HomeMy WebLinkAboutContract 61082-CO1CSC No. 61082-COI
FORT WORTH,., City of Fort Worth
—�' Change Order Request
Project Name E. Northside Dr Bridge City Sec # l 61082
Client Project #(s)1 102097
Project Description This project includes the bridge removal and replacement of East Northside Drive eastbound and westbound bridge decks over Samuels Avenue
Contractor IBCTX, LLC Change Order #I 1 I Datel 8/29/2024
City Project Mgr.1 Gustavo A. Vallejo City Inspector) Curtis Hollingsworth
Dept.
Unit 1: Bridge
Contract Time
Totals
(CD)
Original Contract Amount
$3,714,298.00
$3,714,298.00
300
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
$3,714,298.00
$3,714,298.00
300
Amount of Proposed Change Order
$0.00
5
Revised Contract Amount
$3,714,298.00
$3,714,298.00
305
Original Funds Available for Change Orders
$185,715.00
$185,715.00
Remaining Funds Available for this CO
$185,715.00
$185,715.00
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 1 0.00%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) $4,642,872.50
JUSTIFICATION (REASONS) FOR CHANGE ORDER
IN ACCORDANCE WITH THIS CHANGE ORDER, THE CONTRACTOR SHALL: Furnish all labor and material as per Change Order #1.
Change Order #1 provides bid items for the installation of a traffic rail foundation, relocation of crash barriers, and removal and relocation of the Concrete Traffic Barriers needed
for the 2nd phase of traffic control. These items were not included in the original bid proposal.
Time: The total number of days requested by the contractor is 5 calendar days (3 days for the foundation, 1 day for the relocation of the crash barrier, and 1 day for the removal
and relocation of the concrete traffic barrier). Staff approves these additional days.
Cost: The City of Fort Worth has compared the new bid items to the TxDOT average bid items unit prices at the time the change order was created. The City finds that the prices
that the Contractor is proposing are fair and reasonable.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that
he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements.
Contractor's Company Name IContractor (Name) IContract Signature I Date
IBCTX, LLC I Alex Hammes 1 AlISep 312024
Inspector/Inspection Supervisor
Date
Project and Contract Compliance Manager
Date
Sep 3, 2024
Sep 3, 2024
Program Manager
Date
Senior Capital Project Officer
Date
Sep 3, 2024
—
Sep 4, 2024
Assistant Director (Dept)
Date
Director, Contracting Department (Dept)
Date
=�^�ti - �Lll�
Sep 4, 2024
X..,
Sep 4, 2024
ity Attorney
Date
Assistant City Manager
Date
kpr1z.,2..
Sep 6, 2024
�{' Q�
Sep 12, 2024
Council Action (if required)
M&C Number I N/A M&C Date Approved N/A
ATTEST.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
nuy�
ogooRr
b
Jannette Goodall, City Secretary
oho �=p
QaaIlipSq "
bIloao
FORTWORTH
-1---
City of Fort Worth
Change Order Additions
Project Name I E. Northside Or Bridge
City Sec # 1
61082 1
Client Project # 1 102097
1
Contractorl IBCTX, LLC
PMI Gustavo A. Vallejo
Inspectorl Curtis Hollingsworth l
Change Order Submittal # 0
Date 1 8/29/2024
ADDITIONS
I I EM DESCRIP I ION
DEP I Oty
Unit Unit Cost
I otal 1
62 420-6066 Cl C CON RAIL FOUNDATION
Unit 1: Bridge 8.00000000
CY $993.25
$7,946.001
63 512-6029 PORT CT (MOVE)(F-SHAPE (TY 1)
Unit 1: Bridge 510.00000000
LF $24.81
$12,653.101
64 545-6003 CRASH CUSH ATTEN (MOVE & RESET)
Unit 1: Bridge 2.00000000
EA $2,391.25
$4,782.501
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
Unit 1: fridge
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
$25,381,601
1
Sub Total Additions
1
1
$25,381.601
Change Order Additions Page 2 of 4
Foa -
Project Name I E. Northside Dr Bridge
Client Project # 1 102097
Contractorl IBCTX, LLC
ITEM DESCRIPTION
61 9999.0001 Bridge Construction Allowance
City of Fort Worth
Change Order Deletions
City Sec # 61082
1
PMl Gustavo A. Vallejo l Inspectorl Curtis Hollingsworth l
Change Order Submittal # 0 Date 1 8/29/2024 1
DELETIONS
DEPT Oty Unit Unit Cost Total
Unit 1: Bridge 0.2b381600 LS $100,000.00 $25,W.601
Unit 1: fridge $25,381.601
1
1
1
Sub Total Deletions $25,381.601
Change Order Deletions Page 3 of 4
M/SBE for this Change Order
MISBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
co # DATE I AMOUNT
Total 1 $0.00 I
FORTWORTH.
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE• E. Northside Dr Bridge Replacement at Samuels Ave
M&C:
24-0039 CPN:
102097
CSO: 61082
DOC#:
Date:
To:
Name
Department
Initials
Date Out
1
Alex Hammes
IBCTX
Ali
Sep 3 2024
(AHammes(a,IBCTX.com)
AH
2.
Gustavo A. Vallejo
TPW-PM
a 4Y
Sep 3, 2024
3.
Greg Robbins
TPW-PrgM
GRGR
Sep 3, 2024
4.
Mary Hanna
TPW Sr CPO
N
Sep 4, 2024
5.
Patricia Wadsack
TPW AD
pL
Sep 4, 2024
6.
Lauren Prieur
TPW Director
Sep 4, 2024
7
Doug Black
Legal
DB nH
Sep 6, 2024
8
Jesica McEachern
CMO
C'`
Sep 12, 2024
9
TPW Contracts
TPW
10.
CC: Program Manager, Sr. CPO, TPW BSPAP Recon Team, TPW Records Room, TPW Contracts
ALSO List: Bus Sppt: Filoeonio Munoz ; Prg Mgr: _Greg Robbins: Sr CPO: _Mary Hanna
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: ❑YES MNo SAME DAY: ❑YES ®No NEXT DAY: []YES ®No
ROUTING TO CSO: ®YES ❑No
Action Required: ❑ Attach Signature, Initial and Notary Tabs
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
Return To: Please notify TPWContracts(a,fortworthtexas.cov for pickup when complete. Call ext. 7233 or ext.
8363 with questions. Thank you!
CONSTRUCTION CONTRACT ROUTING & TRANSMITTAL SLIP Eff 0l-13-2024, mdhm