HomeMy WebLinkAboutContract 60542-CO1FORT WORTH City of Fort Worth CSC NO. 60542-COI Change Order Request Project Name: Southside IV Flow Transfer Station at Summer Creek Drive City Sec No.: 1 60542 1 Project No.(s):1 56003 0600430 5740010 103116 001680 1 DOE No. I N/A CityProj. No.: l 103116-2 Project Description:) New flow transfer station and water line and valve connections to support service to the new southside IV pressure plane, Contractor: Circle H Contractors, LP Change Order # 1 1 Date: 8/29/2024 City Project Mgr.1 Suzanne Abbe City Inspector: Ronnie Cardenas Phone Number: 817-392-8209 Phone Number: 682-309-3761 Dept, Water Totals Contract Time (Calender days) Original Contract Amount $1,341,236.00 $1,341,236,00 180 Extras to Dale Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date $1,341,236.00 I $1,341,236.00 Amount of Proposed Change Order $0.00 I $0.00 090 Revised Contract Amount $1,341,236.00 I $1,341,236.00 270 Original Funds Available for Change Orders $67,062.00 $67,062.00 Remaining Funds Available for this CO $67,062.00 I $67,062.00 Additional Funding (if necessary) CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) 1$1,676,545.00 JUSTIFICATION (REASONS) FOR CHANGE ORDER Change Order No. 1 provides for: • Additional concrete pavement repair due to the the stub -out of an existing water line that this project connects to being farther north than the location shown in the the record drawings. Addition of a pay item for re -striping a stop bar and cross walk at Rancho Verde Parkway that was inadvertently omitted at bid time. Staff recommends an addition of 90 calendar days to cover delays in getting electical power to the site. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or Incidental to, the above Change Order. Contractor's Company Name Circle H Contractors, LP Contractor Name Brad Owens nlractor Signature I Date a ' �✓ Inspector Date Project Manager Date Ronnie Cardenas II a-11-24 I Director:(Water Dept) Date ctton Su{o�rvisor (Wafer Dept) %Z� C7stant Date ,„ . ,.., _., „ „ ,,, S. Sep 16, 2024 A!&6Z/ZddrL 1/10004 Senior Assistant Cfty Attorney Date A City Manager Date ", '2 , , Sep 16, 2024 > — Sep 16, 2024 Council Action'(If Required) ' M&C Number N/A I M&C Date Approved N/A FfJRT �W[�►RTH City of Fort worth Change Order Additions Project Name I Southside IV Flow Transfer Station at Summer Creek Drive I City Sec No,: I 60542 Project No.(s): J 56003 0600430 5740010103116 001680 I DOE No.I N/A City Proj. No.: I 103116-2 Project New flow transfer station and water line and valve connections to support service to the new southside IV pressure Description plane. Contractor J Circle H Contractors, LP J Change Order: Date: I 8/29/2024 City Project Mgr. I Suzanne Abbe I City Inspector J Ronnie Cardenas Ali MONS tl tNt UESCKIN I IUN DEPT Qty Unit Unit Cost i Total 20 Concrete Pavement Repair 18,00 SY lWater I $126.00 $2,268.00 40 Striping I I I I I IWater I 1.00�LS I I � J I I I I I I JJ $1,750.00 $1,750.00 I I I I I I I I l , I I I I I I I ( I I j I I I I Water i I I I fI (I( I �$4,018.00 Page 2 of 4 Additions Sub Total 44,018.00 FORT `VYORT.H City of Fort Worth -�" Change Order Deletions Project Name Southside IV Flow Transfer Station at Summer Creek Drive City Sec No.: 60542 Project No.(s): 56003 0600430 5740010103116 001680 1 DOE No. ( N/A ( City Proj. No.: 103116-2 Project Description I New flow transfer station and water line and valve connections to support service to the new southside IV pressure plane. Contractor Circle H Contractors, LP Change Order: F-1-1 Date 8/29/2024 City Project Mgr. , Suzanne Abbe City Inspector: I Ronnie Cardenas DELETIONS ITEM (DESCRIPTION lWater DEPT I City Unit Unit Cost Total 39 Construction Allowance 0.08036 EA 1$50,000.00 $4,018.00 I Water �$4,018.00 Deletions Sub Total 1$4,018.00 Page 3 of 4 MIWBE Breakdown for this Change Order MWBE Sub Type of Service I Amount for this CO Total $0.00 Previous Change Orders c0 # DATE AMOUNT Signature: Email: Suzanne.Abbe@fortworthtexas.gov Total $0.00 Page 4 of 4 7/10/24 Backup Power and Electrical Improvements at Four Pump Stations CSC: 59846 CPN: 103410-2 Change Order 1 Notes Staff has reviewed the requested prices and considers them to be fair and reasonable. Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Digitally signed by David R. Townsend, David R. Townsend, PE PE Date: 2022.12.28 16:43:46-06'00' Signature David Townsend Name of Employee Engineering Manager Title pobuvnpn ATTEST: o*°O//V000 $ °° °a Qn rEXA`�o4 �baaaaao Jannette Goodall City Secretary OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX