FORT W00R1H City of Fort worth
W"— Change Order Request
Project Name:1
Backup Power and Electrical Improvements at Four Pump Stations
City Sec No.: 1 59846
Project No.(s):I
I DOE No. IN /A
I City Proj. No.:, p 03410-2 1
Project Description:
Installation of Backup Generators, Electric Motor and Switchgear Replacement and otherimprovements at Four Pump
Stations (Altamesa, Edwards Ranch Easlside and Como Pump Stations
Contractor:I
ACME Electric Company Change Order #
1 Date: 7/10/2024
City Project Mgr.I
David R. Townsend, P.E. City Inspector:
Ronnie Cardenas
Phone Number:'
716-392-8430 Phone Number:
682-309-3761
Dept. Water Unit I Sewer Unit 2 TPW Unit 3
Totals
Contract Time I
(Calender days]
Original Contract Amount $23,119,632.00
$23,119,632.00
1,090
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
1.090
Amount of Proposed Chanqe Order $39.177.34
$39„177.34
evised Contract Amount $23 158,809.34
$23,158,809.34
1,090
Original Funds Available for Change Orders $3�6,794.00
$346,794.00
Remaining Funds Available for this CO $346,794.00
$346,794.00
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
0.17%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
$28,899,540.00
JUSTIFICATION (REASONS) FOR CHANGE ORDER
The contract change is to add'two inches of encapsulated insulation in the precast wall of the two electrical buildings at Altalmesa
Pump
Station and Edwards Ranch Pump Station
r�
,h
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents
CD
payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order.
I Contractor's Company Name I
re
Contractor Name I Contractor SZr7qa4w
I Date
CD 1180, ACME Electric Company
1�rr`tri f' �✓� IfScrl,t /
%/'%/,(�1
nsAotor
Date ProluuAega er
Date
2 y
Director ater Dept)
r Date Constrryction Supervisor
Date
o _ . X
S.Sep 16, 2024/'�� 4age'r*
Assistant City Attorney
Date AssistantCityI
Date
Sep 16, 2024 ��
Sep 16, 2024
Council Action (if Required)
M&C Number N/A
M&C Dale Approved NIA
FoRI NVosrt_t City of Fort Worth
7' Change Order Additions
Project Name I Backup Power and Electrical Improvements at Four Pump Stations I City Sec k 1 59846 1
Client Project# 1 2699 1
Conlractorl Acme Electric Company I PMI David R. Townsend, P.E. Inspectorl Ronnie Cardenas I
Change Order Submittal # 0 Date 8121 Ut2U24
ADDITIONS
IItM UESGKIPIIUN Uhl'I U Unit Unll Uost Iotal 1
1 UP•001 Add H1.6lnsulabon In Precase Concrete Walls atAllamesa and tdwarNVater Unit 1 1LUW000 LACK 539,111.14 $39,17L'141
I
I
I
I
I
I
I I
I
I
I
I
I
I
I
I
I I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
1
1
I
I
I
I I
� I
I
I
I I
I
1 1
I
I
I
I I
Water Unit 1 $39,177.341
1
1
1
Sub Total Additions $39.177.341
Change Order Additions Page 1 of 1
rr�urN%lol_i± City of Fort Worth
Change Order Deletions
Project Name I Backup Power and Electrical Improvements at Four Pump Stations City Sec # 1 59846 1
Client Project # 1 2699
Conbactorl Acme Electric Company I PMI David R. Townsend, P.E. l Inspeclorl Ronnie Cardenas
Change Order Submittal # Date BI20/2024
DELETIONS
IILM DESCHIPIIUN I DEPI Uly Unit Unit Cost lolal l
I �
I �
I
I
(
I
I
I
I
I
Water Unit I
Sub Total Deletions
$0.00
$0.001
Change Order Deletions Page 1 of 1
MISBE for this Change Order
MISBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
co # DATE AMOUNT
Total $0.00
City of Fort Worth
PENDING CHANGE REQUEST COST ANALYSIS
To be completed by General Contractor or Subcontractor
as outlined in the Uniform General Conditions Section 6.6.1
PROJECT: Generator Backup Q 4 PS
Work performed by:
JOB NO. 2699
( X ) General Con( ) Subcontractor
CONTRACTOR: Acme Electric
Ifsubcontrauor, give Co. name:
PCMN: I
CPRit: 0
Time Extension (if my):
RFlti:
ASK
0
Description of Change: Change order based on engineer comments.
ADDITIONS AND/OR [CREDITS] EXTENSION
A B C D
Description Quantity Unit Cost/Unit Material Labor Equip. Trans.
,Archer Western I EA $0.00 $34,067.25 $0.00 $0.00
Subtotals $34,067.25 $0.00 $0.00
Line 1: Enter total of Columns A+B+C+D+E
Line If: Enter 49% ofCol B for Workman's
Comp. Social Security, and like taxes
Line III: Enter total Col E (Storage)
Line IV: If Line 1 indicates an ADD, Enter 15% of Line I.
If Line I indicates CREDIT, enter -0-
Line V: Total Line I thru Line IV
Enter here and on Summary Sheet
SIGNATURE:
CONTRACTOR/SUBCONTRACTOR
DATE:
SIGNATURE: DATE:
Archer Westem
$0.00
$34,067.25
$0.00
$0
$5, l 10.09
$39,177.34
E
Storage
OWNER:
CITY OF FORT WORTH, TX
ENGINEER:
FREESE AND NICHOLS
COMPANY
ARCHER WESTERN
041 Item I
Can
oeSalatlon I
MATERUU.
EQUIPMENT
1
toFBpi:tOt9
,
t
MISCELlAt1E0US
t
RtiiMS t
1
I U I ALS:
Change Proposal CP- 001
City of Fort Worth, TX
Backup Power, Ebdrlal Imprpvemords at 4 Pump Stations
WORT( DESCRIPTION:
CIT
Y
1 UOM
I UNITn'RICE I
1.00 ILS
I S31,I500.00I
0.00 1 W
1 30.00
Labor Burden 60% of Labor
Small Toots ® 10% of Labor
Sa( Suap'ka �17;5 OI Labor
I VIAL UIREOI f:S\li:
OH&P ® 15h
OHBP Subcontractor @ 5%
Insurance and Bond 3%10%s.pSwto_,.ar .I)
Subtotal:
IUTALAMUUNI Ih13l,USI YRUI1UWkL5UMM/tht ...............................
Cleriticatlona;
This change notice Includes all labor, material and suparvlslon to
Compote the scope of work. We reserve the right to Correct thts
change order for onom or omlaslons. Thia pdoo Is good for
acceptance within 10 days from the date of rocelpL
page
Coat change per submittal ravlow ED-037. Add R7.41 Insulation In
Precast Concrete WCIis at AJUuncaa and Edwards Ranch Pump
Strtlon.
Labor I Material I Eoulcmant 1 St.bcontmetor I
331.5(1Q�
Sl1.Uu 41J.l1U" Sd1.OW.VU I
I
Totaw j
I1
Wr2
191
331.5
331.
43I.
5
Jcalr�b4nrete
Precast Concrete Manufacturer/Subcontractor
P.O. Box 15580 Fort Worth, TX 76119 817-478-1137
To: Jaime Sisniega, Archer Western.
From: Knox Ross
Re: Fort Worth/Power Upgrades
Date:1/18/2024
Per your request, we have prepared a change order proposal to add two inches of
encapsulated insulation in the precast walls for the two buildings on this project. We
propose to perform this work for an additional amount of $31,500. [Note: This would
result in an 11" thick (7/2/2) wall panel profile. This would require a 13" deep 'brick
shelf' in the foundations]. If this is acceptable, please issue a change order in this
amount.
If you have any questions, please let me know.
David Beckman
From: Bill Pannell
Sent: Friday, March 8, 2024 3:47 PM
To: Alan Cossabone; David Beckman; Robb Otey; Jacob Schababerle
Subject: FW: Change Proposal CP-001, Four Pump Stations project
Attachments: CP-001-Add R7.6 Insulation to Precast Concrete -Amber Batista -Pending.pdf
FYI — never seen one come back like this from FTW, but I'll take itlil Will work on this Monday AM
Bill Pannell 1 Construction Manager 1 Freese and Nichols, Inc. 1817-666-51551 bill.nannellamfreese.com 1 www.freese.com
!!�PREESE
�� 'tYICHaLS
From: Townsend, David <David.Townsend@fortworthtexas.gov>
Sent: Friday, March 8, 2024 2:52 PM
To: Bill Pannell <Bill.Pannell @freese.com>
Subject: RE: Change Proposal CP-001, Four Pump Stations project
You don't often get email from david.townsend(@fortvyorthtexas.eov. Learn why this is imnortant
This is an email from an EXTERNAL source. DO NOT click links or open attachments without positive
sender verification of purpose. Never enter USERNAME, PASSWORD or sensitive information on linked
pages from this email. Please report all suspicious messages using the Report Message button in Outlook.
CP-01: Insulation in Precast Walls at Alta Mesa and Edwards Ranch Pump Station
Back-up Power and Electrical Improvements at Four Pump Stations
Project No. 103410-2
This office has reviewed your correspondence dated March 8, 2024, regarding the change proposal (CP-01) for
the installation of 2 inches of encapsulated insulation in the pre -cast walls for the new building Alta Mesa and
Edwards Ranch Pump Stations, requested as part of the review comments for SD-057 (Precast Walls). The Water
Department agrees with your recommendation that the contractor's proposed cost of $39,117.245 should be
accepted for this work, as the cost is fair and reasonable.
This office will recommend to the City Council (and/or the City Manager's Office), the approval and acceptance of
this additional cost in the form of a change order to be prepared and submitted by you to this office.
David R,. Townsend, P.E.
Facilities Engineering Manager
Fort Worth Water Department
From: Bill Pannell <Bill.Panne II(@freese.com>
Sent: Friday, March 8, 202411:41 AM
To: Townsend, David <David.Townsend(@fortworthtexas.Rov>
Subject: RE: Change Proposal CP-001, Four Pump Stations project
CAUTION: This email originated from outside of the City of Fort Worth email system. Do not click any links or open
attachments unless you recognize the sender and know the content is safe.
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Digitally signed by David R. Townsend,
David R. Townsend, PE PE
Date: 2022.12.28 16:43:46-06'00'
Signature
David Townsend
Name of Employee
Engineering Manager
Title
4,d490pntl
F41S; AR
cp0F .
p 40
ddpo
9p=�
o
°oa9aSoo4oATTEST:
° �°°
o
XA
sd �nF
Jannette Goodall
City Secretary
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX