order Submittal # 0 Date 8121 Ut2U24 ADDITIONS IItM UESGKIPIIUN Uhl'I U Unit Unll Uost Iotal 1 1 UP•001 Add H1.6lnsulabon In Precase Concrete Walls atAllamesa and tdwarNVater Unit 1 1LUW000 LACK 539,111.14 $39,17L'141 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1 1 I I I I I � I I I I I I 1 1 I I I I I Water Unit 1 $39,177.341 1 1 1 Sub Total Additions $39.177.341 Change Order Additions Page 1 of 1 rr�urN%lol_i± City of Fort Worth Change Order Deletions Project Name I Backup Power and Electrical Improvements at Four Pump Stations City Sec # 1 59846 1 Client Project # 1 2699 Conbactorl Acme Electric Company I PMI David R. Townsend, P.E. l Inspeclorl Ronnie Cardenas Change Order Submittal # Date BI20/2024 DELETIONS IILM DESCHIPIIUN I DEPI Uly Unit Unit Cost lolal l I � I � I I ( I I I I I Water Unit I Sub Total Deletions $0.00 $0.001 Change Order Deletions Page 1 of 1 MISBE for this Change Order MISBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders co # DATE AMOUNT Total $0.00 City of Fort Worth PENDING CHANGE REQUEST COST ANALYSIS To be completed by General Contractor or Subcontractor as outlined in the Uniform General Conditions Section 6.6.1 PROJECT: Generator Backup Q 4 PS Work performed by: JOB NO. 2699 ( X ) General Con( ) Subcontractor CONTRACTOR: Acme Electric Ifsubcontrauor, give Co. name: PCMN: I CPRit: 0 Time Extension (if my): RFlti: ASK 0 Description of Change: Change order based on engineer comments. ADDITIONS AND/OR [CREDITS] EXTENSION A B C D Description Quantity Unit Cost/Unit Material Labor Equip. Trans. ,Archer Western I EA $0.00 $34,067.25 $0.00 $0.00 Subtotals $34,067.25 $0.00 $0.00 Line 1: Enter total of Columns A+B+C+D+E Line If: Enter 49% ofCol B for Workman's Comp. Social Security, and like taxes Line III: Enter total Col E (Storage) Line IV: If Line 1 indicates an ADD, Enter 15% of Line I. If Line I indicates CREDIT, enter -0- Line V: Total Line I thru Line IV Enter here and on Summary Sheet SIGNATURE: CONTRACTOR/SUBCONTRACTOR DATE: SIGNATURE: DATE: Archer Westem $0.00 $34,067.25 $0.00 $0 $5, l 10.09 $39,177.34 E Storage OWNER: CITY OF FORT WORTH, TX ENGINEER: FREESE AND NICHOLS COMPANY ARCHER WESTERN 041 Item I Can oeSalatlon I MATERUU. EQUIPMENT 1 toFBpi:tOt9 , t MISCELlAt1E0US t RtiiMS t 1 I U I ALS: Change Proposal CP- 001 City of Fort Worth, TX Backup Power, Ebdrlal Imprpvemords at 4 Pump Stations WORT( DESCRIPTION: CIT Y 1 UOM I UNITn'RICE I 1.00 ILS I S31,I500.00I 0.00 1 W 1 30.00 Labor Burden 60% of Labor Small Toots ® 10% of Labor Sa( Suap'ka �17;5 OI Labor I VIAL UIREOI f:S\li: OH&P ® 15h OHBP Subcontractor @ 5% Insurance and Bond 3%10%s.pSwto_,.ar .I) Subtotal: IUTALAMUUNI Ih13l,USI YRUI1UWkL5UMM/tht ............................... Cleriticatlona; This change notice Includes all labor, material and suparvlslon to Compote the scope of work. We reserve the right to Correct thts change order for onom or omlaslons. Thia pdoo Is good for acceptance within 10 days from the date of rocelpL page Coat change per submittal ravlow ED-037. Add R7.41 Insulation In Precast Concrete WCIis at AJUuncaa and Edwards Ranch Pump Strtlon. Labor I Material I Eoulcmant 1 St.bcontmetor I 331.5(1Q� Sl1.Uu 41J.l1U" Sd1.OW.VU I I Totaw j I1 Wr2 191 331.5 331. 43I. 5 Jcalr�b4nrete Precast Concrete Manufacturer/Subcontractor P.O. Box 15580 Fort Worth, TX 76119 817-478-1137 To: Jaime Sisniega, Archer Western. From: Knox Ross Re: Fort Worth/Power Upgrades Date:1/18/2024 Per your request, we have prepared a change order proposal to add two inches of encapsulated insulation in the precast walls for the two buildings on this project. We propose to perform this work for an additional amount of $31,500. [Note: This would result in an 11" thick (7/2/2) wall panel profile. This would require a 13" deep 'brick shelf' in the foundations]. If this is acceptable, please issue a change order in this amount. If you have any questions, please let me know. David Beckman From: Bill Pannell Sent: Friday, March 8, 2024 3:47 PM To: Alan Cossabone; David Beckman; Robb Otey; Jacob Schababerle Subject: FW: Change Proposal CP-001, Four Pump Stations project Attachments: CP-001-Add R7.6 Insulation to Precast Concrete -Amber Batista -Pending.pdf FYI — never seen one come back like this from FTW, but I'll take itlil Will work on this Monday AM Bill Pannell 1 Construction Manager 1 Freese and Nichols, Inc. 1817-666-51551 bill.nannellamfreese.com 1 www.freese.com !!�PREESE �� 'tYICHaLS From: Townsend, David <David.Townsend@fortworthtexas.gov> Sent: Friday, March 8, 2024 2:52 PM To: Bill Pannell <Bill.Pannell @freese.com> Subject: RE: Change Proposal CP-001, Four Pump Stations project You don't often get email from david.townsend(@fortvyorthtexas.eov. Learn why this is imnortant This is an email from an EXTERNAL source. DO NOT click links or open attachments without positive sender verification of purpose. Never enter USERNAME, PASSWORD or sensitive information on linked pages from this email. Please report all suspicious messages using the Report Message button in Outlook. CP-01: Insulation in Precast Walls at Alta Mesa and Edwards Ranch Pump Station Back-up Power and Electrical Improvements at Four Pump Stations Project No. 103410-2 This office has reviewed your correspondence dated March 8, 2024, regarding the change proposal (CP-01) for the installation of 2 inches of encapsulated insulation in the pre -cast walls for the new building Alta Mesa and Edwards Ranch Pump Stations, requested as part of the review comments for SD-057 (Precast Walls). The Water Department agrees with your recommendation that the contractor's proposed cost of $39,117.245 should be accepted for this work, as the cost is fair and reasonable. This office will recommend to the City Council (and/or the City Manager's Office), the approval and acceptance of this additional cost in the form of a change order to be prepared and submitted by you to this office. David R,. Townsend, P.E. Facilities Engineering Manager Fort Worth Water Department From: Bill Pannell <Bill.Panne II(@freese.com> Sent: Friday, March 8, 202411:41 AM To: Townsend, David <David.Townsend(@fortworthtexas.Rov> Subject: RE: Change Proposal CP-001, Four Pump Stations project CAUTION: This email originated from outside of the City of Fort Worth email system. Do not click any links or open attachments unless you recognize the sender and know the content is safe. Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Digitally signed by David R. Townsend, David R. Townsend, PE PE Date: 2022.12.28 16:43:46-06'00' Signature David Townsend Name of Employee Engineering Manager Title 4,d490pntl F41S; AR cp0F . p 40 ddpo 9p=� o °oa9aSoo4oATTEST: ° �°° o XA sd �nF Jannette Goodall City Secretary OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX